Document of The World Bank FOR OFFICIAL USE ONLY

Size: px
Start display at page:

Download "Document of The World Bank FOR OFFICIAL USE ONLY"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING IN THE AMOUNT OF US$27 MILLION TO THE LEBANESE REPUBLIC FOR THE CULTURAL HERITAGE AND URBAN DEVELOPMENT PROJECT Sustainable Development Middle East and North Africa Region March 13, 2012 Report No: LB This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

2 CURRENCY EQUIVALENTS Exchange Rate Effective January 1, 2012 Currency Unit = Lebanese Pound (LL) LL1 = US$ US$1 = LL 1,505 FISCAL YEAR January 1 December 31 ABBREVIATIONS AND ACRONYMS AFD French Agency for Development CPS Country Partnership Strategy CDR Council for Development and Reconstruction DGA Directorate General of Antiquities EA Environmental Assessment EIB European Investment Bank EMP Environmental Management Plan EU European Union GDP Gross Domestic Product GoL Government of Lebanon ICB International Competitive Bidding IDF Institutional Development Fund M&E Monitoring and Evaluation MIU Municipality Implementation Unit MOC Ministry of Culture MOE Ministry of Environment MOH Ministry of Health MOIM Ministry of Interior and Municipalities MOT Ministry of Tourism MPWT Ministry of Public Works and Transportation O&M Operation and Maintenance PDO Project Development Objectives PMU Project Management Unit RAP Resettlement Action Plan SA Social Assessment Vice President: Country Director: Sector Manager: Task Team Leader: Inger Andersen Hedi Larbi Franck Bousquet Chantal Reliquet -ii-

3 LEBANESE REPUBLIC ADDITIONAL FINANCING FOR THE CULTURAL HERITAGE AND URBAN DEVELOPMENT PROJECT TABLE OF CONTENTS Project Paper Data Sheet I. Introduction... 1 II. Background and Rationale for Additional Financing... 1 III. Proposed Changes... 6 IV. Appraisal Summary... 6 Annex 1: Annex 2: Annex 3: Annex 4: Revised Results Framework and Monitoring Indicators.11 Operational Risk Assessment Framework...17 Revised Estimate of Project Costs and Financing Plan...19 Cost Effectiveness Analysis Summary 21 -iii-

4

5 Date: March 13, 2012 Country: Lebanese Republic Project Name: Cultural Heritage and Urban Development Project Original Project ID: P AF Project ID: P PROJECT PAPER DATA SHEET Team Leader: Chantal Reliquet Sector Director: Junaid Ahmad Sector Manager: Franck Bousquet Country Director: Hedi Larbi Environmental Category: B ORAF Rating: Substantial Borrower: Lebanese Republic Responsible Agencies: Council for Development and Reconstruction (CDR); Director General of Antiquities (DGA); and the Municipalities of Baalbeck, Saida, Byblos, Tripoli and Tyre Revised estimated disbursements (Bank FY/US$m) FY Annual Cumulative Current closing date: December 31, 2012 Revised closing date: December 31, 2015 Does the restructured or scaled-up project require any exceptions from Bank policies? Yes No Have these been approved by Bank management? Yes No Is approval for any policy exception sought from the Board? Yes No Does the scaled-up or restructured project trigger any new safeguard policies? No For Additional Financing [X] Loan [ ] Credit [ ] Grant For Loans: Total Bank financing (US$m.): Proposed terms: IBRD Fixed-spread, denominated in US dollars, with a maturity of 11.5 years including an 11 year grace period. Borrower IBRD French Agency For Development Total Financing Plan (US$m.) (AF) Source Total Financing Plan (US$m.) (Original project + AF) Source Borrower IBRD France: French Agency For Development and Government of France Government of Italy Total Total iv-

6

7 I. INTRODUCTION 1. This Project Paper (PP) seeks the approval of the Executive Directors to provide an Additional Loan in the amount of US$27 million to the Lebanese Republic for an Additional Financing (AF) for the Cultural Heritage and Urban Development Project (CHUD). 2. The proposed Additional Loan would help finance the cost over-run of works originally planned under the project, i.e. the delivery of improved public spaces, street upgrading, historical facade restorations, building rehabilitation, and associated activities. No changes are being suggested to the original project outputs. The Project Development Objectives (PDOs) also remain the same. 3. Partnership Arrangements. The Ministry of Culture (MOC), in partnership with the municipalities of Baalbeck, Saida, Byblos, Tripoli, and Tyre, has taken the lead in creating a viable environment for generating local economic development and improving conservation and management of Lebanon s cultural heritage. The original project is co-financed in parallel by other donors (French Agency for Development, Government of France, and Government of Italy). For the Additional Financing, a new agreement for parallel co-financing from the French Agency for Development (AFD) has been signed between AFD and the Council for Development and Reconstruction (CDR) on December 15, There is no joint co-financing under the proposed Additional Financing. II. BACKGROUND AND RATIONALE FOR ADDITIONAL FINANCING 4. Background: Lebanon has a rich and diverse culture inherited from the many civilizations that existed on its territory. It is a small and highly urbanized country with 90% of its 4.5 million people living in urban areas. Most of Lebanon's internationally renowned cultural heritage sites are found in the urban areas, including in the very cores of historic cities. Due to pressures of modern development, post-war reconstruction and lack of the means and mechanisms for heritage site preservation, the unique cultural heritage is suffering from neglect and is progressively being lost to modern construction. Lebanon is also known for its active cultural scene, full of events, festivals and exhibitions. However, the loss of historic urban fabric and monuments in the secondary cities is threatening survival of many traditions, skills and activities practiced in an authentic urban setting. 5. Little economic benefit is derived presently by local residents or municipalities from the rich cultural assets that are found within their communities. Municipalities do not have enough capacity to program and implement infrastructure investments that would stimulate private sector initiatives. These initiatives would potentially create jobs and ensure an additional source of revenue from fees, property and professional taxes levied on productive operation of rehabilitated and re-used historic properties. Local commercial, social, and recreational activity is largely marginal or irrelevant to the cultural heritage environment, resulting in a sense of opposition between local socio-economic development needs and the heritage preservation and tourism industry. Most tourism revenues are either captured by foreign tour operators or by a small group of Beirut-based agencies and hotels. -1-

