AltaLink Management Ltd.

Size: px
Start display at page:

Download "AltaLink Management Ltd."

Transcription

1 Decision D Advance Funding Request from the Cooking Lake Opposition Group Advance Funding Award March 14, 2016

2

3 Alberta Utilities Commission Decision D : Advance Funding Request from the Cooking Lake Opposition Group Advance Funding Award Proceeding March 14, 2016 Published by Alberta Utilities Commission Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Telephone: Fax: Website:

4 Contents 1 Introduction Commission s authority to award advance funding Advance funding application Commission findings Order... 6 ii Decision D (March 14, 2016)

5 Alberta Utilities Commission Calgary, Alberta Decision D Advance Funding Request Proceeding Introduction 1. In this decision the Alberta Utilities Commission considers an application for advance funding by the Cooking Lake Opposition Group (Cooking Lake) for Proceeding (the application). The Commission approved advance funding for Cooking Lake in the amount of $112, for the reasons that follow. 2. Proceeding was assigned by the Commission to consider applications by AltaLink Management Ltd. (AltaLink) for approval to construct, modify, interconnect and operate a set of additions to and upgrades of the 138-kilovolt (kv) and 240-kV transmission systems in the Leduc and Strathcona County areas. Collectively this project is referred to as the South and West of Edmonton Area Transmission Development project (the project). An oral hearing where the Commission will consider the original applications will be held in Edmonton on April 25, Cooking Lake submitted the application on February 23, The Commission assigned Proceeding and Application A001 to the application. 2 Commission s authority to award advance funding 4. When assessing costs claims pursuant to Section 21 of the Alberta Utilities Commission Act, SA 2007, c. A-37.2, the Commission applies AUC Rule 009: Rules on Local Intervenor Costs (Rule 009). 5. Sections 2 and 3 of AUC Rule 009 set out the Commission s authority to award advance funding. 2. Advance of Funds Request 2.1 A local intervener who intends to take part in a hearing or other proceeding may, at any time during the hearing or other proceeding, make a request to the Commission for an advance of funds in accordance with the scale of costs set out in Appendix A and submit a budget in accordance with Appendix B. 2.2 The Commission may award an advance of funds to a local intervener if the local intervener demonstrates a need for financial assistance to address relevant issues in the hearing or other proceeding. 2.3 If the Commission awards an advance of funds to a local intervener under Section 2.2, the Commission may Decision D (March 14, 2016) 3

6 Advance Funding Request of the Cooking Lake Opposition Group advance the funds to the local intervener and (i) set out the terms for repayment of the advance to the Commission by the local intervener, or or (ii) direct the applicant to reimburse the Commission for the funds advanced to the local intervener direct the applicant to advance funds to the local intervener and set out the terms of repayment for the advance to the applicant by the intervener. 3. Budget to be Filed The Commission may, at any time during a hearing or other proceeding, require a local intervener to file a budget of the intervener s anticipated costs in the proceeding in accordance with Appendix B. 3 Advance funding application 6. In its advance funding application, Cooking Lake advised that it had retained five experts to address issues identified by that group to be relevant to the proceeding. The application included a proposed budget in accordance with the Commission s Scale of Costs under Rule 009 for amounts totalling $256, The table below summarizes the experts retained by Cooking Lake, the issues that each expert will address and the total budget for their respective services inclusive of fees, disbursements and GST: Expert Issue Budget Berrien Associates Ltd./Robert A. Berrien Routing $33, SmartDrones Inc. Routing $1, Cottonwood Consultants Ltd./Cliff Wallis FDI Acoustics Inc./James Farquharson Harrison Bowker Real Estate Appraisers Ltd./ Pat Woodlock, Jordan Gillespie Environment $20, Noise $16, Property Values $21, Berrien Associates Ltd. was retained to provide expert evidence on the routing of the project. SmartDrones Inc. was retained to provide aerial/drone video of the proposed route for use in the hearing process. Cottonwood Consultants Inc. was retained to evaluate the environmental effects of the project. FDI Acoustics Inc. was retained to prepare evidence on the 4 Decision D (March 14, 2016)

