1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING IN THE AMOUNT OF 35.3 MILLION (US$48.0 MILLION EQUIVALENT) TO THE PORT OF RIJEKA AUTHORlTY Report No: HR WITH THE GUARANTEE OF THE REPUBLIC OF CROATIA FOR THE RIJEKA GATEWAY PROJECT (LOAN NO HR) Sustainable Development Department South Central Europe Country Unit Europe and Central Asia Region May 4,2007 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

2 CURRENCY EQUIVALENTS (Exchange Rate Effective April 30,2007) Currency Unit = HRK (Kunas) HRK 1 = US$ US$1 = HRK = US$1.361 FISCAL YEAR January 1 - December 31 ABBREVIATIONS AND ACRONYMS CAS ECA IBRD IFRs FMRs MSTTD NIA PRA SIL TEU Country Assistance Strategy Europe and Central Asia International Bank for Reconstruction and Development Interim Un-audited Financial Reports Financial Monitoring Reports Ministry of Sea, Transport, Tourism and Development Not Applicable Port of Rijeka Authority Specific Investment Loan Twenty foot equivalent unit - container Vice President: Country Director: Sector Director: Sector Manager: Task Team Leader: Shigeo Katsu Anand K. Seth Peter D. Thomson Motoo Konishi Gerald Ollivier

3 FOR OFFICIAL USE ONLY ADDITIONAL FINANCING FOR THE RIJEKA GATEWAY PROJECT CONTENTS Page A. Introduction B. Background and Rationale for Additional Financing ( 35.3 million)... 1 C. Proposed Changes... 4 D. Consistency with CAS E. Economic Analysis of Cost Overrun/Financing Gap... 6 F. Risks... 7 G. Financial Terms and Conditions For The Additional Financing This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

4

5 Date: May 4, 2007 Country: Croatia Project Name: Rijeka Gateway - Additional Financing Project ID: P Team Leader: Gerald Ollivier Sector Manager: Motoo Konishi Country Director: Anand K. Seth Environmental Category: A - Full Assessment (carried out for original project) FY Annual Cumulative Current closing date: 09/30/2009 Revised closing date: 12/3 1/2010 Does the restructured or scaled-up project require any exceptions from Bank policies? Have these been approved by Bank management? Is approval for any policy exception sought from the Board? No N/A No Revised project development objectives/outcomes. The project design, components, development objectives and expected outcomes would remain the same. For Additional Financing [XI Loan [ 3 Credit [ ] Grant Total Bank financing ( m.): 35.3 (US$m equivalent) Proposed terms: IBRD terms, with a maturity of 13 years, including a 4 year grace period, at the Bank s standard interest rate for a variable spread loan in Euro Source Borrower IBRD/IDA Others Total Financing Plan (US$m. Eauivalent) Local Foreign Total

6

7 A. Introduction 1. This Project Paper seeks the approval of the Executive Directors to provide an additional loan in an amount of 35.3 million (US$48.0 million equivalent) to the Port of Rijeka Authority, with the guarantee of the Republic of Croatia for the Rijeka Gateway Project (P043195) and the corresponding Loan No HR. The financing is to be made available on IBRD terms with a maturity of 13 years, including a 4 year grace period, at the Bank s standard interest rate for a variable spread loan in Euro. 2. The proposed additional loan would help finance the cost associated with: (i) cost overrun in completing the construction of the main port component, the Zagrebacko Terminal ( 38.6 million); and (ii) financing gap in technical services to prepare the concession arrangements for the Zagrebacko Terminal ( 1.5 million). The project design, components, development objectives and expected outcomes would remain the same. 3. There will be no co-financing from other donors for this particular project. B. Background and Rationale for Additional Financing ( 35.3 million) 4. The original estimated value of the Rijeka Gateway Project was US$266.1 million, supported by three loans of respectively US$55.1 million to the Port of Rijeka Authority (PRA), US$84.1 million to the Croatian Roads, and US$17.3 million to the Croatian Motorways. The Croatian Road and Croatian Motonvays are in the final stage o f implementation of their respective components and would be able to complete their part of the project with the existing loan and their own funds. The first Loan (No.4715-HR) with PRA is the Loan for which Additional Financing is sought. 5. The Loan was approved on July 8, 2003 and became effective on October 10, The project s original objective was to improve the effectiveness of the transport chain through the Rijeka Gateway for both freight and passenger traffic by modernizing the port and road network connections, and privatizing port operations. The original objectives, design, or scope have not been modified with only one significant exception. Several warehouses, originally expected to be demolished under the project, were later on protected and preserved as buildings of historical significance. A review of progress toward meeting the project objectives is presented in the table below. 6. The Project has had solid performance in terms of outputs, outcomes and results, as confirmed by the October 2006 Mid-Term Review. Level of disbursement reached 61 percent of project funds and commitments 86 percent, with most remaining commitments expected within a year. The project is also on track to meet its project development objectives for all criteria. The Borrower is in compliance with the loan covenants.

