Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
|
|
- Augustine McGee
- 5 years ago
- Views:
Transcription
1 Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic Implementing Agency Environment Category Date PID Prepared March 8, 2000 Projected Appraisal Date March 20, 2000 Projected Board Date May 23, 2000 MOMRA Contact Person: Colonel Nicolas Habr Tel: Fax: B 1. Country and Sector Background (a) Inadequacy of infrastructure. Urban areas in Lebanon generally have reasonable access to basic services. Sewerage coverage rates are about 70.4 percent and access to piped water network is about 89 percent. However, these overall averages hide great disparities between districts, with the poorer districts of the North and South having much lower rates of access. Quite apart from differential access rates, existing infrastructure, notably roads, drainage and water and sewer networks are in a state of disrepair due to prolonged lack of expenditure on maintenance and upgrading in most municipalities. Only the largest and better off municipalities have been able to begin addressing the backlog of maintenance and upgrading needs since municipal elections took place. Improvements in existing infrastructure are key priorities to catch up with the backlog of maintenance and upgrading needs, and have generally been the first set of projects undertaken as resources become available.(b) Inadequate municipal finance. Currently, municipal revenues are not adequate to meet local needs. One reason is that own-source revenues collected by municipalities are derived from 16 different fees and taxes, which are not cost effective to administer. The most important of these taxes is based on the lease value of all rented or occupied residential and commercial property (the assessed value is in need of reevaluation and the reporting of such transactions is done haphazardly). It will take time to reform and rationalize the local tax base and establish systems for improved valuation and collections of property taxes. An equally compelling reason for the inadequacy of local resources is that the central-municipal transfer, consisting of surtaxes and fees collected by the state on behalf of all municipalities, has largely been folded into projects of the CDR or other regional development agencies through Decree 7425 of Most municipalities have, therefore, not been able to count on the intergovernmental transfers that are legally due to them as a bloc grant and for capital projects. The sustainability of municipal governments depends largely on substantially improving the municipal and intergovernmental finance system. (c) The Independent Municipal Fund (ImF) Arrears. The ImF is an account held in trust, as
2 part of the account of the Lebanese Treasury, at the central bank for the benefit of the municipalities and municipal associations. The law specifies the sources of ImF funds: taxes and levies collected by the central government on behalf of municipalities, as well as specified shares of custom duties, and surcharges on utility bills and insurance policies. The criteria along which ImF funds are distributed to, and used by, municipalities are spelled out in the law (Decree No of April 6, 1979 amended by Decree 1783 of 10/10/91). In line with that decree, ImF funds can be used to cover the salaries of contractual employees of the Ministry of Municipal and Rural Affairs working on tasks related to various municipalities, as well as the costs of service and materials benefiting municipalities. The remaining ImF fund are to be distributed on a yearly basis as follows:(a) No less than 75 percent (of available balance) should be distributed to municipalities along the following formulae:70 percent are provided as budget support out which: (i) 60 percent distributed in proportion to the number of registered population in the municipality; and (ii) 40 percent distributed to all municipalities in proportion to their own-source revenues over the preceding two years.30 percent are "earmarked" for project finance to foster regional development, particularly in rural areas.(b) No more than 25 percent should be distributed to municipal associations along the following formulae:25 percent are provided as budget support in proportion to the number of registered population within the municipal association.75 percent are "earmarked" for project finance within the administrative areas of the municipal association.over the past several years, the distribution of ImF resources to municipalities had been all but withheld. Proceeds of the World Bank loan would be counted against the ImF arrears, and the project would provide MOF with the opportunity to establish a more predictable and transparent accounting of ImF flows.(d) Limited institutional capacity at both central and local government levels. MOMRA and most municipalities are in need of institutional strengthening. Except for few large municipalities, most have weak administrative capacity and many have none whatsoever, relying on "voluntary" contributions of time by skilled professionals. The latter rely substantially on support from the central government, mostly through MOMRA. However, MOMRA is not equipped to effectively address such needs. The main reason for this situation, of course, is the major dislocations caused by the prolonged civil war, and as significantly, the absence of locally elected authorities until June, There is, as yet, no coherent strategy to deal with these issues. In general The Government policy objectives are to gradually shift the responsibility for local infrastructure to municipal governments. It is also committed to a municipal sector reform and development strategy that focuses on the balanced and equitable development of all the regions of Lebanon. 2. Objectives The project development objective is to address urgent municipal works while setting the stage for gradual assumption of responsibility for municipal services at the local level. The project would: (a) in the short term, restore selected basic municipal infrastructure to improve living conditions in virtually all the municipalities of Lebanon; and (b) in the medium term, set the stage for the development of the municipal sector by enabling municipalities to begin addressing local infrastructure maintenance and rehabilitation needs. - 2-
