FISCAL YEARS
|
|
- Nelson Patterson
- 5 years ago
- Views:
Transcription
1 COUNTY OF LOUISA CAPITAL IMPROVEMENT PLAN DEPARTMENT BUDGET REQUESTS ONLY COUNTY ADMINISTRATOR S RECOMMENDATIONS NOT INCLUDED FISCAL YEARS
2 County of Louisa Capital Improvement Plan 6Bs Department Budget Requests Only County Administrator s Recommendations Not Included 0BTable of Contents Department Page Number I. FY Capital Improvement Plan... 3 II. Information Systems... 8 III. Elections IV. Sheriff s Department V. Revenue Recovery VI. General Services VII. Louisa County Public Schools VIII. Parks and Recreation IX. Community Development X. Transportation Investments XI. Economic Development XII. Louisa County Water Authority XIII. Long Term Project Investments
3 FY Capital Improvement Plan I 12/14/2018 revised 3
4 INTRODUCTION The Capital Improvement Plan (CIP) is a schedule prepared for capital projects in the County. It is required to forecast capital outlays for the upcoming fiscal year and the ensuing years to follow. Previously, the County has planned for the upcoming five years. This year, we are expanding our capital plan to look further into the future with a 20 year Capital Improvement Plan. The information provided in the CIP is useful for projecting future revenue needs and setting funding priorities. It is also a valuable planning tool for the preparation of the County budget. The CIP is intended to advise the Board of Supervisors so better decisions can be made regarding capital expenditures. It is not intended to be used so particular capital projects can reserve funding. The County s CIP is its plan for capital expenditures over the upcoming twenty years. Capital expenditures/projects are defined in general as the purchase or construction of long-lived, high-cost, tangible assets. Long-lived implies a useful life in excess of five years. High-cost means that the project amounts to at least $10,000. Tangible assets exclude contractual services except those that are necessary for putting a tangible asset into service. The CIP is updated on an annual basis, so capital projects can be removed when they are completed or as priorities change. Once adopted, capital project priorities may change throughout the year based on changing circumstances. It is also possible that particular projects may not be funded during the year that is indicated in the CIP. The status of any project becomes increasingly uncertain the further in the future it is projected. In accordance with Section of the Code of Virginia, the County can not accept proffers without first adopting a CIP. Proffers are voluntary contributions typically offered as part of a rezoning application to mitigate impacts associated with new development. Proffers can include cash, property or any other contribution that is directly attributable to the development. Since proffers are specific to a particular development, the County can accept proffers that are not found in the CIP. However, before the County can receive property or cash from a proffer the CIP needs to be updated to include the project to which the proffer is connected. The proffer language itself should specify how cash or property will be used if the County chooses not to use the cash or property for its intended purpose. Section of the Code of Virginia assigns the Planning Commission with the responsibility of evaluating capital outlay projects to determine if they conform to the Comprehensive Plan. Projects that compose the CIP are submitted by department heads to the County Administrator. The County Administrator then forwards the information to the Planning Commission for their review. Specifically, the projects are reviewed with considerations regarding health, safety and the general welfare of the public. Final recommendations of the Planning Commission are then forwarded to the Board of Supervisors for approval consideration. 12/14/2018 revised 4
5 County of Louisa, Virginia Summary of Capital Improvement Projects s Dept Project Title Unencumbered FY2019 as of 11/29/ and Beyond Project Totals Information Systems (12400) Server Renewal $60,000 $75,000 $135,000 Total $60,000 $75,000 $135,000 Elections (13000) Replacement of Voting Equipment $32,000 $16,000 $16,000 $16,000 $16,000 $16,000 $80,000 $80,000 $88,000 $88,000 $448,000 Total $32,000 $16,000 $16,000 $16,000 $16,000 $16,000 $80,000 $80,000 $88,000 $88,000 $448,000 Sheriff (31000) Vehicle Replacements $5,418 $365,000 $365,000 $365,000 $365,000 $365,000 $1,825,000 $1,825,000 $1,825,000 $365,000 $7,670,418 Firearms Training Simulator $45,000 $45,000 Total $5,418 $410,000 $365,000 $365,000 $365,000 $365,000 $1,825,000 $1,825,000 $1,825,000 $365,000 $7,715,418 Revenue Recovery (32000) Ambulance Re-Chassis/Replacement $189,400 $300,000 $300,000 $325,000 $325,000 $330,000 $1,650,000 $1,700,000 $1,700,000 $350,000 $7,169,400 Vol. CIP Funding $220,879 $300,000 $300,000 $300,000 $300,000 $300,000 $1,500,000 $1,500,000 $1,500,000 $300,000 $6,520,879 Generator Purchase - LCRS $19,255 $19,255 Brush Truck Replacement - FS6 $85,000 $85,000 Parking lot replacement - LCRS $96,000 $96,000 Total $410,279 $704,255 $696,000 $625,000 $625,000 $630,000 $3,150,000 $3,200,000 $3,200,000 $650,000 $13,890,534 General Services (41000/42000) Landfill Closure Fund $694,200 $175,000 $175,000 $175,000 $175,000 $175,000 $875,000 $875,000 $875,000 $1,750,000 $5,944,200 Landfill New Cell Development $841,747 $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 $600,000 $2,941,747 Replacement of County Vehicles $49,932 $75,000 $75,000 $75,000 $75,000 $75,000 $375,000 $375,000 $375,000 $375,000 $1,924,932 MSW Waste Compactors for Refuse Centers $90,720 $50,000 $50,000 $50,000 $25,000 $300,000 $565,720 Solid Waste Equipment Replacement $109,000 $109,000 $109,000 $109,000 $109,000 $545,000 $545,000 $545,000 $109,000 $2,289,000 Total $1,676,599 $559,000 $559,000 $559,000 $534,000 $509,000 $2,545,000 $2,395,000 $2,095,000 $2,234,000 $13,665,599 12/14/2018 revised 5
6 Dept Project Title Unencumbered FY2019 as of 11/29/ and Beyond Project Totals LC Public Schools (61000) Garage Equipment/Tools $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 Cafeteria Equipment Replacement $23,959 $97,000 $31,700 $26,700 $76,000 $55,200 $137,800 $219,200 $358,400 $1,025,959 Digital Camera System/Security Cameras $8,587 $41,000 $15,000 $15,000 $15,000 $15,000 $75,000 $75,000 $75,000 $75,000 $409,587 Maintenance Vehicle Replacement $30,981 $56,000 $26,075 $46,000 $26,075 $78,225 $190,305 $453,661 School Bus Purchases & Bus Equipment $710,279 $813,570 $813,570 $813,570 $813,570 $4,169,634 $4,251,276 $4,334,552 $16,720,021 Technology $417,850 $135,000 $100,000 $55,000 $10,000 $355,000 $1,050,000 $1,190,000 $995,000 $4,307,850 Program/Fleet Vehicle Purchases $26,878 $45,000 $30,000 $120,000 $120,000 $75,000 $416,878 CTE Center $2,490,000 $5,810,000 $300,000 $4,300,000 $900,000 $600,000 $14,400,000 Classroom Cabinets $309,740 $309,740 HVAC $30,000 $135,240 $30,000 $30,000 $150,000 $270,000 $150,000 $150,000 $945,240 Flooring $11,000 $22,000 $11,200 $31,500 $64,550 $183,760 $324,010 LED Lighting $25,000 $25,000 $25,000 $50,000 $80,000 $205,000 Restrooms $64,788 $64,788 $129,576 Roof System Replacement $76,755 $47,225 $279,185 $79,631 $142,645 $625,441 Asphalt to CTE/GED Parking Lot $100,000 $112,500 $660,000 $872,500 Plumbing - Boilers at JES $27,000 $55,000 $80,000 $80,000 $242,000 Addition at Jouett Elementary $1,148,827 $2,680,595 $3,829,422 Addition at LC Middle School $4,552,865 $10,623,351 $15,176,216 Addition at Moss Nuckols Elementary $2,072,202 $4,835,138 $6,907,340 Storage $450,000 $450,000 Parking additions $700,000 $700,000 Softball/baseball Complex $500,000 $500,000 Total $533,255 $3,882,389 $6,606,193 $9,830,157 $5,920,539 $6,576,855 $21,653,560 $7,384,541 $6,612,952 $75,000 $69,075,441 Parks and Recreation (71000) Park / Trail Development and Enhancement $150,000 $75,000 $22,000 $25,000 $65,000 $25,000 $25,000 $25,000 $412,000 Permanent Pool Enclosure $796,400 $796,400 Total $150,000 $75,000 $796,400 $22,000 $25,000 $65,000 $25,000 $25,000 $25,000 $1,208,400 Community Development (81000) GIS Multifunction 44" Printer/Scanner $10,000 $10,000 Total $10,000 $10,000 Transportation Investments (82000) Transportation Investment Fund $500,000 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 $500,000 $500,000 $100,000 $2,600,000 Total $500,000 $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 $500,000 $500,000 $100,000 $2,600,000 Economic Development (82000) EDE Project Funds $468,231 $127,893 $596,124 Ferncliff Water/Sewer Development Total $468,231 $127,893 $596,124 12/14/2018 revised 6
7 Dept Project Title Unencumbered FY2019 as of 11/29/ and Beyond Project Totals Louisa County Water Authority (83000) Bowler's Mill Dam Improvements $250,000 $250,000 $250,000 $250,000 $250,000 $500,000 $1,750,000 LRWWTP Ammonia-Nitrogen $1,000,000 $1,000,000 $2,000,000 NEC WTP Fall Protection Safety Upgrade $40,000 $40,000 ZCWWTP Fall Protection Safety Upgrade $90,000 $90,000 LRWWTP Fall Protection Safety Upgrade $100,000 $100,000 Total $1,480,000 $1,250,000 $250,000 $250,000 $250,000 $500,000 $3,980,000 Long Term Projects (91000) Long Term Project Investments $50,000 $2,500,000 $250,000 $250,000 $250,000 $250,000 $1,250,000 $1,250,000 $1,250,000 $250,000 $7,550,000 Total $50,000 $2,500,000 $250,000 $250,000 $250,000 $250,000 $1,250,000 $1,250,000 $1,250,000 $250,000 $7,550,000 Grand Total of Projects $3,825,782 $9,864,537 $10,698,593 $12,017,157 $8,060,539 $8,721,855 $31,643,560 $16,659,541 $15,595,952 $3,787,000 $120,874,516 12/14/2018 revised 7
8 Information Technology II 12/14/2018 revised 8
9 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Server Renewal Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No One Time Technology 9/1/2021 Bob Hardy 12/1/ /05/ New $40k in 2015 no no PROJECT DESCRIPTION: (Enter a brief description of the project) Purchase two new server stacks (Virtualized hosts) and a network storage device (SANS). PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Most of the County's servers are virtualized with a SANS (network storage) for the data. Our current structure includes two primary server stacks and a 12 TB SANS purchased in Oct These are replicated onto secondary equipment (two servers and SANS) that were purchased in May To maintain currency and to insure support is available, we plan to replace our primary equipment in FY21 and move the 2015 equipment to secondary status. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Potential end-of-life status from Dell on the secondary servers and SANS. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Maintenance costs should remain the same as older equipment is replaced. IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 9
10 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Acquisition late-summer finish November 2020 Estimated Project Costs: Project Sub- Total $60,000 $60,000 $60,000 $60, and Beyond Project Totals $75,000 $135,000 $75,000 $135,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: $135,000 Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: $135,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 10
11 Elections III 12/14/2018 revised 11
12 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Voting Machines Project One Time or Recurring: Datee Project Expected to Begin: Elections 2025 Datee Project expected to be Completed: Useful life (in years): Cris Watkins /01/ Continuation Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No $32,000 No Recurring every 10 years Yes PROJECT DESCRIPTION: (Enter a brief description of the project) Replacement of the voting equipment in the 16 precincts in Louisa County. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) The voting equipment used by Louisa County is a paper based scanning system as required by state law. The voting system now being used went into service in November The useful life is projected to be about 10 years. Based on this, the County needs to be prepared to replace the voting equipment around the year Current price estimates are $10,000 per machine. Each precinct has one machine. Replacing the voting machines countywide is projected to be $160, IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Voting machines are required by Virginia Code OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Replacement voting machines would the same resources as the machines currently in use. IF MANDATED, PLEASE EXPLAIN: Virginia Code (B) requires the governing county to provide ballot scanners. 12/14/2018 revised 12
13 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) The life expectancy of the voting machines is 10 years. We are requesting 1/10 of the total cost per year. Estimated Project Costs: Project Sub- Total $16,000 $16,000 $16,000 $16,000 $16,000 $80,000 $16,000 $16,000 $16,000 $16,000 $16,000 $80, and Beyond Project Totals $80,000 $80,000 $88,000 $88,000 $416,000 $80,000 $80,000 $88,000 $88,000 $416,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $416,000 Total: $416,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 13
14 Sheriff s Office IV 12/14/2018 revised 14
15 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Replacement Vehicle Sheriffs Office Project One Time or Recurring Recurring: Datee Project Expected to Begin: July 1, 2019 Contact Person: Date of Submission: MAJ Lowe Nov 7, 2018 Datee Project expected to be Completed: Useful life (in years): June 30, Project New or Expansion/Continuation: Previous s Funding Amount: Continuation k Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Yes no PROJECT DESCRIPTION: Vehicle replacements (Enter a brief description of the project) PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Vehicles with high mileage and increasing service related costs. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Severe impact Law enforcement response OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 15
16 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total 365, , , , ,000 1,825, , , , , , , and Beyond 1,825,000 1,825,000 1,825, ,000 7,665,000 Project Totals 1,825,000 1,825,000 1,825, ,000 7,665,000 Planning/ Engineering: 0 Acquisition: 7,665,000 Construction: 0 Equipment/ Furnishings: Costs Summary: 0 Other Capital Costs: 0 Operating (O&M) Costs: Total: 7,665,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 16
17 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Firearms Training Simulator Sheriff s Office Project One Time or One Time Recurring: Datee Project Expected to Begin: July 1, 2019 Contact Person: Date of Submission: MAJ Lowe Nov 7, 2018 Datee Project expected to be Completed: Useful life (in years): June 30, Project New or Expansion/Continuation: Previous s Funding Amount: New 0 Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No No no PROJECT DESCRIPTION: (Enter a brief description of the project) The Louisa County Sheriff s Office Foundation is seeking fundingg for the purchase of a Firearms Training System known as the VirTra V-100 system OR the VirTra V-300 system. A judgmental use of force system provides real world shoot or don t shoot scenarios and continuum of force techniques whichh have been taken from actual reports. This system would include all of the required equipmentt and the library of scenarios. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Funding this project would provide the Louisa County Sheriff s Office with a system used for real world advancedd training of deputies, and command staff, on a range of concepts ncluding traffic stops, hostage negotiations, threatt assessment and escalation and the concept of shoot/don t shoot. The VirTra V-100/V-300 provides a library of judgmental use of force scenarios taken from actual reports. The threat fire feedback system simulates return fire with electrical impulses to reinforce performance and immediate feedback to the student in the simulator. The system operator cann guide the scenario based on the actions of the officer in training. Scenarios can be developed by the system administrator to include training with the North Anna Power Station security force, local, state or federal law enforcement agencies. The VirTra V-100/V-300 has tremendous value educating the public, Community Policing, Citizens Academy and Churches that are developing an armed security program. This system is also beneficial to county leaders as they get a better understanding of what happens during a critical incident and the need for consistent training for the officers that the academy does not offer. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) None 12/14/2018 revised 17
