HALDIMAND COUNTY 2013 Rate Supported Water and Wastewater Capital Forecast and Operating Budget. Committee of the Whole April 22, 2013
|
|
- Derrick Patrick
- 5 years ago
- Views:
Transcription
1 HALDIMAND COUNTY 2013 Rate Supported Water and Wastewater Capital Forecast and Operating Budget Committee of the Whole April 22, 2013
2 Council Review of s Budget Review Dates Tax Supported Capital Budget and Forecast Completed January 2013 Tax Supported Operating Budget Review Completed March 25, 2013 Water and Wastewater: Draft Capital Forecast and Operating Budget Review April 22, 2013
3 Rate Supported Budget Constraints Legislative Framework/External Budget Constraints Full cost recovery from users of system(s) Water users fund 100% of water capital and operating costs Wastewater users fund 100% of wastewater capital and operating costs Highly legislated/regulated Full cost recovery principles Water conservation principles Economies of scale (significant number of systems in Province (>800 systems) and number of small systems (approx. 600 systems have <10,000 users) Province is advocating use of technology to improve efficiencies of systems
4 Rate Study Budget guidelines based on the principles developed/approved during the water/wastewater rate study Activity Completion Date/Anticipated Timing Completion of water/wastewater models, review with County June 2012 staff, refinement of models and modeling of scenarios Notice of Public Information Session #1 Week of July 2, 2012 Hold Public Information Session #1 July 18, 2012 (two sessions held in Cayuga) Initial Customer feedback period July 2 July 31, 2012 Consideration of public comments, adjustments to models August to November, 2012 and preparation of report to Council Report and Presentation to Council on the draft models and January 21, 2013 customer feedback Notice of Public Information Session #2 February 1, 2013 Hold Public Information Session #2 February 20, 2013 Presentation of Report recommending approval of rate model April 22, 2013
5 HALDIMAND COUNTY 2013 Draft Rate Supported Capital Budget and Forecast
6 2013 Draft Rate Supported Capital Budget Focus on Corporate Strategic Objectives and Long Term Financial Plans Key Principles of Rate Supported Capital Budget Replacement/Rehabilitation Focus Studies/Reviews Provide Service Capacity for Anticipated Growth Focus on Financing of Projects over the forecast Water vs. Wastewater
7 Gross Capital Expenditure Summary Comparison of average gross expenditures over forecasted period Gross Expenditures 2012 Approved Budget Average Annual Gross Expenditures Average Annual Gross Expenditures 10 Year Forecast from Rate Study (average annual gross expenditures) Water System $3.0 Million $4.0 Million $4.7 Million Wastewater System $2.6 Million $3.4 Million $4.3 Million Total $5.6 Million $7.4 Million $9.0 Million
8 2013 Draft Rate Supported Capital Budget 6,000,000 Gross Capital Expenditures - Water 5,000,000 4,000,000 Administration 3,000,000 Plants/Transmission Systems Technical Reviews and Studies Replacement and Upgrade Projects 2,000,000 1,000,
9 2013 Draft Rate Supported Capital Financing 6,000,000 Funding Sources - Water 5,000,000 4,000,000 3,000,000 2,000,000 Debentures Reserve Funds Development Charges Reserve Fund Gas Tax Reserve Fund External Financing Grants/Subsidies 1,000,
10 2013 Draft Rate Supported Capital Budget 6,000,000 Gross Capital Expenditures - Wastewater 5,000,000 4,000,000 Administration 3,000,000 Plants/Transmission Systems Technical Reviews and Studies Replacement and Upgrade Projects 2,000,000 1,000,
11 2013 Draft Rate Supported Capital Financing 6,000,000 Funding Sources - Wastewater 5,000,000 4,000,000 3,000,000 2,000,000 Debentures Reserve Funds Development Charges Reserve Fund Gas Tax Reserve Fund External Financing Grants/Subsidies 1,000,
12 Impact on Capital Replacement Reserve Funds 8,000,000 Forecast -Capital Replacment Reserve Funds 6,000,000 4,000,000 2,000, Wastewater Water -2,000,000-4,000,000-6,000,000-8,000,000
13 2013 Draft Rate Supported Capital Budget Infrastructure Deficit The total value of physical infrastructure investment that should have occurred to maintain optimal performance but did not. This would include any delayed rehabilitation and replacement of assets that are worn out. Haldimand County s estimated water and wastewater infrastructure deficit (based on assets reported for audited financial statement purposes)
14 Haldimand s Infrastructure Deficit Estimated Infrastructure Deficit Rate Supported Assets $ Current Position Capital Replacement Reserve Fund ( CRRF ) Balances $6,151,767 Less: Estimated replacement value of fully amortized Assets (i.e. at/beyond estimated useful life) $11,815,281 Estimated Deficit $5,663,514 Current Historical Cost of All Rate Supported Assets (2011 audited financial statements) $169,751,630 Annual Contributions Current Annual CRRF contributions $3,024,820 Less: Estimated annual required contributions to meet future replacement costs at estimated useful life $23,081,772 Estimated Deficit $20,056,952 Current Annual Amortization Cost for all Rate Supported Assets (2011 audited financial statements) $2,813,600
15 Impact on Long Term Debt Payments $14,000,000 Debt Payments to Benchmark ARL $12,000,000 $10,000,000 $8,000,000 $6,000,000 $4,000,000 Benchmark ARL (10% of Net Revenues) Rate Supported Debt Charges Tax Supported Debt Charges $2,000,000 $
16 HALDIMAND COUNTY 2013 Draft Rate Supported Operating Budget
17 Rate Supported Operating Budget Constraints Full cost recovery from users of the system(s) (no support from tax levy) Relative small number of users (approx. 8,700) and large number of systems to operate (4 wastewater treatment plants, 4 wastewater lagoons, 2 water treatment facilities, 7 water distribution systems and 8 wastewater distribution systems) Large portion of costs fixed (50%); funded from variable rates (70%) Rate study addressed cost allocation/recovery principles (Appendix L): Move to 50%/50% fixed to variable recovery mode; Revised Fire Protection allocation methodology; Monthly Administration fees for bulk water and hauled waste customers; Blended holding and septic tank rates.
