Grand Forks Transportation Overview 10 Year Outlook Anticipated Needs
|
|
- Donna Patterson
- 5 years ago
- Views:
Transcription
1 Grand Forks Transportation Overview 10 Year Outlook Anticipated Needs CITY OF GRAND FORKS February 27, 2017 Allen Grasser, City Engineer of the City of Grand Forks 1
2 National Highway System (NHS) 2
3 Funding/Needs (10 Years) Maintenance Maintenance Needs*: $11.9 million/yr = $119 Million Available: $3.0 million/yr City + $0.5 million/yr assessment = $ 35 Million Shortfall: $ 84 Million City Funding Maintenance at 29.4% of need. *Based on community construction acceptance number 3
4 10 Year City Growth Area Anticipated Areas of City Growth in the Next 10 Years Industrial Commercial Residential Infill 4
5 10 Year City Growth Area Overlaid with Corresponding Street Network Needs not Financially Constrained. 5
6 Funding Construction Needs (10 years) Growth/Capacity Construction Needs: $21.6 Million/Year = $216 Million Available (City/Economic Development/Specials): $4 Million/Year = $40 Million Shortfall: $176 Million City Funding Growth/Capacity at 18.5% of Need 6
7 Grand Forks Transportation Overview 6 Year CIP ( ) Cost Constrained 7
8 Available Existing Revenue $3.0 million/year in Highway Users $4.2 million/year From Current 1% Sales Tax and Use Tax $0.5 million/year Existing Economic Development $7.7 million Approx. Annual Total Revenue 8
9 Priorities A. Minimum Necessary Operating Costs (e.g. Debt Service, Transfer to Street Department, Public Property Management, and Emergency Street Repairs). B. Projects which leverage city dollars with other organizations or sources (e.g. Federal/State Aid Projects, S Columbia Rd, N 42nd St, and SIG). C. Operation and maintenance items essential for long term operation. (e.g. Mill and Overlay Projects, Bikeway Maintenance, and LED Replacement Program). D. Projects serving to provide minimum access to developing areas (e.g. Cherry St, S 34th St, and 6th Ave N). E. Projects needed to provide capacity, safety, growth but eliminated (e.g. S 47th Ave Interchange, 42nd St Underpass, & S Washington St) F. Potential new programs (e.g. Pedestrian Underpasses) 9
10 Spreadsheets Priority A Minimum Necessary Operating Costs Priority A Interdept chgs;ada SW approach Transfer to Gen Fund for Streets (25% of Street department) Street Maintenance (Traffic signal; minor street repair; Mtce Street lights; Minor Intersection Imp; diamond grade; UPS batt; conflict monitors) Public Property Management Debt Service (2021) (Use Tax) Transfer to Flood Protection System Capital Fund (Use Tax) In Millions $602,064 $620,126 1,178,537 1,213,893 1,250, , , , , , , , , , , , ,032 1,258,100 1,274,475 1,273,100 1,172,650 $3.64 $638,730 $657, $677,628 $697,957 1,287,820 1,326,454 1,366,248 1,081,371 1,113,812 $3.72 $3.79 $3.76 $3.74 $
11 Spreadsheets Priority B Projects which leverage City dollars with Federal/State/Economic Development Funds Priority B Transportation Studies/Pavement Management (FAST Compliance) Set Aside Reserve for Bridge/Underpass Project 47th Ave S Interchange (48th to Columbia) and 42nd St Underpass 17th Ave S/Columbia Turn Lanes Columbia Rd (40th to 47th Ave S) Demers Ave Maintenance (I29 to Fire Station) N Wash St BUS81 Surface Treatment N 5th St (Gateway to DemersMill & Overlay) N Wash Reconst (5th Ave S to 1st Ave Nincludes Underpass) N Washington Reconstruct portion from Bridge Res Cash Kennedy Bridge Business US 2 Reconstruction (Demers to Red River) N 42nd Street Reconstruct (University Ave to Gateway Drive) University Ave Bridge Repair (Use of Bridge Reserve Funds) Columbia Rd Overpass (Use of Bridge Reserve Funds) Demers Ave Traffic Signal N Washington CPR & Grind (8th Ave N to Gateway Dr) Traffic Signal (Washinton & 44th Ave S) University Ave Mill & Overlay (State St to N 3rd St) School Sign Replacement Red Light Confirmation Indicators on Gateway Columbia Rd Reconstruct (Overpass University Ave) Washington St Mill & Overlay (1st Ave N to 8th Ave N) 32nd Ave