1 ENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M TABLE OF CONTENTS Schedule Schedule Name Page Sch 1 Summary of Revenue Requirement 2 Sch 1(A) Summary of Revenue Requirement Offsets 3 Sch 2 Summary of Return on Rate Base 4 Sch 2.1 Summary of Mid Year Rate Base 5 Sch 2.2 Summary of Mid Year EPC Total Capital Structure 6 Sch 2.3 Schedule of Debt Capital Employed 7 Sch 3 Summary of Operating and Maintenance Expense 9 Sch 4 Summary of Depreciation Expense Net of CIAC Amortization 10 Sch 4.1 Capital Assets Continuity Schedule Capital Assets and Accumulated Depreciation 11 Sch 4.2 Summary of Capital Additions Utility Plant Net of CIAC 13 Sch 6 Summary of Customers, Energy and Revenue 14 Sch 7 AESO Charges (SAS Costs) 15 Sch 8 Summary of Payroll and Manpower Statistics 16 Sch 9 Summary of Reserve / Deferral Accounts 17 Sch 10 Reconciliation of Audited Statements of Earnings and Comprehensive Income to N 18 Sch 11 Reconciliation of Audited Balance Sheets 20 Sch 12.1 Explanations 24

2 Table of Contents ENMAX POWER CORPORATION Distribution Summary of Revenue Requirement For the Year Ended December 31, 2017 $M SCHEDULE 1 Line Description (To) (From) 2017 Actual 2016 Actual Actual to Prior Year % 1 Return on Rate Base Sch % 2 System Access Charge Sch % 3 Operating and Maintenance Sch % 4 Depreciation and Amortization Sch % 5 Hearing Costs Sch % 6 Pension Accrual to Cash Adjustment Sch 3 (0.380) (1.655) (129.8%) 7 Subtotal % 8 9 Revenue Requirement Offsets Sch 1(A) (6.582) (5.463) (1.119) (20.5%) Revenue Requirement Sch % Totalling of columns and rows may be influenced by rounding. 2

3 Table of Contents ENMAX POWER CORPORATION Distribution Summary of Revenue Requirement Offsets For the Year Ended December 31, 2017 $M SCHEDULE 1(A) Line Description (To) (From) 2017 Actual 2016 Actual Actual to Prior Year % 1 Distribution, Network & Other Revenue 2 Pole and Duct Rental Revenue % 3 Miscellaneous Revenue (0.023) (3.7%) 4 Contractual Services Revenue % 5 Subtotal % 6 7 Distribution, Network & Other Expense 8 Pole and Duct Rental Expense % 9 Miscellaneous Expense % 10 Contractual Services Expense % 11 Subtotal % Regulated Revenue Services 14 Electrical Services Calgary Zone Revenue (0.172) (9.3%) 15 Electrical Services Calgary Zone Expense (0.205) (16.8%) 16 Subtotal % Unregulated Revenue Services 19 Calgary Water Revenue % 20 Calgary Water Expense % 21 Subtotal (0.500) (0.413) (0.087) (21.2%) Municipalities Revenue % 24 Municipalities Expense (1.840) (1.817) (0.023) (1.3%) 25 Subtotal % Fully Allocated Costs Municipalities and Water % Other Miscellaneous Revenue (0.066) (100.0%) Total Revenue Requirement Offsets Sch 1 Sch % Totalling of columns and rows may be influenced by rounding. 3

4 Table of Contents ENMAX POWER CORPORATION Distribution Summary of Return on Rate Base For the Year Ended December 31, 2017 $M SCHEDULE ACTUAL Line Description (To) (From) Mid Year Capital Ratio Prorated Rate Base Cost Rate % Return $ Actual to Prior Year % 1 Long Term Debt Sch 2.1 1, % % % 2 Common Stock Equity Sch 2.1 1, % % % 3 Mid Year No Cost Capital Sch 2.1 (1.311) 0.00% % % 4 Mid Year Invested Capital Sch 2.1 1, % 1, Return on Mid Year Rate Capital Sch % NOTE: On a normalized basis, EPC's 2017 ROE is below the rate of return of 8.5% allowed by the Commission. The 9.93% return shown on this table is overstated because it includes revenue relating to prior years that has been recognized in 2017 because of accounting rules relating to revenue recognition. The 2017 normalized ROE is 8.33% which is 1.36% lower than shown in schedule ACTUAL Line Description (To) (From) Mid Year Capital Ratio Prorated Rate Base Cost Rate % Return $ 1 Long Term Debt Sch 2.1 1, % % Common Stock Equity Sch 2.1 1, % % Mid Year No Cost Capital Sch 2.1 (1.093) 0.00% % Mid Year Invested Capital Sch 2.1 1, % 1, Return on Mid Year Rate Capital Sch Totalling of columns and rows may be influenced by rounding. 4

5 Table of Contents ENMAX POWER CORPORATION Distribution Summary of Mid Year Rate Base For the Year Ended December 31, 2017 $M SCHEDULE 2.1 Line Description (To) (From) 2017 Actual 2016 Actual Actual to Prior Year % 1 Gross Plant in Service Utility 2 Opening Balance % 3 Closing Balance % 4 Mid Year Gross Utility Plant in Service % 5 6 Accumulated Depreciation Utility 7 Opening Balance % 8 Closing Balance % 9 Mid Year Accumulated Depreciation % Contributions in Aid of Construction 12 Opening Balance % 13 Closing Balance % 14 Mid Year Contributions % Amortization of Contributions 17 Opening Balance % 18 Closing Balance % 19 Mid Year Utility Amortization of Contributions % Mid Year Net Plant in Service % Necessary Working Capital % 24 Mid Year No Cost Capital (1.311) (1.093) (0.218) (19.9%) Mid Year Rate Base Sch % Year End Plant in Service Sch % Totalling of columns and rows may be influenced by rounding 5

6 Table of Contents ENMAX POWER CORPORATION Distribution Summary of Mid Year EPC Distribution Capital Structure For the Year Ended December 31, 2017 $M SCHEDULE 2.2 Line Description (To) (From) 2017 Actual 2016 Actual 2017 Actual Mid Year Capital Prior Year Mid Year Capital Actual to Prior Year % 1 Long Term Debt Sch % 2 Common Equity Sch % 3 4 Total Invested Capital % Please note that the 2016 year end actual debt to equity split is at the deemed structure however the mid year is not. It is not possible to get both the year end and mid year at the deemed in 2016 because there was a change in Generic Cost of Capital between 2015 & Any change to either debt or equity to get the mid year inline with the deemed structure causes the year end to not balance. All numbers disclosed above are Distribution only and not Total EPC. Totalling of columns and rows may be influenced by rounding. 6

7 Table of Contents ENMAX POWER CORPORATION Distribution Schedule of Debt Capital Employed For the Year Ended December 31, 2017 $M SCHEDULE ACTUAL Line (To) (From) Issue Date Maturity Date Coupon Rate Principal Outstanding at Year End Carrying Cost Average Cost of Debt 1 23 Mar Mar % Jun Jun % Jun Jun % Jun 07 1 Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jan Jun % Jan Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Dec Dec % Dec Dec % Dec Dec % Dec Dec % Sch 2.2 Total Long Term Debt % 41 Prior Year % Sch 2.2 Mid Year % Totalling of columns and rows may be influenced by rounding. 7

8 Table of Contents ENMAX POWER CORPORATION Distribution Schedule of Debt Capital Employed For the Year Ended December 31, 2017 $M SCHEDULE ACTUAL Line (To) (From) Issue Date Maturity Date Coupon Rate Principal Outstanding at Year End Carrying Cost Average Cost of Debt 1 23 Mar Mar % Jun Jun % Jun Jun % Jun Jun % Jun 07 1 Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jan Jun % Jan Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Jun Jun % Sch 2.2 Total Long Term Debt % 41 Prior Year % Sch 2.2 Mid Year % Please note that the above schedules represent Distribution's debt and not the total for EPC (Distribution and Transmission). Totalling of columns and rows may be influenced by rounding. 8

9 Table of Contents ENMAX POWER CORPORATION Distribution Summary of Operating and Maintenance Expense For the Year Ended December 31, 2017 $M SCHEDULE 3 Line Description (To) (From) 2017 Actual 2016 Actual Actual to Prior Year % 1 Operating, Maintenance & Administration Expense 2 Distribution % 3 General % 4 Executive Office % 5 Human Resources (0.039) (1.3%) 6 Legal and Regulatory % 7 Corporate Secretariat (0.079) (13.5%) 8 Government and Media Relations (0.299) (24.8%) 9 Finance and CFO (0.366) (10.9%) 10 Facilities % 11 Information Technology % 12 Corporate Costs (0.782) (25.0%) 13 Operating Expense Capitalized (11.314) (10.483) (0.831) (7.9%) 14 Operating Expense Billable Projects (1.186) (1.256) % 15 Other % 16 Total Operating, Maintenance and Administration Sch 1 Sch % Hearing Costs Sch 1 Sch % 19 Pension Accrual to Cash Adjustment Sch 1 Sch 10 (0.380) (1.655) (129.8%) Total Utility Operating and Maintenance Costs % Totalling of columns and rows may be influenced by rounding. 9