18 Operating Budget Rate Drivers The required rates revenues is a function of the following: Impacts of increased cost of system(s) Cost allocation methodology to specific customers Offsetting Revenue from other sources Impact on the Rate is a function of: Net required rates revenue (from above) Anticipated consumption/use of the system(s) rate model assumptions consumption impacts
19 Revenue Required from Rates Water Only WATER OPERATIONS incr/(decr) Budget Budget $ % Expenditures Salaries, Wages & Benefits 1,468,440 1,452,080 (16,360) -1.1% Supplies & Materials 112, ,310 (7,670) -6.8% Hamilton Water Supply 2,349,540 2,451, , % Services 2,725,470 2,903, , % Veolia Operating Services Charges 1,744,440 1,778,430 33, % Interdepartmental Charges 318, ,130 11, % Long Term Debt Charges 261, ,740 49, % Transfers to Reserves/Reserve Funds 1,650,430 1,817, , % Total Expenditures 10,631,300 11,148, , % Revenues Municipal Recoveries (192,100) (86,700) 105, % Fees & Recoveries (3,779,200) (5,403,350) (1,624,150) 43.0% Total Revenues (3,971,300) (5,490,050) (1,518,750) 38.2% Net Revenues Required from User Rates 6,660,000 5,658,820 (1,001,180) -15.0% Driver Net Rate Revenue Impact % Impact A. Infrastructure capital financing requirements $83, % B. Base Budget (net) $175, % C. New initiatives ($1,260,180) (18.9%) Total ($1,001,180) (15.0%)
20 Revenue Required from Rates Wastewater only WASTEWATER OPERATIONS incr/(decr) Budget Budget $ % Expenditures Salaries, Wages & Benefits 612, ,700 47, % Supplies & Materials 40,240 27,490 (12,750) -31.7% Services 1,247,100 1,322,490 75, % Veolia Operating Services Charges 1,926,300 1,967,590 41, % Interdepartmental Charges 234, ,590 7, % Long Term Debt Charges 1,568,360 1,592,340 23, % Transfers to Reserves/Reserve Funds 1,992,220 2,253, , % Total Expenditures 7,621,740 8,066, , % Revenues Municipal Recoveries (66,200) (67,500) (1,300) 2.0% Fees & Recoveries (2,034,420) (2,424,730) (390,310) 19.2% Transfers from Reserves/Reserve Funds (419,600) (419,600) 0 0.0% Total Revenues (2,520,220) (2,911,830) (391,610) 15.5% Net Revenues Required from User Rates 5,101,520 5,154,680 53, % Driver Net Rate Revenues Impact % Impact A. Infrastructure capital financing requirements $627, % B. Base Budget (net) ($584,680) (11.5%) C. New initiatives $9, % Total $53, %
21 Impact on Other Revenues/Rates Water Other Revenues Bulk Water Charges represent $1.3 million and Fire Protection Recoveries represent $1.9 million of the total $3.5 million in other charges Wastewater Other Revenues Leachate treatment revenues represent $1.9 million and holding/septic tank revenues represent $325,100 of the total $2.9 million in other charges
22 Customers and Consumption Water System Budgeted Consumption Customer Number of Customers % (cubic metres) % Residential 8, % 1,422, % Commercial % 379, % Large Commercial % 207, % Large Industrial 3 0.0% 685, % Total (excluding bulk water) 8, % 2,694, % Bulk Water* 350 n/a 404, % Total Annual Consumption 3,098, % * - average monthly numb er of b illed b ulk water customers
23 BULK WATER COST ALLOCATION Treatment Plant Distribution System $2.92 /m3 BULK WATER STATION Direct Operating = $0.21/m3 Direct Capital = $0.06/m Rate = $ $ $0.16 (admin) = $3.03/m3
24 Proposed Bulk Water Rate Impact Bulk Water rate Change (per cubic metre) ($) (%) Proposed Rate $2.742 $ $ % New Monthly Administration fees n/a $14.96 Monthly Impact on Typical End User (3,000 gallon load) Water commodity $37.40 $41.32 $ % Estimated hauler delivery charge $72.60 $72.60 $ % Total End User cost $ $ $ %
25 Customers and Consumption Wastewater System Budgeted Consumption Customer Number of Customers % (cubic metres) % Residential 8, % 1,441, % Commercial % 355, % Large Commercial 9 0.1% 152, % Large Industrial 2 0.0% 307, % Total (excluding bulk water) 8, % 2,257, % Holding Tank n/a 17, % 7* Septic n/a 1, % Leachate (from County's landfills) 2 n/a 53, % 73, % Total Annual Consumption 2,330, % * - only includes commercial haulers that use the County's facilities
26 SEPTIC/ HOLDING TANK / LEACHATE Treatment Plant Loading ST = 0.8% HT = 6.6% Leachate = 45% Collection System Shared ST/HT/ Leachate Facilities Leachate and Holding/Septic Wastewater Leachate Receiving Station 100% Leachate
27 Proposed Holding/Septic Charges Impact Holding/Septic/Portable Toilet Tank Treatment Charge Change (per cubic metre) ($) (%) Proposed Rate $7.322 $8.58 $ % New Monthly Administration Fee (haulers only) New Annual Capital Charge for Properties with Holding/Septic Tank n/a $14.96 n/a $12.83 Monthly Impact on Typical End User (2,000 gallon load) Treatment cost $66.56 $77.99 $ % Estimated hauler delivery charge $87.70 $87.70 $0 0.0% Total End User costs $ $ $ %