S Corridor Improvements Phase 1 32nd Ave S Corridor Improvements Phase 2 Traffic Signal Maintenance (Urban) Traffic Signal Maitnenance (Regional) 2018 N 55th St (Demers Ave University Ave) Shared Use Path (TA funded) 2019 Shared Use Path Project (TA Application) (Location TBD) 2021 Shared Use Path Project (TA Application) (Location TBD) 2023 Shared Use Path Project (TA Application) (Location TBD) N 62nd (Gateway to 8th) (18% 2163 shown as transfer in) University Ave (55th to 58th) (50% 2163 shown as transfer in) University Ave (58th to 62nd St N) (50% 2163 shown as transfer in) 17th Ave N (N 48th St to N 55th St) (2163 shown as transfer in) In Millons $120,000 20, ,000 20,000 25, ,000 2,000,000 10,000 25,000 5,000 90,000 20,000 $180,000 10, , ,000 60,000 6, , ,000 $120,000 25, , , , ,000 20,000 1,383,360 $180, ,000 1,237,000 1,000, , , ,000 1,121,600 20,000 $120, , , , ,000 $180, , , , , ,000 $3.04 $2.71 $3.30 $5.14 $2.27 $
12 Spreadsheets for Priority C Operation and maintenance items essential for long term operation Priority C Bikeway Maintenance/Capital LED Street Light Replacement Program Beautification Traffic Signal Interconnect Intelligent Transportation System Contingencies Street Maintenance (mill/overlay) (City Share) In Millions $130, ,932 60,000 $135, ,859 70,000 $140, ,905 70, , , ,713 $1.46 $1.50 $ $146, ,072 70,000 $152, ,365 70,000 $158, ,786 70,000 1,021,464 $1.58 1,052,108 1,083,671 $1.62 $
13 Spreadsheets for Priority D Projects serving to provide minimum access to developing areas Priority D Traffic Signal software/hardware upgrade (Centralized Centracs) 32nd Ave S Turn Lanes (Corridor Improvements) 47th Ave S (20th to Columbia Rd) S 38th St (40th43rd) S 42nd St (34th to 40th Ave S; rural section) S 34th St (45th to 47th Ave S) Cherry St (58th to 62nd Ave S) S 38th St (43rd to 47th Ave S) 47th Ave S (Columbia Rd to S 34th St) (3 lane) 40th Ave S (42nd St to 44th St) 40th Ave S (44th St to 48th St) S 34th St (47th Ave S to 52nd Ave S) S 48th St (32nd to 40th Ave S) 6th Ave (55th to 58th) Cherry St (62nd Ave S to 67th Ave S) N 62nd St (8th Ave N to University Ave) Maintaining Quiet Zone In Millions $ $1,000,000 $ $ $ $ 1,498, ,000 20, ,000 1,191,000 20, , , , ,000 60,000 1,902,000 1,568, ,000 1,120,000 60, , ,000 1,700,000 $5.05 $2.88 $2.97 $3.68 $1.22 $
14 Spreadsheets for Priority E Projects needed to provide capacity, safety, and growth, but eliminated Priority E $ $20,000 $200,000 $30,000 $ $ 2,569, ,000 1,368,000 1,162,000 1,000,000 1,000,000 4,224,000 1,000,000 8,000,000 8,500,000 1,400,000 S Washington St ( 55th Ave S to 62nd Ave S) 200,000 5,300,000 62nd Ave S ( Kingsview Dr to S Washington St) 42nd St Underpass * 200,000 2,385,000 1,500,000 20,000,000 6,000, ,000 47th Ave S Interchange * 1,500,000 23,000, ,000 Traffic Signals 42nd Street & 32nd Ave S/I29 Ramp Reconfiguration * S Washington (S End Drainway to 55th Ave S) Belmont (47th to 62nd Ave S) 62nd Ave S (Cherry to Washington) S 48th St (40th to 47th Ave S) 32nd Ave S Reconstruct Columbia to I29) * S 42nd St (40th Ave S to 47th Ave S) S Columbia Rd (47th Ave S to 55th Ave S) In Millions $2.67 $1.82 $8.00 $30.70 $26.97 $23.05 *Projects are assumed to have a cost share of 50%/50% 14
15 GRAND FORKS TRANSPORTATION INFRASTRUCTURE Priority E 15
16 Spreadsheets for Priority F Potential New Programs Priority F 2018 Columbia Rd Pedestrian Underpass 47th Ave Pedestrian Underpass In Millions 2019 $ $ 2020 $3,500,000 $3.50 $ $ $2,000,000 $ $ $ $ $ *Dollars shown represents approximately 100% of the costs. No current funding available Special Assessments or Cost Sharing to be Determined by City Council 16
17 End of Year Cash End of Year Cash By Priority (6 Year CIP 2023 Ending Balance) A Balance $41.5 Million A & B Balance $22.5 Million A, B, & C Balance $12.9 Million A, B, C, & D Balance $5.1 Million AF Balance $103.9 Million 17
18 Preliminary Categorical Reduction We looked at a number of changes to come to a cost constrained conclusion. Preliminary Staff Recommendation: 10% reduction in Priority C 25% reduction in Priority D No funding for Priorities E and F 18