10 Table of Contents ENMAX POWER CORPORATION Distribution Summary of Depreciation Expense Net of CIAC Amortization For the Year Ended December 31, 2017 $M SCHEDULE 4 DEPRECIATION EXPENSE NET OF CIAC AMORTIZATION Line Description (To) (From) 2017 Actual 2016 Actual Actual to Prior Year % 1 Distribution Driven Transmission Projects (DDTP) Land % Buildings (0.170) (32.6%) Site Development % Substation Equipment % Telecontrol % Supervisory % Land Rights % Wood Poles % Steel Towers % Steel Poles (0.000) 0.0% Insulators % Overhead Conductor % Underground Conduit % Trans 69kV Conduit % Manholes % Underground Cable LPOF % Underground Cable HPOF % Underground Cable Solid Dielectric % Overhead Aluminum Conductor (0.000) 0.0% 21 Subtotal DDTP % Distribution , 471, 490 & 491 Land and Land Rights % & 492 Buildings (0.010) (65.9%) & 4931 Poles % & 494 Conductors % & 495 Underground Facilities % & 496 Underground Cable % & 497 Transformers % & 498 Telecontrol % Meters % General Assets % Insulators % 35 Subtotal Distribution % General Land % Structures and Improvements % Office Furniture and Equipment % Vehicles % Tools and Instruments (0.073) (5.5%) Radios % Computer Systems Software (0.000) 0.0% Computer Systems Hardware % Computer Systems Enterprise Software % Load Settlement Software (0.001) (2.1%) Software Desktop Applications (0.003) (1.1%) Software Departmental Applications % Computer Hardware Desktop/Laptop % Computer Hardware Infrastructure % 52 Subtotal General % Other 55 Construction Funds Collected from Others & AOH Cap (1.451) (1.407) (0.044) (3.1%) 56 AFUDC/IDC Adjustments % 57 Capital Accrual (0.010) % 58 Other Distribution % 59 Problem Entries % 60 Other % 61 Subtotal Other (1.410) (1.380) (0.030) (2.2%) Total Depreciation Expense Sch 1 Sch % Totaling of columns and rows may be influenced by rounding. 10

11 ENMAX POWER CORPORATION Distribution Capital Assets Continuity Schedule Capital Assets and Accumulated Depreciation Net of CIAC For the Year Ended December 31, 2017 $M Table of Contents SCHEDULE 4.1 PART 1 CAPITAL ASSETS NET OF CIAC 2017 ACTUAL 2016 ACTUAL Line Description (To) (From) Opening Balance Additions Retirements Capital Expenditures Closing Balance Opening Balance Additions Retirements Capital Expenditures Closing Balance 1 Distribution Driven Transmission Projects (DDTP) Land Buildings Site Development (0.144) Substation Equipment (2.027) Telecontrol Supervisory Land Rights Wood Poles (0.014) Steel Towers Steel Poles Insulators Overhead Conductor Underground Conduit (0.019) Trans 69kV Conduit Manholes Underground Cable LPOF Underground Cable HPOF Underground Cable Solid Dielectric Overhead Aluminum Conductor Subtotal DDTP (1.893) Distribution , 471, 490 & 491 Land and Land Rights & 492 Buildings & 4931 Poles (1.455) (3.283) & 494 Conductors (0.604) (0.523) & 495 Underground Facilities (0.231) (0.175) & 496 Underground Cable (1.045) (1.726) & 497 Transformers (2.028) (2.956) & 498 Telecontrol (0.172) (0.268) Meters (1.474) (1.305) General Assets Insulators Subtotal Distribution (7.009) (10.236) General Land Structures and Improvements Office Furniture and Equipment Vehicles (3.234) (1.464) Tools and Instruments Radios Computer Systems Software Computer Systems Hardware Computer Systems Enterprise Software (32.126) Load Settlement Software (4.462) Software Desktop Applications (0.045) Software Departmental Applications (1.209) Computer Hardware Desktop/Laptop Computer Hardware Infrastructure Subtotal General (3.234) (38.763) Other 55 Construction Funds Collected from Others & AOH Cap (46.266) (3.572) (49.838) (45.783) (0.483) (46.266) 56 AFUDC/IDC Adjustments Capital Accrual (0.223) Other Distribution Problem Entries Other Subtotal Other (43.829) (2.858) (46.687) (43.790) (0.039) (43.829) Total Gross Plant in Service (10.243) (48.999) Capital Work in Progress (WIP additions in Sch Total Utility (10.243) (48.999)

12 ACCUMULATED AMORTIZATION NET OF CIAC 2017 ACTUAL 2016 ACTUAL PART 2 Line Description (To) Net Cost of Closing (From) Opening Balance Additions Retirements Retirement Balance 2016 Actual Additions Retirements Net Cost of Retirement Closing Balance 68 Distribution Driven Transmission Projects (DDTP) Land Buildings Site Development Substation Equipment Telecontrol Supervisory (0.004) Land Rights Wood Poles (0.153) (0.038) Steel Towers Steel Poles Insulators Overhead Conductor Underground Conduit Trans 69kV Conduit Manholes Underground Cable LPOF Underground Cable HPOF Underground Cable Solid Dielectric Overhead Aluminum Conductor Subtotal DDTP (0.004) Distribution , 471, 490 & 491 Land and Land Rights & 492 Buildings & 4931 Poles (1.455) (0.048) (3.283) (0.932) & 494 Conductors (0.604) (0.523) (0.714) & 495 Underground Facilities (0.231) (0.746) (0.175) (0.615) & 496 Underground Cable (1.045) (0.572) (1.726) (1.235) & 497 Transformers (2.028) (1.113) (2.956) (0.362) & 498 Telecontrol (0.172) (0.152) (0.268) (0.058) Meters (1.474) (1.305) General Assets Insulators Subtotal Distribution (7.009) (2.311) (10.236) (3.917) General Land Structures and Improvements Office Furniture and Equipment Vehicles (3.234) (1.464) Tools and Instruments Radios Computer Systems Software Computer Systems Hardware Computer Systems Enterprise Software (32.126) Load Settlement Software (4.462) Software Desktop Applications Software Departmental Applications (1.209) Computer Hardware Desktop/Laptop Computer Hardware Infrastructure Subtotal General (3.234) (38.763) Other 122 Construction Funds Collected from Others & AOH Cap (13.937) (1.451) (15.388) (12.530) (1.407) (13.937) 123 AFUDC/IDC Adjustments (0.011) Capital Accrual (0.010) Other Distribution Problem Entries Other (0.066) (0.066) (0.066) (0.066) 128 Subtotal Other (12.708) (1.410) (14.118) (12.173) (1.380) (12.708) Total Accumulated Depreciation Plant (10.243) (2.210) (48.999) (3.037) Net Year End Plant in Service Sch

13 Table of Contents ENMAX POWER CORPORATION Distribution Summary of Capital Additions Utility Plant Net of CIAC For the Year Ended December 31, 2017 $M SCHEDULE 4.2 UTILITY PLANT NET OF CIAC 2017 ACTUAL 2016 ACTUAL Line Description (To) (From) Opening CWIP Net Capital Expenditures Capital Additions Closing CWIP Balance Adjusted Opening CWIP Adjusted Capital Expenditures Capital Additions Closing CWIP Balance Adjusted CAPITAL ADDITIONS Actual to Prior Year % 1 Distribution 2 Residential Development % 3 Non Residential Development % 4 Residential & Non Residential Development % 5 System Infrastructure Development (Growth) % 6 System Infrastructure Development (Quality of Supply) % 7 Asset Replacement / Modification % 8 Annexation % 9 AESO Required Capital Contributions (1.579) (1.926) % 10 Distribution Automation (1.150) (41.3%) 11 Subtotal Distribution % Regulated Market Services 14 Revenue Metering (0.247) (6.8%) 15 Client Services % 16 Meter Data Management % 17 Retail Access Support % 18 Other Wires Retail Access Program (WRAP) Projects (0.000) (0.000) (0.003) (0.000) % 19 Subtotal Regulated Market Services (0.247) (6.8%) Information Technology 22 Computer Software % 23 Computer Hardware % 24 Distribution Strategic Technology Application Roadmap (D STAR) % 25 Control Centre System Operations % 26 Subtotal Information Technology % General Plant 29 Buildings % 30 Substation Building Upgrades % 31 Office Equipment & Furniture % 32 Leasehold Improvements (0.004) (100.0%) 33 Subtotal General Plant % Other 36 Capital Tools % 37 Vehicle & Equipment Acquisition & Replacement (0.000) % 38 Support Services Replacement & Upgrade (0.412) (0.191) % 39 Outage Management System % 40 Other Additions % 41 Subtotal Other (0.191) % Adjustment to Admin Overhead (0.619) (3.149) (3.523) (0.245) (0.366) (0.619) (3.776) (1,495.1%) 44 AFUDC Inventory & IDC to AFUDC Adjustment (0.000) (0.000) (0.000) (0.000) % Subtotal % Capital Deposits (16.959) (12.259) (15.249) (1.710) (16.959) % Total Sch % Less: Dismantling Expense (Removal Costs Sch Total Capital Additions

