Semi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project
|
|
- Kerry Kevin Shaw
- 5 years ago
- Views:
Transcription
1 Semi-Annual Social Safeguards Monitoring Report Project No Period Covering July to December 2013 April 2014 SRI: Greater Colombo Wastewater Management Project Prepared by the Ministry of Local Government and Provincial Councils, Government of Sri Lanka.
2 GREATER COLOMBO WASTEWATER MANAGEMENT PROJECT SOCIAL SAFEGUARDS MONITORING SEMI-ANNUAL REPORT (June 2013 to December 2013) LOAN NO (OCR) / 2558 (SF) SRI MINISTRY OF LOCAL GOVERNMENT AND PROVINCIAL COUNCILS SRI LANKA
3 A. Executive Summary SOCIAL SAFEGUARDS MONITORING REPORT 1. The Greater Colombo Waste Water Management Project (GCWMP) proposed to improve the urban environment, public health and sanitation and quality of life of residents in the urban and sub urban areas in Greater Colombo by upgrading sewerage infrastructure and strengthening institutional and operational capacity of the sewerage service provider. 2. The main component of the project consists of reconstruction/rehabilitation works and is limited to upgrading the sewerage infrastructure within existing facilities and does not require land acquisition. Hence, resettlement issues are limited to temporary disturbances which may occur during the implementation. Four resettlement plans have been prepared for sub projects: (i) Rehabilitation of Sea Outfall (ii) Rehabilitation of sewers and conducting Condition Assessment of sewers (iii) Upgrading of Wanathamulla gravity sewer network (iv) Rehabilitation of pumping station (there is no need to develop RPs for the subprojects where resettlement impact will not trigger due to intended rehabilitation/construction work. 3. Filling of ADB prescribed forms /checklists will be adequate for such sub-projects to indicate the nature of resettlement issues involved). In this context, RP prepared for pumping stations will not be necessary and the information in the pumping stations RP will be used to fill the required forms prescribed by ADB. 4. Rehabilitation of Sea Outfall has been commenced and hence monitoring of implementation of RP is in progress. The RPs for rehabilitation of gravity sewers and Wanathamulla gravity sewer upgrading sub-projects have been finalized. This report includes the progress of the social safeguard monitoring activities implemented during June to December Hence, it is focused on reporting implementation activities of RP at Mutwal out fall. B. Background of the Report and Project Description 5. The Greater Colombo Waste Water Management project (GCWMP) has been planned to improve the urban environment, public health and quality of life for Urban and sub-urban residents in Colombo through improved wastewater management service to approximately 838,000 residents in Greater Colombo area. The project has three components; upgrading sewerage infrastructure, strengthening institutional and operational capacity and project management and implementation support. The investment cost of the project is estimated as US$ million. The Asian Development Bank provides 100 million USD and the Government of Sri Lanka provides 16.6 million USD. The expenditure of the resettlement activities is borne by Sri Lanka Government. 6. Under the component of upgrading sewerage infrastructure, rehabilitation of main sewerage system will be mainly carried out within existing fenced lands and no any negative impact can be foreseen. The Rehabilitation of sea outfall created limited negative impact on two housing structures and some vegetation. The Rehabilitation of sewer lines and conducting Condition Assessment sub project will create limited negative impact on the housing structures and disturbances to the livelihood activities of the families living in the close vicinity. 1
4 7. As there is no land acquisition required this sub project falls under Safeguard Category 8. The progress on implementation of RP is focused only on the RP implementation of Sea Outfall rehabilitation. There is no resettlement impact due to the rehabilitation of Sea Outfall at Wellawatta and hence, no separate RP was prepared. The Contractors for Rehabilitation of Sea Outfalls are mobilized and work has been commenced at both outfall sites and initial investigations have also been completed. There is no change in the scope of the work up to now and therefore, no new project induced impacts are observed at this stage. In this context, there is no requirement in adjusting the safeguard measures. C. Scope of Impacts 9. The RP identified two families living close to the Mutwal Outfall chamber as APs. The construction activities so far carried out have not created any further impact on the APs. D. Compensation and Rehabilitation 10. The compensation for the APs of the Sea Outfall rehabilitation at Mutwal was paid during the previous reporting period. The details of APs, compensation paid etc were reported in the report for the period up to December No further entitlements are observed during this reporting period other than the construction induced impacts that are mitigated which were compensated by the Contractor. Table 1- Details of construction induced impacts Subproject Safeguard impact Vulnerability status of the affected people/community Entitlement matrix and rehabilitation measures