Introduction to Water and Sewer Fund Needs August 11, 2017
|
|
- Samantha Melton
- 5 years ago
- Views:
Transcription
1 Introduction to Water and Sewer Fund Needs August 11, 2017 A lot of good things are happening in Buffalo and we hope to make some exciting announcements in the months to come, especially about possible downtown re-development. While we work on these exciting endeavors and opportunities for the future, the Council must also ensure that the infrastructure of the community is maintained and prepared for current and future needs. As a matter of good business practices, the City regularly reviews costs for maintenance and operations of our infrastructure against the funding mechanisms available to support those costs. In 2017, the City Council commissioned a study of the community s water and sewer funds. This review took into account expenditures necessary now as well as important repairs that need to be made in the near future. This review showed that there is need for increases to the user fees for these utilities in order to pay for the services. The City s financial consultants have projected increases in user fees that will eventually pay for the services and a three-month reserve fund will be established, by the year The recommendation for rate increases that you will read in the attached rate study report follows two reports from the city engineer: one report addresses the city s wastewater treatment plant (link); another addresses the wastewater collection system (link), specifically the lift stations which pump wastewater to the plant. Both the treatment plant and lift stations need very costly maintenance and improvement. It is not unusual for a water/wastewater utility to lose money for a year or two, but we can t allow that situation to continue. Our bond covenants state that we will charge a rate sufficient to repay the bonds sold to finance the systems. Each of our utility funds needs to be selfsustaining. By adequately funding our utility systems, banks will look more positively on the City in the future when we borrow money for projects, which will save the community by allowing for us to receive better interest rates and terms. If utility funds are not funded properly, the community may face higher costs for borrowing in the future. The City Council only increases rates after careful consideration and study. The Council has reviewed the information provided by our engineers, staff and financial consultants and are confident that increased rates are needed to make necessary investments in water and wastewater maintenance. If we don t make the investment, we face unacceptable results. There have already been two breaks of a sewer main line. We also need to do everything we
2 reasonably can to make sure our sewer lift stations keep up with demand nobody wants a sewer back-up in a home or business. It would also be detrimental to our community to face state-ordered action because our treatment plant is violating permit requirements. Another factor entering into funding of the water and sewer utilities is access charges at the time a new building connects to our system. The City of Buffalo has not been immune to the effects of the recession and the impact the overall economy has had on new housing starts. Permit numbers are increasing and we have come a long way from the drastic drop in permits during the recession, but the effects of that drop remain and funds need to be generated to pay debt service for the systems we all use every day. We need to face up to this challenge now, not be forced into it later. There will be a public hearing on the pending rate increases. In the meantime, we urge you to look over the documents linked to here, the same documents on which we base our decisions. If you have thoughts, questions or concerns, please contact any of your council people. That is part of our duty, and we seek your understanding of the needs of the community as we move forward. Thank you. Teri Lachermeier Mayor
3 August 9, 2017 Water and Sanitary Sewer Utility Rate Study for the Ehlers Advisors: Nick Anhut Municipal Advisor Jessica Cook Financial Specialist
4 Introduction In February of 2017, the City of Buffalo engaged Ehlers to conduct a Water and Sewer Utility Rate Study. This report provides the key findings and recommendations of the study as presented to the City Council in a work session on July 31, The goals of the rate study were to design and compute user rates for 2018 and subsequent years that will meet all financial obligations of the water and sewer utilities. Background The City of Buffalo owns and operates pumping, treatment, storage and distribution systems that convey drinking water to the homes and businesses in the City. It also owns and operates a sewer collection system and sewer treatment facility that transports and treats waste from residents and businesses. The City undertook this rate study in advance of issuing bonds to restructure existing debt issued for utility capital improvements and has plans to finance additional capital improvements this fall related to the treatment of biosolids. This rate study recommends rates and other revenue that will support continued operations, the 2017 debt issuances, and planned future capital improvements as described later within this report. The utilities financial activity is accounted for in the City s combined Water and Sewer Fund. By looking at the fund as a whole, we can see key features of the utility operations. First, infrastructure costs are the single biggest expense of the Water and Sewer utilities. Today, operating costs account for only 18% of the total utility expenses. Principal and interest on outstanding debt issued to finance capital projects accounts for 77%, and new capital expenditures for 5% of total expenditures. Consistent with most Minnesota communities, the City does not fully fund depreciation. The break-down of costs is shown in Figure 1. Figure Expenditures in the Water and Sewer Fund Capital 5% 2016 Expenditures Operations 18% Operations Debt Service 77% Debt Service Capital Utility Rate Study for the Page 1 August 2017
