1 Public Disclosure Authorized The World Bank REPORT NO.: RES31629 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF SERBIA COMPETITIVENESS AND JOBS PROJECT APPROVED ON SEPTEMBER 16, 2015 TO Public Disclosure Authorized FINANCE, COMPETITIVENESS AND INNOVATION EUROPE AND CENTRAL ASIA REPUBLIC OF SERBIA Public Disclosure Authorized Regional Vice President: Country Director: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: Cyril E Muller Linda Van Gelder Ceyla Pazarbasioglu-Dutz Mario Guadamillas Dusko Vasiljevic

2 ABBREVIATIONS AND ACRONYMS ALMP Active Labor Market Program DLI Disbursement Linked Indicator GDP Gross Domestic Product IMWG Inter Ministerial Working Group IP Implementation Progress NES National Employment Service MoE Ministry of Economy MoESTD Ministry of Education, Science and Technological Development MoF Ministry of Finance MoLEVSA Ministry of Labor, Employment, Veteran and Social Affairs NARR National Agency for Regional Development PDO Project Development Objective PIU Project Implementation Unit PPMC Policy Planning Monitoring and Coordination PPS Public Policy Secretariat SDA Serbian Development Agency SIEPA Serbia Investment and Export Promotion Agency TA Technical Assistance

3 BASIC DATA Product Information Project ID P Original EA Category Partial Assessment (B) Approval Date 16-Sep-2015 Financing Instrument Investment Project Financing Current EA Category Partial Assessment (B) Current Closing Date 30-Jun-2019 Organizations Borrower Ministry of Finance Responsible Agency Public Policy Secretariat,Ministry of Economy,Ministry of Education Science and Technological Development,Ministry of Labor, Employment, Veteran and Social Affairs Project Development Objective (PDO) Original PDO The PDO is to improve the effectiveness and coordination of selected public programs to alleviate constraints to competitivenessand job creation, including investment and export promotion, innovation, active labor market programs, labor intermediation, and activation of social assistance beneficiaries. Summary Status of Financing Ln/Cr/Tf Approval Signing Effectiveness Closing Net Commitment Disbursed Undisbursed IBRD Sep Oct Mar Jun

4 Policy Waiver(s) Does this restructuring trigger the need for any policy waiver(s)? No I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING 1. This Restructuring Paper seeks approval to restructure the Project to address implementation challenges so to increase the likelihood of meeting the Project Development Objective (PDO). The restructuring includes the following elements: (i) amendment to the Project Development Objective (PDO), (ii) revision to the project Disbursement Linked Indicators (DLIs), (iii) reallocation of proceeds between components and disbursement categories, (iv) revision to the results indicators, (v) adjustment to project implementation arrangements, (vi) an extension of the current Project closing date from June 30, 2019 to June 30, The Bank received a request from the Public Policy Secretariat (PPS) on behalf of the Borrower on March 16, 2018, requesting the restructuring of the Project and extension of the Project closing Date by 24 months, from June 30, 2019 to June 30, 2021, to allow enough time for the Borrower to carry out the planned activities supported by the Project and the full achievement of the Project s development objective. The request reflected the agreements reached between the Bank and the Government during the Mid-Term Review (MTR) mission carried out in December The Project is part of a broader Bank engagement with the Government of Serbia on growth and job creation, which was identified as a key area of support under the CPF, along with fiscal consolidation and improved economic governance. After prolonged growth stagnation due to the financial crisis (real GDP has recently returned to pre-2008-crisis level) and successful efforts at fiscal consolidation over the last three years, reforms to reinitiate the growth are seen as an increasing priority by government. Realigning the project with relevant political and economic circumstances will contribute to these efforts as, once restructured, the project will have a stronger focus on improving the effectiveness and coordination of key public programs in the areas of investment and export promotion, innovation and labor intermediation. A. Overall Project Status 4. The project became effective in March A number of changes, particularly around changing economic and political environment, have delayed achievement of DLIs, causing slower than expected implementation and disbursement. 5. The ratings for implementation progress (IP) and progress towards the Project Development Objective (PDO) are Moderately Unsatisfactory as of September 2017 due to delays in implementation, which has made it unlikely the project will be able to achieve its PDO before the current closing date. The project has disbursed a total of US million (21 percent of the loan amount). The Mid-Term Review mission was held in December 2017 to discuss implementation challenges and the possible options for restructuring. The Restructuring Paper reflects the discussions during the MTR. 6. The main factor affecting implementation has been accelerated election cycles, which led to two elections taking place (parliamentary and presidential) since project effectiveness. Project decision-making and implementation were significantly slower than expected during pre-election campaigning and post-election negotiations around the setup of the Government.

