1 STUDY ON ECONOMIC PARTNERSHIP PROJECTS IN DEVELOPING COUNTRIES IN FY2011 Study on the Bypass Road Project in Dalton Pass Republic of the Philippines SUMMARY February 2012 Prepared for: The Ministry of Economy, Trade and Industry Prepared by: 第 1 章 Kensetsu Gijyutsu Center,LTD 第 2 章 Infrastructure Development Institute-Japan Central Consultant Inc.

2 (1) Background and necessity of the project Dalton Pass is an important arterial road linking Metro Manila to the Central / Northern regions of Luzon. Natural disasters caused by typhoons and earthquakes have frequently brought closures of the Dalton Pass up to now. Among other things, 1990 Baguio earthquake caused damages to the Dalton Pass which led to a closure of the road for a long duration. As surrounding areas it traverses have a high risk of earthquake occurrences, it has long been apprehended that re-occurrence of major earthquake will also cause closures of the road. Major typhoons have attacked the area in these years accompanying many human losses and physical damages, and there are concerns that typhoons will also bring closures of the Dalton Pass road. Thus, alternative roads of the Dalton Pass have been proposed in view of such backgrounds, and many surveys and investigations have been conducted to study the existing Dalton Pass and conceivable alternative roads. (2) Basic policy of the contents of the project determined A closure of the Dalton Pass which lasted about 6 months in the wake of the 1990 disaster, resulted in a great deal of damages to the economy and society of the Philippines. Damages caused by typhoons lead a closure of the road every year. In such situations, studies have been conducted for 20 years more or less, but no project has been in progress. As there are no alternative roads existed, the government of the Philippines has high expectations toward the construction of a Dalton Pass By-pass road, which will contribute to the development of the Northern region of Luzon. Thus, the basic policy was determined with the focus on the following matters, upon determining the details of this project. To improve efficiency of the road function during normal circumstances To determine the best measure with the focus on road planning which allows to maximize the road function during disaster as well as normal circumstances. To improve durability against the impact of earthquakes and typhoons To determine the best measure with the focus on road planning which allows the road function to be recovered in a short period of time from the impacts caused by a great earthquake and typhoon. To reduce operating costs and maintenance costs To determine the best measure with the focus on road planning which allows to reduce total operating costs as well as to reduce maintenance management costs. Reduction of cost-benefit As for cost-benefit, to determine the best measure with the focus on road planning which allows to generate the maximum road cost-benefit during normal circumstances. 1

3 To reduce travel distance and time To determine the best measure with the focus on road planning which allows to reduce the travel distance and time, in order to improve the above mentioned cost-benefit. 2

4 Figure-1 Project location map Dalton Bypass Road Target Area Source:Philippines High-standard Highway Network Master Plan, JICA with additions by the study team July

5 (3) Outline of the project 1. Road planning For this proposed project, the existing local road at the start point of the proposed project shall be improved so that the relevant section of the road is offered earlier for use. In addition to the existing drafts, three new drafts were proposed and a comparative study carried out. Table-1 Draft of the proposed project Existing plan Proposal Section Alternative-0 Alternative-1 Alternative-2 Alternative-3 Tunnel Tunnel Tunnel Tunnel L=1.0km L=5.0km L=3.65km L=2.0km Function as an Road function alternative of Road function in normal circumstances existing road Designed speed 30km/h 50km/h Travel time (Existing road 80 min) 100 min 60 min 70 min 105 min Extension (Existing road 53Km) 65 Km 56 Km 58 Km 60 Km Figure-2 Whole project plan Dalton path current road Section for Improvement of Existing Local Roads 4

6 Figure-3 Profile Figure Whole project cross-section 5

7 2. Tunnel planning Drivability of the entire route has been taken into account, at the same time, construction costs, fire-prevention equipment and maintenance management have been taken into account, and also cost-benefit has been studied. As a result, optimal length of the tunnel to be extended would be about 2,000m. Results of the study are as follows. Width of roadway:3.250m 2 Width of road shoulders:1.000m 2 Architectural limits:4.88m Ventilation:Jet fan 1250mm 20 units Tunnel disaster prevention facilities:a grade(emergency telephone 10 locations, fire hydrant 40 locations, and others) Inner-sectional area :Approximately 62.5m 2 Emergency bay:4 locations (see below) Amount of excavated soil:approximately 150,000m 3 Ground being excavated: Granite, Granodiorite Excavation method:blast excavation Drilling:Full face excavation method with auxiliary bench Upper half bench cut method (up/down alternating Tandem) Figure-4 Tunnel plan and Cross section 670m 750m 580m Emergency parking bay Emergency parking bay Emergency parking bay Emergency parking bay 590m 750m 660m 6

8 3. Bridge Planning Japan s earthquake proof bridge bearing has been developed based on the experiences suffered by frequented earthquakes, also studied and developed together with public and private sectors. For earthquake proof bridge bearings, there are seismic isolation bearings, horizontal reaction force isolation bearings, and functional separation bearings which have been studied and developed widely, as well as sold in the market. In terms of the safety and the low cost, the procurement of functional separation bearings is recommended. Functional separation bearing:this is a safe and low cost bearing, which separates both super structure vertical reaction forces and seismic horizontal reaction forces, and supports each force. It also has a function to distribute horizontal reaction forces. It distributes optimal load of seismic horizontal reaction forces to each pier. Figure-5 Cross section of Functional separation bearing Note) It is also applicable to copper girder bridges. 7

9 4. Estimated project cost Estimated construction cost Table-2 Construction cost Unit:million PHP Estimated maintenance management cost Table-3 Maintenance management cost Unit:million PHP 8

10 5. Economic evaluation and Financial analysis Basic concept Economic evaluation is conducted to judge the feasibility of the project from the viewpoint of national economy by comparing the inputs (project cost and maintenance cost) and benefits generated by implementation of the project. Benefits which are grasped by comparing with-case and without-case are savings of various cost, merit for road users and residents, and national economic development etc. Merits derived from implementation of the project will be following 2 types of advantages; i. Driving comfort on the project road will be superior than that of the existing road ii. Avoid of loss of vehicle operation cost and travel time cost caused by long distance detour traffic in the traffic suspension by the natural disasters Regarding i. mentioned above, it will be measured in accumulated saving of vehicle operating cost during 25 years of evaluation period as a benefit of reduction of total vehicle operation cost of all vehicles passing on the project road comparing that on the existing road. As to ii. mentioned above, this benefit which has been treated several times in the past feasibility study for Dalton Pass is to avoid of making a wide detour in emergency time such as natural disaster through the national highways in the east or west side of Luzon (Region-2, Region-3). Estimated Benefit Estimated benefit in the year of 2020, 2030, 2035 calculated by using unit of vehicle operating cost and travel time cost is shown in the following table. Table-4 Estimated benefit Unit:million PHP Case Benefit Alternative-0 Alternative-1 Alternative-2 Alternative-3 VOC 729 1,072 1,302 TTC ,066 VOC 1,578 2,327 2,832 TTC 868 1,409 1,799 VOC 1,619 2,387 2,905 TTC 894 1,451 1,854 VOC 1,660 2,448 2,978 TTC 920 1,494 1,909 9