Compensation Policy Responsible Agency Mutwal sea out fall Loss of temporary boat parking space for the fishermen (occupied the space due to bad weather condition while construction was on progress) Loss of boat parking space may be created additional negative impacts on the livelihood systems of the fishermen. The purpose of recurrent visits would be to find out any new issues emerged and if such issues are found they will be conveyed to the relevant parties for mitigation. These impacts occurred as a result of the Contractors activity and were identified as construction induced impacts. Payments were based on loss of assets. Contractor has paid compensation to the affected fishermen. E. Project disclosure, public participation and consultation 11. Public disclosure of the GCWMP was carried out before the loan effectiveness. The report of the disclosure meeting was submitted to ADB on The awareness program for the contractors was held on and all the details of the program carried out on safeguard were submitted to the ADB along with semi-annual monitoring report on January to June. The awareness program was held for the people in the vicinity of the project site and general public of the area was held at construction site on to make them aware the social safeguard requirement and the institutional 2
5 arrangements established to address the social safeguard issues. The details of the construction work and contribution and their participation for the construction work were also explained. The construction supervision staff of the PMU and the consultants of the project also attended to the awareness program. The awareness program for people in the vicinity of the project site and general public of the area at construction site on F. Grievance Redress Mechanism (GRM) 13. The Grievance Redress Mechanism for the Sea Outfall rehabilitation sub project was established in year 2012 when RP was under preparation. The GRM team was introduced to the APs, people in the vicinity of the project site, the Contractor and the supervision team. The team visits the site often to monitor the social safeguard issues. G. Institutional Arrangement 14. As above the Grievance Redress Committee (GRC) has been appointed in year 2012 and no any requirement aroused to adjust or amend the GRC. H. Monitoring Results Findings 15. The monitoring of the social safeguard of the Affected Persons indicates that there is observed no any un-satisfaction of the APs up to now on the rehabilitation work to be mitigated. I. Follow up Actions, Recommendation and Disclosure 16. The monitoring of the social safeguard of the Affected Persons will be carried out in parallel with the rehabilitation work. 17. The construction activities in Mutwel site have been commenced after completion of all legal and other procedures by the project management. However, after implemented construction work an unanticipated issue emerged from the fishing community in the vicinity of the project site. This issue has been referred to the PMU and PMU has been studied and reported to the relevant parties including ADB, the project EA and the relevant ministry as a special case. 3
Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011
Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No. 1993 SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Reference in Loan Agreement paras 2 and 3 Covenant A.
More informationEnvironmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project
Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads
More informationGEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum)
Resettlement Plan December 2014 GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum) Prepared by the Municipal
More informationAdditional Cofinancing
Additional Cofinancing Sri Lanka Sri Lanka Project Number: 45148 Loan Number: 3029/3030-SRI May 2014 Proposed Administration of Loan Democratic Socialist Republic of Sri Lanka: Greater Colombo Water and
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies
More informationEnvironmental Assessment Framework and Guidelines: Experience from the Philippines
Environmental Assessment Framework and Guidelines: Experience from the Philippines Presented by: Joe B. Tuyor Bishkek, Kyrgyz Republic March 26-28, 2008 Tbilisi, Georgia April 1-3, 2008 1 Outline of the
More informationFINANCIAL ANALYSIS. A. Methodology and Assumptions
Metropolitan Sanitation Management Investment Project (RRP INO 43251-025) FINANCIAL ANALYSIS 1. Financial analysis was prepared for the five subprojects in accordance with the Financial Management and
More informationRESTRUCTURING PAPER ON A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT
More informationOFFICIAL DOCUMENTS. Loan Agreement
Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 8796-IQ Public Disclosure Authorized Loan Agreement (Baghdad Water Supply and Sewerage Improvement Project) between REPUBLIC OF IRAQ Public Disclosure
More informationSafeguards Monitoring Report
Safeguards Monitoring Report Semiannual Report Covering July-Dec 2016 period February 2017 (ESDIP) Tranche-2 Chimtala- Arghandi 220 kv DC Transmission Line Subproject (DABS - 006/ICB) Prepared by Da Afghanistan
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015
More informationINTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE te: This ISDS will be considered
