2 WE, THE UNDERSIGNED, being the duly qualified and acting President and Secretary respectively, of the Board of Trustees of the Santa Ynez River Water Conservation District, Improvement District No. 1, do hereby certify that the above and foregoing resolution was adopted and passed by the Board of Trustees at a Regular meeting held on the 20th day of December, 2016, by the following roll call vote: AYES, in favor thereof, Trustees: Harlan Burchardi Kevin Walsh Michael Burchardi Jeff Clay NOES, Trustees: ABSENT, Trustees: ATTEST: 1t1 ~}~!- J [) };.{.J J I Q)i.J/5/U( M~torte, ~~etary to the Board of Trustees None Brad Joos $u~1~ Kevin Walsh, President

3 APPENDIX C INSTALLATION AND CAPITAL FACILITIES CHARGES PURSUANT TO ARTICLE 6, SECTION 603 (Effective ) Lot Size Minimum Meter Size Maximum Flow Rate Ratio to 5/8" meter Capital Facilities Charge Installation Charge 10,000 sq. ft. 5/ $ 3, The meter and 10,000 sq. ft. to 1 acre 3/4" , service installation charge shall equal >1 to 3 acres 1" , the cost of >3 to 5 acres 1½ " , installation as >5 to 10 acres 2" , determined by Above 10 acres 3" , the District from 4" 1, , time to time 6" 2, , " 3, , For parcels with multiple Domestic or Rural Residential meters, the meter sizes (e.g. 5/8 and 1 inch) may be added to result in a combined equivalent size that satisfies the minimum meter size requirements.

4 APPENDIX D CAPITAL FACILITIES CHARGES AND METER INSTALLATION FEES FOR SERVICES FROM MAIN EXTENSIONS PURSUANT TO ARTICLE 7, SECTION 709 (Effective ) Lot Size Minimum Meter Size Capital Facilities Charge Meter Installation Fee Total 10,000 Sq. Ft. 5/8-3/4 $3, $ $ 4, >10,000 to 1 acre 3/4" 4, , >1 to 3 acres 1" 7, , >3 to 5 acres 1-1/2" 15, , >5 to 10 acres 2" STD 24, , , CPBM 24, , , Above 10 acres 3" STD 48, , , CPBM 48, , ,196.86

5 Establish base increase: Divide current ENR Construction Cost Index (October of each year) by base ENR Index ( from April 1993) to determine current index ratio. Multiply current index ratio by base 5/8" meter CFC of $1,870. Meter Maximum Ratio to Base Current Index Ratio: Base 5/8" New CFC: 2016 CFC Size Flow Rate 5/8" Meter* Index** Index*** (Current/Base) CFC**** (Base CFC x Ratio) CFC Increase 5/8" $1,870 $ 3, $ 3, $ Establish incremental increases: Use ratio to 5/8" meter to multiply by new base 5/8" meter CFC above. Meter Maximum Ratio to CFC Size Flow Rate 5/8" Meter (Base CFC x Ratio) CFC Increase 3/4" $ 4, $ 4, $ " $ 7, $ 7, $ /2" $ 15, $ 14, $ " $ 24, $ 23, $ " $ 48, $ 46, $ 1, " 1, $ 67, $ 65, $ 2, " 2, $ 150, $ 145, $ 5, " 3, $ 240, $ 232, $ 8, * Ratio to 5/8" meter: Referenced below ** Base Index: Engineering News Record 20-City average Construction Cost Index (April 1993) = Source: District Water Rate Study and Financing Plan, October 1993, Bartle Wells Associates *** Current Index: Current ENR 20-City average Construction Cost Index (use first week of October of each **** Base 5/8" CFC: $1,870 for 5/8" meter as set forth in above-referenced Water Rate Study

6 Improvement District No. 1 Meter Cost ONLY. Meter Meter Meter Only Tax Total Additional Parts Parts Tax Parts Labor Total Meter Cap. Fac. Grand Size Type Cost* 8.00% Meter Only Required** Cost 8.00% Total Cost*** Install. Cost Charge Total 5/8" Standard $ $ $ J /8" Ball Valve $ $ 2.94 $ $ $ $ 3, $ 4, /4" Standard $ $ $ J /4" Ball Valve $ $ 4.64 $ $ $ $ 4, $ 4, " Standard $ $ $ J " Ball Valve $ $ 6.80 $ $ $ $ 7, $ 7, /2" Standard $ $ $ J-1913W 1-1/2" Ball Valve $ $ $ $ $ $ 15, $ 15, " Standard $ $ $ J-1913W 2" Ball Valve $ $ $ $ $ 1, $ 24, $ 25, " Compound Body $ 1, $ $ 1, J-1913W 2" Ball Valve $ $ $ FL 36x6 Extension $ $ 4.51 $ $ $ $ 2, $ 24, $ 26, " Standard $ 1, $ $ 1, A Flanged x MJ $ $ $ Resilient Wedge Valve Bolt & Gasket Kit $ 5.00 $ 0.40 $ 5.40 $ $ $ 2, $ 48, $ 50, " Compound Body $ 2, $ $ 2, A Flanged x FLG $ $ $ Resilient Wedge Valve Bolt & Gasket Kit $ 5.00 $ 0.40 $ 5.40 $ $ $ 3, $ 48, $ 51, " Standard $ 2, $ $ 2, A MJ x MJ $ $ $ Resilient Wedge Valve Bolt & Gasket Kit $ 5.00 $ 0.40 $ 5.40 $ $ $ 3, $ 67, $ 71, " Compound Body $ 3, $ $ 3, " Mueller Gate Valve $ $ $ Resilient Wedge Valve Bolt & Gasket Kit $ 5.00 $ 0.40 $ 5.40 FLG x FLG $ $ $ 4, $ 67, $ 72, * Meter Costs: SRII/TRPL (or for 3": Omni T2 w/screen & touch-read) Prices per Invensys/Sensus Technologies - Aqua Metric ** Parts Costs: Per District's material suppliers *** Labor Costs: Two hours of Average (between highest and lowest) field crew hourly rate including benefits Page 2