3 3. Rationale for Bank's Involvement The Bank's participation in the proposed Project would be an important catalyst for supporting viable options for municipal sector investment. The Bank's willingness to support these investments would complement the technical assistance support of the donor community for the sector. Currently, the EU has expressed interest in supporting the Government in these endeavors and USAID is already providing extensive technical assistance to 68 municipalities. Although the Government has taken the lead in countrywide reconstruction and development, it has not been able to mobilize local resources, establish a reliable system of transfers or to delegate responsibility and resources to local governments for addressing their own needs. The proposed project would constitute a first, if modest, step towards addressing some of these issues and complement the Bank's efforts to assist the Government in postwar reconstruction and development through regional projects. 4. Description 1. Upgrading and rehabilitating backlog of essential municipal infrastructure. 2. Capacity building at MOMRA; technical assistance for project implementation and project management. 5. Financing Total ( US$m) Government 20 IBRD 80 IDA Total Project Cost Implementation Executing agency. MOMRA would be responsible for project execution through a Project Coordinating Unit (PCU). Detailed terms of reference for the PCU have been agreed upon with MOMRA (Annex 11). MOMRA has assigned a temporary PCU Project Manager from its own staff of Engineers. It has already held workshops introducing the project to about 150 municipalities and rapidly surveyed investment programs of about twenty municipalities. By Board Approval, four positions will be filled according to the terms of reference: PCU Project Manager; Head of Project Preparation and Procurement Department; Head of Finance and Accounting Department; and Management Information Systems Administrator. The full staff of the PCU will be hired upon Project Effectiveness. The PCU would be responsible for all aspects of project management. Quarterly and annual reports, including the mid-term review and the implementation completion report, would be prepared by the PCU for Bank and Government review in accordance with Bank requirements. [TO BE COMPLETED BASED ON FINANCIAL ASSESSMENT].Accounting, financial reporting, and auditing arrangements. The PCU would hire experienced financial staff to manage project accounts. MOMRA, through the PCU, would establish and maintain project accounts and adequate control procedures to facilitate timely and transparent reporting in accordance with standards acceptable to the Bank The Budgeting and accounting system will be computerised to permit automatic production of Project management Reports. The Operations manual prepared for MOMRA in September 1998 is being updated and revised for -3 -
4 review during appraisal and would be finalized at negotiations. It would fully document all operations of the project. The revised Operations Manual will cover the following topics: (a) financial and accounting policies; (b) flow of funds; (c) accounting system and internal control mechanisms; (d) Chart of Accounts; (e) financial reports, including the format of financial management reports; (f) auditing arrangements; (g) budgeting; and (h) organization and staffing of financial management functions. The Project's annual financial statements, including summaries of the special account activities and of SOE based disbursements/prm based disbursements would be audited each fiscal year in accordance with international auditing standards by independent private auditors acceptable to the Bank. Auditors will be appointed on the basis of terms of reference to be agreed with the Bank, prior to Loan effectiveness. MOMRA would ensure that all project accounts are furnished to the Bank within six months of the end of each fiscal year, in such scope and detail as the Bank may reasonably request. Loan Administration Change Initiative (LACI) requirements will be met by date of project effectiveness. Financial management System. The Project Financial management arrangements are detailed in Annex 6. Initially the project would use the traditional disbursement system and within a (specific period) would convert to the PMR based disbursement system under LACI. The disbursement of funds would be through periodic advances to the Special account based on PMRs, which would link eligible expenditures with actual physical progress made under the project. The necessary copmuter software will be installed to produce reports compatible with the bank's PMR based disbursement system guidelines. A time-bound action plan to permit PMR based disbursements within a specific period) of effectiveness will be agreed with Government at negotiations.special Accounts. To facilitate disbursements against eligible expenditures, the Government would open at the Central Bank of Lebanon two accounts: a Local Account in Lebanese pounds for the contribution from the Government and Special Account (SA) in US dollars for the Bank loan. Both accounts would be operated by MOMRA, under terms satisfactory to the Bank. These