1 Environmental Assessment Framework and Guidelines: Experience from the Philippines Presented by: Joe B. Tuyor Bishkek, Kyrgyz Republic March 26-28, 2008 Tbilisi, Georgia April 1-3,

2 Outline of the Presentation Background of the Philippines and its Portfolio Why Use EA Framework and Guidelines Contents of EA Framework & Guidelines Processes and Procedures for Using the Framework Institutional Arrangements for using the Framework Capacity Building Implementation Experience Challenges 2

3 Background of the Philippines Located in Southeast Asia Lower middle income country Archipelagic country with 7,107 islands Presidential system of government Decentralized system of administration local governments playing a key role in delivery of basic social services 3

4 Background of the Philippine Portfolio 22 active Projects, total net commitment of $1.13 billion >50% of Projects have subprojects that are decentralized and demand-driven in nature Subprojects are implemented by local governments and communities on demand-driven basis Subprojects are small to medium scale Diverse subproject types: small infrastructure, communitybased NRM, agriculture, health centers, eco-tourism, alternative livelihoods, solid waste mgt. facilities, wastewater treatment facilities, sanitation, etc. 4

5 Why Use Framework and Guidelines Types of subprojects not known at appraisal; only identified at implementation Majority of the subprojects are small-scale, mostly not covered by the national EIA law Subproject proponents have inadequate capacity Thousands of subprojects scattered nationwide 5

6 Contents of EA Framework* General provisions Scope and coverage Procedures and processes Monitoring and evaluation Institutional arrangements * Took into account World Bank and Government EA policies and requirements 6

7 Contents of EA Framework General provisions policy and legal bases definition of terms Scope and coverage use of the project thresholds to determine coverage with EA (mainly extent of civil works and types activities that would have adverse impacts) covered projects category A (requirement: full EA) & B (requirement: IEE) projects non-covered projects category C (requirement: screening for impact, if any, only or simple EMP) 7

8 Contents of EA Framework Procedures details the procedures for environmental screening of subprojects for coverage/non-coverage, type of EA required, review, processing and approval of the EA Monitoring and evaluation details compliance monitoring and evaluation Institutional arrangements details the responsibilities of the proponent, PMOs/ PIUs, govt. EA regulatory agency, World Bank 8

9 Contents of Environmental Guidelines Environmental standards and sustainability measures for each type of subproject to address impacts and enhance sustainability of subprojects Measures for consideration and/or mainstreaming in subproject design, site selection, EMP formulation and implementation Apply to both covered and non-covered subprojects 9

10 Processes and Procedures Involved in using the Framework and Guidelines Step 1: Environmental screening of subprojects use of project thresholds to determine coverage or non-coverage with the EIA requirements conducted by the subproject proponent with guidance from the PMO/PIU Step 2: Determine EA requirement non-covered subprojects - impact screening only using a checklist or prepare a simple EMP using the environmental guidelines 10

11 Processes and Procedures Involved in using the Framework and Guidelines Step 2 (continued) covered subprojects - screening for environment category (A or B) and determine type of EA (full EA or IEE) Step 3: Review of safeguard non-covered: review done by the PMO/PIU covered: review done by the govt. regulatory agency (and the Bank) 11

12 Processes and Procedures Involved in using the Framework and Guidelines Approval non-covered: no formal approval covered: approval by govt. regulatory agency Supervision and monitoring PMO/PIU Government Regulatory Agency World Bank 12

13 Safeguard Institutional Arrangements Subproject proponents: local govt. and communities conduct screening using the project threshold prepare the EA and implement the EMP PMOs/PIUs approve subproject, provide oversight, TA, guidance, coordination, monitoring Government Regulatory Agency reviews EA, issues EA permit and conducts monitoring World Bank 13 monitors compliance by PMOs/PIUs and proponents to agreed frameworks

14 Capacity Building Project orientation and briefing Training of the PMO/PIU who then trains the local governments and communities Specialized trainings on demand basis Annual safeguards forum to share lessons learned & experiences, discuss issues and agree on solutions 14

15 Capacity Building Annual safeguards forum started in 2003 objectives: (i) to increase awareness and understanding on Bank safeguard policies; (ii) to share experiences & lessons learned; (iii) to discuss and agree on resolution of safeguard issues & implementation challenges; (iv) to improve project compliance to safeguard policies & frameworks participants: PMOs/PIUs, sector agencies, government oversight agencies, safeguard agencies, government-financing institutions, local government units, congress, donor agencies, safeguard practitioners, civil society organizations, private sector, contractors last forum was co-financed by ADB with support from CIDA 15

