1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6619 OECS Disaster Vulnerability and Climate Risk Reduction Program Region Latin America and the Caribbean Country Member countries of Organization of the Eastern Caribbean States (OECS) Sector Infrastructure (80%); Flood Protection (20%) Lending Instrument Adaptable Program Loan (APL) Project ID P {If Add. Fin.} Parent Project ID N/A Borrower(s) - - Implementing Agency Minister for Finance, Planning, Economy, Energy and Cooperatives Financial Complex The Carenage St. George s Ministry of Finance and Economic Planning P.O. Box 608 Kingstown Environmental Screening { }A { }B { }C { }FI Category Date PID Prepared May 19, 2011 Estimated Date of Appraisal May 19, 2011 Completion Estimated Date of Board Approval June 23, 2011 Decision Project authorized to proceed to negotiations upon agreement on any pending conditions and/or assessments. I. Country Context Eastern Caribbean Sub-Regional Context

2 The six Eastern Caribbean countries: Antigua and Barbuda, Dominica,, Saint Kitts and Nevis, Saint Lucia, and, face similar and important challenges from natural hazards and the impacts of climate change. The traditional natural hazards of the sub-region are being exacerbated by the adverse impacts of climate change that is likely to intensify existing hazard patterns. The volcanic origin of Dominica,, Saint Kitts and Nevis, Saint Lucia, and Saint Vincent means that these islands already suffer beach erosion from sea level rise and storms, rainfall-induced landslides, and coastal and inland flooding from storms. This puts great part of their coastal infrastructure, including coastal investments in the tourism sector, at direct risk. The coral reefs of the Grenadines and Saint Lucia are vulnerable to storms, tsunamis, and coral bleaching. The low-lying and relatively dry Grenadines and Antigua and Barbuda are particularly vulnerable to inundation from sea level rise, flooding from storms, and salt water intrusion of ground water. Changing weather patterns are putting increased stress on the water supply in Antigua,, the Grenadines, and Saint Lucia. If current trends continue, US$ million (m) will likely be lost in the sub-region annually between 2015 and 2050 through declining fish catches, reduced tourism, and loss of shoreline protection associated with sea level rise, storm surge, and coral reef degradation. 1 The six countries also share similar financial challenges with regards to hedging risk of external shocks, in particular little room for debt financing. They have a well developed ongoing political and financial collaboration through the OECS Secretariat and the Eastern Caribbean Central Bank, a common market and customs union, a common monetary policy (including a common currency), trade policy, maritime jurisdiction and boundaries, civil aviation, a shared scientific community and research capacity through the University of the West Indies, and collaboration with CARICOM institutions on disaster risk management (Caribbean Disaster Emergency Management Agency) and climate change adaptation (Caribbean Community Climate Change Center). Because of the region s close political, economic, and financial ties, there are negative subregional spill-over effects from any external shock to one or more of the OECS economies. If one country is devastated by an extreme climatic event such as a hurricane, it would directly affect the entire sub-region s economic and financial stability. Such an external shock would directly impact the entire union s debt-to-gdp ratio, sub-regional tourism, inter-island trade, and exports. This is confirmed by a recently released International Monetary Fund (IMF) study. The study indicates that climatic factors account for almost twenty percent of the variance of real GDP growth in Eastern Caribbean countries. 2 According to the study, the contribution to GDP variance of climatic conditions ranges from thirty six percent in Antigua and Barbuda to seven percent in. 3 Combined with other factors, this puts further pressure on the shared monetary systems (affecting international credit rating and exchange rate stability) and exacerbates existing national fiscal inequalities, 1 IBRD, IDA and IFC Regional Partnership Strategy for the Organization of Eastern Caribbean States (OECS), , May 3, 2010; p IMF, Macroeconomic Fluctuations in the Caribbean: the Role of Climatic and External Shocks, July 2009; p Ibid.; p.10.

