1 South Sudan Common Humanitarian Fund Allocation Process Guidelines 27 January 2012

2 ACRONYMS AB CAP CERF CHF HC HCT HFU ISWG NCE NGO OCHA OPS PPA PRT PUNO TOR UN UNDP Advisory Board Consolidated Appeal Process Central Emergency Response Fund Common Humanitarian Fund Humanitarian Coordinator Humanitarian Country Team Humanitarian Financing Unit (OCHA) Inter -Sector Working Group ( Coordinators and Co-coordinators) No-Cost Extension Non-Governmental Organization Office for the Coordination of Humanitarian Affairs Online Projects System ( Project Partnership Agreement Peer Review Team Participating United Nations Organization Terms of Reference Technical Secretariat United Nations United Nations Development Programme Purpose The purpose of this document is to describe the allocation processes of the South Sudan Common Humanitarian Fund (CHF) as well as detail the roles and responsibilities of the constituent stakeholders. Scope The guidelines will cover all the steps and phases to be followed through the allocation processes and are therefore for all CHF participants and stakeholders including the HC, OCHA, UNDP, Coordinators and humanitarian partners, grantees and donors. Adherence to these guidelines is mandatory to ensure standard and transparent processes. Rationale The objective of the South Sudan CHF is to support the timely allocation and disbursement of donor resources to the most critical humanitarian needs under the direction of the HC. In order to meet that objective, these guidelines support a process that is inclusive, transparent and objective. This process should in addition be based upon agreed and well defined priorities related to the most urgent humanitarian needs and critical gaps in the clusters. These guidelines also provide clarification and instructions of all allocation process steps and requirements to enhance timely and strategic allocation decisions. The guidelines are a synthesis of best practices, lessons learned and reviews of similar pooled funds including the Sudan CHF. Comments on these guidelines: The CHF Technical Secretariat () in South Sudan welcomes further comments or feedback on the use and application of the guidelines. Comments are welcome at: chfsouthsudan@un.org and cc nyambanet@un.org. Page 2 of 15

3 A. Introduction A1. CHF Allocation Process The allocation process is at the centre of the Common Humanitarian Fund (CHF) mechanism. The Humanitarian Coordinator (HC) aiming at sound, strategic, needs based and prioritised decisions will use a consultative process with partners to provide a country level perspective. The CHF Allocation Process allows the HC to consult the Humanitarian Country Team (HCT), CHF Advisory Board (AB), cluster coordinators and implementing partners, to identify priority needs against which CHF funds will be allocated. The objective of the CHF is to support the timely allocation and disbursement of resources to the most critical humanitarian needs of South Sudan under the direction of the HC. In general, the South Sudan CAP is the basis on which requests for funding are prioritized. A consultative allocation process is used to ensure effective targeting of funds. The South Sudan CHF consists of two core allocation modalities: the Standard Allocation Model and the CHF Reserve both of which will be explained below. A2. The CHF Standard Allocation Model The Standard Allocation Model is an allocation model/process through which the majority of CHF funding is allocated to activities within the CAP. The purpose of the standard allocation model is to provide timely and predictable funding to highest priority needs contained in the CAP. The Standard Allocation Model involves close consultation with Coordinators, Co-coordinators, cluster members and other relevant partners. The final decision is made by the HC upon consultation with the HCT and the Advisory Board. The timing of allocation rounds through the Standard Allocation Model will be aligned with CAP cycle and other in-country humanitarian assistance delivery mechanisms taking into consideration seasonal factors such as rainy and dry season. Most of the funds allocated through this modality will typically be allocated early in the year to front load critical humanitarian programmes in the country. Timing of allocation rounds will also depend on availability of funds in the CHF. Guidance on the minimum and/or maximum allocation allowable per project will be given at the time when a Standard Allocation round is announced. A3. CHF Reserve A reserve is kept within the CHF to enable the HC to allocate funds in the event of unforeseen needs (e.g. natural disasters, displacements, disease outbreaks) arising outside the CHF Standard Allocation process. The CHF reserve will typically be a maximum of 20% of committed funds to the CHF (or as may be determined by the HC from time to time). Projects in and outside the CAP will be eligible for allocation of funds from the reserve upon meeting requirements set out in these guidelines. Upon receipt of CHF allocation, projects not in the CAP must register in the Online Projects System ( - OPS. A4. CHF Grant Duration Implementation of a CHF recipient project shall not exceed twelve (12) months from the effective CHF allocation date or in-case of pre-financed projects, from the date of the first invoice related to CHF activities after project allocation approval and before disbursement. The joint OCHA-UNDP Technical Secretariat (), in consultation with the HC, will announce the effective CHF allocation date after taking into consideration the period between HC s allocation approval letter and disbursement of the first instalment of allocated funds. Project pre-financing will be limited to only the costs incurred in the interim period between the HC s approval and the actual cash disbursement to the recipient project. Page 3 of 15

4 B. Standard Allocation Process Management The standard allocation process starts with development of the CHF Allocation Policy Paper. The policy paper is drafted by the in consultation with cluster Coordinators and Co-coordinators. Priorities are recommended through ISWG based upon open and transparent consultation, discussed at the HCT and submitted to the HC for approval. The HC consults the Advisory Board before approving the policy paper. The CHF Advisory Board endorses the policy paper ensuring that it reflects priorities that have been refined to those most urgent humanitarian needs as set out in the CAP response plans. The policy paper will not define funding envelops for clusters. B1. level consultations and reviews Once the policy paper has been approved by the HC and endorsed by the CHF Advisory Board, the HC together with the Technical Secretariat () convenes a CHF stakeholders meeting with potential applicants to articulate the strategic focus of the immediate CHF allocation round as stipulated in the CHF policy paper. A similar meeting is held with the ISWG, in which the HC explains to cluster coordinators and co-coordinators the strategic focus of the allocation round and the shares allocation reference documents and templates with the cluster coordinators. coordinators hold cluster consultations meetings to refine and adopt cluster specific priorities on the basis of priorities set out in the policy paper. CAP partners then submit proposals based on priorities endorsed within their clusters. coordinators together with their respective cluster Peer Review Teams (PRTs) review the proposals submitted against their respective cluster specific criteria in line with priorities stipulated in the policy paper. They rank projects for technical merit in addressing the most urgent humanitarian needs. An OCHA focal point will represent in the PRT meetings. B2. defences and CHF Advisory Board review Each coordinator prepares a presentation to defend the cluster s programmatic strategy and the supporting portfolio of proposals in front of the CHF Advisory Board. Coordinators ensure that the defence is blind hiding the identity of the requesting organization. coordinators are required to demonstrate that their programmatic strategy is evidence-based. They are also required to support their allocation proposals with clear and concise documentation on the ranking and decision making process to demonstrate that a transparent, inclusive and objective process was followed. If dissatisfied with a particular presentation, the HC or CHF Advisory Board can request the concerned coordinator to make a second presentation. Based on the presentations and in line with the policy paper, the HC, in consultation with the CHF Advisory Board, makes recommendations for funding to each cluster. The HC then debriefs each cluster coordinator on the outcome of the cluster defences informing how much is allocated to the cluster, and issues to address before project allocations are approved. B3. Final project submissions coordinators together with cluster Peer Review Teams and concerned requesting organizations address issues raised by the HC and the Advisory Board and make necessary adjustments to accommodate the funding recommended to the cluster. Requesting organizations are informed of allocations recommended for their proposals and asked to revise their proposals, as required and re-submit. liaises with the cluster coordinators to ensure that issues raised by the Advisory Board are adequately addressed, and keep the HC informed. coordinators submit to the finalized proposals, budgets, minutes of their allocation meetings and any other documentation that may be required to facilitate preparation of allocation letters. B4. Allocation letters and disbursement The prepares allocation letters for the HC s signature. The HC signs the allocation letters and sends to CHF grantees requesting them to indicate acceptance. UN agencies submit letter of acceptance to and NGOs sign Project Partnership Agreement (PPA) documents to commence disbursement of funds. Funds are disbursed to CHF recipients upon receipt of compliant documentation as required by UNDP (as Participating United Nations Organization (PUNO) for NGO implemented projects, performing functions established by global corporate practice as those of Managing Agent ). Page 4 of 15