7 APPENDIX 'C' SHORT SIDE SERVICE AND METER INSTALLATION AND CAPITAL FACILITIES CHARGES 1" 5/8" 1-8"x1" Saddle (J-979) $ " J-1929 Corp Ball Valve $ " Instatite Adaptor (I.P.S) $ " Straight Coupling (H-15456) $ " Angle Meter Stop (J-1966W) $ ' - 1" IPS SDR7 200# Poly $ ' - #12 Coated Copper $ Christy Fiber Lite Meter Box (FL-9) $ Christy Meter Box Lid (FL-9D) $ J1908 Customer Service Valve 3/4" $ " Copper Ring $ Mortor (60 lb.) $ 5.39 Sub-total $ % $ Total Parts Cost $ $ 2, $ 3, $ $ 3, $ 3, $ 7, " 3/4" Same Parts as 1"x 5/8" above $ $ 2, $ 3, $ $ 3, $ 4, $ 8, " 1" Same Parts as 1"x 3/4" except 1" Cust. Valve and Meter Box $ $ 2, $ 3, $ $ 3, $ 7, $ 11, " Two 1-8"x 2" Saddle (J-979) $ Double 5/8" 1-1" J-1929 Corp Ball Valve $ Service 2-1" Instatite Adaptor (I.P.S) $ Manifold 1-1" Straight Coupling (H-15456) $ "x3/4"x3/4" bronze branch connector J-2204 $ /4" Angle Meter $92.00 ea (J-1966W) $ ' - 1" IPS SDR7 200# Poly $ ' - #12 Coated Copper $ Christy Fiber Lite Meter Box (FL-36) $ Christy Meter Box Lid (FL-36D) $ J1908 Customer Service Valve $58.00 ea $ " Copper Ring $ Mortor (60 lb.) $ Sub-total $ $ Total Parts Cost $ $ 2, $ 3, $ $ 4, $ 7, $ 11, * Prices Per District's Material Suppliers ** Installation Based on Actual Hours Page 3 3/2/2017

8 APPENDIX 'C' SHORT SIDE SERVICE AND METER INSTALLATION AND CAPITAL FACILITIES CHARGES 2" 1-1/2" 1-8"x1" Saddle (J-979) $ " Corp. Stop (H-9969) $ Sch. 80 FIP $14.00 ea $ " Sch elbow $ "x4" Brass Nipple $ " Angle Meter Stop (H-14286) $ Christy Fiber Lite Meter Box (FL-36) $ Christy Meter Box Lid (FL-36D) $ J1913 Customer Service Valve 1-1/2" $ ' - 2" Sch. 80 PVC 1.13 /l.f. $ ' - #12 Coated Copper $ Mortor (60 lb.) $ 5.39 Sub-total $ % $ Total Parts Cost $ 1, $ 2, $ 3, $ $ 4, $ 15, $ 19, " 2" Same Parts as above except 2" Customer Valve $ 1, $ 2, $ 3, $ 1, $ 4, $ 24, $ 29, Compound Body Meter 2" 2" Same Parts as above standard meter $ 1, FL 36"x6" Extension ($ $4.51 tax) $ Total Parts Cost $ 1, $ 2, $ 3, $ 2, $ 5, $ 24, $ 30, * Prices Per District's Material Suppliers ** Installation Based on Actual Hours Page 4 3/2/2017

9 APPENDIX 'C' LONG SIDE SERVICE AND METER INSTALLATION AND CAPITAL FACILITIES CHARGES 1" 5/8" 1-8"x1" Saddle (J-979) $ " Corp. Stop (J-1929) $ " Instatite Adaptor (I.P.S) $ " Straight Coupling (H-15456) $ " Angle Meter Stop (J-1996W) $ ' - 1" IPS SDR7 200# Poly $ ' - #12 Coated Copper $ Christy Fiber Lite Meter Box (FL-9) $ Christy Meter Box Lid (FL-9D) $ J1908 Customer Service Valve 3/4" $ " Copper Ring $ Morter (60 lb.) $ 5.39 Sub-total $ % $ Total Parts Cost $ $ 6, $ 6, $ $ 7, $ 3, $ 10, " 3/4" Same Parts as 1"x 5/8" above $ $ 6, $ 6, $ $ 7, $ 4, $ 11, " 1" Same Parts as 1" x 3/4" except 1" Cust. Valve & Meter Box $ $ 6, $ 6, $ $ 7, $ 7, $ 14, " Two 1-8"x1" Saddle (J-979) $ Double 5/8" 1-1" Corp. Stop (J-1929) $ Service 2-1" Instatite Adaptor (I.P.S) $ Manifold 1-1" Straight Coupling (H-15456) $ "x3/4"x3/4" bronze branch connector J-2204 $ /4" Angle Meter $92.00 ea J-1966W $ ' - 1" IPS SDR7 200# Poly $ ' - #12 Coated Copper $ Christy Fiber Lite Meter Box (FL-36) $ Christy Meter Box Lid (FL-36D) $ J1908 Customer Service Valve 3/4" ($58.00 ea) $ " Copper Ring $ Morter (60 lb.) $ Sub-total $ % $ Total Parts Cost $ $ 6, $ 7, $ $ 7, $ 7, $ 15, * Prices Per District's Material Suppliers ** Installation Based on Actual Hours Page 5 3/2/2017