5 Further, although the same parliamentary coalition formed the Government after the elections, the Ministers and most of technical teams of the three key ministries participating in the Project changed and led to shifts in Government s priorities. Also, some of the DLIs met unexpected resistance from parts of the research community (in particular DLI #5, which supports reforms of the public research institutes), which led to a renewed dialogue and changes in this area to better reflect political realities. Finally, some of the implementation delays were caused by a relatively complex implementation arrangements, where in addition to the main PIU in PPS, a separate PIU was established in MoLEVSA to manage the Labor component of the project 1 ; however, the PIU in MoLEVSA has performed poorly and has not coordinated well with the main PIU. 7. Despite delays in implementation, the ministries and agencies participating in the project remain committed to the reforms supported by the project. The proposed restructuring is thus not aimed at changing the overall objective of the project as much as realigning the indicators and implementation plans to priorities and political realities. There also remains broad support for the proposed reforms at the Government level, reflected by the fact that the activities supported by the restructured Project are included in the Government Action Plan (the Action Plan for 2018 and 2019 was adopted by the Cabinet in November 2017). 8. Given the delays mentioned above, a project extension is necessary to complete the planned reforms and achieve the PDO. Also, adjustments to some of the DLIs to better reflect the evolution of Government priorities is proposed. Finally, streamlining of implementation arrangements (by dissolving the separate PIU in MoLEVSA and having the main PIU take over its responsibilities) is also envisaged under the restructuring. 9. Financial management arrangements for the project are acceptable. There are no overdue audits of project financial statements. B. Project status by components Component 1: Policy planning, monitoring, and coordination (PPMC) 10. This component supports government efforts to improve coordination and planning around competitiveness, with a focus on cross-cutting policies and issues To achieve this, the implementation of the policy planning, monitoring, and coordination (PPMC) framework is supported by the project, and is supporting the government to develop and pilot an interministerial PPMC system. Overall, progress under this component has been satisfactory. A PPMC framework has been established which is supported through an inter-ministerial working group (IMWG) set up as part of the pilot PPMC system, which includes the preparation of semi-annual progress reports and annual performance review reports with inputs from the various participating ministry. Also, individual planning and monitoring frameworks at the ministry-level are being developed to feed into the inter-ministerial PPMC system. This component was meant to serve as a pilot, to demonstrate usefulness of a PPMC system, with the intention that at some point after the completion of the Project it gets rolled out to other ministries as well. However, given the significant interest by the Government in results based management, activities originally proposed under this Component regarding PPMC are now being implemented at the Cabinet level and with support from the Bank through a separate Result Based Management Project Reimbursable Advisory Services (RAS), which was signed in February With the Cabinet level initiative in place, the support to PPMC by a dedicated DLI under the Project becomes redundant, and as part of the restructuring, the DLI supporting this activity is proposed to be dropped for 2018 (targeted support on policy coordination related to the Project will continue to be provided through the TA part of the project). Component 2: Investment and export promotion 1 Setting up this separate PIU was an explicit request by the former team in MoLEVSA.

6 11. This component supports improvements to programs for investment and export promotion, including through support for consolidation of two previous agencies (SIEPA and NARR) into a newly established Serbia Development Agency (SDA), which performs activities related to investment and export promotion, as well as SME development. Despite some progress the implementation of this component is significantly slower than initially planned. Although strategic framework for the new Serbia Development Agency (SDA) was developed and is being implemented, preparation of the sectoral action plans was significantly delayed and instead of being adopted during 2016, they were adopted by MoE in March This delay is due to protracted procurement of TA, which was slowed down due to elections in 2016, and changes in the MoE team which impacted management of the TA. Implementation of these Action Plans will continue to be supported by DLI #2. Component 3: Innovation 12. Component 3 supports implementation of select reforms in the research and innovation sector: (i) supporting the operations of the Innovation Fund and its programs, including Mini and Matching Grants Program, (ii) strategic planning and institutional reform of the public research and development sector. After initial setbacks, there has been major progress on enterprise innovation, supported by DLI #3 and #4 under this component. The main goal of DLI #3 was to institutionalize funding for the Mini- and Matching Grants programs by including them in the Government s Budget. However, due to fiscal constraints, this funding was not secured in the 2016 Budget. For 2017, the budget allocation to the Innovation Fund for the Matching Grants Program has been made in full, which allowed the Innovation Fund to launch a new call for proposals, following a three-year break. With very strong demand and high quality of proposals submitted, the Government has now significantly upscaled the funding for the programs in the 2018 Budget, making up, in part, for lost time and resources in Also, new programs by the Fund (e.g. collaborative grant scheme to incentivize collaboration between SMEs and public research institutes, and new technology transfer service lines) are being piloted with strong interest by the community. 13. On the other hand, there were major delays in public research sector reforms, supported by DLI #5, as the reforms of the public research sector face substantial resistance from parts of the research community. 2 Although the new Strategy for Research and Innovation was adopted by the Government in early 2016, the accompanying Action Plan (originally due in August 2016), as well as the Research Infrastructure Roadmap (originally due December 2016) are still pending. However, after a prolonged hiatus, there is a new momentum building for the reforms. The MoESTD is now committed to lock in the reform path (most importantly a move to a combined model of financing public research, with both institutional and competitive component) and after several delays, the Action Plan has now been finalized and in March 2018 formally sent to line-ministries for opinions, after which it will be sent to the Government for approval. Also, MoESTD has established a working group to discuss a new law on science, which will include the proposed reforms of research financing in essence a combination of institutional financing and competitive project-based financing. Further, MoESTD is now planning to establish a new Science Fund to manage the competitive part of research funding. Finally, MoESTD has also started working on the Strategy for Smart Specialization, further contributing to the efforts to reform research and innovation policy. All of these reforms are encapsulated in the final draft of the Action Plan. To build on this new momentum, modifying the DLI #5 as part of the restructuring is being proposed. 2 The reforms of public research institutes are perceived by some members of the research community to be threatening to academic freedom and independence from market forces, especially for basic research. These views are speculative, given the relatively modest changes envisioned by the proposed reforms, and the gradual nature of the proposed process, which would allow for feedback and course corrections along the way. Difficulties in reforming the sector were further compounded by the broader context of fiscal consolidation implemented by the Government, which in effect meant that the financing envelope for the public research institutes has remained fixed over the previous couple of years.