14 ENMAX POWER CORPORATION Distribution Summary of Customers, Energy and Revenue For the Year Ended December 31, 2017 Table of Contents SCHEDULE 6 Line Description (To) (From) 2017 Actual 2016 Actual Actual to Prior Year % 1 Residential (Note 1) 2 Customers Average 457, , , % 3 Energy Sales (MWh) 2,954, ,881, , % 4 Revenue ($m) % 5 6 kwh per Customer 6, , % 7 Cents/kWh % 8 9 Commercial (Note 2) 10 Customers Average 36, , % 11 Energy Sales (MWh) 6,477, ,320, , % 12 Revenue ($m) % kwh per Customer 176, , , % 15 Cents/kWh % Street & Space Lights 18 Energy Sales (MWh) 68, , (24, ) (26.4%) 19 Revenue ($m) (0.641) (20.1%) Cents/kWh % Balancing Pool Allocation Rider (33.675) % 24 Other Revenue & Adjustments (Note 3) % Total Utility Revenue Sch 1 Sch % Note 1: Includes Farm Note 2: Includes Industrial Note 3: Timing of revenue recognition due to accrual entries Totalling of columns and rows may be influenced by rounding. 14

15 ENMAX Power Corporation General Tariff Application AESO Charges (SAS Costs) $M Index of Schedules SCHEDULE 7 Line No. Description 2017 Actual 2016 Actual Actual to Prior Year % 1 Billing Determinants 2 Coincident Metered Demand (MW) 1,465 1, % 3 Billing Capacity (MW) 1,856 1, % 4 Metered Demand (MW) 1,642 1, % 5 Metered Energy at POD (GWh) 9,654 9, % 6 7 AESO Charges 8 DTS Charges 9 Interconnection Charge % 10 Operating Reserve Charge % 11 Voltage Control Charge % 12 Other System Support Services Charge % 13 Transmission Constraint Rebalancing Charge % 14 Total DTS % Under Frequency Load Shedding (UFLS) Credit (0.550) (0.538) (0.012) (2.2%) 17 AESO Rider C (8.222) (10.491) % 18 AESO Rider F (30.817) % 19 Prior Period Adjustments (0.237) (0.334) (343.1%) 20 TAC Deferral Account ( ) ( ) (16.042) (13.1%) 21 Other Costs/Adjustments (0.131) (0.700) % Total AESO Charges % Totalling of columns and rows may be influenced by rounding. 15

16 Table of Contents ENMAX POWER CORPORATION Distribution Summary of Payroll and Manpower Statistics For the Year Ended December 31, 2017 $M SCHEDULE 8 SALARIES, WAGES AND EMPLOYEE BENEFITS Line Description (To) (From) 2017 Actual 2016 Actual Actual to Prior Year % 1 Salaries and Wages 2 Transmission Operations % 3 Distribution Operations % 4 Retail Operations % 5 Transmission Capital % 6 Distribution Other Labour (23.904) (20.260) (3.644) (18.0%) 7 Retail Capital % 8 Other % 9 10 Salaries and Wages Charged to Distribution Utility Operations (0.821) (1.8%) Employee Benefits 13 Transmission Operations % 14 Distribution Operations % 15 Retail Operations % 16 Transmission Capital % 17 Distribution Other Capital % 18 Retail Capital % 19 Other % Benefits Charged to Distribution Utility Operations % EMPLOYEE ALLOCATION Line Description 2017 Actual 2016 Actual Actual to Prior Year % 22 Manpower Statistics ENMAX Power and ENMAX Corporate 23 FTE Complement Permanent % 24 FTE Complement Permanent (Allocated) (6.516) (8.5%) 25 FTE Complement Temporary % 26 FTE Complement Temporary (Allocated) % 27 Total Regular Employees (FTEs) % Total Temporary Employees (FTEs) % 30 Total Contract Staff (FTEs) % Total Manpower Distribution Utility Operations % Totalling of columns and rows may be influenced by rounding. 16

17 Table of Contents ENMAX POWER CORPORATION Distribution Summary of Reserve / Deferral Accounts For the Year Ended December 31, 2017 $M SCHEDULE 9 Line Description (To) (From) 2017 ACTUAL 2016 ACTUAL Opening Balance Adds Amortization Refunds / Write Offs Ending Balance Opening Balance Adds Amortization Refunds / Write Offs Ending Balance Actual to Prior Year % 1 List of Deferral Accounts 2 3 Transmission Access Charges Deferral (4.465) (99.935) ( ) (4.465) (869.5%) 4 AUC Flow Through Receivable (0.017) (0.117) % 5 Regulatory Receivable (10.441) (0.615) (0.087) (0.6%) 6 Regulatory Rider Payable (8.121) (6.947) (11.280) (3.562) (8.121) (14.5%) 7 Hearing Cost Reserve Account (1.311) (0.145) (1.312) (0.876) (0.500) (1.311) (0.001) 0.1% 8 9 Total Deferred Assets ( ) ( ) % Totalling of columns and rows may be influenced by rounding. 17

18 Table of Contents ENMAX POWER CORPORATION Distribution Reconciliation of Audited Statements of Earnings and Comprehensive Income to Net Income For the Year Ended December 31, 2017 $M SCHEDULE 10 Line Description (To) (From) DISTRIBUTION FINANCIAL STATEMENTS TOTAL ADJUSTMENTS TOTAL RULE REVENUE 2 3 Electricity Revenue Transmission and Distribution Revenue Sch ( ) SUMMARY OF ADJUSTMENT ENTRIES 7 Reclass of Transmission and Distribution Costs ( ) 8 Subtotal ( ) 9 10 Local Access Fees Revenue (95.849) SUMMARY OF ADJUSTMENT ENTRIES 12 Re class to remove Local Access Fee Revenue Collection on behalf of City of Calgary (95.849) 13 Subtotal (95.849) Contractual Services Revenue (15.187) (0.000) 16 SUMMARY OF ADJUSTMENT ENTRIES 17 Re class of Contractual Services Revenue to Revenue Requirement Offsets (10.115) 18 Adjustment to remove Water & Muni revenue & costs (5.072) 19 Subtotal (15.187) Other Revenue (14.651) SUMMARY OF ADJUSTMENT ENTRIES 23 Re class of Other Revenue to Amortization Expense (14.651) 24 Subtotal (14.651) TOTAL REVENUE Sch ( ) EXPENSES Electricity Costs Transmission and Distribution Costs Sch ( ) SUMMARY OF ADJUSTMENT ENTRIES 35 Reclass of Transmission and Distribution Revenue ( ) 36 Subtotal ( ) Local Access Fees Sch (95.849) (0.000) 41 SUMMARY OF ADJUSTMENT ENTRIES 42 Re class to remove Local Access Fee Revenue Collection on behalf of City of Calgary (95.849) 43 Subtotal (95.849) Contractual Services Expense (7.450) SUMMARY OF ADJUSTMENT ENTRIES 47 Adjustment to remove water & municipal costs (4.054) 48 Re class of Contractual Services Expense to Revenue Requirement Offsets (3.396) 49 Subtotal (7.450) 50 Totalling of columns and rows may be influenced by rounding. 18

19 Table of Contents ENMAX POWER CORPORATION Distribution Reconciliation of Audited Statements of Earnings and Comprehensive Income to Net Income For the Year Ended December 31, 2017 $M SCHEDULE 10 (To) (From) DISTRIBUTION FINANCIAL STATEMENTS Line Description TOTAL ADJUSTMENTS TOTAL RULE Operating and Maintenance Direct (0.754) Operating and Maintenance Common Costs (4.547) Operating and Maintenance Common Costs Billable Projects (0.602) Operating and Maintenance Corporate Costs (4.846) Subtotal Operating and Maintenance Sch (10.750) SUMMARY OF ADJUSTMENT ENTRIES 57 Re class of Allocated Interest from OMA Expense to Interest Expense (0.782) 58 Re class allocated Revenue from OMA Expense to Other Revenue (0.740) Adjustment for allocated assets reverse allocated amortization (7.364) Adjustment to remove software as a Service (1.860) Adjustment for Bonus exclude Financial Metrics for EPC Employees (1.086) 63 Corporate MTIP & 50 percent of LTIP allocated to Power and Trans Re class of Common Cost & Corporate Billable Projects to Revenue Requirement Offsets Subtotal (10.750) Hearing Costs Sch Pension Accrual to Cash Adjustment Sch (0.380) (0.380) 70 SUMMARY OF ADJUSTMENT ENTRIES 71 Re class from OMA Expense to Pension Accrual to Cash Adjustment (0.380) 72 Subtotal (0.380) Amortization Sch (7.913) SUMMARY OF ADJUSTMENT ENTRIES 76 Adjustment to record allocated amortization (8.055) 77 Adjustment to Amortization on SSC Project Adjustment AFUDC vs IDC Reg Asset Accum Amortization (0.034) 79 Subtotal (7.913) Interest Expense SUMMARY OF ADJUSTMENT ENTRIES 83 Re class of Shared Services Interest from OMA Expense to Interest Expense Adjustment for deemed interest calculation Adjustment to re class IDC to Balance Sheet Subtotal Income Tax Revenue Requirement Offsets Total Revenue (10.717) (10.717) 91 Revenue Requirement Offsets Total Expense Subtotal Revenue Requirement Offsets Sch 1(A) (6.581) (6.581) 93 SUMMARY OF ADJUSTMENT ENTRIES 94 Re class of Contractual Services Revenue to Revenue Requirement Offsets (10.115) 95 Re class of Other Revenue to Revenue Requirement Offsets (0.602) 96 Re class of Contractual Services Expense to Revenue Requirement Offsets Re class of Common Cost Billable Projects to Revenue Requirement Offsets Subtotal (6.581) TOTAL EXPENSES ( ) RETURN (1.423) Totalling of columns and rows may be influenced by rounding. 19

