1 Proposed Capital Improvement Plan (CIP) Office of Management & Budget and Engineering & Project Management August 2, 2016

2 CIP Calendar o CIP Development Kickoff o CPWG Prioritized Requests o CPOC Finalized CIP Funding o Finance Committee-Presentation o Public Hearing o Board Meeting - Adopt 2017 CIP o TIP/STIP Revisions Submission Revise/Amend if needed March 7 th June 3 rd July 12 th Aug. 2 th Aug. 2 nd Aug. 16 th Aug. 31 st Dec. 19 th

3 CIP Goals o Prioritize capital projects for funding in support of the Authority s Strategic Plan o Capital Project Ranking Criteria o Health and Safety o Government Mandates o State of Good Repair o Ridership/Transit Oriented Development o Operating Budget Impact o Environmental Impact

4 CIP Goals o Develop a realistic, fiscally constrained multi-year Capital Improvement Plan o Focus on State of Good Repair Projects (SOGR) o Maintain TIP/STIP process alignment w/ Federal FY o Incorporation of FAST ACT legislation o Asset Management Condition Ratings o State Safety Oversight Track Inspections o Support on-going Bus Improvement Program

5 Proposed CIP o Combined Budget Authority - $383.9 M o RTA Development Fund - $366.8 M o Bus Improvement Prog. - $98.8 M (26.9%) o Operating Expense Reimb. - $100.0 M (27.3%) o Rail & Track Bridge projects - $128.6 M (35.1%) o Other Projects - $42.4 M (10.7%) o RTA Capital Fund - $17.1 M o Asset Maintenance (Facilities Improvements) - $8.8 M o Routine Capital (Equipment & Vehicles) - $8.3 M

6 Proposed 2017 CIP Budget o Combined Budget Authority - $64.1 M o RTA Development Fund - $60.2 M o Bus Improvement Program - $12.8 M o Equipment & Vehicles - $0.67 M o Facility & Bridge Rehabilitations - $3.8 M o Operating Expense Reimbursements - $20.0 M o Rail Projects - $20.5 M o Other Projects - $2.4 M o RTA Capital Fund - $3.9 M

7 CIP (Out-Years) o RTA Development Fund - $306.6 M o Bus Garages - $7.85 M o Bus Improvement Program - $85.9 M o Equipment & Vehicles $18.9 M o Facilities & Bridge Rehabilitations $29.7 M o Operating Expense Reimbursements - $80.0 M o Rail Projects $74.7 M o Other Projects - $9.6 M

8 CIP (Out-Years) o RTA Capital Fund - $13.2 M o Asset Maintenance - $7.1 M o Small Equipment Replacements - $3.3 M o Non-Revenue Vehicle Replacement Program-$2.2 M o Other Projects $0.70M

9 CIP Issues & Challenges o FAST (Fixing America s Surface Transportation) Act Requirements o Secure Alternative Funding for Projects o Decreasing General Fund (GF) Balances o Declining Debt Service Ratio o Decreases available local funds for capital program o Sales & Use Tax Base - MMHC

10 CIP Issues & Challenges o Identify Alternative Funding Sources for Backlog of Unfunded Projects o $280 M by 2025 for Replacement Rail Cars o $74.3M HR/LR Track Reconstruction Projects o $35.9 M Replacement Buses o $13.0 M E. 79th Street ADA Reconstruction o $17.3 M Radio-CAD/AVL System Replacement o $10.3 M - Replace Light Rail Block Signals o $ 8.0 M - Light Rail Trunk Line Signals o $ 5.9 M EB Access Road Demo. & Replacement

11 Eng. & Proj. Mgmt CIP Highlights o 2016 Continuing Projects o Rail Projects o Facility Improvements o Bus Improvement Program o Projects Seeking Funding in 2017

12 Track 7 Platform

13 Tower City Escalators

14 Red Line Track S-Curve to W 117th

15 2016 Projects Continuing in 2017 o Design o East 34 th Street Station ADA Rehabilitation o Triskett CNG Upgrades o Construction o CSX/East 92 nd Track Bridge Rehabilitation o East 116 th Street Station ADA Rehabilitation o Lee-Shaker Blvd Station ADA Rehabilitation o Light Rail Grade Crossings Phase 3 o 3 Substations Puritas, West 65 th, Warrensville

