1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN IN THE AMOUNT OF US$15 MILLION TO THE REPUBLIC OF BELARUS FOR THE SOCIAL INFRASTRUCTURE RETROFITTING PROJECT November 5,2007 Sustainable Development Department Belarus, Moldova and Ukraine Country Unit Europe and Central Asia Region Report No: BY This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

2 CURRENCY EQUIVALENTS (Exchange Rate Effective August 30,2007) CurrencyUnit = US$ US$ = 2,15 1 S O Belarusian Rubles FISCAL YEAR January 1 - December31 ABBREVIATIONS AND ACRONYMS CAS CER EED EMP ERR IBRD ICB PMU Country Assistance Strategy Certified Emission Reductions Energy Efficiency Department Environmental Management Plan Economic Rate of Return International Bank for Reconstruction and Development International Competitive Bidding Project Management Unit Vice President: Country ManagerDirector: Sector Manager: Task Team Leader: : Shigeo Katsu Paul Bermingham Charles Feinstein Pekka Salminen 2

3 FOR OFFICIAL USE ONLY Table of Contents INTRODUCTORY STATEMENT BACKGROUND AND RATIONALE FOR ADDITIONAL FINANCING... 5 PROPOSED CHANGES... 7 CONSISTENCY WITH CAS ECONOMIC ANALYSIS APPRAISAL OF SCALE-UP PROJECT EXPECTED OUTCOMES BENEFITS AND RISKS FINANCIAL TERMS AND CONDITIONS FOR THE ADDITIONAL FINANCING This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not be otherwise disclosed without World Bank authorization. 3

4

5 PROJECT PAPER DATA SHEET Borrower: Belarus Responsible agency: BelInvestEnergoSberezhenije (PMU) FY Annual FY08 FY09 FYlO FY11 3.O Bank policies? Revised project development objectives/outcomes: The objectives of the project remain the same: The project s objective is to improve the functional and health environments of social sector facilities, with particular emphasis on reducing energy consumption. The project will retrofit social sector facilities to encourage a more effective use of resources, reducing operation and maintenance costs in schools, hospitals, medical and other selected social facilities such as orphanages, and community homes for the elderly and disabled. Does the scaled-up or restructured project trigger any new safeguard policies? No For Additional Financing [XI Loan [ ] Credit [ 3 Grant For LoansKreditdGrants: Total Bank financing (US$m.): 15.0 million Proposed terms: IBRD Loan Financing Plan (US$m.) Source Local Foreign Total Borrower IBRD/IDA Others Total

6

7 1. INTRODUCTORY STATEMENT 1.1 This Project Paper seeks the approval of the Executive Directors to provide additional financing in an amount of US$ 15.0 million to Belarus for the Social Infrastructure Retrofitting Project (P044748) Loan Number 7056-BY. 1.2 The proposed additional loan would be used to complete the rehabilitation of the original investment program for energy efficiency improvements in social sector buildings (schools and hospitals) across Belarus. Higher than estimated bid prices on the energy efficiency improvements due to the strong Euro and increases in wages in Belarus forced the implementing agencies to reduce the number of buildings covered in the original project. The cost overrun estimate is about US$ 6 million. Additional energy efficiency retrofitting in about 140 buildings (schools and hospitals) across Belarus shall be implemented for an additional US$ 9 million, including required consultants and support to the project management unit (PMU). The PMU has been funded from the government energy efficiency budget. 1.3 There will be no co-financing from other donors for this particular project. Subject to Belarus ratification of Kyoto Protocol, emission reductions achieved through energy efficiency measures will be eligible for trade under the Clean Development Mechanism and could provide an additional income stream to be used to finance activities funded within and beyond the scope of this Energy Efficiency Program in Belarus. 2. BACKGROUND AND RATIONALE FOR ADDITIONAL FINANCING 2.1 Project Development Objectives and Scope: The original loan for US$22.6 million for the Social Infrastructure Retrofit Project was approved in June 2001, and became effective on December 26, The project development objective is to improve the functional and health environments of social sector facilities, with particular emphasis on reducing energy consumption. The project will retrofit social sector facilities to encourage a more effective use of resources, reducing operations and maintenance costs in schools, medical and other selected social facilities such as orphanages, and community homes for the elderly and the disabled. These objectives would be achieved by financing (a) retrofitting of education, health and other selected social sector buildings 5