7 Advance Funding Request of the Cooking Lake Opposition Group noise impacts and effect of the project. Harrison Bowker Real Estate Appraisers Ltd. was retained to evaluate the property value impacts of the project relating to members of Cooking Lake. 8. Cooking Lake also estimated Ackroyd LLP s legal costs to be $163, Cooking Lake advised that it is an intervener group that consists of families and rural landowners. Cooking Lake emphasized its financial need for assistance in order to fully participate in Proceeding given the scope of fees and costs involved in retaining the necessary legal counsel and experts necessary to address the relevant issues. Cooking Lake has further advised that it would present considerable difficulties for individual members of the group to provide pro-rata contributions for the funding of the intervention for the duration of the intervention. 10. Cooking Lake requested that that the Commission order an advance of 50 per cent of the projected legal and consultant fees, disbursements and GST in the sum of $128, Commission findings 11. In its ruling on standing in Proceeding 20924, the Commission concluded that some members of Cooking Lake have rights that may be directly and adversely affected by the Commission s decision on the project because they own or reside upon lands within 800 metres of the proposed preferred Cooking Lake transmission line route. The Commission finds that, by virtue of the participation of those members, Cooking Lake is eligible for advance funding under AUC Rule In accordance with Section 2 of AUC Rule 009, the Commission is satisfied that Cooking Lake has demonstrated a need for financial assistance, and has determined that some amount of advance funding is warranted in this case. 13. Historically, when the Commission has approved an award of advance funding it has awarded between 30 and 60 per cent of an intervener s projected costs. Cooking Lake has requested advance funding of 50 per cent of its budgeted legal and consultant costs of $256, The Commission has reviewed the budget and scope of work for Berrien Associates Ltd., SmartDrones Inc., Cottonwood Consultants Ltd., FDI Acoustics Inc., and Harrison Bowker Real Estate Appraisers Ltd. The Commission considers that the work proposed and the estimated fees to be reasonable. Accordingly, the Commission approves an advance funding award of 50 per cent for the estimated consultant costs in the amount of $46, The Commission has reviewed the budget for Ackroyd LLP, and has decided to award 40 per cent of the estimated legal fees as advance funding. The Commission acknowledges that Cooking Lake represents at least 55 landowners, and that Cooking Lake has retained experts on four different subject areas. However, the Commission observes that Ackroyd LLP has worked with Berrien Associates Ltd., Cottonwood Consultants Ltd., and FDI Acoustics Inc. previously. The Commission expects that this past experience should afford some efficiencies in witness preparation on behalf of counsel which, in turn, should be reflected in the budget. The Commission also notes that the estimated legal fees exceed those claimed by multiple landowner Decision D (March 14, 2016) 5

8 Advance Funding Request of the Cooking Lake Opposition Group groups in a recent hearing of similar length. 1 Accordingly, the Commission finds that an advance funding award of 40 per cent of the estimated legal costs for Ackroyd LLP in the amount of $65, is warranted. 16. The advance funding approved in this decision is subject to adjustment when final costs applications are made and a costs decision is issued following completion of Proceeding In making an advance funding award, the Commission makes no determination respecting the value of Cooking Lake s participation, the value of evidence submitted by its consultants before the Commission, or the amount of any final costs award that the Commission may issue. If Cooking Lake accepts the advance funding award pursuant to this decision and the final costs award for Cooking Lake relating to Proceeding is less than the amount of the advance funding directed in this decision, Cooking Lake will be required to repay the difference. 5 Order 18. It is hereby ordered that: 1) shall pay advance funding of $112, to the Cooking Lake Opposition Group. Payment shall be made to Ackroyd LLP, attention: Mr. Richard Secord at 1500 First Edmonton Place, Jasper Avenue, Edmonton, Alberta, T5J 3S9. Dated on March 14, Alberta Utilities Commission (Original signed by) Tudor Beattie, QC Panel Chair 1 Decision D AESO ENMAX 138 kv Transmission System Reinforcement in South Calgary Foothills Area Transmission Development Plan, Costs Award 6 Decision D (March 14, 2016)

Alberta Electric System Operator, AltaLink Management Ltd. and ENMAX Power Corporation. Foothills Area Transmission Development

Alberta Electric System Operator, AltaLink Management Ltd. and ENMAX Power Corporation. Foothills Area Transmission Development Decision 2013-087 Alberta Electric System Operator, AltaLink Management Ltd. and ENMAX Power Corporation Foothills Area Transmission Development March 12, 2013 The Alberta Utilities Commission Decision

More information

Decision ATCO Electric Ltd. Bonnyville to Bourque Transmission Line Project. Costs Award. October 9, 2013

Decision ATCO Electric Ltd. Bonnyville to Bourque Transmission Line Project. Costs Award. October 9, 2013 Decision 2013-374 Bonnyville to Bourque Transmission Line Project Costs Award October 9, 2013 The Alberta Utilities Commission Decision 2013-374: Bonnyville to Bourque Transmission Line Project Costs Award

More information

Acciona Wind Energy Canada, Inc.

Acciona Wind Energy Canada, Inc. Decision 2013-439 Acciona Wind Energy Canada, Inc. New Dayton Wind Power Project Facility & Substation Costs Award December 11, 2013 The Alberta Utilities Commission Decision 2013-439: Acciona Wind Energy

More information

Capital Power Corporation. Halkirk 2 Wind Power Project

Capital Power Corporation. Halkirk 2 Wind Power Project Decision 23255-D01-2018 Capital Power Corporation Halkirk 2 Wind Power Project July 9, 2018 Alberta Utilities Commission Decision 23255-D01-2018 Capital Power Corporation Halkirk 2 Wind Power Project Proceeding

More information

AltaLink Management Ltd. ATCO Electric Ltd.

AltaLink Management Ltd. ATCO Electric Ltd. Decision 2012-139 May 22, 2012 The Alberta Utilities Commission Decision 2012-139: and Application Nos. 1607971 and 1608183 Proceeding ID No. 1623 May 22, 2012 Published by The Alberta Utilities Commission

More information

E.ON Climate & Renewables Canada Ltd. Grizzly Bear Creek Wind Power Project

E.ON Climate & Renewables Canada Ltd. Grizzly Bear Creek Wind Power Project Decision 21513-D01-2016 Grizzly Bear Creek Wind Power Project July 21, 2016 Alberta Utilities Commission Decision 21513-D01-2016 Grizzly Bear Creek Wind Power Project Proceeding 21513 July 21, 2016 Published

More information

AltaLink Management Ltd. & EPCOR Distribution & Transmission Inc.