10 APPENDIX 'C' LONG SIDE SERVICE AND METER INSTALLATION AND CAPITAL FACILITIES CHARGES 2" 1-1/2" 1-8"x2" Saddle (J-979) $ " Corp. Stop (H-9969) $ Sch. 80 FIP $14.00 ea $ " Sch elbow $ "x4" Brass Nipple $ " Angle Meter Stop (H-14286) $ Christy Fiber Lite Meter Box (FL-36) $ Christy Meter Box Lid (FL-36D) $ J1913 Customer Service Valve 1-1/2" $ ' - 2" Sch. 80 PVC 1.13/l.f. $ ' - #12 Coated Copper $ Morter (60 lb.) $ 5.39 Sub-total $ 1, % $ Total Parts Cost $ 1, $ 6, $ 7, $ $ 8, $ 15, $ 23, " 2" Same Parts as above except 2" Customer Valve $ 1, $ 6, $ 7, $ 1, $ 8, $ 24, $ 32, Compound Body Meter 2" 2" Same Parts as above standard meter $ 1, FL 36"x6" Extension ($ $4.51 tax) $ Total $ 1, $ 6, $ 7, $ 2, $ 9, $ 24, $ 33, * Prices Per District's Material Suppliers ** Installation Based on Actual Hours Page 6 3/2/2017

11 APPENDIX 'C' BORING SERVICE AND METER INSTALLATION COSTS 1" 5/8" 1-8"x1" Saddle (J-979) $ " Corp. Stop (J-1929) $ " Instatite Adaptor (I.P.S) $ " Straight Coupling (H-15456) $ " Angle Meter Stop (J-1996W) $ ' - 1" IPS SDR7 200# Poly $ ' - #12 Coated Copper $ Christy Fiber Lite Meter Box (FL-9) $ Christy Meter Box Lid (FL-9D) $ J-1908 Customer Service Valve 3/4" $ " Copper Ring $ Morter (60 lb.) $ 5.39 Sub-total $ % $ Total Parts Cost $ T&M Basis $ $ $ $ 3, $ 4, " 3/4" Same Parts as 1"x5/8" above $ T&M Basis $ $ $ $ 4, $ 5, " 1" Same Parts as 1"x 3/4" except 1" Cust. Valve and Meter Box $ T&M Basis $ $ $ 1, $ 7, $ 8, " Two 1-8"x1" Saddle (J-979) $ Double 5/8" 1-1" Corp. Stop (J-1929) $ Service 2-1" Instatite Adaptor (I.P.S) $ Manifold 1-1" Straight Coupling (H-15456) $ "x3/4"x3/4" bronze branch connector J-2204 $ /4" Angle Meter $92.00 ea J-1966W $ ' - 1" IPS SDR7 200# Poly $ ' - #12 Coated Copper $ Christy Fiber Lite Meter Box (FL-36) $ Christy Meter Box Lid (FL-36D) $ J1908 Customer Service Valve 3/4" ($58.00 ea) $ " Copper Ring $ Morter (60 lb.) $ Sub-total $ % $ Total Parts Cost $ T&M Basis $ $ $ 1, $ 7, $ 9, * Prices Per District's Material Suppliers ** Installation Based on Actual Hours and Actual Costs Page 7 3/2/2017

12 APPENDIX 'C' BORING SERVICE AND METER INSTALLATION COSTS 2" 1-1/2" 1-8"x2" Saddle (J-979) $ " Corp. Stop (H-9969) $ Sch. 80 FIP $14.00 ea $ " Sch elbow $ "x4" Brass Nipple $ " Angle Meter Stop (H-14286) $ Christy Fiber Lite Meter Box (FL-36) $ Christy Meter Box Lid (B-36P) $ J1913 Customer Service Valve 1-1/2" $ ' - 2" Sch. 80 PVC 1.13/l.f. $ ' - #12 Coated Copper $ Morter (60 lb.) $ 5.39 Sub-total $ 1, % $ Total Parts Cost $ 1, T&M Basis $ 1, $ $ 1, $ 15, $ 16, " 2" Same Parts as above except 2" Customer Valve $ 1, T&M Basis $ 1, $ 1, $ 2, $ 24, $ 26, Compound Body Meter 2" 2" Same Parts as above standard meter $ 1, FL 36"x6" Extension ($ $4.51 tax) $ Total $ 1, T&M Basis $ 1, $ 2, $ 3, $ 24, $ 27, * Prices Per District's Material Suppliers ** Installation Based on Actual Hours and Actual Costs Page 8 3/2/2017

13 Santa Ynez River Water Conservation Disrict, Improvement District No. 1 Short Side Water Service Installation Backhoe and Equipment Costs Day(s) Job Description Hours $ Rate w/benefits Total Day 1 Backhoe + Operator 7.00 $ $ Dump Truck + Operator 4.00 $ $ Operations Technician 3.00 $ $ Operations Technician 7.00 $ $ Labor Foreman 4.00 $ $ Sub Total $ 2, Day 2 Operations Technician 2.00 $ $ Operations Technician 2.00 $ $ $ Item Job Description Unit Costs Total SBCO Encroachment Permit 1 $ $ Trench Plates/5 days 3 $ $ Sand Bedding and Shading 5 $ $ (Backfill trench zone) Sub Total $ Total Cost $ 2, Water service installation using typical procedures for a short side installation. This reflects labor only and the equipment to perform the installation. Parts and materials are separate. Page 9

14 Santa Ynez River Water Conservation District, Improvement District No. 1 Long Side Water Service Installation Labor and Equipment Costs Days Job Description Hours $ Rate w/benefits Total Day 1 Operations Technician 2 $ $ Operations Technician 2 $ $ Concrete Saw $ Sub Total $ Day 2 Backhoe+ Operator 7 $ $ Dump Truck + Operator 7 $ $ Op Tech - Traffic Control 7 $ $ Op Tech - Traffic Control 7 $ $ Foreman 4 $ $ Sub Total $ 2, Day 3 Backhoe+ Operator 4 $ $ Op Tech - Traffic Control 2 $ $ Op Tech - Traffic Control 2 $ $ Operations Technician 2 $ $ Operations Technician 2 $ $ Sub Total $ Item Job Description Unit Costs Total SBCO Encroachment Permit 1 $ Trench Plates - 5 days 3 $ $ Slurry Mix - Backfill/Yd 4 $ $ Slurry Mix - Delivery 1 $ $ Contract Paving $ 1, $ 1, Sand $21.20 Per Yard 7 $ $ Sub Total $ 2, Total Cost $ 6, Water service installation using a typical road cut. This reflects labor only and the equipment to perform the installation. Parts and materials are separate. Page 10