8 with energy efficiency measures, and (b) technical assistance and project management. The project objectives are still the same. 2.2 Project Performance to Date: Project implementation started slowly mainly because of a delay in employing the design and supervision consultant, which delayed the project implementation by about one year. The project implementation has been satisfactory. All project components are proceeding satisfactorily. (a) Heat substation improvements: The target of the original project was to replace 541 heating substations in schools and hospitals heated by district heating in different cities in Belarus. As of October 2007, 519 substations have been replaced and the existing contracts include completion of the remaining 22 substations by end- November At that time all planned 541 substations will be replaced with modern energy efficient heating substations. (b) Boiler Improvements: The boiler component has been more challenging and slow in progress for many reasons. The original target was to replace 42 boiler houses with modern gas-fired or bio-fuel boilers. The current contracts which are under implementation include completion of 27 boiler houses of which 16 have been completed. The remaining 11 boiler houses will be completed by end One bidding package was cancelled because of lack of funds and will be financed with the additional financing. (c) Window replacements: The original target was to replace windows in 28 buildings of which 24 buildings have been completed. Windows in one building have been replaced with local funds and 3 buildings had to be excluded from the existing contracts because of lack of funds. They will be financed with the additional financing. (d) Demonstration sites: The original project included 2 bidding packages for demonstration sites where several energy efficiency measures would be implemented. Because of lack of funds only one bidding package could be contracted for 6 buildings out of which 4 are completed and 2 will be completed in November The original target was 12 buildings. The remaining 6 buildings will be completed with the additional financing. (e) Energy efficient lighting: The lighting component, replacement of old inefficient lighting systems with modern energy efficient lighting in 232 buildings has been fully completed. The original target was 202 buildings. (0 Institutional Support Component: the PMU is performing satisfactorily, and is staffed with competent personnel, who are familiar with Bank procedures. Procurement has been progressing satisfactorily. The PMU submits routine progress and financial management reports in a timely manner. 2.3 Implementation progress (IP) and Development Objective (DO) ratings for the project have been satisfactory. The audit reports have been found satisfactory and the 6

9 project has not had any environmental, social or other safeguard problems. As of October 2007, disbursement had reached US$19.5 million, about 86% of the loan, and the contracted amount is 100% of the existing loan amount. 2.4 Counterpart financing was delayed in 2007 because the source of the funds has been changed from the Innovation Fund (surcharge on gas price) to the National Development Fund. The funds were made available only in September 2007, which has partly caused the delay in completion of the last contracts because the local portion of the contracts (40%) could not be paid in a timely manner. The Belarusian counterpart confirmed that the counterpart financing for energy efficiency projects will be properly secured in the state budget for the following years. Similar delays are not expected to take place in the future. 2.5 Rationale for the Borrower s Request: The Belarus government realizes the importance of energy efficiency measures as a tool to reduce energy intensiveness and dependency on energy import and at the same time improve the heating and lighting service quality inside buildings. Belarus has a national energy efficiency program which has invested in energy efficiency improvements about US$1 billion within 5 years. The energy import prices have increased in Belarus in 2006 and 2007, for instance the price for natural gas has increased from about US$50 to about US$120 per 1,000 m3. 3. PROPOSED CHANGES 3.1 The objective of the proposed program will remain in line with the original development objective of the Social Infrastructure Retrofit Project. Continued energy efficiency improvements in schools and hospitals and social buildings are very much in line with the government s priorities. The proposed project scope will comprise the following main components: (a) Energy Efficiency Measures (US$ million) in schools and hospitals: The additional financing will be used to finance similar improvements as in the original project. Typical measures are: window replacement; wall and roof insulation; heat substation replacement; boiler replacement; and energy efficient lighting. (b) Consultancy Services (US$ 0.88 million): The PMU has been involved in the project to provide technical and monitoring services with the help of consultants financed under the loan. The consultancy services shall continue under the additional financing for: (i) project feasibility studies, design and supervision, (ii) monitoring and evaluation, and (iii) annual financial audits. The PMU shall be funded from the government energy efficiency budget. 7

10 3.2 The estimated cost are shown in the following table: Estimated Project Costs and Financing (US$ million) Component I Cost estimate I Counterpart financing I Additional financing Energy efficiency improvements in social sector buildings Consultancy services including financial audits PMU operating costs Front-end Fee Total Summary of other changes are in the following table: Summarv of Other Comdementarv Changes 8