18 IF MANDATED, PLEASE EXPLAIN: N/A PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Begin project July 1, 2019 Estimated Project Costs: Project Sub- Total 45, , , , and Beyond 45,000 Project Totals 45,000 Planning/ Engineering: 0 Acquisition: Construction: 0 Equipment/ Furnishings: 45,000 Costs Summary: 0 Other Capital Costs: 0 Operating (O&M) Costs: Total: 45,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 18
19 Revenue Recovery V 12/14/2018 revised 19
20 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Ambulance Re-chassis/replacement Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring Fire-EMS July 1, 2019 Keith Greene /06/ per rechassis New 0 Yes No PROJECT DESCRIPTION: (Enter a brief description of the project) Replace or rechassis ambulances within the county to ensure safe and reliable units are available to answer emergency medical calls for service. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) The staffed ambulances within the County travel an average of 60,000-80,000 miles annually. The excessive mileage is primarily due to the geographical area of Louisa County (514 sq. miles) coupled with distances up to 50+ miles to the closest appropriate emergency facility and, call volumes in excess of 6500 responses annually. Safe and reliable ambulances are a necessary component within the county's fire and EMS system to ensure safe and timely transport units for patients and providers alike. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) If not funded, citizens will experience extended response times to emergency calls for service. Extended response times can/will pose negative impact on the health and wellbeing of the lives of those we serve to include death. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) By ensuring re-chassis and/or replacement as needed will significantly reduce associated maintenance costs. "Re-chassis" of an ambulance reduces the cost by approximately 25% in comparison with "replacement" costs. IF MANDATED, PLEASE EXPLAIN: N/A 12/14/2018 revised 20
21 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $300,000 $300,000 $325,000 $325,000 $330,000 $1,580,000 $8,000 $8,000 $8,000 $8,000 $8,000 $40,000 $308,000 $308,000 $333,000 $333,000 $338,000 $1,620, and Beyond Project Totals $1,650,000 $1,700,000 $1,700,000 $350,000 $6,980,000 $40,000 $40,000 $40,000 $8,000 $168,000 $1,690,000 $1,740,000 $1,740,000 $358,000 $7,148,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: $168,000 Construction: Equipment/ Furnishings: $6,980,000 Total: $7,148,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 21
22 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Volunteer Annual CIP Funding Project One Time or Recurring: Datee Project Expected to Begin: FIre-EMS 2019 Keith Greene - Chief Datee Project expected to be Completed: Useful life (in years): 11/05/2018 N/A Continuation Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No No Recurring on-going No PROJECT DESCRIPTION: (Enter a brief description of the project) Recurring annual CIP funding provided to each volunteer station within the County. These funds have been historically utilized for apparatus loan payments, equipment purchases and/or building repairs/upgrades. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) For many years the volunteer stations within the county have been provided $300, annually (divided between $25, each), and have utilized this funding to make apparatus loan payments, equipment purchases and/or building repair/upgrades. The County has in recent years began funding apparatus purchases either whole or in part for the volunteer stations in addition to this annual funding and has adopted a policy that outlines purchase and sale of apparatus and that county funded units shall be co-titled with the respective station and the County. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) There would be a negative impact on services in terms of having safe and effective apparatus if this project is not funded; however, the Department recommends that, this funding be utilized annually (whole or in part) for fire apparatus replacement needs, and that the MOG in collaboration with the Department prioritizes the apparatus need and replacement schedule throughout the county; and, that other Capital purchase requests be submitted through the normal CIP process. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) The replacement of needed apparatus, specifically apparatus that is 20+ years old will assist to reduce overall annual maintenance costs. IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 22
23 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $300,000 $300,000 $300,000 $300,000 $300,000 $1,500,000 $300,000 $300,000 $300,000 $300,000 $300,000 $1,500, and Beyond Project Totals $1,500,000 $1,500,000 $1,500,000 $300,000 $6,300,000 $1,500,000 $1,500,000 $1,500,000 $300,000 $6,300,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $6,300,000 Total: $6,300,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 23
24 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Generator Purchase (louisa Vol. Rescue) Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No One Time Fire-EMS (Louisa Vol. Rescue) July 1, 2019 Keith Greene Before Dec. 1, /05/ years New 0 No No PROJECT DESCRIPTION: (Enter a brief description of the project) Replacement Generator for Louisa Volunteer Rescue station. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Current Generator is 15+ years old and frequently experiences mechanical issues that require repair replacement resulting in excessive maintenance costs. Replacing this unit will decrease annual maintenance costs. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Can expect increased maintenance costs for the current generator. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Annual maintenance is required for this generator, although costs will be reduced in comparison with maintenance costs of current unint. IF MANDATED, PLEASE EXPLAIN: N/A 12/14/2018 revised 24
25 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $19,255 $19,255 $2,000 $2,000 $2,000 $2,000 $2,000 $10,000 $21,255 $2,000 $2,000 $2,000 $2,000 $29, and Beyond Project Totals $19,255 $8,000 $8,000 $8,000 $8,000 $42,000 $8,000 $8,000 $8,000 $8,000 $61,255 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: $42,000 Construction: Equipment/ Furnishings: $19,255 Total: $61,255 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 25
26 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: FS6 Brush Truck Replacement Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No One-Time Fire-EMS (Trevilians Vol. Fire) 1 July 2019 Keith Greene - Chief 31 December /05/ New 0 No No PROJECT DESCRIPTION: (Enter a brief description of the project) FS6 (Trevilians Vol. Fire) wishes to replace the existing 1993 Ford F-350 Brush Truck. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) The 1993 Ford F-350 Brush Truck is currently Out-of-Service due to mechanical issues (Brake system and Transmission). The cost to repair this uit outweighs the value of the unit. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Without a reliable brush unit in the Trevilians area, the response area in the Northwestern area of the county, is negatively impacted by limited access to wild fires that may occur. This unit also serves a role in gaining access to otherwise inaccessible areas by ambulance and/or larger fire apparatus. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) There will be annual maintenance costs associated with a new unit, however these costs would be reduced in comparison with ongoing maintenance costs of the unint being replaced. IF MANDATED, PLEASE EXPLAIN: N/A 12/14/2018 revised 26
27 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $85,000 $85,000 $2,500 $2,500 $2,500 $2,500 $2,500 $12,500 $87,500 $2,500 $2,500 $2,500 $2,500 $97, and Beyond Project Totals $85,000 $2,500 $2,500 $2,500 $2,500 $22,500 $2,500 $2,500 $2,500 $2,500 $107,500 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: $22,500 Construction: Equipment/ Furnishings: $85,000 Total: $107,500 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 27
28 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Louisa Rescue Parking Lot Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No One Time Fire-EMS (Louisa Vol. Rescue) 1 July 2020 Gary Morris (Louisa Rescue) Before 12 December /05/ New 0 No No PROJECT DESCRIPTION: (Enter a brief description of the project) Louisa Rescue requests to have the parking lot at 83 Rescue Lane PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Louisa Rescue Chief indicates that the current parking lot "is sinking" in many spots. Current grade during heavy rains allows water to enter ambulance bays. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) No significant impact on services. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Operating budget would experience general maintenance associated with regular sealing... Estimated costs are less than $10, annually. IF MANDATED, PLEASE EXPLAIN: N/A 12/14/2018 revised 28
29 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $96,000 $96,000 $10,000 $10,000 $10,000 $30,000 $96,000 $10,000 $10,000 $10,000 $126, and Beyond Project Totals $96,000 $10,000 $10,000 $10,000 $10,000 $70,000 $10,000 $10,000 $10,000 $10,000 $166,000 Costs Summary: Planning/ Engineering: Other Capital Costs: $96,000 Acquisition: Operating (O&M) Costs: $70,000 Construction: Equipment/ Furnishings: Total: $166,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 29
30 General Services VI 12/14/2018 revised 30
31 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Landfill Closure Fund Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring General Services July 1, 2019 John Robins /05/ years Continuation $212,400 No Yes PROJECT DESCRIPTION: (Enter a brief description of the project) Yearly funding allocation for future landfill closure. In order to ensure adequate future funding necessary for required closure of the landfill cells, and in an effort to avoid a major monetary funding request at one time, allocation of funding is requested on a annualized basis. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) The closure of Cells 1, 2, 3 and 4 of the current permit (#567) encompasses approximately 30 acres. This is expected to require a full closure cap around 2049 which is a year after filling the last cell (cell 4). The cost of the closure cap in today's dollars is estimated to be $5.9 million dollars. With the current funds accumulated from past annualized payments of nearly $700,000, this requires an expenditure of $5.2 million dollars over 30 years. This results in an annualized payment of approximately $175,000/year. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) If this annual allocation is not funded, the entire construction amount will be required to be appropriated in the future with a significant impact to a future budget. An alternative could include putting off this expense until a future date with a large appropriation at that time. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) The regulations governing the landfill operations and closure will require the County to monitor and be responsible for groundwater and gas impacts along with routine maintenance of the closure cap and facility for at least 30 years after closure (through approximately 2078). This is currently estimated to be on the order of $200,000/year and is currently included in the operations budget of the solid waste budget. IF MANDATED, PLEASE EXPLAIN: The Solid Waste Regulations of the Commonwealth along with the federal regulations requires a low permeability landfill cover once operations have ceased or an area of the landfill has reached maximum fill elevation. 12/14/2018 revised 31
32 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) This request is an annualized allocation for construction of the anticipated closure cover for the area covering Cells 1, 2, 3 and 4 of the landfill. It is anticipated to be needed in 2049 (one year after final filling of cell 4). There is a possibility smaller sections of the side slopes may be required to be closed prior to filling of the entire combined cells 1, 2, 3,and 4. This will be up to the Department of Environmental Quality, and is difficult to completely forecast with accuracy. However, it is estimated that this savings plan will provide enough for partial early closure. The first of these partial closures could be required in 13 years (completion of the combined cell 2 and 3 filling) and include the side slopes of cell 1, 2 and 3. Assuming an approximate area of closure of 15 acres in 13 years at a cost of $200,000/acre the construction cost can be estimated to be $3 million dollars and the funds accumulated through the annual allocation of $175,000 and the starting amount of $700,000 by this time should be nearly $3 million dollars. Estimated Project Costs: Project Sub- Total $175,000 $175,000 $175,000 $175,000 $175,000 $875,000 $175,000 $175,000 $175,000 $175,000 $175,000 $875, and Beyond Project Totals $875,000 $875,000 $875,000 $1,750,000 $5,250,000 $875,000 $875,000 $875,000 $1,750,000 $5,250,000 Costs Summary: Planning/ Engineering: $500,000 Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $5,400,000 Total: $5,900,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 32