8 Overview of Objectives and Outcome/Impact Obi ective: Outcome/Impact Indicators Between 2003 and 2006, percent and passenger tras cargo grew from 15,2 15 TE Increasing private sector involvement in financing and operating transport sector infrastructure and services Private sector participation in the port has been slower than anticipated, but progress is expected over the coming 18 months based on: (i) recent amendmen law on Seaport; and (ii) two new assignments being contra to secure additional private sector involvement in the pres ssionaire and in the new terminals under development. ajor private operators indicated their interest in participating. financial PRA fin ctations with an pected value of 200 Port/City environment is enhanced through The Port Authority and the City mad discussions regarding the DeltdPort ificant progress in their s redevelopment, privately financed urban development although by its nature and the range of constraints it faces, this aspect will require additional support and management attention to materialize. e Total road maint largely exceedin in the Project Po Sections of the R D404 were open expected to be ope1 to be met. vel of US$l55 mil 7. The Project Implementation Progress and Development Objectives have been satisfactory or better over the past 12 months: ISR 9 (04/03/06) IP and DO Highly Satisfactory - ISR 10 (10/31/06) IP and DO Satisfactory. The project does not face problems in terms of Fiduciary, Environmental, Social or other Safeguards aspects. The part managed by PRA, for which extension is required, is rated satisfactory on financial management, procurement and environment. 8. Cost Overrun-Civil Works. Soil conditions prevalent at the location of the Zagrebacko Terminal have proven to be much weaker than anticipated at the time of design and contracting the civil works, requiring soil consolidation works prior to proceeding with the terminal construction. Given the depth of the sea bottom (minus 35 meters) and the thickness of the soil strata requiring treatment (19 meters), only a few contractors worldwide have the capability and expertise required to accomplish the 2

9 needed soil consolidation works. The cost of required soil strengthening work is estimated at 25.5 million plus 5.5 million of contingencies. In addition, changes in market demand and construction code (alignment to EuroCode) call for strengthening the terminal for larger container vessels at a preliminarily estimated cost of 7.6 million. Since a contractor for the terminal construction is already in place, the borrower is incurring significant daily stand-by costs until a technical, financial and procurement solution for soil strengthening is secured. 9. Soil Conditions. The results and suitability of the tests carried out to ascertain soil conditions and characteristics have been confirmed by relevant and qualified specialists. As part of the revisions to the construction permit for the Zagrebacko Terminal, new soil investigations were requested by local reviewers in These indicated significantly weaker soil conditions than anticipated in the design phase. In consequence, PFU recruited, through the Project Engineer for the Terminal, an international expert to define and monitor a plan of soil investigation. A comprehensive set of investigations were carried out accordingly between March and October 2006, providing a full analysis in November The results of this analysis have been formally endorsed by all national and international technical parties working on the project as providing a sound representation of the soil condition. 10. Technical solutions/options. Following the confirmation of the soil conditions, PRA requested the international project designer to identify and compare the main applicable technical alternatives. Five alternatives were considered to consolidate the ground conditions: dredging and replacement, gravel compaction piles, deep concrete mixing, sand gravel drainage, and gravel piles/drains. Among those methods, the gravel compaction pile method is the option favored by PRA, the Designer and the Design Reviewers. Based on their inputs, it offers the following characteristics: (i) expected lower cost; (ii) technology known to reviewers and as such more likely to be approved; (iii) no critical environmental aspects (use of sand and gravel as main material) and in line with existing environmental impact assessment; (iv) more competition than for the second-best method; and (v) no major technical limitations to applicability. The Basic Design Report has been issued, and the project designer received feedback for inclusion in the preparation of the Detailed Design Financing Gap-Consultant Services. The project costs were all estimated in U S Dollars in 2003, at the time of the original project appraisal. Between 2003 and 2007, the exchange rate between the US Dollar and Euro dropped from a parity of US$O.9 for 1 to US$1.36 for 1. Since the loan was in US Dollars and several consultant contracts were awarded to European firms, the resulting consultant costs under the project became higher than originally anticipated, and almost all funds in the consultant category have been used. In consequence, additional funding is sought to prepare the technical documentation and arrange for a concession transaction for the Zagrebacko Terminal. This activity was part of the original project. 12. Rationale. The Borrower has requested the Bank to provide additional financing to complete these two components related to the Zagrebacko Terminal, which is central 3

