FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

Size: px
Start display at page:

Download "FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN"

Transcription

1 Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN BOARD APPROVAL: MAY 13, 2014 TO THE GEORGIA July 20, 2016 Public Disclosure Authorized ENERGY AND EXTRACTIVES GLOBAL PRACTICE EUROPE AND CENTRAL ASIA REGION

2 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. 2

3 ABBREVIATIONS AND ACRONYMS ABTL EIRR EMS OPGW PDO SESA SCADA TGSP Akhaltsikhe Batumi Transmission Line Economic Internal Rate of Return Energy Management System Optical Ground Wire Project Development Objective Strategic Environmental and Social Assessment Supervisory Control and Data Acquisition Transmission Grid Strengthening Project Regional Vice President: Country Director: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: 3 Cyril Muller Mercy Tembon Anita Marangoly George Ranjit Lamech Joseph Melitauri

4 GEORGIA Transmission Grid Strengthening Project (P147348) CONTENTS A. SUMMARY 5 B. PROJECT STATUS 5 C. PROPOSED CHANGES 5 D. APPRAISAL SUMMARY 11 ANNEX 1: RESULTS FRAMEWORK AND MONITORING 13 4

5 A. SUMMARY The proposed Level-II project restructuring is to utilize project savings for the IBRD Loan (Loan No GE) for the Georgia Transmission Grid Strengthening Project, (P147348) for financing rehabilitation and upgrade of an existing 220 kv overhead high voltage transmission lines connecting high voltage substations Menji, Tskaltubo, Kutaisi, and Zestaphoni, rehabilitation and upgrade of the same substations, and upgrade the existing Supervisory Control and Data Acquisition and Energy Management System (SCADA/EMS). The Project, in the amount of US$60 million, was approved on May 13, It is financed through an IBRD Loan (Loan No GE). The Project Development Objectives (PDO) are to provide reliable power transmission to the southwestern part of the grid, upgrade electricity exchange systems, and provide economically efficient, environmentally and socially sustainable electricity sector planning. The Project consists of four components; component 1: Transmission System Strengthening which finances construction of a high voltage transmission line from Akhaltsikhe to Batumi (ABT), component 2: Wholesale Power Exchange Platform; which finances the design, supply and installation of a power exchange platform, component 3: Preparation of Electricity Sector Strategic Environmental and Social Assessment, and component 4: project management and preparation of transmission systems studies. Georgia s Ministry of Finance requested reconstruction of the transmission lines connecting high voltage substations Menji, Tskaltubo Kutaisi and Zestaphoni and upgrade of the SCADA/EMS in letters dated December 25, 2015 and July 6, The request for financing is recorded in the aide-memoire dated June 10, 2016 of the implementation support mission carried out between March 7, March 11, 2016 and May 24, May 25, B. PROJECT STATUS The overall implementation of the project is on track. The IBRD Loan is 24 percent disbursed. Judged by implementation progress the project will achieve its stated objectives, current progress to achieving PDO is satisfactory and overall implementation progress is moderately satisfactory. Moderately satisfactory overall implementation progress is caused by slow implementation of the Component 3; Electricity Sector Strategic Environmental and Social Assessment. Financial management performance of the project is rated Satisfactory. There are no overdue audits. All other project activities, i.e., civil work contracts and institutional strengthening activities, are on track and are expected to be completed by the original closing date of March 31, The status of each component is described below: Component 1: (US$52.35 million) Transmission System Strengthening. This component finances design and supply of the ABT line and supervision services. The contract for the design and supply of the transmission line has been signed on April 27, The 5

