1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING OF DEEPENING MTBF AND STRENGTHENING FINANCIAL ACCOUNTABILITY PROJECT (P117248) TF BD SASGP SOUTH ASIA REGION TO THE GOVERNMENT OF BANGLADESH JULY 10, 2014 This document has a restricted distribution and may be used by recipients only in the performance of their official duties Its contents may not otherwise be disclosed without World Bank authorization

2 ABBREVIATIONS AND ACRONYMS DMFAS DMTBF FBE GA ibas MISC MTBF MTMF MTSBP PAD PC PDO PMCU Debt Management Financial Administration System Deepening Medium Term Budget Framework Forward Baseline Estimate Grant Agreement Integrated Budget and Accounting System Management Implementation Support Consultancy Medium Term Budget Framework Medium Term Macroeconomic Framework Medium Term Strategic Business Plan Project Appraisal Document Planning Commission Project Development Objective Project Management Coordination Unit Regional Vice President: Country Director: Practice Manager: Task Team Leader: Philippe H Le Houerou Johannes M Zutt Alexandre Arrobbio Jonas Arp Fallov 2

3 BANGLADESH DEEPENING MTBF AND STRENGTHENING FINANCIAL ACCOUNTABILITY PROJECT (P117248) CONTENTS A SUMMARY 6 B PROJECT STATUS 7 C PROPOSED CHANGES 8 DATA SHEET Bangladesh Deepening MTBF and Strengthening Financial Accountability (P117248) SOUTH ASIA GGODR Basic Information Project ID: P Lending Instrument: Regional Vice President: Philippe H Le Houerou 3 Report No: Technical Assistance Loan Original EA Category: Not Required (C) Country Director: Johannes CM Zutt Current EA Category: Not Required (C) Senior Director: Mario Marcell Original Approval Date: 23-Sep-2009 Practice Manager: Alexandre Arrobbio Current Closing Date: 31-Jul-2014 Team Leader: Borrower: Responsible Agency: Restructuring Type Jonas Arp Fallov Government of Bangladesh Finance Division, Ministry of Finance Form Type: Simple Restructuring Paper Decision Country Director Approval

4 Restructuring Level: Level 2 Financing ( as of 01-Apr-2014 ) Key Dates Project Ln/Cr/TF Status P TF Effecti ve Disbursements (in Millions) Project Ln/Cr/TF Status P TF Policy Waivers Effecti ve Approval Date Signing Date Authority: Explanation of Approval Authority: Effectivenes s Date Level Two Original Closing Date Revised Closing Date 29-Oct Oct Oct Jul Jul-2014 Currenc y Original Revised Cancelle d Disburse d Undisbu rsed % Disburse d USD % Does the project depart from the CAS in content or in other significant respects? Yes [ ] No [ X ] Does the project require any policy waiver(s)? Yes [ ] No [ X ] A Summary of Proposed Changes The following changes are proposed: A partial extension of the closing date by two months, from July 31, 2014 to September 30, 2014 in order to provide the additional time needed for 26 scholarship students already enrolled in overseas master s programs to complete their studies and fund costs related to their scholarships for August and September 2014 from the project grant Only expenditures related to the completion of overseas master s programs for the 26 scholarship students already enrolled will be eligible after July 31, 2014 A reallocation between spending categories to create a new spending category exclusively for expenditures eligible in the extension period An amendment to the Grant Agreement (GA) to formalize the above changes Change in Implementing Agency Yes [ ] No [ X ] Change in Project's Development Objectives Yes [ ] No [ X ] Change in Results Framework Yes [ ] No [ X ] Change in Safeguard Policies Triggered Yes [ ] No [ X ] 4