20 Table of Contents ENMAX POWER CORPORATION Distribution Reconciliation of Audited Balance Sheets For the Year Ended December 31, 2017 $M SCHEDULE 11 Line Description (To) (From) DISTRIBUTION FINANCIAL STATEMENTS TOTAL ADJUSTMENTS TOTAL RULE ASSETS 2 3 CURRENT ASSETS 4 5 Cash and Short Term Investments (0.184) (0.184) 6 7 Accounts Receivable Regulatory Receivables Inventory Other Current Assets Intercompany Receivables TOTAL CURRENT ASSETS NON CURRENT ASSETS Fixed Asset Inventory Year End Capital Work in Process (19.437) SUMMARY OF ADJUSTMENT ENTRIES 25 Adjustment for Balance Sheet Allocation (0.370) 26 CIAC Contributions in aid of Construction (19.067) 27 Subtotal (19.437) Year End Intangibles Capital Work in Process (0.000) SUMMARY OF ADJUSTMENT ENTRIES 31 Adjustment for Balance Sheet Allocation (0.000) 32 Subtotal (0.000) Capital Assets Net 1, ( ) 1, SUMMARY OF ADJUSTMENT ENTRIES 36 Adjustment for Enmax Balance Sheet Allocation CIAC Contributions in aid of Construction ( ) 38 AFUDC/IDC Adjustment asset (0.643) 39 AFUDC vs IDC Reg Asset Accum Amortization Subtotal ( ) Intangible Assets SUMMARY OF ADJUSTMENT ENTRIES 44 Adjustment for Enmax Balance Sheet Allocation Adjustment to record IT SaaS project Adjustment to record HRIS System Subtotal Long Term Regulatory Receivables Investment in Subsidiaries Other Long Term Assets Long Term Future Income Taxes Asset Financial Assets Long Term TOTAL NON CURRENT ASSETS 1, ( ) 1, TOTAL ASSETS 1, ( ) 1, Totalling of columns and rows may be influenced by rounding. 20

21 Table of Contents ENMAX POWER CORPORATION Distribution Reconciliation of Audited Balance Sheets For the Year Ended December 31, 2017 $M SCHEDULE 11 (To) (From) DISTRIBUTION FINANCIAL STATEMENTS TOTAL ADJUSTMENTS TOTAL RULE 005 Line Description 63 LIABILITIES CURRENT LIABILITIES Accounts Payable & Accrued Liabilities (0.000) Regulatory Payable Income Tax Payable Other Current Liabilities Current Future Income Tax Liabilities Current Portion of Long Term Debt Intercompany Debt Intercompany Accounts Payable SUMMARY OF ADJUSTMENT ENTRIES 83 Adjustment for 2012 Deemed Interest Adjustment for 2013 IDC and AOH reclass Adjustment for 2013 Deemed Interest (1.325) 86 Adjustment for 2014 IDC and AOH reclass Adjustment for 2014 Deemed Interest (1.359) 88 Adjustment for 2015 IDC and AOH reclass Adjustment for 2015 Deemed Interest (2.659) 90 Adjustment for 2016 IDC and AOH reclass Adjustment for 2016 Deemed Interest (0.104) 92 Adjustment for 2017 IDC and AOH reclass Adjustment for 2017 Deemed Interest Subtotal Due To/Due From SUMMARY OF ADJUSTMENT ENTRIES 98 Adjustments Prior Years Adjustments 2017 (0.398) 100 Subtotal Current Portion of Deferred Revenue TOTAL CURRENT LIABILITIES Totalling of columns and rows may be influenced by rounding. 21

22 Table of Contents ENMAX POWER CORPORATION Distribution Reconciliation of Audited Balance Sheets For the Year Ended December 31, 2017 $M SCHEDULE 11 (To) (From) DISTRIBUTION FINANCIAL STATEMENTS TOTAL ADJUSTMENTS TOTAL RULE 005 Line Description NON CURRENT LIABILITIES Long Term Intercompany Debt Long Term Debt (8.405) (3.595) 111 SUMMARY OF ADJUSTMENT ENTRIES 112 Adjustment to align to Deemed Structure Employee Future Benefits SUMMARY OF ADJUSTMENT ENTRIES 117 Adjustment for 2012 Pension accrual to cash Adjustment for 2013 Pension accrual to cash Adjustment for 2014 Pension accrual to cash Adjustment for 2015 Pension accrual to cash Adjustment for 2016 Pension accrual to cash Adjustment for 2017 Pension accrual to cash (0.380) 123 Subtotal Other Liabilities CIAC Year End Capital Work in Process (19.067) SUMMARY OF ADJUSTMENT ENTRIES 129 Re class to remove CIAC to NON CURRENT ASSETS (19.067) 130 Subtotal (19.067) CIAC Contra Capital Asset ( ) SUMMARY OF ADJUSTMENT ENTRIES 134 Re class to remove CIAC to NON CURRENT ASSETS ( ) 135 Subtotal ( ) CIAC Accumulated Amortization ( ) SUMMARY OF ADJUSTMENT ENTRIES 139 Re class to remove CIAC to NON CURRENT ASSETS Subtotal Long Term Deferred Revenue Excluding CIAC Amortization & CIAC WIP Long Term Future Income Taxes Liability TOTAL NON CURRENT LIABILITIES 1, ( ) TOTAL LIABILITIES 1, ( ) 1, Totalling of columns and rows may be influenced by rounding. 22

23 Table of Contents ENMAX POWER CORPORATION Distribution Reconciliation of Audited Balance Sheets For the Year Ended December 31, 2017 $M SCHEDULE 11 (To) (From) DISTRIBUTION FINANCIAL STATEMENTS TOTAL ADJUSTMENTS TOTAL RULE 005 Line Description 150 SHAREHOLDER'S EQUITY Share Capital SUMMARY OF ADJUSTMENT ENTRIES 154 Adjustment to align to Deemed Structure Subtotal Retained Earnings (43.279) SUMMARY OF ADJUSTMENT ENTRIES 159 Adjustment for EPC Retained Earnings opening balance 2017 (26.502) 160 Adjustment to align to Deemed Structure (16.777) 161 Subtotal (43.279) Retained Earnings Net Income (1.423) SUMMARY OF ADJUSTMENT ENTRIES 165 Adjustment for 2017 Net Income (1.423) 166 Subtotal (1.423) Other Comprehensive Income (4.186) (4.186) TOTAL SHAREHOLDER'S EQUITY (15.807) TOTAL LIABILITIES & SHAREHOLDER'S EQUITY 1, ( ) 1, Totalling of columns and rows may be influenced by rounding. 23

24 Table of Contents ENMAX POWER CORPORATION Distribution Explanations HIGH LEVEL For the Year Ended December 31, 2017 $M SCHEDULE ACTUAL vs 2016 ACTUAL Line No. Schedule Schedule Line No Schedule Line No Description $M % Explanation 1 Sch 1(A) Summary of Revenue Requirement Offsets 2 Sch 1(A) 2 Pole and Duct Rental Revenue % Favourable variance due to higher revenue from Pole and Duct Rental charges. Shaw and TELUS signed a new agreement with new, higher rates taking effect in July of 2016 helping to increase revenue by $0.8M in Pole and Duct Rental Revenue. Additionally, there was an increase in number of poles and ducts that were rented due to expansion of the City. 3 Sch 1(A) 4 Contractual Services Revenue % The increase in 2017 revenues was mainly driven by an increase in minor service orders for Trouble Response. The increase in Trouble Response calls were largely due to adverse weather conditions such as snow storms, rains, etc.. In addition, there was an increase in customer driven jobs from Shaw Cable systems and the City of Calgary. 4 Sch 2.1 Summary of Mid Year Rate Base 5 Sch Gross Plant in Service Utility Opening Balance % 6 Sch Gross Plant in Service Utility Closing Balance % 7 Sch Accumulated Depreciation Utility Opening Balance % 8 Sch Accumulated Depreciation Utility Closing Balance % 9 Sch Contributions in Aid of Construction Opening Balance % 10 Sch Contributions in Aid of Construction Closing Balance % 11 Sch Amortization of Contributions Opening Balance % 12 Sch Amortization of Contributions Closing Balance % EPC's Distribution continues to expand to service new customers. The Mid Year Rate Base for the EPC Distribution system, net of CIAC, experienced a net growth of 6.6% (excluding Accumulated Amortization). Consistent with this expansion, Gross Plant in Service increased by 7.6% and gross CIAC increased by 11.3%. The increase in mid year rate base is mainly driven by an increase in Residential Development and System Infrastructure Development assets placed into service. See Schedule 4.2 variance explanations for further information. 13 Sch Necessary Working Capital % The increase is primarily attributed to an increase in the Transmission Access Charges (TAC) Deferral Account balance. This higher account balance is largely due to higher TAC charges, volume variances in SAS, and a refund of AESO deferral account adjustment. 14 Sch 2.2 Summary of Mid Year EPC Distribution Capital Structure 15 Sch Long Term Debt % Increase due to higher in service capital on a mid year basis. 24