5 Second, utility revenues have declined. During the development boom of the early 2000 s, which drove the need for expanding the utilities, the City received $1 million to $2 million annually from connection fees and hook-up charges. These development related fees accumulated in the fund and helped make debt payments through These reserves are now depleted and additional revenue will be needed to meet the City s future obligations. Third, water consumption has declined while the costs for delivering the water are relatively fixed. In 2009, the City sold over 544 million gallons of water.. By comparison, in 2016 the City sold only 442 milliongallons of water. While water consumption is weather dependent and so one cannot simply compare two isolated years of consumption data, a review of the City s Department of Natural Resources reports also indicate a longer-term trend of declining water consumption, which matches national trends. All of these factors have contributed to a weakened financial position for the City s Water and Sewer Fund, which is projected to have a negative cash position of $1.6 million at the end of 2017, and growing deficits in future years. Ehlers is recommending that the City of Buffalo implement a new rate structure in 2018 that will increase and stabilize revenues to immediately address structural deficits, followed by moderate annual rate increases in 2019 and beyond. Assumptions and Methodology Ehlers prepared a 10-year cashflow projection for both the water and sewer utilities. Although both utilities are accounted for in one fund, we separated the financial activity in each utility to allow us to determine what water and sewer rates would need to be to support their respective utility activities. Billing data from 2016 was obtained and sorted to develop a rate structure that would stabilize revenues and minimize impacts on low volume water users. A long-range cash flow analysis was also prepared through the year 2028 to examine projected cash flows in future years and estimate the user rate increases necessary to meet all financial obligations of the utilities while building modest cash reserves. In the cashflow projections we included the following conservative assumptions: 3% annual inflation on operating and capital expenses Water consumption declines 5% in 2018 and remains steady thereafter Sewer consumption declines 2% in 2018 and remains steady thereafter No new users assumed for future operating revenues. Approximately 40 new units per year for future connection fee revenue Utility Rate Study for the Page 2 August 2017
6 In preparing this utility rate study Ehlers relied on estimates of future capital costs from the City s consulting engineers and staff. A summary of these capital costs are in Table 1. Table 1. Planned Capital Improvements for Water and Sewer Utiltiies The major sewer project in 2017 is to improve the treatment of biosolids and the major sewer projects in 2021 and 2022 are the rehabilitation of key lift stations. Other capital items include vehicles, well and water tower rehab, spot water and sewer line repairs, and the maintenance of the treatment plants. The costs listed above are best estimates available at the time of this analysis. Additional items or refined cost estimates may be necessary for future analyses. The city is currently undergoing long-range studies of its street and utility infrastructure repair and replacement costs. Proposed Water Rates and Structure Modifying the Increasing Block Rate Structure for Water The City has an increasing block rate structure for its water rates. This means that as consumption increases, the rate per thousand gallons also increases. However, because the City s three water rate tiers are relatively broad, very few residential customers consume water in the third tier, which is designed to capture water used for irrigation. In fact, in 2016, approximately 89% of all water consumption was within the first two tiers (up to 8,000 gallons per month). The following graph shows the single-family residential water consumption in July of The blue bars represent the number of accounts at each level of consumption. The two black lines represent the current tier breaks. One can see that even in the peak irrigation month of July, very little consumption occurs and is billed in the third tier. Utility Rate Study for the Page 3 August 2017
7 Figure 2. Pattern of Residential Water Use in July 2016 with Existing Rate Tiers 700 Tier 1 Residential Water Use July, Tier Tier The 2017 tier structure and rates for residential customers are as follows: Tier 1: 0-5,000 gallons charged at $3.09 per thousand gallons Tier 2: 5,001 to 25,000 gallons charged at $3.84 per thousand gallons Tier 3: Over 25,000 gallons charged at $5.36 per thousand gallons The rationale for higher rates for higher consumption is to assign the costs of the system to the customers driving those costs. The City has constructed its water system to serve its residents and businesses on the hottest, driest days of summer that produce peak water demand. In the summer of 2016 water demand was 1.9 times higher than winter water demand, largely due to irrigation. By charging more for peak demand the City is allocating more of the costs of building the system large enough to serve those using the most water. The proposed residential water rate structure would have the following tiers 2018: Tier 1: 0-4,000 gallons Tier 2: 4,001 to 8,000 gallons Tier 3: Over 8,000 gallons These tiers are represented by the red bars in the following graph showing the same July, 2016 water consumption. Utility Rate Study for the Page 4 August 2017
8 Figure 3. Pattern of Residential Water Use in July 2016 with Proposed Rate Tiers 700 Tier 1 Residential Water Use July 2016 Proposed Tiers 600 Tier Tier As the tiers narrow more revenue is generated from high-volume users, addressing the cost driver. However, water revenues also become more volatile from year to year as weather patterns change. The water utility does have some fixed expenses that do not vary from one customer to the next, such as the cost of reading water meters, billing, and other fixed overhead. To pay for these fixed charges and stabilize revenues, Ehlers is recommending a new fixed monthly charge for water regardless of the volume used. This charge would apply to all customers year-round and would replace the existing minimum charge. The proposed fixed charge is $7.50 per month. We are proposing that multifamily water rates eliminate the tiers and go to a flat, perthousand gallons. This is to comply with state law which requires a City that has tiered rates for multi-family property to implement tiers for each unit within a multifamily property. This becomes labor-intensive and problematic with the billing system when there are multiple dwelling units on one meter. Transitioning to a flat rate for multifamily eliminates the administrative burden the state law would impose. Proposed Water Rates The proposed 2018 water rates for the various classes of customers are shown in Table 2 with the current 2017 rates shown for reference. Utility Rate Study for the Page 5 August 2017