7 Component 4: Labor 14. Component 4 supports a set of priority measures identified by MoLEVSA during project preparation under the government s National Employment Strategy for the period The component is covered by three DLIs (DLI #6, #7 and #8) around various aspects of the performance of the functioning of the National Employment Service (NES). The overall objectives are to enhance the effectiveness of the NES labor intermediation services for employers and the unemployed, as well as improve the effectiveness of the active labor market programs (ALMPs). It also includes one DLI (DLI #9) related to transition of social assistance beneficiaries into formal jobs. 15. In general, performance on the NES related DLIs has been satisfactory. However, significant delays with regards to the procurement of TA supporting implementation of DLI #8 were experienced. The TA support was aimed at supporting the evaluation of existing Active Labor Market Programs (ALMPs) being implemented by NES and designing of a pilot ALMP based on the results of the evaluation. As mentioned above, the separate PIU established in MoLEVSA performed poorly. Poor performance, as well as changes in the MoLEVSA team, resulted in the procurement of this TA being significantly behind schedule. Although it was anticipated that the TA would be procured by late 2016, the TA has still not been contracted at the time of this restructuring (April 2018). To address these issues, it was agreed that separate PIU in MoLEVSA will be dissolved and the main PIU established within the PPS will take over its responsibilities. 16. Progress with reforms supported by DLI #9 measures to increase activation of social assistance beneficiaries has also been slow and, following the change of the team in MoLEVSA, these measures are no longer seen as a priority by government. Since the specific measures supported by this DLI would be complex to design and implement (they would likely require financial incentives to the beneficiaries, changes in the regulatory framework, and funding from the Ministry s side to pilot the program), they are highly unlikely to be meaningfully implemented without a strong commitment from MoLEVSA. It was thus agreed during the MTR in December 2017 that DLI #9 for 2017 and 2018 will be dropped (with related resources reallocated), and the PDO adjusted accordingly. In dropping the DLI, it is understood that activation of social assistance beneficiaries will continue to be indirectly supported by other activities under the Project, including improvements to ALMPs (supported by DLI #8) and improved functioning of NES (supported by DLI #6 and #7). The dialogue around supporting social assistance beneficiaries will also be continued through other Bank projects. Overall implementation arrangements and delays 17. An Inter-Ministerial Working Group (IMWG) was set up under the project, but recently has started to focus mostly on process-related issues, rather than the substance of the reforms and policy coordination as was envisaged during project preparation. This is partly the result of the fact that there is now a separate results-based management initiative at the Cabinet level (see discussion on Component 1), so dealing with similar issues under this project is perceived as a duplication of efforts. As part of the restructuring, it is therefore proposed to adjust the Project Operations Manual to reflect the shift in the mandate of IMWG, moving IMWG responsibilities explicitly to project oversight, and less to policy coordination. 18. Overall, implementation progress is delayed. A summary of delay are as follows: (i) under Component 2, preparation of Action Plans for priority industrial sectors was completed in 2018, instead of 2016 as originally planned; (ii) under Component 3, reforms of the public research sector also have faced significant delays and the Action Plan for implementing the sector reform is expected to be adopted in 2018 instead of 2016, and; (iii) under Component 4 procurement of the TA to evaluate ALMPs and propose new programs has been significantly delayed, and the TA will become available only in 2018 instead of Due to this delay, the time necessary to evaluate the existing ALMPs, and the planning cycle of NES and MoLEVSA, the earliest that the new programs can be introduced is 2020

8 II. DESCRIPTION OF PROPOSED CHANGES Revision of PDO 19. The terminology and activation of social assistance beneficiaries will be dropped from the original PDO and the corresponding DLI will be dropped from the project for reasons outlined above. The loan proceeds related to this activity will be reallocated. Activation of social assistance beneficiaries will continue to be indirectly supported by other activities under the Project, but the DLI is no longer directly supported. Adjustment of DLIs 20. Full matrix of proposed adjustment to DLIs is provided in Annex 2. Summary of the changes includes: Component 1: Policy planning, monitoring, and coordination (PPMC) 21. DLI #1 for 2018 will be dropped and related loan proceeds reallocated to Component 3 (to DLI #3 and #5) of the Project as the DLI is redundant given the responsibility for coordination and piloting of policy, planning and monitoring tools has been moved to the new cabinet-level process. TA support provided under the Project will continue to provide support to the Public Policy Secretariat and the participating ministries to build capacity for policy coordination and monitoring in the areas related to the project. Component 2: Investment and Export Promotion 22. DLI #2 will be adjusted to reflect increased relevance of enterprise development and upgrading programs (beyond only export promotion). This is to reflect the changing priority for government, whereby Enterprise development, including through supplier development, has gained more importance as a strategic objective for the Serbia Development Agency and Ministry of Economy. The DLI has been revised to reflect the priority and the timeline for this DLI has been shifted as per Annex 2, to reflect the implementation delays and allow enough time to complete the activities supported by the Project. Component 3: Innovation 23. The timeline for DLI #3 will be shifted, as the funding for the Mini- and Matching Grants was not included in the national budget for Also, this DLIs will be revised to include additional programs (collaborative grant scheme to incentivize collaboration between SMEs and public research institutes, innovation vouchers, and new technology transfer service lines) that the Innovation Fund has successfully introduced since the project started and ensure funding for these programs is available going forward. No changes are proposed for DLI # DLI #5, will be revised to better reflect recent momentum around public sector reform in the area of research. Proposed new reforms go beyond the original reforms supported by this DLI, as it is now planned that the reforms will be anchored in the government s new Law on Science, and accompanying Science Fund. The timeline for implementing this DLI will also be adjusted to reflect the timeline for implementation of the new Law and Fund. Component 4: Labor