procedures would be finalized during project appraisal and Administrative details of the Local Account and the Special Accounts would be included in Annex 6. Monitoring and evaluation arrangements. MOMRA's PCU would be responsible for monitoring progress against agreed-upon monitoring and performance indicators. The PCU would submit quarterly and annual progress reports. Monitoring indicators to evaluate development objectives and outputs, project design, implementation progress, and project impact, as detailed in Annex I are to be agreed upon at appraisal and will be included in the Project Operations Manual (OM). These indicators would be computed and analyzed by the MOMRA databank system included in the project. Beneficiary assessment surveys also would be conducted for representative areas and investments, to obtain basic qualitative and quantitative information that would enable monitoring and evaluation of the impact of the project on benefitting communities. Consultants would also undertake post-evaluation technical audits on a representative sample of projects to ensure that investments have been implemented in accordance with conditions stipulated in the OM, and would obtain feedback on the outcome or impact of the subprojects and feed these results into refining technical and economic criteria, as appropriate. Monitoring and evaluation reports would be reviewed at the beginning of each year to enable steps to be taken to ensure the efficient implementation and completion of the project. A mid-term review would be conducted in the - 4 -
5 second year of implementation to assess progress towards meeting development objectives and identify areas where adjustments need to be made to implementation processes and procedures to ensure achievement of objectives and adapt to potential changes in conditions. The resident mission would provide supervision support, supplemented by two Bank supervision missions per year to monitor and evaluate project implementation and achievement of objectives. A project launching workshop would be undertaken initially for MOMRA's staff with main representatives from the district offices and participating municipalities. A workshop would also be held as part of the mid-term review to encourage beneficiary participation in the review process. By maintaining a municipality data base, the PCU will collect fiscal, physical, and socio-economic data, which will provide an important input into future evaluations. 7. Sustainability Two key factors would affect sustainability of the project's development objectives: the ability of municipalities to strengthen capacity and improve administration; and the ability of MOMRA to build institutional capacity to carry on the agenda for municipal sector development. As noted, the recently elected municipal councils, despite weakness in capacity, are committed to demonstrating results in their communities. Moreover, the project would include components that assist in strengthening the institutional capacity at MOMRA through the PCU and complement donor assistance to municipalities from the EU and USAID. A more fundamental risk is the sustainability of benefits. This requires capacity building and improved local revenues and a more sustainable system of intergovernmental finance, to ensure adequate operations and maintenance at the local level. These risks can only be dealt with by a sustained effort to support reform and formulation of a coherent strategy for development of the sector, beyond the duration of this first operation. 8. Lessons learned from past operations in the country/sector The lessons learned in Lebanon are primarily from the ongoing ERRP project and the Solid Waste Project. The main concerns relating to these projects are the lack of institutional capacity in sectoral ministries as a consequence of the long civil war, and the regulatory constraints built into the administrative oversight of control agencies such as the Bureau of Accounts (BOA) and the Civil Service Bureau (CSB). Projects implemented by sectoral ministries have been delayed in some instances by the existing Lebanese procurement procedures. While changing these procedures has been addressed through Bank support in the context of procurement reforms, the rapid implementation of the small municipal rehabilitation works under this project would be significantly facilitated through streamlined procedures in the Operations Manual (OM), which would (i) be based on Bank guidelines, (ii) provide step-by-step instructions from advertising through contract administration, and (iii) include samples of the necessary simplified procurement documents. Corresponding prior review thresholds would be specified in the Loan Agreement. An additional lesson learned in Lebanon is the importance of applying and clarifying rules about the use of ImF resources and promoting an understanding by municipalities of their choices in use of these resources for locally determined investment priorities. Other lessons learned through municipal development projects, especially in the initial stages, - 5-