16 East 34th Station

17 o Design Rail Projects o Farnsleigh Station ADA Rehabilitation o Tower City Tracks 10 and 13 o Construction o Red Line Tracks - West 74 th to West 98 th Street o Light Rail Tracks Buckeye Woodhill Station area o West Park Diamond Rehabilitation

18 Tower City Tracks Phase 1 Phase 2 Track 7 Track 8 Track 10 Track 13

19 o Design o Lorain Road Bridge Rehabilitation o Bridge Inspection Program o Tower City East Portal Concrete Repairs o Construction Facility Improvements o Cuyahoga Viaduct Concrete & Drainage Repairs

20 Bus Improvement Program o 2017 Bus Replacements o ft. CNG Vehicles for Dec 17/Jan 18 delivery o 20 Paratransit Vehicles for late 2017 delivery

21 Projects Seeking Funding o Tower City Tracks 10/13-$15.0 million TIGER 8 o Radio /CAD/AVL System o $18.0 million USDOT request o Bus Improvement Program o $47.0 million CMAQ and other requests o Capital Program Unfunded Backlog - $300 mil o Rail Car Replacement - $280 million

22 Questions & Answers August 2, 2016 Office of Management & Budget & Engineering & Project Management

23 Public Hearing & Comments

24 Request that the Committee recommend the proposed 2017 Capital Improvement Plan Budget Appropriations for approval at the August 16, 2016 Board Meeting.

PROPOSED CAPITAL IMPROVEMENT PLAN

PROPOSED CAPITAL IMPROVEMENT PLAN 2015-19 PROPOSED CAPITAL IMPROVEMENT PLAN Greater Cleveland Regional Transit Authority August 5, 2014 Office of Management & Budget and Engineering & Project Management 2015-19 CAPITAL IMPROVEMENT PLAN

More information

Proposed Capital Improvement Plan (CIP)

Proposed Capital Improvement Plan (CIP) 2018 2022 Proposed Capital Improvement Plan (CIP) Greater Cleveland Regional Transit Authority August 1, 2017 Office of Management & Budget and Engineering & Project Management Capital Budget Calendar

More information

Engineering & Project Management Division

Engineering & Project Management Division Division Summary Michael Schipper, Deputy General Manager The Engineering and Project Management Division is responsible for RTA s planning, real estate, and capital project design and construction administrative

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN 2017 2021 CAPITAL IMPROVEMENT PLAN INTRODUCTION Providing cost effective, safe, clean, and reliable public transportation services depends on the maintenance and upkeep of the Authority s capital assets.

More information

Capital Improvement Plan

Capital Improvement Plan Introduction The GCRTA Capital Improvement Plan (CIP) relates to the implementation of an Authority-wide process to maintain, upgrade, or replace, its capital assets. Effective Capital improvement planning

More information

2011 Capital Improvement Plan

2011 Capital Improvement Plan 2011 Capital Improvement Plan Introduction CIP - 1 Organization of the Capital Improvement Plan CIP - 1 Capital Assets CIP - 2 Capital Improvement Planning Cycle CIP - 8 Budget Calendar of Events CIP -

More information

Division - Engineering & Project Management

Division - Engineering & Project Management Division - Engineering & Project Management Division Summary DB - 83 Euclid Corridor Transportation Project DB - 88 Programming & Planning DB - 92 Engineering & Project Development DB - 96 DIVISION SUMMARY

More information

Capital Improvement Plan

Capital Improvement Plan Introduction The Authority s Capital Improvement Plan (CIP) relates to the implementation of an ongoing process to maintain, upgrade, or replace its capital assets to achieve a State of Good Repair (SGR).

More information

2015 Capital Improvement Plan

2015 Capital Improvement Plan 2015 Capital Improvement Plan Introduction 207 Organization of the Capital Improvement Plan 207 Capital Assets 208 Capital Improvement Planning Cycle 214 Budget Calendar of Events 215 Transportation Improvement

More information

QUARTERLY MANAGEMENT REPORT AUGUST 2017

QUARTERLY MANAGEMENT REPORT AUGUST 2017 From the CEO... 2 Financial Analysis... 4 Financial Vision... 4 Financial Indicators... 7 Capital Commitments and Expenditures...10 Performance Measures...16 Critical Success Factors...17 Second Quarter

More information

QUARTERLY MANAGEMENT REPORT FEBRUARY 2017

QUARTERLY MANAGEMENT REPORT FEBRUARY 2017 Greater Cleveland Regional Transit Authority Quarterly Management Report Fourth Quarter 2016 (revised) February 2017 4 From the CEO 4 Financial Analysis 6 Critical Success Factors 31 DBE Participation/Affirmative