AltaLink Management Ltd. & EPCOR Distribution & Transmission Inc. Decision 2013-280 AltaLink Management Ltd. & EPCOR Distribution & Transmission Inc. Heartland Transmission Project Amendment Structure T176 Repositioning Costs Award July 29, 2013 The Alberta Utilities

More information

AltaLink Management Ltd.

AltaLink Management Ltd. Decision 22025-D03-2017 Red Deer Area Transmission Development Amendment Application June 8, 2017 Decision 22025-D03-2017 Red Deer Area Transmission Development Amendment Application Proceeding 22025 Applications

More information

ENMAX Power Corporation Distribution and Transmission Deferral Account Reconciliation

ENMAX Power Corporation Distribution and Transmission Deferral Account Reconciliation Decision 23108-D01-2018 2014 Distribution and 2014-2015 Transmission Deferral Account Reconciliation February 27, 2018 Alberta Utilities Commission Decision 23108-D01-2018 2014 Distribution and 2014-2015

More information

Daishowa-Marubeni International Ltd.

Daishowa-Marubeni International Ltd. Decision 2011-299 25-MW Condensing Steam Turbine Generator July 8, 2011 The Alberta Utilities Commission Decision 2011-299: 25-MW Condensing Steam Turbine Generator Application No. 1606747 Proceeding ID

More information

AltaLink Management Ltd.

AltaLink Management Ltd. Decision 2012-115 Western Alberta Transmission Line April 27, 2012 The Alberta Utilities Commission Decision 2012-115: Western Alberta Transmission Line Application Nos. 1607884, 1607983, 1608011, 1608050,

More information

Decision D Alberta PowerLine L.P. Tariff Application. January 23, 2018

Decision D Alberta PowerLine L.P. Tariff Application. January 23, 2018 Decision 23161-D01-2018 Alberta PowerLine L.P. Tariff Application January 23, 2018 Alberta Utilities Commission Decision 23161-D01-2018 Alberta PowerLine L.P. Tariff Application Proceeding 23161 January

More information

ENMAX Energy Corporation

ENMAX Energy Corporation Decision 23006-D01-2018 Regulated Rate Option - Energy Price Setting Plan Monthly Filings for Acknowledgment 2017 Quarter 3 February 7, 2018 Alberta Utilities Commission Decision 23006-D01-2018: Regulated

More information

Brion Energy Corporation

Brion Energy Corporation Decision 21524-D01-2016 MacKay River Commercial Project Ownership Change for the Sales Oil Pipeline Lease Automated Custody Transfer Site June 14, 2016 Alberta Utilities Commission Decision 21524-D01-2016

More information

Decision ATCO Electric Ltd. February 1, 2013 Interim Tariff. January 18, 2013

Decision ATCO Electric Ltd. February 1, 2013 Interim Tariff. January 18, 2013 Decision 2013-015 February 1, 2013 Interim Tariff January 18, 2013 The Alberta Utilities Commission Decision 2013-015: February 1, 2013 Interim Tariff Application No. 1609127 Proceeding ID No. 2305 January

More information

Livingstone Landowners Guild

Livingstone Landowners Guild Decision 20846-D01-2016 Livingstone Landowners Guild Application for Review of Decision 2009-126 Needs Identification Document Application Southern Alberta Transmission System Reinforcement as amended

More information

The University of Calgary

The University of Calgary Decision 2014-365 Preferential Sharing of Records between the University of Calgary and URICA Energy Real Time Ltd. December 19, 2014 The Alberta Utilities Commission Decision 2014-365: Preferential Sharing

More information

ENMAX Power Corporation

ENMAX Power Corporation Decision 22756-D01-2017 Tax Agreement with The City of Calgary September 7, 2017 Alberta Utilities Commission Decision 22756-D01-2017 Tax Agreement with The City of Calgary Proceeding 22756 September 7,

More information

AltaLink Management Ltd.

AltaLink Management Ltd. Decision 21054-D01-2016 2013-2014 General Tariff Application (Proceeding 2044-Reopened for Midgard Audit) March 7, 2016 Alberta Utilities Commission Decision 21054-D01-2016: Proceeding 21054 March 7,

More information

The University of Calgary

The University of Calgary Decision 23147-D01-2018 Application for an Order Permitting the Sharing of Records Not Available to the Public Between the University of Calgary and URICA Energy Real Time Ltd. January 30, 2018 Alberta

More information

EPCOR Distribution & Transmission Inc.

EPCOR Distribution & Transmission Inc. Decision 22603-D01-2017 June 23, 2017 Alberta Utilities Commission Decision 22603-D01-2017 Proceeding 22603 June 23, 2017 Published by the: Alberta Utilities Commission Fifth Avenue Place, Fourth Floor,

More information

Decision D Generic Cost of Capital. Costs Award

Decision D Generic Cost of Capital. Costs Award Decision 21856-D01-2016 Costs Award December 2, 2016 Alberta Utilities Commission Decision 21856-D01-2016 Costs Award Proceeding 21856 December 2, 2016 Published by Alberta Utilities Commission Fifth Avenue

More information

AltaLink Management Ltd.