8 6. Archeological and historic sites are often poorly presented, with inadequate information and orientation for the tourists. They sometimes represent significant safety hazards because of unstable or crumbling structures and unregulated circulation. They also lack basic amenities, such as visitor parking lots, shaded areas, seating, and toilets. In urban areas, the condition and access to cultural assets are further jeopardized by traffic congestion, chaotic parking, omnipresence of solid waste and wastewater, and in some cities, degradation of the coastal zones. Touristic accommodation of all types is scarce. Despite rich culinary traditions, historic cores lack restaurants and cafes of all grades where visitors can stop while moving in the old cities. Traditional activities and artisan workshops are dispersed, poorly organized and promoted, and need assistance to improve the competitiveness of their products on the regional market. 7. Rationale for Additional Financing: The need for additional financing is due to cost over-runs caused by the following: (a) After a lengthy process of geographical targeting, project identification and design, only the first batch of investments could be appraised in order to respond to the government s request for implementing the rehabilitation work without delays, but the estimated costs for the remaining batches proved to be substantially below those required for project execution; (b) High country inflation between 2003 and 2010, aggravated by soaring construction material prices in the international market, particularly for steel, cement and asphalt, as well as the introduction of new environmental regulation that led to the closure of several quarries and imposed large variation orders; (c) The uncertainties associated with the rehabilitation work, amplified with the testing restrictions imposed on historical buildings and structures, made it very difficult to anticipate the full extent of repairs and therefore required major adjustments in design and associated costs as the work evolved; (d) The difficulties in estimating the costs of upgrading underground infrastructure, including utilities networks displacement and relocation, generated the largest cost increase; and (e) The unusually high frequency of archeological chance finds in all five cities during project implementation caused unpredictable cost increases and unexpected delays due to the work site closure by the Directorate General of Antiquities (DGA) to allow the works to be redesigned. 8. The total amount of the Additional Financing is estimated at US$ million. It will be co-financed by the Government of Lebanon (GoL) in the amount of US$0.127 million and, in parallel, by the French Agency for Development (AFD) in the amount of Euro 21 million (approximately US$ million). The share of additional parallel financing provided by the AFD has already been approved (agreement dated December 15, 2011). 9. Alternatives Considered: The only alternative considered was the preparation of a new project, however this was rejected because it would force the project to close without fully achieving its PDOs. In addition, the new project would take a considerably longer time to obtain Parliament approval. Given that there are no proposed changes in the PDOs, new components, and new implementation/monitoring and evaluation (M&E) arrangements, additional financing was considered the more appropriate alternative. -2-

9 10. Project Description: The project is financed by IBRD in the original Loan amount of US$31.5 million. The project was approved by the Bank s Board of Directors on April 17, 2003 and became effective on February 3, The project is consistent with Lebanon s current Country Partnership Strategy (CPS) objectives and is engaged in promoting cultural tourism in five historic cities: Baalbeck, Byblos, Saida, Tripoli, and Tyre. The project s PDOs are to: (a) to create the conditions for increased local economic development and enhanced quality of life in the five cities; and (b) to improve the conservation and management of Lebanon s cultural heritage. The original project is co-financed by the Government of Lebanon in the amount of US$6.56 million; the French Agency for Development (AFD) in the amount of US$11 million; the Government of Italy in the amount of US$10 million; a grant by the French government in the amount of US$1 million, and the World Bank Loan of US$31.5 million. The Additional Financing will involve no change to the PDO and no joint co-financing. In addition to counterpart funding from the Government of Lebanon, the only parallel co-financier for the Additional Financing will be AFD. 11. The project has three main components: (i) rehabilitation of historic city centers and urban infrastructure; (ii) archeological sites conservation and management; and (iii) institutional strengthening and project management. Component 1: Rehabilitation of historic city centers and urban infrastructure. Activities under this component support the rehabilitation of the historic centers and urban infrastructure of the cities of Baalbeck, Byblos, Saida, Tripoli, and Tyre, and the promotion of cultural sensitivity and cultural tourism through: (a) upgrading and improving public spaces (such as streets, squares, commercial souks and residential areas) and infrastructure; (b) developing conservation and management of classified monuments and historic buildings and promoting their adaptive reuse; (c) supporting and developing productive and commercial activities related to cultural heritage, and promoting the participation of local populations; (d) rehabilitating the housing stock, including, inter alia, the construction and/or rehabilitation of housing units for temporary occupancy or resettlement purposes; (e) promoting the enforcement of zoning regulations defining historic city centers, including the establishment of a rehabilitation and construction permit system; (f) improving access to historic centers, traffic management and parking availability and regulation; (g) protecting and enhancing landscaping of coastal and green areas; and (h) carrying out technical and financial feasibility studies for urban redevelopment. Component 2: Archeological Sites Conservation and Management. These activities were designed to take place primarily in Baalbeck and Tyre, two of the main archeological sites of Lebanon, both inscribed on the UNESCO World Heritage list. Activities under this component support the conservation and management of archeological sites by: (a) conducting a program of research, inventory and documentation to the conservation and management of monuments and artifacts; (b) improving protection and conservation of exposed surfaces and structures; (c) improving landscaping, enhancing site protection and management and rehabilitating and/or expanding site museums; (d) improving and developing site presentation and visitor facilities, including the enhancement of visitor information capacities and the design of audio-visual programs and cultural circuits; and (e) preparing archeological studies. -3-

10 Component 3: Institutional Strengthening and Project Management. This component includes the following complementary technical assistance and capacity building activities: (a) strengthening the administrative and technical capacity of the five municipalities by rehabilitating, developing, maintaining and managing their historic centers; (b) reviewing the legal, regulatory and institutional framework governing cultural heritage; (c) strengthening the Directorate General of Antiquities; and (d) supporting the Project Management Unit to strengthen its capabilities in implementing the project. These activities will take the form of workshops, seminars, onsite technical assistance, and study tours. They also cover incremental operating costs. 12. The project Mid-Term Review (MTR) took place on May 17, 2007 and the scheduled Project Loan Closing Date has been extended to December 31, The project is in substantial compliance with loan covenants. 13. Overall Project Performance: During the early years of project implementation, the project was constrained by ongoing political turmoil, changes in project management staff, and the lack of sustained presence of social scientists or social safeguards specialists who could properly supervise and ensure full compliance with OP4.12 (Involuntary Resettlement). The project also suffered from a slow rate of disbursement (less than 50% after a four-year implementation). In November 2008, there was a Quality Assessment of the Lending Portfolio (QALP) review, which highlighted the need to improve project performance through strengthening its management staff, paying closer attention to social and environmental issues, and establishing a baseline and quantitative indicators in order to improve M&E. Taking into consideration the guidance provided by the QALP review, greater attention has been devoted since then to addressing the project s main weaknesses by streamlining implementation processes, increasing focus on capacity building in the municipalities, and adopting mitigation measures to minimize project risks. Noteworthy progress was made in many areas i.e., closely monitored contract supervision, cancellation of non-performing contracts, quality of works, setting up Technical Assistance (TA) units within municipalities, building up the Project Management Unit (PMU) capacity, etc. As a result, both the project implementation performance (IP) and the progress towards achieving the development objectives (PDO) substantially improved, and maintained their Moderately Satisfactory (MS) rating. 14. The PDO rating is justified as the project is making good progress toward meeting its development objectives as measured by the outcome indicators. The works implemented to date have clearly led to: (i) a drastic improvement in the quality of life of its inhabitants, particularly those resettled in Tripoli (71 families); and (ii) an improvement in the conservation and management of the built heritage, as evidenced best in Byblos, now considered a model for heritage rehabilitation in the Middle East region. With respect to the intermediate results indicators, implementation resulted in marked increases in the area of public spaces and facades rehabilitated; increased capacity of restaurants and cafes; and a substantial increase in rehabilitation permits for historic buildings. Since 2010, disbursements tripled, increasing from US$225,000 per quarter in 2009 to an average of US$740,000 per quarter in 2010 and the first part of This acceleration in disbursement occurred despite the changes in municipal leadership and confirms that CDR and the municipalities are fully committed to the project. 15. The continuous improvement observed over the last two years results mainly from CDR s dedication to the successful implementation of the project. Improvements in project performance -4-