5 Change of EA category Yes [ ] No [ X ] Other Changes to Safeguards Yes [ ] No [ X ] Change in Legal Covenants Yes [ ] No [ X ] Change in Loan Closing Date(s) Yes [X ] No [ ] Cancellations Proposed Yes [ ] No [ X ] Change to Financing Plan Yes [ ] No [ X ] Change in Disbursement Arrangements Yes [ ] No [X ] Reallocation between Disbursement Categories Yes [X ] No [] Change in Disbursement Estimates Yes [ ] No [X ] Change to Components and Cost Yes [ ] No [X ] Change in Institutional Arrangements Yes [ ] No [X ] Change in Financial Management Yes [ ] No [X ] Change in Procurement Yes [ ] No [X ] Change in Implementation Schedule Yes [ ] No [X ] Other Change(s) Yes [ ] No [X ] Appraisal Summary Change in Economic and Financial Analysis Yes [ ] No [X ] Appraisal Summary Change in Technical Analysis Yes [ ] No [X ] Appraisal Summary Change in Social Analysis Yes [ ] No [X ] Appraisal Summary Change in Environmental Analysis Yes [ ] No [X ] Appraisal Summary Change in Risk Assessment Yes [ ] No [X ] B Project Status Despite a number of achievements, 2 out of 4 PDO-level indicators will not be achieved, and critical activities will not be completed, by the closing date In particular, targets relating to the institutionalization of the Medium Term Budget Framework and the finalization of the Integrated Budget and Accounting System (ibas++) will not be achieved Accordingly, performance ratings for achievement of PDO and overall implementation progress have been downgraded to Unsatisfactory Based on the unsatisfactory performance, the development partners of the SPEMP Multi Donor Trust fund and Government had decided not to extend SPEMP A beyond its closing date of July 31, 2014 However, with respect to scholarships under component 3 of the project, the Government has submitted a specific request dated July 10, 2014 for a partial extension of the closing date by two months to ensure that the 26 scholarship students already enrolled in overseas master s programs can finalize their studies C Proposed Changes Development Objectives/Results 5

6 Project Development Objectives Original PDO The project aims to deepen and institutionalize the MTBF and build a more strategic and performance oriented budget management process, while strengthening financial accountability across the expenditure management cycle The project supports fundamental reforms of operational budget management functions in both central units and line ministries Enhanced budget process and financial accountability is likely to improve the allocative and operational efficiency in public expenditure management which in turn will enable better provision of key public services in support of the Government's social and economic policy objectives Change in Project's Development Objectives Reallocations Explanation: A reallocation is proposed to create a new spending category 2a scholarships for training to be used exclusively for expenditures eligible for the partial extension period of two months Expenditures for scholarship activities up until July 31, 2014 will be charged against category 2 (Consulting services, training and study tours), whereas expenditures for scholarship activities for August 2014 and September 2014 up to an amount of US $ 140,600 will be charged to category 2a (Scholarships for training) Ln/Cr/TF Currency Current Category of Expenditure Allocation Disbursement % (Type Total) Current Proposed Current Proposed TF USD 1) DISB - GOODS 6,660,000 6,660, ) Works \ Cons Serv\Train \ Study Tr 2a) Scholarship for training 3) DISB - OPERATING COSTS 42,113,000 41,972, , ,727,000 3,727, ) UNALLOCATED Designated Account UN Advances Total: 52,500,000 52,500,000 A SUMMARY The following changes are proposed: A partial extension of the closing date by two months, from July 31, 2014 to September 30, 2014 in order to provide the additional time needed for 26 scholarship students already enrolled in overseas master s programs to complete their studies and fund costs related to their scholarships for August and September 6