5 B5. Steps in the CHF Standard Allocation Process A summary of the Standard Allocation process steps are highlighted below and details of the various steps leading to allocation of CHF are described in Annex I. Allocation Step Indicative Timeline 1 Development of the CHF Allocation Policy Paper 12 days 2 Launch of the CHF Allocation Process 1 day 3 level consultations and reviews 16 days 4 Defences and Advisory Board review 4 days 5 Final Project Submissions 5 days 6 Approval by Humanitarian Coordinator and acceptance by recipients 7 days 7 Disbursement of Funds 8-10 days B6. Roles of constituent Stakeholders in the Standard Allocation Model B6.1 The Role of CHF Advisory Board The AB will undertake the following activities in relation to the CHF: a) Advice the HC on any issue related to the operation of the CHF; b) Review and advise the HC on the standard allocation policy papers (ensuring that it is based on identified needs, humanitarian priorities, absorptive capacities of implementing partners and past performance of recipient organizations); c) Review policy guidelines related to the operations of the CHF and project allocations made by the HC at various points in the consultative allocation process; d) Receive the reports submitted by the Administrative Agent and the HC; e) Ensure CHF allocations are used primarily to address humanitarian needs and not recovery or development programmes; f) Ensure that the CHF is utilized as a complement to other humanitarian and recovery pooled funds, as well as to bilaterally funded humanitarian projects; g) Advise on the phasing out from specific sectors/clusters in line with the evolving context and funding modalities in place. B6.2 The Role of Coordinators and Co-coordinators coordinators and co-coordinators will lead processes at the cluster level aimed at ensuring a transparent and strategic allocation process. They ensure a more coherent and effective response by mobilizing cluster Partners to respond in a coordinated, strategic manner. The Coordinator and co-coordinators will undertake the following activities in relation to the CHF: a) Facilitate all CHF related processes in consultation with cluster partners; b) Establish needs-based priorities for CHF funding in consultation with cluster partners; c) Facilitate cross-cluster coordination; d) Lead a process to transparently identify, review and recommend priority humanitarian projects for funding based on agreed overall cluster priorities and strategies, cost effectiveness and document these processes; e) Defend cluster strategies and proposal during CHF Standard Allocation rounds; f) Ensure quality and timely submissions of all related cluster materials; Page 5 of 15

6 g) Support CHF monitoring and reporting activities that are facilitated by by defining the key parameters for monitoring and reporting and promoting the highest technical standards; h) Train and build capacity of cluster partners (national and international) on CHF procedures. B6.3 The Role of Peer Review Teams (PRT) The Peer Review Teams are responsible for technical review of CHF proposals under the Standard Allocation mechanism. For each cluster, the team is composed of the coordinator, co-coordinator, an OCHA focal point and two representatives of the UN agencies and two-three representatives of NGOs, including one national NGO in clusters where there is national NGO representation. a) The PRT members provide an objective and un-biased assessment of projects submitted for funding from the CHF, applying pre-agreed evaluation criteria to assess the merits of projects proposed; b) PRT members rank projects according to the criteria, both from the perspective of technical merit including capacity to implement as well as strategic merit to ensure the project addresses urgent humanitarian needs and critical gaps as defined in the CHF policy paper; c) A PRT member should abstain from voting and may need to leave the room when having their own proposal ranked. However, the member can answer questions pertinent to his/her project posed by the other PRT members during the review; d) PRT members should be trained and orientated to ensure consistent process; e) PRT expertise, experience and knowledge are brought to bear by members to ensure strategic overview, knowing priorities, gaps, who is where, etc. PRT members should not just rely on tools; f) A minimum of 3 days lead time is needed to prepare by PRT members so that they can fulfil their responsibilities in proposal review and follow up with project owners, checking past performance and capacity; g) OCHA focal point representing should be present in each PRT meeting during CHF allocation process; h) Advisory Board members can participate as observers in the PRT meetings during CHF allocation process. B6.4 The Role of OCHA Focal Point in the Peer Review Teams (PRTs) OCHA focal points in the different cluster PRT should not have voting rights and their role should be limited to the following: a) Provide guidance on the process and ensure that procedures are adhered to and followed; b) Provide support and technical guidance on proposals where and when appropriate; c) Participate in the review of project budgets and proposals; d) Support the coordinator/co-coordinator in managing the CHF allocation process whenever necessary. B6.5 The Role of Technical Secretariat () In addition to the tasks outlined in the CHF TORs, the will be responsible for the following: a) Facilitate HC s meetings related to CHF allocation process; b) Train and orientate PRT members to ensure a consistent CHF allocation process; c) Support CHF participants to engage in the CHF Allocation processes; d) Review progress and final reports; e) Facilitate and follow up action points from CHF audits; f) Facilitate and take part in monitoring, reporting and evaluations activities; g) Information management for CHF operations. C. CHF Reserve Management C.1 Purpose of CHF Reserve The CHF Reserve will serve two purposes: Emergency Response: To enable the HC to respond to unplanned for in-country emergency needs (e.g. natural disasters, displacements, disease outbreaks). This will typically be towards activities not originally Page 6 of 15

7 included in the CAP. Proposals for emergency funding may be individual agency requests, or it may be part of a joint response comprising multiple organizations, potentially across multiple clusters, in which case proposals should be coordinated by OCHA and aligned with other emergency response funding 1. Ad Hoc Allocations: To enable the HC to respond to critical funding needs of activities within the CAP on a case by case basis. Ad hoc allocations from the reserve will take place outside the Standard Allocation Process, and will typically be towards under-funded activities in the CAP that may emerge as key priorities during the year. The application template and the general application procedures are the same for all CHF reserve requests, however the procedures may be implemented differently depending on the context surrounding individual request (e.g. fast tracking for urgent needs, or consolidated proposals for larger response). C.2 Allocations through the CHF Reserve Allocations through the CHF Reserve will be subjected to the following procedures: Proposals shall be submitted (using designated templates) to the Technical Secretariat () through the relevant cluster coordinator/co-coordinator; Proposals shall justify why special funding outside the CHF Standard Allocation mechanism is required, including explanation on why the activity/project was not funded during the Standard Allocation process; Proposals will be reviewed and cleared by the cluster coordinator/co-coordinator; There will be a further review by the and OCHA staff undertaking coordination of humanitarian activities in the state or location in question; Time critical allocation decisions and disbursements shall be fast-tracked; Projects that receive funding from the reserve and are not already in the CAP will be registered by the respective requesting organization in the CAP after the allocation; In order to streamline emergency funding processes for humanitarian partners the procedures and templates will be aligned as close to the CERF as feasible. C.3 Approval of CHF Reserve Allocations The Humanitarian Coordinator will give the final approval of any allocation from the CHF Reserve. The HC will involve the CHF Advisory Board in his/her decision making process regarding allocations from the reserve. The HC can decide to shorten the review time through a silent procedure against an agreed timeline or directly authorize allocations to projects under the CHF Reserve and subsequently inform the Advisory Board if this is deemed necessary in order to respond to urgent needs in a timely manner. C.4 Steps in CHF Reserve Allocations. The detailed steps leading to allocations out of the CHF Reserve are detailed in Annex II. D. CHF No-Cost Extension and Revision D.1 Guidelines on Requesting No-Cost Extension (NCE) These guidelines set forth the requirements and conditions under which a request for a No-Cost Extension (NCE) will be considered and approved for on-going CHF grants. CHF grantees are encouraged to adhere to the agreed grant duration and achieve project closure in accordance with the approved allocation letter(s). At times it may be necessary for a CHF grantee to request additional time to complete activities. In this situation a NCE will extend the grant period without any additional budget increases. A NCE will be granted only in exceptional circumstances with a solid justification. 1 For larger emergencies CHF Reserve funding may be provided along with grants from the CERF Rapid Response window, and applications to the two funds should in such cases be closely coordinated and aligned. Page 7 of 15