3 which are currently blamed for constraining the development of a sound macro-economic framework conducive to growth, low unemployment, and debt sustainability. 4 Therefore, the Eastern Caribbean region benefits from any risk reduction investment carried out in a country in the region. Each country will benefit from more of its neighbors investing more in reducing their risk to natural hazards and climate change impacts. II. Sectoral and Institutional Context The Eastern Caribbean has improved its disaster management over the past decade. But Eastern Caribbean governments are not able to manage natural hazard and climate risk strategically. All six countries have, over the past decade, improved their disaster preparedness and response capacity. 5 Supported by international agencies, countries in the region have carried out a large number of vulnerability and hazard assessments that have served to increase the political understanding of the hazard challenge facing the region. The knowledge generated from these studies is unfortunately often not captured in institutional strengthening or improved policies and practices for vulnerability reduction, and the studies themselves often bring little value added due to a lack of data. In some cases countries in the region have invested in disaster vulnerability reduction through coastal protection works, retrofitting of buildings, and in specific disaster mitigation works. These works have shown to be highly beneficial and performed well in subsequent hurricanes. This type of vulnerability reduction has been carried out on an asset-by-asset basis, and limited financing has kept these investments to a pilot level only. General building practices do not appropriately reflect the existing hazard environment and construction is carried out with no regards to risk of future climate change impacts. Newer Government-financed civil works have in the best cases been constructed based on historical hazard trends and loosely integrated performance criteria to avoid foreseeable damage from hazard events. Older infrastructure, including transportation and lifeline facilities (shelters, health clinics, etc.), is particularly vulnerable since in many cases it was built with little consideration for natural hazards, and since civil infrastructure maintenance practices in the region in general are deficient. The vulnerability among private assets is high, too. Up to 40 percent of private houses in the region are built outside regulations, but even houses or businesses with titles have in many cases not been located or built taking the hazard environment into account. As part of an OECS sub-regional effort, a uniform building code was developed and presented to member states in 1992 by the United Nations Center for Human Settlement (UNCHS) and the United Nations Development Programme (UNDP). In 1993 each country accepted these as separate national building codes, but they were largely identical and derived from the CUBiC (Caribbean Uniform Building Codes) of Over time, some countries have modified and accepted these building codes and guidelines, but in practice, 4 IBRD, IDA and IFC Regional Partnership Strategy for the Organization of Eastern Caribbean States (OECS), , May 3, 2010; p See Disaster Risk Management in Latin America and the Caribbean Region: GFDRR Country Notes, 2010.

4 enforcement mechanisms have limited capacity and much of the construction in the region occurs without the benefit of a systematic inspection program. On a broader scale, there is little evidence that development decisions have integrated disaster resilience and expected climate change impacts in decision-making processes. Responsibilities are dispersed among various government agencies including Ministries of Finance, Planning, Economy, Energy, Works, Physical Development, and Agriculture. Lacking an overall structure for analyzing and integrating risks in the development process, agencies normally operate in a relative information vacuum with limited resources, particularly in their capacity to analyze and integrate risk and climate change management in the development process. Data sharing among agencies is weak, largely due to limited capacity and lack of an overall mechanism to share information with low transaction costs. Hence, a major limiting factor inhibiting strategic disaster vulnerability reduction and climate change adaptation is the lack of reliable information on which to base planning and design decisions. The underlying problem is two-fold. Firstly, there is a lack of localized data to inform climate change impact and disaster risk analysis, and a lack of capacity nationally to carry out the needed analysis. Secondly, the countries therefore do not have sufficient information, or appropriate institutional mechanisms, to make portfolio-wide or sector-wide strategic decisions on risk reduction. The first part of the problem will have to be solved by collecting the appropriate data and by developing appropriate protocols and capacity at national and regional level for data sharing and data management. The second part of the problem will be most efficiently addressed by enabling Eastern Caribbean states to access knowledge resources and services outside their countries that can address the questions the countries raise and feed the information back to the countries in a format they can use. In order to efficiently adapt to the hazard environment they live in and the potential changes brought on by a changing climate, the countries in the Eastern Caribbean are faced with two challenges. In the short term, there is a need to reduce the vulnerability of some highly vulnerable public infrastructure. This first challenge is most efficiently addressed at the national level, but has clear sub-regional benefits. In the medium term, there is a need to improve the information base on which national policy makers plan physical development and vulnerability reduction measures in order to be able to strategically guide further vulnerability reduction and to enable the Eastern Caribbean countries adapt to a changing climate. This second challenge needs to be addressed in parallel at both the national and the sub-regional levels. Sub-regionally, this can be done in part by leveraging the existing strong technical, political, and economic collaboration. III. Project Development Objectives The program aims at measurably reducing vulnerability to natural hazards and climate change impacts in the Eastern Caribbean sub-region. The objective of the Project in is to measurably reduce vulnerability to natural hazards and climate change impacts in and in the Eastern Caribbean sub-region. The objective of the Project in Saint