11 are largely due to: (i) the revision of the M&E system, which now contains updated performance indicators that measure more appropriately the achievement of project objectives; (ii) full compliance with the Bank s safeguard policies; and (iii) improved attention to project management within the CDR, including strengthening of the PMU, as a follow-up to the Bank s recommendations and reports on institutional strengthening and project sustainability. In addition, the PMU has hired one senior social scientist and two junior social scientists in order to closely monitor the implementation of activities for compliance with OP.4.12 throughout the project life. The TA team was also strengthened both in Tripoli and Tyre with the hiring of a social worker in each location. The PMU team finalized the operational and management plan for the new market in Tyre, as well as the list of beneficiaries and the distribution map of vendors. It is currently completing the same process for the Tripoli market. In addition, the Mayor of Tripoli has appointed a manager for the platform where the market will be located, and the municipality has approved the market s draft operational manual. 16. Details on progress under each component: Component 1 (Rehabilitation of historic city centers and urban infrastructure): The loan proceeds are fully committed and the construction work is progressing very well in all five cities particularly: (i) the works for the rehabilitation of Khan Al Askar in Tripoli; and (ii) the Phase II of urban works in Saida, Byblos and Tyre. Simultaneously, progress is being made in fine tuning the operations and maintenance plans: (a) in Tripoli for the Abu Ali vegetable market and adjacent public spaces, and circulation and on-street paid parking plan around the old city; (b) in Tyre for the Bawabeh vegetable market, and the circulation plan and on-street paid parking in Tyre old city; and (c) in Saida for the public spaces (touristic paths in the old city, Bab El Serail Square, and Maritime Façade), and for on-street paid parking in selected zones (including the Maritime Façade). Component 2 (Archeological Sites Conservation and Management): The archeological sites conservation and management activities have made significant progress with the archaeological works (infrastructure) in Baalbeck and Tyre advancing well. Because these works are carried out for the first time at this scale in Lebanon by a contractor within important archaeological sites, tight and effective supervision arrangements have been adopted under close monitoring by the PMU and the DGA. The DGA capacity building activities have also taken place and an ambitious program has been finalized with the support of the relevant UN agencies. Component 3 (Institutional Strengthening): Institutional strengthening and project management activities have been undertaken through a constructive partnership between the CDR and the municipalities. While the CDR is focusing primarily on providing technical assistance and building capacity within the municipalities, the local authorities play a key role in supervising implementation, assessing the quality of works and managing the more sensitive political issues associated with resettlement and traffic plan enforcement. Although small, this component has a major positive impact in strengthening the ability and role of the municipal authorities in actively promoting local economic development. 17. Implementation Arrangements for the Additional Financing: The project will continue to be implemented by the same PMU established at the CDR and responsible for all aspects of the project management including procurement, financial management and disbursement activities, as well as the coordination with other agencies. After more than six years of practical experience, the PMU has adequate expertise in historical and cultural heritage -5-

12 restoration and renovation in the country. Going forward, the implementation arrangements include renewed attention to safeguards management, as evidenced with the recent hires of two social specialists (see Par. 27). The project coordinators have acquired expertise in World Bank safeguards management and are now well placed to address any remaining challenges. III. PROPOSED CHANGES 18. No changes will be introduced to the PDOs. The Results Framework has been modified for added clarity and to include more relevant indicators (Annex 1). The project institutional arrangements including financial management and disbursement will remain the same. 19. The activities funded under the Additional Financing Loan would be implemented over a period of approximately three years, i.e. until December 31, This implementation period is considered realistic given: (i) the presence of a strong and qualified PMU; (ii) the experience acquired through the first years of the project, both at the PMU and municipal level; and (iii) the advanced stages of the procurement process. In addition, the GoL has already pre-financed 20% of the works programmed under the Additional Financing, showing strong commitment to the project. 20. The proposed activities funded under the Additional Financing would fall into the existing components, as presented in the summary description and estimated cost table given in Annex 3. The table also presents the proposed IBRD share in the multi-donor funded program. 21. Restructuring of original Loan: In order to align the original Loan with the AF Loan, the original Loan will be restructured to: (a) align updated definitions, covenants and procurement procedures; and (b) extend the Closing Date to December 31, IV. APPRAISAL SUMMARY 22. Economic and financial analysis: Despite the cost overruns, the project investments are economically sound. The project remains consistent with its initial cost effectiveness approach to achieving its reconfirmed development objectives, by supporting investments that are the most cost effective and that focus on the public provision of key infrastructure, urban rehabilitation works with high development potential, and preservation of unique cultural heritage assets. The assumptions that were made at the outset of the project remain valid. Not undertaking the Project Additional Financing would result in: (i) destruction of sensitive and irreproducible cultural sites, landscapes and neighborhoods; (ii) environmental degradation and proliferation of brownfields in the city cores; (iii) the irretrievable loss of existing capital assets; and (iv) forgone tourism revenues. The selected investments remain the most effective alternatives to meeting the project s objectives and all components are also appropriate for the public sector to undertake, as outlined below and further detailed in the updated Cost Effectiveness Analysis (Annex 4). 23. Consistent with a least cost approach to achieving the PDOs, the project supports investments that are the most cost effective, in the best possible locations and at the optimal level of investment, i.e., in the major secondary cities that have the most cultural, social, and tourism potential to be preserved and developed. The project will continue to support the same most cost effective investments, focusing on Tripoli (US$26.12 million, including US$3.80 million from the additional Bank Loan); Tyre (US$14.85 million, including US$7.66 from the Bank Loan); -6-