10 to the project development objectives. The port of Rijeka will need new capacity to accommodate fast growth in container traffic (increased by 520 percent in four years) as soon as feasible. The concession of the terminal is also central to the Government policy of increasing private sector participation in the port sector, as demonstrated by amendments made to the Law on Seaport in December In addition, since a contractor for the construction of the Terminal is already mobilized, rapid resolution of the soil consolidation aspects is required to limit the level of stand-by cost. C. Proposed Changes 13. The Project development objective, design and scope would not be modified as a result of this additional financing, but the additional financing would enable objectives related to the Port Component to be achieved. 14. The additional financing will cover the financing gap coming from the cost overrun in the completion of the Zagrebacko Terminal ( 34 million from the loan) and the financing gap in technical services to prepare concession arrangements for the Zagrebacko Terminal ( 1.3 million from the loan). The present delays in securing a proper soil consolidation method are expected to lead to total delays in construction of about 15 months, with a corresponding postponement of the closing date for the original loan by 15 months, to December 3 lst, Summary of Complementary Changes 15. Institutional Arrangements. The additional loan will use the existing project management structure, strengthened with suitable expertise in large civil works implementation. While PRA has performed satisfactorily in terms of proj ect management with over 30 contracts to date, the present implementation team has limited experience in large civil works of this type, and as such will secure additional expertise for the team, in the form of specialized consulting services, considering the complex remedial marine works that need to be implemented. 16. Project Cost and Financing Plan. The total additional cost for the terminal is estimated at 38.6 million and the cost of the technical documentation and concession arrangements at 1.5 million for a total of 40.1 million. The Additional Loan will cover 35.3 million. The Ministry of Sea, Transport, Tourism and Development (MSTTD) will provide to PRA counterpart funding in the estimated amount o f 4.8 million to support the implementation of these two items. This is consistent with the original commitment of the State of Croatia in the Letter of Development Policy dated May 22, 2003 to provide an estimated HRK320 million to contribute to the Rijeka Gateway Project. MSTTD will also cover standby cost on the on-going construction contract. 4

11 Table 1. Cost and Financing Plan Amount in Euro (millions) Total State World Bank Cost Overrun 1.I Soil Improvement Strengthening of terminal to meet Eurocode and to handle containers I.3 Contingencies Financing Gap 1.4 Zagreb Pier Concession Arrangements Total Financial Management and Disbursement. The financial management functions of the additional financing will be handled by the Rijeka Port Authority PIU, and the PIU will be responsible for the flow of funds, accounting, reporting, and auditing. There would be no changes in financial management and disbursement arrangements except for the percentage of expenditures to be funded by the additional loan established at 88 percent. 18. The financial management arrangements of the Rijeka Gateway Project implemented by the Rijeka Port Authority have been reviewed periodically as part of project supervision and have been found satisfactory. According to the latest Financial Management supervision of Rijeka (September 2006), the financial management arrangements of the project continue to be satisfactory and the control procedures are in place. The client is in compliance with the audit covenant: all the audit reports have been received to date and there were no delays in submitting them to the Bank. For the project financial statements, the auditors have given unqualified opinion and there were no internal control issues in the management letter. For the entity, the auditors have given an unqualified opinion and there were several issues in the management letter, which have been addressed by the management. 19. The financial management arrangements of the project are acceptable to the Bank. The overall FM risk for the project is moderate. 20. Similar audit arrangements will be adopted for the additional financing, which will be included in the overall Rijeka project audit. The audit of the project will be conducted by independent private auditors acceptable to the Bank, on terms of reference acceptable to the Bank, and procured by Rijeka Port Authority. The annual audited project financial statements will be submitted to the Bank within six months of the end of each fiscal year and also at the closing of the project. The cost of the audit will be financed from the proceeds of the loan Project management-oriented Interim Un-audited Financial Reports (IFRs) - previously known as Financial Monitoring Reports (FMRs) - will be used for the additional financing monitoring and supervision. The existing formats of the IFRs will be used and the PIU will produce a full set of IFRs/FMRs every quarter throughout the life 5