9 25. Technical adjustments to DLI #6 will be made by revising the targeted number of unemployed transitioning into formal jobs; and by targeting actual visits by NES to employers instead of all contacts with employers, as the visits are deemed more relevant. Also, timeline for DLI #8 will be revised to reflect the delays discussed above. 26. DLI #9 for 2017 and 2018 will be dropped from the Project, as the reforms supported by this DLI are no longer seen as a Government priority and have very limited traction. The loan proceeds related to this activity will be reallocated to Component 3. Changes in the Results Framework 27. There are no changes to the PDO level indicators, other than accommodating the revised project closing date. Changes to several intermediate indicators are provided in Annex 1. These reflect the proposed adjustments to the project design and the revised closing date outlined above. In addition, new intermediate indicators for public research reforms are proposed to reflect the expanded reform agenda. Implementation arrangements and legal covenants 28. Given it has been agreed that the separate PIU established under MoLEVSA will be dissolved (see para 15), the associated legal covenant under the project Loan Agreement will be dropped. Reallocation of proceeds between components and disbursement categories 29. As discussed above, DLI #1 for 2018 and DLI #9 for 2017 and 2018 are being dropped. The related loan proceeds will be reallocated to DLI #3 and DLI #5 to support more substantive progress anticipated with activities supported by these DLIs (see also paragraphs 23 and 24, and Annex 2). 30. With the closing of the separate PIU in MoLEVSA, funds which were originally allocated for the PIU in MoLEVSA and for the TA for the Labor component will be re-allocated to the main PIU and the main TA component of the project (i.e. Part B.2 of the Project is being cancelled, and the corresponding resources reallocated to Part B.1). 31. A small increase in PIU and TA funding is needed to accommodate the additional costs associated with extension of the project, which will be accomplished by reallocating funding from Part A to Part B of the Project. Extension of the Project s closing date 32. The Project Closing Date will be extended from June 30, 2019 to June 30, 2021 so as to provide sufficient time for completion of all activities supported by the project and the full achievement of the PDO. All of the activities supported by the Project are expected to be completed by end-december Same as in the original project design the additional six months until the Project closing date are to facilitate delivery of documentary evidence and verification of DLIs, preparation of the final progress report, and various other technical activities related to closing the Project. Other issues 33. The project Procurement Plan will be updated and revised to reflect the changes discussed above, including both the proposed extension of the closing date and the revised implementation arrangements (i.e. closing down of the separate PIU in

10 MoLEVSA and dropping of Part B.2 of the Project), as well as adjustments in the TA as required. The main changes envisaged around TA relate to need for enhanced support to MoESTD for more systemic reforms of the public sector financing, and support with complementary reforms of the research and innovation sector, such as the establishment of the new Science Fund, as well as targeted support for the development of Strategy of Smart Specialization, etc. 34. Following the restructuring, Project Operations Manual will be revised to reflect the adjustments to the Project, including the verification protocols for the revised DLIs and the new implementation arrangements (i.e. dissolving the separate PIU in MoLEVSA and consolidating all project implementation and management activities in the main PIU). III. SUMMARY OF CHANGES Changed Not Changed Change in Project's Development Objectives Change in Results Framework Change in Components and Cost Change in Loan Closing Date(s) Reallocation between Disbursement Categories Change in Disbursements Arrangements Change in Disbursement Estimates Change in Legal Covenants Change in Institutional Arrangements Change in Financial Management Change in Procurement Change in Implementation Schedule Change in Implementing Agency Change in DDO Status Cancellations Proposed Change in Overall Risk Rating Change in Safeguard Policies Triggered Change of EA category Other Change(s)

11 PDO_IND_TABLE The World Bank Change in Economic and Financial Analysis Change in Technical Analysis Change in Social Analysis Change in Environmental Analysis IV. DETAILED CHANGE(S) OPS_DETAILEDCHANGES_PDO_TABLE PROJECT DEVELOPMENT OBJECTIVE Current PDO The PDO is to improve the effectiveness and coordination of selected public programs to alleviate constraints to competitivenessand job creation, including investment and export promotion, innovation, active labor market programs, labor intermediation, and activation of social assistance beneficiaries. Proposed New PDO The PDO is to improve the effectiveness and coordination of selected public programs to alleviate constraints to competitiveness and job creation, including investment and export promotion, innovation, active labor market programs and labor intermediation. OPS_DETAILEDCHANGES_RESULTS_TABLE RESULTS FRAMEWORK Project Development Objective Indicators New investor leads generated by the reformed investment promotion agency (annual) Value Revised Participants in export promotion programs that engage in new export activities (annual) Value Revised New collaborations facilitated between research organizations and the private sector

