Liberia Reconstruction Trust Fund Implementation Manual

Size: px
Start display at page:

Download "Liberia Reconstruction Trust Fund Implementation Manual"

Transcription

1 Liberia Reconstruction Trust Fund Implementation Manual Updated November LRTF Implementation Manual 1

2 I. Background... 3 II. Coverage... 3 III. General Principles... 4 IV. Project Development and Approval... 4 V. Project Execution... 5 VI. Project Supervision and Monitoring & Evaluation... 6 Administrator... 6 Oversight Committee... 6 Links to Government and Civil Society... 7 Reporting... 7 VII. Modalities of Administration... 8 Donor Contributions LRTF Implementation Manual 2

3 I. Background 1. Liberia s reconstruction and development present extraordinary challenges for the people and government of Liberia, and for the international community which pledged to support the reconstruction effort. The country has been devastated by a 15-year long civil war, near complete collapse of physical infrastructure and erosion of institutional and human capital. 2. The rationale behind taking a multi-donor approach to infrastructure rehabilitation stems from the sheer scale of infrastructure needs. The funding requirements to re-establish minimum service provision (such as electricity in Monrovia and a few secondary cities, year-round passable roads, and provision of minimum clean water) are immense. World-Bank financed feasibility studies alone focusing on ports, airports, water supply, sanitation, solid waste, drainage, power, and roads in various towns in Liberia identified funding gaps that amount to approximately 350 million USD. 3. Liberia s Poverty Reduction Strategy (PRS) includes Infrastructure and Basic Services as one of its four priority pillars. At a high level, the country s reconstruction efforts are overseen by the Liberia Reconstruction and Development Committee (LRDC), chaired by the President of Liberia. Though the LRDC drives the planning and coordination of the reconstruction process, existing mechanisms for implementation of that process are sub-optimal and capacity-constrained. The result is that partners who are not represented in Liberia have limited choices for channeling their resources. Given the importance of mobilizing as much funding as possible to meet the needs of the country, this issue requires an innovative solution. The creation of multi-donor trust fund provides partners with a mechanism through which they can contribute to Liberia s reconstruction and development efforts. Additionally, the creation of a multi-donor fund simplifies aid flows, facilitating Government ownership of the reconstruction process. II. Coverage 4. The PRS serves as the overall framework under which allocation decisions are made. Within the framework of the PRS, the LRTF provides support for meeting national priorities in infrastructure. Individual projects are aligned with the Government s broader sectoral policies, ensuring that the LRTF contributes to meeting Liberia s longer-term as well as its more immediate needs. 5. Furthermore, LRTF projects will, to the extent possible, accomplish two additional objectives: employment creation and capacity development. Consistent with current Bank practice in Liberia, laborintensive work methods will be utilized wherever feasible, although there will be cases for which other implementation modalities are needed. These projects will also promote capacity development, both within Government and the private sector. Private sector development will result naturally from the increased opportunities available to contractors, while Government s capacity will increase as a result of Government involvement in project planning and execution. Most projects will include a specific capacity-building component LRTF Implementation Manual 3

4 III. General Principles 6. In terms of financing arrangements, a key objective of establishing a pooled donor fund is to simplify flows of external financing, which facilitates aid management and enables donors without a presence in the country to finance projects. 7. The following are the general principles underlying the trust fund: (i) recognition of the ownership and leadership of the Government in the context of a comprehensive reconstruction and development framework; (ii) full transparency and openness in the process; (iii) mutual accountability between the Government and the donors; (iv) a recognition of the need to build the capacity of the Government; and (v) a commitment to distributing funds in a conflict-sensitive and peace-promoting manner. IV. Project Development and Approval 8. As described above, the LRTF will support activities in the infrastructure sectors. Specific project concept notes will be developed jointly by Bank task teams and relevant Government line Ministries and/or agencies. 9. A guiding principle of the LRTF is that projects are to be prepared, appraised, and supervised in accordance with the Bank s existing operational policies and procedures 1. LRTF projects are expected to be prepared specifically under the Bank s Rapid Response procedures, which allow for accelerated response times while still adhering to the Bank s overall operational policy guidelines. 2 A summary of the major steps involved in project development and approval is summarized here. 10. Funding Priorities. The Government members of the LRTF Oversight Committee (Minister of Finance, Minister of Public Works, and National Coordinator of the LRDC) are in continuous dialogue on current and future infrastructure funding priorities, as well as how best to meet those priorities. (In addition to leading discussions on these issues within Cabinet, these three Government officials help to set the country s infrastructure priorities as the members of the IIU Oversight Committee.) With support from the Bank, the Government maintains a list of those infrastructure funding priorities, including candidates for financing by the LRTF. At OC meetings, the Government presents these candidates to the OC. 1 The Bank s Operational Manual sets out all operational policies and procedures. See: ~pagePK: ~piPK: ~theSitePK:502184,00.html 2 The Bank s Rapid response policy and procedures are described in OP/BP 8.00 Rapid Response to Crises and Emergencies. See : ~menuPK: ~pagePK: ~piPK: ~theSitePK:502184,00.html LRTF Implementation Manual 4