28 Average Monthly Increase on Customers
29 Future Issues and Challenges Impacts of Master Servicing Plans Ongoing Performance Evaluations of Facilities Tangible Capital Asset Reporting and Asset Management Leachate Treatment Volumes
M A N I T O B A ) Order No. 100/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES
M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 BEFORE: Graham Lane, CA, Chairman Susan Proven, P.H.Ec., Member MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES Page
More informationPROPOSED 2019 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS
PROPOSED 2019 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS Section 1 Financial Services Report Financial Services Report...1 Section 2 General Information Norfolk County Council & Senior Staff...
More informationWater and Wastewater Budget development Summary of proposed 2015 Water and Wastewater rates About demand forecasting
Water and Wastewater Budget development Annual operating budget development for water and wastewater is based on net zero funding principles, as defined by the Municipal Act, 2001, where revenues and expenses,
More informationFINAL 2017 RATE SUPPORTED BUDGET TABLE OF CONTENTS
FINAL RATE SUPPORTED BUDGET TABLE OF CONTENTS Final Operating Budget WATER & WASTEWATER SUMMARY PSAB Format... 1 WATER & WASTEWATER SUMMARY... 2 Water & Wastewater Administration Summary... 3 Water Operations
More informationFINAL 2018 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS
FINAL RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS Section 1 Final Rate Supported Operating Budget Water & Wastewater Summary PSAB Format...1 Water & Wastewater Summary...2 Water & Wastewater Administration...3
More informationCORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE. Financial Statements. December 31, 2015
CORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE Financial Statements December 31, 2015 Financial Statements Table of Contents PAGE Independent Auditors' Report 1 Statement of Financial Position 2 Statement
More informationCORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE. Financial Statements. December 31, 2016
CORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE Financial Statements December 31, 2016 Financial Statements Table of Contents PAGE Independent Auditors' Report 1 Statement of Financial Position 2 Statement
More informationThe Corporation of Haldimand County. Consolidated Financial Statements
Consolidated Financial Statements December 31, 2016 Index to Consolidated Financial Statements December 31, 2016 Page INDEPENDENT AUDITORS' REPORT 2 CONSOLIDATED FINANCIAL STATEMENTS Management's Responsibility
More informationKneehill County Consolidated Financial Statements For the year ended December 31, 2016
Consolidated Financial Statements For the year ended Consolidated Financial Statements For the year ended Contents Auditors' Report 1 Consolidated Financial Statements Consolidated Statement of Financial
More informationATLANTIC COUNTY UTILITIES AUTHORITY CITY OF ATLANTIC, NEW JERSEY WASTEWATER DIVISION COMPARATIVE BALANCE SHEET. December 31, 1999 and 1998
WASTEWATER DIVISION COMPARATIVE BALANCE SHEET December 31, 1999 and 1998 Assets 1999 1998 Liabilities, Reserves and Fund Equity 1999 1998 Unrestricted Assets: Current Liabilities Payable From Cash $ 2,357,026
More information2019 Draft Rate Supported Operating Budget and 2019 Draft Capital Budget and Forecast
2019 Draft Rate Supported Operating Budget and 2019 Draft Capital Budget and Forecast Joint meeting of the Engineering and Public Works Committee (PW-3-2019) and Finance and Corporate Services Committee
More informationM A N I T O B A ) Order No. 43/02 ) THE PUBLIC UTILITIES BOARD ACT ) March 13, 2002
M A N I T O B A ) Order No. 43/02 ) THE PUBLIC UTILITIES BOARD ACT ) March 13, 2002 BEFORE: S. Proven, Acting Chair M. Girouard, Member THE RURAL MUNICIPALITY OF DE SALABERRY LOCAL IMPROVEMENT DISTRICT
More informationOrder No. 49/18 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES. April 12, 2018
THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES BEFORE: Irene A. Hamilton, Panel Chair Michael Watson, Member Room 400 330 Portage Avenue Winnipeg, MB R3C 0C4 www.pubmanitoba.ca
More informationThe Corporation of the City of Vaughan
The Corporation of the City of Vaughan 2014-2019 Consolidated Water System Financial Plan Vaughan Water System Kleinburg Water System The Corporation of the City of Vaughan 2141 Major Mackenzie Drive,
More informationTHE CORPORATION OF THE MUNICIPALITY OF GREY HIGHLANDS PROPOSED CAPITAL AND OPERATING BUDGET OVERVIEW BUILDING THE BUDGET 2
THE CORPORATION OF THE MUNICIPALITY OF GREY HIGHLANDS PROPOSED CAPITAL AND OPERATING BUDGET 20191 1 OVERVIEW BUILDING THE BUDGET 2 2 LEVELS OF REVIEW Departmental Submissions Public Engagement & Council