11 Evaluation result Economic Internal Rate of Return (EIRR), Benefit cost ratio (B/C) and Net Present value is calculated as indices of economic evaluation through cash-flow analysis for the evaluation period of 25 years, and the result of the calculation is shown in the following table for each alternative. Alternative-1, 2, 3 is judged to be feasible in accordance with the figures of EIRR, 16%, 18%, 21% respectively, on the other hand alternative-0 shows only 13% and it is not feasible. Alternative-1 with EIRR=16%, it will be recommended to deal with the cost reduction considering the fluctuate of the social and economic future situation. Table-5 Evaluation result Unit:NPV million PHP case EIRR B/C NPV Alternative-0 13% ,114 Alternative-1 16% Alternative-2 18% ,054 Alternative-3 21% ,615 Avoid of loss in the traffic block on the existing road According to the DPWH report (Dalton Pass East Alternative Road, Economic Feasibility Re-evaluation, 2011), 9 days of traffic blockage due to typhoon occurred. Based on this fact, regarding 2 cases; 1in case of 6months traffic blockage due to the significant earthquake, 29 days traffic blockage by typhoon in normal year, economic loss has been estimated in this study. Cost/benefit analysis is not conducted here. Following 2 routes were treated as detours Table-6 Detour routes detour Distance Travel time Western Route-A 674km 10.8 hours Western-route-B 738km 11.8 hours The difference of travel distance between Detour routes and Dalton pass is calculated as below. Additional travel distance Western Route-A : 674km - 400km = 274km Western Route-B : 738km - 150km = 588km Additional travel time Western Route-A : 274km 60km/h = 4.6hours Western Route-B : 588km 60km/h = 9.8hours 10

12 Total amount of the loss come up to 9,412 million PHP for 6 months traffic blockage. Total amount of the loss by traffic blockage during 6 months (180 days) was estimated 9,412 million PHP as mentioned above. According to this result, loss due to 9days blockage was estimated in 470 million PHP in the normal year. Therefore, planned bypass road can avoid the loss of 470 million PHP every year. Financial analysis An earning against the project cost in the event where tolls are collected for the tunnel section is calculated in here. Upon setting these toll fares to be collected, Philippines toll highway fares will be referred to. The current toll fares in the Northern Luzon Expressway are shown in the table below. Project Cost It take the minimum rate (proportional at distance) of the expressway of the Philippine country into account, and the pricing in the tunnel section sets it. But the rate resistance does not consider it. Table-7 Examples of Tunnel toll fare setting for Project Cost Vehicle class Draft-0 Draft-1 Draft-2 Draft-3 Tunnel length proposed 0.90km 5.00km 3.65km 2.00km Class-1 (Passenger cars, Motorbikes, SUV, Jeepney) Class-2 (Bus, Light truck) Class-3 (Heavy vehicle) Source:Created by the Investigation team It became the following table calculated FIRR based on this rate, and it followed that It could not lead good rate of return by all routes. Table-8 FIRR calculation results Draft-0 Draft-1 Draft-2 Draft-3 FIRR -12% -3% -5% -8% Source:Created by the Investigation team Maintenance and Operation Cost Maintenance and Operation expense is expensive in the tunnel section. Consider that the one that covered maintenance administrative expense with a rate income was desirable and calculated rate of return in the maintenance administrative expense. The rate set the following amounts of money in reference to the price of north Luzon expressway of the neighborhood in the Philippine country. In addition, we carried out the calculation with substitute Altenative

13 Table-9 Examples of Tunnel toll fare setting for Maintenance and Operation Cost Vehicle class Draft-0 Draft-1 Draft-2 Draft-3 Tunnel length proposed 0.90km 5.00km 3.65km 2.00km Class-1 (Passenger cars, Motorbikes, SUV, J ) Class-2 (Bus, Light truck) Class-3 (Heavy vehicle) Source:Created by the Investigation team As a result of having calculated rate of return, about until 2018 through 2035 of the in-service start, the maintenance administrative expense is a rate income like the following lists Table -10 Toll collection and maintenance costs (1,000PHP) Year Toll income Maintenance Cumulative Balance of and operation balance of payments/year cost payment ,619 20,800-1,181-1, ,385 20, , ,194 20, , ,031 20,800 1, ,883 20,800 2,083 2, ,787 20,800 2,987 5, ,726 20,800 3,926 9, ,721 20,800 4,921 13, ,730 20,800 5,930 19, ,791 20,800 6,991 26, ,891 20,800 8,091 34, ,036 20,800 9,236 44, ,247 20,800 10,447 54, ,487 20,800 11,687 66, ,784 20,800 12,984 79, ,129 20,800 14,329 93, ,543 20,800 15, , ,016 20,800 17, ,600 Source: Created by the investigation team 12

14 In cases where a toll is collected from all the vehicles which use the tunnel, Year balance of payments will turn to be profitable in 2020, which is the third year after launching the service, while Cumulative balance of payment will turn to be profitable in the 4 th year of operation. Please note that this study does not take into account of public resistance to the toll collection. Therefore, further analysis considering public resistance to the toll collection is necessary to be carried out in the future. 6. Environmental and Social evaluation The Dalton Pass Bypass Route project is an ECP (Environmentally Critical Project) in areas classified as ECA (Environmental Critical Area) which have 12 provisions. It is also necessary that DENR will give the license. It is also necessary that consultation about Indigenous People and Local Residents, including the problem of changes of residences, with related organizations shall be held in early stages. A comparison of CO 2 emission between with and without the project was carried out as the evaluation of environmental impact. The result is as below. Table-11 Comparison Chart for CO 2 Emission with & without the Project Small:Passenger car, Large:Trailer Without With Project Existing RouteExisting Route Present Plan Plan 1. Plan 2. Plan 3. Total Length 53km 53km 65km 56km 58km 60km Design Speed km/h 50km/h Speed for Trial Small 30km/h 50km/h 40km/h 60km/h Calculation Large 10km/h 30km/h 15km/h 40km/h Traffic Volume Small 5,490 1,830 3,660 Estimation in 2038 Large 7,090 2,363 4,727 Small 31, , , , , ,279.0 CO 2 Emission Large 181, , , , , ,605.3 Amount (ton/year) Total 212, , , , , ,884.3 CO 2 emission amount on bypass plus existing routes: 206, , , ,627.3 Compared to without case: 6, , , ,279.1 The estimates above reflect a design that the proposed route length gets longer than the existing road (53km). Concerning Proposals 1 through 3, while the running speed of the vehicles are kept low in the Dalton Pass Section (existing road) where the share of the large vehicle traffic volume is large, if partial traffic diversion is realized by opening the bypass route for which improvement of alignment is considered, we can expect a result that increased vehicle running speed will improve fuel consumption and contribute to restraint of greenhouse gas emission. 13