15 Santa Ynez River Water Conservation District, Improvement District No. 1 Boring - Long Side Water Service Installation (Labor Only - Installation Only) Days Job Description Hours $ Rate w/benefits Total Day 1 Backhoe+ Operator 7.00 $ $ Dump Truck + Operator 4.00 $ $ Operations Technician 7.00 $ $ Operations Technician 3.00 $ $ Labor Foreman 3.00 $ $ Sub Total $ 2, Day 2 Backhoe+ Operator 4.00 $ $ Op Tech 4.00 $ $ Sub Total $ Item Job Description Unit Costs Total SBCO Encroachment Permit 1 $ Boring Contractor Time & Materials Based on actual cost.* $ - Fill Sand 4 $ $ Sub Total $ Total Cost $ 2, *Water service installation using boring method is based on a time and materials basis at actual cost. This reflects labor only and the equipment to perform the installation. Parts and materials are separate. Page 11

RESOLUTION No WHEREAS, a capital facilities charge is a key element in the District's overall financing plan; and

RESOLUTION No WHEREAS, a capital facilities charge is a key element in the District's overall financing plan; and RESOLUTION No. 771 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE SANTA YNEZ RIVER WATER CONSERVATION DISTRICT, IMPROVEMENT DISTRICT N 0. 1 APPROVING THE ATTACHMENT OF APPENDIX "C" AND APPENDIX "D" THE AUTOMATIC

More information

CITY OF GALESBURG. PURCHASING 55 W Tompkins St Galesburg, IL Phone: (309)

CITY OF GALESBURG. PURCHASING 55 W Tompkins St Galesburg, IL Phone: (309) CITY OF GALESBURG PURCHASING 55 W Tompkins St Galesburg, IL 61401 Phone: (309) 345-3678 INVITATION FOR BIDS For the purchase of various water main materials to be used for N. Seminary St. improvements

More information

CITY OF HUTCHINSON SEALED BID FORM Page 1 of 3

CITY OF HUTCHINSON SEALED BID FORM Page 1 of 3 CITY OF HUTCHINSON SEALED BID FORM Page 1 of 3 Please quote your delivered prices to the City of Hutchinson on items or services listed below. Consult attached minimum and general specifications for requirements.

More information

BID TABULATION BID REQUEST NO

BID TABULATION BID REQUEST NO BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Ø mm. SYSTEM KAN-therm. High quality for reasonable price TECHNOLOGIA SUKCESU ISO 9001

Ø mm. SYSTEM KAN-therm. High quality for reasonable price TECHNOLOGIA SUKCESU ISO 9001 Ø 16 110 mm SYSTEM KAN-therm PP High quality for reasonable price TECHNOLOGIA SUKCESU System KAN-therm PP - assortment pipe PN10 (S5/SDR11) GROUP: L 20 1,9 1229 202002 04000120 4/200 m 25 2,3 1229 202004

More information

BOPU RESOLUTION NO

BOPU RESOLUTION NO BOPU RESOLUTION NO. 2009 - ENTITLED: "A RESOLUTION APPROVING REVISED TAP FEES, WATER AND SEWER SYSTEM DEVELOPMENT FEES, PUMP STATION AND RELATED FEES SET BY THE BOARD OF PUBLIC UTILITIES." WHEREAS, the

More information

VILLAGE COMMUNITY DEVELOPMENT DISTRICTS PURCHASING DEPARTMENT 940 LAKESHORE DRIVE, SUITE 200 THE VILLAGES, FLORIDA PHONE: (352) * FAX:

VILLAGE COMMUNITY DEVELOPMENT DISTRICTS PURCHASING DEPARTMENT 940 LAKESHORE DRIVE, SUITE 200 THE VILLAGES, FLORIDA PHONE: (352) * FAX: VILLAGE COMMUNITY DEVELOPMENT DISTRICTS PURCHASING DEPARTMENT 940 LAKESHORE DRIVE, SUITE 200 THE VILLAGES, FLORIDA 32162 PHONE: (352) 751-6700 * FAX: (352) 751-6715 E-mail: melissa.schaar@districtgov.org

More information

Kennedy Valve. A Division of McWane, Inc. UL/FM PRODUCTS

Kennedy Valve. A Division of McWane, Inc. UL/FM PRODUCTS A Division of McWane, Inc. UL/FM PRODUCTS 02 East Water Street Elmira, NY 4902 Phone: (607)734-22 Fax: (607)734-3288 Fax: (800)952-477 E-Mail: sales@kennedyvalve.com www.kennedyvalve.com PRICE LIST: WW

More information

CITY OF TAMPA ADDENDUM 2. April 18, 2018

CITY OF TAMPA ADDENDUM 2. April 18, 2018 CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

BID DOCUMENT LEGAL NOTICE - BIDS WANTED GENERAL INFORMATION AND INSTRUCTION (IF YOU CHOOSE NOT TO SUBMIT A BID, PLEASE COMPLETE PAGE )

BID DOCUMENT LEGAL NOTICE - BIDS WANTED GENERAL INFORMATION AND INSTRUCTION (IF YOU CHOOSE NOT TO SUBMIT A BID, PLEASE COMPLETE PAGE ) BID DOCUMENT CITY OF BEVERLY HILLS PURCHASING DIVISION 455 NORTH REXFORD DRIVE BEVERLY HILLS, CALIFORNIA 90210 (310) 285-2440 LEGAL NOTICE - BIDS WANTED Sealed bids are requested on the list of materials,

More information

BID FORM. PROJECT: 2017 Water line replacement

BID FORM. PROJECT: 2017 Water line replacement Project Town of Georgetown P.O. Box 426 Georgetown, CO 80444 BID FORM PROJECT: 2017 Water line replacement THE UNDERSIGNED BIDDER, having familiarized himself with the Work required by the Contract Documents,

More information

VALVES Product Specifications

VALVES Product Specifications VALVES Product Specifications Gate / Ball / Check Valves Stocked 1/8 6 Flanged & Actuated Valves Available Larger Size Valves Not Listed Are Available 800-678-2544 800-678-0857 www.msi-products.com Copyright

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors. Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.