12 Value Revised NES registered unemployment cases transitioning into formal job (annual) Value Revised Intermediate Indicators IO_IND_TABLE Annual performance reviews of pilot policy planning, monitoring, and coordination system (to support competitveness and jobs reforms) (see DL1) Value Marked for Deletion Date 01-Jan Dec Dec-2018 MoE investment and export promotion programs restructured [DLI 2] Unit of Measure: Text Value DLI Table partial DLI achieved DLI Table Revised Number of documented interests by investors (annual) Value Revised

13 Private financing catalyzed through IF support programs (Ammount USD) Unit of Measure: Text Value 0.3m 0 3.6m Revised Enterprises and startups financed through Innovation Fund programs (including MMG) Value Revised Enterprises and startups financed with female owner Breakdown Value Revised Innovative products or services developed by MG beneficiary firms Value Revised Date 31-Dec Jun Dec-2020 Innovative products or services launched by MG beneficiary firms Value Revised

14 Technology transfer: IF TTF service lines deployed [see DLI 4] Unit of Measure: Text Value Revised Technology transfer: transactions initiated [see DLI 4] Value Revised R&I strategy, action plan, RI Roadmap and public research sector reforms including establishment of Science Fund designed and adopted Unit of Measure: Text Value See DLI Table DLI not achieved See DLI Table Revised Citizen Engagement: Innovation matching grant beneficiary annual survey (number of surveys) Value Revised NES registered female unemployment cases transitioning into formal job Value Revised

15 Number of field visits to employers per year by the NES (Number) Unit of Measure: Text Value 15,927 (field visits) ,000 Revised % of total NES staff that is operating as certified case worker [DLI 6] Unit of Measure: Percentage Value Revised Standard Deviation of mean case load per branch office over all branch offices [DLI 7] Value Revised Date 01-Jan Dec Dec-2020 Gross placement rate of NES start-up support program for self-employment 6 months from completion Unit of Measure: Percentage Value Revised Date 31-Dec Dec Dec-2020 Gross placement rate of NES hiring subsidy program for new employment 6 months from completion Unit of Measure: Percentage Value Revised Date 31-Dec Dec Dec-2020

16 Number of new or re-designed ALMPs in the NES [DLI 8] Value Revised Date 31-Jan Dec Dec-2020 Average effective tax rate for social assistance beneficiary with two children and nonworking spouse transitioning to a half-time minimum wage job [DLI 9] Unit of Measure: Percentage Value Marked for Deletion Date 31-Dec Dec Dec-2018 Citizen engagement: Number of employers reached by client satisfaction and needs survey Value No Change Date 31-Dec Dec Dec-2018 Science Fund programs initiated Value New Date 29-Dec Mar Dec-2020 Science Fund programs competitive grants awarded Value New Date 29-Dec Mar Dec-2020 Number of firms participating in the new Supplier Development Program

17 OPS_DETAILEDCHANGES_COMPONENTS_TABLE OPS_DETAILEDCHANGES_LOANCLOSING_TABLE The World Bank Value New Date 29-Dec Mar Dec-2020 COMPONENTS Current Component Name Policy planning, monitoring, and coordination Investment and export promotion Current Cost (US$M) Action 4.00 Revised No Change Proposed Component Name Policy planning, monitoring, and coordination Investment and export promotion Proposed Cost (US$M) Innovation Revised Innovation Labor Revised Labor Project management and technical assistance 4.75 Revised Project management and technical assistance TOTAL LOAN CLOSING DATE(S) Ln/Cr/Tf Status Original Closing Revised Closing(s) Proposed Closing Proposed Deadline for Withdrawal Applications IBRD Effective 30-Jun Jun Oct-2021 OPS_DETAILEDCHANGES_REALLOCATION _TABLE REALLOCATION BETWEEN DISBURSEMENT CATEGORIES Current Allocation Actuals + Committed Proposed Allocation Financing % (Type Total) Current Proposed IBRD Currency: EUR

18 OPS_DETAILEDCHANGES_LEGCOV_TABLE The World Bank ilap Category Sequence No: 1 Current Expenditure Category: EEPs under Part A 85,025, ,705, ,625, ilap Category Sequence No: 2 Current Expenditure Category: G,non-CS,CS,TR,OC Part B1 3,817, , ,600, ilap Category Sequence No: 3 Current Expenditure Category: CS, Part B.2 434, , , Total 89,276, ,592, ,276, OPS_DETAILEDCHANGES_DISBURSEMENT_TABLE DISBURSEMENT ESTIMATES Change in Disbursement Estimates Yes Year Current Proposed ,657, ,657, ,244, ,244, ,096, ,308, ,001, ,340, ,940, ,509, LEGAL COVENANTS Loan/Credit/TF Description Status Action IBRD Finance Agreement :Maintain PPS through Project implementation Description :Loan Agreement Schedule 2, Section I.A.1. The Borrower shall maintain and operate, throughout Project implementation, PPS in a manner, with resources, staff, terms of reference, Complied with No Change