7 2014 from the project grant Only expenditures related to the completion of overseas master s programs for the 26 scholarship students already enrolled will be eligible after July 31, 2014 A reallocation between spending categories to create a new spending category exclusively for expenditures eligible in the extension period An amendment to the Grant Agreement (GA) to formalize the above changes Despite the project s unsatisfactory implementation rating, it is nonetheless proposed to partially extend the project closing date for the following reasons: (i) the scholarships program has been a success; (ii) 26 students are already overseas and would not be able to obtain their master s degrees if the project is not extended; (iii) the investment made with donor funds would be lost; and (iv) the related reputational risk to the Bank and development partners if support for the scholarship students is withdrawn at this time Given this is a partial extension, and all other activities will close by the original closing date of July 31, 2014 or before, there is no risk of extending unsatisfactory activities B PROJECT STATUS 2 out of 4 Project Development Objective (PDO) level indicators pertaining to targets on institutionalizing the MTBF and on implementing ibas++, which is a prerequisite for achieving international standards of financial reporting, will not be reached by the project end-date Accordingly, the rating for progress towards achievement of PDO has been maintained as unsatisfactory While there have been achievements in some areas, overall project implementation has remained sluggish and critical activities are unlikely to be completed by the closing date Consequently, the overall implementation progress rating has been maintained as unsatisfactory The main areas of progress to date and the activities unlikely to be completed by the closing date are summarized below Main areas of progress to date: An upgraded debt management system (DMFAS version 60) installed and connected A draft Medium Term Debt Management Strategy prepared Medium-Term Budget Framework rolled out to all line ministries and new budget institutions (Budget Management Wings, Budget Management Committees and Budget Working Groups) formally established The Finance Minister has ratified the MTBF-roadmap A FD/Planning Commission (PC) joint working group was established to facilitate technical discussions and progress on issues requiring coordination and joint agreement All line ministries have submitted quarterly financial management reports for Q1 of 2014 Annual Performance Reports submitted by 2 line ministries Gender budget reporting submitted by 40 line ministries The Medium Term Strategic Business Plan (MTSBP) of the Ministry of Agriculture has been signed by the Minister and been published Draft MTSBPs 7

8 have been formulated for the Power Division, the Local Governance Division, the Ministry of Education and the Ministry of Social Welfare Draft MTSBPs for the Power Division and the Local Governance Division are at the final stage An internal audit manual and strategy have been approved by Finance Division and a decision taken to establish an internal audit unit/cell in Finance Division The new classification structure for budgeting, accounting and reporting was finalized by the designated task force based on recommendations received from the IMF An Account Code (accounting policies and procedures manual) was drafted to be shared with major stakeholders ibas rolled out to 337 upazilla account offices ibas is importing data from 188 branches of the Sonali Bank and 9 branches of the Bangladesh Bank Electronic fund transfer has been enabled in for all CAO offices Further security enhancements are required 14,170 public officials have participated in training conducted by the project, of which 2,800 over the last 6 months To date, 35 government officials have completed scholarships for overseas master s programs Targets that will not be achieved by the closing date: Introduction of FBEs in line ministries Macroeconomic model will not be used as the basis of the government s Medium Term Macro Framework (MTMF) Envisioned number (22700) of government officials trained Envisioned number of line ministries (5) with budgets based on Medium Term Strategic Business Plans Introduction of an adequate legal framework Development and testing of ibas++ (see below) In terms of compliance with audit covenants, the auditor expressed unqualified audit opinion on the latest financial statements of financial year There has been a repeated audit observation on inadequate documentation and payment procedure of Karmadokhota Training, which has however subsequently been resolved to the satisfaction of the Bank Following a number of issues raised in the recent implementation support missions, a technical assessment mission was carried out in May 2014 on the status of ibas++ implementation, which is critical to implementation success of component 2 and the overall project The assessment found a disconnect between current software development and the foundational and supporting documentation, a lack of ownership of the project by the Finance Division and other budget and accounting staff in the government as well as inadequacies in project management The timeline for implementation of the system proposed by the government as the basis for a project extension was deemed unrealistic Based on the technical assessment of ibas++ and the unsatisfactory performance overall, the development partners of the SPEMP Multi Donor Trust fund and Government decided not to extend the project 8