More information

Stainless Pipe & Tubing

Stainless Pipe & Tubing Stainless ipe ubing SMH-COOR RNAONAL OLL FR 1-800-766-0076 FAX (323) 890-4456 www.smithcooper.com ipe ubing ipe Specifications Welded and seamless pipe material conforms to ASM A312, ASM A999; (ASM A778

More information

CH-PP polypropylene schedule 80 pipe, valves & fittings black and chem-pure natural

CH-PP polypropylene schedule 80 pipe, valves & fittings black and chem-pure natural polypropylene schedule 80 pipe, valves & fittings black and chem-pure natural CH-PP-0410 Effective April 12, 2010 Supercedes CH-PP-0908R dated Sept. 29, 2008 SOCKET FITTINGS Suggested list prices subject

More information

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction

More information

ADVERTISEMENT FOR BIDS WATER SERVICE LINE REPAIR & METER BOX REPLACEMENT CITY / COUNTY UTILITIES

ADVERTISEMENT FOR BIDS WATER SERVICE LINE REPAIR & METER BOX REPLACEMENT CITY / COUNTY UTILITIES ADVERTISEMENT FOR BIDS WATER SERVICE LINE REPAIR & METER BOX REPLACEMENT CITY / COUNTY UTILITIES Pursuant to N.C.G.S. 143-131, sealed bid proposals endorsed Water Line & Meter Box Contract FB19188 will

More information

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations to Bidders, the undersigned

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

PRICE LISTS. Multi Fittings. Gasketed Sewer Gasketed Heavy Wall Solvent Weld Sewer Solvent Weld Heavy Wall C900/C907 Pressure

PRICE LISTS. Multi Fittings. Gasketed Sewer Gasketed Heavy Wall Solvent Weld Sewer Solvent Weld Heavy Wall C900/C907 Pressure Gasketed Sewer Gasketed Heavy Wall Solvent Weld Sewer Solvent Weld Heavy Wall C900/C907 Pressure C900 Non Pressure IPS Pressure 200 PVC DWV UltraRib Backwater Valves Multi Fittings PRICE LISTS Book Version:

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information

The written bid documents supersede any verbal or written prior communications between the parties.

The written bid documents supersede any verbal or written prior communications between the parties. July 14, 2016 INVITATION TO BID BL080-16 The Gwinnett County Board of Commissioners is soliciting competitive sealed bids from qualified suppliers for the Purchase of Lead-Free Water Service Saddles, Couplings,

More information

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN

More information

Kennedy Valve. A Division of McWane, Inc. UL/FM PRODUCTS

Kennedy Valve. A Division of McWane, Inc. UL/FM PRODUCTS Kennedy Valve A Division of McWane, Inc. UL/FM PRODUCTS 1021 East Water Street Elmira, NY 14902 Phone: (607)734-2211 Fax: (607)734-3288 Fax: (800)952-4771 E-Mail: sales@kennedyvalve.com www.kennedyvalve.com

More information

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018 CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00

More information

ASTRO 2 CIRCULATORS. ASTRO 2 3-Speed Circulators (except Astro 286):

ASTRO 2 CIRCULATORS. ASTRO 2 3-Speed Circulators (except Astro 286): ASTRO 2 CIRCULATORS ASTRO 2 3-Speed Circulators (except Astro 286): IRON BODY CONSTRUCTION (Includes Check Valve) Model No. Part No. Connection List Price Wt.ea.lbs. Astro 210CI 110223-326 Flanged $ 307.00

More information

Kennedy Valve. A Division of McWane, Inc. AWWA PRODUCTS

Kennedy Valve. A Division of McWane, Inc. AWWA PRODUCTS Kennedy Valve A Division of McWane, Inc. AWWA PRODUCTS 1021 East Water Street Elmira, NY 1902 Phone: (607)73-2211 Fax: (607)73-3288 Fax: (800)952-771 E-Mail: sales@kennedyvalve.com www.kennedyvalve.com

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 4.g Meeting Date: March 6, 2017 Department: Public Works SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Director of Public Works TOPIC: ADA-DOJ CURB RAMPS 2016-2017 City

More information

Richard Pearson, Community Development Director Tim Tucker, City Engineer

Richard Pearson, Community Development Director Tim Tucker, City Engineer CITY OF MARTINEZ CITY COUNCIL AGENDA February 21, 2007 TO: FROM: PREPARED BY: SUBJECT: Mayor and City Council Don Blubaugh, City Manager Richard Pearson, Community Development Director Tim Tucker, City

More information

Investor Presentation August 2018

Investor Presentation August 2018 Investor Presentation August 2018 Forward Looking Statements Certain statements in this presentation, other than purely historical information, are forward-looking statements within the meaning of the

More information

Electric Service Information Sheet Georgia Power Company

Electric Service Information Sheet Georgia Power Company Electric Service Information Sheet Georgia Power Company Project: Location: Developer: (Name of S/D or Customer) (Street Address or road Name) (Developer s Name) Georgia Power Company (the Company) will

More information

CITY OF TACOMA REQUEST FOR QUOTATION GENERAL TERMS AND CONDITIONS

CITY OF TACOMA REQUEST FOR QUOTATION GENERAL TERMS AND CONDITIONS GENERAL TERMS AND CONDITIONS 1. Preparation/Submittal of Bids A. All information requested of the Bidder/Proposer must be entered in the appropriate space on the form. Failure to do so may disqualify your

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017

More information

Bartlett &West Driv<ng Community and Industry Forward, Together

Bartlett &West Driv<ng Community and Industry Forward, Together PROJECT MANUAL FOR 2018 WATER DISTRIBUTION SYSTEM IMPROVEMENTS PUBLIC WATER SUPPLY DISTRICT NO.4 OF COLE COUNTY, MISSOURI Water System No. M03024163 GARY WILLIAM DAVIS- PROFESSIONAL ENGINEER LICENSE NO.