AltaLink Management Ltd. Decision 20926-D01-2016 Transmission Line 423L March 15, 2016 Alberta Utilities Commission Decision 20926-D01-2016: Transmission Line 423L Proceeding 20926 March 15, 2016 Published by Alberta Utilities

More information

ATCO Electric and ATCO Pipelines. Application for ATCO Electric and ATCO Pipelines License Fees

ATCO Electric and ATCO Pipelines. Application for ATCO Electric and ATCO Pipelines License Fees Decision 21571-D01-2016 and ATCO Pipelines 2015-2016 License Fees August 17, 2016 Alberta Utilities Commission Decision 21571-D01-2016 and ATCO Pipelines 2015-2016 License Fees Proceeding 21571 August

More information

AltaLink Investment Management Ltd. And SNC Lavalin Transmission Ltd. et al.

AltaLink Investment Management Ltd. And SNC Lavalin Transmission Ltd. et al. Decision 3529-D01-2015 AltaLink Investment Management Ltd. And SNC Lavalin Transmission Ltd. et al. Proposed Sale of AltaLink, L.P Transmission Assets and Business to Mid-American (Alberta) Canada Costs

More information

Decision D ATCO Electric Ltd. Hughes 2030S Substation. Costs Award

Decision D ATCO Electric Ltd. Hughes 2030S Substation. Costs Award Decision 22406-D01-2017 Hughes 2030S Substation June 9, 2017 Alberta Utilities Commission Decision 22406-D01-2017 Hughes 2030S Substation Proceeding 22406 June 9, 2017 Published by Alberta Utilities Commission

More information

Highpine Oil & Gas Ltd. (formerly Vaquero Energy Ltd.)

Highpine Oil & Gas Ltd. (formerly Vaquero Energy Ltd.) Alberta Energy and Utilities Board Energy Cost Order 2005-009 (formerly Vaquero Energy Ltd.) Application for a Oil Effluent Pipeline Chip Lake Field Cost Awards ALBERTA ENERGY AND UTILITIES BOARD Energy

More information

Decision D ATCO Electric Ltd. Amounts to be Paid Into and Out of Balancing Pool for Chinchaga Power Plant Sale

Decision D ATCO Electric Ltd. Amounts to be Paid Into and Out of Balancing Pool for Chinchaga Power Plant Sale Decision 21833-D01-2016 Amounts to be Paid Into and Out of Balancing Pool for Chinchaga Power Plant Sale December 20, 2016 Alberta Utilities Commission Decision 21833-D01-2016 Proceeding 21833 December

More information

Provident Energy Ltd.

Provident Energy Ltd. Alberta Energy and Utilities Board Energy Cost Order 2005-002 Applications for Licences for a Well and Battery Cost Awards ALBERTA ENERGY AND UTILITIES BOARD Energy Cost Order 2005-002 Applications for

More information

Collaborative Process

Collaborative Process Alberta Energy and Utilities Board Utility Cost Order 2006-065 Uniform System of Accounts and Minimum Filing Requirements Cost Awards ALBERTA ENERGY AND UTILITIES BOARD Utility Cost Order 2006-065 Uniform

More information

Langdon Waterworks Limited

Langdon Waterworks Limited Decision 20372-D01-2015 May 14, 2015 Alberta Utilities Commission Decision 20372-D01-2015 Proceeding 20372 May 14, 2015 Published by the: Alberta Utilities Commission Fifth Avenue Place, Fourth Floor,

More information

TransCanada Energy Ltd.

TransCanada Energy Ltd. Decision 22302-D01-2017 Request for Permitting the Sharing of Records Not Available to the Public Between and Pembina Pipeline Corporation May 26, 2017 Alberta Utilities Commission Decision 22302-D01-2017

More information

Decision D FortisAlberta Inc. Light-Emitting Diode Lighting Conversion Maintenance Multiplier for the City of St.

Decision D FortisAlberta Inc. Light-Emitting Diode Lighting Conversion Maintenance Multiplier for the City of St. Decision 21754-D01-2016 Light-Emitting Diode Lighting Conversion Maintenance Multiplier for the City of St. Albert August 11, 2016 Alberta Utilities Commission Decision 21754-D01-2016 Light-Emitting Diode

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 23065-D01-2017 Alberta Electric System Operator 2018 Independent System Operator Tariff Update November 28, 2017 Alberta Utilities Commission Decision 23065-D01-2017 Alberta Electric System Operator

More information

ENMAX Power Corporation

ENMAX Power Corporation Decision 22238-D01-2017 ENMAX Power Corporation 2016-2017 Transmission General Tariff Application December 4, 2017 Alberta Utilities Commission Decision 22238-D01-2017 ENMAX Power Corporation 2016-2017

More information

Decision D Balancing Pool

Decision D Balancing Pool Decision 22184-D10-2017 Application for an Order Permitting the Sharing of Records Not Available to the Public Between the, TransAlta Generation Partnership, and Capital Power Generation Services Inc.

More information

ATCO Gas and Pipelines Ltd. (South)

ATCO Gas and Pipelines Ltd. (South) Decision 2010-170 New Construction Replacement of ATCO Pipelines Existing Southern Extension Pipeline From North of Lacombe to East of Gwynne April 15, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-170:

More information

Montana Alberta Tie Ltd. and AltaLink Management Ltd.

Montana Alberta Tie Ltd. and AltaLink Management Ltd. Decision 2013-195 Montana Alberta Tie Ltd. and AltaLink Management Ltd. MATL 230-Kv International Merchant Power Lines Final Design and Time Extension for MATL Project Facilities May 24, 2013 The Alberta

More information

Mayerthorpe and District Rural Electrification Association Ltd.

