FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNANCE TECHNICAL ASSISTANCE PROJECT. Loan No. IDA 37570, P071063

Size: px
Start display at page:

Download "FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNANCE TECHNICAL ASSISTANCE PROJECT. Loan No. IDA 37570, P071063"

Transcription

1 Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: KG Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNANCE TECHNICAL ASSISTANCE PROJECT Loan No. IDA 37570, P May 15, 2003 TO THE KYRGYZ REPUBLIC December 19, 2012 Public Disclosure Authorized ECSP4 ECAVP This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

2 ABBREVIATIONS AND ACRONYMS FMIS GTAC HRMIS PFM TMIS TSA Financial Management Information System Governance Technical Assistance Project Human Resource Management Information System Public Financial Management Treasury Management Information System Treasury Single Account Regional Vice President: Country Director: Sector Manager: Task Team Leader: Philippe H. Le Houérou Saroj Kumar Jha William Leslie Dorotinsky K. Migara O. De Silva 2

3 KYRGYZ REPUBLIC GOVERNANCE TECHNICAL ASSISTANCE PROJECT CONTENTS Page A. SUMMARY... 4 B. PROJECT STATUS... 4 C. PROPOSED CHANGES

4 Kyrgyzstan, Government Technical Assistance Project P Loan No. IDA RESTRUCTURING PAPER A. SUMMARY This paper seeks management s approval to extend the closing date for the Governance Technical Assistance Project (GTAC), Loan No. IDA 37570, P from December 28, 2012 until December 31, This will be the third extension for a cumulative period of five years. This time is required to finalize implementation of key project activities and to allow for full achievement of the Project s Development Objectives: to improve transparency and support modernization of the Treasury. There are no other proposed changes in the project. B. PROJECT STATUS Although the project is in its 9 th year, it has been impacted by two primary causes: 1) Kyrgyzstan has undergone two significant political upheavals causing complete changes in government; and 2) As a result of the political instability, tendering documents for a major component of the project, the acquisition and implementation of an integrated financial management information system (FMIS), were significantly delayed. One of the key objectives of GTAC is to support Kyrgyzstan s transition from its current manual method of budget formulation, execution, accounting, payment processing, and human resource management to a commercial internationally tested automation package which includes TMIS (Treasury Management Information System) and HRMIS (Human Resource Management System). The TMIS package is a necessary requirement for a fully operational Treasury Single Account (TSA) and serves as the foundation of all PFM reforms envisioned in the Government s PFM Strategy As context, since the contract for the FMIS was signed, there have been five Ministers of Finance, three Directors of the State Personnel Service, and three Directors of the Central Treasury. Each change in leadership has triggered a period of delay while the project was evaluated, implementation modes were questioned, and underlying objectives were re-validated. In each case, the leadership has affirmed the project but at a cost of delayed time. Of the total loan amount of $7,775,000, 68% has been disbursed to date. No payments under the FMIS contract have been made in the last 12 months as disputes arose between the vendor and Ministry of Finance as to whether milestones had been met. There are no audit reports due and previous audit reports have been found satisfactory by the Bank. 4