19 Policy Changes 1. Priority C, each line item cut by 10% 2. Maintain City cost share on bike paths of 50% to residential and change City cost share to 0% on commercial/multifamily. (Priority C) 3. Increase reconstruction special assessment of project costs from 20% up to 40%. (Priority D) 4. Increase classified street new construction special assessment of project costs from 20% up to 40%. (Priority D) 5. Increase existing classified street lighting special assessment project costs from 20% up to 40%. (Priority D) 6. Priorities E and F will require new funding. 19
20 End of Year Carryover with Policy Changes Amount Available for Cash Carryover (Priorities A&B w/ 10% reduction to priority C & 25% reduction to priority D) In Millions $5.54 $3.41 $2.80 $ $0.06 $
City of Grand Forks Staff Report
City of Grand Forks Staff Report Committee of the Whole November 28, 2016 City Council December 5, 2016 Agenda Item: Federal Transportation Funding Request Urban Roads Program Submitted by: Engineering
More informationOur Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability.
Department of Environmental Services Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Transportation Capital
More informationChapter 7. Future Network and Implementation
Chapter 7. Future Network and Implementation Background and Overall Approach The previous Range of Alternatives Chapter provides a summary of how the Universe of Projects list was developed, which encompasses
More informationMPO Staff Report MPO EXECUTIVE BOARD: August 16, 2017
MPO Staff Report MPO EXECUTIVE BOARD: August 16, 2017 RECOMMENDED ACTION: August 30 th Open House Matter of Kick-off for 2045 Street/Highway Element Background: The UPWP identifies that the major undertaking
More informationAppendix D Total Project Cost and Year of Expenditure Breakdown
Total Project Cost and Year of Expenditure Breakdown p. D -1 Total Project Cost and Year of Expenditure Breakdown Financial Constraint Methodology using Total Project Cost and Year of Expenditure Dollars
More information10-Year Capital Highway Investment Plan DRAFT
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway
More informationCapital Investment Program (CIP) About CIP
Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The
More informationCITY OF SPOKANE VALLEY Request for Council Action
CITY OF OKANE VALLEY Request for Council Action Meeting Date: May 23, 2017 Department Director Approval: Check all that apply: consent old business new business public hearing information admin. report
More informationChapter 6: Financial Resources
Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation
More informationAmarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates
2005-30 Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates The Federal Transportation bill, the Safe Accountable, Flexible, Efficient Transportation
More informationCity of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016
City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities
More informationMnDOT Highway Construction Outlook
MnDOT Highway Construction Outlook Mark Gieseke MnDOT Office of Capital Programs & Performance Measures Minnesota Transportation Alliance November 1, 2012 MnDOT Highway Construction Outlook Forecast Accuracy
More informationTEXAS TRANSPORTATION COMMISSION
TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create
More informationFY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary
FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP
More informationLAKE~SUMTER MPO - COST FEASIBLE PROJECTS
- COST FEASIBLE PROJECTS TABLE 1 - STATE PROJECTS (STRATEGIC INTERMODAL SYSTEM / FLORIDA'S TURNPIKE / CENTRAL FLORIDA EXPRESSWAY AUTHORITY) Facility From To Project Current Year Cost Estimates M-SIS M-SIS
More information2012 Ballot Initiatives Report