13 Saida (US$5.22 million, including US$3.73 from the Bank Loan); and Byblos (US$3.17 million, including US$2.97 from the Bank Loan). Investments are limited to those representing the core of the urban cultural fabric, whose improvements are likely to encourage significant investment in the adjacent private establishments as evidenced, for example, in the increase in real estate values as well as in the added capacity of restaurants and cafes over the first few years of the project (see Annex 1). The rest of the investments will be devoted to archeological works on two of the country s World Heritage Sites (Baalbeck and Tyre) where tourism potential is also the greatest. 24. The type of investments implemented through the project requires public intervention: most of them (over 90%) take place on public land; moreover, private markets have been unable to either adequately preserve and develop the historic urban cores and archeological sites nor attend to equitable distribution of benefits from the possession of historic assets. Most public spaces are run down and in need of rehabilitation and many areas could be put to higher value uses through a change in regulatory measures. Private sector activities would benefit significantly as a result of the upgrading of urban cores. However, the private sector will not initiate the investments and bear the costs of upgrading the public spaces, as it would be incapable of recovering the costs of upgrading such public spaces that generally belong to the category of non-excludable public goods for use, for which it is impossible or difficult to charge. These investments in non excludable public goods represent about 40% of the total costs of Additional Financing. Another 43% will cover investments that would result in sub-optimal levels of the goods provided without Government intervention. They concern primarily the preservation of publicly accessible sites and monuments. Detailed information on the rationale for public sector involvement in project components is provided in Annex 4, Table Technical: The infrastructure works included in the Additional Financing are the same as in the original project. These were chosen after considering the needs and priorities expressed by the Council for Development and Reconstruction, the Directorate General of Antiquities and the participating municipalities of Baalbeck, Saida, Byblos, Tripoli, and Tyre. All technical issues regarding heritage management, and restoration and conservation works in fragile archeological sites were fully addressed during project preparation, after carrying out detailed assessments and studies by specialized international firms under the auspices of UNESCO World Heritage Center. The packages have been fully appraised and are technically ready to be implemented. 26. Environment: There is no change in the environmental category B as no new safeguard policies are triggered, therefore no new safeguards instruments will be prepared under this Additional Financing. The Environmental Impact Assessment (EIA) has been revised to incorporate, inter alia, the latest revision of the environmental management plan. The EIA has been prepared, consulted upon, cleared, and disclosed both in-country, and at the Bank InfoShop prior to appraisal. The Executive Summary of the EIA was translated into Arabic and has also been disclosed both locally and in the InfoShop. The proposed activities under the Additional Financing are of the same nature, and the project will continue to apply the same agreed environmental framework and mitigation measures, as updated. There are no unresolved environmental safeguard issues that require special attention. The last supervision mission (November 2011) highlighted that, during the rehabilitation activities in various cities, the primary adverse environmental impacts had been associated with the construction period and the temporary impacts associated with the re-routing of traffic around the construction areas. Nevertheless, these impacts have been minimized by careful planning of the staging used for construction and rerouting of traffic, as well as careful supervision of construction activities. In -7-

14 addition, since one of the main objectives of the project is the attraction of a larger number of visitors/tourists, special attention is being paid to the proper management of the valuable public space improved under the project, especially in terms of cleanliness and removal of increased amounts of solid waste. 27. Social: Compliance with social safeguard requirements is rated Moderately Satisfactory. The implementation of the expected social safeguards was considerably delayed due to technical and political reasons. The status of social safeguards implementation was rated as Moderately Unsatisfactory during the October 2011 supervision mission because several key issues were unresolved. However, CDR has made notable advancements in the context of social safeguards implementation. The PMU now has a strong technical team in place to help manage safeguards. With the recruitment of two additional social scientists in July 2011, much progress has been made by the PMU on the preparation of pending safeguards instruments, consultations with affected communities on each instrument, building general capacity, and meeting disclosure requirements. The PMU also has a very strong field presence, including field based staff, which has resulted in regular interactions with affected people, and local government authorities. This interaction also serves to strengthen the grievance redress process because field based staff (who are from the local area) are well known to affected peoples, and are thus available for airing viewpoints and complaints on a regular basis, if needed. There has also been closer Bank followup on the progress related to each instrument, supported in part by an action plan agreed upon by the PMU and followed up by weekly meetings. 28. Finally, two complaints (now resolved) by some community members created an opportunity for crisis management and for mutual learning. The first complaint (July 2011) pertained to grievances which mainly related to traffic plan provisions in Tripoli. The Tripoli Merchants Association (TMA), the main complainant, and the municipality arrived at a signed agreement followed by a reiteration by the TMA President to not only abide by the agreements reached, but also to facilitate project RAP implementation, including issues related to continued consultations and the effective relocation of vendors to the designated sites. The second complaint (August 2011) pertained to three complainants claiming they were eligible for compensation as per project census. It was shown that there was no validity to these cases but as a good will measure, one of the complainants has been placed on a wait-list for an apartment in the relocation site. 29. No new safeguards issues are triggered under the Additional Financing for this project and thus no new safeguards instruments will be prepared under the Additional Financing. The summary of safeguards instruments prepared under the overall project is as follows: an updated Resettlement Policy Framework (RPF) was cleared by the Bank in 2011 and disclosed in-country ( and at the Bank InfoShop in both English and Arabic. The overall project prepared a total of six RAPs. All six RAPs have been submitted to the Bank by the PMU. The English and Arabic versions of these RAPs have been disclosed in-country ( and at the Bank InfoShop. It came to the team s attention that the early RAP from 2002 had not been formally cleared nor disclosed at the time, but upon discovery of this issue, the Task Team made an immediate request to the PMU to locate, translate, and disclose this RAP in-country (this has been completed). The Task Team confirms that the 2002 RAP was implemented in a satisfactory manner. The project affected people are pleased with the relocation; a functioning grievance redress mechanism is in place, including accessibility to the PMU on relocation and general project issues. There is no discernible difference in implementation outcomes between -8-