5 C. PROPOSED CHANGES Achievement of an operational TMIS and TSA was proposed as a prior action for a Development Policy Operation this year and this action provided significant impetus for implementation of the project as the status of the project has been elevated above primary counterparts to the highest levels of leadership in the Government, including the First Vice Prime Minister and the President s Administration. Until the implementation of the TMIS became the subject of the DPO, discussions between the Central Treasury and the vendor would languish on technical disagreements and unproductive periods between meetings with little progress taking place. This is the main reason why the project has been a Problem at Risk with both the DO and IP ratings of moderately unsatisfactory for the last 11 months. However, with the increased attention of senior government officials, significant progress has been made and key accomplishments have occurred. After many months of discussion, a Uniform Chart of Accounts, a necessary precondition to configuration of the FMIS, has been adopted by Government Resolution and temporary instructions on implementation have been issued. After long debate about the appropriate interface between the TMIS and the payment systems of the National Bank of Kyrgyzstan, a Protocol has been signed that defines the respective roles and responsibilities of the Central Treasury and National Bank, the controls that will be in place to provide information integrity, and the technical requirements for information interchange. This protocol was a necessary pre-condition for the configuration of the FMIS. The prior Director of Central Treasury commissioned an in-house IT unit to begin development of an FMIS that could be an alternative to the commercial off-theshelf system supported by GTAC. The Bank has expressed concern about potential weaknesses in internal control that could result from abandoning the commercial system and adopting the in-house system. However, the Coordination Council for GTAC made a decision on December 12, 2012, to proceed with the commercial system and to request an extension of the project of the Bank. This decision was confirmed by the Minister of Finance in a letter requesting extension also dated December 12, The Ministry of Finance and its FMIS vendor have presented a detailed revised project schedule that lays out by week all steps necessary to finalize, implement, train on, and achieve operational acceptance of all three modules TMIS, HRMIS, and Budget Planning with the final step late in the fourth quarter of Upon resolution of the revised project schedule and operational acceptance of the three FMIS modules, remaining payments due to the vendor under the contract will occur during the extension period which will achieve almost full disbursement of the loan amount. 5

6 In summary, along with focus on successful implementation of the FMIS at the most senior levels of government for the first time during the project, key milestones in the project having been accomplished in recent months, and with a detailed plan on all remaining steps necessary for final acceptance and operation laid out, extension of the closing date of the project is warranted to meet the development policy objective. 6

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Project No: 105602 PROPOSED PROJECT

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-37570) ON AN IDA CREDIT IN THE AMOUNT OF SDR5.80 MILLION (US$7.77 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-37570) ON AN IDA CREDIT IN THE AMOUNT OF SDR5.80 MILLION (US$7.77 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00003033 IMPLEMENTATION COMPLETION AND RESULTS

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

The World Bank Strengthening Public Resource Management (P161586)

The World Bank Strengthening Public Resource Management (P161586) EUROPE AND CENTRAL ASIA Ukraine Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 21-Jul-2017 ISR29114 Implementing Agencies: Ministry

More information

Implementation Status & Results Kosovo Public Sector Modernization Project (P101614)

Implementation Status & Results Kosovo Public Sector Modernization Project (P101614) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Kosovo Public Sector Modernization Project (P101614) Operation Name: Public Sector Modernization Project (P101614)

More information

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social Protection Unit South East/South AFTSE Africa Region Document of The World Bank

More information

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF TF-96083) ON AN

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF TF-96083) ON AN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: ICR00003680 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF-92396 TF-96083)

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Document of The World Bank RESTRUCTURING PAPER

Document of The World Bank RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT LOAN 7731-ID JUNE 24, 2009 TO THE REPUBLIC

More information

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank LK GPOBA - Access to Sanitation Project (P111161) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC

More information

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

More information

Ms. Cigdem Aslan Lead Financial Officer World Bank Treasury

Ms. Cigdem Aslan Lead Financial Officer World Bank Treasury 11 th UNCTAD Debt Management Conference 13 15 November 2017 Palais des Nations, Geneva Integrating public debt management within Integrated Financial Management Systems (IFMIS) by Ms. Cigdem Aslan Lead

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES24803 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT

More information

Public Financial Management (PFMx)

Public Financial Management (PFMx) Public Financial Management (PFMx) Module 14 PFM Reform Planning This training material is the property of the International Monetary Fund (IMF) and is intended for use in IMF Fiscal Affairs Department

More information

Second Public Financial Management Capacity Strengthening Project (P151492)

Second Public Financial Management Capacity Strengthening Project (P151492) AFRICA Somalia Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 05-Nov-2018 ISR34381 Implementing Agencies: Ministry of Finance, Puntland,

More information

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133)

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Government Financial Management and Revenue