33 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: New Landfill Development General Services Project One Time or Recurring: Datee Project Expected to Begin: Recurring Next Cell starting in FY2031 Contact Person: Date of Submission: Datee Project expected to be Completed: Useful life (in years): John Robins /05/ to 20 additional years Project New or Expansion/Continuation: Previous s Funding Amount: Continuation $200,000/year Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No No Yes PROJECT DESCRIPTION: (Enter a brief description of the project) This project is an annualized funding for the next Municipal Solid Waste (MSW) cell construction in the "piggy-back" area between the currently closed cell (permit #194) and the active cell (Permit #567). In order to ensure adequate future funding necessary for construction of a new cell at the landfill, and in an effort to avoid a major monetary funding request at one time in the future, the annualized allocation for funding is being requested. This annualized cost is essentially the replacement cost for the air-space being used each year. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) The Louisa county Sanitary Landfill is currently accepting around 70 tons of MSW daily. At our current usage Cell 1 of our current permit (#567) has a life expectancy of 1 year and six months (estimated fill date April 2020). The next cell (combined cells 2 and 3) is currently under construction and is expected to have between 13 and 14 years of operating life. The next cell (cell 4) that is planned to be constructed is located in the roadway between the currently closed cell (permit #194) and the current active cell (cell 1) and new cell (cell 2 and 3 combined). This will use the sides of the old cell and the active cells (cells 1, 2 and 3). This is known as "piggy-backing" since the new cell will be on top of the slopes of the older cell. This new cell is currently in permitting and design information is in the preliminary stages. However, it is estimated to be on the order of magnitude of $2.8 million dollars for the construction. Since there is an estimated $700,000 in savings from the current construction of cell 2 and 3 combined, this reduces the expected need to $2.1 million dollars. Using a period of 14 years to accumulate the funds this requires an annualized amount of $150,000 each year. As the design proceeds this value can be better defined, but this is a reasonable approximation of the annual amount needed for the foreseeable future. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) If this annual allocation is not funded, the entire construction amount will be required to be appropriated in the future with a significant impact to a future budget. An alternative could include putting of this expense until a future date with a large appropriation at that time. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Continuing to operate a landfill will require a continued operational budget for solid waste. Although this will change in accordance to changing costs of fuel, and regulations, and personnel expenses, the construction of the next cell is not expected to add additional operational costs. IF MANDATED, PLEASE EXPLAIN: N/A 12/14/2018 revised 33
34 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) This request is an annualized allocation for construction that is anticipated approximately 14 years from now or in This will create Cell 4 which should last until 2048 (estimated). Estimated Project Costs: Project Sub- Total $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 $150,000 $150,000 $150,000 $150,000 $150,000 $750, and Beyond Project Totals $750,000 $600,000 $2,100,000 $750,000 $600,000 $2,100,000 Costs Summary: Planning/ Engineering: $450,000 Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $2,350,000 Total: $2,800,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 34
35 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Replacement of County Vehicles Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring General Services July 1, 2019 John Robins Recurring 11/05/ to 10 years Continuation $75,000 No No PROJECT DESCRIPTION: (Enter a brief description of the project) Procurement of new vehicles to replace aging County fleet vehicles. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Replacement of County vehicles to reduce maintenance expenses, ensure dependability and improve vehicle safety and efficiency. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) If not funded, the County vehicle fleet will continue to age and expenses for repairs and maintenance will increase. An alternative is to allow the County fleet to age but this will require adding additional money to the Operations budget to increase the maintenance and repair budget. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) The funding of this capital project will help to keep the repair budget for the County vehicle fleet low by retiring the aging vehicles. The only revenue that may come from this project is the proceeds from auctioning the retired vehicles. This revenue is projected to be relatively small. IF MANDATED, PLEASE EXPLAIN: N/A 12/14/2018 revised 35
36 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) This is planned to be a recurring project with annual expenditures to replace the older vehicles in the County fleet. The expense is expected to be annual. Estimated Project Costs: Project Sub- Total $75,000 $75,000 $75,000 $75,000 $75,000 $375,000 $75,000 $75,000 $75,000 $75,000 $75,000 $375, and Beyond Project Totals $375,000 $375,000 $375,000 $375,000 $1,875,000 $375,000 $375,000 $375,000 $375,000 $1,875,000 Planning/ Engineering: Acquisition: Construction: Equipment/ Furnishings: Costs Summary: Other Capital Costs: Operating (O&M) Costs: $1,875,000 Total: $1,875,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 36
37 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Waste Compactor Replacement Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring General Services July 1, 2019 John Robins June 30, /05/ to 20 years Continuation $50,000 No No PROJECT DESCRIPTION: (Enter a brief description of the project) Purchase and installation of new Municipal Solid Waste compactors located at the Louisa County Refuse and Recycling Centers. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Existing waste compactors have been in place and operating since the original construction of the current refuse and recycling centers. The majority of these compactors are older than 20 years. This plan provides a conservative plan and schedule for replacement. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) The operation of the refuse and recycling centers could be adversely impacted with break-downs of the equipment as they continue to age and kept in operations. An alternative approach would be to continue the current repair and maintenance program. However, this continues to increase the operations budget. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) The replacement of the againg compactors will help the operations budget by lowering the maintenance costs of the 20 year old current units. IF MANDATED, PLEASE EXPLAIN: N/A 12/14/2018 revised 37
38 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) This project is expected to take place through FY 2022 so that the expenses can be made evenly and slowly. Estimated Project Costs: Project Sub- Total $50,000 $50,000 $50,000 $25,000 $175,000 $50,000 $50,000 $50,000 $25,000 $175, and Beyond Project Totals $300,000 $475,000 $300,000 $475,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $475,000 Total: $475,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 38
39 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Solid Waste Equipment Replacement Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring General Services July 1, 2019 John Robins On-going 11/05/ years typical on equipmen New No No PROJECT DESCRIPTION: (Enter a brief description of the project) Annualized Equipment Replacement Fund Allocation for Landfill Equipment. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) The solid waste operations uses many pieces of heavy construction equipment and trucks to perform important daily operations. This equipment and the trucks have a limited life and will need to be replaced. Since is clear that replacement of these high dollar items will be necessary in the future it is recommended that a replacement fund be created that can be built up annually in more reasonable amounts. The replacement cost for the equipment at the landfill (dozer, compactor, excavator, off-road dump truck, and tractor) along with the two roll-off trucks will total $1.625 million dollars with the most expensive piece of equipment on the order of $500,000. Using 15 years for the life expectancy on average this requires an annual allocation of $109,000. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) If this annualized allocation for replacement of the rolling stock for the solid waste operations is not created, then large allocations for the replacement will need to be made in future budgets. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) The large requests for equipment replacement will not need to be included in future budget requests leveling out the expenses over the life of the equipment. IF MANDATED, PLEASE EXPLAIN: N/A 12/14/2018 revised 39
40 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) This is an annualized allocation for replacement costs for the rolling stock for the solid waste operations. The annual amount of funds is planned to be requested annually to build up the reserve needed to replace the equipment and trucks. It will be spent as equipment replacement is needed. Each request will be made to the Board of Supervisors. Using an average life expectancy of 15 years and having model dates ranging from 2005 to 2018 the expense requests will be made every few years for replacement. Estimated Project Costs: Project Sub- Total $109,000 $109,000 $109,000 $109,000 $109,000 $545,000 $109,000 $109,000 $109,000 $109,000 $109,000 $545, and Beyond Project Totals $545,000 $545,000 $545,000 $109,000 $2,289,000 $545,000 $545,000 $545,000 $109,000 $2,289,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $1,625,000 Total: $1,625,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 40
41 Solid Waste Operations Replacement Cost Description Detail ID Year Expected Life Replacement Cost Annualized Replacement Cost $ $ $ $ $ $ $ $ $ Dozer D6KLGP $ 180, , ATV Dump 300D $ 250, , Compactor 816F $ 500, , Excavator 320D $ 225, , Roll-Off #1 Mack $ 165, , Roll-Off #2 Mack $ 165, , Tractor with Bush Hog $ 60, , Water Truck $ 80, , $ 1,625, , /14/2018 revised 41
42 Louisa County Public Schools VII 12/14/2018 revised 42
43 012345ÿ71289ÿ2037ÿ471104ÿÿ519ÿ73ÿ ÿÿ 09ÿ03704!"# 179 $%&'()%*$+&,(-%'$+&,(-%'$+&,(-%'$+&,(-%'$.(&/*(/,.$.()-&()%/$.(,,.(--) $'$'$.-(''' $'$,'('''$&)'('''$&)'(''' ÿ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ÿ179ÿ $&,-('''$&''('''$--('''$&'('''$,--('''$&('-'('''$&(&*'('''$**-(''' $'$'$)('%)()')$.(+,-(&,+$'$'$' $' 7889:9;<ÿ>ÿEABÿC&%-D 7889:9;<ÿ>ÿFG?B HIJK9<Lÿ7889:9;<M B:;JILN $&(&.+(+)%$)(/+'(-*- $'$'$'$'$.(--)(+/-$&'(/),(,-& $'$'$'$'$' B;O:PIQRSIMNPIQÿG;TUQNVÿ $%''('''$'$'$'$'$'$' GWAÿGN<:NJ $.-'('''$'$'$'$'$'$' 074ÿX584318ÿ73 $'$'$-''(''' $'$)(.*'('''$-(+&'(''' $'$,''('''$.(,''('''$*''('''$/''(''' $'$'$'$' 91950ÿ074ÿ ÿ7189ÿ4074ÿ011382#ÿX84$&(%-'$'$'$'$' ÿ23189ÿX84 $-''('''$/,-('''$&(&-'('''$&(')'('''$-,&(''' 12/14/2018 revised 43
44 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: PROJECT DESCRIPTION: Replenishing aging bus fleet Buses (Enter a brief description of the project) Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring LCPS - Transportation 7/1/19 Deborah Coles 6/30/39 11/07/ years Continuation No Yes PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) As buses reach the 18 year age, they become more susceptible to major mechanical issues IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Bus fleet becomes older, break downs can potentially become issues. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: Transportation is mandated for ADA / Special Needs students. 12/14/2018 revised 44
45 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total and Beyond Project Totals Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 45
46 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: PROJECT DESCRIPTION: Replenishing aging car/van fleet Fleet Vehicles (Enter a brief description of the project) Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring LCPS - Transportation July 2021 Deborah Coles June /07/ years Continuation No No PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Staying current with vehicles other than buses, that are used to transport students safely and efficiently. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) As the car/van fleet ages, higher potential for major breakdowns. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) As these are replacements maintenance costs for the overall fleet should remain relatively flat. IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 46
47 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $45,000 $30,000 $75,000 $45,000 $30,000 $75, and Beyond Project Totals $120,000 $120,000 $75,000 $390,000 $120,000 $120,000 $75,000 $390,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 47
48 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Tools Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Recurring LCPS - Transportation July 2023 Deborah Coles June /07/ years Project New or Expansion/Continuation: Previous s Funding Amount: PROJECT DESCRIPTION: Tools used to repair fleet vehicles (Enter a brief description of the project) Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No No No PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Tools needed to repair fleet vehicles IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Technicians will not be able to complete necessary repairs and maintenance. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 48
49 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $25,000 $25,000 $25,000 $25, and Beyond Project Totals $25,000 $25,000 $25,000 $100,000 $25,000 $25,000 $25,000 $100,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 49
50 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Replacement of Cafe Equipment Project One Time or Recurring: Datee Project Expected to Begin: School Nutrition Services 7/1/19 Datee Project expected to be Completed: Useful life (in years): Randy Herman 6/30/39 Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring as needed 11/01/2018 Varies by item Continuation 25, No Yes PROJECT DESCRIPTION: (Enter a brief description of the project) Replace of failing equipment and equipment upgrades PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) This project will allow the continued operations of school nutrition services IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Replacement of failing kitchen equipment is necessary to continue to provide meals to students in a safe and efficient manner. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) There is no further budget impact. IF MANDATED, PLEASE EXPLAIN: Necessary to provide meals to students. 12/14/2018 revised 50
51 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $97,000 $31,700 $26,700 $76,000 $55,200 $286,600 $97,000 $31,700 $26,700 $76,000 $55,200 $286, and Beyond Project Totals $137,800 $219,200 $358,400 $1,002,000 $137,800 $219,200 $358,400 $1,002,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $1,002,000 Total: $1,002,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 51
52 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Roof System Replacement Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): 20 yr cycle Maintenance July 2019 David Szalankiewicz June /01/ Project New or Expansion/Continuation: Previous s Funding Amount: New Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No No No PROJECT DESCRIPTION: (Enter a brief description of the project) Replace existing roofing systems that are no longer under warranty and showing signs of failure at multiple locations throughout division PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) To Prevent roofing failure while school is in session and to extend the life of the roofing decking IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Risk of failure while school is in session causing disruptions to the instructional environment OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Reduced maintenance cost and leaks in our facilities. IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 52