15 (4) Implementation schedule 14

16 (5) Yen Loan Request and Implementation Feasibility 1. Opinion of Partner Country s Government on Financing From discussions with related organizations, the DPWH would like to finance as much as possible using loans from foreign countries. The DPWH s thoughts on financing are listed in detail below. According to discussions with Assistant Secretary Cabral, they are hoping for as much foreign aid as possible when it comes to financing. However, since this project is fundamentally positioned as disaster prevention, they would like the project to proceed as fast as possible. For the 2012 budget, the DPWH plans to allocate 500 million pesos to this project. However, it is undecided when this budget will be carried out, and the FS Department would like to carry out the improvement of existing roads and environmental impact assessments that are included as a part of the larger project. Since this project includes a lot of construction that requires sophisticated techniques, such as building tunnels, slope protection and bridge building, significant hope is being placed on technical transfer from Japan, an earthquake-prone country that has nonetheless managed to build a solid infrastructure. The DPWH considers supporting this project extremely important, and is thus planning to include designing and carry out surveys for it in the 2012 national budget. However, they are also fully aware it would be difficult to carry out the entire project under their national budget, and would like to use loans to cover a significant portion of the project costs. In particular, they are hoping for quick support, including technical transfer, from Japan with its advanced construction techniques. 2. Actions of Related Institutions Regarding Financing According to the Public Investment Program ( ) that the DPWH submitted to the NEDA, they estimate billion pesos are needed for road projects, billion pesos for flood prevention, and 65.9 billion pesos for other projects. The breakdown for road projects includes billion pesos in aid from foreign countries, 36.6 billion pesos from PPP projects, and 527 billion pesos in national financing. The primary donors for this foreign aid include: JIBIC JICA Saudi Fund Korean Economic Development Cooperation Fund Asia Development Bank World Bank Millennium Challenge Corporation Looking at the projects using foreign aid, they can be split into the following broad categories. 15

17 1Improvement and preventative maintenance of existing roads 2Creating a highway network in the Metro Manila area 3Extending existing highways 3. Financing Outlook and Current State/Possibility of Requesting Yen Loan Since the proposed project is in the final stages of acquiring 500 million pesos in the Philippine government s budget for the next year (as of December 2011, the budget has passed in Congress, and is now being explained to Congress members from relevant areas) (according to Assistant Secretary Cabral in December 2011), we can see that the DPWH doesn t consider this one of many potential projects, but instead a project that should be undertaken as soon as possible. A request has already been made to JICA via the NEDA to help determine the details for requesting a yen loan. As mentioned previously, significant hopes are being placed on Japan regarding tunnel techniques, and although 500 million pesos has been acquired it is hoped a yen loan will cover most of the financing. Based on the results of this study, Assistant Secretary Cabral hopes to have good results from the meeting between both governments planned for April (according to Assistant Secretary Cabral in December 2011), showing a lot of expectations placed on the yen loan. 4. Approach to Acquiring Yen Loan The Philippine government has already requested aid from the Japanese government for making specific designs for this project. Also, when DPWH Secretary Singson came to Japan in September of 2011, he mentioned this Dalton Pass Project in discussions with related Japanese institutions. Additionally, our contact person Assistant Secretary Cabral also discussed the Dalton Pass Project in meetings during her December 2011 trip to Japan. Therefore, we can assume the DPWH in the Philippines is strongly hoping to proceed with this project on the condition there is a yen loan. Institutions with Japanese connections in the Philippines were also provided with information as part of this study, helping improve sharing of information. In the future, after the NEDA-ICC review and receiving permission for investment, it will be necessary to make a request via the central government for a yen loan. 5. Necessary Measures for Requesting/Receiving Yen Loan After the DPWH submitted the yen loan application to the NEDA, NEDA will deliberate and permission from the ICC will be obtained, however it is necessary for the Philippines to coordinate with the related Japanese organizations during the deliberation period as they would like early realization of this project. Also, the DPWH is under the assumption the project will be done using alternative plan 3 that the investigating team presented, however since this is a pre-fs, another FS with the alternative route as the focus will be necessary. Therefore, an FS that includes a detailed design with the intention of quickly moving the project forward is vital. Assumed topics in the agenda for a FS that includes this design are below. 16

18 Settlement of an optimum rate plan Philippines-side introduction of technical criteria documents Draw up a business plan to work out the tunnel maintenance and operation costs Select the scope of the project and yen loan Settlement of STEP case (introduction of optimum Japanese technology) The DPWH will be in the main agent in dealing with the care of the aboriginal people, however during the course of the FS, it will be necessary for in-depth information to be shared with a Japan-side consultant and for procedures to be conducted correctly following the FPIC guidelines. (6) Technological advantages of Japanese firms 1. Advantage of the tunnel (NATM) technology In Japan, the bullet train railroad and expressway networks have been developed since the 1960s in parallel with the post-war development of social infrastructure, and a lot of tunnels have been constructed. As of 2004, the total length of currently used tunnels is about 4,300 km for railroads and about 2,800 km for roads. The characteristics of the Japanese tunnel technology are as follows: Plenty of experience of tunnel construction Quality control based on the technical standards for maintenance and management, etc. Establishment of the technology for coping with complex geological conditions in a safe manner They are very advantageous for this tunnel construction. It was revealed from the survey that the ground around Dalton Path is fragile due to a fault. It was also found that unconsolidated ground and fault fracture are distributed in the tunnel area. Advanced technology is required for constructing a tunnel in such ground. Sloppy construction would cause face collapse and affect the surrounding environments, hindering the project considerably. Accordingly, it is desirable that Japanese firms, which have the technology for overcoming the fragile ground and a lot of experience, will participate. In addition, this tunnel will be the first mountain tunnel in the Philippines, and so it is essential to introduce the Japanese standards for maintenance and management, etc. Therefore, there will emerge a lot of opportunities for Japanese firms in the fields of anti-disaster, safe equipment, maintenance and management measures. 2. Seismic technology for bridges The national route from San Jose and Aritao runs along Digdig Active Fault, and so this route is often closed because of the risk of an earthquake or a typhoon. The bypass road of the Dalton Path Plan is expected to secure safety of driving in normal 17