11 4. CONSISTENCY WITH CAS 4.1 The proposed program is also consistent with the draft Country Assistance Strategy FY08-10, which aims to: (i) support Belarus efforts in delivering public goods and social services to the vulnerable segments of the population (ii) continue addressing issues of global concern; and (iii) provide flexible, focused AAA in selected areas supporting the liberalization of the economy. By improving the energy efficiency of social service buildings (schools, hospitals, orphanages, homes for the elderly), the additional financing will reduce heating costs and heating emissions, and thus reduce the drain on public resources. It will also improve comfort levels in heated schools, orphanages, homes for the elderly and hospitals. The Bank continues to emphasize the need for attention to limiting the risks that the energy sector poses for macroeconomic and fiscal sustainability, and assuring that the energy needs of the economy are met satisfactorily. In addition, the government also aims to improve the technical performance, governance and financial viability of the energy sector; and to upgrade national infrastructure. The main aim of the proposed additional financing is to enable the government to complete the original scope of the project and to scale up energy efficiency improvements to include lighting in schools, energy efficiency improvements in additional schools and hospitals across Belarus. Continued energy efficiency improvements in schools and hospitals are in line with the priorities of the government. Important results have been attained-the energy intensity of the country has been gradually decreasing. In the past five years investments in energy efficiency accounted for about US$1.17 billion, leading to the reduction in energy intensity by 25 percent. 9

12 5. ECONOMIC ANALYSIS 5.1 The main justification for the additional financing is to complete the substantial investment undertaken with Bank financing by rehabilitating the social infrastructure investments including: (i) lighting systems, (ii) replacement of windows, (iii) replacement of boiler plants, and (iv) modern heating substations. 5.2 At appraisal (in 2000) the project economic rate of return was 24.4%, calculated with the economic price for natural gas of US$60/1000 cubic meter. 5.3 The economic environment in Belarus has changed since appraisal with the main differences being: (i) investment costs have increased due to the strong Euro and increases in wages in Belarus, (ii) also energy prices (gas, electricity) have increased especially during 2006 and 2007 resulting in higher benefits on energy efficiency investments. The current border price for gas is about US$100/1000 cubic meters. The economic analysis is calculated with the gas price of US$120/1000 cubic meters. 5.4 Based on the same methodology calculated with current investment costs and energy prices the economic rate of return is estimated to be 24.7%, which is about the same as at the appraisal of the original project. 6. APPRAISAL OF SCALE-UP PROJECT 6.1 Technical: The original project has retrofitted many hospitals and schools; however the number of remaining buildings requiring energy efficiency measures is large and remains a priority for the Government. The project scale up will implement energy efficiency improvements at schools and hospitals across Belarus, consistent with the respective plan developed by the Energy Efficiency Department (EED) and the PMU in consultation with the Bank. Thus, the scale up scope includes about 140 educational facilities (schools, kindergartens, other), health facilities (hospitals, polyclinics) and social buildings. The EED will identify the specific sites for energy efficiency improvements under the project in consultation with the PMU and the Bank. 10

13 6.2 Financing plan: The financing plan for the additional financing is shown in the table above indicating the need for additional financing for the proposed energy efficiency measures. The government has committed to provide counterpart financing in an amount of US$3.9 million. 6.3 Social: There are no issues related to land acquisition, resettlement or social safeguards in the project. The building efficiency improvements undertaken have already demonstrated positive social impacts and the project is expected to widen such impacts through the additional financing and scale up of the scope. 6.4 Institutional: The existing arrangements include a PMU with staff and facilities financed by the Government s Energy Efficiency Department for day-to-day management of the project, for coordinating and overseeing overall implementation of the project. The PMU provides support for energy audits, technical review, monitoring, etc. These arrangements have been functioning well and will be continued for the additional financing project also. The PMU will be strengthened through additional staffing in technical and procurement areas to handle the expanded scope of the project. 6.5 Environmental: The proposed program extension does not change the environmental category of the project (Category B), as all impacts are expected to be positive. An Environmental Management Plan (EMP) for the energy efficiency retrofitting was prepared during the original project and will continue to be used in the additional financing. Energy efficiency measures in schools, hospitals and social buildings are expected to have a positive impact on environment. 6.6 The project, including the energy efficiency measures in all the buildings, will lead to a significant reduction of greenhouse gas emissions (C02), which could also generate Certified Emission Reductions (CER) for trading after Belarus is eligible for them according to the Kyoto Protocol procedures. 6.7 Procurement: Procurement arrangements will be similar to the ongoing project, and will be in accordance with the Bank s latest procurement guidelines. The relevant thresholds for prior review and for procurement methods will be as under the ongoing project. The procurement plan is included in the minutes of the contract negotiations. The existing contract for the design and supervision consultant will be extended to cover the first year s investments for the additional financing. A new tendering procedure will be organized for the design and supervision consultant for the 2009 and 2010 investments based on local competition Financial management: The financial management functions of the additional financing will be handled by the PMU, which will be responsible for the flow of funds, budgeting, accounting, reporting, auditing and internal controls. There would be no changes in the financial management arrangements which are now in place at the PMU for the implementation of the Social Infrastructure Retrofitting Project. Currently, the financial management arrangements of the Project are acceptable to the Bank. 11