9 In preparing for an orderly closure of the project, a detailed review of commitments and actual expenditures revealed that total project costs exceeded the original grant amount of US $ 50 million As the project had been appraised for US $ 688 million, and the Bank had agreed to provide additional resources as necessary, a level 2-restructuring was processed in June 2014 to increase the grant amount to US $ 525 million and reallocate between spending categories in order to cover commitments already made by the project However, subsequent discussions with Government and development partners revealed the need to put in place financial arrangements so that scholarship students already enrolled in overseas master s programs can finalize their studies Consequently, the Government has submitted a specific request dated July 10, 2014 for a partial extension of the closing date by 2 months C PROPOSED CHANGES Background Under component 3 (Training and Capacity Building), the project is financing scholarships for overseas master s programs for government officials at selected universities in the UK and Japan The main objective of the scholarship program is to create a pool of BCS officers with advanced graduate level education in economics, finance and financial management and related fields to sustain the on-going public financial management reform programs in Bangladesh Candidates for scholarships have been selected among the top achievers from the Fiscal Economics and Economic Management (FEEM) training courses which have been offered to government officials on a regular basis financed by the DMTBF-project 62 government officials have been inducted into overseas master s programs compared to a target of 63 a target realization rate of 98 % 35 officials have already completed overseas master s programs, while 26 are currently pursuing their master s studies Partial extension of closing date The 26 government officials currently pursuing overseas master s studies under the scholarship program will only complete their studies by the end of September 2014 Since activities for August and September 2014 are beyond the project closing date of July 31, 2014, the expenditures relating to these activities would not be eligible It is proposed to partially extend the closing date of the project from July 31, 2014 to September 30, 2014 to ensure that the 27 scholarship students already enrolled can complete their studies and the related expenditures for August and September 2014 can be financed under the project The eligible expenditures for August and September 2014 are estimated at US$ 140,600 and consist of monthly installments of living allowance, departure allowance and return airfare as well as bank charges and a contingency to allow for currency fluctuations (see table 1 below) 9

10 Table 1 Estimated expenditures for Scholarship Program for August and September 2014 Expenditure category Expenditures in US$ Monthly living allowances 78,061 Departure allowances 26,715 Return air fare 30,218 Bank charges and contingency for currency 5,606 fluctuations Total 140,600 The expenditures of the extension period are financed within the existing grant amount of US $ 525 million and the activities covered by the government project document (TPP), which stretches until March 2015 The government counterpart funds of the project will finance the salary of the project director, additional project directors and an accounts officer, who will ensure that payments can be processed during the extension period as needed Bank policy requires an extension of the closing date to be justified in terms of (a) the Project DOs remain achievable; (b) the performance of the borrower remains satisfactory; and (c) the Bank and the borrower agree on actions that will be undertaken by the borrower to complete the Project While these criteria are not fulfilled for the project overall, a partial extension is nonetheless proposed based on the following: Component 3 of the project (which includes the scholarship program) has been rated moderately satisfactory The target for enrollment into overseas master s programs is 98 % achieved (62 students enrolled as opposed to 63 targeted), and the borrower s performance in running the scholarship program is assessed by the task team as satisfactory The extension will ensure that the scholarship students can complete their studies as intended and return back to Bangladesh, thereby avoiding negative consequences for the beneficiaries as well as reputational risks for the Bank and SPEMP donors The extension will protect the investment made by SPEMP Donors as the majority of the expenditure relating to the scholarship program is already incurred There is agreement between the Bank and the Borrower on the actions that need be undertaken to complete the activities for the 26 remaining scholarship students Given the extension is partial, all other activities will close by the original closing date of July 31, hence there is no risk of continuing unsatisfactory activities Reallocation between spending categories A reallocation is proposed to create a new spending category 2a scholarships for training to be used exclusively for expenditures eligible for the partial extension period of two months (see table 2 below) Expenditures for scholarship activities up until July 31, 2014 will be charged against category 2 (Consulting services, training and study tours), whereas expenditures for scholarship activities for August 2014 and September 2014 up to an amount of US $ 140,600 as defined above will be charged to category 2a (Scholarships for training) All other expenditures will only be eligible up to the current closing date of July 31,