19 conditions and function as an anti-disaster road for coping with abnormal weathers and earthquakes. This section promotes the cutting-edge aseismic technology in Japan and enhances Japanese international competitiveness and possibility to receive orders, in order to improve the aseismic performance of bridge structures. Planned bridge types and scales Planned bridge types and scales are shown in the bridge plan list of Table-8. For 9 bridges, it is assumed that the upper structure is constituted by plate girders or PC-T girders and has an average span of S = 30 m; the lower structure is constituted by inverted T abutments and protruded beam-attached wall-type piers; and the base is the cast-in-place pile type (φ = 1,000mm). The cast-in-place pile type is assumed, because the base is sand gravels and hard-packed sands and has not undergone the N-value evaluation, according to the existing column diagram of the pile spring range. Table-8 Bridge plan list 18

20 (7) Concrete schedule for realization of this project and some risks that thwart the project This project is proceeding under the presumption of the DPWH s yen loan and coordination of the Philippines. Also, the investigation team explained the project overview, schedule, project cost, and agenda to Mr. Singson, the secretary of the DPWH in January The DPWH secretary has been notified and understands that this project is going forward under the condition of the yen loan. Therefore, it is reasoned that there is sufficient information sharing on the Philippines-side during the current investigation. Information sharing on the Japanese-side will be necessary going forward. And so, beginning with the JICA, consultation and coordination with Japanese government-sponsored enterprises will be necessary during the NEDA and ICC deliberation period. The below are topics in this consultation and coordination agenda. Coordination of other Japanese aid projects to the Philippines Consultation with the Philippines regarding the presumed STEP case Export of tunnel technology with other technology projects in mind Formulation of a scheme with the purpose of bringing a quick realization of the project (8) Map of places of implementation of Feasibility Study Start Alt-3 Alt-2 Alt-1 Alt-0 End 19

in Developing Countries in FY2010 Access Road in Republic of Indonesia SUMMARY March 2011

in Developing Countries in FY2010 Access Road in Republic of Indonesia SUMMARY March 2011 Study on Private-Initiative Infrastructure Projects in Developing Countries in FY2010 Study on the PPP Project Formulation of Tanjung Priok Access Road in Republic of Indonesia SUMMARY March 2011 第 1 章

More information

Preliminary evaluation table of the project 1. Subject name Country name 2. Background and necessity of the project

Preliminary evaluation table of the project 1. Subject name Country name 2. Background and necessity of the project Japanese ODA Loan Preliminary evaluation table of the project 1. Subject name(country name) Country: The Democratic Republic of Timor-Leste Subject name: National Road No.1 Upgrading Project Date of signing

More information

PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT

PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT Pruethipong Singhatiraj 1, Chatchai Chuangching 1 and Boonkua Janbanjong 1 1 Department of Highways,

More information

Study on Private-Initiative Infrastructure Projects. in Developing Countries in FY2009. Project in Socialist Republic of Viet Nam SUMMARY.

Study on Private-Initiative Infrastructure Projects. in Developing Countries in FY2009. Project in Socialist Republic of Viet Nam SUMMARY. Study on Private-Initiative Infrastructure Projects in Developing Countries in FY2009 Study on the Expressway Operation and Management Project in Socialist Republic of Viet Nam SUMMARY March 2010 Infrastructure

More information

Ex-Post Evaluation of Japanese ODA Loan Cordillera Road Improvement Project

Ex-Post Evaluation of Japanese ODA Loan Cordillera Road Improvement Project The Republic of the Philippines Ex-Post Evaluation of Japanese ODA Loan Cordillera Road Improvement Project External Evaluator: Ryujiro Sasao, IC Net Limited 0. Summary The objective of this project is

More information

Ex-Ante Evaluation (for a Japanese ODA Loan)

Ex-Ante Evaluation (for a Japanese ODA Loan) Ex-Ante Evaluation (for a Japanese ODA Loan) 1. Name of the Project Country: The Republic of Tunisia Project: Metropolitan Railway Electrification Project (II) Loan Agreement: March 11, 2010 Loan Amount:

More information

NORTH LUZON, PHILIPPINES. Case Study (Transportation) Project Summary:

NORTH LUZON, PHILIPPINES. Case Study (Transportation) Project Summary: NORTH LUZON, PHILIPPINES Case Study (Transportation) Project Summary: The Republic of the Philippines is an archipelagic nation in Southeast Asia comprised of 7,107 islands. The Philippines is home to

More information

Executive Summary: Review Result of Jakarta MRT Project

Executive Summary: Review Result of Jakarta MRT Project Executive Summary The Study on Integrated Transport Master Plan for JABOTABEK (Phase I) Final Report Volume III (Review of Jakarta MRT Project) Executive Summary Executive Summary: Review Result of Jakarta

More information

Session 4 Status of Climate Finance in the Philippines

Session 4 Status of Climate Finance in the Philippines Session 4 Status of Climate Finance in the Philippines Workshop on Corruption Risks and Anti- Corruption Strategies in Climate Finance Manila, Philippines 25 to 27 May 2015 Summary of Day 1 2 Session objective

More information

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD 1 Introduction The objective of the cost benefit economic analysis is to identify and quantify the benefits and costs associated with the project. This

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Chittagong-Cox s Bazar Railway Project, Phase 1 (RRP BAN 46452-002) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will construct 102

More information

Republic of the Philippines FY2015 Ex-Post Evaluation of Japanese ODA Loan Post Ondoy and Pepeng Short-term Infrastructure Rehabilitation Project

Republic of the Philippines FY2015 Ex-Post Evaluation of Japanese ODA Loan Post Ondoy and Pepeng Short-term Infrastructure Rehabilitation Project Republic of the Philippines FY2015 Ex-Post Evaluation of Japanese ODA Loan Post Ondoy and Pepeng Short-term Infrastructure Rehabilitation Project External Evaluator: Kenichi Inazawa, Octavia Japan Co,

More information

Prioritising bridge replacements

Prioritising bridge replacements Prioritising bridge replacements Andrew Sonnenberg, National Bridge Engineering Manager, Pitt&Sherry ABSTRACT Road and Rail managers own a variety of assets which are aging and will need replacement. There

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Railway Rolling Stock Project (RRP BAN 49094) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves procurement of 214 meter gauge (MG) passenger carriages, 50 broad gauge (BG) passenger

More information

CBA of transport infrastructure projects in Germany

CBA of transport infrastructure projects in Germany CBA of transport infrastructure projects in Germany Dr. Catharina Horn Federal Transport Infrastructure Planning, Investment Policy Paris, 27th of February 2014 www.bmvi.de 1. The Federal Transport Infrastructure

More information

STUDY SCHEDULE STUDY PURPOSE

STUDY SCHEDULE STUDY PURPOSE STUDY SCHEDULE This Open House is the last of three public meetings for the Route Centennial Bridge Study. The material presented previously at the second Open House in July 2015 focused upon Corridor

More information

CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI

CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI TRACECA PROJECT FICHE CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI 1. BASIC INFORMATION TITLE: Construction of the bypass of 3 villages along the M3 National

More information

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million) Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising

More information

Japan Expressway Holding and Debt Repayment Agency (Incorporated Administrative Agency)

Japan Expressway Holding and Debt Repayment Agency (Incorporated Administrative Agency) Japan Expressway Holding and Debt Repayment Agency (Incorporated Administrative Agency) http://www.jehdra.go.jp 1. Summary of operations implemented using FILP funds Japan Expressway Holding and Debt Repayment

More information

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa Briefing Memorandum: Second Nile Crossing at Jinja- Uganda ICA Meeting: Financing Transport for Growth in Africa December 3-4, 2007 TABLE OF CONTENTS 1. Summary 2. Economic Rationale 3. The Project 4.