5 Vincent and the Grenadines (SVG) is to measurably reduce vulnerability to natural hazards and climate change impacts in and in the Eastern Caribbean sub-region. IV. Project Description The proposed lending instrument for the sub-regional program is a horizontal Adaptable Program Loan (APL) implemented in parallel in the countries of the Eastern Caribbean region. Currently, there are three confirmed participating countries:, Saint Lucia, and. Country projects in and Saint Vincent and the Grenadines form the first phase (APL 1). Saint Lucia constitutes the second phase (APL 2) of the program, and the third phase would allow for the option of the remaining OECS countries, namely Antigua and Barbuda, Dominica, and Saint Kitts and Nevis, to participate in the program, if requested. This regional program will support regional agencies and interested government agencies in 6 island states (Antigua and Barbuda, Dominica,, Saint Kitts and Nevis, Saint Lucia, and ) in the OECS to develop capacity and tools to assess and communicate disaster risk to the general public and to decision makers in different sectors. Furthermore, for, Saint Lucia, and SVG, the country-specific projects will finance investments in disaster vulnerability reduction for public infrastructure. Civil works to be financed would focus on retrofitting and climate-proofing existing infrastructure as well as the construction of key infrastructure designed to protect the most vulnerable assets, including infrastructure linking the sub-region. Collectively, these interventions will mitigate the adverse affects of future economic and natural shocks in the sub-region and, at the same time, create an enabling environment for sustained economic development better adapted to a rapidly changing climate. The four components of the Program are as follow: Component 1: Prevention and Adaptation Investments. The participating countries would implement a broad spectrum of interventions aimed at building resilience in public buildings and infrastructure. Component 2: Regional Platforms for Hazard and Risk Evaluation and Applications for Improved Decision Making. This component would support building the regional capacity for assessment of natural risks and integration of such assessment into policy and decision making process for the development of investments, disaster risk mitigation and disaster response across sectors, through the provision of technical advisory services, training and acquisition of goods. Component 3: Natural Disaster Response Investments. This component would finance emergency recovery and reconstruction subprojects under an agreed action plan of activities designed as a mechanism to implement a country s rapid response to an emergency. Following an adverse natural event, and subject to a Government s declaration of emergency in accordance with national law and the submission of a recovery action plan satisfactory to the Association, a participating Government would be able to request the World Bank to re-

6 categorize financing or provide additional financing to cover early recovery and rehabilitation costs. Component 4: Project Management and Implementation Support. Activities under this component would support strengthening and developing the institutional capacity for Project management, including: (a) preparation for designs and tender documents; (b) preparation of project reports; (c) processing of contracts and tender evaluation; (d) coordination of participating line ministries; (e) supervision of the quality of works; (f) training of staff in Project management and implementation support; (g) capacity building for accreditation to the United National Framework Convention on Climate Change (UNFCCC) Climate Adaptation Fund; and (h) related activities on Project management and implementation, all through the provision of technical advisory services, training, operating costs and acquisition of goods. V. Financing : Total Project Cost: Source Financing Plan (US $m) US$32,200,000 Total Amount Parallel Financing: GFDRR Climate Investment Fund (PPCR-regional) Borrower (in kind): Total World Bank Financing: Climate Investment Fund (PPCR) Grant Concessional IDA National Regional US$1,000,000 US$2,000,000 US$3,000,000 US$26,200,000 US$16,200,000 US$8,000,000 US$8,200,000 US$10,000,000 US$3,500,000 US$6,500,000 : Source Financing Plan (US $m) Total Amount