More information

2017 YEAR-END FINANCIAL REPORT

2017 YEAR-END FINANCIAL REPORT 217 YEAR-END FINANCIAL REPORT The 217 Fiscal Year was another successful year for the Authority. The GCRTA received a Gold Level Award for Achievement in Excellence from The Partnership for Excellence,

More information

State of Good Repair Review

State of Good Repair Review Finance & Administration Committee Action Item IV-D October 9, 2014 State of Good Repair Review Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

FY2014 Capital and Operating Budget Discussion

FY2014 Capital and Operating Budget Discussion Finance & Administration Committee Information Item III-B December 6, 2012 FY2014 Capital and Operating Budget Discussion Page 18 of 44 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Quarterly Management Report First Quarter 2013

Quarterly Management Report First Quarter 2013 7 Quarterly Management Report First Quarter 2013 May, 2013 Greater Cleveland Regional Transit Authority Table of Contents Letter to the Board of Trustees... 1 Financial Analysis... 3 Critical Success Factors...

More information

FY2020 Budget Outlook

FY2020 Budget Outlook Finance and Capital Committee Information Item IV-A October 11, 2018 FY2020 Budget Outlook 35 of 60 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Keeping Metro Safe, Reliable and Affordable

Keeping Metro Safe, Reliable and Affordable Finance Committee Information Item III-B September 14, 2017 Keeping Metro Safe, Reliable and Affordable Washington Metropolitan Area Transit Authority Keeping Metro Safe, Reliable and Affordable 1 Purpose

More information

Notice of Public Hearing Washington Metropolitan Area Transit Authority

Notice of Public Hearing Washington Metropolitan Area Transit Authority Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B18-01: Proposed FY2019 Operating Budget and Docket B18-02: Proposed FY2019 Capital Improvement Program and Federal FY2018

More information

Quarterly Management Report Fourth Quarter 2014

Quarterly Management Report Fourth Quarter 2014 7 Quarterly Management Report Fourth Quarter 2014 February, 2015 Greater Cleveland Regional Transit Authority Table of Contents Letter to the Board of Trustees... 1 Financial Analysis... 3 Critical Success

More information

Project Description & Fund Overview Account Number Fund Name *C* September 2015 Additional Appropriation Mid-Year Adjustment Adjustments Approved by Council as separate actions Proposed & Approved Adjustments

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201958 Resolution: Yes No TITLE: Second Quarter Capital Program Update PRESENTATION SUMMARY:

More information

QUARTERLY MANAGEMENT REPORT

QUARTERLY MANAGEMENT REPORT GREATER CLEVELAND REGIONAL TRANSIT AUTHORITY QUARTERLY MANAGEMENT REPORT THIRD QUARTER 2018 Contents From the CEO... 2 Financial Analysis... 4 Financial Vision... 4 Financial Goals... 7 Capital Commitments

More information

FY2018 Third Quarter Financial Update

FY2018 Third Quarter Financial Update Finance and Committee Information Item IV-A May 10, 2018 Third Quarter Financial Update Page 30 of 53 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Quarterly Capital Progress Update

Quarterly Capital Progress Update Finance & Administration Committee Information Item IV-A September 13, 2012 Quarterly Capital Progress Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Capital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session

Capital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session Capital & Strategic Planning Committee Item III - A January 25, 2018 FY2019 Capital Budget Work Session Page 4 of 29 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

FY2017 Budget Discussion

FY2017 Budget Discussion Finance & Administration Committee Information Item IV-B November 5, 2015 FY2017 Budget Discussion Page 70 of 116 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

Operating Budget Report

Operating Budget Report Operating Budget Report MTD Operating Budget ($ in Millions) Sept-FY2012 Sept-FY2013 Variance FY13 Actual Actual Budget $ Percent $140M Operating Expenditures ($ in Millions) Revenue $ 67 $ 68 $ 71 $ (3)

More information

Financial Report - FY 2017 Year to Date May 31, 2017

Financial Report - FY 2017 Year to Date May 31, 2017 Financial Report - FY 2017 Year to Date July 19, 2017 1 Major Highlights Revenue Sales tax remittances received through YTD April 2017 are 4.2% higher than YTD April 2016 Plaza Saltillo lease income budgeted

