1 Study on Private-Initiative Infrastructure Projects in Developing Countries in FY2010 Study on the PPP Project Formulation of Tanjung Priok Access Road in Republic of Indonesia SUMMARY March 2011 第 1 章 第 2 章 The Ministry of Economy, Trade and Industry Prepared by: Ernst & Young ShinNihon LLC Japan External Trade Organization (JETRO) Infrastructure Development Institute-Japan Nippon Koei Co., Ltd. Yachiyo Engineering Co., Ltd. Mitsubishi Research Institute, Inc.

2 (1) Background and Necessity Tanjung Priok Access Road (TgPA) has been planned to provide better access to Tanjung Priok Port from Jakarta and nearby cities, and to improve the network of expressways and their bypass functions. Areas in the vicinity of Tanjung Priok Port have experienced chronic traffic congestion since 2004, when development of the access road was proposed. The congestion became severe due to an increase in container handling at the port and an increase in car ownership in the Jakarta Metropolitan Area in recent years. If the east section (Cibitung -Cilincing) of the Jakarta Outer Outer Ring Road (JORR2) being separately built is completed, access to Cikarang in East Jakarta from the Tanjung Priok Port will be remarkably improved. Many Japanese companies in the industrial parks in nearby areas (East Jakarta Industrial Park (EJIP), etc.) are expected to benefit from this. Japan has provided yen loans (Special Terms for Economic Partnership, STEP) for the project for two periods in a plan for a 12.1km road. The initial project cost was 64.7 billion yen, and the Government of Indonesia has started the project. However, the results of a detailed design (D/D) performed in 2007 as the project got under way indicated that the project cost would greatly exceed the originally planned cost due to soaring prices of materials and equipment and changes in the road alignments resulting in the total length increasing to 15.5 km. It was difficult to develop the remaining sections entirely with yen loan support, and new funds from the Government of Indonesia were not expected easily. This led to the need to study the possibility of procuring funds by Public Private Partnership (PPP) for the remaining W sections (about 5.2 km). It is thought that application of PPP to complete the expressway network with an early opening of TgPA by utilizing private funds will contribute a great deal to realizing smooth urban transportation in the Jakarta Metropolitan Area.

3 (2) Basic policy for the project contents With the E-1, E-2 and NS-Link sections being constructed with yen loan support, a scheme in which the remaining W sections will be operated and maintained to receive toll revenue to repay the loans and interest used for the construction of the W sections will be considered. However, the entire cost of construction in the W sections cannot be covered by PPP. It is assumed that the remaining need for construction funds will be met by the Government of Indonesia, with support from a yen loan. In calculating future toll revenue, the toll for TgPA will be set in reference to the level of tolls in adjacent roads. Operation and maintenance costs will be calculated based on TgPA traffic conditions, with reference to the actual operating costs of adjacent roads. The feasible scope of PPP involvement in the construction of the W sections will be determined after the future toll revenues and operation and maintenance costs are set. In addition, a proposal for constructing the W sections entirely with government funds and handling Operation and Maintenance (O&M) by concession was considered. (3) Outline of the Project 1) Outline of the project Table 1 shows an outline of the project in which part or all of the construction cost of the W sections is borne by a PPP concessionaire. It is assumed that the project period is 30 years, that the remaining section will be constructed with yen loan support or with funds from the Government of Indonesia in the form of government assistance, that the land acquisition cost will be borne by the government, and that business risk will be guaranteed by Indonesia Infrastructure Guarantee Fund (IIGF).

4 Table 1: Outline of the PPP Project Project name Implemented by Project content Expected mode of business based on the financial analysis Project cost and other Tanjung Priok Port Access Road PPP Construction, Operation and Maintenance Project (1) Investor: Expressway companies, construction companies in Indonesia and Japan (1) Construction of W sections by PPP concessionaire bearing part or all of the costs The scope of W sections to be constructed by PPP concessionaire is set as far as profitability is assured on the basis of financial analysis. The remaining W sections to be constructed by government funds, including yen loan support (2) Operation and maintenance of entire TgPA The concession period to be set at 30 years (3) Land acquisition cost to be borne by the government (1) With the toll set at 4,000 Rp. 50% of the construction cost to be borne by the PPP concessionaire (Financial Internal Rate of Return ; FIRR 16.2%) 50% of the construction cost to be assisted by the government (2) With the toll set at 7,000 Rp. All of the construction cost to be borne by the PPP concessionaire (FIRR 16.3%) No government assistance in construction cost (3) Non-financial assistance: business risk guarantee by government IIGF Total cost of construction 36.5 billion JPY (432 million US dollars) Economic evaluation EIRR=20.05%, NPV=81.2 billion JPY, B/C=1.34 Table 2 shows an outline of the project, in which it is assumed that the W sections will be entirely constructed with Government financing, and that an O&M concession will be executed.

5 Table 2: Outline of O&M Concession Project Project name Implementing body Project content Expected mode of business based on the financial analysis Other Project cost and other Tanjung Priok Port Access Road, Operation and Maintenance Project Investor: assumed to be the expressway companies of Indonesia and Japan (1) Construction of W sections to be implemented with government funds (including yen loan) (2) Operation and maintenance of entire TgPA. Concession period to be set at 30 years. (1) With the toll set at 4,000 Rp. It is possible to pay 55% of the annual toll revenue to the government (FIRR 12.5%). (2) With the toll set at 7,000 Rp. It is possible to pay 74% of the annual toll revenue to the government (FIRR 12.7%) Assuming a revenue sharing system in which private operator and government share the revenue. Total cost of O&M 900 million JPY (10.9 million US dollars) Economic evaluation EIRR=20.05%, NPV=81.2 billion JPY, B/C=1.34 2) Environmental and social aspects of project By offering W sections for use as a result of the project, it is expected that it will contribute to reduction of exhaust gas emissions by alleviating traffic congestion more than would be the case without the W sections. The construction site of W section is public land owned by the government and the publicly operated enterprises. Therefore, no voluntary or non -voluntary resident relocation should occur. Depending on installation of toll systems, additional toll gates will be needed, and accordingly that leads to generate voluntary resident relocation. (4) Planned Project Schedule A project implementation schedule from the announcement of bidding to operation and maintenance was examined. The time needed for bid announcement and prequalification was set at 14 months and the period for contract negotiation was set at 4 months based on the standard schedule indicated by the Government of Indonesia. The PPP conce ssionaire must hire a consultant and contractors by general competitive bid as stipulated in the government regulations, and one year is set aside from retaining a consultant to the hiring of a contractor as indicated in the Table 3.

6 Table 3: Project Implementation Schedule 1st year 2nd year 3rd year 4th year 5th year Bid announcement, PQ (14 months) PPP contract negotiation (4 months) 6th year and onwards Selection of consultant (3 months) Review of detailed design (6 months) Selection of contractor (4 months) Construction (3 years) Operation and maintenance (30 years) (Source: Study Team) (5) Feasibility of implementation Considering value for money (VFM), scheme B (public funded/private managed) is most desirable for the Government of Indonesia. Therefore, the construction of W section is expected be financed by the government including ODA (STEP). W section s EIRR is more than 20%, and FIRR is more than 16% with relatively small government fund subsidiary to the private. Therefore, if the government fund is not sufficient for constructing whole W section, it is feasible to apply PPP scheme for construction of W section. And the feasibility of the project will increase further if a low-interest Japan International Cooperation Agency (JICA) loan, which the Government of Japan is considering resuming, becomes available. On the other hand, risks involved in implementing the project should be flexibly addressed by appropriate provisions in the project contract. These would include provisions pertaining to acquisition of land by the government as planned, thorough quality assurance for the sections built with government funds, fluctuation of demand risk emerging in the operation and maintenance phase, defects in project facilities, and changes of toll levels.

7 (6) Technical Advantages of Japanese Companies The participation of Japanese companies in the TgPA sections is considered to offer significant advantages. Japanese companies have over 50 years of management and maintenance experience since the first expressway was opened in Japan. They have provided excellent and very safe operation and management of expressways and comfort for users. For longevity of road structures, Japan has excelled in asset management technology from the early stage of operations, including preventive maintenance technology. Japanese companies also have a wealth of experience in construction in urban areas such as the Tokyo Metropolitan Area and the Kansai Region, and they excel in doing construction work safely in limited spaces. As the project requires restriction ove r a long term of the current roads with heavy traffic in addition to the expressways, Japan s experience is expected to be utilized. Prompt introduction of Electric Toll Collection (ETC) is expected in Jakarta Outer Ring Road (JORR), including the sections being studied. It is necessary to mitigate congestion at toll gates. Japan has actively raised the rate of ETC utilization since the introduction of ETC in Today the utilization rate has climbed to more than 80%, and congestion at toll gates has been virtually eliminated. In the future, it will be possible to aggressively introduce the use of ETC in Indonesian expressway projects, construct ETC lanes step-by-step considering the utilization rate, and apply other techniques Japanese companies have experience in.

8 (7) Schedule up to realization of the project and risks that might prevent it 1) Specific schedule up to realization of the project The results of this study show that the importance of the Government of Indonesia indicating the direction in which construction of the TgPA by PPP will proceed, and that a feasibility study be conducted at an early stage. In the feasibility study, the scope of PPP construction will be identified after traffic demand is estimated from the viewpoint of investors, after an examination of toll systems, and calculation of operation and maintenance costs. The remainder of the construction work must be undertaken with parallel financing from a yen loan and funds from the Government of Indonesia. Table 4: Implementation schedule toward the contruct 1st year 2nd year 3rd year 4th year The Study Decide construction by PPP for the relevant sections (Government of Indonesia) Precommitment to IIGF Approval by IIGF FS (JICA Cooperation Preliminary Study (construction period of 10 months) Preparation of tender documents Bid announcement, PQ (14 months) PPP contract negotiation (4 months) (Source: Study Team) 2) Risks that might prevent realization The major risks that would prevent realization of the project include: a downswing in traffic volume, a delay of construction schedule due to delays in land acquisition and relocation of utilities, increasing operation costs, toll setting problems, and a fluctuation of exchange rates. Under the current system, the risk of a downswing in traffic volume is borne by the PPP concessionaire, and it is necessary to draft an operating plan incorporating this risk. Concerning the risk of a delay in construction due to problems with land acquisition of W section, it is desirable to aquire operation and maintenance rights of the E-1, E-2 and NS-Link sections, which will be opened before the start of construction of the W sections.

Study on Private-Initiative Infrastructure Projects. in Developing Countries in FY2009. Project in Socialist Republic of Viet Nam SUMMARY.

Study on Private-Initiative Infrastructure Projects. in Developing Countries in FY2009. Project in Socialist Republic of Viet Nam SUMMARY. Study on Private-Initiative Infrastructure Projects in Developing Countries in FY2009 Study on the Expressway Operation and Management Project in Socialist Republic of Viet Nam SUMMARY March 2010 Infrastructure

More information

STUDY ON THE SPECIALIZED MEDICAL SERVICE ARRANGEMENT IN JAVA, THE REPUBLIC OF INDONESIA SUMMARY. February Prepared for:

STUDY ON THE SPECIALIZED MEDICAL SERVICE ARRANGEMENT IN JAVA, THE REPUBLIC OF INDONESIA SUMMARY. February Prepared for: STUDY ON ECONOMIC PARTNERSHIP PROJECTS IN DEVELOPING COUNTRIES IN FY2011 STUDY ON THE SPECIALIZED MEDICAL SERVICE ARRANGEMENT IN JAVA, THE REPUBLIC OF INDONESIA SUMMARY February 2012 Prepared for: The

More information

Ex-Ante Evaluation (for a Japanese ODA Loan)

Ex-Ante Evaluation (for a Japanese ODA Loan) Ex-Ante Evaluation (for a Japanese ODA Loan) 1. Name of the Project Country: The Republic of Tunisia Project: Metropolitan Railway Electrification Project (II) Loan Agreement: March 11, 2010 Loan Amount:

More information

Summary of the Terminal Evaluation

Summary of the Terminal Evaluation Summary of the Terminal Evaluation 1. Outline of the Project Country:The Republic of India Project title:the Assistance for the Introduction of ITS related to Hyderabad Outer Ring Road Construction Project

More information

PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT

PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT Pruethipong Singhatiraj 1, Chatchai Chuangching 1 and Boonkua Janbanjong 1 1 Department of Highways,

More information

Ferry Terminal in East Java and Bali Islands Urgent Rehabilitation Project

Ferry Terminal in East Java and Bali Islands Urgent Rehabilitation Project Indonesia Ferry Terminal in East Java and Bali Islands Urgent Rehabilitation Project 1. Project Profile and Japan s ODA Loan (1) Background Report Date: June 2000 Field Survey: May 2000 Indonesia is a

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Program Country: India Project: Tamil Nadu Investment Promotion Program Loan Agreement: November 12, 2013 Loan Amount: 13,000

More information

Study on the Bypass Road Project in Dalton Pass Republic of the Philippines SUMMARY. February Prepared for:

Study on the Bypass Road Project in Dalton Pass Republic of the Philippines SUMMARY. February Prepared for: STUDY ON ECONOMIC PARTNERSHIP PROJECTS IN DEVELOPING COUNTRIES IN FY2011 Study on the Bypass Road Project in Dalton Pass Republic of the Philippines SUMMARY February 2012 Prepared for: The Ministry of

More information

Japan Expressway Holding and Debt Repayment Agency (Incorporated Administrative Agency)

Japan Expressway Holding and Debt Repayment Agency (Incorporated Administrative Agency) Japan Expressway Holding and Debt Repayment Agency (Incorporated Administrative Agency) http://www.jehdra.go.jp 1. Summary of operations implemented using FILP funds Japan Expressway Holding and Debt Repayment

More information

(1) Establishment of Jabodetabek Transportation Authority

(1) Establishment of Jabodetabek Transportation Authority 10 HOW TO MAKE IT HAPPEN 10.1 MANAGEMENT CHALLENGES (1) Establishment of Jabodetabek Transportation Authority The inevitable and foremost imperative institutional issue in the transportation sector is

More information

Group Exercise to Screen a PPP Project for Financial Feasibility

Group Exercise to Screen a PPP Project for Financial Feasibility World Bank & Brazilian Ministry of Transport Workshop on the Toolkit for PPP in Roads and Highways Group Exercise to Screen a PPP Project for Financial Feasibility Cesar Queiroz, Ph.D. World Bank Brasilia,

More information

Republic of Bulgaria Ex-Post Evaluation of Japanese ODA Loan Project Sofia Metro Extension Project

Republic of Bulgaria Ex-Post Evaluation of Japanese ODA Loan Project Sofia Metro Extension Project Republic of Bulgaria Ex-Post Evaluation of Japanese ODA Loan Project Sofia Metro Extension Project External Evaluator: Masami Tomita, Sanshu Engineering Consultant 0. Summary This project aimed at streamlining

More information

Japanese ODA Loan. Ex-ante evaluation

Japanese ODA Loan. Ex-ante evaluation Japanese ODA Loan Ex-ante evaluation 1. Name of the Program Country: The Republic of Indonesia Project name: Connectivity Development Policy Loan Loan Agreement December 2, 2013 Loan Amount: 19,848 million

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name. Kenya Nairobi Urban Toll Road PRG Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name. Kenya Nairobi Urban Toll Road PRG Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name Kenya

More information

Case Study on Development of Bojonegara Port

Case Study on Development of Bojonegara Port III. Case Study on Development of Bojonegara Port 1. Review of Existing Plan 1.1. The Study for Development of the Greater Jakarta Metropolitan Ports in the Republic of Indonesia 114. The JICA Study 2003

More information

PROJECT FINANCING FOR BTO SECTION OF INCHEON BRIGE PROJECT

PROJECT FINANCING FOR BTO SECTION OF INCHEON BRIGE PROJECT PROJECT FINANCING FOR BTO SECTION OF INCHEON BRIGE PROJECT Dae-Seop Roh Partner, CPA Ernst & Young Korea Project Financing Advisor Dae-seop.roh@kr.ey.com Bong-Soo Jang Director Planning/Management Director

More information

Preliminary evaluation table of the project 1. Subject name Country name 2. Background and necessity of the project

Preliminary evaluation table of the project 1. Subject name Country name 2. Background and necessity of the project Japanese ODA Loan Preliminary evaluation table of the project 1. Subject name(country name) Country: The Democratic Republic of Timor-Leste Subject name: National Road No.1 Upgrading Project Date of signing

More information

THE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 )

THE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 ) THE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 ) VIRGINIA DEPARTMENT OF TRANSPORTATION ( VDOT ) VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION ( DRPT ) RESPONSE TO REQUEST FOR INFORMATION

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE ON INVESTMENT IN THE FORM OF PUBLIC-PRIVATE PARTNERSHIP

More information

India: Public Private Partnerships in Highways Sector

India: Public Private Partnerships in Highways Sector India: Public Private Partnerships in Highways Sector Prepared by World Bank as input for IDA paper, 2008 (provided by Tarun Sankar, PPIAF office, South Asia) India s transport program is one of the most

More information

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project Validation Report Reference Number: PVR-360 Project Number: 40198 Loan Number: 2374 December 2014* Viet Nam: Ho Chi Minh CityLong ThanhDauGiay Expressway Technical Assistance Project Independent Evaluation

More information

Japanese Policy and Implementation on PFI

Japanese Policy and Implementation on PFI Japanese Policy and Implementation on PFI The 3rd Annual Meeting for PPP/PFI Promotion between Japan and Korea October 9th, 2008 History Chart Jul. 1999 Enactment of PFI Law Oct. 1999 Creation of The Committee

More information

Joint Press Release on the Third Steering Committee Meeting of the Metropolitan Priority Areas for Investment and Industry

Joint Press Release on the Third Steering Committee Meeting of the Metropolitan Priority Areas for Investment and Industry Joint Press Release on the Third Steering Committee Meeting of the Metropolitan Priority Areas for Investment and Industry October 9, 2012 The Third Steering Committee Meeting of the Metropolitan Priority

More information

Basic Concept of Availability Payment (AP) and Budgeting Implication

Basic Concept of Availability Payment (AP) and Budgeting Implication JICA Technical Assistance Basic Concept of Availability Payment (AP) and Budgeting Implication July 26, 2017 KPPIP Support Facility Table of Content 1. Basic Concept of Availability Payment (AP) 2. AP

More information

Life-Cycle Project Delivery

Life-Cycle Project Delivery Life-Cycle Project Delivery A Note for Discussion IndII Round Table 11 th December 2012 Concerns with Conventional Project Delivery Government pays for inputs, not outputs Incentive for time/cost over-runs

More information

Overview of the framework

Overview of the framework Overview of the framework Need for a framework The highways sector in India is witnessing a significant interest from both domestic as well as foreign investors following the policy initiatives taken by

More information

PPP in Korea. Highlights on its Institutions. Director General Hyoung-Kwon, Ko. Ministry of Strategy and Finance. November 11.

PPP in Korea. Highlights on its Institutions. Director General Hyoung-Kwon, Ko. Ministry of Strategy and Finance. November 11. PPP in Korea Highlights on its Institutions November 11. 2012 Director General Hyoung-Kwon, Ko Ministry of Strategy and Finance 1 Table of Contents I Framework of PPPs in Korea II Performance Highlights

More information

Public Private Partnership in Highway Sector in Punjab, India

Public Private Partnership in Highway Sector in Punjab, India Public Private Partnership in Highway Sector in Punjab, India Infrastructure Governance Roundtable March 24 th, 2006 Kulwinder Singh Rao Deputy Project Director Punjab Roads & Bridges Development Board

More information

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 Accelerating Infrastructure Delivery through Better Engineering Services Project (RRP INO 49141) Sector Road Map SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 1. Sector Performance, Problems, and Opportunities

More information

Value for Money Test in Korea

Value for Money Test in Korea Global Roundtable on Value for Money Value for Money Test in Korea Hyeon PARK Executive Director Public and Private Infrastructure Investment Management Center (PIMAC), KDI hpark@kdi.re.kr/ +82-19-445-2511

More information

10.1 Paying for Better Transportation

10.1 Paying for Better Transportation 10. HOW TO MAKE IT HAPPEN 10.1 Paying for Better Transportation (1) Principle of Cost Burden The financing plan is formulated so as to promote the restructuring and reforming programs of facility and infrastructure.

More information

Czech D4 Highway PPP Project

Czech D4 Highway PPP Project The Ministry of Transport of the Czech Republic has begun to prepare a tender for a concession for the construction and operation of the D4 Highway using a PPP model. The D4 Highway PPP project consists

More information

Irvine Corona Expressway Project Financing Review

Irvine Corona Expressway Project Financing Review Irvine Corona Expressway Project Financing Review Sperry June 4, 2010 1 The Proposed Irvine Corona Expressway (ICE) Project Project screening is key aspect of pre-development discussions Environmental

More information

Executive Summary: Review Result of Jakarta MRT Project

Executive Summary: Review Result of Jakarta MRT Project Executive Summary The Study on Integrated Transport Master Plan for JABOTABEK (Phase I) Final Report Volume III (Review of Jakarta MRT Project) Executive Summary Executive Summary: Review Result of Jakarta

More information

Timor-Leste. Ex-Post Evaluation of Japanese Grant Aid Project The Project for Improvement of Roads between Dili and Cassa

Timor-Leste. Ex-Post Evaluation of Japanese Grant Aid Project The Project for Improvement of Roads between Dili and Cassa Timor-Leste Ex-Post Evaluation of Japanese Grant Aid Project The Project for Improvement of Roads between Dili and Cassa 1. Project Description Akihiro Nakagome, Hisae Takahashi (Ernst & Young SN Global

More information

The report to the MPA Steering Committee. MPA High Level Consultation for Investment Promotion

The report to the MPA Steering Committee. MPA High Level Consultation for Investment Promotion The report to the MPA Steering Committee MPA High Level Consultation for Investment Promotion December 2013 0 1. Background and basic principles of the High Level Consultation for Investment Promotion

More information

PREPARATORY STUDY ON CONSTRUCTION PROJECT FOR YEN XA WASTEWATER TREATMENT PLANT FINAL REPORT (SUMMARY)

PREPARATORY STUDY ON CONSTRUCTION PROJECT FOR YEN XA WASTEWATER TREATMENT PLANT FINAL REPORT (SUMMARY) No. SOCIALIST REPUBLIC OF VIETNAM HANOI PEOPLE S COMMITTEE PREPARATORY STUDY ON CONSTRUCTION PROJECT FOR YEN XA WASTEWATER TREATMENT PLANT PPP INFRASTRUCTURE PROJECT STUDY FINAL REPORT (SUMMARY) March

More information

Model Concession Agreement for Highways: An Overview

Model Concession Agreement for Highways: An Overview Model Concession Agreement for Highways: An Overview - Gajendra Haldea The highways sector in India is witnessing significant interest from both domestic as well as foreign investors following the policy

More information

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

IPP TRANSACTION ADVISOR TERMS OF REFERENCE IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction

More information

(TEL: +81-(0) )

(TEL: +81-(0) ) 3 rd March 2016 To whom it may concern Name of company: Nippon Koei Co., Ltd. Name of representative: Representative Director and President Ryuichi Arimoto (Code: 1954 First Section of the Tokyo Stock

More information

Myanmar Thilawa SEZ Holdings Public Ltd. (MTSH)

Myanmar Thilawa SEZ Holdings Public Ltd. (MTSH) Summary Myanmar Thilawa SEZ Holdings Public Ltd. (MTSH) Myanmar Thilawa SEZ Holdings Public, Ltd. (MTSH) is the private sector shareholder on the Myanmar side of Myanmar Japan Thilawa Development Ltd.

More information

North-South Road Corridor Investment Program. Republic of Armenia

North-South Road Corridor Investment Program. Republic of Armenia North-South Road Corridor Investment Program Republic of Armenia Poti (Black Sea) Georgia Armenia Iran Bandar Abbas (Persian Gulf) www.northsouth.am North-South Road Corridor Investment Program Brief Introduction

More information

Summary. I. Outline of the Project

Summary. I. Outline of the Project Summary I. Outline of the Project Country:Republic of Indonesia Issue / Sector:Environmental Management Environmental Administration Division in charge: JICA Indonesia Office Period of March 2009 to Cooperation

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Program Country: Socialist Republic of Viet Nam Program: Support Program to Respond to Climate Change (VI) Loan Agreement: March

More information

Japanese Policy and Implementation on PFI

Japanese Policy and Implementation on PFI Japanese Policy and Implementation on PFI The 3rd Annual Meeting for PPP/PFI Promotion between Japan and Korea October 9th, 2008 History Chart Jul. 1999 Enactment of PFI Law Oct. 1999 Creation of The Committee

More information

Experience of Implementing Transportation PPPs in India. Abhijit Bhaumik August 6, 2015

Experience of Implementing Transportation PPPs in India. Abhijit Bhaumik August 6, 2015 Experience of Implementing Transportation PPPs in India Abhijit Bhaumik August 6, 2015 Experience of Implementing PPPs in India India has witnessed successful PPPs across several infrastructure sectors

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance Ex-ante Evaluation 1. Name of the Project Country: The United Republic of Tanzania Project: Fourth Poverty Reduction Support Credit (Loan Agreement: March 9, 2007; Loan Amount: 2,000 million yen; Borrower:

More information

FINAL REPORT EXECUTIVE SUMMARY

FINAL REPORT EXECUTIVE SUMMARY No. 2 Japan International Cooperation Agency (JICA) National Development Planning Agency (BAPPENAS) THE SUPPORT PROGRAM FOR AGRICULTURE AND FISHERIES DEVELOPMENT IN THE REPUBLIC OF INDONESIA FINAL REPORT

More information

Consolidated Financial Results for the Three Months Ended September 30, 2018 [Japanese GAAP]

Consolidated Financial Results for the Three Months Ended September 30, 2018 [Japanese GAAP] Consolidated Financial Results for the Three Months Ended September 30, 2018 [Japanese GAAP] Company name: Nippon Koei Co., Ltd. Stock exchange listing: Tokyo Stock Exchange Code number: 1954 URL: https://www.n-koei.co.jp/english/

More information

NORTH LUZON, PHILIPPINES. Case Study (Transportation) Project Summary:

NORTH LUZON, PHILIPPINES. Case Study (Transportation) Project Summary: NORTH LUZON, PHILIPPINES Case Study (Transportation) Project Summary: The Republic of the Philippines is an archipelagic nation in Southeast Asia comprised of 7,107 islands. The Philippines is home to

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1.Name of the Program Country:Republic of the Philippines Project:Development Policy Support Program Investment Climate Loan Agreement:October

More information

Human Settlements Improvement Project (2)

Human Settlements Improvement Project (2) INDONESIA Human Settlements Improvement Project (2) Report Date: March 2000 1 Project Summary and Japan s ODA Loan This project aimed to provide water supply systems, environmental sanitation facilities,

More information

Indonesia. PPP Country Profile Indonesia. 1. Overview

Indonesia. PPP Country Profile Indonesia. 1. Overview Last Revised: June 2015 Indonesia 1. Overview ASEAN s largest economy, Indonesia, has grown at a robust real GDP growth rate within a range of 5.0 6.5 percent from 2004 to 2014, with an exception of a

More information

Challenges in Expenditure: Sustainability in Public Investment Spending

Challenges in Expenditure: Sustainability in Public Investment Spending Challenges in Expenditure: Sustainability in Public Investment Spending HK Yong Senior Fellow ISIS Malaysia (Institute of Strategic and International Studies) 11 June 2015 Comments on Presentations 1.

More information

Intro Public-Private Partnership (P3) Finance Course

Intro Public-Private Partnership (P3) Finance Course Intro Public-Private Partnership (P3) Finance Course Identifying P3 Projects and Knowing the Atmosphere Kylee Anastasi Director, Capital Projects and Infrastructure Advisory PricewaterhouseCoopers LLP

More information

Bangladesh: Road Maintenance and Improvement Project

Bangladesh: Road Maintenance and Improvement Project Performance Evaluation Report Bangladesh: Road Maintenance and Improvement Project Independent Evaluation Performance Evaluation Report December 2014 Bangladesh: Road Maintenance and Improvement Project

More information

Financing Transport Infrastructure. September 2014

Financing Transport Infrastructure. September 2014 Financing Transport Infrastructure September 2014 Financing Transport Infrastructure PPP Definition Project Risks Contract Structures Case Studies Key Issues Conclusions 2 PPP Definition Public Private

More information

The PFI in Japan. Japan Fair Trade Commission OECD Competition Committee Working Party 2 June 16, Paris. The structure of the presentation

The PFI in Japan. Japan Fair Trade Commission OECD Competition Committee Working Party 2 June 16, Paris. The structure of the presentation The PFI in Japan Japan Fair Trade Commission OECD Competition Committee Working Party 2 June 16, 2014 - Paris The structure of the presentation 1. What is PFI? 2. The process of PFI 3. The types of PPP/PFI

More information

B I L F I N G E R B E R G E R

B I L F I N G E R B E R G E R Capital Markets Day Concessions 22 November 2006 Phases of a PPP-Project Jürgen Schönwasser, Managing Director 1 The Task: Define the process Structure the process Manage the process Conclude the process

More information

MINISTRY OF STRATEGY AND FINANCE

MINISTRY OF STRATEGY AND FINANCE Public Notice No. 2011-60 BASIC PLAN FOR PUBLIC-PRIVATE PARTNERSHIP PROJECTS March 29, 2011 MINISTRY OF STRATEGY AND FINANCE CONTENTS PART Ⅰ DIRECTION-SETTING FOR IMPLEMENTATION OF PUBLIC-PRIVATE PARTNERSHIP

More information

Need for Commercial Financing of Infrastructure

Need for Commercial Financing of Infrastructure Need for Commercial Financing of Infrastructure WHY Commercial Financing? Because There isn t Enough Money!!! The belief that private financing is more expensive to the government is untrue. A large number

More information

Equitable Financial Evaluation Method for Public-Private Partnership Projects *

Equitable Financial Evaluation Method for Public-Private Partnership Projects * TSINGHUA SCIENCE AND TECHNOLOGY ISSN 1007-0214 20/25 pp702-707 Volume 13, Number 5, October 2008 Equitable Financial Evaluation Method for Public-Private Partnership Projects * KE Yongjian ( ), LIU Xinping

More information

Private Sector Participation in Highways Some Insights

Private Sector Participation in Highways Some Insights Private Sector Participation in Highways Some Insights STATE HIGHWAYS WORKSHOP By The World Bank 2 nd November, 2006 Presentation Structure Why Private Finance International Experience Key Lessons for

More information

Tibar Bay Port Timor-Leste

Tibar Bay Port Timor-Leste Investing in Public-Private Partnerships Tibar Bay Port Timor-Leste Project Brief Photo by ECO-STRATEGIC.COM / UN Photos by Martine Perret Important Notice This Project Brief (hereinafter referred to as

More information

PPP s Misconceptions NICOLAS RUBIO US PRESIDENT, CINTRA

PPP s Misconceptions NICOLAS RUBIO US PRESIDENT, CINTRA PPP s Misconceptions NICOLAS RUBIO US PRESIDENT, CINTRA 1. PPPs involve the "sale" of roads to private interests 10 Myths and Facts on The Reason Transportation Foundation, May 31, 2011 - By Leonard PPPs

More information

Ensuring an Appropriate Level of Expressway Management by Using Outcome Indicators. Katsuhiko NAKAMURA

Ensuring an Appropriate Level of Expressway Management by Using Outcome Indicators. Katsuhiko NAKAMURA Ensuring an Appropriate Level of Expressway Management by Using Outcome Indicators Role of JEHDRA after Privatization of Highway Public Corporations in Japan 29 September 2011 XXIV th World Road Congress

More information

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million) Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising

More information

Overview of the framework

Overview of the framework Overview of the framework Need for a framework Economic growth and trade expansion in recent years have enhanced the relevance of port sector as a critical element in globalisation of the Indian economy.

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

T o o l k i t f o r P u b l i c - P r i v a t e P a r t n e r s h i p s i n r o a d s & H i g h w a y s. Advantages of PPP

T o o l k i t f o r P u b l i c - P r i v a t e P a r t n e r s h i p s i n r o a d s & H i g h w a y s. Advantages of PPP Advantages of PPP A key advantage of having the private sector provide public services is that it allows public administrators to concentrate on planning, policy and regulation. The private sector, in

More information

By Thavichanh Thiengthepvongsa Deputy Director General Investment Promotion Department Ministry of Planning and Investment

By Thavichanh Thiengthepvongsa Deputy Director General Investment Promotion Department Ministry of Planning and Investment By Thavichanh Thiengthepvongsa Deputy Director General Investment Promotion Department Ministry of Planning and Investment Outlines Lao Government Policy PPP Development Status Challenges Answers to Questions

More information

Selecting the Right Projects / Sectors for PPP Implementation

Selecting the Right Projects / Sectors for PPP Implementation the Right s / Sectors for PPP Implementation Policy Dialogue on PPP for Infrastructure Development in South Asia Organized by UN ESCAP 21-22 September 2015 PPP Macro Level Large number of commercial banks,

More information

Indonesia: Metropolitan Medan Urban Development Project

Indonesia: Metropolitan Medan Urban Development Project Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS

More information

7,744,392 common shares of MCHC. 5,382,352,440 yen

7,744,392 common shares of MCHC. 5,382,352,440 yen To whom it may concern: November 30, 2016 Company name: Mitsubishi Chemical Holdings Corporation Representative: Hitoshi Ochi, Representative Corporate Executive Officer, President & Chief Executive Officer

More information

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa Briefing Memorandum: Second Nile Crossing at Jinja- Uganda ICA Meeting: Financing Transport for Growth in Africa December 3-4, 2007 TABLE OF CONTENTS 1. Summary 2. Economic Rationale 3. The Project 4.

More information

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN

More information

Program Evaluation of Official Development Assistance in. Infrastructure Related Fields for Papua New Guinea

Program Evaluation of Official Development Assistance in. Infrastructure Related Fields for Papua New Guinea RESEARCH AND PROGRAMMING DIVISION ECONOMIC COOPERATION BUREAU MINISTRY OF FOREIGN AFFAIRS Program Evaluation of Official Development Assistance in Infrastructure Related Fields for Papua New Guinea Executive

More information

Alternative ways of Financing Urban Development

Alternative ways of Financing Urban Development External Support for Decentralization Reforms & Local Governance Systems in the Asia Pacific: Better Performance, Higher Impact? Cities Development Initiative for Asia Alternative ways of Financing Urban

More information

New Financing Trends Impact on Tunnelling Contracts

New Financing Trends Impact on Tunnelling Contracts Martin Holfelder, Dipl.-Ing., Member of Management, Bilfinger Berger AG, Civil Tunnelling Arne Speer, Dipl.-Ing., Regional Director East, Bilfinger Berger BOT Europe GmbH Contents of PPP Projects Return

More information

Corporate and Financial restructuring of the road sector Context

Corporate and Financial restructuring of the road sector Context Corporate and Financial restructuring of the road sector The Croatian Government (the Government) is committed to optimizing the debt held by public companies in the road sector, and wants to achieve a

More information

INVESTMENT IQ INDONESIA

INVESTMENT IQ INDONESIA INVESTMENT IQ INDONESIA Exploring Infrastructure Investment in Indonesia By Dr Scott Younger OBE PhD FICE President Commissioner Glendale Partners & Nusantara Infrastructure Tbk INVESTMENT IQ INDONESIA

More information

THE ROAD TO ECONOMIC GROWTH

THE ROAD TO ECONOMIC GROWTH THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial

More information

LANE RENTAL: CREATING INCENTIVES FOR EARLY COMPLETION OF ROAD WORK. Michele Cyna

LANE RENTAL: CREATING INCENTIVES FOR EARLY COMPLETION OF ROAD WORK. Michele Cyna October I992 Transport No. RD-12 TRANSPORTATION, WATER AND URBAN DEVELOPMENT DEPARTMENT THE WORLD BANK LANE RENTAL: CREATING INCENTIVES FOR EARLY COMPLETION OF ROAD WORK Michele Cyna Delays in the completion

More information

Gautrain Rapid Rail Link - A Public Private Partnership Development Model

Gautrain Rapid Rail Link - A Public Private Partnership Development Model Gautrain Rapid Rail Link - A Public Private Partnership Development Model T E R R Y R A M A B U L A N A M. C O M ; A G A ( S A ) ; D I P ( F A ) ; M I S T D E X E C U T I V E D I R E C T O R T I S H O

More information

1 EXECUTIVE SUMMARY. Figure 1-1: SR 156 Study Area & Monterey Expressway Alignment

1 EXECUTIVE SUMMARY. Figure 1-1: SR 156 Study Area & Monterey Expressway Alignment 1 EXECUTIVE SUMMARY The Transportation Agency for Monterey County (TAMC) Board commissioned a Level 2 Traffic and Revenue study on the feasibility of collecting tolls to fund the proposed new SR156 connector

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting

More information

Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC)

Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) - Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) Final Submission November 2014 Email:- info@transportinsights.com Telephone:- + 353

More information

Indonesia Local Road Development Project (II) Report Date October 2002 Field Survey July Project Profile and Japan s ODA Loan

Indonesia Local Road Development Project (II) Report Date October 2002 Field Survey July Project Profile and Japan s ODA Loan Indonesia Local Road Development Project (II) Report Date October 2002 Field Survey July 2001 1. Project Profile and Japan s ODA Loan Project Location Map Project Site 1.1 Background Development of local

More information

Financing Strategies: Improving Public Expenditure Efficiency

Financing Strategies: Improving Public Expenditure Efficiency Financing Strategies: Improving Public Expenditure Efficiency National Workshop on Infrastructure Financing Strategies for Sustainable Development Organized by The United Nations ESCAP and National Planning

More information

Japanese ODA Loan. Ex-ante Evaluation

Japanese ODA Loan. Ex-ante Evaluation Japanese ODA Loan Ex-ante Evaluation 1. Name of the Project Country: Republic of Indonesia Project: Development Policy Loan (V) Loan Agreement: March 24, 2009 Loan Amount: 9,293 million Yen Borrower:The

More information

Q&A at IR meeting about Real Estate Business

Q&A at IR meeting about Real Estate Business Q&A at IR meeting about Real Estate Business Presentation Date: March 21st, 2017 Presenters: Hirokazu Higashino Yukinari Shiraishi Takeshi Niki Hiroaki Murata Akihito Nakamoto General Manager, Materials,

More information

NEWS RELEASE. R&I Affirms Ratings: 5 Expressway Companies. Rating and Investment Information, Inc. (R&I) has announced the following:

NEWS RELEASE. R&I Affirms Ratings: 5 Expressway Companies. Rating and Investment Information, Inc. (R&I) has announced the following: Aug 04, 2017 R&I Affirms Ratings: 5 Expressway Companies Rating and Investment Information, Inc. (R&I) has announced the following: SEC. COMPANY NAME CODE ---- Central Nippon Expressway Co., Ltd. ----

More information

PRIVATE PARTICIPATION IN THE INFRASTRUCTURE PROGRAMME OF THE REPUBLIC OF KOREA

PRIVATE PARTICIPATION IN THE INFRASTRUCTURE PROGRAMME OF THE REPUBLIC OF KOREA PRIVATE PARTICIPATION IN THE INFRASTRUCTURE PROGRAMME OF THE REPUBLIC OF KOREA Junglim Hahm * ABSTRACT The Private Participation in Infrastructure (PPI) programme of the Republic of Korea was formally

More information

Acquisition of BDP Supplementary Material

Acquisition of BDP Supplementary Material Acquisition of BDP Supplementary Material March 10, 2016 Nippon Koei Co., Ltd. Representative Director and President Ryuichi Arimoto Ⅰ: Our management strategy Group Vision To provide services that are

More information

PPP IDENTIFICATION AND PPP PLANNING

PPP IDENTIFICATION AND PPP PLANNING PPP IDENTIFICATION AND PPP PLANNING Mohammad Taufiq Rinaldi Planner Directorate of PPP and Financial Engineering Ministry of National Planning Agency/BAPPENAS Republic of Indonesia Asia PPP Practioners

More information

City Policy & Procedure

City Policy & Procedure City Policy & Procedure Subject: PUBLIC-PRIVATE PARTNERSHIP (P3) POLICY Policy Number: #1011 Effective: September 3rd, 2014 Purpose: The City of Brandon Public-Private Partnership (P3) Policy intends to

More information

Interactive Numerical Exercise to Screen a PPP Project for Financial Feasibility

Interactive Numerical Exercise to Screen a PPP Project for Financial Feasibility World Bank and Ukravtodor Workshop on the Toolkit for PPP in Roads and Highways Interactive Numerical Exercise to Screen a PPP Project for Financial Feasibility Cesar Queiroz World Bank Kyiv, Ukraine,

More information

FACILITATING ACCESS TO FINANCE FOR INFRASTRUCTURE PROJECTS: ESTABLISHING DEDICATED INSTITUTIONS

FACILITATING ACCESS TO FINANCE FOR INFRASTRUCTURE PROJECTS: ESTABLISHING DEDICATED INSTITUTIONS INDONESIA INFRASTRUCTURE GUARANTEE FUND (IIGF) FACILITATING ACCESS TO FINANCE FOR INFRASTRUCTURE PROJECTS: ESTABLISHING DEDICATED INSTITUTIONS United Nations Economic And Social Commission For Asia And

More information

RISK MANAGEMENT IN TOLL ROAD PROJECT UNDER PUBLIC PRIVATE PARTNERSHIP SCHEME

RISK MANAGEMENT IN TOLL ROAD PROJECT UNDER PUBLIC PRIVATE PARTNERSHIP SCHEME RISK MANAGEMENT IN TOLL ROAD PROJECT UNDER PUBLIC PRIVATE PARTNERSHIP SCHEME (case study : Jakarta Outer Ring Road (JORR) W1) HERU RAHMAT PERMANA UNIVERSITI TEKNOLOGI MALAYSIA RISK MANAGEMENT IN TOLL ROAD

More information

The World Bank Third Secondary and Local Roads Project (P148048)

The World Bank Third Secondary and Local Roads Project (P148048) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:

More information