Mayerthorpe and District Rural Electrification Association Ltd. Decision 22692-D01-2018 Mayerthorpe and District Rural Electrification Association Ltd. Varied Code of Conduct Regulation Compliance Plan January 31, 2018 Alberta Utilities Commission Decision 22692-D01-2018

More information

West Wetaskiwin Rural Electrification Association Ltd.

West Wetaskiwin Rural Electrification Association Ltd. Decision 22067-D01-2016 West Wetaskiwin Rural Electrification Association Ltd. Varied Code of Conduct Regulation Compliance Plan December 21, 2016 Alberta Utilities Commission Decision 22067-D01-2016 West

More information

ATCO Gas and Pipelines Ltd. (South)

ATCO Gas and Pipelines Ltd. (South) Decision 3421-D01-2015 Northeast Calgary Connector Pipeline January 16, 2015 The Alberta Utilities Commission Decision 3421-D01-2015: Northeast Calgary Connector Pipeline Application 1610854 Proceeding

More information

Decision D Performance-Based Regulation Plans for Alberta Electric and Gas Distribution Utilities.

Decision D Performance-Based Regulation Plans for Alberta Electric and Gas Distribution Utilities. Decision 22082-D01-2017 2018-2022 Performance-Based Regulation Plans for Alberta Electric and Gas Distribution Utilities February 6, 2017 Alberta Utilities Commission Decision 22082-D01-2017 2018-2022

More information

Enbridge Battle Sands 594S Substation Connection Needs Identification Document

Enbridge Battle Sands 594S Substation Connection Needs Identification Document APPENDIX C AESO PIP Enbridge Battle Sands 594S Substation Connection Needs Identification Document 1.0 Participant Involvement Program (PIP) From June to October 2015, the AESO conducted a Participant

More information

Shell Canada Limited and Canadian Natural Resources Limited

Shell Canada Limited and Canadian Natural Resources Limited Decision 22614-D01-2017 Albian Oil Sands Industrial Complex and June 28, 2017 Alberta Utilities Commission Decision 22614-D01-2017 Albian Oil Sands Industrial Complex and Proceeding 22614 Applications

More information

Consumers Coalition of Alberta

Consumers Coalition of Alberta Decision 22157-D01-2017 Decision on Preliminary Question AltaLink Management Ltd. 2012-2013 Deferral Account Reconciliation Costs Award February 15, 2017 Alberta Utilities Commission Decision 22157-D01-2017

More information

ATCO Electric Ltd. Stage 2 Review of Decision D ATCO Electric Ltd Transmission General Tariff Application

ATCO Electric Ltd. Stage 2 Review of Decision D ATCO Electric Ltd Transmission General Tariff Application Decision 22483-D01-2017 Stage 2 Review of Decision 20272-D01-2016 2015-2017 Transmission General Tariff Application December 6, 2017 Alberta Utilities Commission Decision 22483-D01-2017 Stage 2 Review

More information

Bumper Development Corporation Ltd.

Bumper Development Corporation Ltd. Alberta Energy and Utilities Board Energy Cost Order 2004-13 Bumper Development Corporation Ltd. Review of Well Licence No. 0287658 Davey Field Cost Awards ALBERTA ENERGY AND UTILITIES BOARD Energy Cost

More information

NOTICE OF REVISED APPLICATION

NOTICE OF REVISED APPLICATION Ontario Energy Board Commission de l énergie de l Ontario EB-2012-0451 NOTICE OF REVISED APPLICATION Enbridge Gas Distribution Inc. has requested to revise its application for approval to build two segments

More information

Decision CU Water Limited. Disposition of Assets. April 30, 2010

Decision CU Water Limited. Disposition of Assets. April 30, 2010 Decision 2010-192 Disposition of Assets April 30, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-192: Disposition of Assets Application No. 1606042 Proceeding ID. 569 April 30, 2010 Published by Alberta

More information

Mackenzie Rural Electrification Association Ltd.

Mackenzie Rural Electrification Association Ltd. Decision 21983-D01-2016 Varied Code of Conduct Regulation Compliance Plan December 14, 2016 Alberta Utilities Commission Decision 21983-D01-2016 Varied Code of Conduct Regulation Compliance Plan Proceeding

More information

ATCO Gas and Pipelines Ltd. (South)

ATCO Gas and Pipelines Ltd. (South) Decision 22634-D01-2017 Southwest Calgary Connector Pipeline Project August 9, 2017 Alberta Utilities Commission Decision 22634-D01-2017 Southwest Calgary Connector Pipeline Project Proceeding 22634 Application

More information

Decision D Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities. First Compliance Proceeding

Decision D Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities. First Compliance Proceeding Decision 22394-D01-2018 Rebasing for the 2018-2022 PBR Plans for February 5, 2018 Alberta Utilities Commission Decision 22394-D01-2018 Rebasing for the 2018-2022 PBR Plans for Proceeding 22394 February

More information

Canadian Natural Resources Limited

Canadian Natural Resources Limited Decision 22669-D03-2017 Application for an Order Permitting the Sharing of Records Not Available to the Public Between Canadian Natural Resources Limited and ATCO Power Canada Ltd. July 21, 2017 Alberta

More information

Immediate Attention for Piikani Nation Members

Immediate Attention for Piikani Nation Members Immediate Attention for Piikani Nation Members IMPORTANT INFORMATION Altalink L.P., Transfer of Specific Assets to PiikaniLink L.P. and associated 2017-2018 General Tariff Application. AUC Proceeding 22612

More information

Decision The ATCO Utilities. Corporate Costs. March 21, 2013

Decision The ATCO Utilities. Corporate Costs. March 21, 2013 Decision 2013-111 Corporate Costs March 21, 2013 The Alberta Utilities Commission Decision 2013-111: Corporate Costs Application No. 1608510 Proceeding ID No. 1920 March 21, 2013 Published by The Alberta

More information

Decision D FortisAlberta Inc.