6 preparation of the design for the line is nightly percent complete. Delivery of the conductors for the transmission line is complete. Contract for the supervision services and management of the contract was signed on April 23, Implementation of this component is on track. Component 2: (US$6.00 million) Wholesale Power Exchange Platform. This component finances design, supply and installation of a power exchange platform. Selection of the consultant to prepare technical specifications for the supply and installation of the Platform is on track. Component 3: (US$1.00 million) Preparation of Electricity Sector Strategic Environmental and Social Assessment (SESA). Implementation of this component is off track. Proposals for the preparation of SESA has been received from the shortlisted consultants, however the selection of the consultant has not been completed. The delay with implementation has been flagged to the government in the recent aide-memoire dated June 10, Component 4: (US$0.50 million) project management and preparation of transmission systems studies. The implementation of this component is on track. Selection of the consultant for preparation of the feasibility study for the new transmission line has started. C. PROPOSED CHANGES The proposed Level-II restructuring will accommodate the following changes: (i) Provision of goods and equipment for reconstruction the total 102 km of the three 220 kv transmission lines; Sataphlia line connecting high voltage substations Tskaltubo and Kutaisi, Ajameti line connecting substations Kutaisi and Zestaphoni, and Kolkhida line connecting substations Menji and Kutaisi. The goods and equipment include towers, foundations, conductors, Optical Ground Wire (OPGW), fittings, steel structures and protections equipment, and spare parts for the substations Menji, Tskaltubo, Kutaisi and Zestaphoni; (ii) Provision of the software for upgrading of the existing SCADA/EMS; and (iii) Revision of the Results Framework to accommodate the above change and the final targets of several project indicators. RATIONALE Reconstruction of the Menji-Kutaisi, Tskaltubo-Kutaisi and Kutaisi-Zestaphoni overhead high voltage transmission lines will further strengthen the southwestern part of the grid through providing stability of the overall transmission grid as the proposed lines serve as a backup to the 500 kv backbone of the transmission grid. The reconstruction which entails rehabilitation and upgrade of the lines is included in the 10 year network development plan which was approved by the Ministry of Energy on December 31, Expansion of the scope of the original project to include reconstruction (rehabilitation and upgrade) of the Menji-Kutaisi, Tskaltubo-Kutaisi, and Kutaisi-Zestaphoni lines and 6

7 substations Menji, Tskaltubo, Kutaisi, and Zestaphoni has been possible due to project savings. The rehabilitation and upgrade of these lines will ensure the stability of the western part of the transmission grid in case of failure of 500 kv Imereti line and avoid overloading of the southwestern part including project financed ABT line. The Component 1, Transmission System Strengthening will be modified to include provision of goods and equipment for rehabilitation and upgrade of the three overhead high voltage transmission lines; Kolkhida - connecting Menji and Kutaisi substations, Sataphlia connecting substations Tskaltubo and Kutaisi and Ajameti connecting substations Kutaisi and Zestaphoni, and rehabilitation and upgrade of the Menji, Tskaltubo, Kutaisi and Zestaphoni substations. The existing SCADA/EMS was financed by the Bank support through Electricity Market Support Project in more than 10 year ago. Board approved the project in in May 2001 and project was closed in The SCADA/EMS system reached end of its expected lifespan and requires upgrade to respond to the needs of the future regional power exchange. The component 2, will be modified to include financing of the software to upgrade of the SCADA/EMS. RESULTS/INDICATORS The results framework is suggested to be modified to reflect the addition of rehabilitated high voltage transmission lines and update of SCADA/EMS. Hundred and two kilometers will be added to the target value of the core indicator transmission lines constructed or rehabilitated under the project. The end target for the indicator will be increased from 142 km to 244 km. An additional core indicator, transmission lines rehabilitated, will be added. The end target for this indicator will be sent at 102 km. Four intermediary results indicators will be added as follows: (i) rehabilitation of Menji Kutaisi 220 kv line, (ii) upgrade of Tskaltubo Kutaisi 220 kv line to double circuit, (iii) upgrade of Kutaisi Zestaphoni 220kV line, and (iv) upgrade of SCADA/EMS. A revised table is attached in the annex. 7

8 DATA SHEET Georgia Transmission Grid Strengthening Project (P147348) EUROPE AND CENTRAL ASIA Energy & Extractives Report No: RES22664 Basic Information Project ID: P Lending Instrument: Investment Project Financing Regional Vice President: Cyril E Muller Original EA Category: Full Assessment (A) Country Director: Mercy Miyang Tembon Current EA Category: Full Assessment (A) Senior Global Practice Director: Practice Manager/Manager: Team Leader(s): Anita Marangoly George Original Approval Date: 13-May-2014 Ranjit J. Lamech Current Closing Date: 31-Mar-2019 Joseph Melitauri Borrower: Responsible Agency: Ministry of Finance Ministry of Energy, Georgian State Electrosystem Restructuring Type Form Type: Full Restructuring Paper Decision Authority: CD Decision Restructuring Level: Level 2 Financing ( as of 18-Jul-2016 ) Key Dates Project Ln/Cr/TF Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P IBRD Effective 13-May Sep Dec Mar Mar-2019 Disbursements (in Millions) Project Ln/Cr/TF Status Currency Original Revised Cancelle d Disburse d Undisbur sed % Disburse d P IBRD Effective USD