14 6.9. The financial management arrangements of the Social Infrastructure Retrofitting Project implemented by the PMU at BelInvestEnergoSberezhenije have been reviewed periodically as part of project FM monitoring and have been found satisfactory. According to the latest Financial Management monitoring of Social Infrastructure Retrofitting Project as of July 10, 2007, the financial management arrangements of the project continue to be satisfactory, and most of the Bank s recommendations have been implemented from the previous FM monitoring in September Implementation of the recommendations made during the current supervision will be monitored during the following monitoring visits. In addition to the recommendations which are to be followed during the remaining implementation period of SIRP, it was agreed that the additionally, PMU would establish the procedure of quarterly budgeting and revise the project POM., in order to enhance the financial management system for the additional financing. Both actions have been completed prior to negotiations The Social Infrastructure Retrofitting Project is in compliance with the audit covenant: the audit report on project financial statements for the fiscal years 2006 and 2005 have been received on time and were found satisfactory. The auditors have issued unqualified opinion for both years; however, no management letter was issued based on those audits. The PMRs for the year 2006 were submitted with a small delay of up to one month in both reporting periods, and were found satisfactory. The FM supervision report of July 2007 contains several recommendations on further enhancement of the quality of the periodic reports and their timely submission to the Bank in the next reporting periods Similar FM arrangements will be adopted for the additional financing. The audit of the project financial statements will be conducted by independent private auditors acceptable to the Bank, on terms of reference agreed with the Bank. The annual audited project financial statements will be submitted to the Bank within six months of the end of each fiscal year and also at the closing of the project. The existing formats of the IFRs (formerly PMRs) will be used and the PMU will produce a full set of IFRs every six months throughout the life of the project and will submit them to the Bank no later than 45 days after the end of each six months period Disbursement Arrangements: The existing disbursement arrangements will continue for the additional financing project with a change in the percentage of expenditures to be financed for all new activities to 100 percent. The allocation of financing proceeds is as follows. 12

15 Category Additional Amount of the Loan Allocated (Expressed in Dollars) % of Expenditures to be Financed (1 ) Goods, Works and Consultancy services 14,962, % (2) Front-end Fee on the Additional Financing 37,500 TOTAL 15,000, EXPECTED OUTCOMES 7.1 The project will enhance achievements and outcomes of the Social Infrastructure Retrofitting project, increasing the number of schools, hospitals and orphanages to be retrofitted. The expected outcomes are: (i) decreased energy consummation; (ii) improved heating services for social sector buildings improved customer satisfaction; and (iii) reduced environmental emissions. Another beneficial outcome would be potential carbon credits accruing from the project through reduced carbon intensity and avoided carbon dioxide emissions, which could be traded when Belarus ratifies the Kyoto Protocol. 7.2 The project will continue to monitor the same indicators as for the original project, including number of buildings retrofitted including buildings where: (i) windows; (ii) substations; (iii) boilers; and (iv) lighting systems are changed. In addition the total saved energy amount for the whole project is monitored. 8. BENEFITS AND RISKS 8.1 Risks: A potential risk to implementation is delays in procurement and implementation because of the capacity of the PMU. The PMU has restructured its organization and employed new staff in 2007 which is assessed to be adequate to 13