More information

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT: ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation

More information

ORDINANCE NUMBER 1174

ORDINANCE NUMBER 1174 ORDINANCE NUMBER 1174 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PERRIS, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, ACTING IN ITS CAPACITY AS THE LEGISLATIVE BODY OF COMMUNITY FACILITIES DISTRICT NO.

More information

BID PROPOSAL Mobilization for Non-Emergency Work Orders; 200 EA $ $ Mobilization for Emergency Work Orders; 2 EA $ $

BID PROPOSAL Mobilization for Non-Emergency Work Orders; 200 EA $ $ Mobilization for Emergency Work Orders; 2 EA $ $ 2018 Annual Water Distribution Leak Repairs Contract, Package 1 SAWS Job Nos. 18-0103 (O&M) and 18-1401 (CIP) Solicitation No. B-18-001-JG BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting

More information

T-103-HC List Price $ 1, PSI CWP, UL/FM, Box Qty. 1 Hose End w/cap & Chain Case Qty. 2 NPT to ANFH* Thds Unit Weight 18.

T-103-HC List Price $ 1, PSI CWP, UL/FM, Box Qty. 1 Hose End w/cap & Chain Case Qty. 2 NPT to ANFH* Thds Unit Weight 18. BRONZE,PVC, CAST IRON AND DUCTILE IRON IRRIGATION VALVES IRR-0718 Effective July 2, 2018 Supercedes IRR-0118 of January 1, 2018 Prices and MTO status are subject to change without notice. Visit our website

More information

REPORT TO MAYOR AND COUNCIL

REPORT TO MAYOR AND COUNCIL AGENDA ITEM NO. AGENDA ITEM NO. 3.f REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL: DATE: May 28, 2013 SUBJECT: ADOPT RESOLUTION NO. 13-50 TO APPROVE A REDUCTION IN LEASE PROCEED FUNDS

More information

Water and Wastewater System Schedules of Rates and Charges and Fees As of July 1, 2015

Water and Wastewater System Schedules of Rates and Charges and Fees As of July 1, 2015 Water and Wastewater System Schedules of Rates and Charges and Fees As of July 1, 2015 East Bay Municipal Utility District Oakland, California Photos on cover: EBMUD crew replacing 16-inch diameter pipeline

More information

RFB Addendum 3

RFB Addendum 3 Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER

More information

RULES AND REGULATIONS FOR WATER SERVICE FOR THE SANTA YNEZ RIVER WATER CONSERVATION DISTRICT, IMPROVEMENT DISTRICT NO. 1

RULES AND REGULATIONS FOR WATER SERVICE FOR THE SANTA YNEZ RIVER WATER CONSERVATION DISTRICT, IMPROVEMENT DISTRICT NO. 1 RULES AND REGULATIONS FOR WATER SERVICE FOR THE SANTA YNEZ RIVER WATER CONSERVATION DISTRICT, IMPROVEMENT DISTRICT NO. 1 Board Adopted: March 20, 2018 Article 1 - GENERAL PROVISIONS TABLE OF CONTENTS 101.

More information

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned

More information

WATER AUTHORITY OF GREAT NECK NORTH

WATER AUTHORITY OF GREAT NECK NORTH WATER AUTHORITY OF GREAT NECK NORTH 50 WATERMILL LANE GREAT NECK, NEW YORK 11021-4235 OFFICE Tel: (516) 487-7973 Fax: (516) 487-5048 24 HOUR EMERGENCY Tel: (516) 482-0210 www.waterauthorityofgreatnecknorth.com

More information

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

PART II - Prospect Street 37. 8 Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050. BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

VACANT/ABANDONED PROPERTY GRASS CUTTING Request for Proposals

VACANT/ABANDONED PROPERTY GRASS CUTTING Request for Proposals VACANT/ABANDONED PROPERTY GRASS CUTTING Request for Proposals CITY OF FAIRFIELD BUILDING & ZONING DIVISION 5350 PLEASANT AVENUE FAIRFIELD, OH 45014 (513) 867-5318 FAX: (513) 867-5310 Job Description: Grass

More information

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native

More information

Rosewood Hills Property and Homeowners Association, Inc. Water System Policies and Procedures

Rosewood Hills Property and Homeowners Association, Inc. Water System Policies and Procedures Rosewood Hills Property and Homeowners Association, Inc. Water System Policies and Procedures REVISION: February 15, 2017 TITLE BOARD POLICY WATER SYSTEM MAINTENANCE Rosewood Hills Property and Homeowners

More information

REQUEST FOR QUOTE (RFQ) FOR IN-LINE METER PROJECT PHASE III MATERIALS. June 6, 2018 RFQ NO. ASPA ESD-WTR APPROVED FOR ISSUANCE:

REQUEST FOR QUOTE (RFQ) FOR IN-LINE METER PROJECT PHASE III MATERIALS. June 6, 2018 RFQ NO. ASPA ESD-WTR APPROVED FOR ISSUANCE: American Samoa Power Authority P.O. Box PPB Pago Pago, American Samoa 96799 Telephone: (684) 699-1234/248-1234 Email: info@aspower.com& Website: www.aspower.com REQUEST FOR QUOTE (RFQ) FOR IN-LINE METER

More information

PVC Gasketed Sewer Fittings SDR35

PVC Gasketed Sewer Fittings SDR35 Price List: GASFMUS0303141 Effective: March 3, 2014 Supercedes: December 6, 2010 PRICE LIST Applicable Standards ASTM D3034 ASTM F-1336-91 CSA B-182.2 PVC Gasketed Sewer s SDR35 IPEX USA LLC Sales and