11 Table 2 Reallocation between spending categories US $ million Original Allocation Proposed allocation Eligibility of expenditures 1) Goods 6,660,000 6,660,000 On or before July 31, ) Consulting services, training and study tours 42,113,000 41,972,400 On or before July 31, a) Scholarships for training (New) - 140,600 August 1, 2014 to September 30, ) Operating costs 3, , On or before July 31, ) Unallocated On or before July 31, 2014 Total 52,500,000 52,500,000 11

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF DEEPENING MTBF AND STRENGTHENING FINANCIAL ACCOUNTABILITY PROJECT (TF BD) GRANT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF DEEPENING MTBF AND STRENGTHENING FINANCIAL ACCOUNTABILITY PROJECT (TF BD) GRANT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31045 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31490 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008 Public Disclosure Authorized RESTRUCTURING PAPER REPORT NO.: RES29620 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT

More information

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank LK GPOBA - Access to Sanitation Project (P111161) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized DOCUMENT OF THE WORLD BANK REPORT NO.: RES30282 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized MEXICO

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-95283) ON A GRANT IN THE AMOUNT OF US$52.5 MILLION TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-95283) ON A GRANT IN THE AMOUNT OF US$52.5 MILLION TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00002545 IMPLEMENTATION COMPLETION AND RESULTS

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES24803 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT

More information

The World Bank NEITI Reporting Compliance (P162344)

The World Bank NEITI Reporting Compliance (P162344) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NEITI REPORTING COMPLIANCE APPROVED ON DECEMBER 7, 2016 TO FEDERAL MINISTRY

More information

Public Disclosure Copy

Public Disclosure Copy SOUTH ASIA Bangladesh Financial Management Global Practice Recipient Executed Activities Technical Assistance Loan FY 2011 Seq No: 4 ARCHIVED on 26-Feb-2015 ISR18034 Implementing Agencies: Key Dates Key

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Project No: 105602 PROPOSED PROJECT

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18411 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL) Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18226 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31013 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social Protection Unit South East/South AFTSE Africa Region Document of The World Bank

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: RES22488 Public Disclosure Authorized

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000) Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION

More information

The World Bank Social Assistance System Strengthening Project (P123960)

The World Bank Social Assistance System Strengthening Project (P123960) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SOCIAL ASSISTANCE SYSTEM STRENGTHENING PROJECT APPROVED ON JANUARY 22,

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31608 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

More information

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy AFRICA Ethiopia Social Protection & Labor Global Practice IBRD/IDA Sector Investment and Maintenance Loan FY 2013 Seq No: 12 ARCHIVED on 09-Oct-2015

More information

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER

More information

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

The World Bank Building a Modern Fiscal System Technical Assistance (P154694) Public Disclosure Authorized EAST ASIA AND PACIFIC China Macro Economics & Fiscal Management Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 15-Jun-2017 ISR26699 Implementing

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Nigeria Governance Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq

More information

Document of. The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Document of. The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451) SOUTH ASIA Pakistan Macroeconomics, Trade and Investment Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 27-Jun-2018 ISR33129 Implementing Agencies:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Implementation Status & Results Chad Public Financial Management Capacity Building (P090265)

Implementation Status & Results Chad Public Financial Management Capacity Building (P090265) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chad Public Financial Management Capacity Building (P090265) Operation Name: Public Financial Management

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES12428 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING

More information

The World Bank Research and Innovation in Science and Technology Project (P121842)

The World Bank Research and Innovation in Science and Technology Project (P121842) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Education Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 7 ARCHIVED on 07-Dec-2016 ISR25509 Implementing Agencies: Ministry

More information

Cambodia: Rural Credit and Savings Project

Cambodia: Rural Credit and Savings Project Project Validation Report Reference Number: CAM 2008-06 Project Number: 30327 Loan Number: 1741 July 2008 Cambodia: Rural Credit and Savings Project Operations Evaluation Department ABBREVIATIONS ADB Asian