Decision D FortisAlberta Inc. Decision 23063-D01-2018 Light-Emitting Diode Lighting Conversion Maintenance Multiplier Filing January 30, 2018 Alberta Utilities Commission Decision 23063-D01-2018 Light-Emitting Diode Lighting Conversion

More information

AltaLink Management Ltd. and EPCOR Distribution & Transmission Inc.

AltaLink Management Ltd. and EPCOR Distribution & Transmission Inc. Decision 2012-124 Decision on Request for Review and Variance of AUC Decision 2011-436 Heartland Transmission Project May 14, 2012 The Alberta Utilities Commission Decision 2012-124: Decision on Request

More information

Decision D FortisAlberta Inc. Light-Emitting Diode (LED) Lighting Conversion Maintenance Multiplier Filing for 30 Customers in 2018

Decision D FortisAlberta Inc. Light-Emitting Diode (LED) Lighting Conversion Maintenance Multiplier Filing for 30 Customers in 2018 Decision 23730-D01-2018 Light-Emitting Diode (LED) Lighting Conversion Maintenance Multiplier Filing for 30 Customers in 2018 September 7, 2018 Alberta Utilities Commission Decision 23730-D01-2018 Light-Emitting

More information

Decision D FortisAlberta Inc Performance-Based Regulation Capital Tracker True-Up. January 11, 2018

Decision D FortisAlberta Inc Performance-Based Regulation Capital Tracker True-Up. January 11, 2018 Decision 22741-D01-2018 FortisAlberta Inc. 2016 Performance-Based Regulation Capital Tracker True-Up January 11, 2018 Alberta Utilities Commission Decision 22741-D01-2018 FortisAlberta Inc. 2016 Performance-Based

More information

Canadian Natural Resources Limited

Canadian Natural Resources Limited Decision 21306-D01-2016 Determination of Compensation for 9L66/9L32 Transmission Line Relocation August 16, 2016 Alberta Utilities Commission Decision 21306-D01-2016 Determination of Compensation for 9L66/9L32

More information

Decision D FortisAlberta Inc PBR Capital Tracker True-Up and PBR Capital Tracker Forecast

Decision D FortisAlberta Inc PBR Capital Tracker True-Up and PBR Capital Tracker Forecast Decision 20497-D01-2016 FortisAlberta Inc. 2014 PBR Capital Tracker True-Up and 2016-2017 PBR Capital Tracker Forecast February 20, 2016 Alberta Utilities Commission Decision 20497-D01-2016 FortisAlberta

More information

Alberta Energy-Capacity Market Framework Engagement November 2017

Alberta Energy-Capacity Market Framework Engagement November 2017 Questions for discussion The engagement is seeking feedback on the six questions outlined in the table below. Please provide your input on these questions in Table 1 on the next three pages. Please submit

More information

AltaLink Management Ltd.

AltaLink Management Ltd. Decision 2012-327 Western Alberta Transmission Line Project December 6, 2012 The Alberta Utilities Commission Decision 2012-327: Western Alberta Transmission Line Project Application No. 1607067 Proceeding

More information

AltaLink Management Ltd.

AltaLink Management Ltd. Decision 20986-D01-2016 Southwest Calgary Ring Road Transmission Project August 31, 2016 Alberta Utilities Commission Decision 20986-D01-2016 Southwest Calgary Ring Road Transmission Project Proceeding

More information

AltaGas Utilities Inc.

AltaGas Utilities Inc. Decision 21822-D01-2016 AltaGas Utilities Inc. 2016-2017 Unaccounted-For Gas Rider E and Rider H September 1, 2016 Alberta Utilities Commission Decision 21822-D01-2016 AltaGas Utilities Inc. 2016-2017

More information

Dominion Exploration Canada Ltd.

Dominion Exploration Canada Ltd. Alberta Energy and Utilities Board Energy Cost Order 2006-007 Dominion Exploration Canada Ltd. Applications for Well Licences Pembina Field Cost Awards ALBERTA ENERGY AND UTILITIES BOARD Energy Cost Order

More information

AltaGas Utilities Inc.

AltaGas Utilities Inc. Decision 23898-D01-2018 2019 Annual Performance-Based Regulation Rate Adjustment Filing December 20, 2018 Alberta Utilities Commission Decision 23898-D01-2018 2019 Annual Performance-Based Regulation Rate

More information

EPCOR Distribution & Transmission Inc.