More information

Getting Metro Back on Track

Getting Metro Back on Track NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board @NovaTransit This forum is sponsored by the Northern Virginia Transportation Commission. Learn more about

More information

SEPTA s State of Good Repair Funding Crisis

SEPTA s State of Good Repair Funding Crisis SEPTA s State of Good Repair Funding Crisis Jeffrey D. Knueppel, PE Deputy General Manager Laura J. Zale Senior Asset Management Analyst State of Good Repair Summit. March 27, 2013 The Southeastern Pennsylvania

More information

Third Quarter. October 2015

Third Quarter. October 2015 Third Quarter October 2015 Table of Contents Letter to the Board of Trustees... 1 Financial Analysis... 2 Critical Success Factors... 25 DBE Participation/Affirmative Action... 28 Engineering/Construction

More information

For Action. TTC 15-Year Capital Investment Plan & Capital Budget & Plan. Summary

For Action. TTC 15-Year Capital Investment Plan & Capital Budget & Plan. Summary For Action TTC 15-Year Capital Investment Plan & 2019 2028 Capital Budget & Plan Date: January 24, 2019 To: TTC Board From: Chief Financial Officer Summary The purpose of this report is to 1. Submit for

More information

Total Operating Activities for FY17 are $56.9 million, an increase of $5.1M or 9.8% from FY16.

Total Operating Activities for FY17 are $56.9 million, an increase of $5.1M or 9.8% from FY16. FY17 ADOPTED ANNUAL OPERATING AND CAPITAL BUDGET Valley Metro Rail, Inc. (VMR) is a public non-profit corporation whose members are the cities of Chandler, Glendale, Mesa, Phoenix, and Tempe. VMR plans,

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED 2016-2025 TTC Capital Budget Date: November 9, 2015 To: From: TTC Budget Committee Chief Executive Officer Summary The 2016-2025 Capital Budget has been prepared consistent

More information

FY2011 Budget Forum. District of Columbia. October 19, 2009

FY2011 Budget Forum. District of Columbia. October 19, 2009 FY2011 Budget Forum District of Columbia October 19, 2009 0 Meeting agenda What is Metro and what is the value of Metro service? What are the Fiscal Year 2011 budget challenges? What are the potential

More information

Approval of FY2017 Capital Budget and FY Capital Improvement Program

Approval of FY2017 Capital Budget and FY Capital Improvement Program Finance Committee Action Item III-B April 14, 2016 Approval of FY2017 Capital Budget and FY2017-2022 Capital Improvement Program Page 23 of 68 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Toronto Transit Commission

Toronto Transit Commission CAPITAL BUDGET NOTES Toronto Transit Commission 2018 2027 CAPITAL BUDGET AND PLAN OVERVIEW The Toronto Transit Commission delivers transit services with an estimated 539.4 million riders in 2018, using

More information

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000)

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000) TIP ID: 5853 Agency ID: Title: Rail Cars - Replacement, Rehabilitation, Expansion, & Enhancements Local 0/0/100 11,629 e 5,380 e 5,600 e 10,980 PRIIA 50/0/50 265,887 e 154,860 e 246,189 e 158,438 e 141,875

More information

Arlington County, Virginia

Arlington County, Virginia Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed

More information

WORKING IN THE DARK: IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY S CAPITAL PLAN

WORKING IN THE DARK: IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY S CAPITAL PLAN WORKING IN THE DARK: IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY S CAPITAL PLAN Citizens Budget Commission October 20, 2009 Overview Importance of the capital plan Scope of CBC analysis

More information

Capital Improvement Program Update

Capital Improvement Program Update Finance & Administration Committee Information Item III-A May 12, 2011 Capital Improvement Program Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

TTC Board Meeting November 28, TTC Capital Budget and Plan

TTC Board Meeting November 28, TTC Capital Budget and Plan TTC Board Meeting November 28, 2017 2018-2027 TTC Capital Budget and Plan Overview 1. 2018-2027 Capital Requirements 2. 2018 2027 Capital Budget & Plan 3. Capacity to Spend Adjustments & Unfunded Projects

More information

ADOPTED 2017 OPERATING BUDGET AND CAPITAL PROGRAM

ADOPTED 2017 OPERATING BUDGET AND CAPITAL PROGRAM 2017 Budget December 2016 ADOPTED 2017 OPERATING BUDGET AND CAPITAL PROGRAM Summary Briefing of the Adopted Operating Budgets, Two-Year Financial Plans, and Five-Year Capital Programs of the RTA, CTA,