7 Total Project Cost: Parallel Financing: GFDRR Climate Investment Fund (PPCR-regional) Borrower (in kind): Total World Bank Financing: Climate Investment Fund (PPCR) Grant Concessional IDA National Regional US$24,920,000 US$1,000,000 US$2,000,000 US$1,000,000 US$20,920,000 US$10,000,000 US$7,000,000 US$3,000,000 US$10,920,000 US$4,420,000 US$6,500,000 VI. Implementation Each project under the program will be implemented by a designated entity under the country s Ministry of Finance. In the case of, Saint Lucia, and Saint Vincent and the Grenadines, the Ministries of Finance have specialized project management units with appropriate fiduciary- and safeguards-handling capacity built from a long experience in managing World Bank-financed projects. For the implementation of civil works, each project management unit will rely on technical support for the descriptions for the bidding documents and for some of the implementation supervision from relevant line ministries, including the Ministries of Works, Education, Health, Physical Planning, and the national disaster management agencies. More complex civil works will rely on the services of an independently contracted supervising engineer. The respective project implementation units will manage environment and social safeguard aspects of country-specific projects under the program structure. These units already have project management capacity and have managed safeguards aspects of several World Bank projects investing in public infrastructure. The World Bank has worked closely with the and project management units to assess their capacity and possible needs for capacity strengthening to appropriately handle safeguards. For subsequent phases of the program, the World Bank will work closely with the project management units during project preparation to assess capacities and, when needed, measures to strengthen capacity will be described in the technical annex for each project. VII. Safeguard Policies (including public consultation) Program-level Environmental Assessment and Management Framework Reports and Resettlement Policy Frameworks have been developed for each country. Appropriate sub-

8 project specific Environmental Assessment(s) will be conducted for any component and investment that may require a stand-alone EA. Similarly, in the event that project activities lead to land acquisition and/or resettlement, Abbreviated Resettlement Plans (ARPs) and/or Resettlement Action Plans (RAPs), as may be applicable, will be prepared for specific subprojects in accordance with the project s Resettlement Policy Framework. Safeguard Policies Triggered by the Project Yes No Piloting the Use of Borrower Systems to Address Environmental and Social Issues in Bank-Supported Projects (OP/BP 4.00) Environmental Assessment (OP/BP 4.01) Natural Habitats (OP/BP 4.04) Pest Management (OP 4.09) Physical Cultural Resources (OP/BP 4.11) Involuntary Resettlement (OP/BP 4.12) Indigenous Peoples (OP/BP 4.10) Forests (OP/BP 4.36) Safety of Dams (OP/BP 4.37) Projects in Disputed Areas (OP/BP 7.60) * Projects on International Waterways (OP/BP 7.50) not eligible for piloting under OP 4.00 not eligible for piloting under OP 4.00 VIII. Contact point at World Bank and Borrower World Bank Contact: Mr. Niels B. Holm-Nielsen Title: Senior Disaster Risk Management Specialist Tel: +1 (202) nholmnielsen@worldbank.org Borrower/Client/Recipient Contact: Mr. Timothy Antoine Title: Permanent Secretary, Minister for Finance, Planning, Economy, Energy & Cooperatives Tel: (473) timothy.antoine@gov.gd * By supporting the proposed project, the Bank does not intend to prejudice the final determination of the parties claims on the disputed areas

9 Contact: Ms. Laura Anthony-Browne Title: Director of Planning, Ministry of Finance and Economic Planning Tel: Implementing Agencies Contact: Minister for Finance, Planning, Economy, Energy and Cooperatives Mr. Timothy Antoine Financial Complex The Carenage, St. George s Tel: +1 (473) ; +1 (473) finance@gov.gd Contact: Ministry of Finance and Economic Planning Ms. Laura Anthony-Browne P.O. Box 608 Kingstown Tel: ; office.finance@mail.gov.vc I. For more information contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C Telephone: (202) Fax: (202) Web:

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

The Global Facility for Disaster Reduction and Recovery. Niels Holm-Nielsen Lead Disaster Risk Management Specialist

The Global Facility for Disaster Reduction and Recovery. Niels Holm-Nielsen Lead Disaster Risk Management Specialist The Global Facility for Disaster Reduction and Recovery Niels Holm-Nielsen Lead Disaster Risk Management Specialist Bringing Scale to Disaster Risk Management: the Eastern Caribbean Eastern Caribbean Photo

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.: AB6515 Afghanistan New Market Development Project Region SOUTH ASIA Sector General industry and trade sector (100%) Project ID P118053

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417 PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No: PIDA1417 Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project ID Borrower(s)

More information

Non-compulsory pensions and insurance (70%);General water, sanitation and flood protection sector (30%) Lending Instrument

Non-compulsory pensions and insurance (70%);General water, sanitation and flood protection sector (30%) Lending Instrument Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6737 Southeast Europe and Caucasus Catastrophe Risk Insurance Facility GEF Project Region Europe and Central Asia Country Southeast

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project.