19 functions and responsibilities satisfactory to the Bank. Frequency :CONTINUOUS IBRD Finance Agreement :Maintain PIU through Project implementation Description :Loan Agreement Schedule 2, Section I.A.2. The Borrower, through PPS, shall establish and, thereafter, operate and maintain throughout Project Implementation the PIU, as a technical coordination unit of the Project, with technical experts and other personnel in adequate numbers and with qualifications, and with terms and conditions, all satisfactory to the Bank, including a PIU director, a procurem Frequency :CONTINUOUS Complied with No Change IBRD Finance Agreement :Matching Grant Program and Safeguards Description :Loan Agreement Schedule 2, Section I.A.3. In respect of Part A.3.(a) of the Project, the Borrower shall ensure that the Matching Grants Program is implemented in a manner satisfactory to the Bank, and in accordance with the Matching Grants Manual, the Environmental and Social Management Framework ( ESMF ) and any applicable Environmental Management Plan ( EMP ) thereunder. Frequency :CONTINUOUS Complied with No Change IBRD Finance Agreement :MoLEVSA s implementation of Part B.2 of the Project Description :Loan Agreement Schedule 2, Section I.A.4. The Borrower, through MoLEVSA, shall carry out the procurement, financial management and other associated activities, in coordination with PPS for Project reporting purposes, all in accordance with the Project Operations Manual, and with resources, staff (including a procurement specialist), terms of reference, functions and responsibilities satisfactory t Frequency :CONTINUOUS Complied with Marked for Deletion

Project Progress Report

Project Progress Report Competitiveness and Jobs Project IBRD RBM Landing Operation Project ID: P152104 Project Progress Report January Jun 2016 Public Policy Secretariat, Republic of Serbia for Inter-Ministerial Working Body

More information

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31045 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO

More information

The World Bank Social Assistance System Strengthening Project (P123960)

The World Bank Social Assistance System Strengthening Project (P123960) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SOCIAL ASSISTANCE SYSTEM STRENGTHENING PROJECT APPROVED ON JANUARY 22,

More information

Loan Agreement (Competitiveness and Jobs Project)

Loan Agreement (Competitiveness and Jobs Project) Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS Loan Agreement (Competitiveness and Jobs Project) between REPUBLIC OF SERBIA and LOAN NUMBER 8528-YF Public Disclosure Authorized

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized DOCUMENT OF THE WORLD BANK REPORT NO.: RES30282 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized MEXICO

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008 Public Disclosure Authorized RESTRUCTURING PAPER REPORT NO.: RES29620 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT

More information

The World Bank Disease Prevention and Control Project (P128442)

The World Bank Disease Prevention and Control Project (P128442) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF DISEASE PREVENTION AND CONTROL PROJECT APPROVED ON MARCH 27, 2013 TO REPUBLIC OF ARMENIA

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES24803 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES12428 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE

More information

The World Bank Industrial Waste Management and Cleanup Project (P122139)

The World Bank Industrial Waste Management and Cleanup Project (P122139) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDUSTRIAL WASTE MANAGEMENT AND CLEANUP PROJECT APPROVED ON SEPTEMBER

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31490 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31013 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000) Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

The World Bank NEITI Reporting Compliance (P162344)

The World Bank NEITI Reporting Compliance (P162344) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NEITI REPORTING COMPLIANCE APPROVED ON DECEMBER 7, 2016 TO FEDERAL MINISTRY

More information

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank LK GPOBA - Access to Sanitation Project (P111161) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Lebanon Social Protection & Labor Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 09-Jan-2017

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT Public Disclosure Authorized REPORT NO.: RES33563 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES

More information

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDIA: BIHAR INTEGRATED SOCIAL PROTECTION STRENGTHENING PROJECT APPROVED

More information

State Owned Financial Institutions Reform Project (P156837)

State Owned Financial Institutions Reform Project (P156837) EUROPE AND CENTRAL ASIA Serbia Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 2 ARCHIVED on 12-Dec-2018 ISR34752 Implementing Agencies: Republic

More information

The World Bank Sustainable Croatian Railways in Europe (P147499)

The World Bank Sustainable Croatian Railways in Europe (P147499) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SUSTAINABLE CROATIAN RAILWAYS IN EUROPE APPROVED ON APRIL 30, 2015 TO HZ INFRASTRUCTURE,HZ

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451) SOUTH ASIA Pakistan Macroeconomics, Trade and Investment Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 27-Jun-2018 ISR33129 Implementing Agencies:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

The World Bank Kabeli-A Hydro Electric Project (P122406)

The World Bank Kabeli-A Hydro Electric Project (P122406) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF KABELI-A HYDRO ELECTRIC PROJECT APPROVED ON JULY 1, 2014 TO NEPAL REPORT NO.: RES32467

More information

The World Bank Water and Sanitation in Tourist Areas (P054221)

The World Bank Water and Sanitation in Tourist Areas (P054221) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WATER AND SANITATION IN TOURIST AREAS APPROVED ON APRIL 2, 2009 TO THE

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 STATE OF RIO GRANDE DO SUL, BRAZIL

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 STATE OF RIO GRANDE DO SUL, BRAZIL Public Disclosure Authorized The World Bank REPORT NO.: RES29864 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 TO

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31608 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845)

Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845) Operation Name: Afghanistan

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: RES22488 Public Disclosure Authorized

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Operation Name: Local Government

More information

Implementation Status & Results Kosovo Public Sector Modernization Project (P101614)

Implementation Status & Results Kosovo Public Sector Modernization Project (P101614) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Kosovo Public Sector Modernization Project (P101614) Operation Name: Public Sector Modernization Project (P101614)

More information

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133)

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Government Financial Management and Revenue