More information2017 Budget In Brief June 2017
2017 Budget In Brief June 2017 TABLE OF CONTENTS INTRODUCTION 201 7 BUDGET General Overview... 2-3 Financial Overview... 4-7 SUPPLEMENTARY INFORMATION Where the Money Comes From... 8 Where We Spend the
More informationOrder No. 105/17. September 29, BEFORE: Shawn McCutcheon, Member, Panel Chair Carol Hainsworth, C.B.A, Member Susan Nemec, FCPA, FCA, Member
MUNICIPALITY OF PEMBINA LOCAL URBAN DISTRICT OF DARLINGFORD WASTEWATER RATES January 1, 2018 and 2019 & 2015 DEFICIT RECOVERY BEFORE: Shawn McCutcheon, Member, Panel Chair Carol Hainsworth, C.B.A, Member
More informationStrategic Plan of Work & Projections. Development of the Plan of Work
Strategic Plan of Work & Projections The Strategic Plan of Work & Projections portion of this document provides a narrative discussion of the County s longterm planning process and links the policy making
More informationBEFORE: Susan Proven, P.H.Ec., Acting Chair Monica Girouard, CGA, Member
M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) May 10, 2012 BEFORE: Susan Proven, P.H.Ec., Acting Chair Monica Girouard, CGA, Member RURAL MUNICIPALITY OF ALEXANDER GREAT FALLS WATER AND SEWER UTILITY
More informationTOWNSHIP OF WEST LINCOLN
TOWNSHIP OF WEST LINCOLN April 18, 2016 dfa DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 664-B Vine Street St. Catharines Ontario Canada L2M 7L8 Telephone: (905) 938-0965
More informationMUNICIPALITY OF MISSISSIPPI MILLS. plan. December, 2016
MUNICIPALITY OF MISSISSIPPI MILLS plan December, 2016 PREFACE This Asset Management Plan is intended to describe the infrastructure owned, operated and maintained by the Municipality of Mississippi Mills
More informationCity of Benicia. Rate Study Update: Water & Wastewater Rates
City of Benicia Rate Study Update: Water & Wastewater Rates March 1, 2016 Prepared by: Karin Schnaider, Finance Director, City of Benicia Greg Clumpner, Director, NBS Carmen Narayanan, Consultant, NBS
More informationStrategic Plan 2014 CONSOLIDATED FINANCIAL
Strategic Plan 2014 CONSOLIDATED FINANCIAL statements 1 TABLE OF CONTENTS Auditor's Report... 1 Consolidated Statement of Financial Position... 2 Consolidated Statement of Operations and Accumulated Surplus...
More informationVillage of Minburn Viability Review
Village of Minburn Viability Review Viability Plan February 2015 A report concerning the viability of the Village of Minburn by the Village of Minburn Viability Review Team Village of Minburn Viability
More informationREFUSE COLLECTION COST OF SERVICE STUDY CITY COUNCIL MEETING APRIL 25, 2017
REFUSE COLLECTION COST OF SERVICE STUDY CITY COUNCIL MEETING APRIL 25, 2017 Topics Solid Waste Collection Services Budget Analysis Financial Model Staff Recommendations Solid Waste Collection Services
More informationCORPORATE AND EMERGENCY SERVICES
CORPORATE AND EMERGENCY SERVICES Asset Management Plan April 19, 2018 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1 1.3 Maintaining the Asset Management
More information2017 Mid-Year Financial Report
2017 Mid-Year Financial Report BACKGROUND The mid-year report provides information regarding the City of Regina s (City) financial performance. This report provides a high level summary on how the City
More informationCounty of Prince Edward. Water and Wastewater Rate and Study and Connection Charges Update
County of Prince Edward Water and Wastewater Rate and Study and Connection Charges Update December 16, 2015 Contents Page 1. Introduction... 1-1 1.1 Background... 1-1 1.2 Update Study Process... 1-5 1.3
More informationWATER and WASTEWATER & TREATMENT DRAFT October 30, 2017
WATER and WASTEWATER & TREATMENT DRAFT October 30, 2017 TABLE OF CONTENTS Recommendations... 1 WATER 2018-2019 Multi-Year Summary - Water... 5 2016-2019 Water Operating Overview... 6 2016-2019 Water Staffing
More informationCity of Waterloo Financial Dashboard
City of Waterloo Financial Dashboard Result for Change from Result for On BMA Study? 2017 2016 2016 A. Overall Financial Position 1 Financial Position per Capita Positive improving Positive Yes 2 Financial
More information2011 Draft Rate Supported Operating & Capital Budgets
2011 Draft Rate Supported Operating & Capital Budgets Joint meeting of the Engineering & Public Works Committee (PW 2 2011) and Corporate & Emergency Service Committee (CES 2 2011) February 2, 2011 The
More information2019 Budget Overview. Presentation to Budget Committee December 11, 2018
2019 Budget Overview Presentation to Budget Committee December 11, 2018 Introductory Comments Mike Murray Chief Administrative Officer 2019 Budget Challenges Base Budget pressures Infrastructure funding