9 Policy Waivers Does the project depart from the CAS/CPF in content or in other significant respects? 9 Yes [ ] No [ X ] Does the project require any policy waiver(s)? Yes [ ] No [ X ] A. Summary of Proposed Changes The proposed Level-II project restructuring is to utilize project savings for the IBRD Loan (Loan No GE) for the Georgia Transmission Grid Strengthening Project (TGSP, P147348) for financing reconstruction (rehabilitation and upgrade) of an existing 220 kv high voltage overhead transmission lines connecting high voltage substations Menji-Kutaisi, Tskaltubo-Kutaisi, and Kutaisi-Zestaphoni, rehabilitation of the same substations, and upgrade of the existing SCADA/EMS. Change in Implementing Agency Yes [ ] No [ X ] Change in Project's Development Objectives Yes [ ] No [ X ] Change in Results Framework Yes [ X ] No [ ] Change in Safeguard Policies Triggered Yes [ ] No [ X ] Change of EA category Yes [ ] No [ X ] Other Changes to Safeguards Yes [ ] No [ X ] Change in Legal Covenants Yes [ ] No [ X ] Change in Loan Closing Date(s) Yes [ ] No [ X ] Cancellations Proposed Yes [ ] No [ X ] Change to Financing Plan Yes [ ] No [ X ] Change in Disbursement Arrangements Yes [ ] No [ X ] Reallocation between Disbursement Categories Yes [ ] No [ X ] Change in Disbursement Estimates Yes [ X ] No [ ] Change to Components and Cost Yes [ X ] No [ ] Change in Institutional Arrangements Yes [ ] No [ X ] Change in Financial Management Yes [ ] No [ X ] Change in Procurement Yes [ ] No [ X ] Change in Implementation Schedule Yes [ ] No [ X ] Other Change(s) Yes [ ] No [ X ] Appraisal Summary Change in Economic and Financial Analysis Yes [ X ] No [ ] Appraisal Summary Change in Technical Analysis Yes [ ] No [ X ] Appraisal Summary Change in Social Analysis Yes [ X ] No [ ] Appraisal Summary Change in Environmental Analysis Yes [ X ] No [ ] Appraisal Summary Change in Risk Assessment Yes [ ] No [ X ] B. Project Status The overall implementation of the project is on track. The IBRD Loan is 24 percent disbursed. Judged by implementation progress the project will achieve its stated objectives, current progress to achieving PDO is

10 satisfactory and overall implementation progress is moderately satisfactory. Moderately satisfactory overall implementation progress is caused by slow implementation of the Component 3; Electricity Sector Strategic Environmental and Social Assessment. Financial management performance of the project is rated Satisfactory. There are no overdue audits. All other project activities, i.e., civil work contracts and institutional strengthening activities, are on track and are expected to be completed by the original closing date of March 31, The status of each component is described below: Component 1: (US$52.35 million) Transmission System Strengthening. This component finances design and supply of the ABT line and supervision services. The contract for the design and supply of the transmission line has been signed on April 27, The preparation of the design for the line is nightly percent complete. Delivery of the conductors for the transmission line is complete. Contract for the supervision services and management of the contract was signed on April 23, Implementation of this component is on track. Component 2: (US$6.00 million) Wholesale Power Exchange Platform. This component finances design, supply and installation of a power exchange platform. Selection of the consultant to prepare technical specifications for the supply and installation of the Platform is on track. Component 3: (US$1.00 million) Preparation of Electricity Sector Strategic Environmental and Social Assessment (SESA). Implementation of this component is off track. Proposals for the preparation of SESA has been received from the shortlisted consultants, however the selection of the consultant has not been completed. The delay with implementation has been flagged to the government in the recent aide-memoire dated June 10, Component 4: (US$0.50 million) project management and preparation of transmission systems studies. The implementation of this component is on track. Selection of the consultant for preparation of the feasibility study for the new transmission line has started. C. Proposed Changes Project Development Objectives Original PDO Development Objectives/Results The project development objectives are to provide reliable power transmission to the southwestern part of the grid, upgrade electricity exchange systems, and provide economically efficient, environmentally and socially sustainable electricity sector planning. Change in Project's Development Objectives Change in Results Framework Explanation: The proposed changes will enable financing of goods and equipment for rehabilitation and upgrade of the total 102 km of the three 220 kv transmission lines; Sataphlia line (15km) connecting high voltage substations Tskaltubo and Kutaisi, Ajameti line (21km) connecting substations Kutaisi and Zestaphoni, and Kolkhida line (66km) connecting substations Menji and Kutaisi. The goods and equipment include towers, foundations, conductors, Optical Ground Wire (OPGW) and protections equipment, and spare parts for the substations Menji, Tskaltubo, Kutaisi and Zestaphoni; and upgrading of the existing 10