EPCOR Distribution & Transmission Inc. (Distribution) SUMMARY OF REVENUE REQUIREMENT FOR THE YEAR ENDED DECEMBER 31, 2008 ($000s)

EPCOR Distribution & Transmission Inc. (Distribution) SUMMARY OF REVENUE REQUIREMENT FOR THE YEAR ENDED DECEMBER 31, 2008 ($000s) SUMMARY OF REVENUE REQUIREMENT SCHEDULE 1 Line Cross- 2008 2008 2007 Var. Actual to Var. Var. Actual to Var. Explanation No. Description Reference Actual Approved Fcst Actual Approved Fcst % Prior Year

More information

St NW, Edmonton, AB T5H 0E8 Canada epcor.com

St NW, Edmonton, AB T5H 0E8 Canada epcor.com 2000 10423 101 St NW, Edmonton, AB T5H 0E8 Canada epcor.com May 1, 2018 Alberta Utilities Commission 10th Floor, 10055 106 Street Edmonton, AB T5J 2Y2 Attention: Mr. Blair Miller Executive Director, Rates

More information

MANAGEMENT S REPORT. Financial Statements December 31, 2011

MANAGEMENT S REPORT. Financial Statements December 31, 2011 Financial Statements December 31, 2011 MANAGEMENT S REPORT The accompanying financial statements of FortisAlberta Inc. (the Corporation ) have been prepared by management, who are responsible for the integrity

More information

EPCOR Energy Alberta GP Inc. AUC RULE 005: ANNUAL REGULATED RATE TARIFF (RRT) FINANCIAL AND OPERATIONAL RESULTS FOR THE YEAR ENDED DECEMBER 31, 2016

EPCOR Energy Alberta GP Inc. AUC RULE 005: ANNUAL REGULATED RATE TARIFF (RRT) FINANCIAL AND OPERATIONAL RESULTS FOR THE YEAR ENDED DECEMBER 31, 2016 EPCOR Energy Alberta GP Inc. AUC RULE 005: ANNUAL REGULATED RATE TARIFF (RRT) FINANCIAL AND OPERATIONAL RESULTS FOR THE YEAR ENDED DECEMBER 31, 2016 TABLE OF CONTENTS Schedule Description A Purpose of

More information

Financial Statements. AltaLink, L.P. Years ended December 31, 2010 and 2009

Financial Statements. AltaLink, L.P. Years ended December 31, 2010 and 2009 Financial Statements FINANCIAL STATEMENTS INDEPENDENT AUDITOR S REPORT To the Partners of We have audited the accompanying financial statements of, which comprise the balance sheets as at December 31,

More information

Alberta Electric System Operator 2017 ISO Tariff Update

Alberta Electric System Operator 2017 ISO Tariff Update Alberta Electric System Operator 2017 ISO Tariff Update Date: October 20, 2016 Prepared by: Alberta Electric System Operator Prepared for: Alberta Utilities Commission Classification: Public Table of Contents

More information

Monthly Financial Report

Monthly Financial Report AGENDA ITEM NO: 4.C.1 Monthly Financial Report with data through February 2019 (Unaudited) The data contained in this report has not been independently audited. Alameda Municipal Power Financial Report

More information

ENMAX Corporation 2017 Q2 INTERIM REPORT CAUTION TO READER

ENMAX Corporation 2017 Q2 INTERIM REPORT CAUTION TO READER ENMAX Corporation 2017 Q2 INTERIM REPORT ENMAX Corporation CAUTION TO READER This document contains statements about future events and financial and operating results of ENMAX Corporation and its subsidiaries

More information

Financial Statements For the years ended December 31, 2015 and 2014

Financial Statements For the years ended December 31, 2015 and 2014 FORTISALBERTA INC. Financial Statements MANAGEMENT S REPORT The accompanying annual financial statements of FortisAlberta Inc. (the Corporation ) have been prepared by management, who are responsible for

More information

Monthly Financial Report

Monthly Financial Report AGENDA ITEM NO: 4.C.1 Monthly Financial Report with data through October 2017 (Unaudited) The data contained in this report has not been independently audited. Alameda Municipal Power Financial Report

More information

COST ALLOCATION. Cost Allocation Informational Filing Guidelines for Electricity Distributors dated November 15, 2006.

COST ALLOCATION. Cost Allocation Informational Filing Guidelines for Electricity Distributors dated November 15, 2006. Filed: October 10, 2008 Schedule 1 Page 1 of 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 COST ALLOCATION PowerStream submitted a cost allocation informational filing with the Board

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 23065-D01-2017 Alberta Electric System Operator 2018 Independent System Operator Tariff Update November 28, 2017 Alberta Utilities Commission Decision 23065-D01-2017 Alberta Electric System Operator

More information

/s/ John L. Carley Assistant General Counsel

/s/ John L. Carley Assistant General Counsel John L. Carley Assistant General Counsel Law Department July 28, 2016 Christopher Psihoules, DAG Division of Law 124 Halsey Street, 5 th Floor P.O. Box 45029 Newark, NJ 07101 Christine M. Juarez, Esq.

More information

Thunder Bay Hydro Electricity Distribution Inc. 1-1 GENERAL (Input) Enter general information related to the Application. EDR 2006 MODEL (ver. 2.

Thunder Bay Hydro Electricity Distribution Inc. 1-1 GENERAL (Input) Enter general information related to the Application. EDR 2006 MODEL (ver. 2. Thunder Bay Hydro Electricity Inc. 1-1 GENERAL (Input) Enter general information related to the Application Version: 2.1 Name of Applicant Thunder Bay Hydro Electricity Inc. License EB -0259 File (s) RP

More information

Q INTERIM REPORT

Q INTERIM REPORT ENMAX CORPORATION Q2 2018 INTERIM REPORT CAUTION TO READER This document contains statements about future events and financial and operating results of ENMAX Corporation and its subsidiaries (ENMAX or

More information

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS November 5, 2014 The following ( MD&A ) of FortisAlberta Inc. (the Corporation ) should be read in conjunction with the following: (i) the unaudited

More information

Residential General Service Less Than 50 kw General Service - 50 to 999,000 kw 1,000 to 4,999 kw Large Use Standby - General Service kw

Residential General Service Less Than 50 kw General Service - 50 to 999,000 kw 1,000 to 4,999 kw Large Use Standby - General Service kw Page 1 of 65 Residential This classification refers to an account where the electricity is used exclusively in a separately metered living accommodation. Customers shall be residing in singledwelling units

More information

May 15, Duke Energy Ohio, Inc., and Duke Energy Kentucky, Inc. Formula Rate Annual Update Docket No. ER

May 15, Duke Energy Ohio, Inc., and Duke Energy Kentucky, Inc. Formula Rate Annual Update Docket No. ER Gary A. Morgans 202 429 6234 gmorgans@steptoe.com 1330 Connecticut Avenue, NW Washington, DC 20036-1795 202 429 3000 main www.steptoe.com The Hon. Kimberly D. Bose Secretary Federal Energy Regulatory Commission

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Northern Indiana Public Service Company LLC Line Allocated No.