More information

Operating Budget Report

Operating Budget Report Operating Report Operating ($ in Millions) Operating Expenditures ($ in Millions) Jun-11 Jun-12 $ Percent Revenue $ 212,640 $ 217,643 $ 214,671 $ 2,973 1% Expense $ 359,102 $ 361,882 $ 366,332 $ 4,450

More information

Financial Report Fiscal Year 2018

Financial Report Fiscal Year 2018 Financial Report Fiscal Year 2018 Year to Date September 30, 2018 1 Major Highlights Revenue Sales tax remittances received in FY2018 are 6.5% higher than FY2017 Additional $20 million in operating grants

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole November 28, 2016 City Council December 5, 2016 Agenda Item: Federal Transportation Funding Request Urban Roads Program Submitted by: Engineering

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

SFMTA 2013 Revenue Bond Board of Directors

SFMTA 2013 Revenue Bond Board of Directors SFMTA Municipal Transportation Agency Image: Market and Geary Streets, circa 1920s, Muni Centennial logo SFMTA 2013 Revenue Bond Board of Directors 09 03 2013 SAN FRANCISCO, CALIFORNIA Background In 2007,

More information

FY2018 Second Quarter Financial Update

FY2018 Second Quarter Financial Update Finance and Committee Information Item III-A February 8, 2018 Second Quarter Financial Update 4 of 52 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Operating Budget Report

Operating Budget Report Operating Budget Report Operating Budget ($ in Millions) Operating Expenditures ($ in Millions) MTD May-FY2011 May - FY2012 Variance FY12 Actual Actual Budget $ Percent $140M Revenue $ 68,140 $ 70,480

More information

2018 FUND BUDGETS ALL FUNDS

2018 FUND BUDGETS ALL FUNDS 2018 FUND BUDGETS The Authority maintains its financial books of accounts on the accrual basis of accounting, using a single enterprise fund to report the results of its operations. However, separate funds

More information

City of Laredo Capital Improvement Program (CIP) INTRODUCTION

City of Laredo Capital Improvement Program (CIP) INTRODUCTION City of Laredo Capital Improvement Program (CIP) INTRODUCTION The Capital Improvements Program (CIP) The following is a summary of the Capital Improvements Project (CIP) Program for fiscal years 2003-2007,

More information

Financial Report Fiscal Year 2018

Financial Report Fiscal Year 2018 Financial Report Fiscal Year 2018 Year to Date December 31, 2017 Presented on February 14, 2018 1 Major Highlights Revenue FY2018 sales tax revenue budgeted at 2.5% growth over FY2017 Sales tax remittances

More information

FY2017 Year-End Financial Update

FY2017 Year-End Financial Update Finance Committee Information Item III-A September 14, 2017 FY2017 Year-End Financial Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

RAC Capital Presentatition May 5, 2010

RAC Capital Presentatition May 5, 2010 RAC Capital Presentation ti May 5, 2010 Flexible Six-Year Agreement Flexible Six-Year Agreement minimum funding commitment to match Federal funds, and to annually assess availability of additional funds

More information

CalACT Expo Transit Asset Management (TAM) Plan Workshop 49 CFR 625 April 24, 2017

CalACT Expo Transit Asset Management (TAM) Plan Workshop 49 CFR 625 April 24, 2017 CalACT Expo Transit Asset Management (TAM) Plan Workshop 49 CFR 625 April 24, 2017 Poll Question 2 Today s Presentation Transit Asset Management Context and Background Final Rule Provisions Reduced burden

More information

September 2014 Monthly Financial Report PREPARED BY

September 2014 Monthly Financial Report PREPARED BY September 2014 Monthly Financial Report PREPARED BY Financial Accounting & Reporting Division City of Phoenix Monthly Financial Report September 2014 Table of Contents by Programs Page Performance Status

More information

2019 CAPITAL BUDGET BRIEFING NOTE State of Good Repair (SOGR) Backlog

2019 CAPITAL BUDGET BRIEFING NOTE State of Good Repair (SOGR) Backlog BN#13 Feb 13 Josie La Vita Executive Director Heather Taylor Chief Financial Officer and Treasurer Financial Planning Division City Hall, 7 th Floor, East Tower 100 Queen Street West Toronto, Ontario,