More informationCombined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS)
Public Disclosure Authorized Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS) Appraisal Stage Date Prepared/Updated: 26-Mar-2018 Report No: PIDISDSA24365 Public Disclosure
More information(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);
2 (f) Goods means equipment and materials to be financed out of the proceeds of the Loan, including related services such as transportation, insurance, installation, commissioning, training, and initial
More informationVIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project. Sub-project: So Vin Hydropower Project
Final Resettlement Monitoring Report Document stage: Final Project number: Loan 2517 May, 2017 VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote s Sector Project Sub-project:
More information(c) Section 3.07 is deleted and the following is substituted therefor:
2 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan
More informationNepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing
Resettlement Planning Document Due Diligence Report Loan Number: 2796 and Grant Number: 0267 NEP June 2012 Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing Ghupa-Sanghu
More informationCOMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 ================= COMPENSATION,
More informationFRAMEWORK FINANCING AGREEMENT (SRI: Colombo Water and Wastewater Management Improvement Investment Program)
FRAMEWORK FINANCING AGREEMENT (SRI: Colombo Water and Wastewater Management Improvement Investment Program) Parties MFF Investment Program This Framework Financing Agreement (FFA) dated 12 September 2012
More informationPAK: MFF Power Distribution Enhancement Investment Program (Tranche 2)
Social Monitoring Report Bi-annual Social Monitoring Report July 2014 PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Lahore Electric Supply Company, Punjab for the Asian
More informationMFF - Bihar Urban Development Investment Program (Facility Concept)
India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount
More informationTimor-Leste: Baucau to Viqueque Highway Project
Resettlement Plan Project Number: 51115 June 2017 Timor-Leste: Baucau to Viqueque Highway Project Prepared by the Government of Timor-Leste for the Asian Development Bank. Table of Contents EXECUTIVE
More informationEvaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015
Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance
More informationThe World Bank LK GPOBA - Access to Sanitation Project (P111161)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC
More informationPeriodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2)
Periodic Financing Request Report Project Number: 42266-025 MFF Number: 0075 August 2016 India: Kolkata Environmental Improvement Investment Program (Tranche 2) Distribution of this document is restricted
More informationOPERATIONS MANUAL BANK POLICIES (BP)
BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development
More informationLOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).
LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan
More informationEnvironmental Assessment and Review Framework. Mongolia: Western Regional Road Corridor Investment Program
Western Regional Road Corridor Investment Program (RRP MON 41193) Environmental Assessment and Review Framework September 2011 Mongolia: Western Regional Road Corridor Investment Program Prepared by the
More informationCivil Aviation Development Investment Program Tranche 3
Social Monitoring Report Semi-annual Report January 2017 Civil Aviation Development Investment Program Tranche 3 Prepared by National Airports Corporation for the Asian Development Bank. This Semi-annual
More informationIndonesia: Metropolitan Sanitation Management and Health Project
Metropolitan Sanitation Management and Health Project (RRP INO 39071-01) Project Administration Manual Project Number: 39071 Loan xxxx June 2010 Indonesia: Metropolitan Sanitation Management and Health
More informationSANITATION REVOLVING. Philippines, January, 2013
SANITATION REVOLVING FUND IN VIETNAM Philippines, January, 2013 LEGAL FRAMEWORK Law on Environmental Protection (revised in 2005); Decree No. 67/2003/ND-CP; Decree 04/2007/ND-CP; Decree No. 59/2007 (solid
More informationPROJECT PREPARATION TECHNICAL ASSISTANCE
12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility
More informationKyrgyz Republic: Emergency Assistance for Recovery and Reconstruction
Completion Report Project Number: 44236-013 Loan Number: 2668 Grant Number: 0217 July 2017 Kyrgyz Republic: Emergency Assistance for Recovery and Reconstruction This document is being disclosed to the
More informationEnvironmental Monitoring Report
Environmental Monitoring Report Bi-annual Report January-June 2013 ARM: Sustainable Urban Development Investment Program, Tranche 1 Project Number: 42417 Loan Number: L2752 July 2013 Prepared by the Yerevan
More informationPeriodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2)
Periodic Financing Request Report Project Number: 43253-027 MFF Number: 0080-IND October 2018 India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Distribution of this document
More informationLOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA.