9 Table 2. Proposed 2018 Monthly Water Rates Percentage Increase Monthly Water Rates Existing Proposed Fixed Rates Minimum Charge (includes almost 3,000 gallons) 9.15 Base Fee (no usage included) 7.50 Usage Rates Residential , ,001-25, >25, Residential , ,000-8, >8, Commercial , , , >300, Commercial 2018 Base Fee , ,001-75, >75, Mobile Homes Multifamily , ,001-25, >25, Multifamily Irrigation Utility Rate Study for the Page 6 August 2017
10 Proposed Sewer Rates The City s current sewer rate is charged on a customer s winter average water consumption so that customers are not charged sewer disposal fees for outdoor water use. The City s rate structure is comprised of a minimum charge of $14 per month which includes almost 2,000 gallons of usage. While having a minimum usage for water is discouraged by the Minnesota Department of Natural Resources, it is common practice in Minnesota for sewer utilities to have a minimum. Therefore, Ehlers is not recommending any changes to the sewer rate structure, but but is proposing that the minimum charge be established at $23.36 per month and include the first 2,000 gallons of metered use.. These increases are designed primarily to address the existing debt carrying cost and future capital needs of the sewer system. The proposed 2018 sewer rate for all classes of customers is shown in the following table, with the 2017 rates shown for reference. Table 3. Proposed 2018 Sewer Rates Percentage Increase Monthly Sewer Rates Existing Proposed Fixed Rates Minimum Charge Minimum Charge (2 Units) Usage Rates All Users per 1,000 gallons Future Rate Increases In addition to the 2018 changes recommended above, Ehlers 10-year cashflow projection indicates that the following future rate increases will be needed to address future capital costs and slowly recover the financial health of the Water and Sewer Fund. Utility Rate Study for the Page 7 August 2017
11 Table 4. Proposed Rate Increases Impact on Customers Across the nation utility rates are increasing faster than the rate of inflation on other goods and services such as electricity and cable television. Buffalo is not immune to the forces driving up the cost of delivering utilities. These costs include replacing pipes under road reconstruction projects and capital projects undertaken to improve the quality of sewer effluent into our streams and rivers. We have compared a sample residential customer s bill with what a customer would pay in surrounding communities. Currently, Buffalo customers are paying less than most of the peer communities. With the proposed increases, the City s customers bills will still be comparable to neighboring communities 2017 rates. Figure 4. Comparison of Water Rates $80 $70 $60 $50 $40 $30 $20 $10 $0 Comparison of Buffalo Proposed 2018 Rates to 2017 Water and Sewer Charges per Month for Sample Residential User (6,000 gallons water/3,500 gallons sewer) Sewer Water Utility Rate Study for the Page 8 August 2017
12 The following tables show the monthly impact of the proposed 2018 water and sewer rates on various hypothetical customers. Table 5. Sample Residential Bills Impact Analysis on Residential Monthly Existing Proposed Dollar Increase Sample Summer Bill Low User - Residential Water (2,000 gallons/month) $ 9.15 $ $ 5.49 Sewer (2,000 gallons/month) $ 7.68 Total Monthly Utility Bill $ $ $ Moderate User - Residential Water (6,000 gallons/month) $ $ $ Sewer (3,500 gallons/month) $ Total Monthly Utility Bill $ $ $ High User - Residential Water (30,000 gallons/month) $ $ $ Sewer (4,000 gallons/month) $ Total Monthly Utility Bill $ $ $ Table 6. Sample Commercial Bills Impact Analysis on Commercial Monthly Existing Proposed Dollar Increase Sample Summer Bill Low User - Commercial Water (3,000 gallons/month) $ 9.15 $ $ 9.06 Sewer (3,000 gallons/month) $ Total Monthly Utility Bill $ $ $ Moderate User - Commercial Water (33,000 gallons/month) $ $ $ Sewer (25,000 gallons/month) $ Total Monthly Utility Bill $ $ $ High User - Commercial Water (175,000 gallons/month) $ $ 1, $ Sewer (182,000 gallons/month) 1, , $ Total Monthly Utility Bill $ 1, $ 3, $ 1, Utility Rate Study for the Page 9 August 2017
13 Table 7. Sample Multifamily Bills Impact Analysis on Multi-Family Monthly Existing Proposed Dollar Increase Sample Summer Bill Low User -Multi-Family (6 Units) Water (8,000 gallons/month) $ $ $ Sewer (8,000 gallons/month) $ Total Monthly Utility Bill $ $ $ Moderate User Multi-Family (16 Units) Water (37,000 gallons/month) $ $ $ Sewer (30,000 gallons/month) $ Total Monthly Utility Bill $ $ $ High User -Multi-Family (84 Units) Water (307,000 gallons/month) $ 1, $ 1, $ (61.88) Sewer (300,000 gallons/month) 2, , $ 1, Total Monthly Utility Bill $ 3, $ 5, $ 1, Development Fees The City of Buffalo has made a significant investment in its utility infrastructure to serve both new and existing users. Ehlers recommends increasing developer fees as illustrated in Table 8 in order to recover costs associated with expanding the system to accommodate new development. Table 8. Proposed Future Development Fees Impact Analysis on Development Fees Existing Residential Property Trunk Water Access Charge $ 750 $ 1,500 $ 1,590 $ 1,685 $ 1,787 $ 1,894 WAC $ 750 $ 1,500 $ 1,590 $ 1,685 $ 1,787 $ 1,894 Proposed Increase 100% 6% 6% 6% 6% Sewer Access Charge $ 1,500 $ 1,590 $ 1,685 $ 1,787 $ 1,894 $ 2,007 SAC $ 5,950 $ 6,307 $ 6,685 $ 7,087 $ 7,512 $ 7,962 Proposed Increase 6% 6% 6% 6% 6% Total Development Fees for Water and Sewer $ 8,950 $ 10,897 $ 11,551 $ 12,244 $ 12,979 $ 13,757 % Increase/(Decrease) 22% 6% 6% 6% 6% Utility Rate Study for the Page 10 August 2017