More information

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

The World Bank Building a Modern Fiscal System Technical Assistance (P154694) Public Disclosure Authorized EAST ASIA AND PACIFIC China Macro Economics & Fiscal Management Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 15-Jun-2017 ISR26699 Implementing

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Project No: 105602 PROPOSED PROJECT

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Afghanistan Governance Global Practice Recipient Executed Activities Technical Assistance Loan FY 2011 Seq No: 12 ARCHIVED on 15-May-2017 ISR28000 Implementing Agencies:

More information

The World Bank DTF: MA-Local Government Support Program (P144438)

The World Bank DTF: MA-Local Government Support Program (P144438) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2014

More information

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MOZAMBIQUE - ARTISANAL FISHERIES AND CLIMATE CHANGE APPROVED ON MARCH

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT

More information

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567) EUROPE AND CENTRAL ASIA Albania Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 2 ARCHIVED on 17-Oct-2017 ISR29727 Implementing Agencies: Key Dates

More information

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

The World Bank Kenya Infrastructure Finance/PPP project (P121019) Public Disclosure Authorized AFRICA Kenya Financial Systems Practice Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 4 ARCHIVED on 22-Dec-2014 ISR17114 Implementing Agencies: Public Private

More information

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility

More information

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Public Disclosure Copy

Public Disclosure Copy SOUTH ASIA Bangladesh Financial Management Global Practice Recipient Executed Activities Technical Assistance Loan FY 2011 Seq No: 4 ARCHIVED on 26-Feb-2015 ISR18034 Implementing Agencies: Key Dates Key

More information

The World Bank Municipal Services Improvement (P096481)

The World Bank Municipal Services Improvement (P096481) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Macedonia, former Yugoslav Republic of Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 15 ARCHIVED on 15-Jun-2015

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Turkey Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 8 ARCHIVED on 16-Oct-2017 ISR29893 Implementing Agencies:

More information

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770) Public Disclosure Authorized SOUTH ASIA Bangladesh Governance Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 7 ARCHIVED on 05-Jun-2017 ISR28344 Implementing Agencies: National Board of Revenue,

More information

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 24-Dec-2017 ISR31037 Implementing Agencies:

More information

Assam State Public Finance Institutional Reforms (ASPIRe) Project (P157198)

Assam State Public Finance Institutional Reforms (ASPIRe) Project (P157198) Public Disclosure Authorized SOUTH ASIA India Governance Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 17-Jan-2019 ISR35620 Implementing Agencies: Republic of India,

More information

Seq No: 5 ARCHIVED on 29-May-2018 ISR31357 Created by: Laila Ashraf AbdelKader Ahmed on 23-Jan-2018 Modified by: Laurent Gonnet on 21- May-2018

Seq No: 5 ARCHIVED on 29-May-2018 ISR31357 Created by: Laila Ashraf AbdelKader Ahmed on 23-Jan-2018 Modified by: Laurent Gonnet on 21- May-2018 Public Disclosure Authorized The World Bank MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Finance, Competitiveness and Innovation Global Practice Requesting Unit: MNC03 Responsible Unit: GFCMW IBRD/IDA

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL) Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18226 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18411 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

TR Third Access to Finance for SMEs (SME III) (P130864)

TR Third Access to Finance for SMEs (SME III) (P130864) EUROPE AND CENTRAL ASIA Turkey Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 9 ARCHIVED on 17-Oct-2018 ISR34297 Implementing Agencies: T.

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Nigeria Governance Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq

More information

Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770) Public Disclosure Authorized SOUTH ASIA Bangladesh Governance Global Practice Requesting Unit: SACBD Responsible Unit: GGOES IBRD/IDA Program-for-Results Financing FY 2014 Team Leader(s): Furqan Ahmad

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Ghana Environment & Natural Resources Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 8 ARCHIVED on 29-Feb-2016 ISR22549 Implementing

More information

The World Bank Malawi Strategic Program for Climate Resilience (P163245)

The World Bank Malawi Strategic Program for Climate Resilience (P163245) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MALAWI STRATEGIC PROGRAM FOR CLIMATE RESILIENCE APPROVED ON NOVEMBER

More information

Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964)

Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964) Operation Name: National

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 16-Jun-2016 ISR23892 Implementing

More information

Nigeria - Program to Support Saving One Million Lives (P146583)

Nigeria - Program to Support Saving One Million Lives (P146583) Public Disclosure Authorized AFRICA Nigeria Health, Nutrition & Population Global Practice Requesting Unit: AFCW2 Responsible Unit: GHN07 IBRD/IDA Program-for-Results FY 2015 Team Leader(s): Benjamin P.