16 Implementation Experience Simple and practical framework and guidelines work Subproject design is enhanced by the use of guidelines Sustainability measures incorporated in the design Increase awareness of local governments and communities Need to build capacity at all levels Buy in of proponents on the added value of safeguards beyond compliance is critical Costing for mitigating measures is always an issue, hence mainstreaming in the design ensures incorporation 16

17 Challenges Building capacity of local governments and communities Enhancing the capacity of PMOs/PIUs Incorporating cost of EMP/mitigating measures in subproject cost Improving environmental screening Intensifying supervision and monitoring 17

18 Thank you! 18

REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER )

REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER ) REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER ) ENVIRONMENTAL FRAMEWORK FOR PARTICIPATING FINANCIAL INSTITUTIONS JANUARY, 2011 III. ENVIRONMENTAL REVIEW PROCEDURES Background

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

Environmental Assessment and Review Framework. Mongolia: Western Regional Road Corridor Investment Program

Environmental Assessment and Review Framework. Mongolia: Western Regional Road Corridor Investment Program Western Regional Road Corridor Investment Program (RRP MON 41193) Environmental Assessment and Review Framework September 2011 Mongolia: Western Regional Road Corridor Investment Program Prepared by the

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section F1/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ENVIRONMENTAL

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

Semi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project

Semi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project Semi-Annual Social Safeguards Monitoring Report Project No. 36173-013 Period Covering July to December 2013 April 2014 SRI: Greater Colombo Wastewater Management Project Prepared by the Ministry of Local

More information

Cambodia: Rural Credit and Savings Project

Cambodia: Rural Credit and Savings Project Project Validation Report Reference Number: CAM 2008-06 Project Number: 30327 Loan Number: 1741 July 2008 Cambodia: Rural Credit and Savings Project Operations Evaluation Department ABBREVIATIONS ADB Asian

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support for Strategic Local Development and Investment Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support for Strategic Local Development and Investment Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Indigenous Peoples Development Planning Document. PHI : Support for the Sustainable Health Care Project

Indigenous Peoples Development Planning Document. PHI : Support for the Sustainable Health Care Project Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Draft Project Number: 41664 August 2008 PHI : Support for the Sustainable Health Care Project The

More information

LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2534-GEO(SF) LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA and ASIAN DEVELOPMENT BANK DATED 20 AUGUST 2009 LAS:GEO 43171 LOAN AGREEMENT

More information

Republic of Uzbekistan: Solid Waste Management Improvement Project

Republic of Uzbekistan: Solid Waste Management Improvement Project Project Administration Manual Project Number: 45366 Loan Number: {LXXXX-UZB} November 2013 Republic of Uzbekistan: Solid Waste Management Improvement Project CONTENTS ABBREVIATIONS I. PROJECT DESCRIPTION

More information

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads

More information

Project Name Philippines-Local Government Finance & Development Project (LOGOFIND)

Project Name Philippines-Local Government Finance & Development Project (LOGOFIND) Public Disclosure Authorized Report No. PID4841 Project Name Philippines-Local Government Finance (@+)... & Development Project (LOGOFIND) Region East Asia and Pacific Region Sector UY - Other Urban Development

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

FILE COPY. E494 Volume 2. Republic of Yemen. Urban Water & Sanitation Project. Terms of Reference for a Pro-Forma Environmental Assessment

FILE COPY. E494 Volume 2. Republic of Yemen. Urban Water & Sanitation Project. Terms of Reference for a Pro-Forma Environmental Assessment Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0a/22/2002 08:26 203240 EXECB PMU SWSSP PAGE 02 Project Background Republic of Yemen

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 2835-PRC PROJECT AGREEMENT (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK and HEBEI PROVINCIAL GOVERNMENT DATED 6 MARCH 2012 PRC 44012 PROJECT

More information

A Tale of Two Sisters: Bangladesh and Philippine PPP Programs 26 November 2014

A Tale of Two Sisters: Bangladesh and Philippine PPP Programs 26 November 2014 A Tale of Two Sisters: Bangladesh and Philippine PPP Programs 26 November 2014 Presented at the UNESCAP PPP Workshop on Public-Private Partnerships for Infrastructure Development in Myanmar Background