8 The HC will make decisions regarding NCE requests in the event a Participant requires an additional time period beyond the approved end date to complete the objectives of the Project. The CHF project cycle should normally run for 12 months however, with variation in depositing time frame for the different contributing donors the cycle may be shorter. NCEs should be considered an extraordinary event, not the norm and must be fully justified. NCEs for Projects receiving funds from a Standard Allocation should not be granted for more than three months and six months under extraordinary circumstances. NCEs for Projects receiving funds from the CHF Reserve should not be granted for more than three months. Although the HC makes the final decision in approving a NCE, the compiles all requests and ensures that all requests include the necessary information needed. Participants should get cluster coordinator s endorsement before submitting their NCE request A NCE request will not be approved if: 1. The reasons provided are not justifiable. 2. More than 30% of the project activities are not accomplished without justifiable reasons. However, any unspent money which could not be used during the approved project duration should not be used as the main or only justification for requesting an NCE. Steps in Requesting a No-Cost Extension 1. CHF grantees requesting an NCE should complete NCE Request Form and the Word version to the at chfsouthsudan@un.org. should confirm receipt within 3 days. If grantee does not receive confirmation after this period, he/she should check with. 2. If any changes are needed to a grant, i.e. change in activities, location, beneficiaries, budget line items, etc., this revision should be made in a separate CHF Revision Request form. 3. A request for a NCE should be submitted at least two weeks prior to the approved grant end date. Requests submitted after the approved grant end date will not be considered. D.2 Guidelines on Requesting a CHF Revision Bases for CHF revision Grantees can request revision to their CHF-funded projects due to change in any of the following: 1- Change in outcomes/ outputs 2- Change in activities 3- Change in targets 4- Change in number of beneficiaries 5- Change in location 6- Change in budget lines 7- Changes in recipient project 8- Any other significant change Revision should be considered as an extraordinary event, not the norm and must be fully justified. The HC makes the final decision in approving a Revision. The compiles all requests and ensures that all requests include the necessary information. Page 8 of 15

9 Steps in Requesting a Revision 1. Revision request should be endorsed by Coordinator before submission to the. 2. CHF grantees requesting revision should complete Revision Request Form available from the and the word version to the at chfsouthsudan@un.org. should confirm receipt within 3 days, if grantee did not receive confirmation after this period, he/she should check with. 3. A request for revision should be endorsed by cluster coordinator and submitted at least one month prior to the approved grant end date. In the event request is submitted after the approved grant end date, it must be included in an NCE Request Form to request both project extension and revision. 4. The Technical Secretariat reviews the revision request and endorses or returns it to the requestor for more information. 5. Upon review and if approved by the HC, an notification with the approval letter, will be sent to the requestor with a copy to UNDP (as Administrative Agent or PUNO). 6. The Technical Secretariat has the right to decline any unjustifiable revision request; should the causes and reasons given negate the Terms of Reference (TOR) of the CHF. Automatic Endorsement of the Budget Revision The Technical Secretariat can automatically endorse a budget revision made by CHF grantee (UN or NGOs) if it meets the following: 1. The project revision should not increase or decrease the total project budget. 2. The revised amount of the budget line item should not increase or decrease by 20% of the total budget line. In addition, the budget revision should not involve shifting money from the direct program costs to administration costs. Increase in budget items for salaries and consultation should not come from budget items that have direct benefit to beneficiaries (for example agencies cannot reduce budget item for the purchase of drugs or NFIs to cover salary costs or related expenditure). This could be done without any prior approval from UNDP/. 3. The budget line revision should not eliminate or add a core project activity. If this happens then it is considered as a routine revision request and should follow the normal revision request steps. Page 9 of 15

10 Annex I: Detailed Steps of the CHF Standard Allocation CHF STANDARD ALLOCATION PROCESS 1 Step 1: Development of the CHF Allocation Policy Paper Responsible Output Indicative Timeline 1.1 OCHA in consultation with HC drafts strategic priorities for the CHF allocation. ISWG discusses the draft policy paper, giving inputs and suggestions. OCHA; Zero draft of policy paper 5 days Information on available funds to be allocated and draft allocation timeline incorporated in the policy paper. 1.2 HC presents draft policy paper to the Advisory Board and HCT for inputs. The Technical Secretariat compiles inputs from the Advisory Board and the HCT. HC issues final policy paper. HC; CHF Allocation Policy Paper 7 days 2 Step 2: Launch of the CHF Allocation Process Responsible Output 2.1 HC separately meets with stakeholders (potential CHF applicants) and cluster coordinators/co-coordinators to explain the CHF allocation process. circulates to Coordinators/co-coordinators the Policy Paper, CHF Allocation Timelines and the following templates/forms: (i) (ii) (iii) (iv) (v) Standard Proposal Budgets (ms excel format), Allocation Report (i.e. minutes form) Project Ranking form, CHF defense presentation. HC; Formal start of CHF standard allocation process; Dissemination of CHF Allocation Policy Paper and supporting allocation templates and forms. 1 day 3 Step 3: level consultations and reviews Responsible Output 3.1 partners meet to discuss and agree on priority activities and geographic locations that will be considered for CHF funding in line with the strategic priorities outlined in CHF policy paper. Partners also agree on cluster specific timelines, projects prioritization criteria, and criteria for fund allocations after cluster defences. Partners nominate Peer Review Team (PRT) members consisting of two representatives of UN agencies and two-three representatives NGOs. coordinators; Partners level priorities, timelines and prioritization criteria Peer Review Teams (PRTs) 3 days 3.2 coordinators/co-coordinators disseminate relevant customized documents to their cluster partners soliciting submission of proposals. partners prepare projects and budgets that address the CHF priorities defined by their respective clusters and submit to the Coordinator/co-coordinators. Draft projects do not include the logframe and work plan at this stage. Note: Outreach and training will be available to partners on how to fill out CHF application forms via the Coordinators/ co-coordinators and. coordinators; Partners Call for proposals Draft project proposals with corresponding budgets 5 days Page 10 of 15

11 3.3 coordinators/co-coordinators with support of Peer Review Teams undertake a first review of the proposals to ensure: (a) Proposed projects address the cluster defined priorities, (b) Projects are technically sound and cost effective, (c) Project templates are filled out appropriately. If required, coordinator comments back to partners to strengthen their project proposals. Coordinators/co-coordinators schedule Peer Review Team (PRT) meetings to review, rank and recommend project proposals that address urgent or critical humanitarian priorities as outlined in the Policy Paper. coordinators/co-coordinators should ensure that: (i) (ii) (iii) (iv) (v) (vi) There is common understanding within the PRT of how to apply and rank cluster specific prioritization criteria for consistency purposes; Process is inclusive, transparent and objective; There is open discussion on technical merits of each proposal and capacity to implement, as well as a discussion of any limitations related to capacity to deliver; There are considerations on whether the project represents value for money or cost effectiveness as well as inquiry into what other sources of funding have been identified for each proposal; Projects with gender marker 2a or 2b are given more weighting in the prioritization process. There is common agreement on how to address any contentious issues that may arise during the review, documenting these in the minutes for transparency purposes. (vii) OCHA focal point representing is present (viii) Projects from PUNOs or NGOs that are black listed for poor performance and reporting are excluded from the review process. coordinator/co-coordinator facilitates discussion with PRT to determine funding per project based upon strong rankings, budget requirements, cost effectiveness, other funding sources and strategic considerations by applying expertise and knowledge of the PRT members. coordinator/co-coordinator fully documents the process in minutes format using the Allocation Report Form (minutes). Coordinators, PRT members Compliant peer reviewed draft proposals. Prioritized list of projects by cluster s recommendation on funding per project Draft CHF allocation minutes 4 days 3.4 coordinators/ co-coordinators compile and complete cluster package that documents the basis for project proposal recommendations. The package submitted to should consist of: (i) Peer reviewed draft proposals. (ii) Prioritized list of projects (iii) Recommended funding per project and total cluster requested amount. coordinators draft project proposals documentation package for review 1 day 3.5 The Technical Secretariat reviews each proposal to determine whether it fulfils all CHF requirements from administrative and financial perspective. If projects are deemed ineligible, the Coordinator/ co-coordinator is notified to clarify with the project owner if the problem is an administrative oversight to ensure projects that provide critical or urgent humanitarian assistance can be considered for funding. s confirmation to coordinator/ co-coordinator regarding determination of administrative and financial requirements. reviewed draft projects Summary of CHF funding requests per cluster 3 days 4 Step 4: Defences and Advisory Board review Responsible Output Page 11 of 15