11 SCADA/EMS system. Hundred and two kilometers will be added to the target value of the core indicator transmission lines constructed or rehabilitated under the project. The end target for the indicator will be increased from 142 km to 244 km. An additional core indicator, transmission lines rehabilitated, will be added. The end target for this indicator will be sent at 102 km. Four intermediary results indicators will be added as follows: (i) rehabilitation of Menji Kutaisi 220 kv line, (ii) upgrade of Tskaltubo Kutaisi 220 kv line to double circuit, (iii) upgrade of Kutaisi Zestaphoni 220 kv line to triple circuit, and (iv) upgrade of SCADA/EMS. A revised table is attached in the annex. Disbursement Estimates Change in Disbursement Estimates Explanation: Financing The disbursement estimate for the fiscal year 2017 will increase by US$5 Million to reflect payment for the supply of the equipment for rehabilitation of the proposed transmission lines and substations. Fiscal Year Current (USD) Proposed (USD) ,000, ,000, ,000, ,000, ,000, ,000, ,000, ,000, ,000, ,000, Change to Components and Cost Explanation: Total 60,000, ,000, Components The Component 1, Transmission System Strengthening envisaged financing of the construction of a high voltage overhead transmission line from Akhaltsikhe to Batumi through: (i) the supply and installation of a double-circuit, 220 kv transmission line from Akhaltsikhe high voltage direct current converter station with back-to-back configuration and 500/400/220 kv substation (Akhaltsikhe station) to Batumi 220 kv substation; and (ii) the supervision of the supply and installation of the Akhaltsikhe Batumi transmission line. The overall size of the component is US$52.35 million. Initial budget for the contract for supply and installation of the line was US$45.65 million, bidding for the contract resulted in a total contract price of US$36.65 million resulting in US$9 million saving. The saving will be used for financing of the rehabilitation and upgrade of the three lines; Kolkhida line connecting substations Menji and Kutaisi, Sataphlia line connecting substations Tskaltubo and Kutaisi, and Ajameti line connecting substations Kutaisi and Zestaphoni and rehabilitation and upgrade of same four substations; Menji, Tskaltubo, Kutaisi, and Zestaphoni, through provision of good and equipment. The Component 2, Wholesale Power Exchange Platform envisaged financing of the design, supply and installation of a power exchange platform including: (i) the provision of hardware and software for metering, balancing, and trading systems; and (ii) supervision of the supply and installation of said platform through the carrying out of small works and the provision of goods and consultantsâ services. This component will also finance update of the current SCADA/EMS through provision of software. Current Component Proposed Component Current Cost Proposed Action 11