16 implement simultaneously Social Infrastructure Retrofitting Project and Post Chernobyl Recovery Project. Additional training for the procurement staff has been provided in 2007 to strengthen the capacity of the PMU. The lessons learned have been used to improve the bidding and technical design documents. 8.2 Benefits: The project has clear benefits for Belarus and especially for social sector buildings including the following: (i) more efficient use of energy in social sector buildings; (ii) improved service level; and (iii) reduction of environmental emissions. All the above are in line with the project s original development objectives. A large part of project benefits are difficult to quantify. These benefits include an increased comfort and improved health users of the rehabilitated schools and hospitals, and lower air pollution. 9. FINANCIAL TERMS AND CONDITIONS FOR THE ADDITIONAL FINANCING 9.1 The Borrower has indicated that the additional loan would be an IBRD variable spread loan in US Dollars, repayable in 17 years including a 5 year grace period. The above-mentioned terms to be finally determined in loan negotiations. The Borrower has selected these terms because they are similar to the terms of the original loan. 14

17

18

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF ENERGY

More information

Project development objective/outcomes

Project development objective/outcomes Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 7971-BY Loan Agreement (Road Upgrading and Modernization Project) between REPUBLIC OF BELARUS and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated November 19, 2010

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SAFE AND SUSTAINABLE TRANSPORT PROJECT LOAN December 10, 2009 IN THE INITIAL AMOUNT OF (US$ {150}

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020001 Public Disclosure Authorized Project ID P100580 Country Ukraine Project Name ROADS & SAFETY IMPROVEMENT

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING (CREDIT)

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING (CREDIT) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 4299 - AZ Public Disclosure Authorized Public Disclosure Authorized PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING

More information

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020839 Public Disclosure Authorized Public Disclosure Authorized Project ID P108080 Project Name XK

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864) Public Disclosure Authorized SOUTH ASIA Afghanistan Transport & Digital Development Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 09-Feb-2018

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,660,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,660,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020596 Public Disclosure Authorized Public Disclosure Authorized Project ID P116680 Country Armenia Project Name ENERGY EFFICIENCY Practice

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

The World Bank Municipal Services Improvement (P096481)

The World Bank Municipal Services Improvement (P096481) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Macedonia, former Yugoslav Republic of Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 15 ARCHIVED on 15-Jun-2015

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT LOAN 7731-ID JUNE 24, 2009 TO THE REPUBLIC

More information

Definitions. Terms of Reference

Definitions. Terms of Reference Terms of Reference National or International consultants: International Description of the assignment (Title of consultancy): Mid-Term Review of the LEPAP project Project Title: Lebanon Environmental Pollution

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Project No: 105602 PROPOSED PROJECT

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

Country Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054

Country Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021115 Public Disclosure Authorized Public Disclosure Authorized Project ID P118737 Project Name ENERGY

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social Protection Unit South East/South AFTSE Africa Region Document of The World Bank

More information

United Nations Development Programme. Government of the Republic of Belarus

United Nations Development Programme. Government of the Republic of Belarus United Nations Development Programme Government of the Republic of Belarus Evaluation of UNDP/GEF Project: Removing Barriers to Energy Efficiency Improvements in the State Sector in Belarus (PIMS 2426)

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

Guidance Note to Staff

Guidance Note to Staff Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GUIDANCE NOTE 1. The Operational Policy/Bank Procedure OP/BP 8.00 Rapid Response to Crises

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 3382 POL Public Disclosure Authorized (Heat Supply Restructuring and Conservation (Warsaw) Project) between INTERNATIONAL BANK FOR RECONSTRUCTION

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank LK GPOBA - Access to Sanitation Project (P111161) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC

More information

IN THE AMOUNT OF SDR 10.0 MILLION (US$lS.O MILLION EQUIVALENT)

IN THE AMOUNT OF SDR 10.0 MILLION (US$lS.O MILLION EQUIVALENT) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

PROPOSED FINANCING PRODUCTS, TERMS AND CONDITIONS FOR PUBLIC SECTOR OPERATIONS OF THE CLEAN TECHNOLOGY FUND 1 2

PROPOSED FINANCING PRODUCTS, TERMS AND CONDITIONS FOR PUBLIC SECTOR OPERATIONS OF THE CLEAN TECHNOLOGY FUND 1 2 CIF/DM.1/Inf. 4 February 28, 2008 First Donors Meeting on Climate Investment Funds Paris, March 4-5, 2008 PROPOSED FINANCING PRODUCTS, TERMS AND CONDITIONS FOR PUBLIC SECTOR OPERATIONS OF THE CLEAN TECHNOLOGY