More informationStrategic Plan CONSOLIDATED FINANCIAL
Strategic Plan 2017 CONSOLIDATED FINANCIAL statements 1 Table of Contents Independent Auditor's Report... 1 Consolidated Statement of Financial Position... 2 Consolidated Statement of Operations and Accumulated
More informationSonoma County Service Area #41(CSA #41) Water Rate Study
Sonoma County Service Area #41(CSA #41) Water Rate Study September 13, 2016 Prepared by Greg Clumpner, Director, NBS Carmen Narayanan, Consultant, NBS 1 CSA #41 Zones of Benefit 2 Overview of Presentation
More informationCITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No
CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No. 112301 April 1st 2016 DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 33 Raymond
More informationWATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016
WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results January 5, 2016. Public Resources Management Group, Inc. Utility, Rate, Financial and Management Consultants Utility
More informationImplementation of an Asset Management Plan
Municipal Finance Officers Association of Ontario 2006 Annual Conference Implementation of an Asset Management Plan Chad McCleave, CA PricewaterhouseCoopers September 21, 2006 pwc Municipal Infrastructure
More informationMunicipality of Bluewater Draft Budget
Municipality of Bluewater - 2010 Draft Budget 1 Draft 2010 Budget Bluewater Municipal Council has approved a draft 2010 budget of $5,551,702, a 4.66% overall increase which protects the current levels
More informationInfrastructure Services. Infrastructure Services
Infrastructure Services Infrastructure Services Infrastructure Services Summary Part Time Hours Overtime Hours Crew Hours Revenues Options 353 346 (2.0) 0 346 (2.0) 56,413 54,972 (2.6) 1,371 56,343 (0.1)
More informationRATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.
WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13
More informationM A N I T O B A ) Order No. 13/13 ) THE PUBLIC UTILITIES BOARD ACT ) February 4, 2013
M A N I T O B A ) Order No. 13/13 ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Susan Proven, P.H.Ec., Acting Chair Marilyn Kapitany, B.Sc. (Hons.), M.Sc., Member RURAL MUNICIPALITY OF PEMBINA LOCAL URBAN
More informationHeadquarters Landfill
Headquarters Landfill Headquarters Landfill Project Progress Sale and Purchase Agreement signed to purchase Headquarters Landfill on March 28, 2012. Final Environmental Impact Statement to convert Headquarters
More informationCORPORATION OF THE TOWN OF ARNPRIOR
Consolidated Financial Statements CORPORATION OF THE TOWN OF ARNPRIOR Consolidated Financial Statements CORPORATION OF THE TOWN OF ARNPRIOR CORPORATION OF THE TOWN OF ARNPRIOR Page Auditors' Report 1 Consolidated
More information2017 NIAGARA REGION ANNUAL FINANCIAL REPORT STATISTICAL
2017 NIAGARA REGION ANNUAL FINANCIAL REPORT For the year ended December 31, 2017 The Regional Municipality of Niagara Ontario, Canada niagararegion.ca Prepared by Enterprise Resource Management Services
More informationp Local governments in Canada moved from a modified accrual to a full accrual accounting approach.
PSAB 3150 p Local governments in Canada moved from a modified accrual to a full accrual accounting approach. p The primary change for local governments was the accounting treatment for tangible capital
More informationOrder No. 99/17. September 15, Carol Hainsworth, C.B.A., Acting Chair Susan Nemec, FCPA, FCA, Member Allan Morin, B.A., ICD.
RURAL MUNICIPALITY OF ROCKWOOD STONY MOUNTAIN WATER AND WASTEWATER UTILITY INTERIM RATES ACTUAL OPERATING DEFICITS for 2013, 2014 AND 2015 BEFORE: Carol Hainsworth, C.B.A., Acting Chair Susan Nemec, FCPA,
More informationFinancing Best Practices: Enterprise, Financial Assurance, Fee Structure
Financing Best Practices: Enterprise, Financial Assurance, Fee Structure North Carolina Chapter SWANA Conference October 31, 2017 Member NYSE FINRA SIPC Solid Waste Services City of Raleigh Establishing
More informationIntroduction to Water and Sewer Fund Needs August 11, 2017
Introduction to Water and Sewer Fund Needs August 11, 2017 A lot of good things are happening in Buffalo and we hope to make some exciting announcements in the months to come, especially about possible
More informationFINANCIAL SUSTAINABILITY PLAN PROJECT SCOPE
FINANCIAL SUSTAINABILITY PLAN PROJECT SCOPE WHY FORMALIZE EXISTING STRATEGIES? 1) Align with Community Action Plan strategies: Ensure tax rates remain reasonable and competitive Rebuild and further strengthen
More informationSanta Ynez River Water Conservation District, ID No. 1. Water Rates & Finances. December 13, 2016