12 Name Name (US$M) Cost (US$M) Component 1. Transmission System Strengthening Component 2. Wholesale Power Exchange Platform Component 3. Electricity Sector Strategic Environmental and Social Assessment Component 4. Project Management and Transmission Systems Studies Revised Revised No Change No Change Total: Appraisal Summary Appraisal Summary Change in Economic and Financial Analysis Explanation: The economic and financial analysis of the project was updated to estimate the flow of economic and financial benefits and costs associated with upgrade of additional transmission lines. The main economic benefit from upgrade of 220 kv Menji-Kutaisi (Kolkhida) 220 kv Tskaltubo-Kutaisi (Sataphlia) and 220kV Kutaisi-Zestaphoni (Ajameti) high voltage transmission lines will be the avoided economic costs due to improved reliability of electricity supply, which were quantified as a reduction of un-served energy due to reduced incidence of outages in the region serviced by those transmission lines. Upgrade of target lines will reduce the amount of load that has to be shed to avoid overload of these lines by 33%-50% in case of loss of 500 kv Imereti line which is a section of the transmission grid backbone transmitting power to the load center in the eastern part of the country. The cost of un-served energy was estimated at $0.33/kWh using back-up diesel generator approach. Upgrade of the 220kV Sataphlia and 220kV Ajameti 1 and 2 lines will also cause a reduction in annual technical losses in the system by 3.50 million kwh or about 1% of average annual electricity flow through those lines, which will help reduce the system costs of meeting the demand. The latter was estimated at 5.7c/kWh, which is equal to the levelized cost of energy supply by a combined cycle gas turbine power plant, which is assumed to be the power plant meeting the peak demand. The main economic costs of upgrading 220kV Kolkhida, 220kV Sataphlia, and 220kV Ajameti lines, will be the investment and incremental operation and maintenance costs. The economic analysis was updated to include the above lines. The updated economic analysis yielded an EIRR of 56.5% and NPV of US$216.0 million (the original analysis yielded an EIRR of 13.4% and NPV of US$3.12 million). Appraisal Summary Change in Social Analysis Explanation: The new activities under the proposed restructuring, including the rehabilitation and upgrade of 220 kv Tskaltubo-Kutaisi (Sataplia) and 220kV Kutaisi-Zestaphoni (Ajameti 1, 2), Menji-Kutaisi (Kolkhida 1) TLs and the Menji, Kutaisi, Tskaltubo and Zestaphoni substations will be carried out within the existing

13 footprint and right of way, the existing right of way will be used for access roads roads for carrying out rehabilitation works, and therefore no land acquisition or economic of physical displacement is expected. Should there be any need for land acquisition of land the GSE will prepare RAPs as per the projectâ s RPF. The original project's social safeguard performance is satisfactory. No additional measures to address social safeguard performance of the original project are planned under the restructured project. Appraisal Summary Change in Environmental Analysis Explanation: Environmental category of the project remains A. Works required for the rehabilitation and upgrade of Kolkhida, Sataplia, and Ajameti TLs and Menji, Kutaisi, Zestaphoni, and Tskaltubo substations were screened for their potential environmental and social impacts and were classified as environmental category B as those activities do not carry similar risks as the original project. The activities under restructuring will be handled as category B interventions. An Environmental and Social Management Plan (ESMP) of works to be financed after project restructuring was prepared by GSE and disclosed for public feedback. Environmental safeguard performance of the original project is satisfactory. No additional measures to address environmental safeguard performance of the original project are planned under the restructured project. 13

14 Results Framework Project Name: Team Leader(s) : Product Line: Transmission Grid Strengthening Project (P147348) Joseph Melitauri IBRD/IDA Requesting Unit: Responsible Unit: Country: Georgia Approval FY: 2014 Region: EUROPE AND CENTRAL ASIA Project Development Objectives Original Project Development Objective: Lending Instrument: Project Stage: Restructuring Status: DRAFT ECCU3 Created by: Joseph Melitauri on 08-Feb-2016 GEE03 Modified by: Joseph Melitauri on 16-Jun-2016 Investment Project Financing The project development objectives are to provide reliable power transmission to the southwestern part of the grid, upgrade electricity exchange systems, and provide economically efficient, environmentally and socially sustainable electricity sector planning. Results Core sector indicators are considered: Yes Project Development Objective Indicators Results reporting level: Project Level Status Indicator Name Core Unit of Measure Baseline Actual(Current) End Target No Change No Change Total electricity evacuated from the newly developed power generation stations in southwestern Georgia through the grid Total duration of outages in Batumi substation Gigawatt-hour (GWh) Value Date 31-Dec Dec May-2018 Hours Value Date 01-Jun Dec Jun-2017 Page 14 of 16