12 of the project and will submit them to the Bank no later than 45 days after the quarter end. 22. Procurement. Procurement rules would remain unchanged. Given the size of the additional works, the procurement approach for the soil consolidation works would be reviewed formally by the Operations Procurement Review Committee of the Bank, prior to proceeding. 23. Environment. The proposed method of soil consolidation was foreseen in the original construction permit, and as such remains within the parameters presented in the original Environmental Assessment and Environmental Management Plan for the Rijeka Gateway project. Furthermore, based on consultation with ECA Safeguards team and as stipulated in the Guidance to Staff on Processing Additional Financing, there i s no need to issue an updated Integrated Safeguard Data Sheet since the technical aspects envisaged under this additional loan are covered under the existing Integrated Safeguard Data Sheet for the project. D. Consistency with CAS 24. The Rijeka Gateway Project supports a core pillar of the Country Assistance Strategy (No HR discussed by the Board on December 21St, 2004) by reducing the cost of doing business and improving the investment climate, in particular in the port sector. It contributes to the program of transport infrastructure modernization of the Croatian Government, which places a strong emphasis on increasing the capacity of Pan- European transport corridors. Those corridors carry the vast majority of trade, transit and tourist traffic between the EU and the Southeast European region and within the region. The inter-modal connectivity of the Rijeka Gateway to the Northeast Corridor Vb to Central Europe is one of the highest priorities. As indicated in the CAS Progress Report, the Government is also seeking a new loan in FY08 to support a follow- up phase for the Rijeka Gateway project, the Rijeka Gateway I1 project. This new project, building on an updated port masterplan, would support the next phase of development of the port. E. Economic Analysis of Cost Overrun/Financing Gap 25. The initial economic analysis carried out in the Project Appraisal Document of the Rijeka Gateway Project reflected the cost and benefits of an investment aiming to develop the Zagrebacko Pier as a multi-purpose terminal, mostly handling low valueadded timber traffic. In 2003, container traffic was too low to consider it a major source of economic benefits. The proposed investment was estimated to have an economic rate of return of 13.8 percent and a net present value of US$3 million with a 12 percent discount rate. 26. Traffic trends have changed significantly since the original project appraisal and provide the basis to support these additional investment costs in the Zagrebacko terminal. Containerized cargo through the port of Rijeka has been growing at over 20 percent a year for the past eight years and is expected to continue to grow rapidly, as transit from the Far East to Central European countries through the Northern Adriatic ports hrther 6

13 expands. Provided proper port capacity is in place, corridor transport cost savings from the Far East to Central European markets using Northern Adriatic ports compared to the Northern European ports are substantial. 27. Based on larger traffic volume and economic benefits coming from corridor cost savings in the use of the transport corridor through Rijeka to Central Europe instead of through Northern European ports, the completion of the Zagrebacko Terminal as a container terminal would offer a higher economic rate of return than originally foreseen, The investments in the Zagrebacko Terminal are estimated to have a net present value of 1 7 million (at 12 percent discount rate) and an economic rate of return of 15 percent. F. Risks 28. Marine Works Risks. Deep-sea marine works are inherently complex and a significant source of technical and financial risks. Highly specialized pieces of equipment need to be mobilized and are subject to high daily stand-by costs in case works can not be performed for reasons beyond the responsibility of the contractor or sub-contractor, such as weather related risks. To address this risk, PRA will expand its project implementation team to ensure proper capacity is in place to manage such complex works appropriately. The terminal designer for these works will be required to identify specifically the risks likely to emerge in the implementation of these works to facilitate their monitoring and identify remedial actions. 29. Withdrawal from Existing Contractor. While the existing contractor for the terminal construction has remained in place up to now, given the delays experienced to date and slow resolution of stand-by cost payments, the contractor may decide to withdraw from the ongoing contract and charge penalties specified in the existing contract. The addition of marine works as a subcontract considerably increases its risks. Accordingly the contractor will need to feel confident about the proposed contractual arrangements including the definition of liability for delays in marine works by its nominated sub-contractor, and the clarification in responsibility to cover existing and potential stand-by cost payments. To address this risk, PRA and the terminal designer will work closely together with the contractor when specifying the qualification requirements for the subcontractor in charge of soil consolidation works and contractual terms. In case the contractor decides to withdraw, the entire terminal construction would be re-tendered. 30. Permitting Process. Once the design for the soil consolidation technical solution is completed, PRA will need to amend the construction permit accordingly. In the past, these modifications have proven, at times, to be complicated and lengthy. They may lead to a postponement of the start of works until all aspects have been designed, reviewed and approved. The Ministry of Sea, Transport, Tourism and Development indicated it would follow up these aspects with the Ministry for Environment, Physical Planning & Construction to accelerate this process. 7