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961 Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower Implementing Agency Environmental Category PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961 IMPROVING

More information

Disaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster

Disaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster Belize benefits from knowledge and experiences from the PPCR Disaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster Photo Credit: http://gov.vc

More information

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation.

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA798 Project Name TURKEY

More information

Environmental Assessment

Environmental Assessment OP 4.01 January 1999 These policies were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. Environmental Assessment (Archived August 2004) Note: OP and BP

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8734-GD. (OECS Regional Tourism Competitiveness Project) between GRENADA

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8734-GD. (OECS Regional Tourism Competitiveness Project) between GRENADA Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 8734-GD Public Disclosure Authorized Loan Agreement (OECS Regional Tourism Competitiveness Project) between GRENADA Public Disclosure Authorized

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 25-Apr-2018

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY EMERGENCY PROJECT PAPER ON A PROPOSED

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region Safeguard Policies: A Quick View Tbilisi April 1-3, 1 2008 The World Bank Europe & Central Asia Region 1 Why do we have the World Bank Safeguard Policies? Do no harm: protect people and environment from

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC14882 Project Name Improved

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower Name Implementing

More information

6 Report No.: JSDSC1361 1

6 Report No.: JSDSC1361 1 Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE 6 Report No.: JSDSC1361 1,2 Date ISDS Prepared/Updated: 05-Nov-2015 Date ISDS Approved/Disclosed: 06-Nov-2015 Public Disclosure

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/06/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESETTLEMENT POLICY FRAMEWORK HURRICANE TOMAS EMERGENCY RECOVERY PROJECT Saint Lucia

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Russia

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name Wenchuan

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country.

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619 Project

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6188 Operation Name

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA16636 Project Name

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No:

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: 111025

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC10930 Project Name Financial

More information

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS)

More information

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA31584 Project Name

More information

The Lessons of 2017 Perspective from the World Bank Group

The Lessons of 2017 Perspective from the World Bank Group The Lessons of 2017 Perspective from the World Bank Group Barbuda Dominica Hurricane Irma Hurricane Maria Rebuild, Rethink, Resilience: Lessons for economic and security partnerships following after the

More information

Sri Lanka: Crisis Response Small and Medium Enterprises Development Facility Project Region

Sri Lanka: Crisis Response Small and Medium Enterprises Development Facility Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5595 Project Name Sri

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

AFRICA. Investment Project Financing P Federal Ministry of Finance

AFRICA. Investment Project Financing P Federal Ministry of Finance Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA24330 Project Name

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 05/10/2012 Report No.: Telecom

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 05/10/2012 Report No.: Telecom Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 02-Jun-2016 Report : PIDISDSC17616 Public Disclosure Authorized Public Disclosure Authorized

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower Name Implementing Agency Environment Category Date PID Prepared Estimated Date of Approval Initiation Note Review Decision

More information

World Bank Environmental. and Social Policy for Investment Project Financing

World Bank Environmental. and Social Policy for Investment Project Financing World Bank Environmental and Social Policy for Investment Project Financing Purpose 1. This Environmental and Social Policy for Investment Project Financing 1 sets out the mandatory requirements of the

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Dec ,872,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Dec ,872,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020840 Public Disclosure Authorized Public Disclosure Authorized Project ID P103470 Country OECS Countries

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 31-Aug-2016 Report : PIDISDSC18959 Public Disclosure Authorized Public Disclosure Authorized

More information

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PUBLIC DISTRIBUTION PROJECT INFORMATION DOCUMENT (PID) Project Name Iraq: Emergency School

More information

SISRI Knowledge Notes. The Small Island States Resilience Initiative (SISRI) OVERVIEW NOTE: #1 FOCUS: PROGRAM OVERVIEW OVERVIEW: NOTE: #1