15 all 71 relocated families (those relocated under the provisions of the 2002 RAP compared to those relocated under the provisions of the 2011 RAP). 30. Disbursement Arrangements. The proceeds of the Additional Financing loan will be disbursed in accordance with the Bank s traditional disbursement procedures, and will be used to finance project activities through the disbursement procedures currently used: i.e. Advances, Direct Payment, Reimbursement and Special Commitment. These will be accompanied by appropriate supporting documentation [Summary Sheets with records and/or Statement of Expenditures (SOEs)], in accordance with the procedures described in the Disbursement Letter and the Bank's "Disbursement Guidelines". The minimum application size for direct payment, reimbursement and special commitment will be the equivalent of 20% of the advance ceiling amount. 31. Designated Account. The Borrower will open a segregated Designated Account at Banque du Liban acceptable to the World Bank in US Dollars to cover the Loan's shares of eligible project expenditures. The ceiling of the Designated Account would be US$3 million. The Borrower will be responsible for submitting monthly replenishment applications with appropriate supporting documentation, along with a reconciled bank statement. The Designated Account will be audited annually in conjunction with the audit of the project financial statements. 32. Statement of Expenditures. Necessary supporting documents will be sent to the Bank in connection with contracts that are above the prior review threshold, except for expenditures under contracts with an estimated value of: (a) US$500,000 or less for Works; (b) US$150,000 for Goods; (c) US$100,000 or less for consulting firms; and (d) US$50,000 or less for individual consultants, as well as training and operating costs, which will be claimed on the basis of SOEs. The documentation supporting expenditures will be retained at the PMU and will be readily accessible for review by the external auditors and periodical Bank supervision missions. All disbursements will be subject to the conditions of the Loan Agreement and disbursement procedures as defined in the Disbursement Letter. 33. Financial Management (FM): The project financial management rating is Satisfactory. Overall, the financial management arrangements of the Project remain adequate, including staff competency, sufficiency and stability, proper utilization of the project management information system, timeliness and quality of the generated project interim un-audited financial reports and project financial statements, availability of documented implementation and FM procedures, adequacy of flow of funds arrangements, and quality of audit report. There are no overdue project audit reports. The audit report for the year ending December 31, 2010 was received by the Bank on June 29, 2011 with an unqualified opinion. The Additional Financing will be implemented by existing CDR FM staff who have acquired adequate knowledge of Bank reporting requirements and disbursements guidelines, as well as using the same agreed upon FM arrangements of the original loan. 34. Procurement: Project procurement is rated Moderately Satisfactory. The implementing agency has gained solid experience in procurement management. The agency has enhanced procurement processing and contract management capabilities. The unit is fully staffed with relevant technical skills (social development, architect, archeological projects, MIU municipal engineer, and two social development experts, in addition to management, procurement, financial and support staff). Administrative bottlenecks that may have delayed decision making -9-

16 have been identified and tackled. Project readiness is rated Satisfactory, given that out of a total of ten (10) contracts (four consultants, five works and one goods ) foreseen for new activities in the Additional Financing, one (1) works contract has already been contracted (Tripoli- Khan Al Askar); while another three (3) Bidding Documents are already prepared and two (2) are being finalized. 35. Based on the 20% limit for retroactive-financing, CDR has already made a commitment from Local Funding equivalent to US$5.4 million (US$1.7 million disbursed), against the projects earmarked under the Additional Loan. The procurement plan is regularly updated to reflect progress on the current Loan and the Additional Financing activities. For new bidding documents the project is already following the Bank guidelines as issued in January The Bank's retroactive financing will be for US$5.4 million for items procured in accordance with applicable Bank procurement procedures. Such payments do not exceed 20% of the Loan amount and pertain to payments that were made by the Borrower not more than 12 months before the expected date of the Loan Agreement signing (i.e. prior to April 18, 2011). 36. No exceptions are requested to the Bank s policies. The project s readiness is considered sufficient for approval of the proposed operation by the Board of Directors. -10-

17 Annex 1: Results Framework and Monitoring Cultural Heritage and Urban Development Additional Financing Results Framework PDO Revisions to the Results Framework Current (PAD) 1) Create conditions for local economic development and enhance the quality of life in the historic centers of five main secondary cities. Proposed Same Comments/ Rationale for Change 2) Improve the conservation and management of Lebanon s built cultural heritage PDO indicators Current (PAD) 1.1 Increased culture, tourism and heritage related local employment, and private sector investments, facilitated by municipalities. 1.2 Increased number of rehabilitated historic properties and public spaces in use for communal and tourist purposes. 1.3 Increased appreciation by residents and visitors of the contribution of cultural amenities to local quality of life and visitor experience. 1.4 Rising property values in and around areas of historic and cultural importance. 2.1 Increased employment of professionals in conservation and management of heritage. 2.2 Increased efficiency of archeological site; urban protected zones management. Proposed change* 1.1 Increased tourism and heritage related local employment, and private sector investments (now indicators 1 and 2). 1.2 Indicator deleted. 1.3 Indicator deleted. Now indicators 3 (residential units) and 4 (business units). 2.1 Indicator deleted. 2.2 Indicator deleted Facilitation by the municipalities is not essential. The important indicator is the increase in private investments. 1.2 Redundant with This indicator is highly subjective and difficult to document. 2.1 Does not prove to be a sufficiently significant indicator to assess evidence of improved conservation and management of the heritage. 2.2 There are currently no indicators available to measure the efficiency of the

18 2.3 Increased rehabilitation activities in historic urban cores in compliance with approved regulations recognizing the centrality of their cultural heritage to their economic and social development. Intermediate Results indicators Current (PAD) Revisions to the Results Framework Now indicator 5. Proposed change* Percentage of civil works progress (ISR) Increase in rehabilitation permits in city cores (ISR) Area of pedestrian public squares spaces (in sq. meters) (ISR). Area of facades of historic buildings rehabilitated (ISR) Number of cafés and restaurants (new) Number of seats and cafes and restaurants (ISR Number of individuals working in cafes and restaurants (ISR) Approved landmark conservation laws (ISR) Establishment of Municipal Units to operate and manage the city core (ISR) Degree of satisfaction after resettlement (new) Comments/ Rationale for Change management of the archeological site and urban protected zones. The project was approved in 2003 before the mandatory use of results frameworks was implemented in Bank projects. Therefore, there are no Intermediate Results Indicators presented in the PAD. Indicators were reported as part of the ISR and are represented under the proposed change column, in addition to indicators being introduced to strengthen the overall framework. -12-