More information

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Lao People's Democratic Republic Lao PDR - Mainstreaming

More information

The World Bank CG Rep. Skills Development for Employability Project (P128628)

The World Bank CG Rep. Skills Development for Employability Project (P128628) Public Disclosure Authorized AFRICA Congo, Republic of Education Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 17-Jun-2017 ISR27973 Implementing Agencies: Ministry

More information

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770) Public Disclosure Authorized SOUTH ASIA Bangladesh Governance Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 5 ARCHIVED on 30-Jun-2016 ISR24364 Implementing Agencies: National Board of Revenue

More information

Implementation Status & Results Nigeria Nigeria Edo State First Development Policy Operation (P123353)

Implementation Status & Results Nigeria Nigeria Edo State First Development Policy Operation (P123353) Public Disclosure Authorized Public Disclosure Authorized Project Name: Implementation Status & Results Nigeria Nigeria Edo State First Development Policy Operation (P123353) Nigeria Edo State First Development

More information

Reform of the public employment services in the Republic of Serbia

Reform of the public employment services in the Republic of Serbia Reform of the public employment services in the Republic of Serbia Ljiljana Dzuver Assistant Minister Ministry of Labour, Employment, Veterans and Social Affairs Content of Presentation Reforms and labour

More information

Public Disclosure Copy

Public Disclosure Copy AFRICA Western Africa Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 2 ARCHIVED on 11-Jun-2018 ISR32159 Implementing Agencies: CRRH, BOAD,

More information

Bangladesh Insurance Sector Development Project (P156823)

Bangladesh Insurance Sector Development Project (P156823) SOUTH ASIA Bangladesh Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 11-Oct-2018 ISR34079 Implementing Agencies: PEOPLE'S REPUBLIC

More information

The World Bank MW: Mining Governance and Growth Support Project (P120825)

The World Bank MW: Mining Governance and Growth Support Project (P120825) Public Disclosure Authorized AFRICA Malawi Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 10 ARCHIVED on 05-Jan-2018 ISR28752 Implementing Agencies: Government

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 31-Aug-2016 Report : PIDISDSC18959 Public Disclosure Authorized Public Disclosure Authorized

More information

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY DOCUMENT OF THE WORLD BANK REPORT NO.: RES29941 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 TO TRANSPORT & ICT

More information

Financial Education and Financial Literacy (P120338)

Financial Education and Financial Literacy (P120338) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Russian Federation Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq : 16 ARCHIVED on 27-v-2018

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Ghana Environment & Natural Resources Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 7 ARCHIVED on 10-Aug-2015 ISR18623 Implementing

More information

ACTIVITY COMPLETION SUMMARY (ACS)

ACTIVITY COMPLETION SUMMARY (ACS) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized ACTIVITY COMPLETION SUMMARY (ACS) Azerbaijan: Mainstreaming EITI Implementation (ID: P162544) Azerbaijan

More information

The World Bank IN Swachh Bharat Mission Support Operation (P153251)

The World Bank IN Swachh Bharat Mission Support Operation (P153251) Public Disclosure Authorized SOUTH ASIA India Water Global Practice IBRD/IDA Program-for-Results FY 2016 Seq No: 2 ARCHIVED on 05-Feb-2017 ISR24559 Implementing Agencies: Public Disclosure Authorized Program

More information

Public Disclosure Copy

Public Disclosure Copy LATIN AMERICA AND CARIBBEAN Honduras Energy & Extractives Global Practice Recipient Executed Activities Technical Assistance Loan FY 2014 Seq No: 1 ARCHIVED on 16-Oct-2015 ISR20092 Implementing Agencies:

More information

Implementation Status & Results Tajikistan Tax Administration (P127807)

Implementation Status & Results Tajikistan Tax Administration (P127807) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tajikistan Tax Administration (P127807) Operation Name: Tax Administration (P127807) Project Stage:

More information

The World Bank Pakistan Punjab Jobs and Competitiveness Program for Results (P155963)

The World Bank Pakistan Punjab Jobs and Competitiveness Program for Results (P155963) Public Disclosure Authorized SOUTH ASIA Pakistan Trade & Competitiveness Global Practice IBRD/IDA Program-for-Results FY 2016 Seq No: 3 ARCHIVED on 14-Aug-2017 ISR28997 Implementing Agencies: Government

More information

Key Dates. Project Development Objectives. Components. Overall Ratings

Key Dates. Project Development Objectives. Components. Overall Ratings Public Disclosure Authorized AFRICA Madagascar Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 08-Jun-2018 ISR32759 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy AFRICA Congo, Republic of Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 13 ARCHIVED on 29-Mar-2017 ISR27236 Implementing Agencies: Key Dates Key Project Dates

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Completion Report Project Number: 46220-001 Loan Number: 3155 June 2017 Armenia: Infrastructure Sustainability Support Program This document is being disclosed to the public in accordance with ADB s Public

More information

Public Disclosure Copy. Name Previous Rating Current Rating

Public Disclosure Copy. Name Previous Rating Current Rating Public Disclosure Authorized AFRICA Kenya Social Protection & Labor Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 8 ARCHIVED on 30-Oct-2017 ISR28662 Implementing Agencies: Department for

More information

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778)

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Operation Name: Revenue Administration

More information

Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313)

Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313) Operation Name: SAMOA HEALTH

More information

Second Science & Technology Project (P127308)

Second Science & Technology Project (P127308) EUROPE AND CENTRAL ASIA Croatia Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 12 ARCHIVED on 31-Oct-2018 ISR33160 Implementing Agencies:

More information

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National

More information

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770) Public Disclosure Authorized SOUTH ASIA Bangladesh Governance Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 3 ARCHIVED on 09-Sep-2015 ISR20285 Implementing Agencies: National Board of Revenue

More information

The World Bank NP: Strengthening the Office of the Auditor General (P127040)

The World Bank NP: Strengthening the Office of the Auditor General (P127040) Public Disclosure Authorized SOUTH ASIA Nepal Financial Management Global Practice Recipient Executed Activities Specific Investment Loan FY 2012 Seq No: 3 ARCHIVED on 20-Feb-2015 ISR18017 Implementing

More information