Santa Ynez River Water Conservation District, ID No. 1 Water Rates & Finances December 13, 2016 Presentation Overview Objectives & Process District Finances Current & Projected Rates 2 Rate Study Objectives
More informationCity of Waterloo Financial Dashboard
City of Waterloo Financial Dashboard Result for Change from On annual A. Overall Financial Position 2013 2012 BMA Study? 1 Financial Position per Capita Positive Positive Trend Yes 2 Financial Position
More informationCORPORATION OF THE TOWN OF ARNPRIOR
Consolidated Financial Statements CORPORATION OF THE TOWN OF ARNPRIOR Year ended December 31, 2006 Consolidated Financial Statements CORPORATION OF THE TOWN OF ARNPRIOR Year ended December 31, 2006 CORPORATION
More informationSolid Waste Management Services
OPERATING PROGRAM SUMMARY Contents I: Overview 1 II: Council Approved Budget 4 III: 2014 Service Overview and Plan 6 IV: 2014 Operating Budget 18 V: Issues for Discussion 29 Appendices: Solid Waste Management
More informationOverview Presentation January 9, /4/2017 1
Overview Presentation January 9, 2017 1/4/2017 1 2017 Business Plan Process Budget Direction Report EMT Review Service Partners June and August 2016 October 2016 January 9, 2017 January 16, 2017 February
More information2016 WCGFOA Conference
2016 WCGFOA Conference Considerations in Setting User Rates September 22, 2016 Andrew Grunda Watson & Associates Economists Ltd. Introduction Having established municipal finance policy objectives regarding
More informationM A N I T O B A ) Order No. 47/11 ) THE PUBLIC UTILITIES BOARD ACT ) March 31, 2011 THE VILLAGE OF NOTRE-DAME-DE-LOURDES WATER AND SEWER RATES
M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) March 31, 2011 BEFORE: Graham Lane, CA, Chairman Monica Girouard, CGA, Member Susan Proven, P.H.Ec., Member THE VILLAGE OF NOTRE-DAME-DE-LOURDES WATER
More informationToday we will discuss...
City of Brantford 2019 Development Charges Study Public Information Centre #1 Friday, September 28 th, 2018 Today we will discuss... Background What are Development Charges? DCs in Brantford Development
More informationWater and Wastewater Utility Rates
Water and Wastewater Utility Rates March 1, 2016 Presented By: Diana Langley Public Works Director 1 OVERVIEW 2 Uses of Funds Capital Investment Debt Service Operating Cost = Revenue Requirement 3 Source
More informationExecutive Summary. Preliminary Financial Forecast
Executive Summary The purpose of this report is to obtain directions from City Council regarding development of the 2019 Budget. It includes: a) A description of the proposed 2019 Budget development process
More informationDRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london.
6 MULTI-YEAR BUDGET FOR THE 2019 ANNUAL UPDATE INVESTING IN OUR FUTURE london.ca/budget DRAFT 2019 Water and Wastewater & Treatment Budget December 17, 2018 Table of Contents Recommendations... 1 WATER
More information2015 BUDGET SUMMARY Approved by Council December 15, 2014
BUDGET SUMMARY Approved by Council December 15, TOWN OF TABER APPROVED BUDGET SUMMARY TABLE OF CONTENTS APPROVED OPERATING BUDGET SUMMARY 1 OBJECT SUMMARY 2 FUNCTIONAL AREA SUMMARY 3-4 EXPENDITURE ESTIMATES
More informationNotice of a public hearing
Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.
More informationRURAL MUNICIPALITY OF ROCKWOOD STONY MOUNTAIN WATER AND WASTEWATER UTILITY APPROVAL OF REVISED RATES AS FINAL 2017, 2018 & 2019 VARYING BOARD ORDER NO
RURAL MUNICIPALITY OF ROCKWOOD STONY MOUNTAIN WATER AND WASTEWATER UTILITY APPROVAL OF REVISED RATES AS FINAL 2017, 2018 & 2019 VARYING BOARD ORDER NO. 99/17 DEFICIT RECOVERY FOR 2013, 2014 & 2015 ACTUAL
More informationCORPORATION OF THE TOWN OF ST. MARYS CONSOLIDATED FINANCIAL STATEMENTS DECEMBER 31, 2011
CORPORATION OF THE TOWN OF ST. MARYS CONSOLIDATED FINANCIAL STATEMENTS DECEMBER 31, 2011 INDEPENDENT AUDITORS' REPORT To the Members of Council, Inhabitants and Ratepayers of the Corporation of the Town
More informationM A N I T O B A ) Order No. 42/11 ) THE PUBLIC UTILITIES BOARD ACT ) March 30, 2011 RURAL MUNICIPALITY OF GIMLI WATER AND SEWER RATES
M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Graham Lane, CA, Chairman Monica Girouard, CGA Member Susan Proven, P.H.Ec., Member RURAL MUNICIPALITY OF GIMLI WATER AND SEWER RATES Page 2
More informationCouncil Meeting January 12, 2016
FO-46 Sept. 9/15 Council Meeting January 12, Subject: Proposed Levy Supported Operating Report Number: F.S.16-01 Department: Financial Services Division: Financial Planning and Reporting Closed Session:
More informationBUDGET DRAFT 1 November 19, 2019
BUDGET 2019 DRAFT 1 November 19, 2019 Executive summary For the consideration of our Mayor and Council, City of Lloydminster Administration is pleased to provide a first draft of the 2019 Municipal Budget.