LOAN NUMBER 3007-CAM (SF) LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 26 AUGUST
More informationAZERBAIJAN MOTORWAY IMPROVEMENT AND DEVELOPMENT Baku Shamakhi Road Widening
SFG1532 Public Disclosure Authorized AZERBAIJAN REPUBLIC Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY AZERBAIJAN MOTORWAY IMPROVEMENT
More informationProject Administration Manual
Project Administration Manual Project Number: 31501 June 2011 Proposed Loan for Additional Financing Democratic Socialist Republic of Sri Lanka: Secondary Towns and Rural Community-Based Water Supply and
More informationIndia: Karnataka Urban Development and Coastal Environmental Management Project
Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation
More informationARM: Sustainable Urban Development Investment Program, Tranche 1
Environmental Monitoring Report Bi-annual Report July-December 2012 ARM: Sustainable Urban Development Investment Program, Tranche 1 Project Number: 42417 Loan Number: L2752 May 2013 Prepared by the Yerevan
More informationReport and Recommendation of the President to the Board of Directors
Report and Recommendation of the President to the Board of Directors Project Number: 50138-001 September 2017 Proposed Loan Walkers Colombo Shipyard (Private) Limited Shipyard Rehabilitation and Infrastructure
More informationThe World Bank Transport Connectivity and Asset Management Project (P132833)
SOUTH ASIA Sri Lanka Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2016 Seq No: 3 ARCHIVED on 31-Aug-2017 ISR29065 Implementing Agencies: Democratic Socialist Republic of Sri Lanka,
More informationASIAN DEVELOPMENT BANK RESETTLEMENT PLAN. Subproject: SH-70 (Gaya to Rajauli)
ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN Subproject: SH-70 (Gaya to Rajauli) BIHAR STATE HIGHWAYS PROJECT ROAD CONSTRUCTION DEPARTMENT (RCD) GOVERNMENT OF BIHAR FEBRUARY 2008 TABLE OF CONTENTS ITEM Page
More informationb) if the sub-project is in the Annex B list of this Operational Manual;
Environmental Review Procedures 1. Background The Environmental Category of the project is FI, since Ziraat Bank (as an FI) will on-lend the World Bank funds to private commercial banks and leasing companies
More informationIslamic Republic of Pakistan: Punjab Intermediate Cities Improvement Investment Project
Punjab Intermediate Cities Improvement Investment Project (RRP PAK 46526) Project Administration Manual Draft as of 26 July 2017 Project Number: 46526-002 Loan Number: LXXXX July 2017 Islamic Republic
More informationCountry Operations Business Plan. Fiji September 2017
Country Operations Business Plan September 2017 Fiji 2018 2020 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 13
More informationCOMPARATIVE ANALYSIS OF DMC LEGAL FRAMEWORK AND ADB SAFEGUARD POLICY STATEMENT BANGLADESH
COMPARATIVE ANALYSIS OF DMC LEGAL FRAMEWORK AND ADB SAFEGUARD POLICY STATEMENT BANGLADESH Note: The following is based on the provisions of The Acquisition and Requisition of Immovable Property Ordinance
More informationResettlement Planning Document. IND: Bihar State Highways Project Subproject: SH-74 (Hajipur Areraj)
Resettlement Planning Document Resettlement Plan Document Stage: Updated Project Number: 41127 August 2008 IND: Bihar State Highways Project Subproject: SH-74 (Hajipur Areraj) Prepared by Road Construction
More informationFILE COPY. E494 Volume 2. Republic of Yemen. Urban Water & Sanitation Project. Terms of Reference for a Pro-Forma Environmental Assessment
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0a/22/2002 08:26 203240 EXECB PMU SWSSP PAGE 02 Project Background Republic of Yemen
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET
More informationSection 3.07 is deleted and the following is substituted therefor:
2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest
More informationSocial Monitoring Report
Social Monitoring Report Project Number: 44427-013 November 2016 Period: January 2016 June 2016 IND: Chhattisgarh State Road Sector Project Package: Group A Submitted by: Public Works Department, Government
More informationTonga Cable Limited. Compensation and resettlement framework Tonga Connectivity
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized onga Cable Limited RP1114 Compensation and resettlement framework onga Connectivity Compensation
More informationOFFICIAL -1 L(-L DOCUMENTS. Between. and
Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the
More informationMultitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)