5 11. Development and Presentation of Concept Notes. With support from the Bank Task Team for infrastructure, the Government prepares Project Concept Notes for review and approval by the OC. The LRTF Secretariat circulates a Project Concept Note at least one week before the OC Meeting during which the proposed project is to be discussed. 12. Approval of Concept Notes. It is expected that the OC will accept projects on an as-needed basis according to its agreed Terms of Reference. At an OC Meeting, the Government presents the Project Concept Note. The Bank Task Team Leader will attend the meeting to answer question about the Concept Note. If the Project Concept Note is approved, the Bank Task Team and Government line Ministry/agency move forward to Project Appraisal. 13. Project Approval, Effectiveness, and Disbursements. Following OC approval of the project concept, Bank task teams appraise the projects according to the Bank s Rapid Response Procedures (see above). For each project an Emergency Project Paper is prepared and a Bank Rapid Response Committee decision meeting is held to determine whether a project moves to negotiations. Projects are negotiated with Government according to Bank procedures. Final approval is given by the Bank Regional Vice President for Africa. 14. Projects are declared effective and disbursed according to Bank policies and procedures, and more specifically, arrangements made in the Emergency Project Paper and the Financing Agreement signed with Government. V. Project Execution 15. The Government will be responsible for the majority of project execution, in accordance with Ban k procedures. The following structures, already executing a number of Bank projects, will be generally utilized, although projects will be designed on a case by case basis and all implementation arrangements will be in accordance with Bank policies and procedures. Project Financial Management Unit (PFMU): The Government of Liberia has established this unit within the Ministry of Finance as the sole project disbursement and accounting unit for donor-funded projects. The unit has been strengthened and utilized for disbursement of government-executed project funds. Over time, some Government agencies are expected to develop their own financial management capacity. As with all World Bank projects, project management agencies would have to be certified by World Bank fiduciary staff before undertaking financial management duties. Special Implementation Unit (SIU): The Government of Liberia, supported by the World Bank, established the SIU within the Ministry of Public Works in order to execute donor-funded projects. The SIU plays a key role in any infrastructure funding mechanism, both through participation in project selection and development, and in project execution. During the lifetime of the LRTF, the SIU will evolve into the Infrastructure Implementation Unit (IIU) and assume all duties and responsibilities previously entrusted to the SIU LRTF Implementation Manual 5

6 Project Implementation Unit at Monrovia City Corporation. This agency has not yet been established. However, it is the intention of the MCC to set up a small project office to implement projects financed by the LRTF (or other donors.) 16. Although most projects will be executed by the Government of Liberia (through the Ministry of Public Works), there may be cases when third parties, such as UN agencies, execute projects. In addition, certain TA or project start-up activities, including procurement of small goods and works and feasibility studies, may be executed by the Bank. Occasionally, Bank-executed projects are justified by the urgent need to move forward with rehabilitation works in Liberia; given the lack of capacity on the ground, Bank execution in certain cases will allow the activities to proceed more rapidly. VI. Project Supervision and Monitoring & Evaluation 17. All LRTF projects will be supervised with the same diligence and rigor applied to regular Bank projects in accordance with Bank operational policies and procedures. Approved project documents and Supervision Aide Memoires will be shared with Government and donors. 18. Regarding Monitoring and Evaluation, all projects will be prepared under regular World Bank procedures and will include a results framework with measurable indictors. These indicators will be followed throughout the life of the project and will be included in regular project reporting as with any World Bank project. The OC will discuss project implementation on a regular basis. At the broader, strategic level, the overall monitoring and evaluation framework for the LRTF would be the framework detailed in the PRS. As such, the LRDC would be an appropriate venue for broad-based discussions on LRTF progress. Governance Structures and Processes 19. Based on the above principles, and recognizing the modest scale of the LRTF (at least at the outset), the governance structure is comprised of a single Oversight Committee (OC). The World Bank is the Administrator of the LRTF and will co-chair the OC, along with the Government of Liberia, represented by the Minister of Finance. Administrator 20. As Administrator, the World Bank carries the fiduciary responsibility for the management of LRTF funds, and will be responsible for supervising all uses of the funds and ensuring that projects are subjected to the same policies and procedures as regular World Bank funds. Oversight Committee 21. The Terms of Reference of the Oversight Committee (OC) provides a detailed description of the OC s operations, policies, and procedures. See Annex A for the full TOR. 22. The OC is co-chaired by the Government and the World Bank. It includes three permanent members from the Government of Liberia: the National Coordinator of the Liberia Reconstruction and LRTF Implementation Manual 6

7 Development Committee, the Minister of Finance, and the Minister of Public Works. Other OC members include the World Bank, represented by its Country Manager, and contributing donors to the LRTF. Observers will include other potential donors to the LRTF and other donors active in Liberia s infrastructure sector. The OC uses its best efforts to reach all decisions through consensus of contributing members. 23. The main responsibilities of the OC will be: a) to ensure that LRTF programs support national priorities as articulated in the Liberia Poverty Reduction Strategy, as well as national strategies guiding the infrastructure sectors; b) to review and approve initial project concepts received from the Government of Liberia, based on the above criteria; c) monitor the implementation of activities funded by the LRTF and address any bottlenecks facing LRTF operations. Links to Government and Civil Society 24. Although the OC is the only body explicitly charged with governing the LRTF, it is expected that the Liberia Reconstruction and Development Committee (LRDC), a structure which includes government and international partners, will offer a forum for high-level discussions about the LRTF s performance. Either in conjunction with a Liberia Partners Forum meeting, or as an event connected with regular LRDC meetings, the OC may request that the LRDC convene a meeting to review the status of the LRTF. Attendees to this meeting will include not only the sitting members of the LRDC and the OC, but also regional organizations, non-lrtf donors, and civil society and community representatives. The meeting will allow broad and transparent communication on the work of the LRTF, including progress made, obstacles encountered, and the expected path forward. These meetings will provide a natural juncture for decisions to be announced with regards to the evolving portfolio of the LRTF and changes that may be proposed for its structure and/or operations, such decisions having been debated and decided in advance by the OC. Reporting 25. Regular Bank project implementation status reporting will be provided to the OC by project task teams. The LRTF TTL will also submit reports summarizing the operations of the LRTF, including the receipt and use of contributions, with an account of activities financed. The OC will then make all reports available to the LRDC LRTF Implementation Manual 7