More information

PART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY. A policy to establish an environmental assessment process in Palestine

PART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY. A policy to establish an environmental assessment process in Palestine PART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY A policy to establish an environmental assessment process in Palestine WHEREAS the Palestinian National Authority seeks to achieve sustainable development

More information

NGO Concerns on the Use of National Safeguard Systems in World Bank Projects

NGO Concerns on the Use of National Safeguard Systems in World Bank Projects NGO Concerns on the Use of National Safeguard Systems in World Bank Projects A Critique of the World Bank Paper, Issues in Using Country Systems in Bank Operations, August 23, 2004 By Peter Bosshard, Policy

More information

Stephanie Fried March 2015 Adapted from article forthcoming in BankWatch, NGO Forum on ADB

Stephanie Fried March 2015 Adapted from article forthcoming in BankWatch, NGO Forum on ADB Lessons Learned? The Implications of the ADB s Review of Safeguard Policy Implementation for the World Bank and the Asian Infrastructure Investment Bank Stephanie Fried March 2015 Adapted from article

More information

ARM: Sustainable Urban Development Investment Program, Tranche 1

ARM: Sustainable Urban Development Investment Program, Tranche 1 Environmental Monitoring Report Bi-annual Report July-December 2011 ARM: Sustainable Urban Development Investment Program, Tranche 1 Project Number: 42417 Loan Number: L2752 May 2013 Prepared by the Yerevan

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Public-Private Partnership Monitor Key Trends and Findings

Public-Private Partnership Monitor Key Trends and Findings Office of Public Private Partnership Public-Private Partnership Monitor Key Trends and Findings 23 November 2017 PPP Monitor Benefits and Key Findings PPP Monitor The PPP Monitor tracks the development

More information

Report No.: ISDSA13978

Report No.: ISDSA13978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 29-Jul-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

TERMS OF REFERANCE FOR PROJECT MANAGEMENT CONSULTANTS [PMC]

TERMS OF REFERANCE FOR PROJECT MANAGEMENT CONSULTANTS [PMC] TERMS OF REFERANCE FOR PROJECT MANAGEMENT CONSULTANTS [PMC] I. Overview 1. National Capital Region (NCR) is 33,578 square kilometer area covering Delhi and sub-regions of the states of Haryana, Rajasthan

More information

ARM: Sustainable Urban Development Investment Program, Tranche 1

ARM: Sustainable Urban Development Investment Program, Tranche 1 Environmental Monitoring Report Bi-annual Report July-December 2012 ARM: Sustainable Urban Development Investment Program, Tranche 1 Project Number: 42417 Loan Number: L2752 May 2013 Prepared by the Yerevan

More information

Stakeholder Engagement in Livelihood Restoration

Stakeholder Engagement in Livelihood Restoration Stakeholder Engagement in Livelihood Restoration Development Bank Half-Day : Joint ADB-IAIA Special Symposium on Resettlement and Livelihoods Michaela S Bergman Chief Counsellor for Social Issues, EBRD

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

Yen Loan Ex-ante project evaluation report

Yen Loan Ex-ante project evaluation report Yen Loan Ex-ante project evaluation report 1. Name of Project Country: Republic of the Philippines Project title: Agricultural Credit Support Project L/A signed on: November 25, 2009 Loan amount approved:

More information

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA.

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA. LOAN NUMBER 3007-CAM (SF) LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 26 AUGUST

More information

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Validation Report Reference Number: PVR-326 Project Number: 37066 Loan Number: 2248 October 2014 Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Independent Evaluation

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Report No. PID6809 Project Pakistan-Punjab Municipal Development (+) Fund Project Region Sector Project ID Borrower Implementing Agencies South Asia Urban PKPE55293 Government of Pakistan (GOP) Date PID

More information

XII. CGIF Environmental and Social Safeguards Policy and Framework 1

XII. CGIF Environmental and Social Safeguards Policy and Framework 1 A. Policy XII. CGIF Environmental and Social Safeguards Policy and Framework 1 1. Credit Guarantee and Investment Facility (CGIF), a trust fund of the Asian Development Bank (ADB) was established to promote

More information

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region Safeguard Policies: A Quick View Tbilisi April 1-3, 1 2008 The World Bank Europe & Central Asia Region 1 Why do we have the World Bank Safeguard Policies? Do no harm: protect people and environment from