6 is the need to adapt and simplify objectives taking into account both local capacity and readiness. 9. Program of Targeted Intervention (PTI) N 10. Environment Aspects (including any public consultation) Issues The proposed program would not include subprojects that would negatively impact the environment (such as wastewater networks, slaughter houses and septic tanks cleaning); however, subprojects would be subject to environmental reviews by qualified consultants. A sample of about 200 subprojects consisting of road resurfacing and street light rehabilitation have been appraised by consultants. The reviews of such works confirmed that small subprojects would not contribute to increased traffic volume, and that environmental benefits would be positive due to reduced vehicle emissions resulting from the improved traffic flow. The street lights would contribute to road safety at night and to general safety of people and their property. A review of 2,000 subproject applications screened by consultants also shows that such works consist of small rehabilitation and upgrading of existing municipal roads, street lights, and some road crossings and sidewalks, which would generally improve safety of both pedestrian and vehicular traffic on main roads. The mitigating measures of this group of services, such as proper rights-of-way and prevention of erosion, would be addressed as part of the detailed engineering design for civil works. However, there is a possibility of including subprojects consisting of urgent repairs and improvements to small water supply and sewage collection and disposal facilities, which would be subject to environmental screening and analysis acceptable to the Bank. 11. Contact Point: Task Manager Sonia Hammam The World Bank 1818 H Street, NW Washington D.C Telephone: (202) Fax: (202) For information on other project related documents contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C Telephone: (202) Fax: (202) Web: Note: This is information on an evolving project. Certain components may not be necessarily included in the final project. Processed by the InfoShop week ending March 24,
7 Annex Because this is a Category B project, it may be required that the borrower prepare a separate EA report. If a separate EA report is required, once it is prepared and submitted to the Bank, in accordance with OP 4.01, Environmental Assessment, it will be filed as an annex to the Public Information Document (PID). If no separate EA report is required, the PID will not contain an EA annex; the findings and recommendations of the EA will be reflected in the body of the PID. -7-
Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category
More informationProject Name Philippines-Local Government Finance & Development Project (LOGOFIND)
Public Disclosure Authorized Report No. PID4841 Project Name Philippines-Local Government Finance (@+)... & Development Project (LOGOFIND) Region East Asia and Pacific Region Sector UY - Other Urban Development
More informationNicaragua-Pension and Financial Market Reform Technical Assistance Credit
Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Report No. PID8081 Nicaragua-Pension and Financial Market (@) Reform Technical Assistance Credit Latin America
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723
More informationTable 1 the Road Network of Mozambique (in kilometers)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads
More informationProject Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways
More information[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PUBLIC DISTRIBUTION PROJECT INFORMATION DOCUMENT (PID) Project Name Iraq: Emergency School
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Report No. PID6809 Project Pakistan-Punjab Municipal Development (+) Fund Project Region Sector Project ID Borrower Implementing Agencies South Asia Urban PKPE55293 Government of Pakistan (GOP) Date PID
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Project Name Region Sector Project ID Borrower Report No. PIC2827 Latvia-Welfare Reform Project (@) Europe and Central Asia Social Sector Adjustment LVPA35807 Republic of Latvia
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category
More informationCentral government administration (80%); Sub-national government administration (20%) Operation ID
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE 31 March 2016 Report No.: AB7818 (The
More informationSERBIA AND MONTENEGRO-Montenegro Environmentally Sensitive Tourist Areas Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Report No: AB131 Project Name SERBIA AND MONTENEGRO-Montenegro
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Project Name Region Sector Project ID Implementing Agency Report No. PIC908 West Bank and Gaza-Emergency Rehabilitation Project (& Middle East and North Africa Non-Sectoral XOPA34112 Date prepared May
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Project Name Region Sector Project ID Borrower Beneficiaries Implementing Agency Report No. PID10910 India-Andhra Pradesh Economic Reform... Loan/Credit South Asia Poverty Reduction and Economic Management
More informationState Secretariat for Planning, Science and Technology (SEPLAN)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID10306
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/27/2010 INTEGRATED SAFEGUARDS DATASHEET
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID8369 Tanzania-Social Action Fund Project Africa Regional Office Social Funds & Social Assistance TZPE65372 GOT
More informationPROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No:
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: 111025
More informationPROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project
More informationPROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Program Name
More informationLiberia Reconstruction Trust Fund Implementation Manual
Liberia Reconstruction Trust Fund Implementation Manual Updated November 2009 2011-02-28 LRTF Implementation Manual 1 I. Background... 3 II. Coverage... 3 III. General Principles... 4 IV. Project Development
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original
More informationFIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS)
FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) OPERATIONS POLICY AND COUNTRY SERVICES APRIL 2, 2002 FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) CONTENTS Page I. Introduction..1 II.