8 Figure 2: Schematic of LRTF Governance Structure Donor Contributions LRDC LRTF Oversight Committee GOL, Donors, WB Projects Executing body: Government, occasionally other Project Supervision: Bank Task Teams VII. Modalities of Administration Donor Contributions 26. As a multi-donor trust fund, the LRTF commingles all donors contributions into a common pool, administered in accordance with World Bank trust fund procedures. As a matter of Bank policy, contributions earmarked for specific components, activities, or programs will not be accepted. However, given that the trust fund will have established a limited number of core priorities, donors will be aware of the likely uses of all contributions to the trust fund. Contributions to the LRTF will be held in trust by the Bank and, pending disbursement, invested in accordance with the Bank s practices on investment of Bank-administered funds. 27. A 1% charge is levied on all contributions to the LRTF to cover the cost of Administration to the central units at the World Bank. All other operational costs, including project identification, appraisal, and supervision, will be charged to the fund directly, and quarterly reporting on use of funds will be provided to the OC LRTF Implementation Manual 8

9 Annex A: Oversight Committee (OC) Terms of Reference Revised 9 September 2008 PREAMBLE With the full support of the Government of Liberia, the Liberia Reconstruction Trust Fund (LRTF) has been established for support to building infrastructure, as articulated in the Poverty Reduction Strategy. The LRTF is administered by the World Bank and supervised by an Oversight Committee comprising GoL, the World Bank and contributing donors. These Terms of Reference serve as the framework within which the Trust Fund Oversight Committee (OC) will oversee the development, allocation, and implementation of the Fund. The Fund will be consistent with the Financing Agreements between each contributing donor and the World Bank. The OC shall be supported by a Secretariat. Any modifications to these Terms of Reference will require the approval of the OC. Article I Responsibilities 1. The OC will ensure that LRTF programs support national priorities as articulated in the Liberia Poverty Reduction Strategy, as well as national strategies guiding the infrastructure sectors. 2. The OC will review and approve initial project concepts received from the Government of Liberia, based on the above criteria. 3. The OC shall monitor the implementation of activities funded by the LRTF and address any bottlenecks facing LRTF operations LRTF Implementation Manual 9

10 Article II Procedures 4. The OC will be co-chaired by the Government of Liberia, represented by the Ministry of Finance, and the World Bank 3. Administrative support for the OC will be provided by the LRTF Secretariat. 5. The OC will generally meet on a quarterly basis, but ad-hoc meetings can be called asneeded. 6. The OC will accept project proposals from the Government of Liberia on a rolling basis. Proposals will be submitted to the OC through the LRTF Proposal Form The LRTF Secretariat will screen project proposals to ensure that they meet the minimum funding threshold and support Liberia s Poverty Reduction Strategy. The LRTF Secretariat will then submit those proposals for review by the OC. 8. The OC shall use its best efforts to reach all decisions through consensus of contributing members. 9. The LRTF Secretariat, in consultation with the co-chairs, shall propose the agenda for OC meetings. Members may submit additional agenda items to the Secretariat at least one week in advance of the scheduled meeting. The Secretariat will send meeting announcements, along with agendas and all relevant meeting materials, to OC members at least one week in advance of the meeting. 10. The discussion and outcome of each meeting will be recorded in Agreed Minutes. The Agreed Minutes will be drafted by the Secretariat and a draft will be sent to all OC members for their approval/comments within one week after the meeting. The members will inform the Secretariat of their approval/comments within seven working days of 3 The World Bank will be represented by its Country Manager. 4 To be developed LRTF Implementation Manual 10

11 receipt of the draft. The Secretariat shall understand no reply to mean that the member agrees with the draft minutes. Article III Membership 11. The OC shall have three permanent members from the Government of Liberia: the National Coordinator of the Liberia Reconstruction and Development Committee, the Minister of Finance, and the Minister of Public Works. 12. OC members will include: World Bank, represented by its Country Manager Contributing donors to the LRTF 13. Observers will include other potential donors to the LRTF and other donors active in Liberia s infrastructure sector. 14. OC co-chairs will agree on the invitation list one month in advance of each OC meeting LRTF Implementation Manual 11

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million LRTF Quarterly Report March 1, 2012 I. LRTF Administration As of February 22, 2012, the LRTF status was as follows: USD million Contributions Received Cash Contributions $146,902,156.80 Investment Income

More information

Annex 1: The One UN Programme in Ethiopia

Annex 1: The One UN Programme in Ethiopia Annex 1: The One UN Programme in Ethiopia Introduction. 1. This One Programme document sets out how the UN in Ethiopia will use a One UN Fund to support coordinated efforts in the second half of the current

More information

Operating Guidelines

Operating Guidelines Operating Guidelines Facility: Donor(s): BSEC: BSTDB: BSEC PERMIS: Donor Agreement(s): Cooperation Agreement: Steering Committee: Manager: 1. Glossary the Black Sea Project Promotion Facility the Russian

More information

Arrangements for the revision of the terms of reference for the Peacebuilding Fund

Arrangements for the revision of the terms of reference for the Peacebuilding Fund United Nations A/63/818 General Assembly Distr.: General 13 April 2009 Original: English Sixty-third session Agenda item 101 Report of the Secretary-General on the Peacebuilding Fund Arrangements for the

More information

South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR)

South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR) South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR) 14 February 2012 List of Acronyms AA Administrative Agent AB Advisory Board CAP Consolidated Appeal Process CHF Common Humanitarian

More information

Liberia s economy, institutions, and human capacity were

Liberia s economy, institutions, and human capacity were IDA at Work Liberia: Helping a Nation Rebuild After a Devastating War Liberia s economy, institutions, and human capacity were devastated by a 14-year civil war. Annual GDP per capita is only US$240 and

More information

Governance Document For Haiti Reconstruction Fund

Governance Document For Haiti Reconstruction Fund ANNEX 2 Governance Document For Haiti Reconstruction Fund The governance and organizational structure of the Trust Fund includes a Steering Committee, a Secretariat and a Trustee. A. Steering Committee

More information

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF)

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) Terms of Reference 29 March 2013 1 Contents I. Introduction... 3 II. Purpose, Scope and Principles of the UNDF... 4 III.