SISRI Knowledge Notes. The Small Island States Resilience Initiative (SISRI) OVERVIEW NOTE: #1 FOCUS: PROGRAM OVERVIEW OVERVIEW: NOTE: #1 SISRI Knowledge Notes A series highlighting good practices in climate and disaster resilience in Small Island States The Small Island States Resilience Initiative (SISRI) Tom Perry/World Bank NOTE: #1

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247 Country: Madagascar Project ID: P104049 Project Name:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GUINEA: EDUCATION FOR

More information

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC56822

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 02-Sep-2014

More information

Public Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris

Public Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I - Basic Information Date ISDS Prepared/Updated:

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 04-Oct-2018

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2649. Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2649. Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION A. Basic Project Data Country:

More information

EAST ASIA AND PACIFIC. Indonesia

EAST ASIA AND PACIFIC. Indonesia Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA853 Project Name HCFC

More information

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5278 Project Name

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Project Name Kosovo Health Project

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 13-Feb-2018

More information

Tanzania Health Sector Development APL II Region

Tanzania Health Sector Development APL II Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5049 Project Name Tanzania Health Sector Development APL II Region Africa Sector Health (80%), Non-compulsory health finance (10%), Central

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC695 Project Name DO

More information

Trade and Natural Disaster Response. Ricardo James, Charge d Affaires, Permanent Delegation of the Organization of Eastern Caribbean States (OECS)

Trade and Natural Disaster Response. Ricardo James, Charge d Affaires, Permanent Delegation of the Organization of Eastern Caribbean States (OECS) Trade and Natural Disaster Response Ricardo James, Charge d Affaires, Permanent Delegation of the Organization of Eastern Caribbean States (OECS) Natural Disaster Threats in the Caribbean Hurricanes and

More information

with the Ministry of Economic Planning, Sustainable Development, Industry, Labour and Information for Saint Vincent and the Grenadines

with the Ministry of Economic Planning, Sustainable Development, Industry, Labour and Information for Saint Vincent and the Grenadines with the Ministry of Economic Planning, Sustainable Development, Industry, Labour and Information for Saint Vincent and the Grenadines 21 February 2017 NDA Strengthening & Country Programming PAGE 1 OF

More information

Earth is our Business

Earth is our Business Earth is our Business changing the rules of the game POLLY HIGGINS SHEPHEARD-WALWYN (PUBLISHERS) LTD 2012 Polly Higgins Some rights reserved. [license_3.0] This work is licensed under a Creative Commons

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: I. BASIC INFORMATION 1. Basic Project Data INTEGRATED SAFEGUARDS

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 13-Jan-2014 INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Project Name Frontier Finance (P147183)

More information

IBRD: ($m.) support the development of municipal infrastructure to provide quality local services.

IBRD: ($m.) support the development of municipal infrastructure to provide quality local services. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I Basic Information Date ISDS Prepared/Updated:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 11/15/2005 INTEGRATED SAFEGUARDS DATASHEET

More information

International Monetary and Financial Committee

International Monetary and Financial Committee International Monetary and Financial Committee Thirty-Ninth Meeting April 12 13, 2019 IMFC Statement by Bill Morneau Minister of Finance Canada On behalf of Antigua and Barbuda, The Bahamas, Barbados,

More information

Document of The World Bank PROJECT APPRAISAL DOCUMENT ONA PROPOSED LOAN AND CREDIT

Document of The World Bank PROJECT APPRAISAL DOCUMENT ONA PROPOSED LOAN AND CREDIT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank PROJECT APPRAISAL DOCUMENT ONA PROPOSED LOAN AND CREDIT Report

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 11-Aug-2016 Report : PIDISDSC18528 Public Disclosure Authorized Public Disclosure Authorized

More information

BOARDS OF GOVERNORS 2008 ANNUAL MEETINGS WASHINGTON, D.C.