More informationPROPOSED 2017 CAPITAL PLAN
PROPOSED 2017 CAPITAL PLAN Sec tion 1: Financial Services Report FO-46 Sept. 9/15 Special Meeting October 26, 2017 Subject: Report Number: Department: Division: Proposed 2017 Capital Plan F.S.16-28 Financial
More information2014 FONOM/MMAH NORTHERN MUNICIPAL CONFERENCE ASSET MANGEMENT PLANNING: TIP SHEETS. May 8 th 2014
2014 FONOM/MMAH NORTHERN MUNICIPAL CONFERENCE ASSET MANGEMENT PLANNING: TIP SHEETS May 8 th 2014 Topics Introduction & Overview MFOA s work with MMAH Hemson s Involvement Asset Management Tip Sheets 1.
More informationTown of New Sampleford. Financial Statement Presentation for December 31, Introduction and Sample
Financial Statement Presentation for December 31, Introduction and Sample Applicable Accounting Standards The Municipal Government Act requires a municipality to prepare annual audited financial statements
More informationFY 2015 Operating and Capital Budget Union County, NC
1 County Services Public Hearing Tonight s Meeting Public Hearing Concerning the Proposed FY 2015 Operating and Capital Budget for County Services Including the proposed County Ad Valorem Tax Rate of 30.64
More informationTHE REGIONAL MUNICIPALITY OF NIAGARA CONSOLIDATED STATEMENT OF FINANCIAL POSITION
CONSOLIDATED STATEMENT OF FINANCIAL POSITION As at December 31, 2017 (In thousands of dollars) 2017 2016 FINANCIAL ASSETS Cash $ 143,765 $ 102,524 Investments (note 2) $ 480,130 $ 438,585 Accounts receivable
More informationMark Spafford, General Manager Department of Solid Waste Services #DoSomething. October 18 and 19, 2018
MUNICIPALITY OF ANCHORAGE ENTERPRISE AND UTILITY OVERSIGHT COMMITTEE AND ASSEMBLY WORK SESSION FOR INTEGRATED SOLID WASTE MASTER PLAN, PLAN OF FINANCE AND PROPERTY ACQUISITION Mark Spafford, General Manager
More informationUTILITY RATE STUDY. Public Hearing
UTILITY RATE STUDY Public Hearing. Public January 23, 2018 Resources Management Group, Inc. Utility, Rate, Financial, and Management Consultants Rate Guiding Principles Recognized Revenues Should Be Sufficient
More informationBURK'S FALLS, ARMOUR AND RYERSON TRI R COMMITTEE
FINANCIAL STATEMENTS DECEMBER 31, 2015 CONTENTS Page Independent Auditor's Report 1-2 Statement of Financial Position Statements of Operations and Accumulated Deficit Statement of Change in Net Debt Statement
More informationCHAPTER XI. WATER & SEWER ARTICLE A. WATER CONNECTION FEES. New Water Connection Fees. Inside City Limits
CHAPTER XI. WATER & SEWER ARTICLE A. WATER CONNECTION FEES Section 1. New Water Connection Fees Limits Service Complete Service Connection Installation (Potable or Irrigation) Meter Only Installation for
More informationM A N I T O B A ) Order No. 63/10 ) THE PUBLIC UTILITIES BOARD ACT ) June 18, 2010 RURAL MUNICIPALITY OF GIMLI INTERIM WATER AND SEWER RATES
M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Graham Lane, CA, Chairman Monica Girouard, CGA Member Susan Proven, P.H.Ec., Member RURAL MUNICIPALITY OF GIMLI INTERIM WATER AND SEWER RATES
More informationCounty of Wetaskiwin No. 10 Consolidated Financial Statements For the year ended December 31, 2016
Consolidated Financial Statements For the year ended ConsoLidated Financial Statements For the year ended Contents Independent Auditors Report 1 Consolidated Financial Statements Statement of Financial
More information2018 Budget Highlights
2018 Budget Highlights Budget Highlights The 2018 Budget builds on the foundation of last year s budget. Helping residents understand the relationship between the services the municipality provides, and
More informationWATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY
REPORT January 2017 WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY PREPARED BY: ECONOMICS STRATEGY STAKEHOLDERS SUSTAINABILITY www.newgenstrategies.net 3420
More informationGuelph/Eramosa 2016 Budget Presentation. Thursday, February 18, 2016
Guelph/Eramosa 2016 Budget Presentation Thursday, February 18, 2016 1 Our Township We cover 292 km 2 and provide services to 12,380 residents The Township is responsible for maintaining: 225 km of roads
More informationSpecial City Council Meeting Agenda Consolidated as of January 4, 2019
Special City Council Meeting Agenda Consolidated as of January 4, 2019 Thursday, January 10, 2019 5:30 p.m. Council Chambers, Guelph City Hall, 1 Carden Street Please turn off or place on non-audible all
More informationMUNICIPALITY OF MIDDLESEX CENTRE FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2016
FINANCIAL STATEMENTS FINANCIAL STATEMENTS -1- Independent Auditor's Report -2- Statement of Financial Position -3- Statement of Operations and Accumulated Surplus -4- Statement of Cash Flows -5- Statement
More informationWORKSHOP 1: LONG-RANGE FINANCIAL PLANNING
WORKSHOP 1: LONG-RANGE FINANCIAL PLANNING Tuesday, September 19, 2017 Overview of Today s Session Timeframe Topic/Discussion 20 min What is long-range financial planning and why is it important? 10 min
More informationFY15 APPROPRIATIONS. Specific highlights for the General Fund, Special Capital
FY15 APPROPRIATIONS The following sections will provide highlights on changes to budgeted appropriations from FY14 to FY15. OPERATING BUDGET HIGHLIGHTS The total Operating Budget for FY15 has increased
More informationPlease turn off or place on non-audible all cell phones, PDAs, Blackberrys and pagers during the meeting.