More informationUpdated Project Information Document (PID) Report No: AB793. UGANDA - THIRD PHASE OF THE ROAD DEVELOPMENT PROGRAM Region.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Report No: AB793 Project Name UGANDA - THIRD
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:
More informationProject development objective/outcomes
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799
More informationProject Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing. AFRICA Sector.
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing Region AFRICA Sector Railways (80%); Ports, waterways and shipping (5%); Aviation
More informationPROJECT INFORMATION DOCUMENT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name: Region: Sector: Task Manager: Project ID Number: Borrower: Guarantor: Implementing
More informationUS$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M):
Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14437 1. Project Data: Date Posted : 09/22/2014 Public Disclosure Authorized Public Disclosure Authorized Country:
More informationPROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: 120763 Operation
More informationTHE ROAD TO ECONOMIC GROWTH
THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial
More informationTURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible
More informationInitial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Initial Project Information Document () Report No: AB484 Project Name INDONESIA - Domestic
More informationUpdated Project Information Document (PID) Report No: AB894
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Theme Project Borrower(s) Implementing Agency(ies) Environment
More informationAddress: Avda de la Republica 154, Piso 11 Contact Person: Lic. Enrique Moreno Tel:
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Implementing Agency Environment Category Report
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET
More informationPublic Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Project Information Document Report No. PID8416 Turkey-Marmara Earthquake
More informationTrends, challenges and Opportunities for Resource Mobilization in Myanmar for Sustainable Development
Trends, challenges and Opportunities for Resource Mobilization in Myanmar for Sustainable Development 6 12 2018 Outline Revenue and expenditure and Financing Trends Challenges for resource mobilization
More informationwith the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming
with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming PAGE 1 OF 8 (Please submit completed form to countries@gcfund.org)
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GUINEA: EDUCATION FOR
More informationPLANNING BUREAU SUMMARY. December 2009
PLANNING BUREAU EUROPEAN UNION REPUBLIC OF CYPRUS EVALUATION OF THE INDICATORS OF THE OPERATIONAL PROGRAMMES SUSTAINABLE DEVELOPMENT AND COMPETITIVENESS AND EMPLOYMENT, HUMAN CAPITAL AND SOCIAL COHESION
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationPrimary Health; Including Reproductive Health; Chi
Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Report No. PID9659 China-Tuberculosis Control Project East Asia and Pacific
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Report No. PID11533 WEST BANK AND GAZA-Emergency Municipal... Services
More informationKarnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS
Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product
More informationProject Name Comoros-Health Project... (Previously Second Human Resources Project)
Report No. PID5951 Project Name Comoros-Health Project... (Previously Second Human Resources Project) Region Sector Project ID Borrower Implementing Agency Africa Basic Health KMPE52887 Government of Comoros
More informationDated: 0 VltA r. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DOCUMENT OFFIClIL The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK
More informationPROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. First Governance and Competitiveness Development Policy Operation (DPO1) Region
PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6864 Operation Name First Governance and Competitiveness Development Policy Operation (DPO1) Region AFRICA Sector Central government administration
More informationActual Project Name : Urban Infrastructure & Project Costs (US$M US$M): Sector Board : Water Cofinancing (US$M US$M): US$M):
Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13817 1. Project Data: Date Posted : 06/27/2013 Public Disclosure Authorized Public Disclosure Authorized Public
More informationOFFICIAL DOCUMENTS. H. E. Jean Gustave Sanon Minister of Economy and Finance Ministry of Economy and Finance Ouagadougou Burkina Faso.
Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID8347 Project Name Indonesia-Western Java Environmental (@) Management Project
More informationHuman Settlements Improvement Project (2)
INDONESIA Human Settlements Improvement Project (2) Report Date: March 2000 1 Project Summary and Japan s ODA Loan This project aimed to provide water supply systems, environmental sanitation facilities,
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID10650 Nigeria-Community and Local Government Development... Project Africa Regional Office Decentralization
More informationRepublic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance
Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved
More informationTechnical Assessment
SOCIALIST REPUBLIC OF VIETNAM Results-Based National Urban Development Program in the Northern Mountains Region Technical Assessment April 28, 2014 PREPARED BY THE WORLD BANK Table of Contents Executive
More informationEnvironmental Assessment Framework and Guidelines: Experience from the Philippines
Environmental Assessment Framework and Guidelines: Experience from the Philippines Presented by: Joe B. Tuyor Bishkek, Kyrgyz Republic March 26-28, 2008 Tbilisi, Georgia April 1-3, 2008 1 Outline of the
More informationREPORT 2016/081 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2016/081 Audit of selected subprogrammes and related technical cooperation projects in the Economic and Social Commission for Western Asia Overall results relating to the
More informationPROGRAM INFORMATION DOCUMENT (PID)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Operation Name PROGRAM INFORMATION DOCUMENT (PID) Appraisal STAGE September 25, 2015
More informationProject Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support for Strategic Local Development and Investment Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support
More informationZambia s poverty-reduction strategy paper (PRSP) has been generally accepted
15 ZAMBIA The survey sought to measure objective evidence of progress against 13 key indicators on harmonisation and alignment (see Foreword). A four-point scaling system was used for all of the Yes/No
More informationProgress on the Strengthening of the European Integration Structures
TENTH MEETING OF THE STABILISATION AND ASSOCIATION PROCESS TRACKING MECHANISM CONCLUSIONS PRISTINA, 14 JULY 2006 The tenth meeting of the Stabilisation and Association Process Tracking Mechanism was held
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Health Sector Support Project
More informationProject Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.: AB6515 Afghanistan New Market Development Project Region SOUTH ASIA Sector General industry and trade sector (100%) Project ID P118053
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00
Public Disclosure Authorized 1. Project Data Report Number : ICRR0020321 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project ID P107840 Country Macedonia, former
More informationArrangements for the revision of the terms of reference for the Peacebuilding Fund
United Nations A/63/818 General Assembly Distr.: General 13 April 2009 Original: English Sixty-third session Agenda item 101 Report of the Secretary-General on the Peacebuilding Fund Arrangements for the
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Russia
More informationGovernance for Improved Service Delivery Region. Program-for-Results Program ID. Republic of Kenya Implementing Agency
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:PIDC0091373 (The
More informationIntergovernmental Finance and Fiscal Equalization in Albania
The Fiscal Decentralization Initiative for Central and Eastern Europe Intergovernmental Finance and Fiscal Equalization in Albania by Sherefedin Shehu Table of Contents Executive Summary... 5 Introduction...
More informationI Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1
Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE 36184 Report No.: AB219 I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1 Public Disclosure Authorized Public Disclosure
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 14-Jul-2014
More informationREPORT 2015/174 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2015/174 Audit of management of selected subprogrammes and related capacity development projects in the United Nations Economic and Social Commission for Asia and the Pacific
More informationPublic Disclosure Authorized OFFICIAL~ DOCUMENTS (
Public Disclosure Authorized OFFICIAL~ DOCUMENTS ( Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Trust Fund Administration Agreement between the Royal Norwegian
More informationLiaoning Project Agreement
Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7918-CN Public Disclosure Authorized Liaoning Project Agreement (Liaoning and Shandong Technical and Vocational Education and Training Project) Public
More informationTHE INTERNATIONAL MONETARY FUND AND THE INTERNATIONAL DEVELOPMENT ASSOCIATION REPUBLIC OF DJIBOUTI
THE INTERNATIONAL MONETARY FUND AND THE INTERNATIONAL DEVELOPMENT ASSOCIATION REPUBLIC OF DJIBOUTI Interim Poverty Reduction Strategy Paper Joint Staff Assessment Prepared by the Staff of the International
More informationREVENUE AND EXPENDITURE MANAGEMENT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TECHNICAL BRIEF REVENUE AND EXPENDITURE MANAGEMENT Nam Theun 2 Hydroelectric Project
More informationOFFICIAL DOCUMENTS. Woyirty. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS Woyirty The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C.