14 G. Financial Terms and Conditions For The Additional Financing 31. The additional loan would have BRD terms, with a maturity of 13 years, including a 4 year grace period, at the Bank s standard interest rate for a variable spread loan in Euro. The use of the Euro would enable a better match between local costs and sources of financing while the VSL offers a lower cost of borrowing to PRA than an alternative fixed spread loan. 8

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864) Public Disclosure Authorized SOUTH ASIA Afghanistan Transport & Digital Development Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 09-Feb-2018

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SAFE AND SUSTAINABLE TRANSPORT PROJECT LOAN December 10, 2009 IN THE INITIAL AMOUNT OF (US$ {150}

More information

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank LK GPOBA - Access to Sanitation Project (P111161) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

The World Bank Sustainable Croatian Railways in Europe (P147499)

The World Bank Sustainable Croatian Railways in Europe (P147499) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SUSTAINABLE CROATIAN RAILWAYS IN EUROPE APPROVED ON APRIL 30, 2015 TO HZ INFRASTRUCTURE,HZ

More information

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020731 Public Disclosure Authorized Public Disclosure Authorized Project ID P116080 Project Name EXPORT

More information

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 4299 - AZ Public Disclosure Authorized Public Disclosure Authorized PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING

More information

The Bank s Emergency Policy

The Bank s Emergency Policy The Bank s Emergency Policy 04/10/2006 1 Emergency Recovery Assistance OP 8.50 Bank emergency assistance may take the form of (a) immediate support in assessing the emergency's impact and developing a

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)

SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270) Public Disclosure Authorized SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice IBRD/IDA Specific Investment

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650) ON A LOAN IN THE AMOUNT OF EURO 90.0 MILLION (US$ MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650) ON A LOAN IN THE AMOUNT OF EURO 90.0 MILLION (US$ MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650)

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)

The World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No:

More information

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020001 Public Disclosure Authorized Project ID P100580 Country Ukraine Project Name ROADS & SAFETY IMPROVEMENT

More information

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Public Disclosure Authorized East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Terms of Reference [COUNTRY] [PROJECT NAME] Pilot PPP/CONCESSION PROJECTS. Consulting Services

Terms of Reference [COUNTRY] [PROJECT NAME] Pilot PPP/CONCESSION PROJECTS. Consulting Services Terms of Reference [COUNTRY] [PROJECT NAME] Pilot PPP/CONCESSION PROJECTS Consulting Services I BACKGROUND 1. The Ministry of [ ] and the World Bank entered into an [AGREEMENT] signed on [DATE] for a period

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information

Tuvalu: Outer Island Maritime Infrastructure Project

Tuvalu: Outer Island Maritime Infrastructure Project Project Design Advance Project Number: 48484-003 November 2015 Tuvalu: Outer Island Maritime Infrastructure Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

Loan Agreement. (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA. and

Loan Agreement. (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA. and CONFORMED COPY LOAN NUMBER 4674 HR Loan Agreement (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated September

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT LOAN 7731-ID JUNE 24, 2009 TO THE REPUBLIC

More information

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER

More information

Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project

Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project PD 00001-PAK June 6, 2016 PROJECT DOCUMENT Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project This document has a restricted distribution and may be used by recipients