15 Results Framework New New New No Change No Change Marked for Deletion Marked for Deletion Transmission lines constructed or rehabilitated under the project Transmission lines rehabilitated under the project Transmission lines constructed under the project Power is exchanged (traded) using new exchange platform The results of the least cost planning and strategic environmental assessment have been incorporated into the Government s hydropower development plan Transmission lines constructed or rehabilitated under the project Transmission lines constructed under the project Kilometers Value Date 01-Mar Mar-2016 Kilometers Value Sub Type Date 01-Mar Mar-2016 Breakdown Kilometers Value Sub Type Date 01-Mar Mar Jan-2019 Breakdown Yes/No Value No No Yes Date 31-Dec Dec Dec-2018 Yes/No Value No No Yes Date 31-Dec Dec Dec-2018 Kilometers Value Date 31-Dec Dec Dec-2018 Kilometers Value Sub Type Date 01-Jun Dec Jun-2017 Breakdown Page 15 of 16

16 Intermediate Results Indicators Results Framework Status Indicator Name Core Unit of Measure Baseline Actual(Current) End Target No Change No Change No Change New New Section from Shuakhevi to Batumi transmission line constructed Strategic Environmental Impact Assessment prepared based on the feedback from all stakeholders Wholesale power exchange systems updated Tskaltubo Kutaisi 220 kv line upgraded to double circuit Kutaisi Zestaphoni 220 kv line upgraded Kilometers Value Date 31-Dec Dec Jun-2016 Yes/No Value No No Yes Date 31-Dec Dec Dec-2018 Yes/No Value No No Yes Date 31-Dec Dec Dec-2018 Kilometers Value Date 30-Apr Apr Dec-2018 Kilometers Value Date 30-Apr Apr Dec-2018 New Menji Kutaisi line rehabilitated Kilometers Value Date 30-Apr Apr Dec-2018 New SCADA/EMS updated Yes/No Value No No Yes Date 30-Apr Apr Dec-2018 Page 16 of 16

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

Georgian State Electrosystem JSC. Special Purpose Project Financial Statements for the year ended 31 December 2016

Georgian State Electrosystem JSC. Special Purpose Project Financial Statements for the year ended 31 December 2016 Public Disclosure Authorized Georgian State Electrosystem JSC Public Disclosure Authorized Special Purpose Project Financial Statements for the year ended 31 December 2016 Public Disclosure Authorized

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: RES22488 Public Disclosure Authorized

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000) Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION

More information

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864) Public Disclosure Authorized SOUTH ASIA Afghanistan Transport & Digital Development Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 09-Feb-2018

More information

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank Indonesia Power Transmission Development Project (P117323) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 13 ARCHIVED on 28-Dec-2017 ISR30911 Implementing

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL) Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18226 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic

More information

The World Bank NEITI Reporting Compliance (P162344)

The World Bank NEITI Reporting Compliance (P162344) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NEITI REPORTING COMPLIANCE APPROVED ON DECEMBER 7, 2016 TO FEDERAL MINISTRY

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized DOCUMENT OF THE WORLD BANK REPORT NO.: RES30282 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized MEXICO

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Georgia Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 11-Sep-2017 ISR28869 Implementing Agencies:

More information

Implementation Status & Results India Assam State Roads Project (P096018)

Implementation Status & Results India Assam State Roads Project (P096018) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results India Assam State Roads Project (P096018) Operation Name: Assam State Roads Project (P096018) Project Stage: Implementation

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Georgia Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 5 ARCHIVED on 09-Feb-2017 ISR25380 Implementing Agencies:

More information

The World Bank Indonesia Power Transmission Development Project (P117323)

The World Bank Indonesia Power Transmission Development Project (P117323) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 7 ARCHIVED on 07-Jul-2015 ISR18557 Implementing Agencies:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31490 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY

More information

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT

More information

Public Disclosure Copy

Public Disclosure Copy EAST ASIA AND PACIFIC Solomon Islands Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 14 ARCHIVED on 16-May-2018 ISR32246 Implementing Agencies: Ministry of Finance

More information

The World Bank Kabeli-A Hydro Electric Project (P122406)

The World Bank Kabeli-A Hydro Electric Project (P122406) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF KABELI-A HYDRO ELECTRIC PROJECT APPROVED ON JULY 1, 2014 TO NEPAL REPORT NO.: RES32467