14 Achieving Financial Sustainability for Water and Sewer Utilities The Water and Sewer Fund is an enterprise fund, meaning it is intended to operate like a business and be financially self-supporting. In 2016, the City contributed $498,954 of property tax receipts to support the utilities. Even with the proposed rate increases, it will take some time for the Fund to become financially stable, and we are projecting the need to continue the property tax levy for the utilities through It is estimated that $500,000 per year of levy will be need in 2017 through 2022, and $300,000 per year will be needed in 2023 through After 2028, a significant portion of the utilityrelated debt will be retired and levy support will no longer be necessary. The decline in 2029 of projected debt payments is shown in Figure 5. Figure 5. Debt Service Payments on Outstanding Bonds With the proposed rate increases and sustained levy support, the Water and Sewer Fund will slowly build cash reserves and have capacity to pay cash for capital improvements beginning in 2029, as shown in Figure 6. The projected cash balances are compared to the City s target cash reserve for the combined fund, which is equal to 3 months of operating costs plus the next year s debt service. Utility Rate Study for the Page 11 August 2017
15 Figure 6. Cash Projection for Water and Sewer Fund 10,250,000 8,250,000 6,250,000 4,250,000 2,250,000 Combined Water and Sewer Fund Projected vs. Target Cash Balances 250,000 (1,750,000) Target Cash Balance Ending Cash Recommendations Ehlers makes the following recommendations based on this utility rate study. 1. Adopt the water rates as shown in Table 2 and the sewer rates as shown in Table Adopt increases to the development related charges as shown in Table Continue the property tax levy for the utilities in the amount of $500,000, evaluating the need on an annual basis based on the revenue performance in the fund. 4. Evaluate the affordability of new capital projects by including the marginal cost in the rate study model and measuring the impact of the project on cash reserves and the sufficiency of user rates. 5. Periodically update the full rate study. It is important to note that a number of assumptions were used to develop the results shown in this study. It is therefore recommended that the City continuously monitor the financial health of its water and sewer utility as part of its annual budgeting process, and revise the study every three years or at the onset of designing significant capital improvements. Utility Rate Study for the Page 12 August 2017
City of Buffalo Water and Sewer Rate Study. Nick Anhut Jessica Cook
City of Buffalo Water and Sewer Rate Study Nick Anhut Jessica Cook 09/05/2017 1 Topics Tonight Review Financial Snapshot of Water and Wastewater Utilities Key Assumptions Future Capital Needs Review Proposed
More informationCity of Fridley Water and Sewer Rate Study. Jessica Cook 9/25/17
City of Fridley Water and Sewer Rate Study Jessica Cook 9/25/17 1 Utility Funds They are Enterprise Funds 1. Should pay for Capital Outlays Operations Replacement Reserves Debt 2. Should be flush with
More informationWater and Sewer Utility Rate Studies
Final Report Water and Sewer Utility Rate Studies July 2012 Prepared by: HDR Engineering, Inc. July 27, 2012 Mr. Mark Brannigan Director of Utilities 591 Martin Street Lakeport, CA 95453 Subject: Comprehensive
More informationWater and Wastewater Budget development Summary of proposed 2015 Water and Wastewater rates About demand forecasting
Water and Wastewater Budget development Annual operating budget development for water and wastewater is based on net zero funding principles, as defined by the Municipal Act, 2001, where revenues and expenses,
More informationGlacial Lakes Sanitary Sewer & Water District Utility Rate Study. Shelly Eldridge Ehlers Jeanne Vogt - Ehlers
Glacial Lakes Sanitary Sewer & Water District Utility Rate Study Shelly Eldridge Ehlers Jeanne Vogt - Ehlers 05/30/2017 1 Background What are Utility Funds Utility funds are used to pay for operations,
More informationSAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3
01 April, 2014 SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3 Bill Zieburtz Richard Campbell Robert Chambers RATE SETTING PROCESS STUDY APPROACH RATE SETTING OBJECTIVES FINANCIAL PLAN
More informationThe City of Sierra Madre
The City of Sierra Madre Comprehensive Water and Wastewater Cost of Service Study Report / December 24, 2018 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145 www.raftelis.com December
More informationWATER AND WASTEWATER FUND REVENUES
WATER AND WASTEWATER FUND REVENUES Water revenues comprise $12.11 million, or 70.6% of total revenues of the fund, while wastewater (sewer) charges comprise $4.25 million, or 24.7% of total revenues. Water
More informationCOMPREHENSIVE WATER AND SEWER RATE AND FEE STUDY VILLAGE OF ALGONQUIN
COMPREHENSIVE WATER AND SEWER PREPARED FOR VILLAGE OF ALGONQUIN PREPARED BY RHMG ENGINEERS, INC. CONSULTING ENGINEERS 975 CAMPUS DRIVE, MUNDELEIN, IL 60060 JANUARY, 2016 Section I Executive Summary General
More informationMaking up 69% of the annual fixed costs is debt service for water system improvements by two
METROPOLITAN DOMESTIC WATER IMPROVEMENT DISTRICT 2013 WATER RATES & REVENUE ANALYSIS AUGUST 12, 2013 Last August, an analysis was completed and provided to the Board of Directors that gave a detailed look
More informationMaurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM
TO: FROM: Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 SUBJECT: - MEMORANDUM Introduction The (City) provides sewer sanitary collection services
More informationCITY OF TITUSVILLE ORDINANCE. Sec Schedule of water and sewer charges
CITY OF TITUSVILLE ORDINANCE Sec. 21-241. Schedule of water and sewer charges (1) No free service. No water or sewer service shall be furnished free of charge to any person whatsoever, and the city and
More informationES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives
Table of Contents Executive Summary ES.1 Findings and Recommendations... ES-1 Chapter 1. Introduction 1.1 Overview... 1-1 1.2 Current Rates... 1-1 1.3 Rate Making Objectives... 1-1 Chapter 2. Revenue Requirement
More informationWATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016
WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results January 5, 2016. Public Resources Management Group, Inc. Utility, Rate, Financial and Management Consultants Utility
More informationCOMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS
Black & Veatch Holding Company 2011. All rights reserved. COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 26 MAY 2015 B&V PROJECT NO.
More informationDRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR
Black & Veatch Holding Company 2011. All rights reserved. DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 21 MAY 2015 B&V PROJECT
More informationUtility Billing Adjustment Policy
Utility Billing Adjustment Policy I. DEFINITIONS As used in this policy, the following terms shall have the meanings specified below: a. Customer means the person or entity under whose name a water account
More informationRegional Wastewater System Financial Assessment Technical Memorandum
Regional Wastewater System Financial Assessment Technical Memorandum To: From: CC: Project: Subject: Sarpy County Tom Gould - HDR David Dechant HDR Judy Dean HDR Joe Roberts HDR File Southern Sarpy County
More informationTOWNSHIP OF WEST LINCOLN
TOWNSHIP OF WEST LINCOLN April 18, 2016 dfa DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 664-B Vine Street St. Catharines Ontario Canada L2M 7L8 Telephone: (905) 938-0965
More informationBudgeting for Municipal Enterprises
Budgeting for Municipal Enterprises Glenn Barnes & Shadi Eskaf Senior Project Directors Environmental Finance Center at UNC School of Government SOG Course: Budgeting in Local Government Chapel Hill, NC
More informationCity of San Carlos Sewer Financial Plan & Rate Update
City of San Carlos Sewer Financial Plan & Rate Update Revised 06/13/16 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com June 13, 2016 City of San Carlos Department of Public
More informationORDINANCE NO AN ORDINANCE To Be Entitled:
AN ORDINANCE To Be Entitled: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF FORT MYERS, FLORIDA, AMENDING THE CITY CODE, CHAPTER 90, UTILITIES, ARTICLE II WATER, SECTION 90-35 RATES AND CHARGES ESTABLISHED;
More informationNotice of a public hearing
Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.
More informationMARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013
MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT September 2013 10540 TALBERT AVENUE, SUITE 200 EAST FOUNTAIN VALLEY, CALIFORNIA 92708 P. 714.593.5100 F. 714.593.5101 MARINA
More information2017 Mid-Year Financial Report
2017 Mid-Year Financial Report BACKGROUND The mid-year report provides information regarding the City of Regina s (City) financial performance. This report provides a high level summary on how the City
More information2019 BUDGET EXECUTIVE SUMMARY Submitted by: Liesel M. Gross, Chief Executive Officer October 16, 2018
LEHIGH COUNTY AUTHORITY 1053 SPRUCE ROAD * P.O. BOX 3348 * ALLENTOWN, PA 18106-0348 610-398-2503 * FAX 610-398-8413 * www.lehighcountyauthority.org email: service@lehighcountyauthority.org 2019 BUDGET
More informationCITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No
CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No. 112301 April 1st 2016 DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 33 Raymond
More informationWATER USER RATES & FEE STUDY
WATER USER RATES & FEE STUDY FINAL REPORT February 2016 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510/653-3399
More informationDesigning Rate Structures that Support Your Objectives: Guidelines for NC Water Systems
that Support Your Objectives: Guidelines for NC Water Systems June 2009 Funding support for these guidelines provided by the Public Water Supply Section of the North Carolina Department of Environment
More information2017 UTILITY RATE STUDY WORK SESSION #2: BACKGROUND, EDUCATIONAL/INFORMATIONAL
2017 UTILITY RATE STUDY WORK SESSION #2: BACKGROUND, EDUCATIONAL/INFORMATIONAL Receive a presentation from Lewis Young Robertson & Burningham regarding the 2017 Utility Rate Study The purpose of the Council
More informationBudgeting for Municipal Enterprises
Budgeting for Municipal Enterprises Glenn Barnes & Shadi Eskaf Senior Project Directors Environmental Finance Center at UNC School of Government SOG Course: Budgeting in Local Government Chapel Hill, NC
More informationCity and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY
City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY Summary of Findings October 2003 Financial Consulting Solutions Group, Inc. 8201 -- 164th Ave. NE, Suite 300, Redmond, WA
More informationTOWN OF PRESCOTT VALLEY
TOWN OF PRESCOTT VALLEY Management Services Department WATER & SEWER RATE STUDY July 27, 2017 TOWN OF PRESCOTT VALLEY REPORT OF PROPOSAL TO REVISE CERTAIN WATER AND WASTEWATER RATES, FEES AND SERVICE CHARGES
More informationRATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.
WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13
More informationTOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009
TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 EXECUTIVE SUMMARY The functions and duties of the Oro Valley Water Utility Commission include reviewing and developing
More informationTemescal Valley Water District
Temescal Valley Water District Comprehensive Water, Recycled Water, and Wastewater Cost of Service Study Draft Report / December 7, 2016 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145
More informationCost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges
Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges UNC School of Government EFC 2017 Water & Wastewater Finance Workshop February 28 March 1, 2017 The William & Ida Friday
More informationModule 8 Rate Design Overview for Small Water Systems
Module 8 Rate Design Overview for Small Water Systems Workbook Financial/Managerial Series This course includes content developed by the Pennsylvania Department of Environmental Protection in cooperation