More information

Liberia Reconstruction Trust Fund. Oversight Committee Meeting December 2, 2010 Minutes

Liberia Reconstruction Trust Fund. Oversight Committee Meeting December 2, 2010 Minutes Liberia Reconstruction Trust Fund Oversight Committee Meeting December 2, 2010 Minutes 1. Introduction Mr. Ohene Nyanin, Co-chair of the Liberia Reconstruction Trust Fund (LRTF) Oversight Committee (OC)

More information

OFFICIAL -1 L(-L DOCUMENTS. Between. and

OFFICIAL -1 L(-L DOCUMENTS. Between. and Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the

More information

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

FINANCE AND OPERATIONAL PERFORMANCE COMMITTEE DECISIONS AND RECOMMENDATIONS TO THE BOARD

FINANCE AND OPERATIONAL PERFORMANCE COMMITTEE DECISIONS AND RECOMMENDATIONS TO THE BOARD Thirty-First Board Meeting Jakarta, Indonesia, 6-7 March 2014 Board Information FINANCE AND OPERATIONAL PERFORMANCE COMMITTEE DECISIONS AND RECOMMENDATIONS TO THE BOARD Purpose: 1. This report serves to

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

GPE OPERATIONAL FRAMEWORK FOR EFFECTIVE SUPPORT IN FRAGILE AND CONFLICT- AFFECTED STATES

GPE OPERATIONAL FRAMEWORK FOR EFFECTIVE SUPPORT IN FRAGILE AND CONFLICT- AFFECTED STATES GPE OPERATIONAL FRAMEWORK FOR EFFECTIVE SUPPORT IN FRAGILE AND CONFLICT- AFFECTED STATES Operational Framework Page 1 of 10 BOD/2013/05 DOC 08 OPERATIONAL FRAMEWORK FOR EFFECTIVE SUPPORT TO FRAGILE AND

More information

FINAL 26 February PARTNERSHIP FOR PROGRESS: UN Civil Society Fund

FINAL 26 February PARTNERSHIP FOR PROGRESS: UN Civil Society Fund PARTNERSHIP FOR PROGRESS: UN Civil Society Fund 1 I. Introduction The UN s current policy towards civil society stems from the Millennium Declaration of 2000, which includes the commitment by member states

More information

World Bank HIV/AIDS Program

World Bank HIV/AIDS Program blic Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized World Bank HIV/AIDS Program A Guidance Note on Disbursement Procedures This document was

More information

Joint Partnership Arrangement

Joint Partnership Arrangement Joint Partnership Arrangement Concerning Common Arrangements for Joint Support to the Health Strategic Plan 2008-2015 between the Royal Government of Cambodia and the 2nd Health Sector Support Program

More information

UN BHUTAN COUNTRY FUND

UN BHUTAN COUNTRY FUND UN BHUTAN COUNTRY FUND Terms of Reference Introduction: 1. The UN system in Bhutan is implementing the One Programme 2014-2018. The One Programme is the result of a highly consultative and participatory

More information

DOCU MENTS FOFFRCIAL71?

DOCU MENTS FOFFRCIAL71? Public Disclosure Authorized FOFFRCIAL71? DOCU MENTS The.World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD

More information

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Guidance Paper United Nations Development Group 19 MAY 2006 TABLE OF CONTENTS Introduction A. Purpose of this paper... 1 B. Context...

More information

WSSCC, Global Sanitation Fund (GSF)

WSSCC, Global Sanitation Fund (GSF) Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in

More information

(Donor Reference No )

(Donor Reference No ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS Administration Arrangement between Government of the Netherlands,

More information

Joint Education Sector Working Group Terms of Reference (Revised)

Joint Education Sector Working Group Terms of Reference (Revised) Introduction Joint Education Sector Working Group Terms of Reference (Revised) At the Myanmar Development Cooperation Forum (MDCF) held in January 2013, the Government of Myanmar (GoM) and its Development

More information

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014 AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014 I. Contents Introduction... 2 Purpose... 2 Scope... 2 Rationale... 2 Acronyms... 2 I. Funding Mechanisms... 3 A. Eligibility... 3 B. Standard Allocation...