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

The World Bank Sustainable Croatian Railways in Europe (P147499)

The World Bank Sustainable Croatian Railways in Europe (P147499) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SUSTAINABLE CROATIAN RAILWAYS IN EUROPE APPROVED ON APRIL 30, 2015 TO HZ INFRASTRUCTURE,HZ

More information

The World Bank Disease Prevention and Control Project (P128442)

The World Bank Disease Prevention and Control Project (P128442) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF DISEASE PREVENTION AND CONTROL PROJECT APPROVED ON MARCH 27, 2013 TO REPUBLIC OF ARMENIA

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 12 ARCHIVED on 17-Jun-2015 ISR19641 Implementing Agencies:

More information

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project Public Disclosure Authorized Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project (P124351) AFRICA Africa Energy and Mining Global Practice IBRD/IDA Specific Investment

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUNICIPAL SERVICES PROJECT LOAN 7885-TU

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUNICIPAL SERVICES PROJECT LOAN 7885-TU Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social, Urban Rural and Resilience (GSURR) Europe and Central Asia Region Document of

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31045 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021097 Public Disclosure Authorized Public Disclosure Authorized Project ID P111598 Country Tanzania

More information

Public Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464)

Public Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464) Public Disclosure Authorized AFRICA Cabo Verde Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 10 ARCHIVED on 23-Oct-2017 ISR29430 Implementing Agencies: Unidade

More information

Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029)

Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Albania Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 06-May-2017 ISR27818 Implementing Agencies:

More information

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778)

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Operation Name: Revenue Administration

More information

The World Bank Water and Sanitation in Tourist Areas (P054221)

The World Bank Water and Sanitation in Tourist Areas (P054221) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WATER AND SANITATION IN TOURIST AREAS APPROVED ON APRIL 2, 2009 TO THE

More information

Road Sector Development Project (P149322)

Road Sector Development Project (P149322) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Ukraine Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 6 ARCHIVED on 20-Jun-2018 ISR32806 Implementing

More information

Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kazakhstan SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008 Public Disclosure Authorized RESTRUCTURING PAPER REPORT NO.: RES29620 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Uzbekistan Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 12-Jan-2018 ISR30620 Implementing Agencies: Republic

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31013 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740)

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740) Operation Name: Project

More information

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE KARNATAKA HEALTH SYSTEM DEVELOPMENT AND REFORM PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE KARNATAKA HEALTH SYSTEM DEVELOPMENT AND REFORM PROJECT Public Disclosure Authorized Docume of The World Bank FOR OFFICIAL USE ONLY Report No: RES22733 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

Implementation Status & Results China China Wuhan Second Urban Transport (P112838)

Implementation Status & Results China China Wuhan Second Urban Transport (P112838) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results China China Wuhan Second Urban Transport (P112838) Operation Name: China Wuhan Second Urban Transport (P112838)

More information

Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964)

Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964) Operation Name: National

More information

Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663)

Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663) Operation Name: Sao Paulo Feeder Roads Project (P106663) Project

More information

The World Bank Industrial Waste Management and Cleanup Project (P122139)

The World Bank Industrial Waste Management and Cleanup Project (P122139) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDUSTRIAL WASTE MANAGEMENT AND CLEANUP PROJECT APPROVED ON SEPTEMBER

More information

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES12428 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES19910 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank LK GPOBA - Access to Sanitation Project (P111161) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC

More information

Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029)

Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Albania Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 5 ARCHIVED on 31-Dec-2017 ISR30419 Implementing Agencies:

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18411 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Armenia Energy & Extractives Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 1 ARCHIVED on 24-Sep-2015 ISR20717

More information

Document of. The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Document of. The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270) Public Disclosure Authorized SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice IBRD/IDA Specific Investment

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 6.0 ARCHIVED on 21-Nov-2014 ISR16536 Implementing Agencies: Wuhan Urban

More information

The World Bank Research and Innovation in Science and Technology Project (P121842)

The World Bank Research and Innovation in Science and Technology Project (P121842) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Education Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 7 ARCHIVED on 07-Dec-2016 ISR25509 Implementing Agencies: Ministry

More information

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase

More information

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN

SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES30500 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SENEGAL: TRANSPORT &

More information

Justice Sector Support Project (P104749)