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF DEEPENING MTBF AND STRENGTHENING FINANCIAL ACCOUNTABILITY PROJECT (TF BD) GRANT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF DEEPENING MTBF AND STRENGTHENING FINANCIAL ACCOUNTABILITY PROJECT (TF BD) GRANT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

The World Bank Tax Administration Modernization Project (P111942)

The World Bank Tax Administration Modernization Project (P111942) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Armenia Governance Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 20-Apr-2018 ISR32167 Implementing Agencies:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NATIONAL HYDROMET MODERNIZATION PROJECT LOAN NO RU

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NATIONAL HYDROMET MODERNIZATION PROJECT LOAN NO RU Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NATIONAL HYDROMET MODERNIZATION PROJECT LOAN NO. 4769 RU Date of Board Approval: MARCH 17, 2005 TO THE RUSSIAN FEDERATION

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

The World Bank Ghana: Public Financial Management Reform Project (P151447)

The World Bank Ghana: Public Financial Management Reform Project (P151447) Public Disclosure Authorized AFRICA Ghana Governance Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 27-Dec-2016 ISR26534 Implementing Agencies: Ministry of Finance

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SAFE AND SUSTAINABLE TRANSPORT PROJECT LOAN December 10, 2009 IN THE INITIAL AMOUNT OF (US$ {150}

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Congo, Republic of Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 4 ARCHIVED on 07-Jan-2016 ISR22324 Implementing Agencies:

More information

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Transport Connectivity and Asset Management Project (P132833) SOUTH ASIA Sri Lanka Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2016 Seq No: 3 ARCHIVED on 31-Aug-2017 ISR29065 Implementing Agencies: Democratic Socialist Republic of Sri Lanka,

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000) Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Nepal Governance Global Practice Recipient Executed Activities Technical Assistance Loan FY 2012 Seq No: 2 ARCHIVED on 07-Dec-2015 ISR18236 Implementing Agencies:

More information

DIRECTIVE ON OPERATIONS PROCUREMENT A. OVERRIDING OBJECTIVE B. DEFINITIONS

DIRECTIVE ON OPERATIONS PROCUREMENT A. OVERRIDING OBJECTIVE B. DEFINITIONS DIRECTIVE ON OPERATIONS PROCUREMENT August 18, 2017 A. OVERRIDING OBJECTIVE 1. Purpose. The purpose of this Directive on Operations Procurement (Directive) is to enable the Bank s staff to implement the

More information

JORDAN. Terms of Reference

JORDAN. Terms of Reference JORDAN Terms of Reference Jordan: Strengthening municipal financial management systems to sustain service delivery in municipalities affected by the refugee crisis Assessment of Municipal Public Financial

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Public Disclosure Copy. Implementation Status & Results Report Nigeria Public Sector Governance Reform and Development Project (P097026)

Public Disclosure Copy. Implementation Status & Results Report Nigeria Public Sector Governance Reform and Development Project (P097026) Public Disclosure Authorized AFRICA Nigeria Governance Global Practice IBRD/IDA Technical Assistance Loan FY 2010 Seq No: 11 ARCHIVED on 20-Mar-2017 ISR26980 Implementing Agencies: Public Disclosure Authorized

More information

NICARAGUA: TRACKING POVERTY RELATED SPENDING IN HEAVILY INDEBTED POOR COUNTRIES (HIPC)

NICARAGUA: TRACKING POVERTY RELATED SPENDING IN HEAVILY INDEBTED POOR COUNTRIES (HIPC) NICARAGUA: TRACKING POVERTY RELATED SPENDING IN HEAVILY INDEBTED POOR COUNTRIES (HIPC) July 2004 ACRONYMS AND ABBREVIATIONS ANBE AP CBN CGA CFAA CPAR DGB DGI DGPI DGSA DGT EMTA GAO GBR GCO GoN HIPC IDB