12 4.1 coordinator/co-coordinator prepares presentation to defend programmatic strategy and the supporting portfolio of prioritized projects as recommended by the cluster PRT for funding. Coordinators ensure presentation is blind not mentioning names of agencies or NGOs requesting for CHF. coordinators/co-coordinators defend their proposals before a panel of CHF Advisory Board members chaired by HC. facilitates the defence sessions. Note: If dissatisfied with a particular presentation, the CHF Advisory Board can request the concerned coordinator to make a second presentation. coordinators; ; AB defense presentation ( copy to ) CHF Advisory Board review comments, suggestions and recommendations. 2 days 4.2 HC convenes follow-up consultation sessions with CHF AB. The HC presents his/her cluster funding recommendations for discussion and endorsement of the Advisory Board. HC debriefs each cluster coordinator/co-coordinator on the outcome of the CHF defence presentations, recommended funding for the cluster and required revisions/changes, if any, as suggested by the Advisory Board. facilitates the debriefing sessions. HC; AB s endorsement of HC s recommended funding by cluster. Funding for each cluster communicated to cluster coordinators. 2 days 5 Step 5: Final Project Submissions Responsible Output 5.1 coordinator/co-coordinator together with cluster peer review team and concerned requesting organizations address issues raised by the Advisory Board and adjust projects to accommodate the funding recommended to the cluster. Coordinator informs requesting organizations of recommended allocations and asks them to revise their proposals, if needed. liaises with the cluster coordinators/co-coordinators to ensure that issues raised by the Advisory Board are adequately addressed, and keep the HC informed. coordinators; Requesting organizations; HC and Advisory Board recommendations incorporated in CHF project proposals. Briefing notes to HC 2 days 5.2 Requesting organizations prepare and submit final projects and related documentation: (i) revise their proposals as directed by cluster coordinator/ co-coordinator to incorporate AB and PRT recommendations; (ii) complete the project logframe and work plan sections of the proposal document; and (iii) complete any other documents that may be required. Documents are submitted electronically to the cluster coordinator/ co-coordinator in the specified formats and filename conventions. coordinators/co-coordinators compile and finalize documentation for the CHF allocation round, including minutes and allocation matrix. coordinators/ co-coordinators submit to the finalized proposals, budgets, minutes of their allocation meetings and any other documentation that may be required to facilitate preparation of allocation letters. Requesting organizations; coordinators Final project proposals; Partners inputs to CHF allocation documentation. Completed cluster project documentation package Submission of final projects and documentation 3 days 6 Step 6: Approval by Humanitarian Coordinator and acceptance by recipients Responsible Output Page 12 of 15

13 6.1 prepares CHF allocation letters for HC s signature to approve allocations to projects The letter is accompanied by the CHF allocation table for that cluster and is sent to the HC for final approval and authorization to proceed with disbursement of funds. The HC signs the allocation letters and authorization to proceed with fund disbursement. The HC may request additional information or briefing before his/her signature and authorization to proceed with fund disbursement. The HC sends a letter of acceptance to the recipient PUNO, requesting that they indicate their acceptance of the CHF allocation. Note: UNDP acts as the recipient PUNO for NGO implemented projects, performing functions established by global corporate practice as those of Managing Agent. draw lessons learned and advice on improvements to the operation of the fund. Lessons learnt will be tabled for adoption and action thereof at the proceeding quarterly Advisory Board meeting. updates and files the CHF allocation documents HC; Allocation Letters Approval of HC to fund recommended projects Letter of acceptance sent to recipient agency for signature Lessons learned and advice on improvements Updated CHF database 7 days 7 Step 7: Disbursement of Funds Responsible Output 7.1 UN agencies (PUNO) send to a signed acceptance letter on receiving the allocation letter from HC PUNO Acceptance letter by PUNO 5 days 7.2 UNDP MPTF Office will release the allocated funds in two tranches upon receipt of signed acceptance letter from PUNO. For the allocations made to NGOs, the fund disbursement process will start once the Project Partnership Agreement (PPA) has been signed by both UNDP and the NGO. The NGO has to provide a signed payment request along with details of the bank account to start the fund disbursement process. However, it should be noted that partners working with CHF for first time will have to be assessed by UNDP for their capacity before the contract is prepared. Capacity assessment requirements will be shared with concerned partners in advance. NGO partner working with the CHF for the first time will have to provide banking information and supporting documents as per templates provided by UNDP to set up their bank account in the UNDP system. PUNO; NGO Fund disbursement to PUNOs by UNDP Fund disbursement to NGOs Set-up of Vendor Profile for NGOs 3-10 days Page 13 of 15

14 Annex II: Application Procedure for CHF Reserve Funding CHF RESERVE - APPLICATION PROCEDURE RESPONSIBLE OUTPUT INDICATIVE TIMELINE 1 The requesting organisation approaches the relevant cluster coordinator/co-coordinator and presents the request. If the cluster coordinator/co-coordinator supports the initial request, the requesting organisation will prepare a proposal using the CHF Reserve application template and submit this to the cluster coordinator/co-coordinator with copy to head of. If the request is not endorsed by the cluster coordinator/co-coordinator the requesting organisation can appeal the decision to the by preparing and forwarding proposals along with the cluster coordinator/co-coordinator s feedback. The head of will then consult with the HC for direction on the matter. Requesting Organisation Outline of request by sent to Coordinator. Proposal and budget in standard CHF Reserve application format sent to coordinator. 2 Days 2 The cluster coordinator/co-coordinator will review the proposal and add initial review comments to the proposal template before submitting to the. Submission by the cluster coordinator/co-coordinator indicates endorsement that the project is technically sound, cost effective and responds to unplanned for in-country emergency and/or covers a critical gap. Coordinator Proposal with cluster coordinator review comments sent to: chfsouthsudan@un.org 2-3 Days 3 The will review the proposal to ensure it is in keeping with overall CAP or emerging priorities, cost effective and is in proper form and quality. This may require some communication with the requesting organization. ; Requesting Organization Final project proposal and budget completed by requesting organization 2-3 Days Note: Completion of this step depends on the requestor timely submissions. 4 When the proposal is complete, the will prepare overall recommendation, allocation letter and table for the signature of the HC s consideration. If deemed necessary the can call a review meeting with the cluster coordinator/co-coordinator and relevant parties. Recommendation memo Database update 1 Day 5 The HC makes a decision on whether or not to approve the allocation. The HC may consult the Advisory Board before authorising CHF Reserve allocations, if necessary via a silent ( ) procedure against an agreed timeline or directly authorize allocations to projects under the CHF Reserve and subsequently inform the Advisory Board. Whenever possible, the HC will give the Advisory Board advance notice of pending application(s) and request their endorsement of the concerned allocation(s). HC Grant decision Decision of the HC transmitted by to requesting organization. 1-5 Days The HC s Office or informs the requesting organization of the decision of the HC. If CHF Reserve allocation is granted 6 If approved, the HC instructs the Administrative Agent, and in case of allocations to NGOs also UNDP as PUNO, to proceed with disbursement of funds 2 HC Signed allocation, allocation letter and table. 1-3 Days 2 In case of time critical assistance the allocation procedures including the disbursement process can be fast tracked Page 14 of 15

15 7 The informs the Coordinator/Co-coordinator of the HC s decision and if the project was not in the CAP, requests recipient organization to upload the project onto OPS. ; Coordinator requesting OPS upload New project uploaded onto OPS. 1 Day 8 Recipient PUNOs sign the acceptance letter and submit it to Recipient NGOs sign the PPA documents and submit it to Note: signing by UNDP is upon completion of all requested PPA documents. CHF Recipient; Signed acceptance letter Signed PPA between UNDP and recipient NGOs 1-3 Days 9 UNDP as Administrative Agent disburses funds as per instruction by the HC. For allocations to NGOs, UNDP as PUNO contracts NGOs as per their standard agreement and disburses funds accordingly. Once compliant documentation is received by UNDP, disbursement is on average 3 days to UN Agencies and 5 days to NGOs UNDP; Requesting Organisation Disbursement of funds 3 Days for UN Agencies 5-10 Days for NGOs Page 15 of 15

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014 AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014 I. Contents Introduction... 2 Purpose... 2 Scope... 2 Rationale... 2 Acronyms... 2 I. Funding Mechanisms... 3 A. Eligibility... 3 B. Standard Allocation...