More informationCity of Cocoa FY 2010 Utility Rate Study. Final Report. Water, Sewer & Reclaimed Water Rates, Fees & Charges Study. Prepared by:
p FY 2010 Utility Rate Study Water, Sewer & Reclaimed Water Rates, Fees & Charges Study June 29, 2010 Prepared by: June 29, 2010 W.E. Mack Finance Director 65 Stone Street Cocoa, FL 32922 Re: FY 2010
More informationThe series 2008 Water & Sewer Revenue Bonds Feasibility Report recommended the City perform and implement a rate study for the following reasons:
Additional Background Information Water and Wastewater The City of Fort Lauderdale supplies water and sewer services on a regional basis to over 250,000 residents of central Broward County. The areas serviced
More informationFINANCIAL PLAN WATER AND WASTEWATER LINES OF SERVICE
UCS2018-0223 ATTACHMENT 1 FINANCIAL PLAN 2019-2022 WATER AND WASTEWATER LINES OF SERVICE 2018 MARCH 14 MAKING LIFE BETTER EVERY DAY UCS2018-0223 Financial Plan 2019-2022 - Water and Wastewater Lines of
More informationWATER AND WASTEWATER RATE STUDY
WATER AND WASTEWATER RATE STUDY Draft July 3, 2013 Prepared by: Page 1 Page 2 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626. 583. 1894 Fax 626. 583. 1411 www.raftelis.com July 1, 2013 Mr. Don
More informationFinancial Management Plan for the Palatine Public Library District
March 2, 2018 Financial Management Plan for the Ehlers Advisors: John Piemonte Municipal Advisor jpiemonte@ehlers-inc.com Jessica Cook Senior Financial Specialist jcook@ehlers-inc.com Anthony Kalina Financial
More informationWATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY
REPORT January 2017 WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY PREPARED BY: ECONOMICS STRATEGY STAKEHOLDERS SUSTAINABILITY www.newgenstrategies.net 3420
More informationCity of Rohnert Park SEWER FINANCIAL PLAN
City of Rohnert Park SEWER FINANCIAL PLAN AND RATE STUDY February 17, 2011 3053 Freeport Boulevard #158 Sacramento, CA 95818-4346 (916) 444-9622 www.thereedgroup.org TABLE OF CONTENTS I. EXECUTIVE SUMMARY...1
More informationWater & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for
Water & Sewer Cost of Service Rate Study for City of Norco, CA October 11, 2016 Table of Contents October 11, 2016 Chad Blais Director of Public Works City of Norco 2870 Clark Avenue Norco, CA 92860 Re:
More informationFORT COLLINS- LOVELAND WATER DISTRICT
FORT COLLINS- LOVELAND WATER DISTRICT Water Financial Planning and Rate Study Report March 16, 2018 District of Thousand Oaks Water and Wastewater Financial Plan Study Report March 16, 2018 Board of Directors
More informationRoadmap to Financial Health
Roadmap to Financial Health Jeff Hughes Shadi Eskaf March 5-6, 2012 Chapel Hill, NC www.efc.unc.edu Session Objectives 1. Improve ability to assess financial health 2. Improve understanding of strategies
More informationRATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended.
Page 1 of 8 Section 1. PURPOSE The purpose of this policy to explain how the Bedford Regional Water Authority ( Authority ) implements the adopted Rates policy and to provide explanation for each of the
More informationTown of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017
City Council Public Hearing February 13, 2017 Public Hearing on Proposed Water Rates PRESENTED BY Kelly J. Salt Partner 2016 Best Best & Krieger LLP Article X, section 2 (1928) The general welfare requires
More information2018 Five Year Financial Plan
2018 Five Year Financial Plan Five Year Financial Plan City of Pittsburg, Kansas May 19, 2018 Introduction: It is the role of the City Commission and the City s management staff to find ways to not just
More informationVillage of Baltimore Water & Wastewater Analysis. July 2018
Village of Baltimore Water & Wastewater Analysis July 2018 Table of Contents Introductory Summary... 1 Data... 1 Water Treatment Plant (WTP)... 1 Production... 2 Costs & Debts... 2 Wastewater Treatment
More informationStudy Workshops are designed to be both educational and to seek broad direction from the Board
Study Workshops are designed to be both educational and to seek broad direction from the Board Workshop #1 Financial Forecast & Cost of Service Water, recycled water, & sewer services Revenue requirement
More informationThe Utilities Fund is broken into two categories: a Capacity Expansion Fund and an Operating Fund.
Attachment 1 O16-19 BACKGROUND REPORT The Utilities Fund is an enterprise fund. An enterprise fund establishes a separate accounting financial reporting mechanism for municipal services for which a fee
More information3. What is the net bil increase for range of water use? Usage Level Very Low Low Typical Heavy Very Heavy Monthly Usage Monthly Increase
1. What contributes to the increases in labor compensation and benefits? Can the Board comment on the Cost of Service Study s Table 1B with respect to inflationary assumptions for compensation and benefits?
More informationSewer Rates. General Information Sheet. July 18, 2017
Sewer Rates General Information Sheet July 18, 2017 Welcome to the City of O'Fallon's sewer rates public hearing. This meeting presents the preliminary findings to revise the sewer rates. In this public
More informationVillage of Shorewood Long Range Financial Plan In Preparation for the 2015 Budget Process
Village of Shorewood Long Range Financial Plan 2015-2024 In Preparation for the 2015 Budget Process Long Range Financial Plan 2015-2024 Table of Contents Overview 1 Property Taxes 2-5 Operational Forecast
More informationDRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london.