BOARDS OF GOVERNORS 2008 ANNUAL MEETINGS WASHINGTON, D.C. BOARDS OF GOVERNORS 2008 ANNUAL MEETINGS WASHINGTON, D.C. INTERNATIONAL MONETARY FUND WORLD BANK GROUP INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL FINANCE CORPORATION INTERNATIONAL

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project

More information

CARIBBEAN AND CENTRAL AMERICAN PARTNERSHIP FOR CATASTROPHE RISK INSURANCE POOLING RISK TO SAFEGUARD AGAINST CATASTROPHES GENERATED BY NATURAL EVENTS

CARIBBEAN AND CENTRAL AMERICAN PARTNERSHIP FOR CATASTROPHE RISK INSURANCE POOLING RISK TO SAFEGUARD AGAINST CATASTROPHES GENERATED BY NATURAL EVENTS CARIBBEAN AND CENTRAL AMERICAN PARTNERSHIP FOR CATASTROPHE RISK INSURANCE POOLING RISK TO SAFEGUARD AGAINST CATASTROPHES GENERATED BY NATURAL EVENTS May 2014 NINE COUNTRIES IN THE CARIBBEAN AND CENTRAL

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC47357

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 14-Jul-2014

More information

Disaster Risk. Management. Niels Holm-Nielsen. Lead Specialist Disaster Risk Management

Disaster Risk. Management. Niels Holm-Nielsen. Lead Specialist Disaster Risk Management Disaster Risk Management Niels Holm-Nielsen Lead Specialist Disaster Risk Management 1 Who Cares? 1 tropical storm was the likely cause of 20% of the increase in poverty in Guatemala between 2006 and 2011

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.108 Issued August 18, 2017 Effective August 18, 2017 Retired November 9, 2017

More information

Project Name. Region. Date of Board Approval July 29, 2008

Project Name. Region. Date of Board Approval July 29, 2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: AB3458.: MAURITANIA:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 09/06/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132. Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132. Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132 Country: Morocco Project ID: P125799 Project Name: Morocco

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC19292 Project Name Road

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON PROPOSED

More information

Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS)

Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS) Public Disclosure Authorized Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS) Appraisal Stage Date Prepared/Updated: 29-Jul-2018 Report : PIDISDSA24860 Public Disclosure

More information

EASTERN CARIBBEAN SECURITIES REGULATORY COMMISSION

EASTERN CARIBBEAN SECURITIES REGULATORY COMMISSION EASTERN CARIBBEAN SECURITIES REGULATORY COMMISSION COLLECTIVE INVESTMENT SCHEMES OPERATING IN THE CAPITAL MARKETS OF THE EASTERN CARIBBEAN CURRENCY UNION COLLECTIVE INVESTMENT SCHEMES OPERATING IN THE

More information

World Bank Safeguard Policies: An Overview

World Bank Safeguard Policies: An Overview Forest Carbon Partnership Facility World Bank Safeguard Policies: An Overview Victor Mosoti, Legal Department, World Bank Pan Africa Indigenous Peoples Dialogue Arusha, Tanzania April 19-24, 2012 Overview

More information

The findings, interpretations, and conclusions expressed do not necessarily represent the views of the International Bank for Reconstruction and

The findings, interpretations, and conclusions expressed do not necessarily represent the views of the International Bank for Reconstruction and The findings, interpretations, and conclusions expressed do not necessarily represent the views of the International Bank for Reconstruction and Development/World Bank and its affiliated organizations,

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/15/2005 INTEGRATED SAFEGUARDS DATASHEET

More information

OP Investment Project Financing. Bank Access to Information Policy Designation Public

OP Investment Project Financing. Bank Access to Information Policy Designation Public Bank Policy - Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPSVP5.03-POL.103 Issued Effective July 1, 2014 Last Revised On July 1, 2016 Retired July

More information

Fisheries & Food (SAGPyA)

Fisheries & Food (SAGPyA) Report No. PID7776 Project Name Argentina-Sustainable Fisheries (+) Management Project Region Sector Project ID Latin America and the Caribbean AF, SE ARLL57459 Estimated Project Cost: $6.5 million Expected

More information

Applicant Guidelines CCRIF Regional Internship Programme 2018

Applicant Guidelines CCRIF Regional Internship Programme 2018 Applicant Guidelines CCRIF Regional Internship Programme 2018 About CCRIF SPC In 2007, the Caribbean Catastrophe Risk Insurance Facility was formed as the first multi-country risk pool in the world, and

More information