More information

APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI

APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: _100.00 Date: / / Receipt No: APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE,

More information

HOBBS MUNICIPAL SCHOOLS P.O. Box 1030 Hobbs, New Mexico PRICE INQUIRY

HOBBS MUNICIPAL SCHOOLS P.O. Box 1030 Hobbs, New Mexico PRICE INQUIRY HOBBS MUNICIPAL SCHOOLS P.O. Box 1030 Hobbs, New Mexico 88241 PRICE INQUIRY SUBJECT: Plumbing Supplies BID NUMBER: OPENING DATE: PLACE OF OPENING: May 21st, 2010 2:00 p.m. Hobbs Municipal Schools Administration

More information

CIRCUIT BALANCING VALVES

CIRCUIT BALANCING VALVES DATE: January 0, 0 DATE: January, 0 MODEL NUMBER ITEM NUMBER QTY PER CARTON LIST PRICE EACH Wt (lbs.) EACH MINI-SWEAT CBV-/MS 009- $ 0 $ 8 0. CBV-/MS 009- $ 0 $ 9 ARMflo DZR CBV SWEAT - (FIVE TURN) CBV00VSCR-LF

More information

Quote Name: Furnish and Install New Drainage Outfall Pipe and Inlet

Quote Name: Furnish and Install New Drainage Outfall Pipe and Inlet Quote Name: Furnish and Install New Drainage Outfall Pipe and Inlet Description: SEE BELOW FOR FURTHER INFORMATION Township Contact: Andy Baran Contact Phone Number: 609-361-6672 Fax: 609-361-7624 Quote

More information

Parts List 245 Series

Parts List 245 Series Parts List Effective: March 15, 2003 WARNING FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THE PRODUCTS AND/OR SYSTEMS DESCRIBED HEREIN OR RELATED ITEMS CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY

More information

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price 2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF

More information

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R

More information

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES Table of Contents I. DEFINITIONS... 2 II. DEPOSITS... 3 A. Establishment of Credit... 3 B. Deposit Refunds... 4 III. CUSTOMER SERVICE FEES AND CHARGES... 4 A.

More information

REQUEST FOR QUOTATION

REQUEST FOR QUOTATION Return Bids By 11:00 AM, 11/06/2015 to: Debbie Seibert D Seibert TPU Administration Building North 3628 S. 35th St. Tacoma WA 98409 Ph. 253-502-8587 Fax.253-502-8372 Material will ship to: Tacoma Water

More information

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00

More information

Meter Connect Supplies

Meter Connect Supplies CITY OF MISSION SOLICITATION, OFFER AND AWARD FORM SOLICITATION INFORMATION REQUEST FOR BIDS (RFB) 1. BID NO.: 17-083-01-23 4. BRIEF DESCRIPTION: 2. ISSUE DATE: January 09, 2017 3. FOR INFORMATION CONTACT:

More information

PART A ROADWAY - BASE BID

PART A ROADWAY - BASE BID May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00

More information

Heather Hafer, Senior Management Analyst Kate Whan, Public Works Administrative Manager SAN PABLO SUBDIVISION LANDSCAPE & LIGHTING DISTRICT A-03

Heather Hafer, Senior Management Analyst Kate Whan, Public Works Administrative Manager SAN PABLO SUBDIVISION LANDSCAPE & LIGHTING DISTRICT A-03 I-10 STAFF REPORT MEETING DATE: May 22, 2018 TO: City Council FROM: Heather Hafer, Senior Management Analyst Kate Whan, Public Works Administrative Manager 922 Machin Avenue Novato, CA 94945 (415) 899-8900

More information

Job No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL

Job No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL Solicitation No. B-11-030-BB Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations

More information

Parts List 852 Series

Parts List 852 Series Parts List Effective: December 15, 2001 Supersedes: P410-852 Dated August 1996 WARNING FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THE PRODUCTS AND/OR SYSTEMS DESCRIBED HEREIN OR RELATED ITEMS CAN

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20

More information

METROPOLITAN REGIONAL HOUSING AUTHORITY

METROPOLITAN REGIONAL HOUSING AUTHORITY RFQ: 16-215 Plumbing Materials METROPOLITAN REGIONAL HOUSING AUTHORITY 2131 Gottingen St, Floor, HALIFAX, N.S. B3K 5Z7 Telephone 420-2108 Please quote on the following items and estimated quantities we

More information

Contract Documents And Specifications. For. Construction of. Pipeline Replacement Project Phases 5 & 6 MCRS / Morongo Road FOR

Contract Documents And Specifications. For. Construction of. Pipeline Replacement Project Phases 5 & 6 MCRS / Morongo Road FOR Contract Documents And Specifications For Construction of Pipeline Replacement Project Phases 5 & 6 MCRS / Morongo Road FOR MORONGO BAND OF MISSION INDIANS Januar Prepared by: Cannon 11900 West Olympic

More information

TRANSMITTAL MEMORANDUM. The Honorable Mayor and City Council

TRANSMITTAL MEMORANDUM. The Honorable Mayor and City Council KPU G, m ral Mauag~r 334 Prom Sm:ct Ke t~ohikan, AK 9~9C I Y.mr Cmr»umity. Y.t-"T U; ilijy Phon(' (907) :ns. 5603 Fax (907) 225-5075 TRANSMITTAL MEMORANDUM TO: FROM: DATE: RE: The Honorable Mayor and City

More information

ORDINANCE NUMBER 1104

ORDINANCE NUMBER 1104 ORDINANCE NUMBER 1104 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PERRIS ACTING IN ITS CAPACITY AS THE LEGISLATIVE BODY OF COMMUNITY FACILITIES DISTRICT NO. 2001-3 (NORTH PERRIS PUBLIC SAFETY) OF THE