More information

Washington Metropolitan Area Transit Authority Metro Budget Overview

Washington Metropolitan Area Transit Authority Metro Budget Overview Washington Metropolitan Area Transit Authority Metro Budget Overview February 2011 Metro 10,877 Employees (10,974 budgeted) 1,491 Buses 588 Escalators and 237 Elevators 106 Miles of Track 92 Traction Power

More information

Municipal Transportation Agency FY Capital Improvement Program Balboa Park. Balboa Park Citizen s Advisory Committee April 22, 2014

Municipal Transportation Agency FY Capital Improvement Program Balboa Park. Balboa Park Citizen s Advisory Committee April 22, 2014 Municipal Transportation Agency FY 2015 2019 Capital Improvement Program Balboa Park Balboa Park Citizen s Advisory Committee April 22, 2014 Presentation Outline Overview of the MTA s 5-Year CIP Proposal

More information

Operating Budget Report

Operating Budget Report Operating Budget Report MTD Operating Budget ($ in Millions) Oct-FY2012 Oct-FY2013 Variance FY13 Actual Actual Budget $ Percent $140M Operating Expenditures ($ in Millions) Revenue $ 67 $ 70 $ 79 $ (8)

More information

PROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority.

PROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority. PROPOSED FISCAL YEAR 2011 BUDGET Testimony of Richard Sarles, General Manager Washington Metropolitan Area Transit Authority Before the Council of the District of Columbia Committee on Public Works and

More information

VALLEY METRO RAIL FY18 Budget EXECUTIVE SUMMARY

VALLEY METRO RAIL FY18 Budget EXECUTIVE SUMMARY VALLEY METRO RAIL FY18 Budget EXECUTIVE SUMMARY FY18 ADOPTED ANNUAL OPERATING AND CAPITAL BUDGET Valley Metro Rail, Inc. (VMR) is a public non-profit corporation whose members are the cities of Chandler,

More information

Recommended Capital Budget and Plan, and Proposed Capital Forecast

Recommended Capital Budget and Plan, and Proposed Capital Forecast 2009 2018 Recommended Capital Budget, Plan & Forecast 2009 2013 Recommended Capital Budget and Plan, and 2014 2018 Proposed Capital Forecast December 10, 2008 2009 2018 Staff Recommended Capital Budget

More information

January 2015 Monthly Financial Report PREPARED BY

January 2015 Monthly Financial Report PREPARED BY January 2015 Monthly Financial Report PREPARED BY Financial Accounting & Reporting Division City of Phoenix Monthly Financial Report January 2015 Table of Contents by Programs Page Performance Status

More information

Capital Improvement Program Fund

Capital Improvement Program Fund Capital Improvement Program Fund The Capital Improvement Program Fund provides funding for streets, public buildings (both governmental and school facilities), land, and other capital assets. Capital Improvement

More information

RIDOT The Ten Year Plan, Asset Management, and Innovation Moving Ahead in the 21 st Century

RIDOT The Ten Year Plan, Asset Management, and Innovation Moving Ahead in the 21 st Century RIDOT The Ten Year Plan, Asset Management, and Innovation Moving Ahead in the 21 st Century Accent image here Rhode Island Bar Association Environmental and Energy Law Committee (EELC) February 16, 2018

More information

JULY 17, 2018 FINAL AGENDA SENIOR CITIZEN AND DISABLED RESIDENT TRANSPORTATION ADVISORY COMMITTEE REPORT (NEXT SCHEDULED REPORT DECEMBER 2018)

JULY 17, 2018 FINAL AGENDA SENIOR CITIZEN AND DISABLED RESIDENT TRANSPORTATION ADVISORY COMMITTEE REPORT (NEXT SCHEDULED REPORT DECEMBER 2018) NEW JERSEY TRANSIT CORPORATION NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT MORRIS, INC. REGULARLY SCHEDULED BOARD OF DIRECTORS MEETINGS JULY 17,

More information

City Council Budget Work Session. City of McKinney August 4, 2017

City Council Budget Work Session. City of McKinney August 4, 2017 City Council Budget Work Session City of McKinney August 4, 2017 Agenda Budget Process & FY18 Overview Property Tax General Fund Revenues & Expenditures Capital Improvements Program Debt Service Water

More information

GM/CEO s Proposed FY2020 Budget

GM/CEO s Proposed FY2020 Budget Finance and Capital Committee Information Item IV-A November 1, 2018 GM/CEO s Proposed FY2020 Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Amend FY 2006 Infrastructure Renewal Program