More information

South Sudan Common Humanitarian Fund Allocation Process Guidelines

South Sudan Common Humanitarian Fund Allocation Process Guidelines South Sudan Common Humanitarian Fund Allocation Process Guidelines 27 January 2012 ACRONYMS AB CAP CERF CHF HC HCT HFU ISWG NCE NGO OCHA OPS PPA PRT PUNO TOR UN UNDP Advisory Board Consolidated Appeal

More information

Multi Donor Trust Fund Southern Sudan Final Minutes of the Oversight Committee Meeting March 13, 2007

Multi Donor Trust Fund Southern Sudan Final Minutes of the Oversight Committee Meeting March 13, 2007 Multi Donor Trust Fund Southern Sudan Final Minutes of the Oversight Committee Meeting March 13, 2007 1. The Oversight Committee for the MDTF-S met on March 13 2007 in Juba. HE Arthur Akuien Chol, (former)

More information

ONE WASH NATIONAL PROGRAMME (OWNP)

ONE WASH NATIONAL PROGRAMME (OWNP) ONE WASH NATIONAL PROGRAMME (OWNP) ONE Plan ONE Budget ONE Report planning with linked strategic and annual WASH plans at each level budgeting re ecting all WASH-related investments and expenditures financial

More information

SAICM/ICCM.4/INF/9. Note by the secretariat. Distr.: General 11 August 2015 English only

SAICM/ICCM.4/INF/9. Note by the secretariat. Distr.: General 11 August 2015 English only SAICM/ICCM.4/INF/9 Distr.: General 11 August 2015 English only International Conference on Chemicals Management Fourth session Geneva, 28 September 2 October 2015 Item 5 (a) of the provisional agenda Implementation

More information

Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006

Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006 Attachment I: Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006 ISSUES BACKGROUND ACTIONS DEADLINE RESPONSIBLE STATUS as of 15 June 2008 1.1 With relevant capacity

More information

PMR Governance Framework*

PMR Governance Framework* PARTNERSHIP FOR MARKET READINESS (PMR) PMR Governance Framework* I. Objectives of the PMR The PMR aims to provide a platform for technical discussions and the exchange of information on market instruments

More information

PROPOSED ORGANIZATIONAL ARRANGEMENTS FOR THE CLIMATE INVESTMENT FUNDS

PROPOSED ORGANIZATIONAL ARRANGEMENTS FOR THE CLIMATE INVESTMENT FUNDS First Donors Meeting on Climate Investment Funds Paris, March 4-5, 2008 CIF/DM.1/Inf.5 February 28, 2008 PROPOSED ORGANIZATIONAL ARRANGEMENTS FOR THE CLIMATE INVESTMENT FUNDS 1 Introduction 1. As noted

More information

Ethiopia One UN Fund Terms of Reference

Ethiopia One UN Fund Terms of Reference Ethiopia One UN Fund Terms of Reference I Introduction 1. The One UN process in Ethiopia was initiated in mid 2008. It was in part based on the General Assembly s: "Triennial comprehensive policy review

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

INTERNAL AUDIT DIVISION REPORT 2016/155. Audit of the United Nations Human Settlements Programme project management process

INTERNAL AUDIT DIVISION REPORT 2016/155. Audit of the United Nations Human Settlements Programme project management process INTERNAL AUDIT DIVISION REPORT 2016/155 Audit of the United Nations Human Settlements Programme project management process Established policies and procedures need to be further strengthened, particularly

More information

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS MINISTRY OF FINANCE AND ECONOMIC AFFAIRS Contents 1. PREAMBLE 4 2. THE POLICY OBJECTIVES 5 3. DEFINITION OF PPP 5 4. BENEFITS OF PPP 6 5. KEY GUIDING PRINCIPLES 7 6. SCOPE AND APPLICATION OF PPP PROJECTS

More information

The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action. Operations Manual

The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action. Operations Manual Review of the main purpose and added value of the GAI 1 The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action Operations Manual This Operations Manual describes

More information

The United Republic of Tanzania Ministry of Finance. Memorandum of Understanding. Between. The Government of the United Republic of Tanzania

The United Republic of Tanzania Ministry of Finance. Memorandum of Understanding. Between. The Government of the United Republic of Tanzania The United Republic of Tanzania Ministry of Finance Memorandum of Understanding Between The Government of the United Republic of Tanzania And Development Partners In Support of The Public Finance Management

More information

OFFICIAL DOCUMENTS. 2. The Donor and the Bank agree to the following amendments to the Administration Arrangement: (a)

OFFICIAL DOCUMENTS. 2. The Donor and the Bank agree to the following amendments to the Administration Arrangement: (a) Public Disclosure Authorized OFFICIAL DOCUMENTS Amendment No. 2 to the Administration Arrangement between the Swiss State Secretariat for Economic Affairs SECO, Federal Department of Economic Affairs,

More information

PARTNERSHIP FOR MARKET READINESS (PMR) Eighth Partnership Assembly Meeting Mexico City, March 3-5, Resolution No. PA8/2014-3

PARTNERSHIP FOR MARKET READINESS (PMR) Eighth Partnership Assembly Meeting Mexico City, March 3-5, Resolution No. PA8/2014-3 PARTNERSHIP FOR MARKET READINESS (PMR) Eighth Partnership Assembly Meeting Mexico City, March 3-5, 2014 Resolution No. PA8/2014-3 Amendment to the PMR Governance Framework Whereas: (1) The PMR Governance

More information

CHARTER The Charter sets out the governance arrangements of FIRST that encapsulate this collaborative arrangement.

CHARTER The Charter sets out the governance arrangements of FIRST that encapsulate this collaborative arrangement. CHARTER 1. Introduction 1.1 The International Bank for Reconstruction and Development ( IBRD ) and the International Development Association ( IDA ) (collectively, the Bank ), the International Monetary

More information

GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND

GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND June 2014 GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND Adopted November 2008 and amended June 2014 Table of Contents A. Introduction B. Purpose and Objectives C. Types of Investment D. Financing

More information

Implement integrated financial. Low proportion of donor missions are co-ordinated. Low quality of development information

Implement integrated financial. Low proportion of donor missions are co-ordinated. Low quality of development information 29 LIBERIA INTRODUCTION WITH A POPULATION OF 3 MILLION, Liberia has a gross national income (GNI) of USD 140 per person. According to the Core Welfare Indicator Questionnaire in 2007, it is estimated that

More information

The offices responsible for coordination of all matters related to the implementation of this arrangement are:

The offices responsible for coordination of all matters related to the implementation of this arrangement are: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Mr. Richard Fallon First Secretary Emergency Aid and Rehabilitation Assistance Unit Department

More information

HAITI RECONSTRUCTION FUND

HAITI RECONSTRUCTION FUND HAITI RECONSTRUCTION FUND REBUILDING TOGETHER SIX MONTH PROGRESS REPORT June 17 - December 16, 2010 Haiti Reconstruction Fund Secretariat Nouvelle Primature Port au Prince, Haiti Tel: (509) 2519-3131 Email:

More information

KENYA HEALTH SECTOR WIDE APPROACH CODE OF CONDUCT

KENYA HEALTH SECTOR WIDE APPROACH CODE OF CONDUCT Introduction KENYA HEALTH SECTOR WIDE APPROACH CODE OF CONDUCT This Code of Conduct made this 2 nd August 2007 between the Government of the Republic of Kenya represented by its Ministry of Health, Afya

More information

Table of Recommendations

Table of Recommendations Table of Recommendations This table of recommendations provides a series of suggestions to help close the implementation gaps identified by the MDG Gap Task Force Report 2012, entitled The Global Partnership

More information

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PUBLIC DISTRIBUTION PROJECT INFORMATION DOCUMENT (PID) Project Name Iraq: Emergency School

More information

We recommend the establishment of One UN at country level, with one leader, one programme, one budgetary framework and, where appropriate, one office.

We recommend the establishment of One UN at country level, with one leader, one programme, one budgetary framework and, where appropriate, one office. HIGH-LEVEL PANEL ON UN SYSTEM WIDE COHERENCE Implications for UN operational activities at Country Level: What s new and what has already been mandated? Existing mandates and progress report HLP recommendations

More information

EDUCATION FOR ALL FAST-TRACK INITIATIVE FRAMEWORK PAPER March 30, 2004

EDUCATION FOR ALL FAST-TRACK INITIATIVE FRAMEWORK PAPER March 30, 2004 EDUCATION FOR ALL FAST-TRACK INITIATIVE FRAMEWORK PAPER March 30, 2004 The Education for All (EFA) Fast-track Initiative (FTI) is an evolving global partnership of developing and donor countries and agencies

More information

Liberia Reconstruction Trust Fund (LRTF) Minutes of the Oversight Committee Meeting. March 1, 2012

Liberia Reconstruction Trust Fund (LRTF) Minutes of the Oversight Committee Meeting. March 1, 2012 Liberia Reconstruction Trust Fund (LRTF) Minutes of the Oversight Committee Meeting March 1, 2012 Introduction 1. The LRTF Oversight Committee Co-chair, Ms. Inguna Dobraja, the new Country Manager of the

More information

GOVERNANCE FRAMEWORK FOR

GOVERNANCE FRAMEWORK FOR December, 2011 GOVERNANCE FRAMEWORK FOR THE STRATEGIC CLIMATE FUND Adopted November 2008 and amended December 2011 Table of Contents A. Introduction B. Purpose and Objectives C. SCF Programs D. Governance

More information

Dated: 0 VltA r. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Dated: 0 VltA r. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DOCUMENT OFFIClIL The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

Zambia s poverty-reduction strategy paper (PRSP) has been generally accepted

Zambia s poverty-reduction strategy paper (PRSP) has been generally accepted 15 ZAMBIA The survey sought to measure objective evidence of progress against 13 key indicators on harmonisation and alignment (see Foreword). A four-point scaling system was used for all of the Yes/No

More information

Competitive process for the selection of the Permanent Trustee

Competitive process for the selection of the Permanent Trustee Meeting of the Board 13 15 December 2016 Apia, Samoa Provisional agenda item 17 GCF/B.15/15/Rev.01 11 December 2016 Competitive process for the selection of the Permanent Trustee Summary This document

More information

DSB Product Committee Framework

DSB Product Committee Framework DSB Product Committee Framework October 2016 ANNA Confidential Version 1.07 Confidential: Derivatives Service Bureau (DSB) Product Committee Page 2 Page left Blank Intentionally Confidential: Derivatives

More information

Year end report (2016 activities, related expected results and objectives)

Year end report (2016 activities, related expected results and objectives) Year end report (2016 activities, related expected results and objectives) Country: LIBERIA EU-Lux-WHO UHC Partnership Date: December 31st, 2016 Prepared by: WHO Liberia country office Reporting Period:

More information

OfFK1AL DOCUMENTS7. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized.

OfFK1AL DOCUMENTS7. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ms. Gisela Strand Head of Development Cooperation, Embassy of Sweden, Liberia LCL Compound

More information

March 31, Mr. Roy Plucknett Grant Officer USAID/Afghanistan U.S. Embassy Great Massoud Circle Kabul, Afghanistan

March 31, Mr. Roy Plucknett Grant Officer USAID/Afghanistan U.S. Embassy Great Massoud Circle Kabul, Afghanistan Public Disclosure Authorized OFFICIAL DOCUMOTS The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action. Operations Manual

The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action. Operations Manual The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action Operations Manual 1 This Operations Manual describes the rules and procedures applicable to the GAI. It describes

More information

TOSSD AND TYPES OF AID INVOLVING NO CROSS-BORDER RESOURCE FLOWS

TOSSD AND TYPES OF AID INVOLVING NO CROSS-BORDER RESOURCE FLOWS Organisation for Economic Co-operation and Development Development Co-operation Directorate Development Assistance Committee DCD/DAC/STAT(2018)20 English text only 26 March 2018 DAC Working Party on Development

More information

GLOBAL INFRASTRUCTURE FACILITY. A partnership platform for greater investment in the infrastructure of emerging markets and developing economies