More information

South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR)

South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR) South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR) 14 February 2012 List of Acronyms AA Administrative Agent AB Advisory Board CAP Consolidated Appeal Process CHF Common Humanitarian

More information

South Sudan Humanitarian Fund Operational Manual

South Sudan Humanitarian Fund Operational Manual A South Sudan Humanitarian Fund Operational Manual December 2016 Juba, South Sudan www.unocha.org The mission of the is to mobilize and coordinate effective and principled humanitarian action in partnership

More information

Sudan Humanitarian Fund. Operational Manual. November FINAL VERSION.

Sudan Humanitarian Fund. Operational Manual. November FINAL VERSION. Sudan Humanitarian Fund Operational Manual November 2017 1 FINAL VERSION 1 This version replaces the SHF Operational Manual dated February 2017. www.unocha.org The mission of the United Nations Office

More information

Operational Manual 1

Operational Manual 1 Sudan Humanitarian Fund Operational Manual 1 February 2016 FINAL VERSION 1 Also called Terms of Reference in reference to the current Standard Administrative Agreements that donors sign with the Multi

More information

Sudan Common Humanitarian Fund (CHF) Revised Terms of Reference July 2008

Sudan Common Humanitarian Fund (CHF) Revised Terms of Reference July 2008 Sudan Common Humanitarian Fund (CHF) Revised Terms of Reference July 2008 I -General 1. In 2006 and the subsequent years after that, the United Nations coordinated approach to the delivery of humanitarian

More information

Myanmar Emergency Response Fund Operational Manual

Myanmar Emergency Response Fund Operational Manual Myanmar Emergency Response Fund Operational Manual 1 Myanmar Emergency Response Fund Operational Manual July 2015 Myanmar Emergency Response Fund Operational Manual 2 Table of Contents 1. Acronyms... 3

More information

Lebanon Humanitarian Fund Operational Manual 2019

Lebanon Humanitarian Fund Operational Manual 2019 Lebanon Humanitarian Fund Operational Manual 2019 Coordination Saves Lives The mission of the is to mobilize and coordinate effective and principled humanitarian action in partnership with national and

More information

REPORT 2016/038 INTERNAL AUDIT DIVISION. Audit of the Office for the Coordination of Humanitarian Affairs operations in South Sudan

REPORT 2016/038 INTERNAL AUDIT DIVISION. Audit of the Office for the Coordination of Humanitarian Affairs operations in South Sudan INTERNAL AUDIT DIVISION REPORT 2016/038 Audit of the Office for the Coordination of Humanitarian Affairs operations in South Sudan Overall results relating to the effective management of operations in

More information

March. Coordination Saves. Lives

March.   Coordination Saves. Lives Ethiopia Humanitarian Fund Operational Manual March 2016 www.unocha.org The mission of the United Nations Office for the Coordination of Humanitarian Affairs (OCHA) is to mobilize and coordinate effective

More information

The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action. Operations Manual

The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action. Operations Manual Review of the main purpose and added value of the GAI 1 The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action Operations Manual This Operations Manual describes

More information

23/06/2017. Agenda. Myanmar Humanitarian Fund. Project Proposal Design Training. What is the MHF? MHF Governance and Management

23/06/2017. Agenda. Myanmar Humanitarian Fund. Project Proposal Design Training. What is the MHF? MHF Governance and Management Agenda Myanmar Humanitarian Fund Project Proposal Design Training 1. MHF Overview 2. Eligibility 3. Grant Management System 4. MHF Programme Cycle 5. MHF Feedback & Complaints Mechanism 6. MHF Visibility

More information

Iraq Humanitarian Pooled Fund Operational Manual

Iraq Humanitarian Pooled Fund Operational Manual Iraq Humanitarian Pooled Fund Operational Manual July 2015 www.unocha.org The mission of the is to mobilize and coordinate effective and principled humanitarian action in partnership with national and

More information

Pakistan Humanitarian. Pooled Fund (PHPF) Operational Manual. February PHPF Operational Manual 1

Pakistan Humanitarian. Pooled Fund (PHPF) Operational Manual. February PHPF Operational Manual 1 PHPF Operational Manual 1 Pakistan Humanitarian Pooled Fund (PHPF) Operational Manual February 2018 PHPF Operational Manual 2 www.unocha.org The mission of the is to mobilize and coordinate effective and

More information

Lebanon Humanitarian Fund Operational Manual

Lebanon Humanitarian Fund Operational Manual Lebanon Humanitarian Fund Operational Manual Coordination Saves Lives The mission of the is to mobilize and coordinate effective and principled humanitarian action in partnership with national and international

More information

Arrangements for the revision of the terms of reference for the Peacebuilding Fund

Arrangements for the revision of the terms of reference for the Peacebuilding Fund United Nations A/63/818 General Assembly Distr.: General 13 April 2009 Original: English Sixty-third session Agenda item 101 Report of the Secretary-General on the Peacebuilding Fund Arrangements for the

More information

Overview of the UFE Country Selection Process

Overview of the UFE Country Selection Process CERF UNDERFUNDED EMERGENCIES Overview of Technical Methodology Purpose This paper provides a general overview of the country selection decision-making process for the Central Emergency Response Fund (CERF)

More information

DRC Pooled Fund. Annual Report. January December UN Humanitarian Coordinator

DRC Pooled Fund. Annual Report. January December UN Humanitarian Coordinator DRC Pooled Fund Annual Report January December 2007 UN Humanitarian Coordinator Kinshasa, March 2008 TABLE OF CONTENTS Executive Summary... 6 1. DRC Pooled Fund in 2007: Overview... 8 2. DRC Pooled Fund:

More information

PERFORMANCE AND ACCOUNTABILITY FRAMEWORK (PAF) FOR THE CENTRAL EMERGENCY RESPONSE FUND (CERF)

PERFORMANCE AND ACCOUNTABILITY FRAMEWORK (PAF) FOR THE CENTRAL EMERGENCY RESPONSE FUND (CERF) PERFORMANCE AND ACCOUNTABILITY FRAMEWORK (PAF) FOR THE CENTRAL EMERGENCY RESPONSE FUND (CERF) August 2010 I. BACKGROUND AND RATIONALE The Central Emergency Response Fund (CERF) was established to enable

More information

The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action. Operations Manual

The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action. Operations Manual The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action Operations Manual 1 This Operations Manual describes the rules and procedures applicable to the GAI. It describes

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

CERF and Country Based Humanitarian Pooled Funds

CERF and Country Based Humanitarian Pooled Funds CERF and Country Based Humanitarian Pooled Funds I. Introduction Country based humanitarian funds (i.e. Emergency Response Funds 1 (ERFs) and Common Humanitarian Funds (CHFs) 2 ) have in recent years increased

More information

Syria Humanitarian Fund (SHF) Operational Manual

Syria Humanitarian Fund (SHF) Operational Manual Syria Humanitarian Fund (SHF) Operational Manual August 2016 www.unocha.org The mission of the is to mobilize and coordinate effective and principled humanitarian action in partnership with national and

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012 INDIVIDUAL CONSULTANT PROCUREMENT NOTICE IC/2012/026 TOR - CONSULTANCY Date: 16 April 2012 Position: Consultant - RESOURCE MOBILISATION STRATEGY 2012-2015 for UNCT ETHIOPIA Duty Station: Addis Ababa, Ethiopia

More information

Ethiopia One UN Fund Terms of Reference

Ethiopia One UN Fund Terms of Reference Ethiopia One UN Fund Terms of Reference I Introduction 1. The One UN process in Ethiopia was initiated in mid 2008. It was in part based on the General Assembly s: "Triennial comprehensive policy review

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2014-2021 Adopted by the EEA Financial Mechanism Committee pursuant to Article 10.5 of Protocol 38c to the EEA Agreement on 8 September 2016 and confirmed

More information

OCHA s Management Response Plan (MRP) to Evaluation of the Common Humanitarian Fund Country Report: Sudan

OCHA s Management Response Plan (MRP) to Evaluation of the Common Humanitarian Fund Country Report: Sudan OCHA s Management Response Plan (MRP) to Evaluation of the Common Humanitarian Fund Country Report: Sudan Prepared by: Bavo Christiaens, Pooled Fund Manager, HFRMS 18/11/2015 Cleared by: Name, Position,

More information

Operating Guidelines

Operating Guidelines Operating Guidelines Facility: Donor(s): BSEC: BSTDB: BSEC PERMIS: Donor Agreement(s): Cooperation Agreement: Steering Committee: Manager: 1. Glossary the Black Sea Project Promotion Facility the Russian

More information

Occupied Palestinian Territory Humanitarian Fund Operational Manual

Occupied Palestinian Territory Humanitarian Fund Operational Manual Occupied Palestinian Territory Humanitarian Fund Operational Manual January 2017 www.unocha.org The mission of the is to mobilize and coordinate effective and principled humanitarian action in partnership

More information

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF)

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) Terms of Reference 29 March 2013 1 Contents I. Introduction... 3 II. Purpose, Scope and Principles of the UNDF... 4 III.