More information

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF ENERGY

More information

IMPLEMENTATION OF THE STRATEGY ON MODERNISATION OF PUBLIC ADMINISTRATION MONITORING PERIOD: OCTOBER 2015 OCTOBER 2016

IMPLEMENTATION OF THE STRATEGY ON MODERNISATION OF PUBLIC ADMINISTRATION MONITORING PERIOD: OCTOBER 2015 OCTOBER 2016 IMPLEMENTATION OF THE STRATEGY ON MODERNISATION OF PUBLIC ADMINISTRATION MONITORING PERIOD: OCTOBER 2015 OCTOBER 2016 January 2017 1 1. INTRODUCTION The strategic framework on Public Administration Reform

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Document of The World Bank

Document of The World Bank Document of The World Bank PROJECT COMPLETION NOTE OF A LEARNING AND INNOVATION LOAN IN THE AMOUNT OF SDR 2.7 MILLION (US$4 MILLION EQUIVALENT) TO THE REPUBLIC OF MALAWI FOR A DEVELOPMENT LEARNING CENTER

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

The United Republic of Tanzania Ministry of Finance. Memorandum of Understanding. Between. The Government of the United Republic of Tanzania

The United Republic of Tanzania Ministry of Finance. Memorandum of Understanding. Between. The Government of the United Republic of Tanzania The United Republic of Tanzania Ministry of Finance Memorandum of Understanding Between The Government of the United Republic of Tanzania And Development Partners In Support of The Public Finance Management

More information

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY DOCUMENT OF THE WORLD BANK REPORT NO.: RES29941 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 TO TRANSPORT & ICT

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Assam State Public Finance Institutional Reforms (ASPIRe) Project (P157198)

Assam State Public Finance Institutional Reforms (ASPIRe) Project (P157198) Public Disclosure Authorized SOUTH ASIA India Governance Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 17-Jan-2019 ISR35620 Implementing Agencies: Republic of India,

More information

AUDITOR GENERAL'S REPORT

AUDITOR GENERAL'S REPORT Public Disclosure Authorized Public Disclosure Authorized AUDITOR GENERAL'S REPORT Public Disclosure Authorized Integrated Public Financial Management Reform Project (IPFMRP) For the fiscal Period 2015/2016

More information

Implementation Status & Results Chad Public Financial Management Capacity Building (P090265)

Implementation Status & Results Chad Public Financial Management Capacity Building (P090265) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chad Public Financial Management Capacity Building (P090265) Operation Name: Public Financial Management

More information

The World Bank Social Assistance System Strengthening Project (P123960)

The World Bank Social Assistance System Strengthening Project (P123960) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SOCIAL ASSISTANCE SYSTEM STRENGTHENING PROJECT APPROVED ON JANUARY 22,

More information

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)

The World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567) EUROPE AND CENTRAL ASIA Albania Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 2 ARCHIVED on 17-Oct-2017 ISR29727 Implementing Agencies: Key Dates

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INDEX-BASED LIVESTOCK INSURANCE PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INDEX-BASED LIVESTOCK INSURANCE PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 59553-KH PROPOSED PROJECT

More information

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)

Debt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451) SOUTH ASIA Pakistan Macroeconomics, Trade and Investment Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 27-Jun-2018 ISR33129 Implementing Agencies:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

Documnent of The World Bank FOR OFFICIAL USE ONLY. Report No: PROJECT COMPLETION NOTE (SCL-4450) LOAN IN THE AMOUNT OF US$ 100 MILLION TO THE

Documnent of The World Bank FOR OFFICIAL USE ONLY. Report No: PROJECT COMPLETION NOTE (SCL-4450) LOAN IN THE AMOUNT OF US$ 100 MILLION TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Exiergy and Mining Sector Unit EAst Asia and Pacific Region Documnent of The World Bank

More information

Financing (In USD Million) Financing Source

Financing (In USD Million) Financing Source Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 06-Dec-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMBODIA EDUCATION SECTOR SUPPORT SCALE UP ACTION PROGRAMME (TF092097)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMBODIA EDUCATION SECTOR SUPPORT SCALE UP ACTION PROGRAMME (TF092097) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING

More information

The World Bank Mauritania Public Sector Governance Project (P146804)