More information

Ex-ante Evaluation. Country: Republic of the Philippines Program: Development Policy Support Program (III) and Emergency Budget Support

Ex-ante Evaluation. Country: Republic of the Philippines Program: Development Policy Support Program (III) and Emergency Budget Support Japanese ODA Loan Ex-ante Evaluation 1. Name of the Program Country: Republic of the Philippines Program: Development Policy Support Program (III) and Emergency Budget Support Japanese ODA Loan Loan Agreement:

More information

PCDIP. Philippine City Disaster Insurance Pool

PCDIP. Philippine City Disaster Insurance Pool PCDIP Philippine City Disaster Insurance Pool Disaster Risk The Philippines is located in one of the world s most disaster-prone regions. Positioned on the Pacific Ring of Fire and within the Western North

More information

CITY OF CORNING SPECIAL EVENT APPLICATION [***PLEASE READ ENTIRE APPLICATION BEFORE COMPLETING***]

CITY OF CORNING SPECIAL EVENT APPLICATION [***PLEASE READ ENTIRE APPLICATION BEFORE COMPLETING***] CITY OF CORNING SPECIAL EVENT APPLICATION [***PLEASE READ ENTIRE APPLICATION BEFORE COMPLETING***] To apply for a Special Event, applicants must submit a typewritten letter to the City Clerk, City of Corning,

More information

Program Evaluation of Official Development Assistance in. Infrastructure Related Fields for Papua New Guinea

Program Evaluation of Official Development Assistance in. Infrastructure Related Fields for Papua New Guinea RESEARCH AND PROGRAMMING DIVISION ECONOMIC COOPERATION BUREAU MINISTRY OF FOREIGN AFFAIRS Program Evaluation of Official Development Assistance in Infrastructure Related Fields for Papua New Guinea Executive

More information

Interior Health Authority Board Manual 3.6 DIRECTOR RETAINERS, FEES AND EXPENSES

Interior Health Authority Board Manual 3.6 DIRECTOR RETAINERS, FEES AND EXPENSES 1. INTRODUCTION (1) The Board of Directors (the Board ) is committed to the responsible use of public funds to support Board operations. This Policy reflects requirements of the Provincial Government,

More information

Comprehensive Immediate Policy Package

Comprehensive Immediate Policy Package Comprehensive Immediate Policy Package Easing Public Anxiety (Summary by the Cabinet Office) August 29, 2008 Joint Meeting of the Government and the Ruling Parties Council on the Comprehensive Immediate

More information

Summary of the Terminal Evaluation

Summary of the Terminal Evaluation Summary of the Terminal Evaluation 1. Outline of the Project Country:The Republic of India Project title:the Assistance for the Introduction of ITS related to Hyderabad Outer Ring Road Construction Project

More information

The Philippine Evaluation Policy Framework: Supporting Evidence-based Decision Making

The Philippine Evaluation Policy Framework: Supporting Evidence-based Decision Making The Philippine Evaluation Policy Framework: Supporting Evidence-based Decision Making 13 th ODA Evaluation Workshop Tokyo, Japan 9-10 December 2015 Undersecretary Rolando G. Tungpalan National Economic

More information

Estimating Future Renewal Costs for Road Infrastructure and Financial Burden in Japanese Prefectures

Estimating Future Renewal Costs for Road Infrastructure and Financial Burden in Japanese Prefectures Policy Research Institute, Ministry of Finance, Japan, Public Policy Review, Vol.12, No.1, March 2016 95 Estimating Future Renewal Costs for Road Infrastructure and Financial Burden in Japanese Prefectures

More information

TABLE OF CONTENTS E. FEES

TABLE OF CONTENTS E. FEES TOPIC TABLE OF CONTENTS A. INTRODUCTION ------------------------------------------------------------------------------------- 2 B. SCOPE ------------------------------------------------------------------------------------------------

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting

More information

ARTA 22 months on. Have we made a difference to transport in Auckland?

ARTA 22 months on. Have we made a difference to transport in Auckland? ARTA 22 months on Have we made a difference to transport in Auckland? The starting point > Land Transport Management Act > Local Government (Auckland) Amendment Act > Regional Land Transport Strategy >

More information

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide.

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide. Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities Municipal Funding Agreement Guide January 2010 Administered by: Association of Municipalities of Ontario 200 University

More information

RISK COMPARISON OF NATURAL HAZARDS IN JAPAN

RISK COMPARISON OF NATURAL HAZARDS IN JAPAN 4th International Conference on Earthquake Engineering Taipei, Taiwan October 12-13, 2006 Paper No. 248 RISK COMPARISON OF NATURAL HAZARDS IN JAPAN Tsuyoshi Takada 1 and Yoshito Horiuchi 2 ABSTRACT Japan

More information

Creativity and Challenge

Creativity and Challenge Please 10 Osaka Gas Group Annual Report 2014 An Interview with the President Creativity and Challenge Hiroshi Ozaki President Osaka Gas Co., Ltd. give us your assessment of the first phase of your Field

More information

THE ROAD TO ECONOMIC GROWTH

THE ROAD TO ECONOMIC GROWTH THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial

More information

ECONOMIC ANALYSIS. A. Introduction

ECONOMIC ANALYSIS. A. Introduction Bridge Replacement for Improved Rural Access Sector Project (RRP PNG 43200) ECONOMIC ANALYSIS A. Introduction 1. The economic analysis of the proposed project has been carried out in accordance with ADB

More information

ECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive

ECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive Western Regional Road Corridor Investment Program (RRP MON 41193) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. Project Costs. The project s capital costs include the costs of the road works, design,

More information

Mitsubishi Electric Announces Consolidated and Non-consolidated Financial Results for Fiscal 2016

Mitsubishi Electric Announces Consolidated and Non-consolidated Financial Results for Fiscal 2016 MITSUBISHI ELECTRIC CORPORATION PUBLIC RELATIONS DIVISION 7-3, Marunouchi 2-chome, Chiyoda-ku, Tokyo, 100-8310 Japan FOR IMMEDIATE RELEASE No. 3023 Investor Relations Inquiries Investor Relations Group,

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide

More information

Perspectives on Earthquake Risk Assessment and Management in Trinidad and Tobago

Perspectives on Earthquake Risk Assessment and Management in Trinidad and Tobago Perspectives on Earthquake Risk Assessment and Management in Trinidad and Tobago Jacob Opadeyi Professor and Head Department of Geomatics Engineering and Land Management, The University of the West Indies,

More information

7.7.2 Daang Hari Road (DH)

7.7.2 Daang Hari Road (DH) Chapter 7 7.7.2 Daang Hari Road (DH) The Daang Hari Road (DH) will start from the border between Muntinlupa City (National Capital Region) and the municipality of Imus, Cavite, where it will be connected

More information

PIPE / PEDESTRIAN BRIDGE

PIPE / PEDESTRIAN BRIDGE PIPE / PEDESTRIAN BRIDGE Public Information CITY OF TRAIL September 14, 2015 Authored by: David Perehudoff, CPA, CGA PIPE / PEDESTRIAN BRIDGE Public Information INTRODUCTION The purpose of this public

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Program Country: Socialist Republic of Viet Nam Program: Support Program to Respond to Climate Change (VI) Loan Agreement: March

More information

FUNDING TRANSPORTATION PROJECTS. Partners in Planning March 8, 2014

FUNDING TRANSPORTATION PROJECTS. Partners in Planning March 8, 2014 FUNDING TRANSPORTATION PROJECTS Partners in Planning March 8, 2014 Overview Background what guides our decisions? Prioritization how do we decide which projects to build? Funding Sources how do we pay

More information

MANAGING FLOOD AND WATER-RELATED RISKS: A CHALLENGE FOR THE FUTURE

MANAGING FLOOD AND WATER-RELATED RISKS: A CHALLENGE FOR THE FUTURE MANAGING FLOOD AND WATER-RELATED RISKS: A CHALLENGE FOR THE FUTURE Tarek MERABTENE, Junichi YOSHITANI and Daisuke KURIBAYASHI Public Works Research Institute (PWRI), 1-6 Minamihara, 305-8516Tsukuba, Japan

More information

LOCAL MAJOR BRIDGE PROGRAM

LOCAL MAJOR BRIDGE PROGRAM LOCAL MAJOR BRIDGE PROGRAM The Local Major Bridge Program provides federal funds to counties and municipal corporations for bridge replacement or bridge major rehabilitation projects. A Local Major Bridge

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

A. What is the value of the tax increase multiplier if the MPC is.80? B. Consumption changes by 400 and disposable income by 100. What is the MPC?

A. What is the value of the tax increase multiplier if the MPC is.80? B. Consumption changes by 400 and disposable income by 100. What is the MPC? KOFA HIGH SCHOOL SOCIAL SCIENCES DEPARTMENT AP ECONOMICS EXAM PREP WORKSHOP # 3 > AGGREGATE DEMAND AND SUPY NAME : DATE : 1. Figure out the following multiplier questions : A. What is the value of the

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Name of the Project Country: The Democratic Socialist Republic of Sri Lanka Project: Development Policy Loan (Private Sector Development, Governance Improvement,

More information

Chapter 9 Financial Considerations. 9.1 Introduction

Chapter 9 Financial Considerations. 9.1 Introduction 9.1 Introduction Chapter 9 This chapter presents anticipated costs, revenues, and funding for the NEPA BART Extension Alternative. A summary of VTA s financial plan for the BART Extension Alternative is

More information

Contents. Alamo Area Metropolitan Planning Organization. Introduction S. St. Mary s Street San Antonio, Texas 78205

Contents. Alamo Area Metropolitan Planning Organization. Introduction S. St. Mary s Street San Antonio, Texas 78205 Contents Introduction 1 Alamo Area Metropolitan Planning Organization Tel 210.227.8651 Fax 210.227.9321 825 S. St. Mary s Street San Antonio, Texas 78205 www.alamoareampo.org aampo@alamoareampo.org Pg.

More information

Sendai Cooperation Initiative for Disaster Risk Reduction

Sendai Cooperation Initiative for Disaster Risk Reduction Sendai Cooperation Initiative for Disaster Risk Reduction March 14, 2015 Disasters are a threat to which human being has long been exposed. A disaster deprives people of their lives instantly and afflicts

More information

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 Appendix 6 ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 1. Background. The Second Rural Connectivity Investment Program will support the Government of India in improving rural connectivity through the

More information

Group Exercise to Screen a PPP Project for Financial Feasibility

Group Exercise to Screen a PPP Project for Financial Feasibility World Bank & Brazilian Ministry of Transport Workshop on the Toolkit for PPP in Roads and Highways Group Exercise to Screen a PPP Project for Financial Feasibility Cesar Queiroz, Ph.D. World Bank Brasilia,

More information

Introduction to Risk for Project Controls

Introduction to Risk for Project Controls Introduction to Risk for Project Controls By Eukeni Urrechaga, PE Quick view at Project Controls Project Controls, like project management, is much an art as it is a science. The secret of good project

More information

Questionnaire and Proposal for Contractor s All Risk Insurance

Questionnaire and Proposal for Contractor s All Risk Insurance Questionnaire and Proposal for Contractor s All Risk Insurance 1. Title of contract (If project consists of Several sections, specify Section(s) to be insured.). Site Country/Province/District City/Town/Village

More information

FINANCIAL MANAGEMENT OF LARGE-SCALE CATASTROPHES IN THE PHILIPPINES

FINANCIAL MANAGEMENT OF LARGE-SCALE CATASTROPHES IN THE PHILIPPINES FINANCIAL MANAGEMENT OF LARGE-SCALE CATASTROPHES IN THE PHILIPPINES Financial management of large scale catastrophes is the concern primarily by the public sector and secondarily by the private sector

More information

Budgeting for Disaster Risk in the Philippines. Bureau of the Treasury

Budgeting for Disaster Risk in the Philippines. Bureau of the Treasury Budgeting for Disaster Risk in the Philippines Bureau of the Treasury Institutions of the Executive Branch Department of Budget and Management Budget preparation and execution Department of Finance (Bureau

More information

Kojima Conference Room of the Economics Research Annex at the University of Tokyo Hongo

Kojima Conference Room of the Economics Research Annex at the University of Tokyo Hongo Todai Finance Innovation Program Lecture 4 Report The venue for the 4 th Lecture of the Todai Finance Innovation Program shifted to the Kojima Conference Room of the Economics Research Annex at the University

More information

Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission. Street Repair Policy Update and Permeable Paver Trial Project

Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission. Street Repair Policy Update and Permeable Paver Trial Project Public Works Commission ACTION CALENDAR July 14, 2009 To: From: Honorable Mayor and Members of the City Council Public Works Commission Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission

More information

ANNUAL LETTER. Visit our Highway Department Website!

ANNUAL LETTER. Visit our Highway Department Website! ANNUAL LETTER From: James Griesbach, Highway Commissioner Date: March 15, 2018 Visit our Highway Department Website! Marathon County Highway Department s Web Site includes information on the following

More information

THE STUDY ON SOLID WASTE MANAGEMENT PLAN FOR IN THE REPUBLIC OF PANAMA

THE STUDY ON SOLID WASTE MANAGEMENT PLAN FOR IN THE REPUBLIC OF PANAMA JAPAN INTERNATIONAL COOPERATION AGENCY MUNICIPALITY OF PANAMA THE REPUBLIC OF PANAMA MUNICIPIO DE PANAMA THE STUDY ON SOLID WASTE MANAGEMENT PLAN FOR MUNICIPALITY OF PANAMA IN THE REPUBLIC OF PANAMA Final

More information

NATIONAL LAND TRANSPORT PROGRAMME / INformation sheet / october 2012

NATIONAL LAND TRANSPORT PROGRAMME / INformation sheet / october 2012 NATIONAL LAND TRANSPORT PROGRAMME 2012 15 / INformation sheet / october 2012 Creating transport solutions for a thriving New Zealand The NZ Transport Agency Board has adopted the 2012 15 National Land

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Program Country: India Project: Tamil Nadu Investment Promotion Program Loan Agreement: November 12, 2013 Loan Amount: 13,000

More information

Alleviating Traffic Congestion in Manila, Appraisal of the Pasig Expressway. Baher El-Hifnawi Cambridge Resources International Inc.

Alleviating Traffic Congestion in Manila, Appraisal of the Pasig Expressway. Baher El-Hifnawi Cambridge Resources International Inc. Alleviating Traffic Congestion in Manila, Appraisal of the Pasig Expressway Baher El-Hifnawi Cambridge Resources International Inc. Glenn P. Jenkins Queen s University, Kingston, Canada. Eastern Mediterranean

More information

Fiscal 2002 Economic Outlook and Basic Stance for Macroeconomic & Fiscal Management. 1. Fiscal 2001 Macroeconomic Management and the Japanese Economy

Fiscal 2002 Economic Outlook and Basic Stance for Macroeconomic & Fiscal Management. 1. Fiscal 2001 Macroeconomic Management and the Japanese Economy Fiscal 2002 Economic Outlook and Basic Stance for Macroeconomic & Fiscal Management 1. Fiscal 2001 Macroeconomic Management and the Japanese Economy The Japanese economy entered a phase of mild-paced recovery

More information

Partnership for Quality Infrastructure

Partnership for Quality Infrastructure Partnership for Quality Infrastructure Japan will fully mobilize public and private resources, in collaboration with other countries and international organizations, to address the immense demand for infrastructure

More information

THE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 )

THE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 ) THE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 ) VIRGINIA DEPARTMENT OF TRANSPORTATION ( VDOT ) VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION ( DRPT ) RESPONSE TO REQUEST FOR INFORMATION

More information

Program for Accelerating the Rebirth of Japan. - Promoting Recovery of Japan's economy and Reconstruction of the disaster-affected areas -

Program for Accelerating the Rebirth of Japan. - Promoting Recovery of Japan's economy and Reconstruction of the disaster-affected areas - Program for Accelerating the Rebirth of Japan - Promoting Recovery of Japan's economy and Reconstruction of the disaster-affected areas - Decided on by the Cabinet on November 30, 2012 I. Basic Concepts

More information

Indonesia Local Road Development Project (II) Report Date October 2002 Field Survey July Project Profile and Japan s ODA Loan

Indonesia Local Road Development Project (II) Report Date October 2002 Field Survey July Project Profile and Japan s ODA Loan Indonesia Local Road Development Project (II) Report Date October 2002 Field Survey July 2001 1. Project Profile and Japan s ODA Loan Project Location Map Project Site 1.1 Background Development of local

More information

In addition to embarking on a new dialogue on Ohio s transportation priorities,

In addition to embarking on a new dialogue on Ohio s transportation priorities, Strategic Initiatives for 2008-2009 ODOT Action to Answer the Challenges of Today In addition to embarking on a new dialogue on Ohio s transportation priorities, the Strategic Initiatives set forth by

More information

Financial Results for Third Quarter of FY2011 (From April 1, 2010 to December 31, 2010)

Financial Results for Third Quarter of FY2011 (From April 1, 2010 to December 31, 2010) 1/19 1/20 Financial Results for Third of FY2011 (From April 1, 2010 to December 31, 2010) January 31, 2011 Hino Motors, Ltd. 1. Sales Turnover 2/20 Global Unit Sales 3/20 FY2011 3rd ('10/10-12) FY2010

More information

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT COMBINED MONTHLY AND QUARTERLY PROGRESS REPORT FOR QUARTER ENDING JUNE 30, 2014 GEORGE MASSEY TUNNEL MONTHLY STATUS REPORT SEPTEMBER 2017 FOREWORD TO MONTHLY STATUS REPORT On September 6, 2017, the Minister

More information

Republic of Bulgaria Ex-Post Evaluation of Japanese ODA Loan Project Sofia Metro Extension Project

Republic of Bulgaria Ex-Post Evaluation of Japanese ODA Loan Project Sofia Metro Extension Project Republic of Bulgaria Ex-Post Evaluation of Japanese ODA Loan Project Sofia Metro Extension Project External Evaluator: Masami Tomita, Sanshu Engineering Consultant 0. Summary This project aimed at streamlining

More information

Traffic Impact Analysis Guidelines Methodology

Traffic Impact Analysis Guidelines Methodology York County Government Traffic Impact Analysis Guidelines Methodology Implementation Guide for Section 154.037 Traffic Impact Analysis of the York County Code of Ordinances 11/1/2017 TABLE OF CONTENTS

More information

Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009

Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009 Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009 Introduction The formal benefit cost analysis has been conducted using best

More information

Virginia Department of Education

Virginia Department of Education Virginia Department of Education Module Ten Transparencies Driver Responsibilities: Making Informed Choices Topic 1 -- Insuring Vehicle Topic 2 -- Purchasing Vehicle Topic 3 -- Trip Planning Topic 4 Virginia

More information

Cost-effectiveness of protection measures to mitigate terrorist attacks on bridges and tunnels

Cost-effectiveness of protection measures to mitigate terrorist attacks on bridges and tunnels Safety and Security Engineering V 341 Cost-effectiveness of protection measures to mitigate terrorist attacks on bridges and tunnels C. A. Andersen, K. C. Jørgensen & E. K. Lauritzen NIRAS A/S, Denmark

More information

Partnership for Quality Infrastructure

Partnership for Quality Infrastructure Partnership for Quality Infrastructure Japan will fully mobilize public and private resources, in collaboration with other countries and international organizations, to address the immense demand for infrastructure

More information

PROUD TO BE PART ROUTE 21-24

PROUD TO BE PART ROUTE 21-24 PROUD TO BE PART ROUTE 21-24 ROute 21-24 1 summary Type of Contract: Design, Construct, Finance, Operate and Transfer Tender: International Procurement Variable: Availability Payment + Shadow Toll Estimated

More information

Chapter 8: Lifecycle Planning

Chapter 8: Lifecycle Planning Chapter 8: Lifecycle Planning Objectives of lifecycle planning Identify long-term investment for highway infrastructure assets and develop an appropriate maintenance strategy Predict future performance

More information

PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency

PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency The Finnish Transport Agency is a multidisciplinary expert organisation specialising in transport.

More information

APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI

APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: _100.00 Date: / / Receipt No: APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE,

More information

Financial Results for 2Q/FY2011 (cumulative) and Outlook for Full FY2011

Financial Results for 2Q/FY2011 (cumulative) and Outlook for Full FY2011 Investor Presentation Financial s for 2Q/FY2011 (cumulative) and Outlook for Full FY2011 November 9, 2011 Disclaimer This investor presentation, an English translation of the presentation made at the investor

More information

OTTO AT A GLANCE COMPANY OFFICERS. By E-Lodgement. Otto acquires Borealis Petroleum Pty Ltd HIGHLIGHTS:

OTTO AT A GLANCE COMPANY OFFICERS. By E-Lodgement. Otto acquires Borealis Petroleum Pty Ltd HIGHLIGHTS: 6 August 2015 Manager of Company Announcements ASX Limited Level 6, 20 Bridge Street SYDNEY NSW 2000 By E-Lodgement HIGHLIGHTS: Otto acquires Borealis Petroleum Pty Ltd Revised entry into Alaskan North

More information

This document provides information about the provincial government s response to the 2009 coroner s recommendations.

This document provides information about the provincial government s response to the 2009 coroner s recommendations. On March 7, 2007, a van carrying 17 people (16 farmworkers and a driver) was involved in a motor vehicle accident near Abbotsford, B.C. that resulted in the deaths of three workers and injuries to the

More information

Draft PPP Policy Outline

Draft PPP Policy Outline Note 7 May 2012 Draft PPP Policy Outline This note is the seventh in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership (PPP) programs.

More information

Rationalle for the Sendai Framework for DRR Evidence from the 2009, 2011 and 2013 Global Assessment Report on DRR

Rationalle for the Sendai Framework for DRR Evidence from the 2009, 2011 and 2013 Global Assessment Report on DRR Rationalle for the Sendai Framework for DRR Evidence from the 2009, 2011 and 2013 Global Assessment Report on DRR Good progress in Hyogo Framework for Action (HFA) implementation has been made, but more

More information

Accelerated Bridge Construction Decision Making Process 2010

Accelerated Bridge Construction Decision Making Process 2010 Accelerated Bridge Construction Decision Making Process 2010 Introduction In the past, the Department used an Accelerated Bridge Construction (ABC) Decision Chart during project scoping to determine if

More information

CAPITAL MARKETS DAY NOBINA AB, OCTOBER 9, 2018

CAPITAL MARKETS DAY NOBINA AB, OCTOBER 9, 2018 CAPITAL MARKETS DAY NOBINA AB, OCTOBER 9, 2018 WELCOME TO NOBINA CAPITAL MARKETS DAY 2018 The purpose of today is for us to provide you with: Agenda Introduction Market Outlook Strategic Focus Magnus Rosén,

More information

Questionnaire and proposal for contractors all risks insurance No.

Questionnaire and proposal for contractors all risks insurance No. Questionnaire and proposal for contractors all risks insurance No. 1. Title of contract (If project consists of several sections, specify section(s) to be insured.) 2. Site County/Province/District City/Town/Village

More information

AFGHANISTAN RESOURCE CORRIDOR STRATEGY AND PLAN. Executive Summary

AFGHANISTAN RESOURCE CORRIDOR STRATEGY AND PLAN. Executive Summary AFGHANISTAN RESOURCE CORRIDOR STRATEGY AND PLAN Executive Summary Afghanistan s vast endowment of natural resources remains largely undeveloped. The country s resources include copper, coal, iron ore,

More information

CHAPTER 9 FINANCIAL CONSIDERATIONS

CHAPTER 9 FINANCIAL CONSIDERATIONS CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the Berryessa Extension Project (BEP) Alternative and the Silicon Valley Rapid Transit

More information

The Implementation of Engineering Economy in the Transport Development - A Case Study of Road Transport

The Implementation of Engineering Economy in the Transport Development - A Case Study of Road Transport Abstract The Implementation of Engineering Economy in the Transport Development - By Winner Yousman The engineering economy is a part of skill and knowledge of cost engineering could be applied in many

More information

2016 TRB Webinar. Using Asset Valuation as a Basis for Bridge Maintenance and Replacement Decisions

2016 TRB Webinar. Using Asset Valuation as a Basis for Bridge Maintenance and Replacement Decisions 2016 TRB Webinar Using Asset Valuation as a Basis for Bridge Maintenance and Replacement Decisions Adam Matteo Jeff Milton Todd Springer Virginia Department of Transportation Structure and Bridge Division

More information

Mitsubishi Electric Announces Consolidated Financial Results for Fiscal 2018

Mitsubishi Electric Announces Consolidated Financial Results for Fiscal 2018 MITSUBISHI ELECTRIC CORPORATION PUBLIC RELATIONS DIVISION 7-3, Marunouchi 2-chome, Chiyoda-ku, Tokyo, 100-8310 Japan FOR IMMEDIATE RELEASE No. 3190 Investor Relations Inquiries Investor Relations Group,

More information

Table of Contents. Study Overview. Corridor Needs Analysis. Financial Strategies. Legislative Review

Table of Contents. Study Overview. Corridor Needs Analysis. Financial Strategies. Legislative Review Table of Contents Study Overview Corridor Needs Analysis Climbing Lanes Additional Lane I-25/I-80 Cost Estimate ITS Truck Parking Financial Strategies Legislative Review 02 Study Overview The overall goal

More information

Transportation Planning FAQ s

Transportation Planning FAQ s Transportation Planning FAQ s 1. What is the Master Thoroughfare Plan (MTP)? The Master Thoroughfare Plan defines the network of existing and future roads deemed appropriate to accommodate the various

More information

The General Insurance Association of Japan (GIAJ)

The General Insurance Association of Japan (GIAJ) 2nd Conference of the OECD International Network on the Financial Management of Large-scale Catastrophes Bangkok, 24-25 September 2009 Day 1, Session II Natural hazard awareness and disaster risk reduction

More information