More information

PROJECT INFORMATION DOCUMENT (PID) MOD STAGE Report No Project Name

PROJECT INFORMATION DOCUMENT (PID) MOD STAGE Report No Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) MOD STAGE Report No 32161 Project Name VENEZUELA-

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category

More information

Annex D. Completion and Learning Review Template Document of The World Bank FOR OFFICIAL USE ONLY

Annex D. Completion and Learning Review Template Document of The World Bank FOR OFFICIAL USE ONLY Annex D. Completion and Learning Review Template Document of The World Bank FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT [AND/OR INTERNATIONAL DEVELOPMENT ASSOCIATION] [AND/OR

More information

Nordic Energy Efficiency & Humanitarian Support Initiative for Ukraine Facility for Energy Saving Credits in Ukraine

Nordic Energy Efficiency & Humanitarian Support Initiative for Ukraine Facility for Energy Saving Credits in Ukraine Nordic Energy Efficiency & Humanitarian Support Initiative for Ukraine Facility for Energy Saving Credits in Ukraine Framework Contract for Consulting Services on Project Preparation & Implementation Support

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized (Heat Supply Restructuring and Conservation (Gdansk) Project) LOAN NUMBER 3378 POL between Public Disclosure Authorized INTERNATIONAL

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7888-HR Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Justice Sector Support Project) between REPUBLIC OF CROATIA and

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million LRTF Quarterly Report March 1, 2012 I. LRTF Administration As of February 22, 2012, the LRTF status was as follows: USD million Contributions Received Cash Contributions $146,902,156.80 Investment Income

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.110 Issued September 30, 2018 Effective October 1, 2018 Content Operational policy

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.109 Issued November 10, 2017 Effective November 10, 2017 Content Operational policy

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TAX MODERNIZATION PROJECT TO THE REPUBLIC OF TANZANIA AUGUST 30, 2006

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TAX MODERNIZATION PROJECT TO THE REPUBLIC OF TANZANIA AUGUST 30, 2006 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Document of The World Bank RESTRUCTURING PAPER

Document of The World Bank RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Russia

More information

ANNEX 3 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION

ANNEX 3 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION ANNEX 3 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Third EU Contribution to the Eastern Europe Energy Efficiency and

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.108 Issued August 18, 2017 Effective August 18, 2017 Retired November 9, 2017

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 30244 Public Disclosure Authorized PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) ON A LOAN/GEF GRANT Public Disclosure

More information

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming PAGE 1 OF 8 (Please submit completed form to countries@gcfund.org)

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31490 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY

More information

Port Authority of the City of Saint Paul Property Assessed Clean Energy Program (PACE OF MN) ADMINISTRATIVE GUIDELINES

Port Authority of the City of Saint Paul Property Assessed Clean Energy Program (PACE OF MN) ADMINISTRATIVE GUIDELINES Port Authority of the City of Saint Paul Property Assessed Clean Energy Program () ADMINISTRATIVE GUIDELINES Saint Paul Port Authority 850 Lawson Commons 380 St. Peter Street Saint Paul, MN 55102 (651)

More information

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank Indonesia Power Transmission Development Project (P117323) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 7 ARCHIVED on 07-Jul-2015 ISR18557 Implementing Agencies:

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4705-CHA Public Disclosure Authorized Public Disclosure Authorized Project Agreement (Shanghai Urban Environment Project) between INTERNATIONAL BANK

More information

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and Public Disclosure Authorized OFFIAL DOCUMENTS LOAN NUMBER 8229-AM Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Lifeline Road Network Improvement Project) between REPUBLIC OF

More information

Clean Technology Fund Loan Agreement

Clean Technology Fund Loan Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS CTF LOAN NUMBER TF016327 Public Disclosure Authorized Clean Technology Fund Loan Agreement Public Disclosure Authorized (Ukraine District Heating Energy

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sustainable Development Unit South Asia Region Document of The World Bank FOR OFFICIAL

More information

CLIMATE FINANCE LOAN SHCEMES Existing and Planned Loan Schemes in Lebanon

CLIMATE FINANCE LOAN SHCEMES Existing and Planned Loan Schemes in Lebanon CLIMATE FINANCE LOAN SHCEMES Existing and Planned Loan Schemes in Lebanon September 2014 Financed by the Lebanon Recovery Fund, a Lebanese Government led programme established on the occasion of the Stockholm

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Financing Agreement CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG. (Emergency Recovery Project) between KYRGYZ REPUBLIC.