Amend FY 2006 Infrastructure Renewal Program Washington Metropolitan Area Transit Authority Amend FY 2006 Infrastructure Renewal Program Budget Committee December 8, 2005 Purpose That the Budget Committee approve and forward to the Board for approval

More information

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s): METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit

More information

RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning

RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning Land & Water Conservation Summit March 10, 2012 Statewide Planning Framework Department of Administration Statewide Planning Program State Planning

More information

2011 Citizens' Summary

2011 Citizens' Summary 2011 Citizens' Summary Transmittal Letter Executive Summary TL - 1 A Strategic Approach to the Budget TL - 4 Program and Project Initiatives TL - 5 Fare Structure TL - 6 General Fund TL - 7 Service Levels

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

- II OPERATING BUDGET REPORT ^ H FY2013 ^^ H. ««-ms. I ~?j i... \6.3 j^^^^^^ YTD OVERTIME BUDGET VS ACTUAL ($ in Millions) 1

- II OPERATING BUDGET REPORT ^ H FY2013 ^^ H. ««-ms. I ~?j i... \6.3 j^^^^^^ YTD OVERTIME BUDGET VS ACTUAL ($ in Millions) 1 OPERATING BUDGET REPORT ^ H FY2013 ^^ H OPERATING BUDGET($ in Millions) MTD Revenue Expense Subsidy Cost Recovery YTD Revenue Expense Subsidy Cost Recovery Jan-FY2012 Jan-FY2013 Variance FY13 Actual Actual

More information

Executive Summary - Fiscal Year 2016 Valley Metro Rail Preliminary Annual Operating and Capital Budget

Executive Summary - Fiscal Year 2016 Valley Metro Rail Preliminary Annual Operating and Capital Budget Executive Summary - Fiscal Year 2016 Valley Metro Rail Preliminary Annual Operating and Capital Budget Valley Metro Rail, Inc. (VMR) is a public non-profit corporation whose members are the cities of Chandler,

More information

Next Capital Funding Agreement

Next Capital Funding Agreement Finance & Administration Committee Action Item II-A April 22, 2010 Next Capital Funding Agreement The Next Capital Funding Agreement and the 2011-2016 Capital Program Finance and Administration Committee

More information

SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011

SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011 MEMORANDUM SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011 FROM: DGMA/CFO - Carol Dillon Kissa TO: GM/CEO - Richard Sarles A I am enclosing for your review the October financial report.

More information

City Budget Union Station Capital Budget Analyst Notes

City Budget Union Station Capital Budget Analyst Notes City Budget 2012 Union Station Capital Budget Analyst Notes The City of Toronto's budget is presented by program and service, in Analyst Note format. The City's Capital Budget funds major infrastructure.

More information

Governor s FY 2017 Revised, FY 2018 and Capital Budget Recommendations House Finance Committee April 12, 2017

Governor s FY 2017 Revised, FY 2018 and Capital Budget Recommendations House Finance Committee April 12, 2017 Governor s FY 2017 Revised, FY 2018 and Capital Budget Recommendations House Finance Committee April 12, 2017 Quasi-public agency Established in 1964 Responsible: Fixed route bus service and Americans

More information

EXECUTIVE DIVISION MISSION STATEMENT STRATEGIC PLAN CHANGE INITIATIVES & SCORECARD MEASURES

EXECUTIVE DIVISION MISSION STATEMENT STRATEGIC PLAN CHANGE INITIATIVES & SCORECARD MEASURES EXECUTIVE DIVISION MISSION STATEMENT The Mission of the Executive Division is to plan, execute, and manage the efficient, effective, safe, and courteous delivery of quality public transportation services

More information

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun REVENUE AND RIDERSHIP 4th Quarter FY2014 REVENUE (in Millions) $90M $85M $80M $75M $70M $65M $60M $55M $50M 79 77 74 74 72 70 FY2013 Actual FY2014 Budget FY2014 Actual 79 85 78 78 77 67 66 70 59 67 65

More information

RESOLUTION ALLOCATING $5,820,000 IN PROP K FUNDS, WITH CONDITIONS, FOR

RESOLUTION ALLOCATING $5,820,000 IN PROP K FUNDS, WITH CONDITIONS, FOR BD091217 RESOLUTION NO. 18XX RESOLUTION ALLOCATING $5,820,000 IN PROP K FUNDS, WITH CONDITIONS, FOR THIRTEEN REQUESTS WHEREAS, The Transportation Authority received thirteen requests for a total of $5,820,000