More information

Global Environment Facility Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF 052141 HR RELATED TO LOAN NUMBER 7198 HR Public Disclosure Authorized Global Environment Facility Trust Fund Grant Agreement (Energy

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.108 Issued August 18, 2017 Effective August 18, 2017 Retired November 9, 2017

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROJECT TO IMPROVE EDUCATION QUALITY IN MALAWI PROJECT LOAN TO THE REPUBLIC OF MALAWI Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT

More information

b.were the project objectives/key associated outcome targets revised during implementation? No

b.were the project objectives/key associated outcome targets revised during implementation? No Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14721 1. Project Data: Date Posted: 06/24/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778)

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Operation Name: Revenue Administration

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.109 Issued November 10, 2017 Effective November 10, 2017 Content Operational policy

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.110 Issued September 30, 2018 Effective October 1, 2018 Content Operational policy

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF ENERGY

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF GRANT NUMBER TF092100 Public Disclosure Authorized Global Environment Facility Grant Agreement (Agricultural Development Program Support Project) Public

More information

The World Bank Municipal Services Improvement (P096481)

The World Bank Municipal Services Improvement (P096481) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Macedonia, former Yugoslav Republic of Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 15 ARCHIVED on 15-Jun-2015

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

Project development objective/outcomes

Project development objective/outcomes Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Project No: 105602 PROPOSED PROJECT

More information

PHARE PROJECT FICHE. 2.3 Accession Partnership, NPIEU priority and Croatian Transport Development Strategy

PHARE PROJECT FICHE. 2.3 Accession Partnership, NPIEU priority and Croatian Transport Development Strategy PHARE PROJECT FICHE 1. Basic Information 1.1 CRIS Nr.: HR2006/018-113/5/1 1.2 Title: Restructuring and Development of Croatian Railway System within the framework of EU legislation 1.3 Sector: 43010 1.4

More information

Independent State of Samoa: Port Development Project

Independent State of Samoa: Port Development Project Project Design Advance Project Number: 47358-003 April 2018 Independent State of Samoa: Port Development Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

OFFMCAL. olrakdocuments,

OFFMCAL. olrakdocuments, Public Disclosure Authorized Th OFFMCAL. olrakdocuments, The World Bank 1818 H Strelft N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOP Pll.I Vaiil.rdy6, D.C. 20433 Cable Address:

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020321 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project ID P107840 Country Macedonia, former

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Integrated Safeguards Data Sheet (Initial) Section I - Basic Information Date Prepared/Updated: 06/16/2003 A. Basic Project Data (from PDS) I.A.1. Project Statistics Country: EGYPT, ARAB REPUBLIC OF Project

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project Validation Report Reference Number: PVR-360 Project Number: 40198 Loan Number: 2374 December 2014* Viet Nam: Ho Chi Minh CityLong ThanhDauGiay Expressway Technical Assistance Project Independent Evaluation

More information

Turkey s World Bank Portfolio in Context. Sally Zeijlon ECA Quality Unit Manager February 6, 2012

Turkey s World Bank Portfolio in Context. Sally Zeijlon ECA Quality Unit Manager February 6, 2012 0 Turkey s World Bank Portfolio in Context Sally Zeijlon ECA Quality Unit Manager February 6, 2012 1 Turkey in the World Bank and ECA Turkey s loans are significant in the Bank s loan portfolio Commitments

More information

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020839 Public Disclosure Authorized Public Disclosure Authorized Project ID P108080 Project Name XK

More information

Road and Transport Management Project Phase II SAU/10/51658

Road and Transport Management Project Phase II SAU/10/51658 UNITED NATIONS DEVELOPMENT PROGRAMME United Nations Department of Social and Economic Affaires (UNDESA) Project of the Government of the Kingdom of Saudi Arabia Ministry of Transport (MOT) Road and Transport

More information

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6343-RW. Public Disclosure Authorized. (Housing Finance Project)

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6343-RW. Public Disclosure Authorized. (Housing Finance Project) Public Disclosure Authorized OFFICIAL DOCUMENTS CREDIT NUMBER 6343-RW Public Disclosure Authorized Financing Agreement (Housing Finance Project) between Public Disclosure Authorized REPUBLIC OF RWANDA

More information

Completion Report. Project Number: Loan Number: 2327 October Maldives: Domestic Maritime Transport Project