EPCOR Distribution & Transmission Inc. Decision 21229-D01-2016 EPCOR Distribution & Transmission Inc. 2015-2017 Transmission Facility Owner Tariff and 2013 Generic Cost of Capital Compliance Application April 15, 2016 Alberta Utilities Commission

More information

Report to the Minister. For the Year Ending December 31, March 20, 2015

Report to the Minister. For the Year Ending December 31, March 20, 2015 Report to the Minister For the Year Ending December 31, 2014 March 20, 2015 Market Surveillance Administrator 403.705.3181 #500, 400 5th Avenue S.W., Calgary AB T2P 0L6 www.albertamsa.ca Table of Contents

More information

ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta

ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta IMPERIAL OIL RESOURCES LIMITED APPLICATION TO CONSTRUCT AND OPERATE THE THICKSILVER PIPELINE PROJECT A BLENDED BITUMEN PIPELINE AND ASSOCIATED SURFACE

More information

Canadian Natural Resources Limited

Canadian Natural Resources Limited Alberta Energy and Utilities Board Energy Cost Order 2004-07 Canadian Natural Resources Limited Application for an Oil Sands Mine, Bitumen Extraction Plant, and Bitumen Upgrading Plant in the Fort McMurray

More information

Financial Statements. AltaLink, L.P. Years ended December 31, 2010 and 2009

Financial Statements. AltaLink, L.P. Years ended December 31, 2010 and 2009 Financial Statements FINANCIAL STATEMENTS INDEPENDENT AUDITOR S REPORT To the Partners of We have audited the accompanying financial statements of, which comprise the balance sheets as at December 31,

More information

ALBERTA ENVIRONMENTAL APPEAL BOARD. Discontinuance of Proceedings

ALBERTA ENVIRONMENTAL APPEAL BOARD. Discontinuance of Proceedings Appeal No. 03-020-DOP ALBERTA ENVIRONMENTAL APPEAL BOARD Discontinuance of Proceedings Date of Discontinuance of Proceedings September 25, 2003 IN THE MATTER OF sections 91, 92 and 95 of the Environmental

More information

We believe that the audit evidence we have obtained in our audits is sufficient and appropriate to provide a basis for our audit opinion.

We believe that the audit evidence we have obtained in our audits is sufficient and appropriate to provide a basis for our audit opinion. Financial Statements For the years ended 2017 and 2016 Deloitte LLP 700, 850 2 Street SW Calgary, AB T2P 0R8 Canada Tel: 403-267-1700 Fax: 587-774-5379 www.deloitte.ca INDEPENDENT AUDITOR S REPORT To the

More information

Alberta Utilities Commission

Alberta Utilities Commission Alberta Utilities Commission In the Matter of the Need for the Al Rothbauer 321S Substation And in the matter of the Electric Utilities Act, S.A. 2003, c. E-5.1, the Alberta Utilities Commission Act, S.A.

More information

Decision ATCO Utilities. Corporate Cost Allocation Methodology. September 20, 2010

Decision ATCO Utilities. Corporate Cost Allocation Methodology. September 20, 2010 Decision 2010-447 Corporate Cost Allocation Methodology September 20, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-447: Corporate Cost Allocation Methodology Application No. 1605473 Proceeding ID. 306

More information

Alberta Utilities Commission

Alberta Utilities Commission Alberta Utilities Commission In the Matter of the Need for the Irma Wind Power Project Connection And in the matter of the Electric Utilities Act, S.A. 2003, c. E-5.1, the Alberta Utilities Commission

More information

ATCO Gas and Pipelines Ltd.

ATCO Gas and Pipelines Ltd. Decision 2738-D01-2016 Z Factor Application for Recovery of 2013 Southern Alberta Flood Costs March 16, 2016 Alberta Utilities Commission Decision 2738-D01-2016 Z Factor Application for Recovery of 2013

More information

EPCOR Energy Alberta GP Inc.

EPCOR Energy Alberta GP Inc. Decision 20633-D01-2016 EPCOR Energy Alberta GP Inc. 2016-2017 Regulated Rate Tariff Application December 20, 2016 Alberta Utilities Commission Decision 20633-D01-2016 EPCOR Energy Alberta GP Inc. 2016-2017

More information

2014 ABAER 007. Inter Pipeline Ltd. Application for a Pipeline Licence Edmonton/Fort Saskatchewan Area. June 23, 2014

2014 ABAER 007. Inter Pipeline Ltd. Application for a Pipeline Licence Edmonton/Fort Saskatchewan Area. June 23, 2014 2014 ABAER 007 Inter Pipeline Ltd. Application for a Pipeline Licence Edmonton/Fort Saskatchewan Area June 23, 2014 ALBERTA ENERGY REGULATOR Decision 2014 ABAER 007: Inter Pipeline Ltd., Application for

More information

Alberta Utilities Commission

Alberta Utilities Commission Decision 22091-D01-2017 Commission-Initiated Proceeding to Review the Terms and November 9, 2017 Decision 22091-D01-2017 Commission-Initiated Proceeding to Review the Terms and Proceeding 22091 Application

More information

Kneehill Rural Electrification Association Ltd.

Kneehill Rural Electrification Association Ltd. Decision 23420-D01-2018 Kneehill Rural Electrification Association Ltd. Varied Code of Conduct Regulation Compliance Plan April 23, 2018 Alberta Utilities Commission Decision 23420-D01-2018 Kneehill Rural

More information

Decision D ATCO Electric Ltd. Compliance Filing to Decision D Capital Tracker True-Up

Decision D ATCO Electric Ltd. Compliance Filing to Decision D Capital Tracker True-Up Decision 23454-D01-2018 ATCO Electric Ltd. Compliance Filing to Decision 22788-D01-2018 2016 Capital Tracker True-Up May 4, 2018 Alberta Utilities Commission Decision 23454-D01-2018 ATCO Electric Ltd.