53 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $76,755 $47,225 $279,185 $79,631 $142,645 $625,441 $76,755 $47,225 $279,185 $79,631 $142,645 $625, and Beyond Project Totals $625,441 $625,441 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 53
54 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Security Cameras Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Ongoing Maintenance April 2019 David Szalankiewicz August /20/ years Continuation/Expansion No No PROJECT DESCRIPTION: (Enter a brief description of the project) Replacement and addition of cameras, storage devices, and associated equipment at all facilities PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) To support the security and safety needs at all facilities IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Limits our ability to provide needed facility coverage and incident storage OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 54
55 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $41,000 $15,000 $15,000 $15,000 $15,000 $101,000 $41,000 $15,000 $15,000 $15,000 $15,000 $101, and Beyond Project Totals $75,000 $75,000 $75,000 $75,000 $401,000 $75,000 $75,000 $75,000 $75,000 $401,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 55
56 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: PROJECT DESCRIPTION: Carpet Replacement at all facilities Flooring (Enter a brief description of the project) Project One Time or Recurring: Datee Project Expected to Begin: Maintenance May 2019 Datee Project expected to be Completed: Useful life (in years): David Szalankiewicz August /01/ Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Carpet failure due to age IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 56
57 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $22,000 $11,200 $31, $22,000 $11,200 $31, and Beyond Project Totals Planning/ Engineering: Acquisition: Construction: Equipment/ Furnishings: Costs Summary: Other Capital Costs: Operating (O&M) Costs: Total: *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 57
58 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Built in classroom cabinets Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No One-Time Maintenance May 2019 David Szalankiewicz August /01/ New.00 No No PROJECT DESCRIPTION: (Enter a brief description of the project) Replace original base cabinets, counter, and sinks PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Original, 30 year old, base cabinets and counters are failing at Jouett and Trevilians. Formica is letting loose. Counters are swelling and coming apart. Sinks and faucets are failing. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 58
59 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $309,740 $309,740 $309,740 $309, and Beyond Project Totals $309,740 $309,740 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $309,740 Total: $309,740 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 59
60 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Asphalt Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No One-Time Maintenance May 2020 David Szalankiewicz August /01/ New.00 No No PROJECT DESCRIPTION: (Enter a brief description of the project) Addition of asphalt to CTE/GED parking lot and to replace the teacher parking lot at Trevilians Elementary School PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) To pave existing gravel parking lot at the CTE/GED center to make the surface safer and more attractive. To resurface the teacher parking lot at Trevilians Elementary School that is failing and to expand parking to safely park guests during large school and community events. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 60
61 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $100,000 $112,500 $212,500 $100,000 $112,500 $212, and Beyond Project Totals $660,000 $872,500 $660,000 $872,500 Costs Summary: Planning/ Engineering: Other Capital Costs: $872,500 Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: $872,500 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 61
62 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: HVAC Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Ongoing Maintenance June 2020 David Szalankiewicz August /01/ Continuation No No PROJECT DESCRIPTION: (Enter a brief description of the project) Replacement of HVAC units that are failing due to age PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Units are original equipment that are showing signs of failure. Units need to be replaced due to their age and the availability of parts and outdated refrigerant IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Impact on the ability to maintain proper building/space temperatures OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 62
63 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $30,000 $135,240 $30,000 $30,000 $150,000 $375,240 $30,000 $135,240 $30,000 $30,000 $150,000 $375, and Beyond Project Totals $270,000 $150,000 $150,000 $945,240 $270,000 $150,000 $150,000 $945,240 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $945,240 Total: $945,240 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 63
64 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Lighting Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Ongoing Maintenance June 2020 David Szalankiewicz August /01/ New.00 No No PROJECT DESCRIPTION: (Enter a brief description of the project) Replace current lighting with more energy efficient LED tubes PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Upgrading to LED lighting will provide a more efficient and safer facility IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Increased operating costs OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 64
65 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $25,000 $25,000 $25,000 $50,000 $80,000 $205,000 $25,000 $25,000 $25,000 $50,000 $80,000 $205, and Beyond Project Totals $205,000 $205,000 Costs Summary: Planning/ Engineering: Other Capital Costs: $205,000 Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: $205,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 65
66 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Plumbing Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring Maintenance June 2019 David Szalankiewicz August /01/ New.00 No No PROJECT DESCRIPTION: (Enter a brief description of the project) Replace boilers at Jouett Elementary School PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Replace boilers that are showing signs of failure IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Loss of ability to provide hot water if the systems fail OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 66
67 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $27,000 $55,000 $82,000 $27,000 $55,000 $82, and Beyond Project Totals $80,000 $80,000 $242,000 $80,000 $80,000 $242,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $242,000 Total: $242,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 67
68 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: PROJECT DESCRIPTION: Restrooms are original and are failing Restrooms (Enter a brief description of the project) Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No One-Time Maintenance June 2019 David Szalankiewicz August /01/ New.00 No No PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Restrooms are original and are failing. This project encompasses classroom and hall restrooms. The fixtures are old and in need of being upgraded. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Loss of ability to provide hot water if the systems fail OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 68
69 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $64,788 $64,788 $129,576 $64,788 $64,788 $129, and Beyond Project Totals $129,576 $129,576 Costs Summary: Planning/ Engineering: Other Capital Costs: $129,576 Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: $129,576 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 69
70 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Vehicles Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring Maintenance June 2019 David Szalankiewicz August /01/ Continuation 27,113 No No PROJECT DESCRIPTION: (Enter a brief description of the project) Vehicles in the fleet are old, failing, and are in need of replacement PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) The fleet vehicles are old and are having to be serviced quite often. Some vehicles in the fleet are from IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 70
71 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $56,000 $26,075 $46,000 $26,075 $154,150 $56,000 $26,075 $46,000 $26,075 $154, and Beyond Project Totals $78,225 $190,305 $422,680 $78,225 $190,305 $422,680 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: $422,680 Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: $422,680 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 71
72 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: PROJECT DESCRIPTION: Technology Infrastructure and Hardware Technology (Enter a brief description of the project) Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring Technology 7/1/2019 David Childress 6/30/ /12/2018 Various Continuation $600,000 No No PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) To support and meet the ongoing needs to educate students in a 21st century classroom, technology must continue to be updated. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) The technology infrastructure and hardware would break and we would no longer meet the needs of our students and staff. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) When technology is maintained and supported correctly, it has a positive affect on the operating budget. It helps to ensure that all other activities run smoother and can be more affective through collaboration and time saving efforts. IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 72
73 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total and Beyond Project Totals Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 73
74 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Addition at Moss Nuckols El. School Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): One-Time Maintenance July 2021 David Szalankiewicz June /01/ Project New or Expansion/Continuation: Previous s Funding Amount: New Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No No No PROJECT DESCRIPTION: (Enter a brief description of the project) 17K sq ft addition at MNES for an additional 250 students PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Growing student population requires additional infrastructure. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Additional Staffing as needed. $33,000 additional utilities. IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 74
75 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $2,072,202 $4,835, $2,072,202 $4,835, and Beyond Project Totals $6,907, Costs Summary: Planning/ Engineering: $552,587 Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $5,318,652 $1,036,101 Total: *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 75
76 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Addition at Jouett El. School Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): One-Time Maintenance July 2019 David Szalankiewicz June /01/ Project New or Expansion/Continuation: Previous s Funding Amount: New N/A Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No No No PROJECT DESCRIPTION: (Enter a brief description of the project) 11K sq. ft. addition at JES for additional students and to house students currently in trailers. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Safety concerns of students in isolated structures and increasing student enrollment requires additional infrastructure IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Additional Staff as needed. $22K additional utility cost IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 76
77 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $1,148,827 $2,680,595 $3,829, $1,148,827 $2,680, and Beyond Project Totals $3,829, Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $2,948,655 $574,413 Total: *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 77
78 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Addition at LCMS Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): One-Time Maintenance July 2023 David Szalankiewicz June /01/ Project New or Expansion/Continuation: Previous s Funding Amount: New Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No No No PROJECT DESCRIPTION: (Enter a brief description of the project) Expansion at LCMS for additional 400 Students approximately 44K sq. ft. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Growing student enrollment requires additional infrastructure. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Additional Staffing as needed based on growth and programs; $88,000 additional utilities. IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 78
79 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $4,552,865 $4,552,865 $4,552,865 $4,552, and Beyond Project Totals $10,623,351 $15,176, Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: Total: *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 79
80 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Parking additions Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): One-Time Maintenance July 2019 David Szalankiewicz June /01/ Project New or Expansion/Continuation: Previous s Funding Amount: New Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No No PROJECT DESCRIPTION: (Enter a brief description of the project) Parking additions and roadway for CTE Complex PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Additional Parking required for staff and guest. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 80
81 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $700,000 $700,000 $700,000 $700, and Beyond Project Totals $700,000 $700,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $105,000 Total: $700,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 81
82 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Storage Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): One-Time Maintenance July 2019 David Szalankiewicz June /01/ Project New or Expansion/Continuation: Previous s Funding Amount: New Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No PROJECT DESCRIPTION: (Enter a brief description of the project) Conditioned storage facility to prevent loss of furniture, supplies and equipment to the elements of unconditioned space. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Having a conditioned storage facility will provide room for records, storage of furnishings, equipment and supplies. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Additional utility cost $5,000 IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 82
83 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $450,000 $450, $450, and Beyond Project Totals $450, Costs Summary: Planning/ Engineering: $50,000 Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $400,000 Total: *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 83