More information

2009 PILS / CORPORATE TAX FILING

2009 PILS / CORPORATE TAX FILING Page 1 of 44 29 PILS / CORPORATE TAX FILING Sheet Index: Title Page Input Information Summary Tax Rates & Exemptions 28 Adjusted Taxable Income 28 Taxable Income Additions 28 Taxable Income Deductions

More information

Statement of Financial Position (unaudited)

Statement of Financial Position (unaudited) Condensed Interim Financial Statements (unaudited) For the three months ended March 31, 2015 and 2014 CONDENSED INTERIM FINANCIAL STATEMENTS Statement of Financial Position (unaudited) As at Notes March

More information

2010 PILS / CORPORATE TAX FILING

2010 PILS / CORPORATE TAX FILING Page 1 of 39 21 PILS / CORPORATE TAX FILING Sheet Index: Title Page Input Information Summary Tax Rates & Exemptions 29 Adjusted Taxable Income 29 Taxable Income Additions 29 Taxable Income Deductions

More information

2007 PILS / CORPORATE TAX FILING

2007 PILS / CORPORATE TAX FILING Page 1 of 44 27 PILS / CORPORATE TAX FILING Sheet Index: Title Page Input Information Summary Tax Rates & Exemptions 26 Adjusted Taxable Income 26 Taxable Income Additions 26 Taxable Income Deductions

More information

Alberta Electric System Operator 2018 ISO Tariff Application

Alberta Electric System Operator 2018 ISO Tariff Application Alberta Electric System Operator 2018 ISO Tariff Application Date: September 14, 2017 Table of Contents 1 Application... 6 1.1 Background... 6 1.2 Organization of application... 6 1.3 Relief requested...

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS For the three and twelve months ended February 8, 2011 The following discussion and analysis of financial condition

More information

2011 PILS / CORPORATE TAX FILING

2011 PILS / CORPORATE TAX FILING Page 1 of 33 2011 PILS / CORPORATE TAX FILING Sheet Index: Title Page Input Information Summary Tax Rates & Exemptions Test Year Sch 8 and 10 UCC&CEC Test Year UCC and CEC Additions & Disposals Test Year

More information

Statement of Financial Position (unaudited)

Statement of Financial Position (unaudited) Condensed Interim Financial Statements (unaudited) For the three and nine months ended and CONDENSED INTERIM FINANCIAL STATEMENTS Statement of Financial Position (unaudited) As at Notes December 31, ASSETS

More information

ENMAX Power Corporation

ENMAX Power Corporation Decision 22238-D01-2017 ENMAX Power Corporation 2016-2017 Transmission General Tariff Application December 4, 2017 Alberta Utilities Commission Decision 22238-D01-2017 ENMAX Power Corporation 2016-2017

More information

ITC Midwest 2014 Attachment O True-Up Presentation. Presenter: David Grover Manager, Transmission Pricing July 8, 2015

ITC Midwest 2014 Attachment O True-Up Presentation. Presenter: David Grover Manager, Transmission Pricing July 8, 2015 2014 Attachment O True-Up Presentation Presenter: David Grover Manager, Transmission Pricing July 8, 2015 Presentation Purpose Discuss the 2014 Annual True-Up posting Walk through the timeline and mechanics

More information

CHUGACH ELECTRIC ASSOCIATION 1 STATEMENT OF OPERATIONS. Allowance for Funds Used During Construction. Total Cost of Electric Service (MTD Actual)

CHUGACH ELECTRIC ASSOCIATION 1 STATEMENT OF OPERATIONS. Allowance for Funds Used During Construction. Total Cost of Electric Service (MTD Actual) FINANCIAL REPORT MARCH 2014 STATEMENT OF OPERATIONS CATEGORY 2014 MTD ACTUAL 2014 MTD BUDGET Operating Revenue and Patronage Capital Fuel and Purchased Power Expense Power Production Expense Transmission

More information

Decision D FortisAlberta Inc Performance-Based Regulation Capital Tracker True-Up. January 11, 2018

Decision D FortisAlberta Inc Performance-Based Regulation Capital Tracker True-Up. January 11, 2018 Decision 22741-D01-2018 FortisAlberta Inc. 2016 Performance-Based Regulation Capital Tracker True-Up January 11, 2018 Alberta Utilities Commission Decision 22741-D01-2018 FortisAlberta Inc. 2016 Performance-Based

More information

We believe that the audit evidence we have obtained in our audits is sufficient and appropriate to provide a basis for our audit opinion.

We believe that the audit evidence we have obtained in our audits is sufficient and appropriate to provide a basis for our audit opinion. Financial Statements For the years ended 2017 and 2016 Deloitte LLP 700, 850 2 Street SW Calgary, AB T2P 0R8 Canada Tel: 403-267-1700 Fax: 587-774-5379 www.deloitte.ca INDEPENDENT AUDITOR S REPORT To the

More information

HYDRO-QUÉBEC DISTRIBUTION S RESPONSE TO

HYDRO-QUÉBEC DISTRIBUTION S RESPONSE TO HYDRO-QUÉBEC DISTRIBUTION S RESPONSE TO THE RÉGIE S INFORMATION REQUEST #1 pages 13 to 41 Translation commissioned by Association québécoise des consommateurs industriels d électricité (AQCIE) and Québec

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

AltaLink, L.P. (unaudited)

AltaLink, L.P. (unaudited) Condensed Interim Financial Statements (unaudited) For the three months ended March 31, 2014 and 2013 CONDENSED INTERIM FINANCIAL STATEMENTS Statement of Financial Position (unaudited) As at Notes March

More information

Nelson Electricity Ltd Asset Management Plan Update

Nelson Electricity Ltd Asset Management Plan Update Nelson Electricity Ltd Asset Management Plan Update April 2017 March 2027 April 2017 Nelson Electricity Ltd central Nelson city view In accordance with the Commerce Act Electricity Distribution Information

More information

Decision D FortisAlberta Inc PBR Capital Tracker True-Up and PBR Capital Tracker Forecast

Decision D FortisAlberta Inc PBR Capital Tracker True-Up and PBR Capital Tracker Forecast Decision 20497-D01-2016 FortisAlberta Inc. 2014 PBR Capital Tracker True-Up and 2016-2017 PBR Capital Tracker Forecast February 20, 2016 Alberta Utilities Commission Decision 20497-D01-2016 FortisAlberta

More information

Q INTERIM REPORT

Q INTERIM REPORT ENMAX CORPORATION Q1 2018 INTERIM REPORT CAUTION TO READER This document contains statements about future events and financial and operating results of ENMAX Corporation and its subsidiaries (ENMAX or

More information

June 20, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

June 20, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C McGuireWoods LLP 2001 K Street N.W. Suite 400 Washington, DC 20006-1040 Phone: 202.857.1700 Fax: 202.857.1737 www.mcguirewoods.com Julia Dryden English Direct: 202.857.1706 jenglish@mcguirewoods.com Fax:

More information

PPL Electric Utilities Corporation

PPL Electric Utilities Corporation Page 1 of 22 ATTACHMENT H8G PPL Electric Utilities Corporation Formula Rate Appendix A Notes FERC Form 1 Page # or Instruction 2014 Data Shaded cells are input cells Allocators Wages & Salary Allocation

More information

June 13, Informational Filing Public Service Electric and Gas Company, Annual True-Up Adjustment Docket No. ER

June 13, Informational Filing Public Service Electric and Gas Company, Annual True-Up Adjustment Docket No. ER Hesser G. McBride, Jr. Associate General Regulatory Counsel Law Department 80 Park Plaza, T5G, Newark, NJ 07102-4194 tel: 973.430.5333 fax: 973.430.5983 email: Hesser.McBride@pseg.com June 13, 2016 VIA

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

ORCAS POWER AND LIGHT COOPERATIVE 2018 Q3 FINANCIALS Q3 Financial Report Page 1 of 20

ORCAS POWER AND LIGHT COOPERATIVE 2018 Q3 FINANCIALS Q3 Financial Report Page 1 of 20 ORCAS POWER AND LIGHT COOPERATIVE 2018 Q3 FINANCIALS Page 1 of 20 MEMORANDUM November 09, 2018 To: Board of Directors From: Foster Hildreth, General Manager Re: OPALCO 2018 Third Quarter Financial Report

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION PECO ENERGY COMPANY STATEMENT NO. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION DOCKET NO. R-01-0001 DIRECT TESTIMONY

More information

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS April 30, 2018 The following ( MD&A ) of FortisAlberta Inc. (the Corporation ) should be read in conjunction with the following: (i) the unaudited

More information

SECOND QUARTER FINANCIAL REPORT JUNE 30, 2017

SECOND QUARTER FINANCIAL REPORT JUNE 30, 2017 SECOND QUARTER FINANCIAL REPORT JUNE 30, 2017 TORONTO HYDRO CORPORATION TABLE OF CONTENTS Glossary 3 Management s Discussion and Analysis 4 Introduction 5 Business of Toronto Hydro Corporation 6 Results

More information

2015 Deferral Account Reconciliation Application Consultation Meeting. LaRhonda Papworth, Regulatory May 3, Calgary

2015 Deferral Account Reconciliation Application Consultation Meeting. LaRhonda Papworth, Regulatory May 3, Calgary 2015 Deferral Account Reconciliation Application Consultation Meeting LaRhonda Papworth, Regulatory May 3, 2016 - Calgary Agenda Objectives and scope (slides 3-4) Deferral account reconciliation application

More information

Alberta Electric System Operator Amended 2018 ISO Tariff Application

Alberta Electric System Operator Amended 2018 ISO Tariff Application Alberta Electric System Operator Amended 2018 ISO Tariff Application Date: August 17, 2018 Table of Contents 1 Application... 6 1.1 Background... 6 1.2 Organization of application... 7 1.3 Relief requested...