2012 Ballot Initiatives Report Voters on November 6 showed once again the importance of transportation by approving 68 percent of the measures to or extend funding for highways, bridges and transit. This
More informationMPO EXECUTIVE POLICY BOARD WEDNESDAY, NOVEMBER 15 TH, :00 NOON EGF CITY HALL TRAINING CONFERENCE ROOM
MPO EXECUTIVE POLICY BOARD WEDNESDAY, NOVEMBER 15 TH, 2017 12:00 NOON EGF CITY HALL TRAINING CONFERENCE ROOM DeMers Malm Vein Mock Strandell Grasser Powers Vetter 1. CALL TO ORDER 2. CALL OF ROLL 3. DETERMINATION
More information10-Year Capital Highway Investment Plan DRAFT
10-Year Capital Highway Investment Plan DRAFT 2018-2027 DRAFT AUGUST 2017 1 Table of Contents PURPOSE OF 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN... 1 This page intentionally left blank. SUMMARY OF INVESTMENT
More informationTEXAS TRANSPORTATION COMMISSION
TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create
More informationBoulder County Countywide Transportation Sales Tax Seven Year Update DRAFT FOR PUBLIC REVIEW
Boulder County Countywide Transportation Sales Tax 2009-2024 Seven Year Update DRAFT FOR PUBLIC REVIEW April 2017 Boulder County Transportation 2007 Countywide Transportation Sales Tax 7-Year Update Summary
More informationTABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures
Alameda CTC Programs Annual Compliance Report 00 Reporting Year TABLE BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and DATE : Revised /0/ Column A Column B Column C Column D Column E Column F Column
More informationJACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N
More informationFY17 Budget Discussion
FY17 Budget Discussion Metro is Everywhere Metro is a lot more than buses and trains. Anyone who has boarded a bus or a train, driven on the freeway, used the toll roads, stopped at a traffic signal, or
More informationEast of Merle Hay Road
East of Merle Hay Road Johnston, Iowa 2017 APWA Spring Conference March 2017 Oldest neighborhood in the City Settled in 1846 Narrow rural corridor with aging or non-existent infrastructure Inadequate
More informationFFY 2009 OBLIGATED AND GRANTED PROJECTS LIST
Note: Yellow highlighted entries are bicycle and pedestrian facilities projects. CAPITOL 10 0400-0043 CON FTA SEC 5309RR RECOVERY & REINVESTMENT 10 0426-0049 ACQ FTA SEC 5307C CAPITAL 10 0426-0050 CON
More informationColumbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012)
Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012) Summary Description Proposed Project: Light Rail Transit 2.9 Miles, 5 Stations Total Capital Cost ($YOE):
More informationDRAFT PROPOSED BUDGET THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017
DRAFT PROPOSED BUDGET 2017 18 THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017 DRAFT PROPOSED BUDGET 2017 18 SCHEDULE May 2 nd Round #2 Community Development Public Works May 16 th Questions
More informationINVESTING STRATEGICALLY
11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program
More informationFY Transportation Improvement Program (TIP)
Corvallis Area Metropolitan Planning Organization (CAMPO) FY2018-2021 Transportation Improvement Program (TIP) Approved by the Corvallis Area Metropolitan Planning Organization Policy Board May 17, 2017
More informationPioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017
2017-2021 Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017 HIGHWAY AMENDMENTS FEDERAL FISCAL YEAR 2017 Part 1A: Federal Aid Target Projects Increase cost of (604033)
More informationTransportation Funding
Transportation Funding TABLE OF CONTENTS Introduction... 3 Background... 3 Current Transportation Funding... 4 Funding Sources... 4 Expenditures... 5 Case Studies... 6 Washington, D.C... 6 Chicago... 8
More informationPublic Works and Development Services
City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement
More informationCapital Budgeting and Programming
Capital Budgeting and Programming Presented by the Southern Windsor County Regional Planning Commission with support from the Vermont Agency of Commerce and Community Development and the US Department