More information

Alberta Utilities Commission

Alberta Utilities Commission Alberta Utilities Commission In the Matter of the Need for the ATCO Power Heartland Generating Station Connection And in the matter of the Electric Utilities Act, S.A. 2003, c. E-5.1, the Alberta Utilities

More information

AltaGas Utilities Inc.

AltaGas Utilities Inc. Decision 2013-465 2014 Annual PBR Rate Adjustment Filing December 23, 2013 The Alberta Utilities Commission Decision 2013-465: 2014 Annual PBR Rate Adjustment Filing Application No. 1609923 Proceeding

More information

April 13, Via

April 13, Via ENMAX Corporation 141 50 Avenue SE Calgary, AB T2G 4S7 Tel (403) 514-3000 enmax.com April 13, 2007 Via Email Ms. Brenda Ambrosi Vancouver, BC V7X 1V5 Dear Ms. Ambrosi: Re: Network Economy Business Practices

More information

ANNUAL REPORT. Walton Big Lake Development L.P. ANNUAL REPORT For the year ended December 31, 2011

ANNUAL REPORT. Walton Big Lake Development L.P. ANNUAL REPORT For the year ended December 31, 2011 ANNUAL REPORT Walton Big Lake Development L.P. 2011 Walton Big Lake Development L.P. Edmonton, Alberta March 2012 ANNUAL REPORT For the year ended December 31, 2011 Walton Big Lake Development L.P. Edmonton,

More information

Alberta Utilities Commission

Alberta Utilities Commission Alberta Utilities Commission In the Matter of the Need for 138 kv and 240 kv Transmission System Development in the Red Deer Region And in the matter of the Electric Utilities Act, S.A. 2003, c. E-5.1,

More information

NaturEner Energy Canada Inc.

NaturEner Energy Canada Inc. Decision 2009-174 Review and Variance of Alberta Utilities Commission Decision 2009-042 (October 22, 2009) ALBERTA UTILITIES COMMISSION Decision 2009-174, Review and Variance of Alberta Utilities Commission

More information

FINANCIAL STATEMENTS. Walton Big Lake Development L.P. For the years ended December 31, 2016 and December 31, (Expressed in Canadian Dollars)

FINANCIAL STATEMENTS. Walton Big Lake Development L.P. For the years ended December 31, 2016 and December 31, (Expressed in Canadian Dollars) FINANCIAL STATEMENTS Walton Big Lake Development L.P. For the years ended and May 1, 2017 Independent Auditor s Report To the Partners of Walton Big Lake Development L.P. We have audited the accompanying

More information

Report to the Minister March 1, 2011

Report to the Minister March 1, 2011 March 1, 2011 Market Surveillance Administrator 403.705.3181 #500, 400 5th Avenue S.W., Calgary AB T2P 0L6 www.albertamsa.ca March 1, 2011 1 Table of Contents 1 Introduction... 3 2 Offer Behaviour... 3

More information

INVESTOR PRESENTATION JUNE 2018

INVESTOR PRESENTATION JUNE 2018 INVESTOR PRESENTATION JUNE 2018 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and Canadian Utilities Limited and information provided in this presentation may be considered forward-looking

More information

Decision D ATCO Electric Ltd Transmission General Tariff Application. Costs Award

Decision D ATCO Electric Ltd Transmission General Tariff Application. Costs Award Decision 21747-D01-2017 January 30, 2017 Alberta Utilities Commission Decision 21747-D01-2017 Proceeding 21747 January 30, 2017 Published by Alberta Utilities Commission Fifth Avenue Place, Fourth Floor,

More information

INVESTOR PRESENTATION JUNE 2018

INVESTOR PRESENTATION JUNE 2018 INVESTOR PRESENTATION JUNE 2018 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and Canadian Utilities Limited and information provided in this presentation JUNE be considered forward-looking

More information

Statement of Financial Position (unaudited)

Statement of Financial Position (unaudited) Condensed Interim Financial Statements (unaudited) For the three and nine months ended and CONDENSED INTERIM FINANCIAL STATEMENTS Statement of Financial Position (unaudited) As at Notes December 31, ASSETS

More information

Unaudited Condensed Interim Financial Statements

Unaudited Condensed Interim Financial Statements Unaudited Condensed Interim Financial Statements For the three months ended March 31, 2012 NOTICE OF NO AUDITOR REVIEW OF INTERIM FINANCIAL STATEMENTS Section 4.3(3) of National Instrument 51-102, Continuous

More information

City of Edmonton. Natural Gas Franchise Agreement with ATCO Gas and Pipelines Ltd. August 31, Decision

City of Edmonton. Natural Gas Franchise Agreement with ATCO Gas and Pipelines Ltd. August 31, Decision Alberta Energy and Utilities Board Decision 2004-072 Natural Gas Franchise Agreement with ATCO Gas and Pipelines Ltd. August 31, 2004 ALBERTA ENERGY AND UTILITIES BOARD Decision 2004-072: Natural Gas Franchise

More information

2013 Generic Cost of Capital

2013 Generic Cost of Capital Decision 2191-D01-2015 2013 Generic Cost of Capital March 23, 2015 Alberta Utilities Commission Decision 2191-D01-2015 2013 Generic Cost of Capital Proceeding 2191 Application 1608918-1 March 23, 2015

More information