84 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Softball/Baseball complex Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): One-Time Maintenance July 2021 David Szalankiewicz June /01/ Project New or Expansion/Continuation: Previous s Funding Amount: New Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No No No PROJECT DESCRIPTION: (Enter a brief description of the project) Softball/Baseball Complex upgrade for players and fans. Improve lighting, grade, seating, layout, restrooms and concessions. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Softball/Baseball Complex to meet needs of teams and fans. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 84
85 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $500,000 $500,000 $500,000 $500, and Beyond Project Totals $500,000 $500,000 Costs Summary: Planning/ Engineering: $40,000 Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $385,000 $75,000 Total: $500,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 85
86 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: CTE Center Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): One-Time Maintenance July 2021 David Szalankiewicz June /01/ Project New or Expansion/Continuation: Previous s Funding Amount: New Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No PROJECT DESCRIPTION: (Enter a brief description of the project) CTE Center is a 36,000sq ft it will consist of offices, classrooms, and labs. The center will be designed to grow and evolve with the needs of students, community and employers. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) CTE Center will allow for expansion of our current programs and additional programs. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Additional positions will be added as programs are developed. Additional utility and maintenance cost estimated $72k IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 86
87 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $2,490,000 $5,810,000 $300,000 $8,600,000 $2,490,000 $5,810,000 $300,000 $8,600, and Beyond Project Totals $4,300,000 $900,000 $600,000 $14,400,000 $4,300,000 $900,000 $600,000 $14,400,000 Costs Summary: Planning/ Engineering: $1,152,000 Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $11,088,000 $2,160,000 Total: $14,400,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 87
88 Parks and Recreation VIII 12/14/2018 revised 88
89 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Park Development & Enhancement Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Recurring Parks, Recreation & Tourism July 2019 James Smith Ongoing 11/05/2018 Lifetime Continuation $25,000 Yes No PROJECT DESCRIPTION: (Enter a brief description of the project) The project is an ongoing effort to maintain and enhance the county parks and best utilize the available green space. There are a variety of needs at existing parks, which include replacing and updating signage, repairing and replacing broken playground furniture and equipment, and adding security features to limit after hours usage. This project would also include creating additional green space on site at the Betty Queen Intergenerational Center. The green space would provide a centralized location for programs, activities, concerts and pavilion rentals. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) This project allows us to provide safe venues for outdoor recreation for families throughout our county. We currently have two parks with playground equipment that are over 20 years old. We have made several minor repairs and replaced parts to extend the life of the equipment over the past three years, however, more significant work is needed. Creating additional green space on site at the Betty Queen Intergenerational Center would a create a centralized programmable space that can be utilize to host special events, implement programs, promote wellness, and pavilion rentals. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) If the repairs are not funded, the department will have to utilize funds from the Operating Budget to make temporary repairs on the playground equipment. Not funding the additional green space at the Betty Queen Intergenerational Center would require the department to continue to utilize off site locations that do not provide adequate parking and or restrooms. These issues limit our ability to grow our special events which impacts revenue. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) There would be a limited amount of impact in terms of expenses. However, the revenue from new programming and pavilion rentals from the green space at the Betty Queen Center could be anywhere from $10,000 to $20,000 annually. IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 89
90 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) The budget reflects an initial request of $75,000 for FY20 and then an additional $25,000, every couple of years throughout the remainder of this planned budget. Estimated Project Costs: Project Sub- Total $75,000 $22,000 $25,000 $122,000 $75,000 $22,000 $25,000 $122, and Beyond Project Totals $65,000 $25,000 $25,000 $25,000 $262,000 $65,000 $25,000 $25,000 $25,000 $262,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $262,000 Total: $262,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 90
91 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Permanent Pool Enclosure Project One Time or Recurring: Datee Project Expected to Begin: Parks, Recreation & Tourism 2021 Datee Project expected to be Completed: Useful life (in years): James Smith /01/ One Time Project New or Expansion/Continuation: Previous s Funding Amount: New N/A Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No No No PROJECT DESCRIPTION: (Enter a brief description of the project) Building a permanent enclosure around the Junior Olympic Pool at the Louisa County Aquatic Facility. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Building an enclosure will allow year-round use which would provide opportunities to add and expand aquatic wellness programs, swim lessond and water safety classes, and space for year round training for local swim teams. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) We would not be able to provide the aforementioned additional services that are a associated with the usage of a year round aquatic facility. An alternative solution is to enclose the pool with a temporary air supported structure. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Year round usage will allow the department to generate additional revenue from program participation, facility memberships and pool rentals. Please see the attached documents for additional operational impacts. IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 91
92 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Estimated Project Costs: Project Sub- Total $796,400 $796,400 $252,650 $252,650 $265,250 $265,250 $1,035,800 $85,000 $85,000 $88,750 $88,750 $347,500 $3,000 $3,000 $3,000 $3,000 $12,000 $796,400 $340,650 $357,000 $357,000 $796, and Beyond Project Totals $796,400 $1,392,500 $1,460,000 $1,535,300 $307,060 $4,694,860 $465,750 $489,000 $513,500 $102,700 $1,570,950 $17,500 $18,375 $19,250 $3,850 $58,975 $1,875,750 $1,967,375 $2,068,050 $413,610 $796,400 Planning/ Engineering: Acquisition: Construction: Equipment/ Furnishings: Costs Summary: Other Capital Costs: Operating (O&M) Costs: $340,650 $750,000 $46,400 Total: $1,137,050 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 92
93 12/14/2018 revised 93
94 12/14/2018 revised 94
95 Community Development IX 12/14/2018 revised 95
96 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: GIS Multifunction 44" Printer/Scanner Project One Time or Recurring: Datee Project Expected to Begin: Community Development 2020 Datee Project expected to be Completed: Useful life (in years): Robert Gardner or Jeff Ferrell /02/ Expansion of existing project Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No 0 No One time Yes, planning and permitting PROJECT DESCRIPTION: (Enter a brief description of the project) To buy a second HP Designjet T " or equivalent, large scale printer scanner for GIS mapping, building, planning, and zoning activities. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) As the County transcends from paper to digital processing, reviewing, and storage this new informational requirement creates a need for a second large scale 44" printer scanner for GIS mapping, building, planning, and zoning activities. The current printer scanner is several years old and its reliability is questionable due to its age. In addition, the current printer scanner is the only one we have and there is no backup unit in case of breakage. Another large scale printer scanner is also needed for digitizing large paper plan sets and other development related documents in order to create an accurate data base for our now software systems. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) There are no alternatives. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) The purchase of another large scale printer scanner is a one time event. Because the unit will be new there will not be significant maintenance costs. There will be some osts related to consumable supplies in terms of buying paper and inkjet cartages. IF MANDATED, PLEASE EXPLAIN: The new planning, zoning, and building software requires a large scale printer scanner in order to produce large maps and scan larger building plans sets. 12/14/2018 revised 96
97 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) One time purchase only. Estimated Project Costs: Project Sub- Total $10,000 $10,000 $400 $500 $600 $700 $800 $3,000 $10,400 $500 $600 $700 $800 $13, and Beyond Project Totals $10,000 $3,000 $13,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: $3,000 Construction: Equipment/ Furnishings: $10,000 Total: $13,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 97
98 Transportation Investments X 12/14/2018 revised 98
99 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Transportation Investment Pool Economic Development Project One Time or Recurring: Datee Project Expected to Begin: Recurring, as needed TBD Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: PROJECT DESCRIPTION: Andy Wade (Enter a brief description of the project) Datee Project expected to be Completed: Useful life (in years): 11/05/2018 TBD Continuation/Carryover Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No $500,000 Yes TBD TBD- Revenue Sharing Please see the attached memo dated PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Please see the attached memo dated IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) None anticipated. Use of these funds would help accelerate revenue sharing projects between the County an VDOT. Right now, funding for County initiated projects must OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) N/A IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 99
100 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) Projects utilizing these funds will be determined on a case by case basis by the Board of Supervisors. There is no one specific project that these funds will be used for. Estimated Project Costs: Project Sub- Total $100,000 $100,000 $100,000 $100,000 $100,000 $500,000 $100,000 $100,000 $100,000 $100,000 $100,000 $500, and Beyond Project Totals $500,000 $500,000 $500,000 $100,000 $2,100,000 $500,000 $500,000 $500,000 $100,000 $2,100,000 Planning/ Engineering: Acquisition: Construction: Equipment/ Furnishings: Costs Summary: Other Capital Costs: $2,100,000 Operating (O&M) Costs: Total: $2,100,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 100
101 Economic Development XI 12/14/2018 revised 101
102 COUNTY OF LOUISA MEMORANDUM TO: FROM: Wanda Colvin, Finance Director Andy Wade, Economic Development Director DATE: November 5, 2018 RE: CIP Memo 1) Economic Development Projects (seed money): GL # Request: $127, Unencumbered Balance: $468, Year Projected Total Cost: $127, Balance if Funded: $596, Calendar Year Use of Funds: Calendar use of funds = $127, These funds should be used to promote new economic development initiatives. The funds should be used for stand alone projects or to supplement Economic Development related requests as approved by the Board of Supervisors. Seed funds should also be used as matching funds for State and Federal Grants and also used for incentives and low interest loans made available to new/existing industry interested in establishing/expanding their business in Louisa County. Louisa County is wise to have funds readily available to develop new property, incentivize new industry to establish businesses in Louisa County; retain existing businesses and help them expand in Louisa County. New funding request is to reimburse this CIP line item for funds spent in the previous FY. 2) Revenue Sharing Transportation Funds: GL # request: $100,000 Unencumbered Balance: $500,000 5 Year Projected Cost: $500,000 1 WOOLFOLK AVENUE POST OFFICE BOX LOUISA, VIRGINIA (540) /14/2018 revised 102
103 December 11, 2018 Currently, there are no specific projects in the pipe line that would qualify for funding from this Capital Improvement Budget. Funds under this CIP project are intended to be utilized for transportation projects that have significant public value, as determined by the Board of Supervisors. Such projects may be directly related to public safety, or may emphasize other goals related to planning, economic development, or recreation. -- Annual contributions to the fund, as possible, are recommended so funds are available when needed to implement important transportation projects that are not funded, or fully funded, by VDOT. -- Funds may be used toward matching funds for programs such as the Revenue Sharing Program, Rural Addition Program, Economic Development & Recreational Access Fund Program; Smart Scale and the Transportation Enhancement Program. -- The Transportation Investment Fund has an unencumbered balance of $500,000. Page 2 12/14/2018 revised 103
104 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Economic Development Projects Economic Development Project One Time or Recurring: Datee Project Expected to Begin: Recurring- As needed As approved Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: PROJECT DESCRIPTION: Andy Wade (Enter a brief description of the project) Datee Project expected to be Completed: Useful life (in years): 11/05/2018 TBD Continuation Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No TBD Use determined as needed $596, Yes, as determined/approved See attached memo dated PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) See attached memo dated IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) N/A OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Not able to identify until a specific use of these funds has been considered/approved. ** IF MANDATED, PLEASE EXPLAIN: 12/14/2018 revised 104
105 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) ** Please see above. Estimated Project Costs: Project Sub- Total $127,893 $127,893 $127,893 $127, and Beyond Project Totals $127,893 $127,893 Planning/ Engineering: Acquisition: Construction: Equipment/ Furnishings: Costs Summary: Other Capital Costs: $127,893 Operating (O&M) Costs: Total: $127,893 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 105
106 Louisa County Water Authority XII 12/14/2018 revised 106
107 12/14/2018 revised 107
108 12/14/2018 revised 108