More information~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount
CITYOFWOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rct Avenue NE, Woodinville, WA 98072 WWW.Cl.WOODINVILLE.WA.US To: Honorable City Council Date: April 5, 2016 By Thomas E Hansen P E., Public Works
More informationApproved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019
3116-151 Hwy 169 from Taconite to Pengilly, Safety Improvements 5409-32 Concrete resurface, raise grade at levee's, install lighting, improve drainage and pedestrian accessibility on Hwy 75 in Halstad
More informationI. Introduction and Background
I. Introduction and Background The purpose of the Midterm Review of the 2007 Five-Year Implementation Plan (Implementation Plan) is to provide a review of the current status of the goals, programs and
More informationTEXAS TRANSPORTATION COMMISSION
TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create
More informationRemoved Projects TR th Way SE (Snake Hill) Improvements o Will be completed in TR th Ave SE Gap Project
Agenda Bill City Council Regular Meeting June 19, 2018 SUBJECT: 2019-2024 Six-Year Transportation Improvement Plan (TIP) DATE SUBMITTED: June 12, 2018 DEPARTMENT: Public Works NEEDED FROM COUNCIL: Action
More informationMETROPOLITAN TOPEKA PLANNING ORGANIZATION TOPEKA, KANSAS
METROPOLITAN TOPEKA PLANNING ORGANIZATION TOPEKA, KANSAS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL FISCAL YEARS 2017-2020 The Metropolitan Topeka Planning Organization (MTPO) Staff prepared the Transportation
More informationFY19 Budget - Discussion. April 2018
FY19 Budget - Discussion April 2018 FY19 Proposed Budget: $6.6 Billion General Planning & Programs 3% Identify regional mobility needs and solutions Debt Service 6% Obligations from current and past projects
More informationPUBLIC WORKS - ENGINEERING
PUBLIC WORKS - ENGINEERING 4 DIVISIONS: CAPITAL IMPROVEMENT PROGRAM (CIP) TRAFFIC ENGINEERING DEVELOPMENT ENGINEERING SEWER & STORM DRAIN ENGINEERING 18 FTE s, 2 Hourly s In FY 14/15 Expended approximately
More informationOverview of Funding Sources
Overview of Funding Sources 0 Transportation 0 Transportation Sales Tax 0 License Tax 0 G.O. Bonds 0 CIP Sales Tax 0 General Fund 0 Public Safety, Facilities, Buildings 0 G.O. Bonds 0 General Fund 0 Stormwater
More informationOne-Cent for Transportation Presentation
One-Cent for Transportation Presentation Presented by: April 2019 Osceola County Countywide FY19 Adopted Budget $1,169,289,994 Includes over 75 individual Funds Restricted Funds = $641,756,014 or 55% Revenue
More informationNASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY
NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amendment Conformity Report for August 20, 2008 Amendments (Amendment # 2008-028 thru 2008-030) On August 20, 2008 the Executive Board
More informationTransportation Improvement Program
Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address
More informationMemorandum City of Lawrence City Manager s Office
Memorandum City Manager s Office TO: FROM: Date: CC: Lawrence Cultural Arts Commission Diane Stoddard, Assistant City Manager September 4, 2014 David L. Corliss, City Manager Casey Toomay, Assistant City
More informationMINUTES OF SEPTEMBER 5, 2017
CITIZENS ADVISORY COMMITTEE (CAC) SAN MATEO COUNTY TRANSPORTATION AUTHORITY (TA) 1250 San Carlos Avenue, San Carlos CA 94070 Bacciocco Auditorium, 2 nd Floor MINUTES OF SEPTEMBER 5, 2017 MEMBERS PRESENT:
More information10-Year Capital Highway Investment Plan
10-Year Capital Highway Investment Plan 2017-2026 OCTOBER 2016 1 Table of Contents PURPOSE OF 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN...1 This page intentionally left blank. SUMMARY OF INVESTMENT PLANS...6
More informationPolicy Statement No: 304 Adopted: June 2011 Category: Financial Management. Subject: Reporting Unrestricted Fund Balance in the General Fund Financial