The World Bank Mauritania Public Sector Governance Project (P146804) Public Disclosure Authorized AFRICA Mauritania Governance Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 27-Feb-2018 ISR31581 Implementing Agencies: Ministry of Economy

More information

Implementation Status & Results Bosnia and Herzegovina Agriculture and Rural Development Project (P101213)

Implementation Status & Results Bosnia and Herzegovina Agriculture and Rural Development Project (P101213) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Bosnia and Herzegovina Agriculture and Rural Development Project (P101213) Operation Name: Agriculture and Rural

More information

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

The World Bank Kenya Infrastructure Finance/PPP project (P121019) Public Disclosure Authorized AFRICA Kenya Financial Systems Practice Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 4 ARCHIVED on 22-Dec-2014 ISR17114 Implementing Agencies: Public Private

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Nigeria Governance Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq

More information

Public Sector Financial Management Reform Support

Public Sector Financial Management Reform Support GEORGIA Public Sector Financial Management Reform Support Report No. 126842 JUNE 28, 2018 2018 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW Washington DC 20433

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 7971-BY Loan Agreement (Road Upgrading and Modernization Project) between REPUBLIC OF BELARUS and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated November 19, 2010

More information

Agenda July 19, 2013 at 10:45 12:00 a.m.

Agenda July 19, 2013 at 10:45 12:00 a.m. Agenda July 19, 2013 at 10:45 12:00 a.m. Opening Remarks by H.E. Siniša Hajdaš-Dončić, Minister of Maritime Affairs, Transport and Infrastructure Opening Remarks by Mr. Hongjoo Hahm, Croatia Country Manager,

More information

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2 Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14712 1. Project Data: Date Posted: 06/16/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

What s News in Tax Analysis That Matters from Washington National Tax

What s News in Tax Analysis That Matters from Washington National Tax What s News in Tax Analysis That Matters from Washington National Tax LB&I Updates Publication 5125 and the Internal Revenue Manual In February 2016, the IRS revised Publication 5125, which provides guidance

More information

Implementation Status & Results Nigeria Nigeria Edo State First Development Policy Operation (P123353)

Implementation Status & Results Nigeria Nigeria Edo State First Development Policy Operation (P123353) Public Disclosure Authorized Public Disclosure Authorized Project Name: Implementation Status & Results Nigeria Nigeria Edo State First Development Policy Operation (P123353) Nigeria Edo State First Development

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016 Public Disclosure Authorized The World Bank REPORT NO.: RES31608 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INCOME SUPPORT AND EMPLOYABILITY PROJECT LOAN 7811-SV

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INCOME SUPPORT AND EMPLOYABILITY PROJECT LOAN 7811-SV Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES20444 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SECOND STATE PENSION REFORM TECHNICAL ASSISTANCE LOAN PARSEP II. January 10, 2007 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SECOND STATE PENSION REFORM TECHNICAL ASSISTANCE LOAN PARSEP II. January 10, 2007 TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE

More information

Bangladesh Insurance Sector Development Project (P156823)

Bangladesh Insurance Sector Development Project (P156823) SOUTH ASIA Bangladesh Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 11-Oct-2018 ISR34079 Implementing Agencies: PEOPLE'S REPUBLIC

More information

The World Bank Pastoral Community Development Project III (P130276)

The World Bank Pastoral Community Development Project III (P130276) Public Disclosure Authorized AFRICA Ethiopia Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 06-Jan-2017 ISR26725 Implementing Agencies: Ministry of Federal

More information

Managerial Accountability in Budget Execution. Bill Dorotinsky Sector Manager, World Bank Co-lead, Global Expert Team on Public Sector Performance

Managerial Accountability in Budget Execution. Bill Dorotinsky Sector Manager, World Bank Co-lead, Global Expert Team on Public Sector Performance Managerial Accountability in Budget Execution Bill Dorotinsky Sector Manager, World Bank Co-lead, Global Expert Team on Public Sector Performance Outline Context objectives of PFM Systems Managerial Accountability