109 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Bowlers Mill Dam Improvements Louisa County Water Authority Project One Time or Recurring: Datee Project Expected to Begin: Recurring Unknown Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: Pam Baughman Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No Unknown 10/19/ years Upgrade to existing structure 0 No Yes - NRCS PROJECT DESCRIPTION: (Enter a brief description of the project) Bowlers Mill Dam in Gordonsville, Virginia has been classified as a high hazard dam. The UDSA and NRCS will require Bowlers Mill Dam to be upgraded to prevent a potential dam failure. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) A breach of Bowlers Mill Dam could cause loss of tax payers property or loss of life. 100% grant funding will be provided for the design phase and 65% grant funding of the construction costs will be provided by USDA and NRCS. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Protection of downstream structures and loss of life in the event Bowlers Mill Dam is breached would be a violation of USDA and NRCS Regulations. Further mandates could be imposed if steps are not taken to make the upgrades. Also, 100% grant funding for the design of the upgrades and 65% grant funding of the construction costs could be forfeited if the upgrades are not made. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) There are no anticipated operating costs for personnel, maintenance, savings to the County or additional revenues generated. IF MANDATED, PLEASE EXPLAIN: Bowlers Mill Dam in Gordonsville, Virginia has been classified as a high hazard dam. The UDSA and NRCS will require Bowlers Mill Dam to be upgraded to prevent a potential dam failure. 12/14/2018 revised 109
110 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) This CIP Budget request is intended to provide funding every year until the grant funding becomes available for the construction costs. This would prevent a large capital expenditure in one fiscal year. Estimated Project Costs: Project Sub- Total $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $1,250, and Beyond Project Totals $500,000 $1,750,000 $500,000 $1,750,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $1,750,000 Total: $1,750,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 110
111 12/14/2018 revised 111
112 12/14/2018 revised 112
113 12/14/2018 revised 113
114 12/14/2018 revised 114
115 12/14/2018 revised 115
116 12/14/2018 revised 116
117 12/14/2018 revised 117
118 12/14/2018 revised 118
119 12/14/2018 revised 119
120 12/14/2018 revised 120
121 12/14/2018 revised 121
122 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: LRWWTP Ammonia-Nitrogen Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No One-Time Louisa County Water Authority January 1, 2021 Pam Baughman December 31, /19/ years New-Upgrade 0 No Yes - EPA/DEQ PROJECT DESCRIPTION: (Enter a brief description of the project) An upgrade to the Louisa Regional Wastewater Treatment Plant to meet the new Freshwater Ammonia-Nitrogen Standards. This is a request for 50% of the total cost, the second 50% of costs will be requested from the Town of Louisa. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) The Department of Environmental Quality adopted the Environmental Protection Agencies recommendation for more stringent Freshwater Ammonia-Nitrogen limits on wastewater treatment facilities to prevent damage to mussels and snails habitat in the waters of the Commonwealth. The new standards are expected to be very stringent with limits being proposed to half of the current water quality criteria. The Louisa Regional Wastewater Treatment Plant will fall into the Phase 2 category with potential upgrades being imposed beginning in July IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) Violations of Department of Environmental Quality regulations cause Consent Orders and fines. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) Authority staff anticipate an increase in operating costs of $50,000/year. IF MANDATED, PLEASE EXPLAIN: The Department of Environmental Quality adopted the Environmental Protection Agencies recommendation for more stringent Freshwater Ammonia-Nitrogen limits on wastewater treatment facilities to prevent damage to mussels and snails habitat in the waters of the Commonwealth. The new standards are expected to be very stringent with limits being proposed to half of the current water quality criteria. The Louisa Regional Wastewater Treatment Plant will fall into the Phase 2 category with potential upgrades being imposed beginning in July /14/2018 revised 122
123 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) $1,000,000 in FY2020 and $1,000,000 in FY2021. Estimated Project Costs: Project Sub- Total $1,000,000 $1,000,000 $2,000,000 $50,000 $50,000 $50,000 $50,000 $200,000 $1,000,000 $1,050,000 $50,000 $50,000 $50,000 $2,200, and Beyond Project Totals $2,000,000 $250,000 $250,000 $250,000 $50,000 $1,000,000 $250,000 $250,000 $250,000 $50,000 $3,000,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: $1,000,000 Construction: Equipment/ Furnishings: $2,000,000 Total: $3,000,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 123
124 12/14/2018 revised 124
125 12/14/2018 revised 125
126 12/14/2018 revised 126
127 12/14/2018 revised 127
128 12/14/2018 revised 128
129 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: ZCWWTP Fall Protection Safety Upgrades Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No One-Time Louisa County Water Authority July 2019 Pam Baughman December /19/ Upgrade to existing facility 0 No Yes - OSHA PROJECT DESCRIPTION: (Enter a brief description of the project) Due to an OSHA Inspection conducted at the Zion Crossroads WWTP, safety deficiencies were noted. This request is the total cost to bring the Zion Crossroads Water Treatment Plant into compliance with OSHA Fall Protection Regulations. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Compliance with OSHA Regulations. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OSHA and VOSH now have the ability to impose fines if all safety regulations are not applied in the operation of any utility facility. The expenditure of funds would be better served in making upgrades, rather than paying fines and being mandated to make the upgrades. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) No additional personnel costs, maintenance costs, savings to the County or additional revenue is expected from this upgrade. IF MANDATED, PLEASE EXPLAIN: OSHA and VOSH have safety regulations for all types of businesses, the utility business is included under their regulatory jurisdiction. Utilities are required to provide a safe work environment for all staff members. Not adhering to the regulations will create a liability and the ability to be fined by the regulatory agencies. 12/14/2018 revised 129
130 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) The project is expected to begin and end in FY Estimated Project Costs: Project Sub- Total $90,000 $90,000 $90,000 $90, and Beyond Project Totals $90,000 $90,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $90,000 Total: $90,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 130
131 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: NEC WTP Fall Protection Safety Upgrades Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No One-Time Louisa County Water Authority July 2019 Pam Baughman December /19/ Upgrade to existing facility 0 No Yes - OSHA PROJECT DESCRIPTION: (Enter a brief description of the project) Due to an OSHA Inspection conducted at the Zion Crossroads WWTP, safety deficiencies were noted. This request is the total cost to bring the Northeast Creek Water Treatment Plant into compliance with OSHA Fall Protection Regulations. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Compliance with OSHA Regulations. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OSHA and VOSH now have the ability to impose fines if all safety regulations are not applied in the operation of any utility facility. The expenditure of funds would be better served in making upgrades, rather than paying fines and being mandated to make the upgrades. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) No additional personnel costs, maintenance costs, savings to the County or additional revenue is expected from this upgrade. IF MANDATED, PLEASE EXPLAIN: OSHA and VOSH have safety regulations for all types of businesses, the utility business is included under their regulatory jurisdiction. Utilities are required to provide a safe work environment for all staff members. Not adhering to the regulations will create a liability and the ability to be fined by the regulatory agencies. 12/14/2018 revised 131
132 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) The project is expected to begin and end in FY Estimated Project Costs: Project Sub- Total $40,000 $40,000 $40,000 $40, and Beyond Project Totals $40,000 $40,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $40,000 Total: $40,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 132
133 County of Louisa Capital Improvement Plan Project Requestt Form s General Project Information Project Title: Department: Contact Person: Date of Submission: Project New or Expansion/Continuation: Previous s Funding Amount: LRWWTP Fall Protection Safety Upgrades Project One Time or Recurring: Datee Project Expected to Begin: Datee Project expected to be Completed: Useful life (in years): Mandated by Federal, State, or Local Regulations? Yes/No Willl Project Bring in Additional Revenue? Yes/No One-Time Louisa County Water Authority July 2019 Pam Baughman December /19/ Upgrade to existing facility 0 No Yes - OSHA PROJECT DESCRIPTION: (Enter a brief description of the project) Due to an OSHA Inspection conducted at the Zion Crossroads WWTP, safety deficiencies were noted. This request is for 50% of the total cost to bring the Louisa Regional Wastewater Treatment Plant into compliance with OSHA Fall Protection Regulations. The remaining 50% will be requested from the Town of Louisa. PROJECT JUSTIFICATION: (Explain benefits of the project or why project is needed) Compliance with OSHA Regulations. IMPACT ON SERVICES IF PROJECT NOT FUNDED: (Are there alternatee solutions?) OSHA and VOSH now have the ability to impose fines if all safety regulations are not applied in the operation of any utility facility. The expenditure of funds would be better served in making upgrades, rather than paying fines and being mandated to make the upgrades. OPERATING BUDGET IMPACTS: (Explain operating impacts of this project, such as additional personnel costs, maintenance costs, savings to the County, or additional revenue that may be generated) No additional personnel costs, maintenance costs, savings to the County or additional revenue is expected from this upgrade. IF MANDATED, PLEASE EXPLAIN: OSHA and VOSH have safety regulations for all types of businesses, the utility business is included under their regulatory jurisdiction. Utilities are required to provide a safe work environment for all staff members. Not adhering to the regulations will create a liability and the ability to be fined by the regulatory agencies. 12/14/2018 revised 133
134 PROJECT SCHEDULE: (If your project is a multi-year allocation, provide a schedule of expenditures from project start through completion) The project is expected to begin and end in FY Estimated Project Costs: Project Sub- Total $100,000 $100,000 $100,000 $100, and Beyond Project Totals $100,000 $100,000 Costs Summary: Planning/ Engineering: Other Capital Costs: Acquisition: Operating (O&M) Costs: Construction: Equipment/ Furnishings: $100,000 Total: $100,000 *Please attach any additional documentation that would be helpful in evaluating this project. 12/14/2018 revised 134
135 12/14/2018 revised 135
136 12/14/2018 revised 136
137 12/14/2018 revised 137
138 12/14/2018 revised 138
139 12/14/2018 revised 139
140 12/14/2018 revised 140
141 12/14/2018 revised 141
142 12/14/2018 revised 142
143 12/14/2018 revised 143
144 12/14/2018 revised 144
145 12/14/2018 revised 145
146 12/14/2018 revised 146
147 12/14/2018 revised 147
148 12/14/2018 revised 148
149 12/14/2018 revised 149
150 12/14/2018 revised 150
151 12/14/2018 revised 151
152 12/14/2018 revised 152
153 12/14/2018 revised 153
154 12/14/2018 revised 154
155 12/14/2018 revised 155
156 12/14/2018 revised 156
157 12/14/2018 revised 157
158 12/14/2018 revised 158
159 12/14/2018 revised 159
160 12/14/2018 revised 160
161 12/14/2018 revised 161
162 12/14/2018 revised 162
163 12/14/2018 revised 163
164 12/14/2018 revised 164
165 12/14/2018 revised 165
166 12/14/2018 revised 166
167 12/14/2018 revised 167
168 12/14/2018 revised 168
169 Long Term Project Investments XIII 12/14/2018 revised 169
Capital Improvement Project Requests FY 13/14-17/18
Department Name: Fire, Rescue & Emergency Services s FY 13/14-17/18 No. Project Title Priority Prior Appropr Totals 2013-14 2014-15 2015-16 2016-17 2017-18 Est Oper Costs 1 Replacement of Engine 11 Necessary
More informationPICKENS COUNTY FINANCIAL SUMMARY
PICKENS COUNTY FINANCIAL SUMMARY GOVERNMENTAL FUND TYPES GENERAL DEBT SPECIAL CAPITAL ENTERPRISE TOTAL TOTAL FUND SERVICE REVENUES PROJECTS FUNDS FY 2008 FY 2007 REVENUES Taxes $ 22,205,272 $ 2,410,503
More informationFY Capital Improvement Program City of New Bedford, Massachusetts
City of New Bedford, Massachusetts Background The Massachusetts Department of Revenue, credit agencies and the Government Accounting Standards Board recommend that localities develop a capital improvement
More informationLetter of Transmittal
Letter of Transmittal October 25, 2019 To: New Hanover Township Board of Supervisors Introduction I am pleased to submit the proposed 2019 Budget for your consideration. The budget document consists of
More informationBudget Summary. FY2018 Total County Revenue Sources. Other Localities 2.8% Misc 0.7% Charges For Serv 13.2%
Revenue vs. Expenditure Comparison The pie charts show the expenditure and revenue budgets for all Countywide funds. The detail for these charts is displayed in the Combined Statement of Projected Revenues,
More informationFY 2014 BUDGET AND PUBLIC HEARING. Frederick County, Virginia
FY 2014 BUDGET AND PUBLIC HEARING Frederick County, Virginia FY 2014 BUDGET DEVELOPMENT PRIORITIES Merit Increases Fund increase in County share of Northwestern Regional Adult Detention Center Maintain
More informationFull Cost Accounting for Municipal Solid Waste Services Workshop Capital Area Council of Governments
June 21, 2017 9:00 AM to 3:00 PM Full Cost Accounting for Municipal Solid Waste Services Workshop Capital Area Council of Governments Presenter: Mr. David S. Yanke Workshop Agenda A. Background B. Full
More informationBARRINGTON PUBLIC SCHOOLS FY18 FY22 CAPITAL IMPROVEMENT BUDGET
BARRINGTON PUBLIC SCHOOLS FY18 FY22 CAPITAL IMPROVEMENT BUDGET Date: December 6, 2016 To: Phil Hervey, Town Planner From: Ronald D. Tarro, Director of Admin. & Finance Re: FY18 22 Capital Budget Please
More informationFire Chief. Fire Suppression and Rescue
Fire Chief Govt/community/public relations Policy Administration Interagency relations Negotiation Fire Department Issues Staff Development Finance Administration Operations Fire Prevention Emergency Communications
More informationCity of Penticton: Financial Plan Reporting Structure
City of Penticton: Financial Plan Reporting Structure General Utilities General Government Services Recreation and Culture Environmental Health Services Public Health and Safety Protective Services Environmental
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationProperty tax revenues are expected to remain strong with a projected FY 08 growth rate of 8.7% mainly due to growth in reassessments.