CITY OF EL CENTRO POLICY STATEMENT Policy Statement No: 304 Adopted: June 2011 Category: Financial Management 1 Revised: Subject: Reporting Unrestricted Fund Balance in the General Fund Financial I. Purpose:
More informationAgenda. Background Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement
1 Agenda Background 2013-2014 Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement Sustainable Transportation Funding Dedicated Revenues Potential Rate Impact Clarification Proposed
More informationBRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION
BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)
More informationReview and Update of Year 2035 Regional Transportation Plan
Review and Update of Year 2035 Regional Transportation Plan #217752 1 Background Every four years, the Year 2035 Plan is reviewed Elements of review Validity of Plan Year 2035 forecasts Transportation
More informationProposed Capital Improvement Plan (CIP)
2017-2021 Proposed Capital Improvement Plan (CIP) Office of Management & Budget and Engineering & Project Management August 2, 2016 2017-2021 CIP Calendar o CIP Development Kickoff o CPWG Prioritized Requests
More informationProgramed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0
WCOG Managed WHATCOM COUNCIL OF GOVERNMENTS 2014 Transportation Improvement Program Amendment #1 (1401) MPO Financial Feasibility Summary Anticipated Federal Funding* & Programmed Expenditures (in Thousands)
More informationSKATS FY 2018-FY 2023
SKATS FY 2018-FY 2023 Metropolitan Transportation Improvement Program and Air Quality Conformity Determination PUBLIC REVIEW Salem-Keizer Area Transportation Study Cover Photos Top left: 45th Avenue NE
More informationFinancial Capacity Analysis
FINANCIAL CAPACITY ANALYSIS Introduction Federal transportation planning rules require that metropolitan area transportation plans include a financial capacity analysis to demonstrate that the plan is
More informationPlanning Board Worksession No.6: Transportation and Staging
Planning Board Worksession No.6: Transportation and Staging Prior Worksessions January 27: Focused on transportation analysis and staging recommendations in the Draft Plan. February 9: Reviewed the Executive
More informationA. Approve updated Measure R Early Action Project list (Attachment A) ; and
One Gateway Plaza Los Angeles, CA 90012-2952 213-922.2000 Te metro. net 21 PLANNING AND PROGRAMMING COMMITTEE OCTOBER 17, 2012 SUBJECT: ACTION: MEASURER 1-710 EARLY ACTION PROJECT LIST UPDATE APPROVE RECOMMENDATION
More informationFINANCIAL ACTION SUMMARY
City of Woodinville, WA Report to the City Council 17301 133 rd Avenue NE, Woodinville, WA 98072 www.ci.woodinville.wa.us To: Honorable City Council Date: 02/06/2018 By: Blaine Fritts, Finance Director;
More information2018 Budget Public Budget Consultation Meeting November 16 th, 2017
2018 Budget Public Budget Consultation Meeting November 16 th, 2017 2 1. 2018 Budget Process and Communications Plan 2. 2018 Proposed Capital Budget a. Funding Sources b. Expenditures c. Life Cycle Reserve
More information$+ 121 $+ 120 $+ 122 $+ 155 $+ 155 $+ 109 $+ 139 $+ 136 $+ 111 $+ 124 $ MINNEHAHA COUNTY TIP Projects !.!. !.!. Dell Rapids.
ST AVE TH AVE TH AVE BIG SIOUX RD TH AVE TH AVE TH AVE TH AVE TH AVE 9 9 0 Miles TH AVE $+ 0 $+ 0 TH AVE TH AVE 9 Humboldt TH ST TH AVE $+ 0 0 0-0-00 0 Construction 09 Construction 00 Construction 0 Construction
More informationInfrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007
Infrastructure Asset Management Southwest Chula Vista Civic Association April 26, 2007 Chula Vista s Municipal Infrastructure Pavement* Traffic Signals Alleys Streetlights Parking Lots Street Signs Sidewalks*
More informationHow to Read the Project Modification Listings Roadway Section
How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement
More informationHow to Read the Project Modification Listings - Roadway Section
How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation
More informationGLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.
Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding
More informationProject Description & Fund Overview Account Number Fund Name *C* September 2015 Additional Appropriation Mid-Year Adjustment Adjustments Approved by Council as separate actions Proposed & Approved Adjustments
More informationInfrastructure and Capital Projects Planning and Funding
Infrastructure and Capital Projects Planning and Funding September 6, 2018 Preview of FY 2020 2024 CIP process Why are we here? Overview Current Assets Overview and Highlights of Adopted FY 2019 2023 CIP
More informationFY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary
FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary The adopted FY 2016 FY 2020 CIP is $205.3 million (including prior year expenditures) and is $2.9 million lower than the previous CIP
More informationMETRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):
METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit
More informationTECHNICAL ADVISORY COMMITTEE MEETING WEDNESDAY, APRIL 12 TH, :30 P.M. EAST GRAND FORKS CITY HALL TRAINING ROOM
TECHNICAL ADVISORY COMMITTEE MEETING WEDNESDAY, APRIL 12 TH, 2017 1:30 P.M. EAST GRAND FORKS CITY HALL TRAINING ROOM MEMBERS Lang Laesch/Konickson West Ellis Johnson/Hanson Magnuson Bail/Emery Kuharenko/Williams/Yavarow
More informationPROCEEDINGS OF THE TECHNICAL ADVISORY COMMITTEE Wednesday, April 11 th, 2018 East Grand Forks City Hall Training Conference Room
CALL TO ORDER PROCEEDINGS OF THE East Grand Forks City Hall Training Conference Room Earl Haugen Chairman, called the April 11 th, 2018, meeting of the MPO Technical Advisory Committee to order at 1:32
More informationCAPITAL IMPROVEMENT PLAN
20192024 CAPITAL IMPROVEMENT PLAN City of Woodinville, Washington WOODINVILLE CITY COUNCIL Mayor James Evans Deputy Mayor Elaine Cook Councilmember Al Taylor Councilmember Susan BoundySanders Councilmember
More informationREPORT TO THE CAPITAL REGIONAL DISTRICT BOARD MEETING OF WEDNESDAY, SEPTEMBER 8, 2010
REPORT TO THE CAPITAL REGIONAL DISTRICT BOARD MEETING OF WEDNESDAY, SEPTEMBER 8, 2010 SUBJECT City of Victoria Request for General Strategic Priorities Funding Application Support Johnson Street Bridge
More informationCITY OF SACRAMENTO CALIFORNIA. April 27, 2012
OFFICE OF THE CITY MANAGER CALIFORNIA April 27, 2012 CITY HALL 5 th FLOOR 915 I STREET SACRAMENTO, CA 95814-2684 PH 916-808-5704 FAX 916-808-7618 Honorable Mayor and City Council Sacramento, California
More informationFY February Quarterly Revision. Bryan DISTRICT
FY 20132016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM February Quarterly Revision Bryan DISTRICT TRANSIT Administrative Amendment February 2013 BCSMPO, Final FY 20132016 TIP, FY 2013 2016 Transportation
More informationYork Region Rapid Transit Corporation Board of Directors. YRRTC 2016 Metrolinx Multi-Year Capital Expenditures Budget
Meeting of the Board of Directors on November 19, 2015 To: From: Subject: Ref: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President YRRTC 2016 Metrolinx Multi-Year Capital
More informationCIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director
PUBLIC WORKS DEPARTMENT Timm Borden, Director CITY HALL 10300 TORRE AVENUE ~ CUPERTINO, CA 95014-3266 (408) 777-3354 ~ FAX (408) 777-3333 CIP 2015-2016 Budget report of the Capital Improvement Program
More informationEVANSTON. FY 2017 Proposed Budget Presentation. Martin Lyons, Assistant City Manger / CFO Lara Biggs, City Engineer.