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 18-Sep-2013

More information

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Transport Connectivity and Asset Management Project (P132833) Public Disclosure Authorized SOUTH ASIA Sri Lanka Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2016 Seq No: 2 ARCHIVED on 30-Jan-2017 ISR26613 Implementing Agencies: Public Disclosure

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON A MULTI DONOR TRUST FUND TF IN THE AMOUNT OF US$ MILLION EQUIVALENT TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON A MULTI DONOR TRUST FUND TF IN THE AMOUNT OF US$ MILLION EQUIVALENT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON

More information

The World Bank Mozambique Public Financial Management for Results Program (P124615)

The World Bank Mozambique Public Financial Management for Results Program (P124615) Public Disclosure Authorized AFRICA Mozambique Governance Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 6 ARCHIVED on 29-Jun-2017 ISR28952 Implementing Agencies: Ministry of Economy and

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES19910 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Implementation Status & Results Tajikistan Tax Administration (P127807)

Implementation Status & Results Tajikistan Tax Administration (P127807) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tajikistan Tax Administration (P127807) Operation Name: Tax Administration (P127807) Project Stage:

More information

The World Bank CG Rep. Skills Development for Employability Project (P128628)

The World Bank CG Rep. Skills Development for Employability Project (P128628) Public Disclosure Authorized AFRICA Congo, Republic of Education Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 17-Jun-2017 ISR27973 Implementing Agencies: Ministry

More information

Public Finance Management (PFM) Reform in Lao PDR. Pasomphet Khamton DDG of Fiscal Policy Department Ministry of Finance

Public Finance Management (PFM) Reform in Lao PDR. Pasomphet Khamton DDG of Fiscal Policy Department Ministry of Finance Public Finance Management (PFM) Reform in Lao PDR Pasomphet Khamton DDG of Fiscal Policy Department Ministry of Finance 29/06/2017 Contents Implementation of government budget plan for 2017 Public Finance

More information

The World Bank NP: Strengthening the Office of the Auditor General (P127040)

The World Bank NP: Strengthening the Office of the Auditor General (P127040) Public Disclosure Authorized SOUTH ASIA Nepal Financial Management Global Practice Recipient Executed Activities Specific Investment Loan FY 2012 Seq No: 3 ARCHIVED on 20-Feb-2015 ISR18017 Implementing

More information

PUBLIC FINANCE MANAGEMENT STRATEGY OF THE REPUBLIC OF TAJIKISTAN FOR

PUBLIC FINANCE MANAGEMENT STRATEGY OF THE REPUBLIC OF TAJIKISTAN FOR Approved y the ecree of the President Of the Republic of Tajikistan On 20 March 2009 # 639 PULI FINANE MANAGEMENT STRATEGY OF THE REPULI OF TAJIKISTAN FOR 2009-2018 1 Table of contents List of Abbreviations

More information

Document of The World Bank

Document of The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION REPORT (CPL-40770;

More information

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770) Public Disclosure Authorized SOUTH ASIA Bangladesh Governance Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 3 ARCHIVED on 09-Sep-2015 ISR20285 Implementing Agencies: National Board of Revenue

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF IRAQ: PUBLIC FINANCE MANAGEMENT REFORM PROJECT (P110862) (GRANT TF094552)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF IRAQ: PUBLIC FINANCE MANAGEMENT REFORM PROJECT (P110862) (GRANT TF094552) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1

LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1 Policy-Based Lending 2008 2017: Performance, Results, and Issues of Design, Linked Document 2 LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1 A. Armenia: 2008 and 2013 1. Overall,

More information

Maldives: Enhancing Tax Administration Capacity

Maldives: Enhancing Tax Administration Capacity Completion Report Project Number: 47150-001 Technical Assistance Number: 8525 August 2018 Maldives: Enhancing Tax Administration Capacity This document is being disclosed to the public in accordance with

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31045 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008 Public Disclosure Authorized RESTRUCTURING PAPER REPORT NO.: RES29620 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT

More information