More information

Common Humanitarian Fund for Somalia

Common Humanitarian Fund for Somalia Common Humanitarian Fund for Somalia Standard Allocation Document First Standard Allocation 2012, March/April 2012 I. Introduction Following extensive consultations, the Common Humanitarian Fund for Somalia

More information

Somalia Common Humanitarian Fund Standard Allocation Document 2015

Somalia Common Humanitarian Fund Standard Allocation Document 2015 Somalia Common Humanitarian Fund Standard Allocation Document 2015 First standard allocation 2015 This document outlines the strategic objectives of the Somalia Common Humanitarian Fund (CHF) first standard

More information

UN BHUTAN COUNTRY FUND

UN BHUTAN COUNTRY FUND UN BHUTAN COUNTRY FUND Terms of Reference Introduction: 1. The UN system in Bhutan is implementing the One Programme 2014-2018. The One Programme is the result of a highly consultative and participatory

More information

UN-Habitat Policy For Implementing Partners. UN-Habitat. Policy For. Partners

UN-Habitat Policy For Implementing Partners. UN-Habitat. Policy For. Partners UN-Habitat Policy For Implementing Partners 01 Version Date Author/Reviewer Status V1 06.12.2016 Mohamed Robleh Circulated for SMB comments V2 27.01.2017 Andrew Cox Approved For further information, please

More information

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary Fund for Gender Equality Monitoring and Framework Executive Summary Primary Goal of the Monitoring and Framework The overall aim of this Monitoring and (M&E) Framework is to ensure that the Fund for Gender

More information

FINAL 26 February PARTNERSHIP FOR PROGRESS: UN Civil Society Fund

FINAL 26 February PARTNERSHIP FOR PROGRESS: UN Civil Society Fund PARTNERSHIP FOR PROGRESS: UN Civil Society Fund 1 I. Introduction The UN s current policy towards civil society stems from the Millennium Declaration of 2000, which includes the commitment by member states

More information

L 347/174 Official Journal of the European Union

L 347/174 Official Journal of the European Union L 347/174 Official Journal of the European Union 20.12.2013 REGULATION (EU) No 1292/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 December 2013 amending Regulation (EC) No 294/2008 establishing

More information

FUNDING REQUEST APPLICATION FORM

FUNDING REQUEST APPLICATION FORM FUNDING REQUEST APPLICATION FORM Tailored to Challenging Operating Environments SUMMARY INFORMATION Applicant Component(s) Principal Recipient(s) Envisioned grant(s) start date Allocation funding request

More information

Vision Paper: OCHA Country-Based Pooled Funds (CBPFs) and Beyond

Vision Paper: OCHA Country-Based Pooled Funds (CBPFs) and Beyond Vision Paper: OCHA Country-Based Pooled Funds (CBPFs) and Beyond Vision: By 2017, OCHA will get relief to people affected by conflicts and natural disasters in a quicker and more efficient way through

More information

E Distribution: GENERAL EVALUATION REPORTS. Agenda item 5

E Distribution: GENERAL EVALUATION REPORTS. Agenda item 5 Executive Board First Regular Session Rome, 9 10 February 2015 EVALUATION REPORTS Agenda item 5 For consideration MANAGEMENT RESPONSE TO THE RECOMMENDATIONS OF THE SUMMARY EVALUATION REPORT OF WFP'S USE

More information

Policy Paper South Sudan Common Humanitarian Fund 2012 First Round Allocation FINAL 05 March 2012

Policy Paper South Sudan Common Humanitarian Fund 2012 First Round Allocation FINAL 05 March 2012 Policy Paper South Sudan Common Humanitarian Fund 2012 First Round Allocation FINAL 05 March 2012 1. This paper outlines the allocation strategy and guidance for the first round of the 2012 Common Humanitarian

More information

REPORT 2015/095 INTERNAL AUDIT DIVISION

REPORT 2015/095 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/095 Review of recurrent issues identified in recent internal audit engagements for the Office for the Coordination of Humanitarian Affairs 8 September 2015 Assignment

More information

CERF and Country-Based Pooled Funds Stocktaking

CERF and Country-Based Pooled Funds Stocktaking CERF and Country-Based Pooled Funds Stocktaking CERF secretariat, April 2013 1. Introduction The present paper provides an overview of the main findings regarding complementarity at country level between

More information

NGO Forum Statutes of Operation. 5 February 2016

NGO Forum Statutes of Operation. 5 February 2016 NGO Forum Statutes of Operation 5 February 2016 Contents NGOs in South Sudan Background... 1 NGO Forum... 1 NGO Forum Structure... 1 Mission Statement... 3 Approach... 3 Mandate... 3 Chapter 1: Name and

More information

MANUAL OF PROCEDURES FOR DISBURSEMENT OF FUNDS TO PARTICIPATING PARTNERS

MANUAL OF PROCEDURES FOR DISBURSEMENT OF FUNDS TO PARTICIPATING PARTNERS MANUAL OF PROCEDURES FOR DISBURSEMENT OF FUNDS TO PARTICIPATING PARTNERS Global Strategy to Improve Agricultural and Rural Statistics The main steps of the procedure for disbursement of funds (from the

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

CERF and Country-Based Pooled Funds in Emergency Response A Case Study

CERF and Country-Based Pooled Funds in Emergency Response A Case Study CERF and Country-Based Pooled Funds in Emergency Response A Case Study I. Background CERF Secretariat, 25 March 2011 Country-based humanitarian funds (i.e. Emergency Response Funds 1 (ERFs) and Common

More information

Procedures for financing the evaluation of initiatives funded by voluntary contributions FAO evaluation policy guidance

Procedures for financing the evaluation of initiatives funded by voluntary contributions FAO evaluation policy guidance Food and Agriculture Organization of the United Nations Procedures for financing the evaluation of initiatives funded by voluntary contributions FAO evaluation policy guidance November 2013 Food and Agriculture

More information

Benin 27 August 2015

Benin 27 August 2015 Benin 27 August 2015 PAGE 1 OF 6 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Benin Submission Date 27/08/2015 NDA or Focal Point Directorate

More information

IASC Subsidiary Bodies. Report on Sub-Working Group on Humanitarian Financing Activities in 2011

IASC Subsidiary Bodies. Report on Sub-Working Group on Humanitarian Financing Activities in 2011 INTER-AGENCY STANDING COMMITTEE WORKING GROUP IASC Subsidiary Bodies Report on Sub-Working Group on Humanitarian Financing Activities in 2011 6 January 2012 I Report on Activities Undertaken in 2011 In

More information

Terms of Reference for the Mid-term Evaluation of the Implementation of UN-Habitat s Strategic Plan,

Terms of Reference for the Mid-term Evaluation of the Implementation of UN-Habitat s Strategic Plan, Terms of Reference for the Mid-term Evaluation of the Implementation of UN-Habitat s Strategic Plan, 2014-2019 I. Introduction and Mandate 1. The Governing Council (GC) of the United Nations Human Settlement

More information

Initial Structure and Staffing of the Secretariat

Initial Structure and Staffing of the Secretariat Initial Structure and Staffing of the Secretariat GCF/B.05/10 26 September 2013 Meeting of the Board 8-10 October 2013 Paris, France Agenda item 6 Page b Recommended action by the Board It is recommended

More information

AUDIT UNDP COUNTRY OFFICE BANGLADESH. Report No Issue Date: 28 May 2015

AUDIT UNDP COUNTRY OFFICE BANGLADESH. Report No Issue Date: 28 May 2015 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN BANGLADESH Report No. 1429 Issue Date: 28 May 2015 Table of Contents Executive Summary i I. About the Office 1 II. Good practice 1 III.