EVANSTON FY 2017 Proposed Budget Presentation Martin Lyons, Assistant City Manger / CFO Lara Biggs, City Engineer October 24, 2016 Administrative Services 1 FY 2017 BUDGET PRESENTATION-- October 17, 2016
More informationCITY OF SALEM FINANCIAL SUMMARY
CITY OF SALEM FINANCIAL SUMMARY Through Q2 / FY 2015-16 Financial summaries through the second quarter of each year complement development of both the five-year forecast for the General Fund and the upcoming
More informationChapter 3: Regional Transportation Finance
Chapter 3: Regional Transportation Finance This chapter examines the sources of funding for transportation investments in the coming years. It describes recent legislative actions that have changed the
More informationECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)
Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising
More informationCapital Improvements Program. City Council October 14, 2014
Capital Improvements Program City Council October 14, 2014 Neighborhood Attendees ~15 (Paul Kaspar) Presentation Today CIP Advantages/Process Approved CIP Program (FY14 - FY18 CIP) Financial Forecast Projects
More informationFY Transportation Improvement Program (TIP)
Corvallis Area Metropolitan Planning Organization (CAMPO) FY2015-2018 Transportation Improvement Program (TIP) Approved by the Corvallis Area Metropolitan Planning Organization Policy Board July 27, 2016
More informationSOUND TRANSIT RESOLUTION NO. R99-14
SOUND TRANSIT RESOLUTION NO. R99-14 A RESOLUTION of the Board of the Central Puget Sound Regional Transit Authority to reallocate $10 million (1995 dollars) from the East Everett Park and Ride Lot to the
More informationInstructions for Completing the Annual Road and Street Finance Report
Instructions for Completing the Annual Road and Street Finance Report Additional information you wish to submit may be attached to the report on 8.5" by 11" paper. Please round all amounts up or down to
More informationRecommended Capital Budget and Plan, and Proposed Capital Forecast
2009 2018 Recommended Capital Budget, Plan & Forecast 2009 2013 Recommended Capital Budget and Plan, and 2014 2018 Proposed Capital Forecast December 10, 2008 2009 2018 Staff Recommended Capital Budget
More informationIMPLEMENTATION PLAN INTRODUCTION PROJECT PACKAGES
INTRODUCTION The Implementation Plan is intended to provide the City of Berkeley a framework to define the future steps for the West Berkeley Circulation Master Plan (WBCMP). Since the objective of the
More informationDevelopment of the Cost Feasible Plan
March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development
More informationEnd-of-Session Update
End-of-Session Update Transportation Advisory Board Prepared by MnDOT, Office of Government Affairs June 21, 2017 The Sources of New Funding: Major provisions include: Dedicating Vehicle Rental Taxes,
More informationCapital Improvement Program Fund
Capital Improvement Program Fund Capital Improvement Program (CIP) Overview The Capital Improvement Program provides funding for streets, public buildings (both governmental and school facilities), land,
More informationCOUNTY OF EL DORADO ANNUAL FINANCIAL REPORT FOR THE YEAR ENDED JUNE 30, 2018
ANNUAL FINANCIAL REPORT FOR THE YEAR ENDED JUNE 30, 2018 THIS PAGE INTENTIONALLY LEFT BLANK ANNUAL FINANCIAL REPORT FOR THE YEAR ENDED JUNE 30, 2018 Table of Contents Independent Auditor s Report... 1
More informationSurface Transportation Program (STP) State Exchange Funds - Claimed and Unclaimed Funds, Fiscal Years 05/06 through FY 17/18 5/11/2018
Surface Transportation Program (STP) State Exchange Funds - and Unclaimed Funds, Fiscal Years 05/06 through FY 17/18 Buellton Unclaimed (Balance) FY 05/06 FY 06/07 FY 07/08 FY 08/09 FY 09/10 FY 10/11 FY
More informationCapital Improvement Program
218-227 Capital Improvement Program Section A Introduction Transmittal Letter A - 1 Evaluation Process A - 2 Project & Funding Charts (4 years) A - 3 Project & Funding Charts (1 years) A - 4 Pay-As-You-Go
More informationTechnical Report No. 4. Revenue and Costs
Technical Report No. 4 Revenue and Costs Technical Report No. 4 REVENUE AND COSTS PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph (727) 847-8140, fax (727)
More informationSurface Transportation Program (STP) State Exchange Funds - Claimed and Unclaimed Funds, Fiscal Years 2005/06 through FY 15/16 8/18/2016
Buellton Surface Transportation Program (STP) State Exchange Funds - and Unclaimed Funds, Fiscal Years 2005/06 through FY 15/16 FY 05/06 FY 06/07 FY 07/08 FY 08/09 FY 09/10 FY 10/11 FY 11/12 FY 12/13 FY
More informationRegion 5 Upcoming Projects for Summer/Fall 2018
Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The
More informationTHIRD QUARTER FINANCIAL REPORT September 30, 2018
THIRD QUARTER FINANCIAL REPORT September 30, 2018 2018 Cider Squeeze Introduction The 3rd Quarter 2018 Financial Report is presented here. As has been the custom in the past, the report has been prepared
More informationChapter 5: Cost and Revenues Assumptions
Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the
More informationCascade Charter Township. Capital Improvement Plan
Cascade Charter Township - Capital Improvements Plan outlines a schedule of capital expenditures for the next 6 years To be included, must be consistent with: Master Plan State/Federal Requirement Township
More information