6 MULTI-YEAR BUDGET FOR THE 2019 ANNUAL UPDATE INVESTING IN OUR FUTURE london.ca/budget DRAFT 2019 Water and Wastewater & Treatment Budget December 17, 2018 Table of Contents Recommendations... 1 WATER
More informationCITY OF HEALDSBURG RESOLUTION NO
CITY OF HEALDSBURG RESOLUTION NO. 49-2012 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HEALDSBURG DETERMINING THAT THERE WAS NO MAJORITY PROTEST OF THE PROPOSED WATER AND WASTEWATER SERVICES RATE INCREASE
More informationRaising Revenue for Capital Infrastructure
Raising Revenue for Capital Infrastructure Jeff Hughes Environmental Finance Center jhughes@sog.unc.edu Shadi Eskaf Environmental Finance Center eskaf@sog.unc.edu www.efc.unc.edu How satisfied are you
More informationSANITARY SEWER FUND PUBLIC WORKS
285 2015 2016 2017 2017 2018 Actual Actual Budget Estimate Budget Beginning Net Position $ 1,556,256 $ 2,133,912 $ 3,537,945 $ 3,537,945 $ 3,333,823 Operating Revenue 5,758,183 6,475,486 6,751,246 6,681,766
More informationSAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415)
1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) 332-0244 Fax: (415) 332-0453 Budget FY 2017/18 Adopted by Board on June 5, 2017 BUDGET EXECUTIVE SUMMARY FISCAL YEAR 2017/18 DISTRICT OVERVIEW The Sausalito-Marin
More informationWater Rates DETERMINING THE REAL COST OF POTABLE WATER
Water Rates DETERMINING THE REAL COST OF POTABLE WATER Rates adopted in 2007 began producing sufficient revenue coverage to begin to develop an amount in the Water Capital Fund to be used on projects identified
More informationTOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services
TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN May 30, 2016 Atikokan Public Works Water & Wastewater Services WATER & WASTEWATER FINANCIAL PLAN TOWN OF ATIKOKAN Table of Contents 1.0 Introduction ----------------------------------------------------------
More informationFinal COST OF SERVICE STUDY SEPTEMBER City of San Clemente
Final COST OF SERVICE STUDY SEPTEMBER 2017 City of San Clemente Contents CONTENTS Executive Summary... 1 Study Goals and Drivers... 1 Water Rate Analysis & Adoption... 2 Recycled Water Rate Analysis &
More informationFrequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems
Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems 1) How much revenue does Chatham Borough need to collect to operate and maintain its water and sewer systems? A:
More informationM A N I T O B A ) Order No. 169/07 ) THE PUBLIC UTILITIES BOARD ACT ) December 28, 2007 THE CITY OF BRANDON REVISED WATER AND SEWER RATES
www.pub.gov.mb.ca M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) December 28, 2007 BEFORE: Graham F. J. Lane, CA, Chairman Monica Girouard, CGA, Member Susan Proven, P.H.Ec., Member THE CITY OF BRANDON
More informationUTILITY RATE STUDY. Public Hearing
UTILITY RATE STUDY Public Hearing. Public January 23, 2018 Resources Management Group, Inc. Utility, Rate, Financial, and Management Consultants Rate Guiding Principles Recognized Revenues Should Be Sufficient
More informationWATER RATE AND FINANCIAL POLICY TACOMA PUBLIC UTILITIES WATER DIVISION
WATER RATE AND FINANCIAL POLICY TACOMA PUBLIC UTILITIES WATER DIVISION March 2017 Adopted by Public Utility Board Resolution U-10910 on February 22, 2017 Adopted by City Council Ordinance No. 28413 on
More informationCITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN
CITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN JUNE 2016 1 LONG RANGE FINANCIAL PLAN TABLE OF CONTENTS Table of Contents... 2 Executive Summary... 4 1. Introduction... 6 2. Background...
More informationSTAFF REPORT SAUSALITO CITY COUNCIL
STAFF REPORT SAUSALITO CITY COUNCIL AGENDA TITLE: Public hearing on proposed sanitary sewer fee effective fiscal year 2014-15 RECOMMENDED ACTIONS: (1) Open Public Hearing and receive public comment and
More informationToronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate
2017 BU25.1 Toronto Water Budget 2017 Recommended Operating Budget 2017 2026 Recommended Capital Plan 2017 Recommended Water Rate Lou Di Gironimo, General Manager, Toronto Water Budget Committee, November
More informationRevenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020
1925 Palomar Oaks Way, Suite 3 Carlsbad, California 928 tel: 76 438 7755 fax: 76 438 7411 Dennis Davies Deputy Director of Public Works 2 Civic Center Way El Cajon, CA 922 Subject: Six Year Revenue Plan
More informationPage 2 of 11. Operating Fund Current Plan Last Plan Target 25. Rev vs. Exp 50 CIP. Long-Term Borrowing Current Plan Last Plan
Ann Arbor Water and Wastewater Cost of Service Study and Rate Analysis Advisory Committee Meeting Summary Tuesday, September 19, 2017 4:00 p.m. to 6:00 p.m. 1. Participant List See Attachment #1 2. Welcome
More informationFinal Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY
Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Phase 2 Cost of Service and Rate Design BLACK & VEATCH PROJECT NO. 192366 Black & Veatch Holding Company 2017. All rights
More informationRates, Rates and More Rates
Rates, Rates and More Rates Jeff Hughes David Tucker February 5-6, 2013 Chapel Hill, NC www.efc.unc.edu Session Objectives 1. Provide update on state of rates 2. Provide strategies for dealing with rate
More informationBODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study
BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study FINAL REPORT March 22, 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors 1889 Alcatraz Avenue Berkeley, CA 94703-2714 Tel.
More informationWATER AND SEWER RATE STUDY
FINAL WATER AND SEWER RATE STUDY B&V PROJECT NO. 179322.0100 PREPARED FOR City of Lynwood, CA JANUARY 11, 2017 Black & Veatch Holding Company 2011. All rights reserved. City of Lynwood, CA WATER AND SEWER
More informationTown Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, :00PM - 8:00PM at Seasons Lakehouse 1048 N.
Town Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, 2018 7:00PM - 8:00PM at Seasons Lakehouse 1048 N. Lakeshore Drive, Crown Point, Indiana Community Utilities of Indiana, Inc.