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404 202-239-3300 Fax: 202-239-3333 www.alston.com September 1, 2016 To: Re: Parties to FERC Docket No. ER08-386-000 Potomac-Appalachian

More information

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696 Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/14 Utilizing FERC Form 1 Data Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line

More information

First Revised Sheet No. 2758L. Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data VECTREN

First Revised Sheet No. 2758L. Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/10 Utilizing FERC Form 1 Data VECTREN Midwest ISO FERC Electric Tariff, Fourth Revised Volume No. 1 First Revised Sheet No. 2758L Superseding Original Sheet No. 2758L Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended

More information

Exhibit PSE-501 Period II John Story. Statement AA - Period II Puget Sound Energy Balance Sheets

Exhibit PSE-501 Period II John Story. Statement AA - Period II Puget Sound Energy Balance Sheets Statement AA - Period II Balance Sheets Page 1 of 4 FERC 2010 Change 2011 Line No. Account Description Amount Amount Utility Plant 1. 101 Plant in Service $9,793,926,043 $478,686,201 $10,272,612,244 2.

More information

UNIFORM SYSTEM OF ACCOUNTS ACCOUNT LISTING BALANCE SHEET CHART OF ACCOUNTS ASSETS AND OTHER DEBITS

UNIFORM SYSTEM OF ACCOUNTS ACCOUNT LISTING BALANCE SHEET CHART OF ACCOUNTS ASSETS AND OTHER DEBITS BALANCE SHEET CHART OF ACCOUNTS ASSETS AND OTHER DEBITS 1. UTILITY PLANT 101 Electric plant in service (Major only). 101.1 Property under capital leases. 102 Electric plant purchased or sold. 103 Experimental

More information

Rate Formula Template (A) (B) (C) (D) (E) (F)

Rate Formula Template (A) (B) (C) (D) (E) (F) Page 1 of 4 Rate Formula Template (A) (B) (C) (D) (E) (F) Line Allocated No. Reference Worksheet/Note Amount A. NETWORK SERVICE 1 GROSS REVENUE REQUIREMENT Page 2, line 26, col. (F) $ 116,851,990 REVENUE

More information

FOURTH QUARTER AND FULL-YEAR 2018 RESULTS. February 22, 2019

FOURTH QUARTER AND FULL-YEAR 2018 RESULTS. February 22, 2019 FOURTH QUARTER AND FULL-YEAR 208 RESULTS February 22, 209 FORWARD LOOKING STATEMENTS AND NON-GAAP FINANCIAL MEASURES This presentation contains forward-looking statements based on current expectations,

More information

Audited Financial Statements For the years ended December 31, 2018 and 2017

Audited Financial Statements For the years ended December 31, 2018 and 2017 FORTISALBERTA INC. Audited Financial Statements Deloitte LLP 700, 850 2 Street SW Calgary, AB T2P 0R8 Canada Independent Auditor s Report Tel: 403-267-1700 Fax: 587-774-5379 www.deloitte.ca To the Shareholder

More information

Electric Price Outlook for Indiana High Load Factor (HLF) customers December 2016

Electric Price Outlook for Indiana High Load Factor (HLF) customers December 2016 Electric Price Outlook for Indiana High Load Factor (HLF) customers December 2016 Price projection We project our prices for High Load Factor customers to increase 4 to 6 percent in 2017 compared to 2016.

More information

BC Hydro FIrST QUArTEr report FISCAL 2015

BC Hydro FIrST QUArTEr report FISCAL 2015 BC Hydro FIRST QUARTER REPORT FISCAL 2015 BC Hydro & Power Authority Management S Discussion and Analysis This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority

More information

British Columbia Hydro and Power Authority

British Columbia Hydro and Power Authority 2017/18 THIRD QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

Consolidated Financial Statements. Lakeland Holding Ltd. December 31, 2013

Consolidated Financial Statements. Lakeland Holding Ltd. December 31, 2013 Consolidated Financial Statements Lakeland Holding Ltd. Contents Page Independent Auditor s Report 1-2 Consolidated Statements of Earnings and Comprehensive Loss 3 Consolidated Statement of Shareholders

More information

Audited Financial Statements. March 31, 2007

Audited Financial Statements. March 31, 2007 Audited Financial Statements March 31, 2007 Vancouver, Canada May 23, 2007 Report of the Office of the Auditor General of British Columbia To the Members of the Board of British Columbia Transmission

More information

CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT. for the period ended

CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT. for the period ended CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT for the period ended SEPTEMBER 30, 2017 FINANCIAL STATEMENTS (UNAUDITED) QUARTER ENDED SEPTEMBER 30, 2017 TABLE OF

More information

British Columbia Hydro and Power Authority

British Columbia Hydro and Power Authority 2016/17 SECOND QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

HYDRO ONE NETWORKS INC. DISTRIBUTION Revenue Deficiency/(Sufficiency) Year Ending December 31, 2010 and 2011 ($ Millions)

HYDRO ONE NETWORKS INC. DISTRIBUTION Revenue Deficiency/(Sufficiency) Year Ending December 31, 2010 and 2011 ($ Millions) HYDRO ONE NETWORKS INC. DISTRIBUTION Revenue Deficiency/(Sufficiency) Year Ending December, 0 and 0 ($ Millions) Updated: September, 00 Schedule Attachment Page of Line No. Particulars 0 0 Revenue requirement

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

Clean and Redline Tariffs Schedule 18 Only Attachment 2 to Appendix IX of SCE Transmission Owner Tariff January 1, 2015 and January 1, 2016 Effective

Clean and Redline Tariffs Schedule 18 Only Attachment 2 to Appendix IX of SCE Transmission Owner Tariff January 1, 2015 and January 1, 2016 Effective Clean and Redline Tariffs Schedule 18 Only Attachment 2 to Appendix IX of SCE Transmission Owner Tariff January 1, 2015 and January 1, 2016 Effective Dates Clean Tariff Schedule 18 Only Attachment 2 to

More information

Appendix 1 Duquesne Light Company Attachment H -17A Page 1 of 25 Formula Rate - Appendix A True-Up Notes FERC Form 1 Page # or Instruction 2017 Shaded cells are input cells Allocators 1 Transmission Wages

More information

Power Workers' Union (PWU) INTERROGATORY #1. Ref (a): Participant Information Package: Exhibit C1-2-1, Page 5 of 6, Table 2 (OM&A Expenditures)

Power Workers' Union (PWU) INTERROGATORY #1. Ref (a): Participant Information Package: Exhibit C1-2-1, Page 5 of 6, Table 2 (OM&A Expenditures) Filed: 0-0- 0-0 Tx Rates Schedule Page of Power Workers' Union (PWU) INTERROGATORY # Ref (a): Participant Information Package: Exhibit C--, Page of, Table (OM&A Expenditures) Table : 0 Board Approved versus

More information

SCHEDULE and 2019 Budget Assumptions

SCHEDULE and 2019 Budget Assumptions SCHEDULE 3.4 2018 and 2019 Budget Assumptions 1 2018-19 Budgets Assumptions 2 3 The following assumptions were used by EGNB in the development of its 2018 and 2019 Budgets: 4 5 Budget Item Assumption 6

More information

BUSINESS PLANNING ASSUMPTIONS

BUSINESS PLANNING ASSUMPTIONS EB-00-0 Exhibit C Tab Schedule Page of BUSINESS PLANNING ASSUMPTIONS INTRODUCTION Following is a summary of key assumptions related to THESL s financial projections included in this Application. ECONOMIC

More information

Fourth Quarter and Year End 2016 Investor Call. March 21, Oncor Electric Delivery

Fourth Quarter and Year End 2016 Investor Call. March 21, Oncor Electric Delivery Fourth Quarter and Year End 2016 Investor Call March 21, 2017 Forward Looking Statements This presentation contains forward-looking statements, which are subject to various risks and uncertainties. Discussion

More information

Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators

Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators Page 1 of 25 Formula Rate - Appendix A Estimate Notes FERC Form 1 Page # or Instruction 2015 Shaded cells are input cells Allocators 1 Transmission Wages Expense p354.21.b 5,926,573 2 Total Wages Expense

More information

Duquesne Light Company Distribution Rate Case Docket No. R Filing Index

Duquesne Light Company Distribution Rate Case Docket No. R Filing Index Duquesne Light Company Distribution Rate Case Docket No. R-2013-2372129 Filing Index Exhibit 1 Summary of Filing Part I General Information Part II Primary Statements of Rate Base & Operating Income Part

More information

Wages & Salary Allocation Factor 1 Transmission Wages Expense p b 18,901,839

Wages & Salary Allocation Factor 1 Transmission Wages Expense p b 18,901,839 Page 1 of 29 Arizona Public Service Company Formula Rate Appendix A Notes Instruction 2014 Shaded cells are input cells Allocators Wages & Salary Allocation Factor 1 Transmission Wages Expense p354.21.b

More information

Electric Price Outlook for Indiana Low Load Factor (LLF) customers December 2016

Electric Price Outlook for Indiana Low Load Factor (LLF) customers December 2016 Electric Price Outlook for Indiana Low Load Factor (LLF) customers December 2016 Price projection We project our prices for Low Load Factor customers to increase 4 to 6 percent in 2017 compared to 2016.