Validation Report Reference Number: PVR-326 Project Number: 37066 Loan Number: 2248 October 2014 Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Independent Evaluation
More informationRESETTLEMENT PLAN. Democratic Socialist Republic of Sri Lanka: Sustainable Power Sector Support Project
Sustainable Power Sector Support Project (RRP SRI 39415) RESETTLEMENT PLAN Document Stage: Draft Project Number: 39415 vember 20 Democratic Socialist Republic of Sri Lanka: Sustainable Power Sector Support
More informationRESETTLEMENT POLICY FRAMEWORK
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESETTLEMENT POLICY FRAMEWORK HURRICANE TOMAS EMERGENCY RECOVERY PROJECT Saint Lucia
More informationASIAN DEVELOPMENT BANK RESETTLEMENT PLAN. Subproject: SH-69 (Dumaria - Ranitalab)
ASIAN DEVELOPMENT BANK RESETTLEMENT PLAN Subproject: SH-69 (Dumaria - Ranitalab) BIHAR STATE HIGHWAYS PROJECT ROAD CONSTRUCTION DEPARTMENT (RCD) GOVERNMENT OF BIHAR FEBRUARY 2008 TABLE OF CONTENTS ITEM
More informationProposed Multitranche Financing Facility India: Tamil Nadu Urban Flagship Investment Program
Facility Administration Manual Project Number: 49107-003 Loan Number: LXXXX September 2018 Proposed Multitranche Financing Facility India: Tamil Nadu Urban Flagship Investment Program ABBREVIATIONS ADB
More informationPROJECT AGREEMENT. (Renewable Energy Development Sector Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF PUNJAB
LOAN NUMBER 2286/2287(SF)-PAK PROJECT AGREEMENT (Renewable Energy Development Sector Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF PUNJAB DATED 5 October 2007 PAL:PAK 34339
More informationMaldives: Tsunami Emergency Assistance Project
Validation Report Reference Number: PVR 218 Project Number: 39099 Loan Number: 2160 (SF) Grant Number: 0001 December 2012 Maldives: Tsunami Emergency Assistance Project Independent Evaluation Department
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF-10112,TF-15895,TF Jun ,100,000.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020397 Public Disclosure Authorized Project ID P125584 Project Name PK: KP Emergency Roads Recovery
More informationREPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER )
REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER ) ENVIRONMENTAL FRAMEWORK FOR PARTICIPATING FINANCIAL INSTITUTIONS JANUARY, 2011 III. ENVIRONMENTAL REVIEW PROCEDURES Background
More informationProject Administration Memorandum. Democratic Socialist Republic of Sri Lanka: Eastern & North Central Provincial Road Project
Project Administration Memorandum Project Number: 39619 Loan Number: 2546 December 2009 Democratic Socialist Republic of Sri Lanka: Eastern & North Central Provincial Road Project This Project administration
More informationProject Agreement. OffICIAL OCUMENTS I LOAN NUMBER 8121-ID. Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) between
OffICIAL OCUMENTS I LOAN NUMBER 8121-ID Project Agreement Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT and
More informationPROGRAM EXPENDITURE AND FINANCING ASSESSMENT
Additional Financing of Skills Sector Enhancement Program (RRP SRI 42251-019) PROGRAM EXPENDITURE AND FINANCING ASSESSMENT A. Expenditure Framework 1. Macroeconomic context. Sri Lanka s economic growth
More informationOFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized
Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL
More information(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);
2 (f) GAP or Gender Action Plan means the gender action plan for the Project, including any update thereto, prepared and agreed between the Borrower and ADB and further set out in the PAM; (g) Goods means
More informationRepublic of Uzbekistan: Solid Waste Management Improvement Project
Project Administration Manual Project Number: 45366 Loan Number: {LXXXX-UZB} November 2013 Republic of Uzbekistan: Solid Waste Management Improvement Project CONTENTS ABBREVIATIONS I. PROJECT DESCRIPTION
More informationPlaquemines Parish Government 2017 Current Budget Fund Balance Summary Through 12/08/16 Council Meeting
Special Revenue Funds 001 003 004 005 006 Road Public Solid General Maintenance Health Waste Library Fund Fund Fund Fund Fund $25,861,874 $0 $55 $3,023,046 $1,080,106 37,250,660 3,117,820 1,580,239 5,197,640
More informationCSS South and South Asia Subregional Workshop
BAPPENAS CSS South and South Asia Subregional Workshop Dewobroto Joko Putranto, Acting Director of Multilateral Foreign Funding, Director of International cooperation, BAPPENAS Naning Mardiniah, Social
More informationLOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).
LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith
More informationResettlement Plan Due Diligence Report
Resettlement Plan Due Diligence Report Document Stage: Updated Project Number: 34304 April 2014 NEP: Kathmandu Valley Water Supply Improvement Project Block Distribution System and Service Reservoir (Package
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/27/2010 INTEGRATED SAFEGUARDS DATASHEET
More informationPROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH
LOAN NUMBER 2499-PAK (SF) PROJECT AGREEMENT (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF SINDH NORTH SINDH URBAN SERVICES CORPORATION LIMITED DATED
More informationCity of Rohnert Park SEWER FINANCIAL PLAN
City of Rohnert Park SEWER FINANCIAL PLAN AND RATE STUDY February 17, 2011 3053 Freeport Boulevard #158 Sacramento, CA 95818-4346 (916) 444-9622 www.thereedgroup.org TABLE OF CONTENTS I. EXECUTIVE SUMMARY...1
More informationVIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject
Social Monitoring Report Final Report December 2016 VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject Prepared by the Southern
More informationResettlement Plan. Nepal: Kathmandu Valley Water Supply Improvement Project
Resettlement Plan Document Stage: Updated Project Number: 34304 January 2014 Nepal: Kathmandu Valley Water Supply Improvement Project Prepared by CDM Smith Inc. for the Project Implementation Directorate,
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Project Name Region Sector Project ID Implementing Agency Report No. PIC908 West Bank and Gaza-Emergency Rehabilitation Project (& Middle East and North Africa Non-Sectoral XOPA34112 Date prepared May
More informationFINANCIAL ANALYSIS. A. Introduction
Urban Water Supply and Wastewater Management Investment Project (RRP FIJ 491-2) A. Introduction FINANCIAL ANALYSIS 1. The Asian Development Bank (ADB) Urban Water Supply and Wastewater Management Investment
More informationTECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT
Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The
More informationKarnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS
Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product
More informationSocialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project
Technical Assistance Report Project Number: 41425 October 2008 Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project (Financed by the Netherlands Trust Fund for the Water Financing
More informationGOVERNMENT OF KARNATAKA
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF KARNATAKA Karnataka Urban Water Supply Modernization Project (KUWSMP) RESETTLEMENT
More informationTechnical Assistance Report
Appendix 3 Technical Assistance Report Project Number: 50109-001 Transaction Technical Assistance (TRTA) July 2017 Myanmar: Preparing the Second Mandalay Urban Services Improvement Project Cofinanced by
More informationEnvironmental and Social Management System Arrangement. Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project
Environmental and Social Management System Arrangement February 2017 Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project Prepared by Sampath Bank PLC for the Asian Development Bank. The
More informationOPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.
OM Section F1/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ENVIRONMENTAL
More informationVIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line
Social Monitoring Report Semestral Report July to December 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line
More informationProject Administration Manual. Project Number: November Republic of Palau: North Pacific Regional Connectivity Investment Project
Project Administration Manual Project Number: 46382-001 November 2015 Republic of Palau: North Pacific Regional Connectivity Investment Project ABBREVIATIONS Contents I. PROJECT DESCRIPTION 1 A. Impact
More informationCountry Operations Business Plan. Fiji October 2016
1 Country Operations Business Plan October 2016 Fiji 2017 2019 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 29
More informationCountry Operations Business Plan. Fiji December 2015
1 Country Operations Business Plan December 2015 Fiji 20162018 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. ADB COBP CPS GDP MOL OCR PDA CURRENCY
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development
More informationDemocratic Socialist Republic of Sri Lanka: Skills Sector Enhancement Program
Skills Sector Enhancement Program (RRP SRI 42251) Program Implementation Document Project Number: 42251 Loan Numbers: 3119, 3120 July 2017 Democratic Socialist Republic of Sri Lanka: Skills Sector Enhancement
More information6 Report No.: JSDSC1361 1
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE 6 Report No.: JSDSC1361 1,2 Date ISDS Prepared/Updated: 05-Nov-2015 Date ISDS Approved/Disclosed: 06-Nov-2015 Public Disclosure
More informationCost Apportionment Bylaw CONSOLIDATED
Cost Apportionment Bylaw CONSOLIDATED THIS IS A CONSOLIDATION, FOR REFERENCE PURPOSES, OF: Greater Vancouver Sewerage and Drainage District Cost Apportionment Bylaw No. 283, 2014 (Adopted March 28, 2014)
More informationVIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151) Due Diligence Review of Involuntary
More informationIND: Bihar Power System Improvement Project
Resettlement Plan (Revised) Document Stage: Revised Project Number: 41626 (IND) July 2014 IND: Bihar Power System Improvement Project Prepared by: Bihar State Power Transmission Company Ltd. Government
More informationFOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT PAPER ON A PROPOSED
More informationSection 3.06 is deleted and the following is substituted therefor:
2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan
More information