Financing Agreement CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG. (Emergency Recovery Project) between KYRGYZ REPUBLIC. Public Disclosure Authorized CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG Public Disclosure Authorized Financing Agreement Public Disclosure Authorized (Emergency Recovery Project)

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,040,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,040,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020616 Public Disclosure Authorized Public Disclosure Authorized Project ID P119939 Country Uzbekistan

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 24-Dec-2017 ISR31037 Implementing Agencies:

More information

May 7, International Bank for Reconstruction and Development. Amended and Restated Instrument Establishing The Carbon Partnership Facility

May 7, International Bank for Reconstruction and Development. Amended and Restated Instrument Establishing The Carbon Partnership Facility May 7, 2014 International Bank for Reconstruction and Development Amended and Restated Instrument Establishing The Carbon Partnership Facility Table of Contents Page Chapter I Definitions...2 Article 1

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

Country Practice Area(Lead) Additional Financing China Energy & Extractives P123239

Country Practice Area(Lead) Additional Financing China Energy & Extractives P123239 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020838 Public Disclosure Authorized Public Disclosure Authorized Project ID P084874 Project Name CN-

More information

Indonesia: Java-Bali Electricity Distribution Performance Improvement Project

Indonesia: Java-Bali Electricity Distribution Performance Improvement Project Validation Report November 2017 Indonesia: Java-Bali Electricity Distribution Performance Improvement Project Reference Number: PVR-535 Program Number: 40061-013 Loan Number: 2619 and 8245 Grant Number:

More information

Document of The World Bank

Document of The World Bank Public Disclosure Authorized Document of The World Bank FOR OFFICIAL UE ONLY Public Disclosure Authorized IMPLEMENTATION COMPLETION REPORT (CL-45340) ON A LOAN IN THE AMOUNT OF U$ 18.29 MILLION Report

More information

Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029)

Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Albania Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 06-May-2017 ISR27818 Implementing Agencies:

More information

Indonesia: Metropolitan Medan Urban Development Project

Indonesia: Metropolitan Medan Urban Development Project Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS

September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS INTRODUCTION 1. Among the functions of the Clean Technology Fund

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: RES22488 Public Disclosure Authorized

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021292 Public Disclosure Authorized Public Disclosure Authorized Project ID P120427 Project Name AF: ARTF-Public Fin. Mgmt. Reform II Country

More information

People s Republic of China: Guangdong Energy Efficiency and Environment Improvement Investment Program, Tranche 3 and Multitranche Financing Facility

People s Republic of China: Guangdong Energy Efficiency and Environment Improvement Investment Program, Tranche 3 and Multitranche Financing Facility Completion Report Project Number: 39653-043 Loan Number: 2773 MFF Number: 0020 August 2015 People s Republic of China: Guangdong Energy Efficiency and Environment Improvement Investment Program, Tranche

More information

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Transport Connectivity and Asset Management Project (P132833) Public Disclosure Authorized SOUTH ASIA Sri Lanka Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2016 Seq No: 2 ARCHIVED on 30-Jan-2017 ISR26613 Implementing Agencies: Public Disclosure

More information

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Public Disclosure Authorized East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3909 YF Public Disclosure Authorized Development Credit Agreement (Transport Rehabilitation Project) Public Disclosure Authorized between SERBIA

More information

Financing Agreement CREDIT NUMBER VN. (Ho Chi Minh City Green Transport Development Project) between SOCIALIST REPUBLIC OF VIETNAM.

Financing Agreement CREDIT NUMBER VN. (Ho Chi Minh City Green Transport Development Project) between SOCIALIST REPUBLIC OF VIETNAM. Public Disclosure Authorized OFFICIAL DOCUMENTS CREDIT NUMBER 5654 - VN Public Disclosure Authorized Financing Agreement Public Disclosure Authorized (Ho Chi Minh City Green Transport Development Project)

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 60062-XK Public Disclosure Authorized Public Disclosure Authorized PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000) Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION