1 TRACECA PROJECT FICHE CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI 1. BASIC INFORMATION TITLE: Construction of the bypass of 3 villages along the M3 National Road Chisinau- Giurgiulesti SECTOR: Road LOCATION: Republic of Moldova 2. OBJECTIVES 2.1 OVERALL OBJECTIVES The project objective is to ensure regional economic development by: extending agricultural markets, extension, enhancing access to social services, reducing transportation costs and travel time for international and national operators and passengers. These developments will generate employment for a considerable number of the population. 2.2 PROJECT PURPOSE To ensure continuity of the M3 National Road, designated as the shortest link between the capital city Chisinau and Giurgiulesti International Free Port. This route constitutes the only access to the fluvial and maritime navigable ways. To develop transport infrastructure, improving the conditions for border crossing with Republic of Moldova, by alternatives to the existing infrastructure. 2.3 CONTRIBUTION TO NATIONAL DEVELOPMENT PLAN The Government of Moldova has prepared a comprehensive Transport Sector Program for the period with special focus on the road sector. It includes a Strategy for Road Infrastructure Recovery and a prioritized 10-year Road Sector Investment and Expenditure Plan, which will be the sole basis for decision-making on road investments. The Strategy addresses the underlying causes and issues of the road infrastructure crisis and proposes legal, institutional and physical measures to overcome this situation. The Strategy constitutes the framework for all actions, investments and expenditures in the Road Sector starting from 2008 onwards, including those to be financed by external donors. The proposed project is in line with the Transport Infrastructure Development Strategy for CROSS BORDER IMPACT The project as a part of the M3 national road ensures an important connection with Romania and Ukraine. The development of this cross-border road will have a positive effect on regional trade and will integrate Republic of Moldova in European Transport networks. The 1
2 development of the International Giurgiulesti Free Port road construction and cross border infrastructure developments will create an important increase in traffic flow, a reduction in transport costs and regional economic growth. 3. DESCRIPTION 3.1 BACKGROUND AND JUSTIFICATION The Moldovan M3 road provides the most important and shortest link between Chisinau and Giurgiulesti and provides access to the Danube and Black Sea. In addition, the M3 corridor is an integral part of the European Road E584 Poltava Kirovograd Chisinau Giurgiulesti Galati Slobozia. It provides a link between PanEuropean corridors IV and IX. Currently, the corridor has, in parts, a high level of deterioration and reduced bearing capacity, resulting in axle load restrictions, the diversion of freight traffic, high transportation costs and subsequently reduced local business opportunities and transit traffic. Construction of the proposed section ensures the continuity of the ongoing and planned projects along the M3 corridor, which is the highest priority project within the road network development policy. The construction and rehabilitation of the road M3 Chisinau-Giurgiulesti will improve transport links between Moldova, Ukraine and other TRACECA countries. The rehabilitation and partial realignment of the first section of the road (Chisinau-Cimislia) will improve transport connections, avoiding inhabited areas, and will substantially decrease transport costs. The rehabilitation of the second (existing) part of the road Cimislia-Giurgiulesti is very important since road conditions are poor for current traffic levels. The rehabilitation and reconstruction of the whole road will facilitate trade, transport, industry and tourism development, strengthen access to agricultural markets in the region and will be a prerequisite for securing transportation connections between the country's centre and its southern regions. 2
3 3.2 LESSON LEARNT Underappreciation of the land transport infrastructure in the national economy has lead to considerable losses for transport operators as well as for the national public budget. Therefore, according to the most recent estimates, the transport operators incur losses of over 2 billion MDL due the bad condition of the roads. The national economy incurs losses of over 6-7 billion MDL. Lessons learnt include the fact that the lack of financing of roads has led to significant degradation of the public road network. This fact imposes the Government a financial effort 2-3 times higher than would be possible if sufficient funding during the previous year. The M3 national road represents the main axis that links to the south of the Republic. Currently, the traffic flow in this direction is much lower compared to that which would be in case of road construction. In this case the traffic diverts on other directions incurring additional expenses. 3.3 ACTIVITIES Activity 1 Tendering construction works Activity 2 Earthworks o Site clearance 3
4 o General excavation o Preparation of sub-grade o Embankments Activity 3 Drainage o Pipe culverts o Drainage channels (including underground) o Manholes, chambers, catchpits, oil separators o Channels, chutes, rip rap protection Activity 4 Bridge structures Activity 5 Roadworks o Wearing course o Binder course o Base course o Sub-base Activity 6 Ancillary works o Slope protection/rockfall protection o Barriers and guardrails o Traffic signs o Pavement markings o Accesses / side and service roads o Junctions Activity 7 Landscaping 3.4 RESULTS/DELIVERABLES Evaluation Criteria Results 1 Length of new road 20,5 km 2 Travel time in minutes 23 min 3 Traffic in 2011 in (000) average Improved regional circulation Continuous M3 Corridor Chisinau Giurgiulesti 5 Improved local circulation Inter-regional traffic diverted from local road network 6 Congestion 2 lane construction on 4 Lane Right-of Way 7 Type of Improvement New alignment 4
5 4. PROJECT ORGANISATION 4.1 INSTITUTIONAL FRAMEWORK The project is a part of public road network which has as its beneficiaries all categories of road users. The owner of the project will be the Ministry of Transport and Road Infrastructure. The Ministry will also act as the Contracting Authority. The Implementing Party will be the State Road Administration under the Ministry of Transport and Road Infrastructure. 4.2 OWNERSHIP/IMPLEMENTING PARTY Name of the Project Owner: Ministry of Transport and Road Infrastructure Address: 162, Stefan cel Mare ave, MD2004, Chisinau, Moldova Telephone: andrei.cuculescu@mtid.gov.md Name of Implementing partner: State Road Administration (SRA) Address: 12 a, Bucuriei str, MD2004, Chisinau, Moldova Telephone: asd@asd.md 4.3 ORGANISATION STRUCTURE Ministry of Transport and Road Infrastructure ownership State Road Administration management Road Assets Structure and Responsibilities of the Implementing Party within State Road Administration (SRA). 5
6 Role Organisation Resource Name Responsibilities Project manager SRA Road Fund Coordinates the project activities among the Ministry, SRA and Investor manager SRA Road Fund Manages and coordinates the team activities related to the project SRA Road Fund Procurement, contract management member SRA Road Fund Financial management activities member member SRA Road Fund Environmental management activities. 5. DETAILED BUDGET (IN EUR/USD) No. Description Investment Financing Co-Financing Total Total % RISK ASSUMPTIONS AND CONSTRAINTS Risk Risk description Likelihood (*) Impact (*) Land acquisition The land acquisition process in Moldova can take up to 1 year. The State road administration is planning to start the land acquisition at the end of M L VL= Very Low, L = Low, M = Medium, H = High, VH = Very High 7. IMPLEMENTATION SCHEDULE 7.1 TENDERING CONSTRUCTION AND SUPERVISION WORKS: 8 months 7.2 EARTHWORKS, DRAINAGE, RETAINING WALLS: 14 months 7.3 BRIDGE STRUCTURES, ROADWORKS: 14 months 7.4 ANCILLARY WORKS, LANDSCAPING: 3 months 8. ENVIRONMENT The impacts foreseen after the project implementation are: Pollution The environmental impact will be a bare minimum as the proposed alignment will not cross any settlements, the vehicles engine work will be optimum and the pollutant emissions will decrease. Noise Sensitive receptors are the residential areas within villages and towns. Because the project avoids traversing any settlement area impact of this project is considered as low. Energy consumption After project implementation the energy consumption will considerably decrease due the smoother engine function. 6
7 9. RATES OF RETURN ECONOMIC INTERNAL RATE OF RETURN (30 YEARS): 12,2% HAVE THE FEASIBILITY STUDIES BEEN COMPLETED AND WHEN: The Feasibility Study was completed in June, 2009 THE DISCOUNT RATE APPLIED IN THE PROJECT: 12%. 10. INVESTMENT CRITERIA 10.1 SOURCES OF FINANCING The sources of financing of this project could be: International Financial Institutions, Donor Governments, State Budget, and PPP s CO-FINANCING The co-financing of the project is possible in all the cases stated above PROJECT READINESS AND SIZE The capacities of the Republic of Moldova allow implementation of the project without any risks and it is ready to be started immediately SUSTAINABILITY The presented project is a high priority one and it is in line with the national development plans and government policies and strategies. It represents a strategic link for the Republic of Moldova in this connection to the only port of the country. 11. CONDITIONALITY AND SEQUENCING 7
Energy Efficiency Fund of the Republic of Moldova. 22 April 2014, Minsk, Belarus
Energy Efficiency Fund of the Republic of Moldova 22 April 2014, Minsk, Belarus Geographical position GENERAL DATA population 3 559 500 Total area 33 846 km 2 GDP (nominal) 7.252 b USD. Total energy consumption
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])
CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities
More informationGiurgiulesti Free Economic Zone (G-FEZ) Overview. June 2014
Giurgiulesti Free Economic Zone (G-FEZ) Overview June 2014 Content Owner and Management of Business Park Free Economic Zone & Free Trade Areas Location Infrastructure Connections Human Resources Utilities
More informationTHE PATH TO SUSTAINABLE ROAD MAINTENANCE IN MOLDOVA
Title Page THE PATH TO SUSTAINABLE ROAD MAINTENANCE IN MOLDOVA TRB Paper 15-4622 (for the 94 annual meeting) Final paper without line numbers Author: Chaim J. Poran, PhD, PE Director, Infrastructure Millennium
More informationPPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency
PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency The Finnish Transport Agency is a multidisciplinary expert organisation specialising in transport.
More information03.03 Border crossing in Dorohusk / 1
03.03 Border crossing in Dorohusk 1. Basic Information: 1.1. Desiree Number: PL0005.03 1.2. Title: Border crossing in Dorohusk 1.3. Sector: Administration 1.4. Location: Poland, Dorohusk, on the Polish-Ukrainian
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationALL Counties. ALL Districts
TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation
More informationLocal Government System and Finances in the Republic of Moldova
Local Government System and Finances in the Republic of Moldova V I O R E L R O S C O V A N M A Y 2 7, 2 0 1 5 Overview of this talk Background of Local Governance Legislation, Structure, and Competences
More informationRehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo
STANDARD SUMMARY PROJECT FICHE Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo 1. Basic Information CRIS Number: 2002/000-624-01 Title: Rehabilitation and Partial
More informationTHE ROAD TO ECONOMIC GROWTH
THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial
More informationTeam Leader: Srinivasan Palle Venkata, Evaluation Specialist ( Contact:
Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Paper Project
More informationPL CBC PL/D Mieszka I Crossroads reconstruction
PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction 1. Basic Information 1.1.Desiree Number: PL01.08.11 1.2. Title: Re-construction of crossroads: Mieszka I, Dabrowskiego, Piast?w, Boh. Warszawy, Powst.
More informationSTANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ Project Title : Krimov Hora Sv.Šebestiána - Re-laying of Road I/7
1. Basic Information 1.1 Project Number CZ 01.12.02 1.2 Project Title : Krimov Hora Sv.Šebestiána - Re-laying of Road I/7 1.3 Sector Transport 1.4 Project Location Euroregion: Cross-border region: District:
More informationAECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option
More informationNorth-South Road Corridor Investment Program. Republic of Armenia
North-South Road Corridor Investment Program Republic of Armenia Poti (Black Sea) Georgia Armenia Iran Bandar Abbas (Persian Gulf) www.northsouth.am North-South Road Corridor Investment Program Brief Introduction
More informationECONOMIC AND FINANCIAL ANALYSIS
Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting
More informationPrioritisation Methodology
Prioritisation Methodology March 2014 PRIORITISATION METHODOLOGY Table of contents 1 Introduction... 5 2 The Projects Prioritisation Process... 7 3 The Methodological Assumptions... 8 3.1 Background...
More informationProject Appraisal Guidelines for National Roads Unit Minor Projects ( 0.5m to 5m)
Project Appraisal Guidelines for National Roads Unit 14.0 - Minor Projects ( 0.5m to 5m) February 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII)
More informationCorporate and Financial restructuring of the road sector Context
Corporate and Financial restructuring of the road sector The Croatian Government (the Government) is committed to optimizing the debt held by public companies in the road sector, and wants to achieve a
More informationAnnex 7 - Action Fiche for ENPI Regional East Action Programme part II. TRACECA Maritime Safety and Security II (CRIS: ENPI/2011/ )
Annex 7 - Action Fiche for ENPI Regional East Action Programme part II 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation TRACECA Maritime Safety and Security II (CRIS: ENPI/2011/023-051)
More informationECONOMIC AND FINANCIAL ANALYSIS
Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state
More informationANNEX C1: Twinning Fiche
ANNEX C1: Twinning Fiche Project title: Reform of the initial and continuous training of the police system in the Republic of Moldova Beneficiary administration: Ministry of Internal Affairs and the General
More informationCOUNTRY REPORT ON INFRASTRUCTURE AND FINANCE BULGARIA TABLE OF CONTENT
COUNTRY REPORT ON INFRASTRUCTURE AND FINANCE TABLE OF CONTENT I. COUNTRY INFRASTRUCTURE AND POLICY DIRECTIONS... 2 II. 1.1 IMPLEMENTATION PROCESS... 3 1.2 LEGAL AND REGULATORY FRAMEWORK FOR INFRASTRUCTURE...
More informationSTANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ
STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ 01.13.02 1. Basic Information 1.1 Project Number CZ01.13.02 1.2 Project Title Reconstruction of Access Roads II/311 and II/319 to the Border Crossing
More informationReceive and file capital works report CW providing an update on the Burloak grade separation.
Page 1 of Report CW-13-17 SUBJECT: Burloak Grade Separation Project Update TO: FROM: Committee of the Whole Capital Works Report Number: CW-13-17 Wards Affected: 5 File Numbers: 570.02-818 Date to Committee:
More informationCOST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD
COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD 1 Introduction The objective of the cost benefit economic analysis is to identify and quantify the benefits and costs associated with the project. This
More informationDoing Business in Moldova
Doing Business in Moldova www.bakertillyinternational.com Preface This guide is one a series of guides designed to provide an overview of the key issues facing those considering doing business outside
More information10-Year Capital Highway Investment Plan DRAFT
10-Year Capital Highway Investment Plan DRAFT 2018-2027 DRAFT AUGUST 2017 1 Table of Contents PURPOSE OF 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN... 1 This page intentionally left blank. SUMMARY OF INVESTMENT
More informationGLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.
Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding
More information1. Ongoing Projects 2. Future Projects
1. Ongoing Projects 2. Future Projects 1. Ongoing Projects 1.1. Extension by 1,050 m of Northern Breakwater 1.2. Road bridge over Danube-Black Sea Canal 0+540 km 1.3. Development of the railway capacity
More informationClyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Counc
Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Council, Renfrewshire Council Main catchment Firth of Clyde
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development
More informationFlood Risk Management
Flood Risk Management COUNTY SUMMARY COUNTY: MONAGHAN (Information correct as of 31/12/2017) CONTENTS: 1. OPW Capital Investment to 31 December 2017 a. Major Flood Relief Schemes 1995 2017 b. Minor Flood
More informationAnnex C. The objectives of the 2003 Phare External Border Initiative for Romania are
Annex C 1. Objectives and Description The 2003 Phare External Border Initiative for Romania has been designed following bilateral discussions between the Romanian authorities and the European Commission
More information1 Malta. 1.1 Introduction
1 Malta 1.1 Introduction This Country Summary for Malta has been produced as part of the Task 5 of the Ex Post Evaluation of Cohesion Policy Interventions 2000-2006 by the Cohesion Fund (including former
More informationPHARE PROJECT FICHE. 2.3 Accession Partnership, NPIEU priority and Croatian Transport Development Strategy
PHARE PROJECT FICHE 1. Basic Information 1.1 CRIS Nr.: HR2006/018-113/5/1 1.2 Title: Restructuring and Development of Croatian Railway System within the framework of EU legislation 1.3 Sector: 43010 1.4
More informationECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)
Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising
More informationUNIFIED TRANSPORTATION PROGRAM
2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION
More informationPartnerships in Transportation Workshop Transportation PPPs beyond Toll Roads
TRANSACTION ADVISORY SERVICES PPP ADVISORY Partnerships in Transportation Workshop Transportation PPPs beyond Toll Roads Alistair SAWERS, Head of Transport, PPP Advisory, Ernst & Young 1 Introduction Brownfield
More informationIslamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project
PD 00001-PAK June 6, 2016 PROJECT DOCUMENT Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project This document has a restricted distribution and may be used by recipients
More informationSummary of Findings, Recommendations and Lessons Learnt. 1st Meeting of the Programme Steering Committee. Chisinau, Moldova September 28 29, 2012
Improving capacities to eliminate and prevent recurrence of obsolete pesticides as a model for tackling unused hazardous chemicals in the former Soviet Union Summary of Findings, Recommendations and Lessons
More informationVADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP
EUROPEAN COMMISSION EUROPEAN EXTERNAL ACTION SERVICE VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP ***LAST UPDATE 24 SEPTEMBER 2010*** Table of Contents PART I An Overview of the Eastern
More informationCARBON MARKET INSTRUMENTS TO URBAN DEVELOPMENT
Department of Municipal Debts & Securities Odessa City Council UKRAINE CARBON MARKET INSTRUMENTS TO URBAN DEVELOPMENT Barcelona, Spain May 26-29, 2009 Tel: +38 (048) 784-0310 Fax: +38 (048) 784-0311 info@investment.odessa.ua
More informationSuccess story: Slovak D4 R7 PPP & lessons learnt for Czech PPPs
www.pwc.com Success story: Slovak D4 R7 PPP & lessons learnt for Czech PPPs November 2016 Jan Brazda, (Head of PPP in CEE) Agenda 1 Key highlights of the D4/R7 PPP project 2 EU financial instruments 3
More informationBi-annual Environmental Monitoring Report
Bi-annual Environmental Monitoring Report Project Number: 42145 January-June 2011 Armenia: North-South Road Corridor Investment Program, Tranches 1 and 2 (Financed by the ADB) Prepared by the Organization
More information! " #"! $%& "%! ' "!( )
!" #$ 1! " #"! $%& "%! ' "!( ) 2 This appendix report comprises the pre-feasibility analyses conducted in connection with the REBIS project. This section provides a description of the process, the methodology
More informationCBA of transport infrastructure projects in Germany
CBA of transport infrastructure projects in Germany Dr. Catharina Horn Federal Transport Infrastructure Planning, Investment Policy Paris, 27th of February 2014 www.bmvi.de 1. The Federal Transport Infrastructure
More informationMOLDOVA. Guide to the National Requirements Relevant for the Implementation of Projects Financed under EaPTC Programme in the Republic of Moldova
Eastern Partnership Territorial Cooperation MOLDOVA Guide to the National Requirements Relevant for the Implementation of Projects Financed under EaPTC Programme in the Republic of Moldova Territorial
More informationProjected Funding & Highway Conditions
Projected Funding & Highway Conditions Area Commission on Transportation Gary Farnsworth ODOT Interim Region 4 Manager March, 2011 Overview ODOT is facing funding reductions that will require new strategies
More informationFINANCING MEMORANDUM
FINANCING MEMORANDUM The European Commission, hereinafter referred to as "THE COMMISSION", acting for and on behalf of the European Community, hereinafter referred to as "THE COMMUNITY" on the one part,
More informationModernisation of Local Public Services in the Republic of Moldova - MLPS
Modernisation of Local Public Services in the Republic of Moldova - MLPS Based on bilateral Government negotiations Moldova-Germany Nov 2009 Duration 6 years: 1/2010 12/2015 > Main institutional Counterparts:
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 30.3.2009 C(2009) 2178 final COMMISSION DECISION of 30.3.2009 establishing the multi-annual work programme 2009 for grants in the field of trans- European
More informationFINANCIAL SCHEDULES Moldova Energy Sector Reform and Efficiency Improvements Project
Public Disclosure Authorized Energy Sector Reform and Efficiency Improvements (ESREI) Project Grant No. TF099139 Public Disclosure Authorized Public Disclosure Authorized FINANCIAL SCHEDULES Moldova Energy
More informationEx Post-Evaluation Brief Laos: Rural road building Bokeo / Rural road infrastructure Northern Laos I+II
Ex Post-Evaluation Brief Laos: Rural road building Bokeo / Rural road infrastructure Northern Laos I+II Rural road building Province of Bokeo (RRB) 1) BMZ-Nr.: 00 65 05* Programme/Client Rural infrastructure
More informationXII. Public Private Partnerships for Public Transport Investments
XII. Public Private Partnerships for Public Transport Investments Introduction to Public Transport Planning and Reform XII-1 What is PPP? Agreement between Public and Private sector entities Often (but
More informationCOMMISSION IMPLEMENTING DECISION. of
EUROPEAN COMMISSION Brussels, 18.12.2013 C(2013) 9450 final COMMISSION IMPLEMENTING DECISION of 18.12.2013 adopting a National programme for Serbia under the IPA Transition Assistance and Institution Building
More information2002/ Sulechow by-pass
2002/000-606.08 - Sulechow by-pass 1. Basic information 1.1 CRIS Number: 2002/000-606.08 1.2 Title: Sulechow by-pass 1.3 Sector: Cross-Border Co-operation / Infrastructure 1.4 Location: Poland, province
More informationI Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1
Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE 36184 Report No.: AB219 I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1 Public Disclosure Authorized Public Disclosure
More informationOrganizational structure for implementing the project
Organizational structure for implementing the project Lukasz Wyrowski, UNECE secretariat Project s groups National working groups Hazard management group Crisis management group Project management group
More informationCOMMISSION DECISION. C(2007)6376 on 18/12/2007
COMMISSION DECISION C(2007)6376 on 18/12/2007 adopting a horizontal programme on the Energy Efficiency Finance Facility for Albania, Bosnia and Herzegovina, Croatia, Montenegro, Serbia including Kosovo
More informationANNUAL PERFORMANCE AGREEMENTS BETWEEN THE ROAD AGENCY AND ROAD FUND OR PARENT MINISTRY
ANNUAL PERFORMANCE AGREEMENTS BETWEEN THE ROAD AGENCY AND ROAD FUND OR PARENT MINISTRY Source: General suggestions by Ian G. Heggie, UK Highways Agency example from Mel Quinn and Tanzania example from
More informationCOMMISSION IMPLEMENTING DECISION. of
EUROPEAN COMMISSION Brussels, 22.12.2011 C(2011) 9531 final COMMISSION IMPLEMENTING DECISION of 22.12.2011 amending Commission Decision C(2011) 1772 of 22 March 2011 on the adoption of a financing decision
More informationSUPPLEMENTAL SPECIFICATION CRITICAL PATH METHOD CONSTRUCTION SCHEDULES
March 1, 2007 SUPPLEMENTAL SPECIFICATION CRITICAL PATH METHOD CONSTRUCTION SCHEDULES General This supplemental specification addresses the Critical Path Method (CPM) construction schedule requirements
More informationREPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS
EUROPEAN COMMISSION Brussels, 8.4.2013 COM(2013) 181 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Jan-2013
More informationFlood Risk Management
Flood Risk Management COUNTY SUMMARY COUNTY: CAVAN (Information correct as of 31/12/2017) CONTENTS: 1. OPW Capital Investment to 31 December 2017 a. Major Flood Relief Schemes 1995 2017 b. Minor Flood
More informationFOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL
More informationPROUD TO BE PART ROUTE 21-24
PROUD TO BE PART ROUTE 21-24 ROute 21-24 1 summary Type of Contract: Design, Construct, Finance, Operate and Transfer Tender: International Procurement Variable: Availability Payment + Shadow Toll Estimated
More informationAppendix E: Revenues and Cost Estimates
Appendix E: Revenues and Cost Estimates Photo Source: Mission Media Regional Financial Plan 2020-2040 Each metropolitan transportation plan must include a financial plan. In this financial plan, the region
More informationSTART Danube Region Project Fund Workshop for Lead- and Project Partners. May, 6 th 2015 Vienna
START Danube Region Project Fund Workshop for Lead- and Project Partners May, 6 th 2015 Vienna PAC 10 & EuroVienna (Implementing Body) EUSDR Priority Area Coordinator 10 / (City of Vienna, Austria): Dr.
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Bhutan Second Rural Access
More informationIndia: Public Private Partnerships in Highways Sector
India: Public Private Partnerships in Highways Sector Prepared by World Bank as input for IDA paper, 2008 (provided by Tarun Sankar, PPIAF office, South Asia) India s transport program is one of the most
More informationSTANDARD SUMMARY PROJECT FICHE PROJECT PREPARATION FACILITY FOR THE PHARE CBC PROGRAMME BULGARIA-GREECE
STANDARD SUMMARY PROJECT FICHE PROJECT PREPARATION FACILITY FOR THE PHARE CBC PROGRAMME BULGARIA-GREECE 1. Basic Information 1.1 CRIS Number 2002/000-624-06 1.2 Title: Project Preparation Facility for
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC19292 Project Name Road
More informationAgriculture. Textile, Apparel, footwear and leather goods ICT. Medicine. Renewable Energy. Automotive. Moldova. Opportunities near to you
Agriculture Textile, Apparel, footwear and leather goods ICT Medicine Automotive Renewable Energy Moldova Opportunities near to you Contents Introduction...2 Top reasons to Invest in Moldova...2 Key facts...3
More information«Kekava Bypass» Case Study
«Kekava Bypass» Case Study 28 September, 2017 Contents Introduction 3 Project details 6 Legal aspects Procurement procedure 15 Legal aspects PPP Agreement 22 Finance aspects 26 Off balance sheet treatment
More informationSUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP. Module 6 Implementation Plan
SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP Module 6 Implementation Plan Sustainable Urban Mobility Plans: Delivery & Implementation Plans Identifying phased approach to delivery and programming
More informationLowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page
Mike Page Lowestoft FLOOD RISK MANAGEMENT Strategy Summary 2016 Introduction This Strategy Summary Document is a brief overview of the Strategy for managing the risk of flooding to Lowestoft from the sea,
More informationTHE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA
THE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA Roy Harry MUMU, John Belly Kelly KAIO PNG National Roads Authority Boroko, National Capital District, Papua New Guinea roymumu@daltron.com.pg, johnkaio@datec.net.pg
More informationProposition 1B and the Strategic Growth Plan
Proposition 1B and the Strategic Growth Plan Presentation before the Senate Transportation and Housing Committee California Department of Transportation Proposition 1B Just one component of the Strategic
More informationAlbania. Restructuring Public Expenditure to Sustain Growth. Public Expenditure and Institutional Review. Sector related presentations-transport
Albania Public Expenditure and Institutional Review Restructuring Public Expenditure to Sustain Growth Sector related presentations-transport Tirana March 15, 2007 Main messages 1. The assets of the sector
More informationChapter 12: Programming/Resource Allocation
Chapter 12: Programming/Resource Allocation What is works programming? Works programming refers to the preparation of annual and multi-annual works programs in which road assets requiring treatment are
More informationSEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1
SEETO priority projects rating methodology July, 2012 13/07/2012 Page 1 Table of content 1 Introduction... 3 1.1 Purpose of the Rating methodology... 3 1.2 Rationale for the Rating methodology... 3 1.3
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723
More informationLIFE CYCLE MANAGEMENT OF ROAD ASSETS (Emphasis on Long Life Pavements)
14 th INTERNATIONAL FLEXIBLE PAVEMENTS CONFERENCE LIFE CYCLE MANAGEMENT OF ROAD ASSETS (Emphasis on Long Life Pavements) Prepared for Master Class / Workshops In Sydney, Melbourne and Brisbane September
More informationPPP Policies, Performances & Prospects of the Republic of Korea
PPP Policies, Performances & Prospects of the Republic of Korea 2007. 10.5 CHANG, Byoung-Wan Minister of Planning and Budget Contents Ⅰ Overview of Korean PPPs Ⅱ Performance Highlights Ⅲ Prospects on Korean
More information10-Year Capital Highway Investment Plan DRAFT
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway
More informationProgramme funded by the EUROPEAN UNION. National conference. Cross-border cooperation: achievements and perspectives of the Republic of Moldova
National conference Cross-border cooperation: achievements and perspectives of the 31 October 2014, Chisinau, Venue: Leogrand Hotel & Convention Center Mitropolit Varlaam str. 77, MD-2012, Chisinau, 1
More informationANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode
ANNEX 1. IDTIFICATION Title Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode DAC-code 15010 Project approach Partially decentralised management.
More informationRESTRUCTURING PAPER ON A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT
More informationPeople s Republic of Bangladesh: Updating the Road Master Plan
South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 21-Aug-2013
More informationProcess of strategic planning in the context of regional development EU legislation and best practises from the Member States
Process of strategic planning in the context of regional development EU legislation and best practises from the Member States Prof. Dr. Ralf von Ameln STRUCTURE EU Legislation Elements of Regional Policy
More informationOlivier Le Ber Lead Transport Specialist World Bank
World Bank Transport Projects in TRACECA Countries Olivier Le Ber Lead Transport Specialist World Bank 2 WB has 16 transport projects total US$ 4.8 billion in TRACECA countries (3 projects under preparation)
More informationStudy of High Speed Rail in Alberta
Study of High Speed Rail in Alberta Presentation to Standing Committee on Alberta s Economic Future Marc-Andre Roy February 4, 2014 Via Videoconference Many options, varying capital costs: $3-$8 billion
More informationNational Agriculture and Rural Development Plan
MEASURE 2.3. DEVELOPMENT AND IMPROVEMENT OF THE RURAL INFRASTRUCTURE Rationale The development of the private economic activities and the improvement of the living conditions for the population in the
More informationTHE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT MOLDOVA
THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT MOLDOVA A STRATEGIC APPROACH TO COMPETITIVENESS SCOPE, FOCUS AND PROCESS Sofía,
More informationROADMAPS TO IMPLEMENT EACH THEMATIC ACTION FIELD
ROADMAPS TO IMPLEMENT EACH THEMATIC ACTION FIELD Annex 1 Beside the recurrent activities for implementing PA 1a the EUSDR (cf. Annex 2), specific activities shall be accomplished with direct and varying
More informationHarden Contributions Plan for Heavy Haulage Developments. Adopted by Council Resolution No. 277/11/11 16 th November, Prepared by.
Harden Contributions Plan for Heavy Haulage Developments Adopted by Council Resolution No. 277/11/11 16 th November, 2011 Prepared by newplan Urban Planning Solutions ABN 16 113 272 705 Member of the Planning
More information