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES19910 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

The World Bank Malawi Strategic Program for Climate Resilience (P163245)

The World Bank Malawi Strategic Program for Climate Resilience (P163245) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MALAWI STRATEGIC PROGRAM FOR CLIMATE RESILIENCE APPROVED ON NOVEMBER

More information

Document of The World Bank RESTRUCTURING PAPER

Document of The World Bank RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT

More information

Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623)

Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623) Operation Name:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT Public Disclosure Authorized REPORT NO.: RES33563 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Lebanon Social Protection & Labor Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 09-Jan-2017

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT LOAN 7731-ID JUNE 24, 2009 TO THE REPUBLIC

More information

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Lao People's Democratic Republic Lao PDR - Mainstreaming

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NATIONAL HYDROMET MODERNIZATION PROJECT LOAN NO RU

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NATIONAL HYDROMET MODERNIZATION PROJECT LOAN NO RU Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NATIONAL HYDROMET MODERNIZATION PROJECT LOAN NO. 4769 RU Date of Board Approval: MARCH 17, 2005 TO THE RUSSIAN FEDERATION

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNANCE TECHNICAL ASSISTANCE PROJECT. Loan No. IDA 37570, P071063

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNANCE TECHNICAL ASSISTANCE PROJECT. Loan No. IDA 37570, P071063 Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 74602 - KG Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770) Public Disclosure Authorized SOUTH ASIA Bangladesh Governance Global Practice Requesting Unit: SACBD Responsible Unit: GGOES IBRD/IDA Program-for-Results Financing FY 2014 Team Leader(s): Furqan Ahmad

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Project development objective/outcomes

Project development objective/outcomes Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799

More information

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDIA: BIHAR INTEGRATED SOCIAL PROTECTION STRENGTHENING PROJECT APPROVED

More information

Key Dates. Project Development Objectives. Components. Overall Ratings

Key Dates. Project Development Objectives. Components. Overall Ratings Public Disclosure Authorized AFRICA Madagascar Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 08-Jun-2018 ISR32759 Implementing

More information

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133)

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Government Financial Management and Revenue

More information

The World Bank NP: Strengthening the Office of the Auditor General (P127040)

The World Bank NP: Strengthening the Office of the Auditor General (P127040) Public Disclosure Authorized SOUTH ASIA Nepal Financial Management Global Practice Recipient Executed Activities Specific Investment Loan FY 2012 Seq No: 3 ARCHIVED on 20-Feb-2015 ISR18017 Implementing

More information

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740)

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740) Operation Name: Project

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

The World Bank Kabeli-A Hydro Electric Project (P122406)

The World Bank Kabeli-A Hydro Electric Project (P122406) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF KABELI-A HYDRO ELECTRIC PROJECT APPROVED ON JULY 1, 2014 TO NEPAL REPORT NO.: RES32467

More information

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325) AFRICA Mozambique Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2007 Seq No: 22 APPROVED ISR29261 Implementing Agencies: Key Dates Key Project Dates Bank Approval Date:23-May-2007

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMBODIA EDUCATION SECTOR SUPPORT SCALE UP ACTION PROGRAMME (TF092097)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMBODIA EDUCATION SECTOR SUPPORT SCALE UP ACTION PROGRAMME (TF092097) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING

More information

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 24-Dec-2017 ISR31037 Implementing Agencies:

More information

Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845)

Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845) Operation Name: Afghanistan

More information

Second Science & Technology Project (P127308)

Second Science & Technology Project (P127308) EUROPE AND CENTRAL ASIA Croatia Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 12 ARCHIVED on 31-Oct-2018 ISR33160 Implementing Agencies:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND

More information

Implementation Status & Results Kosovo Public Sector Modernization Project (P101614)

Implementation Status & Results Kosovo Public Sector Modernization Project (P101614) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Kosovo Public Sector Modernization Project (P101614) Operation Name: Public Sector Modernization Project (P101614)