CITY COUNCIL AGENDA Council Chambers, Guelph City Hall, 1 Carden Street DATE Tuesday, November 5, 2013 6:00 p.m. Please turn off or place on non-audible all cell phones, PDAs, Blackberrys and pagers during
More informationTHE CORPORATION OF THE COUNTY OF BRANT CONSOLIDATED FINANCIAL STATEMENTS
CONSOLIDATED FINANCIAL STATEMENTS Millards Chartered Professional Accountants INDEX Page Management Report INDEPENDENT AUDITORS' REPORT 1 2 FINANCIAL STATEMENTS Consolidated Statement of Financial Position
More informationDevelopment Charge Bylaw Directions
Clause 8 in Report No. 17 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on November 17, 2016. 8 Committee of the Whole
More informationCity of Welland. Comprehensive Asset Management Plan. GMBP File: January 13, Prepared By:
Prepared By: City of Welland Comprehensive Asset Management Plan GMBP File: 614013 January 13, 2015 GUELPH OWEN SOUND LISTOWEL KITCHENER EXETER HAMILTON GTA 650 WOODLAWN RD. W., BLOCK C, UNIT 2, GUELPH
More informationA GUIDE TO THE NEW LEGISLATIVE REQUIREMENTS CAPITAL PLANS FOR MUNICIPAL FINANCIAL &
A GUIDE TO THE NEW LEGISLATIVE REQUIREMENTS FOR MUNICIPAL FINANCIAL & CAPITAL PLANS 2018 Government of Alberta. This publication is issued under the Open Government Licence Alberta (http://open.alberta.ca/licence)
More informationM A N I T O B A ) Order No. 169/07 ) THE PUBLIC UTILITIES BOARD ACT ) December 28, 2007 THE CITY OF BRANDON REVISED WATER AND SEWER RATES
www.pub.gov.mb.ca M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) December 28, 2007 BEFORE: Graham F. J. Lane, CA, Chairman Monica Girouard, CGA, Member Susan Proven, P.H.Ec., Member THE CITY OF BRANDON
More informationM A N I T O B A ) Order No. 36/10 ) THE PUBLIC UTILITIES BOARD ACT ) April 12, 2010 TOWN OF MINNEDOSA INTERIM WATER AND SEWER RATES
M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Graham Lane, CA, Chairman Monica Girouard, CGA, Member TOWN OF MINNEDOSA INTERIM WATER AND SEWER RATES Page 2 of 11 Executive Summary By this
More informationAPPENDIX B. Water/Wastewater Connection Fees. 1. Basis B Authority B Connection Fees B-1thru B Calculating Connection Fees B-2
APPENDIX B Water/Wastewater Connection Fees Article Page 1. Basis B-1 2. Authority B-1 3. Connection Fees B-1thru B-2 4. Calculating Connection Fees B-2 5. Connection Fee Worksheet, Residential Water B-3
More information2017 Financial Information Return Instructions Ministry of Municipal Affairs Municipal Finance Policy Branch
2017 Financial Information Return Instructions Ministry of Municipal Affairs Municipal Finance Policy Branch FIR2017 Introduction INTRO - 1 Table of Contents 1. Introduction... 4 2. Municipal Services
More informationThorhild County Consolidated Financial Statements. December 31, 2015
Consolidated Financial Statements December 31, 2015 Independent Auditors' Report To the Reeve and Councillors of : We have audited the accompanying consolidated financial statements of, which comprise
More informationBURK'S FALLS, ARMOUR AND RYERSON TRI R COMMITTEE
FINANCIAL STATEMENTS DECEMBER 31, 2013 CONTENTS Page Independent Auditor's Report 12 Statement of Financial Position Statements of Operations and Accumulated Deficit Statement of Change in Net Debt Statement
More informationSUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077) (City Wide)
TO: Mayor and Members General Issues Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: October 16, 2013 SUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077)
More informationM A N I T O B A ) Order No. 83/12 ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012
M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012 BEFORE: Susan Proven, P.H.Ec, Acting Chair Monica Girouard, CGA, Member Raymond Lafond, CA, Member RURAL MUNICIPALITY OF DE SALABERRY ST.
More informationNith Peninsula, Brant County Fiscal Impact Study
Fiscal Impact Study October 25, 2017 Fiscal Impact Study Prepared for: Losani Homes Prepared by: 33 Yonge Street Toronto Ontario M5E 1G4 Phone: (416) 641 9500 Fax: (416) 641 9501 economics@altusgroup.com
More informationSUMMER VILLAGE OF SUNSET BEACH Consolidated Financial Statements Year Ended December 31, 2015
Consolidated Financial Statements Index to Consolidated Financial Statements INDEPENDENT AUDITOR'S REPORT 1 Page CONSOLIDATED FINANCIAL STATEMENTS Consolidated Statement of Financial Position 2 Consolidated
More information