GLOBAL INFRASTRUCTURE FACILITY. A partnership platform for greater investment in the infrastructure of emerging markets and developing economies GLOBAL INFRASTRUCTURE FACILITY A partnership platform for greater investment in the infrastructure of emerging markets and developing economies COLLABORATION FINANCE LEVERAGE IMPACT The Global Infrastructure

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: Limited 1 December 2015 Original: English For decision United Nations Children s Fund Executive Board First regular session 2016 2-4 February 2016 Item

More information

ACTIVITY COMPLETION SUMMARY (ACS)

ACTIVITY COMPLETION SUMMARY (ACS) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized ACTIVITY COMPLETION SUMMARY (ACS) Azerbaijan: Mainstreaming EITI Implementation (ID: P162544) Azerbaijan

More information

partnership charter I. Background II. Mission

partnership charter I. Background II. Mission Partnership Charter GLOBAL FACILITY FOR DISASTER REDUCTION AND RECOVERY 1 partnership charter I. Background 1. The Global Facility for Disaster Reduction and Recovery (GFDRR) is a global partnership program

More information

Further options for decision-making relating to funding proposals

Further options for decision-making relating to funding proposals Meeting of the Board 1 4 July 2018 Songdo, Incheon, Republic of Korea Provisional agenda item 14 GCF/B.20/22 8 June 2018 Further options for decision-making relating to funding proposals Summary The paper

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID AND CIVIL PROTECTION - ECHO

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID AND CIVIL PROTECTION - ECHO EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID AND CIVIL PROTECTION - ECHO FRAMEWORK PARTNERSHIP AGREEMENT WITH INTERNATIONAL ORGANISATIONS PREAMBLE 1 The European Union's humanitarian action

More information

Ghana Harmonisation and Aid Effectiveness Action Plan 1

Ghana Harmonisation and Aid Effectiveness Action Plan 1 Ghana Harmonisation and Aid Effectiveness Action Plan 1 Group A: Country Environment National strategy (indicator 1) Country Fiduciary Systems (indicator 2a + 2b) Country Results Framework (indicator 11)

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

Country Case Study GFF Work in Liberia. Shun Mabuchi Country Health Team Leader The World Bank With contribution from MoH team June 20, 2017

Country Case Study GFF Work in Liberia. Shun Mabuchi Country Health Team Leader The World Bank With contribution from MoH team June 20, 2017 Country Case Study GFF Work in Liberia Shun Mabuchi Country Health Team Leader The World Bank With contribution from MoH team June 20, 2017 Outline Liberia Context How the GFF works in Liberia (so far)

More information

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized

More information

G8/G20 TAXATION ISSUES : Tax Training Day, ODI, London 16 September 2013

G8/G20 TAXATION ISSUES : Tax Training Day, ODI, London 16 September 2013 G8/G20 TAXATION ISSUES : Tax Training Day, ODI, London 16 September 2013 BASE EROSION AND PROFIT SHIFTING 2 OECD Work on Taxation Focus has historically been on the development of common standards to eliminate

More information

MUTUAL HOUSING MANAGEMENT

MUTUAL HOUSING MANAGEMENT J O B D E S C R I P T I O N Job Title: Location: Department: Reports To: FSLA Status: Director of Property Management Sacramento Property Management Chief Executive Officer Exempt (professional) Updated:

More information

October Review of the Asian Development Bank s Service Charges for the Administration of Grant Cofinancing from External Sources

October Review of the Asian Development Bank s Service Charges for the Administration of Grant Cofinancing from External Sources October 2009 Review of the Asian Development Bank s Service Charges for the Administration of Grant Cofinancing from External Sources i ABBREVIATIONS ADB Asian Development Bank AfDB African Development

More information

Report on the activities of the Co-Chairs

Report on the activities of the Co-Chairs Meeting of the Board 1 4 July 2018 Songdo, Incheon, Republic of Korea Provisional agenda item 6 GCF/B.20/Inf.16 12 June 2018 Report on the activities of the Co-Chairs Summary This document contains the

More information

2011 SURVEY ON MONITORING THE PARIS DECLARATION

2011 SURVEY ON MONITORING THE PARIS DECLARATION TASK TEAM ON MONITORING THE PARIS DECLARATION 2011 SURVEY ON MONITORING THE PARIS DECLARATION Revised Survey Materials Initial Annotated Draft 3 May 2010 FOR COMMENT This initial text with annotations

More information

Operational Manual GUYANA REDD-Plus INVESTMENT FUND (GRIF)

Operational Manual GUYANA REDD-Plus INVESTMENT FUND (GRIF) Operational Manual GUYANA REDD-Plus INVESTMENT FUND (GRIF) This Operations Manual is not a legal document. It describes the operating principles, guidelines and procedures for the day-to-day operations

More information

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness SURVEY GUIDANCE 2011 Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness This document explains the objectives, process and methodology agreed for the 2011 Survey on

More information

Dianne Stewart Secretariat

Dianne Stewart Secretariat Appointment of the Decision Point GF/B16/DP1: Mr from the European Commission (Belgium, Finland, Portugal) constituency is designated as for the. This decision does not have material budgetary implications.

More information

GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND. November, 2008

GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND. November, 2008 GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND November, 2008 Table of Contents A. Introduction B. Purpose and Objectives C. Types of Investment D. Financing under the CTF E. Country Access to the

More information

GUIDELINES FOR CCM FUNDING

GUIDELINES FOR CCM FUNDING GUIDELINES FOR CCM FUNDING Overview 1. In recognition of the important role of Country Coordinating Mechanisms 1 ( CCMs ) in the Global Fund architecture (including their central role in proposal development,

More information

OFFICIAL DOCUMENTS. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

OFFICIAL DOCUMENTS. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS Restated and Amended Administration Arrangement between the United

More information

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations INTERNAL AUDIT DIVISION REPORT 2015/041 Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations Overall results relating to the effective management of mine action

More information

Public financial management is an essential part of the development process.