More information

CHF Sudan 2015 Standard Allocation. Project Proposal and Budget Guidelines: SUBMISSION OF CONCEPT NOTES

CHF Sudan 2015 Standard Allocation. Project Proposal and Budget Guidelines: SUBMISSION OF CONCEPT NOTES CHF Sudan 2015 Standard Allocation Project Proposal and Budget Guidelines: SUBMISSION OF CONCEPT NOTES Content 1. Eligibility criteria and allocation process 2. Creation of project Concept Note 3. Project

More information

E Distribution: GENERAL EVALUATION REPORTS. Agenda item 5

E Distribution: GENERAL EVALUATION REPORTS. Agenda item 5 Executive Board First Regular Session Rome, 9 10 February 2015 EVALUATION REPORTS Agenda item 5 For consideration SUMMARY EVALUATION REPORT OF WFP'S USE OF POOLED FUNDS FOR HUMANITARIAN PREPAREDNESS AND

More information

WSSCC, Global Sanitation Fund (GSF)

WSSCC, Global Sanitation Fund (GSF) Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in

More information

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS ELEVENTH MEETING

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS ELEVENTH MEETING CBD Distr. GENERAL UNEP/CBD/COP/DEC/XI/5 5 December 2012 ORIGINAL: ENGLISH CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY Eleventh meeting Hyderabad, India, 8-19 October 2012 Agenda

More information

Decisions of the Board Thirteenth meeting of the Board, June 2016

Decisions of the Board Thirteenth meeting of the Board, June 2016 Decisions of the Board Thirteenth meeting of the Board, 28-30 June 2016 GCF/B.13/32/Rev.01 10 August 2016 Meeting of the Board 28-30 June 2016 Songdo, Incheon, Republic of Korea Agenda item 25 Page b Table

More information

INTERNAL AUDIT DIVISION REPORT 2018/058. Audit of the management of the regular programme of technical cooperation

INTERNAL AUDIT DIVISION REPORT 2018/058. Audit of the management of the regular programme of technical cooperation INTERNAL AUDIT DIVISION REPORT 2018/058 Audit of the management of the regular programme of technical cooperation There was a need to enhance complementarity of activities related to the regular programme

More information

FUNDING STRATEGY FOR THE IMPLEMENTATION OF THE GLOBAL PLAN OF ACTION FOR ANIMAL GENETIC RESOURCES

FUNDING STRATEGY FOR THE IMPLEMENTATION OF THE GLOBAL PLAN OF ACTION FOR ANIMAL GENETIC RESOURCES Revised edition: http://www.fao.org/3/a-i3975e.pdf FUNDING STRATEGY FOR THE IMPLEMENTATION OF THE GLOBAL PLAN OF ACTION FOR ANIMAL GENETIC RESOURCES COMMISSION ON GENETIC RESOURCES FOR FOOD AND AGRICULTURE

More information

Annex 2: SSHF Memorandum of Understanding [Template] STANDARD MEMORANDUM OF UNDERSTANDING (MOU) FOR SOUTH SUDAN HUMANITARIAN FUND

Annex 2: SSHF Memorandum of Understanding [Template] STANDARD MEMORANDUM OF UNDERSTANDING (MOU) FOR SOUTH SUDAN HUMANITARIAN FUND A Annex 2: SSHF Memorandum of Understanding [Template] STANDARD MEMORANDUM OF UNDERSTANDING (MOU) FOR SOUTH SUDAN HUMANITARIAN FUND Memorandum of Understanding between Participating UN Organizations 1,

More information

Report on the activities of the Co-Chairs

Report on the activities of the Co-Chairs Meeting of the Board 1 4 July 2018 Songdo, Incheon, Republic of Korea Provisional agenda item 6 GCF/B.20/Inf.16 12 June 2018 Report on the activities of the Co-Chairs Summary This document contains the

More information

Decision 3/CP.17. Launching the Green Climate Fund

Decision 3/CP.17. Launching the Green Climate Fund Decision 3/CP.17 Launching the Green Climate Fund The Conference of the Parties, Recalling decision 1/CP.16, 1. Welcomes the report of the Transitional Committee (FCCC/CP/2011/6 and Add.1), taking note

More information

Review of the initial proposal approval process (Progress report)

Review of the initial proposal approval process (Progress report) Meeting of the Board 8 10 March 2016 Songdo, Incheon, Republic of Korea Provisional agenda item 13 GCF/B.12/Inf.05 3 March 2016 Review of the initial proposal approval process (Progress report) Summary

More information

Arrangements for establishing the Peacebuilding Fund

Arrangements for establishing the Peacebuilding Fund United Nations A/60/984 General Assembly Distr.: General 22 August 2006 Original: English Sixtieth session Agenda items 46 and 120 Integrated and coordinated implementation of and follow-up to the outcomes

More information

CERF Guidance Note Underfunded Emergencies window: 2018 First Round

CERF Guidance Note Underfunded Emergencies window: 2018 First Round CERF Guidance Note Underfunded Emergencies window: 2018 First Round 9 November 2017 1. Summary guidelines for Country Selection and Apportionment A. Planning figures Amount: The Central Emergency Response

More information

Proposal for a COUNCIL DECISION

Proposal for a COUNCIL DECISION EUROPEAN COMMISSION Brussels, 18.2.2016 COM(2016) 75 final 2016/0047 (NLE) Proposal for a COUNCIL DECISION amending Decision 2008/376/EC on the adoption of the Research Programme of the Research Fund for

More information

Liberia Reconstruction Trust Fund Implementation Manual

Liberia Reconstruction Trust Fund Implementation Manual Liberia Reconstruction Trust Fund Implementation Manual Updated November 2009 2011-02-28 LRTF Implementation Manual 1 I. Background... 3 II. Coverage... 3 III. General Principles... 4 IV. Project Development

More information

Accelerating Progress toward the Economic Empowerment of Rural Women (RWEE) Multi-Partner Trust Fund Terms of Reference UN WOMEN, FAO, IFAD, WFP

Accelerating Progress toward the Economic Empowerment of Rural Women (RWEE) Multi-Partner Trust Fund Terms of Reference UN WOMEN, FAO, IFAD, WFP Accelerating Progress toward the Economic Empowerment of Rural Women (RWEE) Multi-Partner Trust Fund Terms of Reference UN WOMEN, FAO, IFAD, WFP March 2013 TABLE OF CONTENTS I. Introduction II. Programme

More information

UNDG Fiduciary Management Oversight Group (FMOG) Terms of Reference

UNDG Fiduciary Management Oversight Group (FMOG) Terms of Reference UNDG Fiduciary Management Oversight Group (FMOG) Terms of Reference 5 December 2014 I. Institutional context In 2007, the UN Development Group (UNDG), recognizing the growing importance of Multi- Donor

More information

GGGI Project Cycle Management Manual

GGGI Project Cycle Management Manual GGGI Project Cycle Management Manual VERSION 1.0 1 VERSION CONTROL Current version: Version 1.0 Authorized by: Date: 27 January 2017 Frank Rijsberman, Director General, GGGI 2 Contents Acronyms...4 1.

More information

THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria

THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria Technical Evaluation Reference Group for the Global Fund to fight AIDS, Tuberculosis and Malaria Terms of reference, membership and procedures I.