More information

Transportation Funding

Transportation Funding Transportation Funding TABLE OF CONTENTS Introduction... 3 Background... 3 Current Transportation Funding... 4 Funding Sources... 4 Expenditures... 5 Case Studies... 6 Washington, D.C... 6 Chicago... 8

More information

CALTRAIN CAPITAL IMPROVEMENT PROGRAM

CALTRAIN CAPITAL IMPROVEMENT PROGRAM Item 6 Enclosure Board November 13, 2018 2019 PROPOSITION K 5-YEAR PRIORITIZATION PROGRAM CALTRAIN CAPITAL IMPROVEMENT PROGRAM Pending Board Approval: November 27, 2018 Prepared for the San Francisco County

More information

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM TO: FROM: NOACA Board of Directors Grace Gallucci, Executive Director DATE: October 3, 2014 RE: Resolution No. 2014-045 Plan and TIP Amendments 1

More information

Getting Metro Back on Track

Getting Metro Back on Track NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board This forum is sponsored by the Northern Virginia Transportation Commission. It is separate and distinct

More information

City of Glendale, Arizona Pavement Management Program

City of Glendale, Arizona Pavement Management Program City of Glendale, Arizona Pavement Management Program Current Year Plan (FY 2014) and Five-Year Plan (FY 2015-2019) EXECUTIVE SUMMARY REPORT December 2013 TABLE OF CONTENTS TABLE OF CONTENTS I BACKGROUND

More information

Capital Budget Summary Capital Funding Summary

Capital Budget Summary Capital Funding Summary 2017-2018 Capital Summary 2017 2018 2017 + 2018 JOHN GLENN INTERNATIONAL $39,524,297 $61,796,179 $101,320,476 INDUSTRIAL DEVELOPMENT $2,724,933 $913,792 $3,638,724 RICKENBACKER $11,060,635 $12,526,122

More information

Los Angeles County Metropolitan Transportation Authority (MTA)

Los Angeles County Metropolitan Transportation Authority (MTA) Los Angeles County Metropolitan Transportation Authority (MTA) Agency Introduction March 9, 2012 Overview > MTA Role: Planning Construction Operation/Maintenance > 1,433 square-mile service area > Clean-air

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 2nd Quarter FY2017: October 1 December 31, 2016 Prepared for the March 1, 2017 SamTrans Board Meeting San Mateo County Transit District San Mateo County Transit

More information

PRESENTATION TITLE TRANSLINK ASSET MANAGEMENT PROJECT. Title sub text if required. Vikki Kwan, TransLink

PRESENTATION TITLE TRANSLINK ASSET MANAGEMENT PROJECT. Title sub text if required. Vikki Kwan, TransLink TRANSLINK ASSET MANAGEMENT PROJECT Vikki Kwan, TransLink vikki.kwan@translink.ca Chris Lombard, AECOM christiaan.lombard@aecom.com May 6 th, 2013 Agenda Introduction to TransLink Title Study sub text Background

More information

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY QUALITY TRANSPORTATION SUMMARY Quality Transportation Overview... 126 Department of Transportation... 127 Traffic Field Operations... 129 Winston-Salem Transit Authority... 131 Quality Transportation Non-Departmental...

More information

CHAPTER 7: Financial Plan

CHAPTER 7: Financial Plan CHAPTER 7: Financial Plan Report Prepared by: Contents 7 FINANCIAL PLAN... 7-1 7.1 Introduction... 7-1 7.2 Assumptions... 7-1 7.2.1 Operating Revenue Assumptions... 7-2 7.2.2 Operating Cost Assumptions...

More information

Report by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Finance and Administration Committee (B) 01-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201701 Resolution: Yes No TITLE:

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET CITY OF PLACERVILLE ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET 2014/2015 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with limited

More information

Grand Forks Transportation Overview 10 Year Outlook Anticipated Needs

Grand Forks Transportation Overview 10 Year Outlook Anticipated Needs Grand Forks Transportation Overview 10 Year Outlook Anticipated Needs CITY OF GRAND FORKS February 27, 2017 Allen Grasser, City Engineer of the City of Grand Forks 1 National Highway System (NHS) 2 Funding/Needs

More information