Public financial management is an essential part of the development process. IDA at Work Public Financial Management: Tracking Resources for Better Results Public financial management is an essential part of the development process. It supports the efficient and accountable use

More information

Sustainable Development Goals Fund (SDG Fund) Framework and Guidance for Partnerships with the Private Sector

Sustainable Development Goals Fund (SDG Fund) Framework and Guidance for Partnerships with the Private Sector Sustainable Development Goals Fund (SDG Fund) Framework and Guidance for Partnerships with the Private Sector Why partner with the SDG Fund The private sector has played an active role in the work of the

More information

Nile Basin Trust Fund Grant Agreement

Nile Basin Trust Fund Grant Agreement Public Disclosure Authorized NILE BASIN TRUST FUND GRANT NUMBER TF054439 NB Public Disclosure Authorized Public Disclosure Authorized Nile Basin Trust Fund Grant Agreement (Socioeconomic Development and

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

The Evolving Allocative Efficiency of Education Aid: A Reflection on Changes in Aid Priorities to enhance Aid Effectiveness. By Birger Fredriksen

The Evolving Allocative Efficiency of Education Aid: A Reflection on Changes in Aid Priorities to enhance Aid Effectiveness. By Birger Fredriksen Draft, November 2, 2008 The Evolving Allocative Efficiency of Education Aid: A Reflection on Changes in Aid Priorities to enhance Aid Effectiveness By Birger Fredriksen Executive Summary (This is the Executive

More information

EU- WHO Universal Health Coverage Partnership: Supporting policy dialogue on national health policies, strategies and plans and universal coverage

EU- WHO Universal Health Coverage Partnership: Supporting policy dialogue on national health policies, strategies and plans and universal coverage EU- WHO Universal Health Coverage Partnership: Supporting policy dialogue on national health policies, strategies and plans and universal coverage Year 1 Report Oct. 2011 Dec. 2012 Abbreviations AFRO/IST

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS)

Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS) Annex I Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS) (Planning and Budget Management Division) 1. Position Description Post Title: Level: Project: Supervisor:

More information

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE Annex to Government Decision 21 December 2017 (UD2017/21053/IU) Guidelines for strategies in Swedish development

More information

Bangladesh 25 October 2015

Bangladesh 25 October 2015 Bangladesh 25 October 2015 PAGE 1 OF 10 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Bangladesh Submission Date 25 October 2015 NDA or Focal

More information

Sector-wide Approaches (SWAps) in Education. An Overview. World Bank, Islamabad August 2007

Sector-wide Approaches (SWAps) in Education. An Overview. World Bank, Islamabad August 2007 Sector-wide Approaches (SWAps) in Education An Overview World Bank, Islamabad August 2007 What is a SWAp: definition A sector wide approach is an approach to support a country-led and owned program for

More information

LIBERIA S EDUCATION POOLED FUND: A Case for Private Foundation Engagement in Post Conflict Education Recovery. Caroline Schmidt Aleesha Taylor

LIBERIA S EDUCATION POOLED FUND: A Case for Private Foundation Engagement in Post Conflict Education Recovery. Caroline Schmidt Aleesha Taylor LIBERIA S EDUCATION POOLED FUND: A Case for Private Foundation Engagement in Post Conflict Education Recovery Caroline Schmidt Aleesha Taylor The case study Public-Private Partnership for the Recovery

More information

THE EFA-FTI MODALITY GUIDELINES NOVEMBER, Prepared by the FTI Secretariat

THE EFA-FTI MODALITY GUIDELINES NOVEMBER, Prepared by the FTI Secretariat THE EFA-FTI MODALITY GUIDELINES NOVEMBER, 2008 Prepared by the FTI Secretariat 1 Abbreviations and Acronyms CF CFC DAC DfID DPO EC EFA ESP FM FTI GBS MTEF MoU PFM PRSC SBS SE SWAp WB Catalytic Fund Catalytic

More information

Joint Venture on Managing for Development Results

Joint Venture on Managing for Development Results Joint Venture on Managing for Development Results Managing for Development Results - Draft Policy Brief - I. Introduction Managing for Development Results (MfDR) Draft Policy Brief 1 Managing for Development

More information

Rwanda Aid Policy As endorsed by the Cabinet Kigali, 26th July 2006

Rwanda Aid Policy As endorsed by the Cabinet Kigali, 26th July 2006 Rwanda Aid Policy As endorsed by the Cabinet Kigali, 26 th July 2006 Foreword The elimination of poverty is one of the biggest challenges facing the Government of Rwanda. Whilst we have come far since

More information

Workstream II: Govenance and Institutional Arrangements Workstream III: Operational Modalities Revised background note: Direct Access

Workstream II: Govenance and Institutional Arrangements Workstream III: Operational Modalities Revised background note: Direct Access Second meeting TC-2/WSII/4 Workstream II: Govenance and Institutional Arrangements Workstream III: Operational Modalities Revised background note: Direct Access I. Introduction A. Background 1. At the

More information

Alternative Reference Rates Committee Terms of Reference (Revised March 7, 2018)

Alternative Reference Rates Committee Terms of Reference (Revised March 7, 2018) Alternative Reference Rates Committee Terms of Reference (Revised March 7, 2018) The Alternative Reference Rates Committee (the ARRC ), is a private-sector organization sponsored by the Board of Governors

More information