More informationManaging Financial Risk and Declining Demand. Presentation Outline
Managing Financial Risk and Declining Demand Washington Association of Sewer & Water Districts Spring Conference April 13, 2012 John Ghilarducci Presentation Outline 1. Why Consumption is Declining Potential
More informationCITY OF CITY OF SONOMA FULLERTON. Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study
CITY OF CITY OF FULLERTON SONOMA Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study Interview / September 21, 2017 City Council Meeting / January 17, 2018 Agenda 1. Introduction 2. City
More informationRESOLUTION CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE
RESOLUTION 30-17 CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE A RESOLUTION establishing and directing the levy, charge and collection of connection charges,
More informationPublic Hearing on Water and Sewer Rates. September 20, 2017
Public Hearing on Water and Sewer Rates September 20, 2017 Agenda Discuss Proposed Rates Impacts to Reserves and Financial Performance Rate Protest Comments Cost of Service and Rate Structure Study Recommendation
More information2017 ENTERPRISE ASSET MANAGEMENT PLAN
Corporate Asset Management 2017 ENTERPRISE ASSET MANAGEMENT PLAN Investments in Peel s Infrastructure We are all asset managers! Executive Summary The Region s infrastructure is a public investment with
More informationOFF-SITE LEVIES UDI ALBERTA & CHBA ALBERTA RECOMMENDATIONS
OFF-SITE LEVIES UDI ALBERTA & CHBA ALBERTA RECOMMENDATIONS 1. OVERVIEW We want to express our appreciation for the work of Municipal Affairs staff throughout the consultation process on the individual
More informationLa Cañada Irrigation District
La Cañada Irrigation District Water Rate Study Report - 2009 March, 2009 201 S. Lake Blvd, Suite 803 Pasadena CA 91101 Phone Fax 626 583 1894 626 583 1411 www.raftelis.com March 30, 2009 Mr. Douglas M.
More informationNotice of Public Hearing for Proposed Change to a Water Budget Rate Structure to be Held at Murrieta City Hall
May 20, 2011 Notice of Public Hearing for Proposed Change to a Water Budget Rate Structure to be Held at Murrieta City Hall Dear Western Municipal Water District customer, Every Western Municipal Water
More informationWATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017
WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017 TABLE OF CONTENTS Approval of 2018 Annual Update... 1 WATER 2018-2019 Multi-Year Summary - Water... 5 2016-2019 Water Operating Overview...
More informationWater Rates Rate Restructure and Rate Adjustments
Water Rates Rate Restructure and Rate Adjustments Community Outreach Meeting Questions We Will Address Why are water rates changing? Where does the water come from? Did the rain from last winter help?
More informationNorth Pecos Water & Sanitation District. Rates, Charges, Fees and Penalties Effective January 1, 2015
North Pecos Water & Sanitation District Rates, Charges, Fees and Penalties Effective January 1, 2015 Updated : 1-1-2015 RATES, CHARGES, FEES AND PENALTIES OF THE NORTH PECOS WATER AND SANITATION DISTRICT
More informationWater and Wastewater Utility Rates
Water and Wastewater Utility Rates March 1, 2016 Presented By: Diana Langley Public Works Director 1 OVERVIEW 2 Uses of Funds Capital Investment Debt Service Operating Cost = Revenue Requirement 3 Source
More informationCAPITAL RECOVERY POLICY TABLE OF CONTENTS
TABLE OF CONTENTS ARTICLE I GENERAL PROVISIONS Section 1.01 General Policy Statement... 1 Section 1.02 Authority... 1 Section 1.03 Definitions... 1 Section 1.04 Capital Recovery Fees as Conditions of Development
More informationMONROE CITY COUNCIL. Agenda Bill No
MONROE CITY COUNCIL Agenda Bill No. 15-145 TITLE: Discussion: Utility Rates (Postponed from August 18, 2015) 1 DATE: DEPT: CONTACT: PRESENTER: ITEM: 08/18/2015 Public Works Brad Feilberg Brad Feilberg
More informationWater Rate Study for City of Lemoore
Water Rate Study for City of Lemoore June 17, 2016 Prepared by: Dan Bergmann, Principal 15 Shasta Lane, Walnut Creek, CA 94597 Email: dan@igservice.com Office: 925-946-9090 Water Rate Study for City of
More informationComprehensive Water Rate Study
Final Report Dublin San Ramon Services District Comprehensive Water Rate Study January 213 Prepared by: HDR Engineering, Inc. January 1, 213 Ms. Lori Rose Financial Services Manager Dublin San Ramon Services
More informationVillage of Oak Park, IL Department of Finance. Quarterly Finance and Performance Report 2016, 1st Quarter
Village of Oak Park, IL Department of Finance Quarterly Finance and Performance Report 2016, 1st Quarter May, 2016 Table of Contents Section 1: Introduction... 3 Section 2: 1 st Quarter Financial Report
More informationRate Schedule. Fiscal Year-2018 (July 1, 2017 June 30, 2018) P.O. Box 5911 Virginia Beach, Virginia
Rate Schedule Fiscal Year-2018 (July 1, 2017 June 30, 2018) P.O. Box 5911 Virginia Beach, Virginia 23471-0911 757.460.2491 www.hrsd.com HRSD Rate Schedule Fiscal Year-2018 (July 1, 2017 June 30, 2018)
More informationDISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY
DC Retail Water and Sewer Rates Committee - 1. Call to Order - Alan Roth, Chairman DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors DC Retail Water and Sewer Rates Committee Tuesday March
More informationRE:EX Toronto Water CAPITAL BUDGET NOTES CONTENTS CONTACTS CAPITAL BUDGET AND PLAN OVERVIEW. Overview
RE:EX29.18 CAPITAL BUDGET NOTES CONTENTS Overview 1: Recommended 10-Year Capital Plan 5 2: Issues for Discussion 22 Appendices: 1. 2017 Performance 30 2. Recommended 10-Year Capital Plan Summary 32 Toronto
More informationCity of Benicia. Rate Study Update: Water & Wastewater Rates
City of Benicia Rate Study Update: Water & Wastewater Rates March 1, 2016 Prepared by: Karin Schnaider, Finance Director, City of Benicia Greg Clumpner, Director, NBS Carmen Narayanan, Consultant, NBS
More information