More informationDocument of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL
More informationINTERNAL AUDIT DIVISION REPORT 2016/155. Audit of the United Nations Human Settlements Programme project management process
INTERNAL AUDIT DIVISION REPORT 2016/155 Audit of the United Nations Human Settlements Programme project management process Established policies and procedures need to be further strengthened, particularly
More informationto ensure that the urban poor in participating Kelurahans benefit from improved socio -economic and local governance conditions.
Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14905 1. Project Data: Date Posted: 06/02/2016 Public Disclosure Authorized Public Disclosure Authorized Public
More informationProgram Information Document (PID)
Program Information Document (PID) Appraisal Stage Date Prepared/Updated: 17-May-2018 Report No: PIDA24962 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public
More informationOECS Disaster Vulnerability and Climate Risk Reduction Program Region. Latin America and the Caribbean Country
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6619 OECS
More informationActual Project Name : Social Insurance. US$9.7 US$9.4 Technical Assistance Project (SITAP) Country: Bosnia and US$M): Project Costs (US$M
IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 10/22/2008 Report Number : ICRR12969 PROJ ID : P071004 Appraisal Actual Project Name : Social Insurance Project Costs (US$M US$M):
More informationCountry Practice Area(Lead) Additional Financing
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021281 Public Disclosure Authorized Public Disclosure Authorized Project ID P149884 Project Name CF-
More informationProject Name. Region Sector
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report
More informationAction Fiche for Lebanon
Action Fiche for Lebanon 1. IDENTIFICATION Title/Number Facility in support of SMEs energy efficiency investments Total cost EU Contribution : 15,000,000 Aid method / Method of implementation Project approach
More informationRepublic of Indonesia Indonesia. [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Category Date PID Prepared December 4, 2006
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION
More informationFinancing Agreement CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG. (Emergency Recovery Project) between KYRGYZ REPUBLIC.
Public Disclosure Authorized CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG Public Disclosure Authorized Financing Agreement Public Disclosure Authorized (Emergency Recovery Project)
More informationMacedonia: Social Infrastructure Programme I-III
Macedonia: Social Infrastructure Programme I-III Ex-post evaluation OECD sector 43030 - Urban development and management; 15140 - Government administration (Phase III) BMZ project ID 2000 65 037; 2000
More informationLiberia s economy, institutions, and human capacity were
IDA at Work Liberia: Helping a Nation Rebuild After a Devastating War Liberia s economy, institutions, and human capacity were devastated by a 14-year civil war. Annual GDP per capita is only US$240 and
More informationANNEX. DAC code Sector Economic and Development Planning
ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Project Name Region Sector Project ID Borrower Report No. PIC4620 Senegal-Urban Transport Reform and... Capacity Building Project Africa Urban Transport SNPA44383 Republic
More informationPEFA Training. Dakar, Senegal January & February 1, #PEFA. PEFA Secretariat
www.pefa.org #PEFA PEFA Training Dakar, Senegal January 30-31 & February 1, 2019 PEFA Secretariat Improving public financial management. Supporting sustainable development. INTRODUCTION Introductions Participant
More informationPROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. MA-Second Capital Market Development and SME Finance DPL Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7824 March 8, 2016 Operation
More informationProject Name. Region. Date of Board Approval July 29, 2008
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: AB3458.: MAURITANIA:
More informationLRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million
LRTF Quarterly Report March 1, 2012 I. LRTF Administration As of February 22, 2012, the LRTF status was as follows: USD million Contributions Received Cash Contributions $146,902,156.80 Investment Income
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK TAR: INO 34115 TECHNICAL ASSISTANCE TO THE REPUBLIC OF INDONESIA FOR FISCAL DECENTRALIZATION November 2001 CURRENCY EQUIVALENTS (as of 31 October 2001) Currency Unit Rupiah (Rp)
More informationKazakhstan-Leveraged Insurance Facility for Trade and Development (LIFTAD)
Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID8599 Kazakhstan-Leveraged Insurance Facility for Trade and Development (LIFTAD) Europe and Central Asia Private
More informationSECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities
Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project
More informationGovernment of Peru Peru. PROVIAS Departamental Peru
Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Safeguard Classification PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB827 Regional Transport
More information