Completion Report. Project Number: Loan Number: 2327 October Maldives: Domestic Maritime Transport Project Completion Report Project Number: 37265 Loan Number: 2327 October 2013 Maldives: Domestic Maritime Transport Project CURRENCY EQUIVALENTS Currency Unit Rufiyaa (Rf) At Appraisal At Project Completion (1

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Corporate and Financial restructuring of the road sector Context

Corporate and Financial restructuring of the road sector Context Corporate and Financial restructuring of the road sector The Croatian Government (the Government) is committed to optimizing the debt held by public companies in the road sector, and wants to achieve a

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Republic of Albania Country Office January 2018 Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Albania Country Office (2017/24) 2 Summary

More information

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

The World Bank Kenya Infrastructure Finance/PPP project (P121019) Public Disclosure Authorized AFRICA Kenya Financial Systems Practice Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 4 ARCHIVED on 22-Dec-2014 ISR17114 Implementing Agencies: Public Private

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country.

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619 Project

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Senegal Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 21-May-2018 ISR32084 Implementing Agencies:

More information

Bangladesh Insurance Sector Development Project (P156823)

Bangladesh Insurance Sector Development Project (P156823) SOUTH ASIA Bangladesh Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 11-Oct-2018 ISR34079 Implementing Agencies: PEOPLE'S REPUBLIC

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

International Bank for Reconstruction and Development International Development Association

International Bank for Reconstruction and Development International Development Association Report No. 49153-AL International Bank for Reconstruction and Development International Development Association Albania - Integrated Coastal Zone Management and Clean-Up Project Progress Report on the

More information

Document of The World Bank RESTRUCTURING PAPER

Document of The World Bank RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 60062-XK Public Disclosure Authorized Public Disclosure Authorized PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT

More information

IN THE AMOUNT OF SDR 10.0 MILLION (US$lS.O MILLION EQUIVALENT)

IN THE AMOUNT OF SDR 10.0 MILLION (US$lS.O MILLION EQUIVALENT) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2518 Operation Name

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Armenia Energy & Extractives Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 1 ARCHIVED on 24-Sep-2015 ISR20717

More information

Liberia Reconstruction Trust Fund Implementation Manual

Liberia Reconstruction Trust Fund Implementation Manual Liberia Reconstruction Trust Fund Implementation Manual Updated November 2009 2011-02-28 LRTF Implementation Manual 1 I. Background... 3 II. Coverage... 3 III. General Principles... 4 IV. Project Development

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank Egypt National Railways Restructuring Project (P101103) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Transport Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 19-Mar-2015 ISR18375 Implementing

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 12 ARCHIVED on 08-Dec-2017

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

The World Bank Water and Sanitation in Tourist Areas (P054221)

The World Bank Water and Sanitation in Tourist Areas (P054221) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WATER AND SANITATION IN TOURIST AREAS APPROVED ON APRIL 2, 2009 TO THE

More information

Second Science & Technology Project (P127308)

Second Science & Technology Project (P127308) EUROPE AND CENTRAL ASIA Croatia Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 12 ARCHIVED on 31-Oct-2018 ISR33160 Implementing Agencies:

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

US$M): US$M): (US$M. Cofinancing (US$M US$M):

US$M): US$M): (US$M. Cofinancing (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14162 1. Project Data: Date Posted : 05/20/2014 Public Disclosure Authorized Public Disclosure Authorized Public

More information

OP Investment Project Financing. Bank Access to Information Policy Designation Public

OP Investment Project Financing. Bank Access to Information Policy Designation Public Bank Policy - Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPSVP5.03-POL.103 Issued Effective July 1, 2014 Last Revised On July 1, 2016 Retired July

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Madagascar Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2006 Seq No: 21 ARCHIVED on 30-Dec-2014 ISR17647 Implementing Agencies: Public Disclosure

More information

The World Bank Egypt National Railways Restructuring Project (P101103)

The World Bank Egypt National Railways Restructuring Project (P101103) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 21 ARCHIVED on 05-Jun-2018

More information

The World Bank Second Karnataka State Highway Improvement (P107649)

The World Bank Second Karnataka State Highway Improvement (P107649) Public Disclosure Authorized SOUTH ASIA India Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 10 ARCHIVED on 31-Jul-2015 ISR18834 Implementing Agencies: Karnataka Road