Operating Revenues Property Tax Property tax revenues are expected to remain strong with a projected FY 08 growth rate of 8.7% mainly due to growth in reassessments. Since 2000, the average home sale price
More informationPUBLIC WORKS. FY 17 Recommended Public Works Budget $4,937,107
PUBLIC WORKS FY 17 Recommended Public Works Budget $4,937,107 RSWA Contribution 11% Facilities And Environmental Services 89% FY15 FY16 FY16 FY17 FY17 FY17 $ % EXPENDITURES ACTUAL ADOPTED PROJECTED REQUEST
More informationSECTION 6: CAPITAL IMPROVEMENT DETAIL
SECTION 6: CAPITAL IMPROVEMENT DETAIL Summary... 1 General Government... 2 Public Safety... 6 Public Works... 12 Recreation and Leisure... 18 Education... 24 SUMMARY TOTALS CAPITAL IMPROVEMENT PLAN AND
More informationFY CURRENT REVENUE BUDGET MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements)
FY 2007-08 CURRENT REVENUE BUDGET MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements) $13,000,000 $12,000,000 $11,000,000 $10,000,000 $9,000,000
More informationHonorable Chairman Pat Prescott and the Pamlico County Board of Commissioners:
May 31, 2016 Honorable Chairman Pat Prescott and the Pamlico County Board of Commissioners: I respectfully submit the recommended Pamlico County, North Carolina fiscal year 2016-2017 budget. The budget
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationSOLID WASTE AUTHORITY
SOLID WASTE AUTHORITY Uniform Chart of Accounts To Be Adopted By All Solid Waste Authorities Beginning July 1, 2006 The Uniform Chart of Accounts is formulated and prescribed by the State Auditor in collaboration
More informationCitizens of Leon County
FACILITIES MANAGEMENT General Operations Citizens of Leon County Citizen Advisory Boards Board of County Commissioners County Administrator Constitutional Officers County Attorney Director, Office of &
More informationGENERAL FUND EXPENDITURES
GENERAL FUND EXPENDITURES The recommended fiscal year (FY) 2018-19 General Fund budget totals $616,459,260. This is $8 million (1.3%) more than the budget approved for FY 2017-18. The recommended general
More informationBudget Summary. FY17 Total County Revenue Sources. Misc 1.1% Federal 5.2% Gen Prop Taxes 40.3% $2,037,947,949
Revenue vs. Expenditure Comparison The pie charts show the expenditure and revenue budgets for all Countywide funds. The detail for these charts is displayed in the Combined Statement of Projected Revenues,
More informationTRANSMITTAL LETTER. July 1, 2014
TRANSMITTAL LETTER July 1, 2014 Prince William County Citizens: On behalf of the Prince William Board of County Supervisors, I am pleased to present the Prince William County FY 2015 Budget, including
More informationPOLK COUNTY BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING ON BUDGET AGENDA
POLK COUNTY BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING ON 2018-2019 BUDGET AGENDA September 10, 2018 6:00 p.m. Commission Boardroom 1. Call to order Commissioner R. Todd Dantzler, Chair 2. Public Hearing
More informationCounty of Gloucester Virginia
County of Gloucester Virginia Adopted Capital Improvements Plan FY 2014 to FY 2018 Capital Planning The basic function of a Capital Improvement Program is to provide governments with an orderly process
More informationRESOLUTION NO. R RESOLUTION ADOPTING THE TOWN OF KERNERSVILLE CAPITAL IMPROVEMENT PLAN
RESOLUTION NO. R-2018-02 RESOLUTION ADOPTING THE TOWN OF KERNERSVILLE CAPITAL IMPROVEMENT PLAN WHEREAS, the Board of Aldermen of the Town of Kernersville has determined that it is in the best interest
More information2019 THREE YEAR OPERATING PLAN APPROVED BY COUNCIL DECEMBER 10, 2018
2019 THREE YEAR OPERATING PLAN APPROVED BY COUNCIL DECEMBER 10, 2018 Preamble The Municipal Government Act (MGA) requires each municipality to prepare a written plan respecting its anticipated financial
More informationTotal Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationOperating Budget Overview 2019
OPERATING BUDGET Operating Overview 2019 Introduction In planning for a vibrant, healthy and sustainable community, the Town of Halton Hills is committed to providing community leadership on issues of
More informationUse of State and District Construction Funds
8 Use of State and District Construction Funds Through its long-range planning process, the district has met its facilities needs without issuing significant debt. To improve cost efficiency, however,
More informationTangible Capital Assets Policy
Tangible Capital Assets Policy Draft 3: March 24, 2018 Approved: March 24, 2018 Effective Date: March 24, 2018 Table of Contents 1. Policy... 3 2. Purpose... 3 3. Scope... 3 4. Definitions... 3 5. Responsibilities...
More informationWhat Is Affecting The 2017 Budget
2017 Budget What Is Affecting The 2017 Budget Policing costs up $154,722.00 from 2016 which is an increase of 9.80% Increasing insurance premiums-up $16,391.00 (9.57%) in 2016 Year two of Septic Inspection
More informationCAPITAL FUNDS 2015 Budget
CAPITAL FUNDS This section provides comparisons of revenues and expenditures/appropriations for all capital funds for 2014 2016, the 2017 budget, and the 2018 2022 plan. Historical fund balances and the
More informationCITY OF WILLIAMSBURG MEMORANDUM. Mayor and City Council Planning Commission. From: Andrew O Trivette, Assistant City Manager
CITY OF WILLIAMSBURG MEMORANDUM To: Mayor and City Council Planning Commission From: Andrew O Trivette, Assistant City Manager Date: Thursday, January 11, 2018 RE: Capital Improvements for FY18 Status
More informationResolution Establishing Special Event Permit Requirements For Larimer County Roads
Resolution Establishing Special Event Permit Requirements For Larimer County Roads SECTION I - Authority Authority for the administration and enforcement of the Special Event Permit for Larimer County
More informationFY Proposed Budget
FY 2016-17 Proposed Budget FY 2016-17 Proposed Budget Resilient Community Rockefeller 100 Resilient Cities Develop strategies to improve the local economy, provide great opportunities for our residents,
More informationTwo Ballot Proposals. August 8, 2017
Two Ballot Proposals August 8, 2017 Per-Pupil Foundation Allowance Ten-Year History for Schools* Per-Pupil Foundation Allowance Ten-Year History for Schools* FYs 2007-08 through 2016-17 FY2008 FY2009 FY2010
More informationGeneral Fund (001) Five-Year Outlook. Expenditures:
General Fund (001) Expenditures: Health Care costs increased by 5% in FY18. Because of this increase, the City will be paying close attention to this line item in future years. The Tallahassee Police Department
More informationCity Council Budget Work Session. City of McKinney August 4, 2017
City Council Budget Work Session City of McKinney August 4, 2017 Agenda Budget Process & FY18 Overview Property Tax General Fund Revenues & Expenditures Capital Improvements Program Debt Service Water
More informationSchools Councilman Moss 4/24/2018 How many special education students are in residential facilities? 5/4/2018
Department Council Member Date Received Question Date Answered Schools Councilman Moss 4/24/2018 How many students have historically been in the TCC remedial program? Schools Councilman Moss 4/24/2018
More informationCapital Improvement Plan. May 19, Dear Mayor Starling and Members of the City Council:
May 19, 2011 Dear Mayor Starling and Members of the City Council: I am pleased to present the Recommended FY2011-2012 Capital Improvement Plan (CIP) for your review and consideration. The City s CIP represents
More informationMemorandum. Mid Year Budget Review - Amended City Manager's Annual Budget Report
Mid Year Budget Review Fiscal 2011-12 City Manager's Transmittal Memorandum TO: FROM: COPIES: SUBJECT: Mayor and City Council Bill Horne, City Manager Jill Silverboard, Assistant City Manager Rod Irwin,
More informationTABLE OF CONTENTS CAPITAL BUDGET
TABLE OF CONTENTS BUDGET Capital Organization Chart... 569 Capital Items Defined as Fixed Assets... 569 Programs... 571 Summary of Programs (schedule)... 571 Buildings and Building Improvements Program...
More informationFull Cost Accounting and Solid Waste Rate Structuring
September 28, 2016 8:30 AM New Mexico Solid Waste & Recycling Conference Full Cost Accounting and Solid Waste Rate Structuring Presenter: Mr. David S. Yanke Workshop Agenda A. Background B. Full Cost Accounting
More informationTotal Revenues $2,305,895 ($122,050) ($119,269) ($93,522) $334,119 $2,305,173. Total Project Costs $2,305,000 $0 $0 $0 $0 $2,305,000
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationSolid Waste & Recycling
Solid Waste & Recycling The Solid Waste & Recycling Fund accounts for the activities of Chatham County's waste management, including the collection sites, hauling, and disposal costs. The Solid Waste &
More informationCapital Improvement Program Fund
Capital Improvement Program Fund The Capital Improvement Program Fund provides funding for streets, public buildings (both governmental and school facilities), land, and other capital assets. Capital Improvement
More informationSPECIAL EVENTS PROCEDURE
Procedure Date Policy Description Adoption Date Amendment Date Page/Section 2/6/2009 Special Events Procedure 10/21/2013 SPECIAL EVENTS PROCEDURE I. INTENT a. A Special Events Permit shall only be required
More informationFY BUDGETED CURRENT REVENUE MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements)
FY 2008-09 BUDGETED CURRENT REVENUE MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements) $13,000,000 $12,000,000 $11,000,000 $10,000,000 $9,000,000
More informationCITY OF WATERVLIET 2015 BUDGET 2015 Budget A1010 MAYOR AND CITY COUNCIL Estimate
CITY OF WATERVLIET 2015 BUDGET A1010 MAYOR AND CITY COUNCIL Estimate (1) Mayor, (2) Councilpersons $97,506 (1)Secretary $9,500 Office supplies, printing, misc expense _ Total $107,006 A1230 GENERAL MANAGER
More informationBudgeted Fund Structure
I. Fund Type / Name ed Fund Structure as of Percent Change Over 3/31 General Fund and Sub Funds General Fund and Subfunds $ 917,708,943 $ 965,169,687 $ 2,311,394 $ 967,481,081 5.4 % $ 917,708,943 $ 965,169,687
More informationCity of Penticton: Financial Plan Reporting Structure
City of Penticton: Financial Plan Reporting Structure General Utilities General Government Services Recreation and Culture Environmental Health Services Public Health and Safety Protective Services Environmental
More informationProposed FY2018 Budget Presentation
Proposed FY2018 Budget Presentation February 21, 2017 Christopher E. Martino County Executive Prince William County, Virginia Strategic Vision Statement 2 Citizen View of PWC 2016 Survey 91% Quality of
More informationCOUNTY of Jackson, Georgia
COUNTY of Jackson, Georgia Annual Budget Fiscal Year 2011 FY 2011 Annual Budget Jackson County, Georgia Prepared by: The Office of Financial Administration - The New Hoschton Park, Dedicated on September
More informationREPORT. Fourth Quarter Fiscal Year Prince William County, Virginia
REPORT Fourth Quarter Fiscal Year 2016 Prince William County, Virginia FY2016 General Fund Expenditure Report Fourth Quarter Issued: August 12, 2016 General Information The Board of County Supervisors
More informationLetter of Transmittal
Letter of Transmittal November 15, 2017 To: New Hanover Township Board of Supervisors Introduction I am pleased to submit the proposed 2018 Budget for your consideration. The budget document consists of
More informationCOLE COUNTY MISSOURI
COLE COUNTY MISSOURI Budget Officer Recommended Budget For Fiscal Year 2019 Prepared by: Auditor s Office Kristen Berhorst County Auditor Cole County, Missouri 2019 Budget Table of Contents Budget Message
More informationParks & Recreation. Mission Statement. Mandates. Expenditure Budget: $35,570,456. Community Development Expenditure Budget: $162,905,334
Mission Statement The Department of Parks & Recreation enriches our diverse community s quality of life through citizendriven recreational experiences, offered in an environmentally and fiscally responsible
More information2019 Capital Improvement Plan 2018 Adopted vs 2019 Request Agency Request CIP 2018 Adopted CIP
Fleet Service Capital Improvement Plan Project Summary Agency Priority # Fire Apparatus / Rescue Veh 1 2,635,000 2,200,000 4,100,000 3,100,000 3,780,000 1,912,500 # Fleet Equipment Replacement 2 7,356,410
More informationHUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T
HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T Under this measure, the Hueneme Elementary School District ( District ) is submitting a bond measure, described below,
More informationCity of Lawrence Page 1 Strategic Plan Performance Measures
City of Lawrence Page 1 Strategic Plan s Strategic Plan s Performance measures are specific metrics for each aspect of performance to be monitored. In March 2017, the City of Lawrence s Critical Success
More informationTransmittal Letter. February 12, Mr. Chairman and Members of the Board: Transmittal Letter
Transmittal Letter February 12, 2013 Mr. Chairman and Members of the Board: On behalf of Prince William County government staff, I am pleased to deliver the Prince William County Executive s Proposed FY
More informationOVERVIEW. Note: This section provides an overview of the detailed CIP Budget Manual.