19 Core REVISED PROJECT RESULTS FRAMEWORK Project Development Objective (PDO): (1) Create conditions for local economic development and enhance the quality of life in the historic centers of five main secondary cities; and (2) Improve the conservation and management of Lebanon s built cultural heritage. PDO Level Results Indicators 1. Increased tourism and heritage related local employment. UOM 1 Number of individuals working in the sector of culture, tourism and heritage related local businesses Baseline Original Project Start (2004) (2002) 662 Progress To Date (January 2012) (2011) 1027 Dec Cumulative Target Values Dec Dec Dec Frequency Yearly Data Source/ Methodology Counting- Survey Responsibility for Data Collection M&E Cons./ CHUD Team Comments Non- Cumulative/ All the cities have a big potential to increase the number of employees by 10% yearly (estimation). 2. Increased private sector investments. 3. Rising property values in and around areas of historic and cultural importance- Residential units. 4. Rising property values in and around areas of historic and cultural importance-business unites. 5. Increased rehabilitation activities in historic urban cores in compliance with approved regulations recognizing the centrality of their cultural heritage to their economic and social development % of business and property owners that have invested in their business or property development Residential units prices (USD per sqm) Business unit prices (USD per sqm) Number of rehab. permits (2008) 6.4% (2008) (2008) (2002) 36 (2010) 10% (2011) +30% (2011) +20% (2011) % 17% 22% 27% Yearly +33% +36% +39% +42% Yearly +23% +26% +29% +32% Yearly Yearly Survey- A Sample of business and property owners. Field Survey and research Field Survey and research Local Administratio n and Municipalities M&E Cons./ CHUD socio economic unit. M&E Cons./ CHUD M&E Cons./ CHUD CHUD Non- Cumulative/ Upon the Business Census- Wave1 done in is given as reference since 2011 was a stagnation period on the investment level figures based on national statistics (Cumulative) 2011 figures based on national statistics (Cumulative) Cumulative total. 1 UOM = Unit of Measurement. -13-

20 Beneficiaries Project most direct Beneficiaries (Residents) Project most direct Beneficiaries (Visitors) Project indirect Beneficiaries (overall city population) Number Number Number (2004) 37,529 (2004) 203,000 (2000) 565,000 (2011) 43,100 (2010) 308,000 (2011) 1,150,000 44,000 45,000 47,000 48,000 Yearly 325, , , ,000 Yearly 1,196,000 1,244,000 1,294,000 1,345,000 Yearly Preliminary study and demographic projections. Preliminary study and demographic projections Preliminary study and demographic projections M&E Cons./ CHUD- M&E Cons./ CHUD- M&E Cons./ CHUD- It concerns only the population living inside the CHUD project area. -14-

21 Core Intermediate Results and Indicators Intermediate Results Indicators Unit of Measure ment Baseline Original Project Start 2 (Jan. 2012) Dec Target Values Dec Dec Dec Frequency Data Source/ Methodology Responsibility for Data Collection Comments Intermediate Result 1: Cumulative Percentage of civil works progress % 20% 50% 80% 100% WB Additional Financing only Intermediate Result 2: Improved livability of the urban areas targeted by the project 1. Area of pedestrian public squares spaces sqm 2. Facades of historic buildings rehabilitated sqm (2006) 9,840 (2006) 42, , , , , ,830 Yearly CHUD TA and CHUD 211, , , , ,933 Yearly CHUD TA and CHUD Cumulative numbers- (works only in Tripoli in 2015). Cumulative numbers-. (works only in Tripoli in 2015). 2 WB Additional Financing only -15-

22 Intermediate Result 3: Improved local economic benefits in project cities 3. Number of restaurants and cafés Number (2002) Capacity in restaurants and cafés # of seats (2002) 5, Number of Individuals working in restaurants and cafés Number (2002) , Yearly Field Survey CHUD and CRI 13,605 15,000 16,500 18,000 20,000 Yearly Field Survey CHUD and CRI 1,410 1,475 1,550 1,650 1,750 Yearly Field Survey CHUD and CRI Cumulative numbers- 5% increasing per year (estimation). Cumulative numbers- 10% increasing per year (estimation). Cumulative numbers- 5% increasing per year (estimation). Intermediate Result 4: Improved conservation and management of built cultural heritage 6. Approval landmark conservation laws # of laws (2002) Over 2002 and 2011 Period CDR- Lebanese government CHUD and CDR (Cumulative) Intermediate Result 5: Improved performance of local institutions in charge of built cultural heritage 7. Establishment of Municipal Unit to operate and manage the city core units (2002) Over the lifetime of the Project Municipality and CDR. The objective is to have five units by the end of A unit for each city. -16-

23 ANNEX 2: OPERATIONAL RISK ASSESSMENT FRAMEWORK (ORAF) LEBANON: Additional Financing for the Cultural Heritage and Urban Development Project Project Stakeholder Risks Rating Substantial Description: Shopkeepers in the vicinity of Tripoli upgraded esplanade (Abu Ali platform) have contested its design, as well as the modification in the traffic plan and the proximity of the vegetable market. This situation may derail the Project implementation process as regards the Tripoli platform improvement subcomponent. Risk Management: The PMU, in collaboration with the municipality of Tripoli, has led an intensive process of consultation over the last few months. Modifications were made to the proposed traffic plan. The current design has been approved by the stakeholders and by the municipality (decisions endorsed by the council). The PMU is also following very closely on the process of transfer of the vegetable vendors to the market. Provisions have been included in the market design for progressive partial transformation of the vegetable market to handicraft selling activities, thereby improving the appearance of the esplanade as requested by some of the stakeholders. Resp: PMU/Municipality Stage: Implementation Due Date : 12/31/2015 Status: On-going Implementing Agency Risks (including fiduciary) Capacity Rating: Low Description: The PMU has experienced a fairly high turnover of staff (particularly social positions) over the first years of the Project, resulting in poor compliance with social safeguards, particularly with respect to communication and disclosure. The situation has been corrected over the last few months. Stage: Preparation/ Risk Management: A strong Project core is in place at the central level. The PMU has acquired unmatched experience in cultural heritage and is fully able to provide relevant assistance to the design and implementation of investments. A new team of social scientists has been hired. Resp: CDR Implementation Due Date : 12/31/2015 Governance Rating: Substantial Description: Internal disagreements within Tripoli Municipal Council may affect its commitment to support expedient implementation of the Project. Status: On-going Risk Management: The risk only affects one sub-component of the Project, i.e. the upgrading of the esplanade over the Abu Ali river in Tripoli. A number of decisions have now been enacted by the Municipality regarding the organization of the renovated esplanade, the operation of the market, and the new traffic plan. The CDR and CMU are following all developments very closely. Project Risks Resp: CDR Stage: Implementation Due Date : 12/31/2015 Status: On-going -17-