More information

ADMINISTRATION REQUIRIMENTS

ADMINISTRATION REQUIRIMENTS DAY ONE TRAINING CERF BUDGET AND SESSION ADMINISTRATION REQUIRIMENTS WORKSHOP Objective of this session Understand administrative process for the funding of a CERF project Understand administrative issues

More information

Instrument for the Establishment of the Restructured Global Environment Facility

Instrument for the Establishment of the Restructured Global Environment Facility Instrument for the Establishment of the Restructured May 2004 Global Environment Facility Instrument for the Establishment of the Restructured COPYRIGHT 2004 GLOBAL ENVIRONMENT FACILITY 1818 H STREET NW

More information

Strategy for Resource Mobilization in Support of the Achievement of the Three Objectives of the Convention on Biological Diversity

Strategy for Resource Mobilization in Support of the Achievement of the Three Objectives of the Convention on Biological Diversity Strategy for Resource Mobilization in Support of the Achievement of the Three Objectives of the Convention on Biological Diversity Decision adopted by the Conference of the Parties IX/11. Review of implementation

More information

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG)

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG) UNDP Initiation Plan to programme the project preparation grant received from the GEF (otherwise called GEF PPG) effective for all PIFs approved as of GEF November work programme 2017 A. Background: The

More information

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201 ANNEX to Commission Implementing Decision adopting an Annual Action Programme for Turkey under the Instrument for Pre-accession Assistance (IPA II) for the year 2017 1. IDENTIFICATION Beneficiary CRIS/ABAC

More information

Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility

Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility GCF/B.07/08 12 May 2014 Meeting of the Board 18-21 May 2014 Songdo, Republic of Korea

More information

2011 SURVEY ON MONITORING THE PARIS DECLARATION

2011 SURVEY ON MONITORING THE PARIS DECLARATION TASK TEAM ON MONITORING THE PARIS DECLARATION 2011 SURVEY ON MONITORING THE PARIS DECLARATION Revised Survey Materials Initial Annotated Draft 3 May 2010 FOR COMMENT This initial text with annotations

More information

FUNDING REQUEST APPLICATION FORM

FUNDING REQUEST APPLICATION FORM FUNDING REQUEST APPLICATION FORM Tailored to Transition SUMMARY INFORMATION Applicant Component(s) Principal Recipient(s) Envisioned grant(s) start date Allocation funding request Envisioned grant(s) end

More information

EU framework programme processes

EU framework programme processes Briefing January 2018 Adoption, implementation, evaluation SUMMARY Over the past 35 years, the European Union ( EU) institutions have adopted eight framework programmes for research. The lifecycles of

More information

Report of the Programme, Budget and Administration Committee of the Executive Board

Report of the Programme, Budget and Administration Committee of the Executive Board EXECUTIVE BOARD 136th session 26 January 2015 Provisional agenda item 3 Report of the Programme, Budget and Administration Committee of the Executive Board 1. The twenty-first meeting of the Programme,

More information

Policy and Procedures for Development, Approval and Issuance of Policies, Procedures, Tools and Guidance Notes

Policy and Procedures for Development, Approval and Issuance of Policies, Procedures, Tools and Guidance Notes UNFPA Policies and Procedures Manual Issuance of Policies and Procedures, tools and guidance notes Policy Title Previous title (if any) Policy objective Target audience Risk control matrix Checklist Policy

More information

SAICM/ICCM.4/INF/9. Note by the secretariat. Distr.: General 11 August 2015 English only

SAICM/ICCM.4/INF/9. Note by the secretariat. Distr.: General 11 August 2015 English only SAICM/ICCM.4/INF/9 Distr.: General 11 August 2015 English only International Conference on Chemicals Management Fourth session Geneva, 28 September 2 October 2015 Item 5 (a) of the provisional agenda Implementation

More information

Global Environment Facility

Global Environment Facility Global Environment Facility GEF Council June 3-8, 2005 GEF/ME/C.25/3 May 6, 2004 Agenda Item 5 FOUR YEAR WORK PROGRAM AND BUDGET OF THE OFFICE OF MONITORING AND EVALUATION FY06-09 AND RESULTS IN FY05 (Prepared

More information

Handbook. CEWARN Rapid Response Fund (RRF)

Handbook. CEWARN Rapid Response Fund (RRF) CEWARN Rapid Response Fund (RRF) Handbook Version: authorised by the CEWARN Steering Committee on: 1.0 16 th of January, 2009 This handbook is maintained by Mr. Abdirashid Warsame, Response Coordinator,

More information

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA PEFA Handbook Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA Second edition November 20, 2018 PEFA Secretariat Washington DC, USA Table of Contents PEFA ASSESSMENT HANDBOOK...

More information

Terms of Reference (ToR)

Terms of Reference (ToR) Terms of Reference (ToR) Mid -Term Evaluations of the Two Programmes: UNDP Support to Deepening Democracy and Accountable Governance in Rwanda (DDAG) and Promoting Access to Justice, Human Rights and Peace

More information

CLINICAL POLICY Department: Medical Management Document Name: Clinical Policy Committee Reference Number: CP.CPC.01 Effective Date: 09/08

CLINICAL POLICY Department: Medical Management Document Name: Clinical Policy Committee Reference Number: CP.CPC.01 Effective Date: 09/08 Page: 1 of 6 06/12, 06/13, 09/13, 09/14, 09/15, 09/16, Subject Clinical Policy Committee process Description The Clinical Policy Committee ensures that clinical policies provide a guide to medical necessity,

More information

REPORT 2016/062 INTERNAL AUDIT DIVISION. Audit of the management of trust funds at the United Nations Framework Convention on Climate Change

REPORT 2016/062 INTERNAL AUDIT DIVISION. Audit of the management of trust funds at the United Nations Framework Convention on Climate Change INTERNAL AUDIT DIVISION REPORT 2016/062 Audit of the management of trust funds at the United Nations Framework Convention on Climate Change Overall results relating to the effective management of trust

More information

Supplementary matrix 1

Supplementary matrix 1 Supplementary matrix 1 General Assembly resolution 67/226 on the quadrennial comprehensive policy review of UN operational activities for development 1 Legislative mandates by actor ECOSOC/Executive Boards/Governing

More information

UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN

UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN Approved Version April 2014 Contents Contents... 2 1. Key Elements of Results Based Management in

More information

Guidelines for the United Nations Trust Fund for Human Security

Guidelines for the United Nations Trust Fund for Human Security Guidelines for the United Nations Trust Fund for Human Security Eighth Revision 1 30 October 2014 1 This sets out the revised Guidelines for the United Nations Trust Fund for Human Security, effective

More information

Synthesis report on the progress made in the implementation of the remaining elements of the least developed countries work programme

Synthesis report on the progress made in the implementation of the remaining elements of the least developed countries work programme United Nations FCCC/SBI/2014/INF.17 Distr.: General 23 October 2014 English only Subsidiary Body for Implementation Forty-first session Lima, 1 8 December 2014 Item 11(b) of the provisional agenda Matters

More information

Global Evaluation of the Common Humanitarian Fund. Country Report: Sudan

Global Evaluation of the Common Humanitarian Fund. Country Report: Sudan Global Evaluation of the Common Humanitarian Fund Country Report: Sudan May 2015 Global Evaluation Team [from The KonTerra Group] Silvia Hidalgo Cécile Collin Martin Fisher Dorian LaGuardia Marie Spaak

More information

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation Office of the Auditor General of Norway Handbook for the Office of the Auditor General s Development Cooperation i Photo: The Office of the Auditor General of Norway Illustration: Lobo Media AS March 2009

More information

EUROPEAN UNION. Brussels, 22 November 2013 (OR. en) 2011/0384 (COD) PE-CONS 68/13

EUROPEAN UNION. Brussels, 22 November 2013 (OR. en) 2011/0384 (COD) PE-CONS 68/13 EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Brussels, 22 November 2013 (OR. en) 2011/0384 (COD) PE-CONS 68/13 RECH 370 COMPET 589 ATO 88 IND 219 MI 667 EDUC 309 TELECOM 210 ER 370 V 739 REGIO 163

More information

REPORT 2015/178 INTERNAL AUDIT DIVISION. Audit of the United Nations Human Settlements Programme Regional Office for Arab States

REPORT 2015/178 INTERNAL AUDIT DIVISION. Audit of the United Nations Human Settlements Programme Regional Office for Arab States INTERNAL AUDIT DIVISION REPORT 2015/178 Audit of the United Nations Human Settlements Programme Regional Office for Arab States Overall results relating to Regional Office for Arab States operations were

More information

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II Introduction This Project proposal has been prepared by the HLCM Procurement Network (PN)

More information

Principles for the Design of the International Financing Facility for Education (IFFEd)

Principles for the Design of the International Financing Facility for Education (IFFEd) 1 Principles for the Design of the International Financing Facility for Education (IFFEd) Introduction There is an urgent need for action to address the education and learning crisis confronting us. Analysis

More information