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770) Public Disclosure Authorized SOUTH ASIA Bangladesh Governance Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 7 ARCHIVED on 05-Jun-2017 ISR28344 Implementing Agencies: National Board of Revenue,

More information

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778)

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Operation Name: Revenue Administration

More information

The World Bank Jamaica Strategic Public Sector Transformation (P146688)

The World Bank Jamaica Strategic Public Sector Transformation (P146688) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Jamaica Governance Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 28-Jun-2018 ISR32761 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Nepal Governance Global Practice Recipient Executed Activities Technical Assistance Loan FY 2012 Seq No: 2 ARCHIVED on 07-Dec-2015 ISR18236 Implementing Agencies:

More information

Second Public Financial Management Capacity Strengthening Project (P151492)

Second Public Financial Management Capacity Strengthening Project (P151492) AFRICA Somalia Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 05-Nov-2018 ISR34381 Implementing Agencies: Ministry of Finance, Puntland,

More information

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Operation Name: Local Government

More information

Implementation Status & Results India Assam State Roads Project (P096018)

Implementation Status & Results India Assam State Roads Project (P096018) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results India Assam State Roads Project (P096018) Operation Name: Assam State Roads Project (P096018) Project Stage: Implementation

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SERBIA COMPETITIVENESS AND JOBS PROJECT (P152104) APPROVED ON SEPTEMBER 16, 2015

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SERBIA COMPETITIVENESS AND JOBS PROJECT (P152104) APPROVED ON SEPTEMBER 16, 2015 Public Disclosure Authorized The World Bank REPORT NO.: RES31629 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF SERBIA COMPETITIVENESS AND JOBS PROJECT APPROVED

More information

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation

More information

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National

More information

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Montenegro Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 13 ARCHIVED on 12-Apr-2016 ISR23062 Implementing Agencies:

More information

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Transport Connectivity and Asset Management Project (P132833) SOUTH ASIA Sri Lanka Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2016 Seq No: 3 ARCHIVED on 31-Aug-2017 ISR29065 Implementing Agencies: Democratic Socialist Republic of Sri Lanka,

More information

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567) EUROPE AND CENTRAL ASIA Albania Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 2 ARCHIVED on 17-Oct-2017 ISR29727 Implementing Agencies: Key Dates

More information

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632

Country Practice Area(Lead) Additional Financing Afghanistan Governance P150632,P150632 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021292 Public Disclosure Authorized Public Disclosure Authorized Project ID P120427 Project Name AF: ARTF-Public Fin. Mgmt. Reform II Country

More information

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Water Global Practice Requesting Unit: EACVF Responsible Unit: GWA02 IBRD/IDA Program-for-Results Financing FY 2013 Team Leader(s): Lilian Pena

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy EAST ASIA AND PACIFIC China Energy & Extractives Global Practice IBRD/IDA Financial Intermediary Loan FY 2008 Seq No: 11 ARCHIVED on 16-Dec-2015 ISR21909

More information

Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775)

Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775) Operation Name: LR-Public Financial Management

More information

INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 THE REPUBLIC OF INDIA

INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 THE REPUBLIC OF INDIA The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES30277 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 TO ENVIRONMENT & NATURAL

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE KARNATAKA HEALTH SYSTEM DEVELOPMENT AND REFORM PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE KARNATAKA HEALTH SYSTEM DEVELOPMENT AND REFORM PROJECT Public Disclosure Authorized Docume of The World Bank FOR OFFICIAL USE ONLY Report No: RES22733 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVLOPMENT AND INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT PAPER ON A

FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVLOPMENT AND INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT PAPER ON A Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: PAD1481 Public Disclosure Authorized Public Disclosure Authorized INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVLOPMENT

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation

More information

Public Disclosure Copy

Public Disclosure Copy EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Technical Assistance Loan FY 2013 Seq No: 4 ARCHIVED on 28-Dec-2015 ISR21722