24 Design (Project overall) Rating: Low Description: The Project design is fairly complex but the operation has successfully disbursed for sub-projects and Risk Management: The PMU has demonstrated its experience and know-how in the conduct of activities. activities concurrently in five cities, which is a testimony to the adequacy of project design and implementation arrangements. The Project has been complemented by international organizations (including UN Habitat) and commended for international rewards. Resp: PMU Stage: Implementation Due Date : 12/31/2015 Status: On-going Social & Environmental Description: The Project failed to be in compliance with social and environmental safeguards, mainly because of lack of proper documentation and full disclosure. This caused: (i) a hold on some of the major on-going works in Tripoli, Tyre, and Saida; (ii) two postponements of the Loan Closing Date; and (iii) delays in the preparation of the Project Additional Financing. The complete original Environmental Impact Assessment (EIA) had not been fully disclosed at the Bank InfoShop. Rating: Moderate Risk Management : The situation has been addressed: the Resettlement Policy Framework (RPF) has been updated and disclosed. The Resettlement Action Plans (RAPs) (in English) have been updated and were disclosed in country and at the Bank s InfoShop prior to appraisal. The Arabic translations of these RAPs has been completed and disclosed in-country and at the Bank s InfoShop. The original EIA was revised and disclosed before appraisal. Social and environmental staff has been recruited by the PMU. Comprehensive environmental management plans are being prepared for both Tripoli and Tyre vegetable markets, clarifying the details of waste collection and overall cleanliness and hygiene requirements. Resp: PMU Stage: Implementation Due Date : 12/31/2015 Status: On-going Program & Donor Rating: Low Description: Relations with the parallel co-financier (AFD) are not considered risky for this AF as the PDO is unchanged. The donor has faith in the Bank s systems and processes re Risk Management: The co-financier is an integral part of the Bank missions and no additional measures are necessary. Appraisal of French AF has already been completed, in the amount of US$30 million. procurement and safeguard issues. They have been and will continue to follow the same processes as the Bank. Resp: Bank/ Stage: Preparation/ Co-donor Implementation Due Date : 12/31/2015 Status: On-going Delivery Monitoring & Sustainability Rating: Moderate Description: Cases of poor quality delivery and maintenance have occurred in the course of the Project, with the risk of some works falling into a state of disrepair because of negligence or insufficient funds for maintenance (archeological sites). Risk Management : The M&E system has been revised for the AF. Insufficient maintenance management has been addressed through: (i) incentives to DGA by way of capacity building; and (ii) by and large, municipalities have been consulted on the preparation of management plans for archeological sites improved by the Project. Resp: Bank/PMU Stage: Preparation/ Implementation Overall Risk Following Review Implementation Risk Rating Rating: Substantial Description: The overall risk rating is substantial due to the high country risk identified above as a result of the highly polarized domestic political situation, which might also be further exacerbated by a potential spillover from the Syrian uprising. Due Date : 12/31/2015 Status: On-going -18-

25 Components Annex 3 Cultural Heritage and Urban Development Project Additional Financing Project Costs and Financing Plan Appraisal Cost Estimate US$ million Incl. Contingencies 1 Rehabilitation of Historic City Centers and Urban Infrastructure Improvements Table 1: Estimated Project Costs and Financing Plan WB Financing Plan Revised Financing Plan as of January Additional Financing at Appraisal Updated 2011 Financing Plan Cost Estimate Total US$ million US$ million US$ million US$ million Additional AFD + Incl. AFD + Govt of Govt of Financing GoL Govt of Gap Italy Contingencies WB GoL Govt of WB GoL AFD Italy France France Rehabilitation of Baalbeck Historic city center Rehabilitation of Byblos Historic city center Rehabilitation of Saida Historic city center Rehabilitation of Tripoli Historic city center Rehabilitation of Tyre Historic city center Total Component Archaeological Sites Conservation and Management Baalbeck Archaeological Site Tyre Archaeological Site Detailed studies & Spn services for Baalbeck and Tyre Archeological works Tripoli Citadelle St Gilles Saida Château de la Terre: Consolidation interventions and site presentation Tyre and Byblos Archaeological Mapping Institutional Strengthening and Project Management Sub-total TA to the Municipalities Sub-Total TA to the DGA Sub-Total TA to the DGU Sub-Total Project Management by CDR Total Component Total World Bank Front End Fee Total

26 Table 2: Estimated Project Costs and Financing Plan (World Bank Loan Only) -20-

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Lebanon Global Practice

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Lebanon Global Practice Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020845 Public Disclosure Authorized Public Disclosure Authorized Project ID P050529 Project Name LB

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020001 Public Disclosure Authorized Project ID P100580 Country Ukraine Project Name ROADS & SAFETY IMPROVEMENT

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015

More information

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864) Public Disclosure Authorized SOUTH ASIA Afghanistan Transport & Digital Development Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 09-Feb-2018

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Jan-2013

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PUBLIC DISTRIBUTION PROJECT INFORMATION DOCUMENT (PID) Project Name Iraq: Emergency School

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Lebanon Social Protection & Labor Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 09-Jan-2017

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: RES22488 Public Disclosure Authorized

More information

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020731 Public Disclosure Authorized Public Disclosure Authorized Project ID P116080 Project Name EXPORT

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

Project development objective/outcomes

Project development objective/outcomes Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country.

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619 Project

More information

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020321 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project ID P107840 Country Macedonia, former

More information

Definitions. Terms of Reference

Definitions. Terms of Reference Terms of Reference National or International consultants: International Description of the assignment (Title of consultancy): Mid-Term Review of the LEPAP project Project Title: Lebanon Environmental Pollution

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/06/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8734-GD. (OECS Regional Tourism Competitiveness Project) between GRENADA

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8734-GD. (OECS Regional Tourism Competitiveness Project) between GRENADA Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 8734-GD Public Disclosure Authorized Loan Agreement (OECS Regional Tourism Competitiveness Project) between GRENADA Public Disclosure Authorized

More information

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020839 Public Disclosure Authorized Public Disclosure Authorized Project ID P108080 Project Name XK

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESETTLEMENT POLICY FRAMEWORK HURRICANE TOMAS EMERGENCY RECOVERY PROJECT Saint Lucia

More information

PART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY. A policy to establish an environmental assessment process in Palestine

PART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY. A policy to establish an environmental assessment process in Palestine PART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY A policy to establish an environmental assessment process in Palestine WHEREAS the Palestinian National Authority seeks to achieve sustainable development

More information

Action Fiche for Lebanon

Action Fiche for Lebanon Action Fiche for Lebanon 1. IDENTIFICATION Title/Number Facility in support of SMEs energy efficiency investments Total cost EU Contribution : 15,000,000 Aid method / Method of implementation Project approach

More information

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million LRTF Quarterly Report March 1, 2012 I. LRTF Administration As of February 22, 2012, the LRTF status was as follows: USD million Contributions Received Cash Contributions $146,902,156.80 Investment Income

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

Program-for-Results Financing 1

Program-for-Results Financing 1 Operational Manual BP 9.00 - Program-for-Results Financing These procedures were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. BP 9.00 February, 2012

More information

Environmental and Social Directive for Investment Project Financing. Bank Access to Information Policy Designation Public

Environmental and Social Directive for Investment Project Financing. Bank Access to Information Policy Designation Public Bank Directive Environmental and Social Directive for Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-DIR.111 Issued October 3, 2018 Effective

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Project No: 105602 PROPOSED PROJECT

More information

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M):