CAPITAL IMPROVEMENTS PROGRAM OVERVIEW Note: This section provides an overview of the detailed CIP Budget Manual. The Capital Improvement Plan and the Capital Needs Assessment - collectively referred to
More informationTHE CORPORATION OF THE COUNTY OF BRANT CONSOLIDATED FINANCIAL STATEMENTS
CONSOLIDATED FINANCIAL STATEMENTS Millards Chartered Professional Accountants INDEX Page Management Report INDEPENDENT AUDITORS' REPORT 1 2 FINANCIAL STATEMENTS Consolidated Statement of Financial Position
More informationMISSION SUMMARY OF SERVICES/FACILITIES TRENDS AND ISSUES
DEPARTMENT SUMMARY MISSION To maintain the sound financial condition of the Palm Beach County government by providing management with timely and accurate decision-making information regarding policy and
More informationThe Citizen s Report 2009
ERNIE LEE MAGAHA YOUR ESCAMBIA COUNTY CLERK and COMPTROLLER PRESENTS The Citizen s Report 2009 A Summary Report of the COMPREHENSIVE ANNUAL FINANCIAL REPORT Fiscal Year Ended September 30, 2009 Independent
More informationTotal Revenues $45,750,000 $15,000,000 $27,000,000 $26,000,000 $5,600,000 $119,350,000
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationFY 2017 Budget Public Hearing
FY 2017 Budget Public Hearing Frederick County, VA Brenda G. Garton County Administrator March 23, 2016 1 Board Budget Priorities and Objectives Concentrate on public safety issues Attempt to keep property
More informationCAPITAL PROGRAM (CP) TOWN OF LAGUNA VISTA
CAPITAL PROGRAM (CP) 2011 2014 TOWN OF LAGUNA VISTA DEFINITION The CP is a three-year planning document to be adopted annually by the Town Council to plan for capital improvements related to the Town s
More informationPublic Schools of the Tarrytowns
Union Free School District of the Tarrytowns Board of Education Fiscal 2018/2019 Budget Development Empower students to make informed choices as they become self-directed, lifelong learners committed to
More informationTown of Bedford Town Meeting Warrant Articles and Municipal Budget Summary
Town of Bedford 2016 Town Meeting Warrant Articles and Municipal Budget Summary There is an estimated tax increase of $0.0 in the Municipal portion of the property tax rate for this budget. The estimated
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationRe: Lanterns Fiscal Impact Analysis. Background. Analysis Process. June 7, Mr. Scott Carlson Carlson Land PO Box 247 East Lake CO 80614
June 7, 2013 Mr. Scott Carlson Carlson Land PO Box 247 East Lake CO 80614 Re: Lanterns Fiscal Impact Analysis Dear Mr. Carlson: As per your request, this analysis quantifies the likely fiscal effects of
More informationBudget Summary by Function
Budget Summary by Function Your budget shows the 2014, 2015, 2016 approved budgets, the 2017 department request and 2017 city manager proposed. The numbers below reflect percentages based on the city manager
More information2018 BUDGET AND FINANCIAL PLAN
Questionnaire 2018 BUDGET AND FINANCIAL PLAN January 1, 2018 - January 23, 2018 The Township of Langley is reviewing the Draft 2018 2022 Five-Year Financial Plan with emphasis on the 2018 Budget. Your
More informationFiscal Year Adopted Budget-In-Brief. Monroe County, FL. Board of County Commissioners
Fiscal Year 2016 Adopted Budget-In-Brief Monroe County, FL Board of County Commissioners CONTENTS Brief Overview... 2 Funding County Services... 4 Your Dollar At Work... 6 Capital Budget... 8 We are an
More informationAUTOMOTIVE EQUIPMENT FUND Department of Environmental Services
Department of Environmental Services Our Mission: To ensure that safe, energy-efficient, and environmentally friendly vehicles are available to agency staff to accomplish their work/missions The Automotive
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationFiscal Responsibility to Further Invest in the Future. Executive Committee Department of Finance May 4, 2017
Fiscal Responsibility to Further Invest in the Future Executive Committee Department of Finance May 4, 2017 1 Asset Inventory Denver s Assets Parks and Recreation $1.8B Transportation $4.7B Buildings $1.9B
More informationPennsylvania Intergovernmental Cooperation Authority
Pennsylvania Intergovernmental Cooperation Authority Staff Report on the City of Philadelphia s Quarterly City Managers Report for the Period Ending September 30, 2016 January 3, 2017 Executive Summary
More informationDIVISION OF POLLUTION PREVENTION AND ENVIRONMENTAL ASSISTANCE
Full Cost Analysis Worksheet for Local Government Solid Waste Management Programs Introduction TECHNICAL ASSISTANCE NC DIVISION OF POLLUTION PREVENTION AND ENVIRONMENTAL ASSISTANCE 1639 MAIL SERVICE CENTER
More informationAnnual Fiscal Plan. FY14 FY15 FY16 Change Description 2.0% Operation 28,769,847 31,190,819 31,195, % Capital 1,525,639 1,596,650 1,600,350
PUBLIC WORKS Description The Henrico County Department of Public Works maintains the third largest road network in the State of Virginia after the State of Virginia and the City of Virginia Beach. The
More informationTaxes: This 2019 Budget holds property and income taxes for city services at their current rates.
January 30, 2019 Dear Members of City Council: I present to you our 2019 Oakwood City Budget. This is my 17 th budget as your city manager. Many people assisted in the preparation of this document, most
More informationFY15 APPROPRIATIONS. Specific highlights for the General Fund, Special Capital
FY15 APPROPRIATIONS The following sections will provide highlights on changes to budgeted appropriations from FY14 to FY15. OPERATING BUDGET HIGHLIGHTS The total Operating Budget for FY15 has increased
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 13 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Finance and Information Technology BRIEF DESCRIPTION: Authorizing the Director of Transportation to submit
More informationFirst Public Budget Hearing. September 11, 2015
First Public Budget Hearing September 11, 2015 Agenda Staff Presentation Resolution 2015-042: Non-Ad Valorem Special Assessment for Fire Services Resolution 2015-043: Non-Ad Valorem Special Assessment
More informationMETRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):
METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit
More informationThis Capital Improvements Plan includes the following projects and recommendations:
FY2014-2018 Capital Improvements Plan Adopted By the Board of Supervisors May 14, 2013 SUMMARY The Planning Commission approved the Capital Improvement Plan Committee s recommendation of the Capital Improvement
More informationTOWN OF HINESBURG FIRE PROTECTION IMPACT FEE ANALYSIS. Prepared By. Michael J. Munson, Ph.D., FAICP
TOWN OF HINESBURG FIRE PROTECTION IMPACT FEE ANALYSIS Prepared By Michael J. Munson, Ph.D., FAICP September 23, 2009 I. INTRODUCTION: The Town of Hinesburg, Vermont, has recently updated its Town Plan
More informationTOWN OF BOILING SPRINGS NC
TOWN OF BOILING SPRINGS NC ANNUAL BUDGET FISCAL YEAR 2018-2019 TABLE OF CONTENTS TABLE OF CONTENTS... 2 BUDGET ORDINANCE... 3 BUDGET MESSAGE... 8 GENERAL FUND REVENUES... 10 GENERAL FUND EXPENSES... 11
More informationPUBLIC SAFETY AND ADMINISTRATION
PASCO COUNTY FISCAL YEAR 216-22 CAPITAL IMPROVEMENT PLAN PUBLIC SAFETY AND ADMINISTRATION The Public Safety and Administration Improvement Plan represent the proposed acquisition of land, design and construction
More informationPage 1 of 2 Clause 4, Report 8, By-Law Number A By-Law to Approve the 2018 Operating Budget
Page 1 of 2 Clause 4, Report 8, By-Law Number -18 A By-Law to Approve the Operating Passed: December 19, The Council of The Corporation of the City of Kingston hereby enacts as follows: 1. That Council
More informationBUDGET MESSAGE COUNTY OF BLADEN May 23, Bladen County Board of Commissioners: Revenue Overview
BUDGET MESSAGE COUNTY OF BLADEN May 23, 2016 Bladen County Board of Commissioners: I am pleased to present for your consideration, the FY 2016-2017 Proposed Budget for Bladen County, North Carolina. The
More informationTown of Bedford Town Meeting Warrant Articles and Municipal Budget Summary
Town of Bedford 2017 Town Meeting Warrant Articles and Municipal Budget Summary There is an estimated tax decrease of $0.04 in the Municipal portion of the property tax rate for this budget. The estimated
More informationRadnor Fire Company Budget Plan Discussion
Radnor Fire Company 2013 Budget Plan Discussion Mission THE MISSION OF THE RADNOR FIRE COMPANY OF WAYNE (RFC) IS TO PROTECT THE LIVES AND PROPERTY OF THE RESIDENTS, BUSINESSES, AND VISITORS OF RADNOR AND
More informationCOUNTY OF GREENVILLE PROPRIETARY FUNDS
Fiscal Years 2012 and 169 COUNTY OF GREENVILLE PROPRIETARY FUNDS Proprietary funds are used to account for activities, which are similar to those found in the private sector. The County s proprietary fund
More informationContents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...
Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationCity of Penticton: Financial Plan Reporting Structure
City of Penticton: Financial Plan Reporting Structure General Utilities General Government Transportation Services Recreation and Culture Environmental Health Services Public Health and Safety Protective
More informationPROPOSED ANNUAL OPERATING BUDGET CITY OF ATHENS TEXAS FISCAL YEAR 2017
PROPOSED ANNUAL OPERATING BUDGET CITY OF ATHENS TEXAS FISCAL YEAR 2017 BUDGET HIGHLIGHTS BUDGETED FINANCIAL RESERVE (SAVINGS) EQUAL TO 60 DAYS OPERATING EXPENSES, OR $1,790,434 FOR SECOND YEAR IN A ROW
More informationCOUNTY MANAGERS BUDGET FY 2015/2016 GENERAL FUND BUDGET
COUNTY MANAGERS BUDGET FY 2015/2016 MESSAGE June 1, 2015 To the Cleveland County Board of Commissioners: It is my privilege to present the proposed fiscal year 2015-2016 budget for Cleveland County. The
More information