Justice Sector Support Project (P104749) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Croatia Governance Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 9 ARCHIVED on 10-Nov-2015 ISR21126 Implementing Agencies: Public

More information

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,040,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,040,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020616 Public Disclosure Authorized Public Disclosure Authorized Project ID P119939 Country Uzbekistan

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31608 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Serbia Transport Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 4 ARCHIVED on 24-Jun-2015 ISR17421 Implementing Agencies: Public

More information

Implementation Status & Results Africa Central African Backbone - APL4 - Gabon (P122776)

Implementation Status & Results Africa Central African Backbone - APL4 - Gabon (P122776) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Central African Backbone - APL4 - Gabon (P122776) Operation Name: Central African Backbone

More information

Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296)

Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296) Operation Name: URBAN SECTOR DEVELOPMENT

More information

State Owned Financial Institutions Reform Project (P156837)

State Owned Financial Institutions Reform Project (P156837) EUROPE AND CENTRAL ASIA Serbia Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 2 ARCHIVED on 12-Dec-2018 ISR34752 Implementing Agencies: Republic

More information

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Water Global Practice Requesting Unit: EACVF Responsible Unit: GWA02 IBRD/IDA Program-for-Results Financing FY 2013 Team Leader(s): Lilian Pena

More information

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Montenegro Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 13 ARCHIVED on 12-Apr-2016 ISR23062 Implementing Agencies:

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020001 Public Disclosure Authorized Project ID P100580 Country Ukraine Project Name ROADS & SAFETY IMPROVEMENT

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Nepal Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2015 Seq No: 5 ARCHIVED on 28-Jun-2017 ISR28273 Implementing Agencies: Ministry of

More information

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

More information

The World Bank Social Assistance System Strengthening Project (P123960)

The World Bank Social Assistance System Strengthening Project (P123960) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SOCIAL ASSISTANCE SYSTEM STRENGTHENING PROJECT APPROVED ON JANUARY 22,

More information

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National

More information

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325) AFRICA Mozambique Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2007 Seq No: 24 ARCHIVED on 29-Aug-2018 ISR33744 Implementing Agencies: ROAD FUND (Fundo de Estradas),

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES24803 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Myanmar Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 06-Jan-2016 ISR21425 Implementing Agencies:

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy EAST ASIA AND PACIFIC China Energy & Extractives Global Practice IBRD/IDA Financial Intermediary Loan FY 2008 Seq No: 11 ARCHIVED on 16-Dec-2015 ISR21909

More information

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133)

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Government Financial Management and Revenue

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-72940) ON A LOAN IN THE AMOUNT OF US$48 MILLION TO AZERENERJI OJSC

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-72940) ON A LOAN IN THE AMOUNT OF US$48 MILLION TO AZERENERJI OJSC Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-72940)

More information

Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775)

Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775) Operation Name: LR-Public Financial Management

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 STATE OF RIO GRANDE DO SUL, BRAZIL

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 STATE OF RIO GRANDE DO SUL, BRAZIL Public Disclosure Authorized The World Bank REPORT NO.: RES29864 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 TO

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT Public Disclosure Authorized REPORT NO.: RES33563 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES

More information

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 24-Dec-2017 ISR31037 Implementing Agencies:

More information

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785) Operation Name:

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Oct ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Oct ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021153 Public Disclosure Authorized Public Disclosure Authorized Project ID P126180 Country Sierra Leone Project Name Sierra Leone Energy

More information

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325) AFRICA Mozambique Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2007 Seq No: 22 APPROVED ISR29261 Implementing Agencies: Key Dates Key Project Dates Bank Approval Date:23-May-2007

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Peru Social Protection Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 7 ARCHIVED on 04-Feb-2015 ISR17689 Implementing Agencies:

More information

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351) LATIN AMERICA AND CARIBBEAN Dominican Republic Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Development Policy Lending FY 2018 Seq No: 1 ARCHIVED on 26-Jan-2018 ISR31220

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 9 ARCHIVED on 22-Jun-2017

More information

The World Bank Second Karnataka State Highway Improvement (P107649)

The World Bank Second Karnataka State Highway Improvement (P107649) Public Disclosure Authorized SOUTH ASIA India Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 10 ARCHIVED on 31-Jul-2015 ISR18834 Implementing Agencies: Karnataka Road

More information