More information

Michigan Public Service Commission The Detroit Edison Company Projected Net Operating Income "Total Electric" and "Jurisdictional Electric"

Michigan Public Service Commission The Detroit Edison Company Projected Net Operating Income Total Electric and Jurisdictional Electric Projected Net Operating Income Schedule: C1 "Total Electric" and "Jurisdictional Electric" Witness: T. M. Uzenski Projected 12 Month Period Ending March 31, 2012 Page: 1 of 1 ($000) (a) (b) (c) Historical

More information

Public Utility District #1 of Ferry County Budget. December 19, 2016

Public Utility District #1 of Ferry County Budget. December 19, 2016 Public Utility District #1 of Ferry County 2017 Budget December 19, 2016 The Approved Budget for 2017 is $7,688,400 which reflects an overall decrease of 3.86% from the 2016 Budget; this is a reduction

More information

APPENDIX X FORMULA FOR CALCULATING THE ALLOCATED COSTS TO THE CITIZENS BORDER EAST LINE RATE UNDER SDG&E S TRANSMISSION OWNER TARIFF

APPENDIX X FORMULA FOR CALCULATING THE ALLOCATED COSTS TO THE CITIZENS BORDER EAST LINE RATE UNDER SDG&E S TRANSMISSION OWNER TARIFF APPENDIX X FORMULA FOR CALCULATING THE ALLOCATED COSTS TO THE CITIZENS BORDER EAST LINE RATE UNDER SDG&E S TRANSMISSION OWNER TARIFF Appendix X sets forth the formula for calculating the Citizens Border

More information

ONCOR ELECTRIC DELIVERY COMPANY LLC

ONCOR ELECTRIC DELIVERY COMPANY LLC Tariff for Transmission Service Oncor Electric Delivery Company LLC 1616 Woodall Rodgers Fwy Dallas, Texas 75202-1234 Contents Sheet 1 Revision: Nine Effective Date: November 27, 2017 Page 1 of 2 CONTENTS

More information

Information Disclosure prepared in accordance with the. Electricity Distribution Information Disclosure Determination 2012

Information Disclosure prepared in accordance with the. Electricity Distribution Information Disclosure Determination 2012 Information Disclosure prepared in accordance with the Electricity Distribution Information Disclosure Determination 2012 For the Year Ended 31 March 2013 COUNTIES POWER LIMITED Information Disclosure

More information

ONCOR ELECTRIC DELIVERY COMPANY LLC

ONCOR ELECTRIC DELIVERY COMPANY LLC Tariff for Transmission Service Oncor Electric Delivery Company LLC 1616 Woodall Rodgers Fwy Dallas, Texas 75202-1234 Contents Sheet 1 Revision: Nine Effective Date: November 27, 2017 Page 1 of 2 CONTENTS

More information

Public Accounts of Ontario

Public Accounts of Ontario Ontario Ministry of Finance Public Accounts of Ontario Financial Statements of Crown Corporations, Boards, Commissions 2000-2001 VOLUME 2 TABLE OF CONTENTS General Guide to Public Accounts...vii Ontario

More information

Decision FortisAlberta Inc Phase II Distribution Tariff. January 27, 2014

Decision FortisAlberta Inc Phase II Distribution Tariff. January 27, 2014 Decision 2014-018 FortisAlberta Inc. 2012-2014 Phase II Distribution Tariff January 27, 2014 The Alberta Utilities Commission Decision 2014-018: FortisAlberta Inc. 2012-2014 Phase II Distribution Tariff

More information

Orlando Utilities Commission

Orlando Utilities Commission NINE MONTHS ENDED June 2016 1 Table of Contents Management s Discussion and Analysis 3 Statements of Revenues, Expenses and Changes 6 in Net Position - Unaudited Statements of Net Position - Unaudited

More information

CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT. for the period ended

CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT. for the period ended CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT for the period ended MARCH 31, 2018 FINANCIAL STATEMENTS (Unaudited) QUARTER ENDED MARCH 31, 2018 TABLE OF CONTENTS

More information

ICM True-Up Model. Last COS Re-based Year Note: Drop-down lists are shaded blue; Input cells are shaded green. Utility Name. Assigned EB Number

ICM True-Up Model. Last COS Re-based Year Note: Drop-down lists are shaded blue; Input cells are shaded green. Utility Name. Assigned EB Number ICM TrueUp Model Version 4.00 Utility Name PowerStream Inc. Assigned EB Number EB20150103 Name and Title Tom Barrett, Manager, Rates Applications Phone Number 9055324640 Email Address tom.barrett@powerstream.ca

More information

Statement of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4

Statement of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4 M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: DATE: August 26, 2016 SUBJECT: OBJECTIVE: Commissioners Simpson, Helgeson, Manning, Mital and Brown Sue Fahey, CFO; Susan Eicher, Accounting

More information

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES 1. Acceptance of Electricity Service By establishing or requesting a POD or by continuing an

More information

Unaudited Condensed Interim Financial Statements For the three and nine months ended September 30, 2018

Unaudited Condensed Interim Financial Statements For the three and nine months ended September 30, 2018 FORTISALBERTA INC. Unaudited Condensed Interim Financial Statements For the three and nine months ended 2018 FORTISALBERTA INC. CONDENSED INTERIM BALANCE SHEETS (UNAUDITED) As at (all amounts in thousands

More information

Southwestern Public Service Company. Attachment O - Transmission Formula Rate 2014 True-Up. Golden Spread Information Request No. 1.

Southwestern Public Service Company. Attachment O - Transmission Formula Rate 2014 True-Up. Golden Spread Information Request No. 1. The following questions pertain to the spreadsheet file 07-2015---Attachment_O- 2014_SPS_Transmission_Formula_Rate_True-Up_rv1 : GSEC 1-1. Refer to SPS s 2014 FERC Form 1 page 207, line 48 Account 350

More information

Report of Management. Auditors Report

Report of Management. Auditors Report Report of Management The consolidated financial statements and all the information in the 2007 annual report are the responsibility of management. The financial statements have been prepared in accordance

More information

Public Utility District #1 of Ferry County Budget. December 17, 2018

Public Utility District #1 of Ferry County Budget. December 17, 2018 Public Utility District #1 of Ferry County 2019 Budget December 17, 2018 The Approved Budget for 2019 reflects an overall reduction of approximately 3.2 percent from the 2018 Budget. The District is predicting

More information

SECOND QUARTER REPORT JUNE 30, 2015

SECOND QUARTER REPORT JUNE 30, 2015 SECOND QUARTER REPORT JUNE 30, 2015 TORONTO HYDRO CORPORATION TABLE OF CONTENTS Glossary 3 Management s Discussion and Analysis 4 Executive Summary 5 Introduction 5 Business of Toronto Hydro Corporation

More information

ARKANSAS PUBLIC SERVICE COMMISSION

ARKANSAS PUBLIC SERVICE COMMISSION ARKANSAS PUBLIC SERVICE COMMISSION First Revised Sheet No. 4-9.1/34 Replacing: Original Sheet No. CenterPoint Energy Resources Corp. d/b/a CenterPoint Energy Arkansas Gas (Name of Company) Kind of Service:

More information

HYDRO ONE INC. MANAGEMENT S REPORT

HYDRO ONE INC. MANAGEMENT S REPORT MANAGEMENT S REPORT The Consolidated Financial Statements, Management s Discussion and Analysis (MD&A) and related financial information have been prepared by the management of Hydro One Inc. (Hydro One

More information

Long Island Power Authority Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets

Long Island Power Authority Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets George E. Pataki Governor Richard M. Kessel Chairman LONG ISLAND POWER AUTHORITY APPROVED 2002 OPERATING BUDGET APPROVED 2002 AND 2003

More information

Schedule of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4

Schedule of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4 M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: Commissioners Simpson, Helgeson, Manning, Mital and Brown FROM: Sue Fahey, Chief Financial Officer; Susan Eicher, Accounting & Treasury Supervisor

More information

REVENUE REQUIREMENT CGA Regulatory Course. Michelle Carman FortisBC Energy Inc.

REVENUE REQUIREMENT CGA Regulatory Course. Michelle Carman FortisBC Energy Inc. REVENUE REQUIREMENT 2016 CGA Regulatory Course Michelle Carman FortisBC Energy Inc. 1 Introduction Presentation Objectives Part 1: Explain and demonstrate the calculation of revenue requirement for the

More information

ESKOM S CONNECTION CHARGES METHODOLOGY

ESKOM S CONNECTION CHARGES METHODOLOGY ESKOM S CONNECTION CHARGES METHODOLOGY 13 November 2007 This document may be updated from time to time. Please refer to www.eskom.co.za/tariffs for the latest version. Eskom s Connection Charges Methodology