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14437 1. Project Data: Date Posted : 09/22/2014 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

REPORT 2015/178 INTERNAL AUDIT DIVISION. Audit of the United Nations Human Settlements Programme Regional Office for Arab States

REPORT 2015/178 INTERNAL AUDIT DIVISION. Audit of the United Nations Human Settlements Programme Regional Office for Arab States INTERNAL AUDIT DIVISION REPORT 2015/178 Audit of the United Nations Human Settlements Programme Regional Office for Arab States Overall results relating to Regional Office for Arab States operations were

More information

Environmental Monitoring Report

Environmental Monitoring Report Environmental Monitoring Report Bi-annual Report January-June 2013 ARM: Sustainable Urban Development Investment Program, Tranche 1 Project Number: 42417 Loan Number: L2752 July 2013 Prepared by the Yerevan

More information

Seq No: 5 ARCHIVED on 29-May-2018 ISR31357 Created by: Laila Ashraf AbdelKader Ahmed on 23-Jan-2018 Modified by: Laurent Gonnet on 21- May-2018

Seq No: 5 ARCHIVED on 29-May-2018 ISR31357 Created by: Laila Ashraf AbdelKader Ahmed on 23-Jan-2018 Modified by: Laurent Gonnet on 21- May-2018 Public Disclosure Authorized The World Bank MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Finance, Competitiveness and Innovation Global Practice Requesting Unit: MNC03 Responsible Unit: GFCMW IBRD/IDA

More information

Document of The World Bank RESTRUCTURING PAPER

Document of The World Bank RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT

More information

OFFICIAL DOCt HMENTS

OFFICIAL DOCt HMENTS Public Disclosure Authorized OFFICIAL DOCt HMENTS CREDIT NUMBER 6000-LC Public Disclosure Authorized Financing Agreement (OECS Regional Tourism Competitiveness Project) between SAINT LUCIA Public Disclosure

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Mar ,200,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Mar ,200,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020833 Public Disclosure Authorized Public Disclosure Authorized Project ID Project Name P133226 LB Fiscal Management Reform 2 Country

More information

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 DRAFT FOR CONSULTATION OCTOBER 7, 2014 Information Note 1: Environmental and Social Risk Classification The Board has requested the release of this document for consultation purposes to seek feedback on

More information

Liberia Reconstruction Trust Fund Implementation Manual

Liberia Reconstruction Trust Fund Implementation Manual Liberia Reconstruction Trust Fund Implementation Manual Updated November 2009 2011-02-28 LRTF Implementation Manual 1 I. Background... 3 II. Coverage... 3 III. General Principles... 4 IV. Project Development

More information

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS)

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Liberia Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 11 ARCHIVED on 10-Nov-2016 ISR24991 Implementing Agencies: Infrastructure Implementation

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021272 Public Disclosure Authorized Public Disclosure Authorized Operation ID P159774 Country Fiji Operation Name Fiji Post-Cyclone Winston

More information

THE REPUBLIC OF UGANDA

THE REPUBLIC OF UGANDA THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE KAMPALA INSTITUTIONAL AND INFRASTRACTURE DEVELOPMENT PROJECT (KIIDP 2) IDA CREDIT NO. 53840 UG FOR THE FOURTEEN (14)

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic

More information

The World Bank DTF: MA-Local Government Support Program (P144438)

The World Bank DTF: MA-Local Government Support Program (P144438) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2014

More information

b.were the project objectives/key associated outcome targets revised during implementation? No

b.were the project objectives/key associated outcome targets revised during implementation? No Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14721 1. Project Data: Date Posted: 06/24/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 14-Jul-2014

More information

Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Finance and Treasury Department

Finance and Treasury Department Mission To provide financial governance, accountability and safeguard the City s assets while providing financial advice and strategy from both a department and corporate perspective Our Road Map Overview

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 11/15/2005 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

World Bank Environmental. and Social Policy for Investment Project Financing

World Bank Environmental. and Social Policy for Investment Project Financing World Bank Environmental and Social Policy for Investment Project Financing Purpose 1. This Environmental and Social Policy for Investment Project Financing 1 sets out the mandatory requirements of the

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

Environmental Assessment

Environmental Assessment OP 4.01 January 1999 These policies were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. Environmental Assessment (Archived August 2004) Note: OP and BP

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/26/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Indonesia: Metropolitan Medan Urban Development Project

Indonesia: Metropolitan Medan Urban Development Project Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA Date ISDS Prepared/Updated: 12-Jan-2016

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA Date ISDS Prepared/Updated: 12-Jan-2016 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o ci Date ISDS Prepared/Updated: 12-Jan-2016 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUNICIPAL SERVICES PROJECT LOAN 7885-TU

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUNICIPAL SERVICES PROJECT LOAN 7885-TU Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social, Urban Rural and Resilience (GSURR) Europe and Central Asia Region Document of

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

Implementation Status & Results Lebanon LB-EMERGENCY POWER SECTOR REFORM CAPACITY REINFORCEMENT (P104774)

Implementation Status & Results Lebanon LB-EMERGENCY POWER SECTOR REFORM CAPACITY REINFORCEMENT (P104774) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Lebanon LB-EMERGENCY POWER SECTOR REFORM CAPACITY REINFORCEMENT (P104774) Operation Name: LB-EMERGENCY

More information

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 13-Jan-2014 INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

More information

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

The World Bank Kenya Infrastructure Finance/PPP project (P121019) Public Disclosure Authorized AFRICA Kenya Financial Systems Practice Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 4 ARCHIVED on 22-Dec-2014 ISR17114 Implementing Agencies: Public Private

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,212,149.53

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,212,149.53 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021311 Public Disclosure Authorized Public Disclosure Authorized Project ID P110051 Country India Project

More information

Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Case Studies in Indonesia

Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Case Studies in Indonesia Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Case Studies in Indonesia Phase 3 Consultation in Indonesia January 26-28, 2016 Objective Illustrate

More information

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized

More information

Public Disclosure Copy. Implementation Status & Results Report Gansu Cultural and Natural Heritage Protection and Development Project (P091949)

Public Disclosure Copy. Implementation Status & Results Report Gansu Cultural and Natural Heritage Protection and Development Project (P091949) Public Disclosure Authorized EAST ASIA AND PACIFIC China Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 8 ARCHIVED on 26-Nov-2014 ISR16372 Implementing Agencies: GANSU

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT Public Disclosure Authorized REPORT NO.: RES33563 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 4299 - AZ Public Disclosure Authorized Public Disclosure Authorized PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021097 Public Disclosure Authorized Public Disclosure Authorized Project ID P111598 Country Tanzania

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 22-Apr-2015 Report No.: ISDSC8904 Date ISDS Approved/Disclosed: 27-Apr-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information