More information

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH LOAN NUMBER 2499-PAK (SF) PROJECT AGREEMENT (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF SINDH NORTH SINDH URBAN SERVICES CORPORATION LIMITED DATED

More information

Aloysius M. Kamperewera [PhD] Ministry of Environment and Climate Change Managment Director for Environmental Affairs

Aloysius M. Kamperewera [PhD] Ministry of Environment and Climate Change Managment Director for Environmental Affairs Session 6: Element D: Reporting, Monitoring And Review: Experiences And Lessons Learnt From National Climate Change Programme And NAPA Implementation In Malawi Aloysius M. Kamperewera [PhD] Ministry of

More information

Loan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between

Loan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 8035-PH Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Additional Financing for Laguna de Bay Institutional Strengthening

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) Goods means equipment and materials to be financed out of the proceeds of the Loan, including related services such as transportation, insurance, installation, commissioning, training, and initial

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project Report and Recommendation of the President to the Board of Directors Project Number: 45366 October 2013 Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project CURRENCY EQUIVALENTS

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011

Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No. 1993 SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Reference in Loan Agreement paras 2 and 3 Covenant A.

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID8369 Tanzania-Social Action Fund Project Africa Regional Office Social Funds & Social Assistance TZPE65372 GOT

More information

Climate Funds AfDB Mobilizing Concessional Finance for NDC Implementation

Climate Funds AfDB Mobilizing Concessional Finance for NDC Implementation Climate Funds AfDB Mobilizing Concessional Finance for NDC Implementation Davinah Milenge Uwella Senior Climate Change Officer Climate Change and Green Growth Department Presentation Outline Preamble Climate

More information

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 Accelerating Infrastructure Delivery through Better Engineering Services Project (RRP INO 49141) Sector Road Map SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 1. Sector Performance, Problems, and Opportunities

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities National Disaster Risk Management Fund (RRP PAK 50316) SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) A. Sector Road Map 1. Sector Performance, Problems, and Opportunities a. Performance

More information

TERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT

TERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT 23 TERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT 1. The Asian Development Bank (ADB) is providing technical assistance to the Government of the Philippines (the government)

More information

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 26-Jun-2014

More information

Ex-ante Evaluation. Country: Republic of the Philippines Program: Development Policy Support Program (III) and Emergency Budget Support

Ex-ante Evaluation. Country: Republic of the Philippines Program: Development Policy Support Program (III) and Emergency Budget Support Japanese ODA Loan Ex-ante Evaluation 1. Name of the Program Country: Republic of the Philippines Program: Development Policy Support Program (III) and Emergency Budget Support Japanese ODA Loan Loan Agreement:

More information

Environmental Monitoring Report

Environmental Monitoring Report Environmental Monitoring Report Bi-annual Report January-June 2013 ARM: Sustainable Urban Development Investment Program, Tranche 1 Project Number: 42417 Loan Number: L2752 July 2013 Prepared by the Yerevan

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA Date ISDS Prepared/Updated: 12-Jan-2016

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA Date ISDS Prepared/Updated: 12-Jan-2016 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o ci Date ISDS Prepared/Updated: 12-Jan-2016 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name Wenchuan

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

b) if the sub-project is in the Annex B list of this Operational Manual;

b) if the sub-project is in the Annex B list of this Operational Manual; Environmental Review Procedures 1. Background The Environmental Category of the project is FI, since Ziraat Bank (as an FI) will on-lend the World Bank funds to private commercial banks and leasing companies

More information

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization Completion Report Project Number: 46-01 Technical Assistance Number: 7857 April 016 Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization This document is being disclosed

More information

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 KALAHI CIDSS National Community-Driven Development Project (RRP PHI 46420) SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 A. Program Objective and Outcomes 1. The

More information

SAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE

SAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE SAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE WBG-CSO Forum October 7, 2010 1. Objective and Methodology First comprehensive evaluation

More information

SUMMARY FINANCIAL MANAGEMENT ASSESSMENT

SUMMARY FINANCIAL MANAGEMENT ASSESSMENT A. Introduction Emergency Assistance for Relief and Recovery from Typhoon Yolanda (RRP PHI 47337) UMMARY FINANCIAL MANAGEMENT AEMENT 1. This financial management assessment was prepared in accordance with

More information

Section 3.06 is deleted and the following is substituted therefor:

Section 3.06 is deleted and the following is substituted therefor: 2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan

More information

SAICM/ICCM.4/INF/9. Note by the secretariat. Distr.: General 11 August 2015 English only

SAICM/ICCM.4/INF/9. Note by the secretariat. Distr.: General 11 August 2015 English only SAICM/ICCM.4/INF/9 Distr.: General 11 August 2015 English only International Conference on Chemicals Management Fourth session Geneva, 28 September 2 October 2015 Item 5 (a) of the provisional agenda Implementation

More information

State Secretariat for Planning, Science and Technology (SEPLAN)

State Secretariat for Planning, Science and Technology (SEPLAN) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID10306

More information

GLOBAL INFRASTRUCTURE FACILITY. A partnership platform for greater investment in the infrastructure of emerging markets and developing economies

GLOBAL INFRASTRUCTURE FACILITY. A partnership platform for greater investment in the infrastructure of emerging markets and developing economies GLOBAL INFRASTRUCTURE FACILITY A partnership platform for greater investment in the infrastructure of emerging markets and developing economies COLLABORATION FINANCE LEVERAGE IMPACT The Global Infrastructure

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1710 Leader

More information

Lessons learned from implementing Microfinance in a post-tsunami environment SRI LANKA. Dr. Dirk Steinwand

Lessons learned from implementing Microfinance in a post-tsunami environment SRI LANKA. Dr. Dirk Steinwand Lessons learned from implementing Microfinance in a post-tsunami environment SRI LANKA Dr. Dirk Steinwand Microfinance in South Asia Today and Tomorrow December 5-7, 2005, New Dehli Pre-Tsunami MF landscape

More information

REPORT 2014/107 INTERNAL AUDIT DIVISION. Audit of quick-impact projects in the African Union-United Nations Hybrid Operation in Darfur

REPORT 2014/107 INTERNAL AUDIT DIVISION. Audit of quick-impact projects in the African Union-United Nations Hybrid Operation in Darfur INTERNAL AUDIT DIVISION REPORT 2014/107 Audit of quick-impact projects in the African Union-United Nations Hybrid Operation in Darfur Overall results relating to the management of quick-impact projects

More information

Earth is our Business

Earth is our Business Earth is our Business changing the rules of the game POLLY HIGGINS SHEPHEARD-WALWYN (PUBLISHERS) LTD 2012 Polly Higgins Some rights reserved. [license_3.0] This work is licensed under a Creative Commons

More information

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent

More information

Financing initiatives for reducing vulnerability and increasing resilience to impact of climate change. IMACC GIZ PAKLIM

Financing initiatives for reducing vulnerability and increasing resilience to impact of climate change. IMACC GIZ PAKLIM Financing initiatives for reducing vulnerability and increasing resilience to impact of climate change. IMACC 29.07.2013 Adaptation Finance for : Central Government Local Government Private Sector Households

More information

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 13-Jan-2014 INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

More information

Evaluation and future development of the EIA system in Jordan

Evaluation and future development of the EIA system in Jordan MEDITERRANEAN ENVIRONMENTAL TECHNICAL ASSISTANCE PROGRAM Evaluation and future development of the EIA system in Jordan A report prepared under the METAP EIA Institutional Strengthening Project December

More information

Bi-annual Environmental Monitoring Report

Bi-annual Environmental Monitoring Report Bi-annual Environmental Monitoring Report Project Number: 42145 January-June 2011 Armenia: North-South Road Corridor Investment Program, Tranches 1 and 2 (Financed by the ADB) Prepared by the Organization

More information

CC is a development issue - not just an environmental concern CC impacts on human development, economic growth, poverty alleviation and the

CC is a development issue - not just an environmental concern CC impacts on human development, economic growth, poverty alleviation and the CC is a development issue - not just an environmental concern CC impacts on human development, economic growth, poverty alleviation and the achievement of MDGs Long term: human lives and livelihoods are

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Implementing Agency Report No. PIC908 West Bank and Gaza-Emergency Rehabilitation Project (& Middle East and North Africa Non-Sectoral XOPA34112 Date prepared May

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN THE AMOUNT OF US$32.8 MILLION TO THE REPUBLIC OF GUATEMALA

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN THE AMOUNT OF US$32.8 MILLION TO THE REPUBLIC OF GUATEMALA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN

More information

Country Operations Business Plan. Myanmar September 2015

Country Operations Business Plan. Myanmar September 2015 Country Operations Business Plan September 2015 Myanmar 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program Facility Administration Manual Project Number: 42107 MFF Number: 0042-UZB Loan Numbers: 2635-UZB (Project 1), 2746-UZB (Project 2), and 2868-UZB (Project 3) 21 August 2013 Multitranche Financing Facility

More information

Country Operations Business Plan. Kazakhstan September 2017

Country Operations Business Plan. Kazakhstan September 2017 Country Operations Business Plan September 2017 Kazakhstan 2018 2020 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

THE COUNTY GOVERNMENT OF MACHAKOS THE COUNTY TREASURY PROGRAMMME BASED BUDGET FY 2015/2016

THE COUNTY GOVERNMENT OF MACHAKOS THE COUNTY TREASURY PROGRAMMME BASED BUDGET FY 2015/2016 REPUBLIC OF KENYA THE COUNTY GOVERNMENT OF MACHAKOS THE COUNTY TREASURY PROGRAMMME BASED BUDGET FY JUNE 2015 0 Table of contents Table of contents... 1 Revenue Estimates FY 2015/16-2017-18... 2 Summary

More information

Alternative ways of Financing Urban Development

Alternative ways of Financing Urban Development External Support for Decentralization Reforms & Local Governance Systems in the Asia Pacific: Better Performance, Higher Impact? Cities Development Initiative for Asia Alternative ways of Financing Urban

More information

4. Outline of EIA for Development Assistance

4. Outline of EIA for Development Assistance 4. Outline of EIA for Development Assistance 4.1 EIA and Development EIA has an important role to play resolving these environmental problems through its ability to contribute to environmentally sound

More information

Financing Sustainable Infrastructure In Asia. Fei Yu Deputy Representative Asian Development Bank North American Representative Office

Financing Sustainable Infrastructure In Asia. Fei Yu Deputy Representative Asian Development Bank North American Representative Office Financing Sustainable Infrastructure In Asia Fei Yu Deputy Representative Asian Development Bank North American Representative Office Agenda The Asia Scene The sustainable infrastructure gap The current

More information

Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Executive Summary. An IDEV Country Strategy Evaluation

Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Executive Summary. An IDEV Country Strategy Evaluation Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program 2004 2015 Executive Summary An IDEV Country Strategy Evaluation March 2017 IDEV conducts different types of evaluations

More information

Indonesia: Earthquake and Tsunami Emergency Support Project

Indonesia: Earthquake and Tsunami Emergency Support Project Validation Report Reference Number: PVR 237 Project Number: 39127 Grant Number: 0002-SF December 2012 Indonesia: Earthquake and Tsunami Emergency Support Project Independent Evaluation Department ABBREVIATIONS

More information

Philippines: Mindanao Basic Urban Services Sector Project

Philippines: Mindanao Basic Urban Services Sector Project Validation Report Reference Number: PCV: PHI 2011-25 Project Number: 30551 Loan Number: 1843 September 2011 Philippines: Mindanao Basic Urban Services Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Session 2. Discussion: The MDGs Localization in the Philippines

Session 2. Discussion: The MDGs Localization in the Philippines Session 2. Discussion: The MDGs Localization in the Philippines National Economic and Development Authority Philippines 23 June 2014 Sub-regional Advocacy Workshop on MDGs for South East Asia Lao Plaza

More information

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS)

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Concept Stage Date ISDS Prepared/Updated:

More information

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance

More information

UPDATE. Financial Intermediary Lending and Environmental Assessment. Environmental Assessment

UPDATE. Financial Intermediary Lending and Environmental Assessment. Environmental Assessment Environmental Assessment S o u r c e b o o k UPDATE Environment Department June 2002 The World Bank Number 27 Financial Intermediary Lending and Environmental Assessment The World Bank supports economic

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 14-Jul-2014

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) GAP or Gender Action Plan means the gender action plan for the Project, including any update thereto, prepared and agreed between the Borrower and ADB and further set out in the PAM; (g) Goods means

More information

Technical Assistance Republic of the Philippines: Harmonization and Managing for Results

Technical Assistance Republic of the Philippines: Harmonization and Managing for Results Technical Assistance Report Project Number: 35166 November 2005 Technical Assistance Republic of the Philippines: Harmonization and Managing for Results The views expressed herein are those of the consultant

More information

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE te: This ISDS will be considered

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 02-Sep-2014

More information

(c) Section 3.07 is deleted and the following is substituted therefor:

(c) Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information