More information

CITY OF ANN ARBOR INVITATION TO BID

CITY OF ANN ARBOR INVITATION TO BID CITY OF ANN ARBOR INVITATION TO BID 2018 Utility Infrastructure Materials ITB No. 4554 Due Date: November 7, 2018 at 2:00 P.M. (Local Time) Public Services Area Public Works Unit Issued By: City of Ann

More information

Catalog of Cleaned for Oxygen Copper Fittings

Catalog of Cleaned for Oxygen Copper Fittings Catalog of Cleaned for Oxygen Copper Fittings www.totalpiping.com 440-235-6664 1-800-464-2796 sales@totalpiping.com Revised: March 2018 1 Updated Mar-18 Couplings 37001 1/8 $.93 37002 1/4 $.85 37003 3/8

More information

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This

More information

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No. Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation

More information

Agenda Item C.1 PUBLIC HEARING Meeting Date: April 21, 2015

Agenda Item C.1 PUBLIC HEARING Meeting Date: April 21, 2015 Agenda Item C.1 PUBLIC HEARING Meeting Date: April 21, 2015 TO: FROM: SUBJECT: Mayor and Councilmembers Genie Wilson, Finance Director Report on Annual Adjustment for User Fees RECOMMENDATION: A. Conduct

More information

JOB: TILT UP WAREHOUSE, TYPICAL By : Foothill Consultants

JOB: TILT UP WAREHOUSE, TYPICAL By : Foothill Consultants 03000 MOBILIZATION SUPERINTENDENT PLAN REVIEW & MAT'L TAKEOFF 40 MH 1 LS $5.00 $200 $76.70 $3,068 40.0 $0 $0 $3,268 TOTAL STATION SET UP 16 MH 1 LS $0 $50.00 $800 10.4 $50.00 $800 $0 $1,600 PRIMAVERA -

More information

October 2, 2018 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA INVITATION FOR BIDS Y AH; ADDENDUM NO. 3 FENCE INSTALLATION AND REPAIR

October 2, 2018 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA INVITATION FOR BIDS Y AH; ADDENDUM NO. 3 FENCE INSTALLATION AND REPAIR October 2, 2018 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA INVITATION FOR BIDS Y18-1107-AH; ADDENDUM NO. 3 FENCE INSTALLATION AND REPAIR This Addendum is hereby incorporated into the bid documents

More information

Agenda Item D.1 DISCUSSION ACTION ITEM Meeting Date: April 7, 2015

Agenda Item D.1 DISCUSSION ACTION ITEM Meeting Date: April 7, 2015 Agenda Item D.1 CPMS DISCUSSION ACTION ITEM Meeting Date: April 7, 2015 TO: FROM: Mayor and Councilmembers Rosemarie Gaglione, Public Works Director CONTACT: Tim Giles, City Attorney SUBJECT: Transportation

More information

Water Main Repairs at Parra Grande Creek Bridge Montecito Water District

Water Main Repairs at Parra Grande Creek Bridge Montecito Water District 2-20-19 Water Main Repairs at Parra Grande Creek Bridge Montecito Water District The District is now seeking proposals from qualified contractors to replace pipeline and related infrastructure damaged

More information

T580-A List Price $ $ $ $ $ $

T580-A List Price $ $ $ $ $ $ SPECIALTY VALVE PRODUCTS SVP-1018 Effective October 1, 2018 Supercedes SVP-0718 of July 2, 2018 CONVENTIONAL PORT BALL VALVES - 400 PSI CWP S580-A $ 13.71 $ 20.00 $ 31.12 $ 49.08 $ 71.48 $ 103.00 Cup x

More information

Pflugerville, TX St. Hedwig, TX 78152

Pflugerville, TX St. Hedwig, TX 78152 Pesado Construction Co., Inc. 7054 Pipestone Schertz, TX 78154 Lewis Contractors, Inc. P.O. Box 1623 Bertram, TX 78605 Wauters Engineering, LLC 12870 Adkins St. Hedwig Rd. St. Hedwig, TX 78152 Cash Construction

More information

REQUEST FOR QUOTATION

REQUEST FOR QUOTATION Return Bids By 11:00 AM, 10/20/2014 to: Debbie Seibert Purch Ass't DS TPU Administration Building North 3628 S. 35th St. Tacoma WA 98409 Ph. 253-502-8587 Fax.253-502-8372 Material will ship to: Water Warehouse

More information

2013 METER REPLACEMENT PROGRAM REQUEST FOR COMPETITIVE SEALED PROPOSALS Solicitation Number: B DD Job No.:

2013 METER REPLACEMENT PROGRAM REQUEST FOR COMPETITIVE SEALED PROPOSALS Solicitation Number: B DD Job No.: 2013 METER REPLACEMENT PROGRAM REQUEST FOR COMPETITIVE SEALED PROPOSALS Solicitation Number: B-13-015-DD Job No.: 13-4003 ADDENDUM #1 March 18, 2013 This addendum, applicable to work referenced above,

More information

Baltimore Gas and Electric Company Gas Extensions

Baltimore Gas and Electric Company Gas Extensions Baltimore Gas and Electric Company Gas 15 8. Extensions 8.1 General 8.11 General Statement Regarding Extensions: The Company extends its gas lines in accordance with the general practice described in these

More information

ORDINANCE NO ORDINANCE LEVYING AND ASSESSING TAXES OF LISLE-WOODRIDGE FIRE PROTECTION DISTRICT DUPAGE AND WILL COUNTIES, ILLINOIS FOR 2016

ORDINANCE NO ORDINANCE LEVYING AND ASSESSING TAXES OF LISLE-WOODRIDGE FIRE PROTECTION DISTRICT DUPAGE AND WILL COUNTIES, ILLINOIS FOR 2016 ORDINANCE NO. 2016- ORDINANCE LEVYING AND ASSESSING TAXES OF DUPAGE AND WILL COUNTIES, ILLINOIS FOR 2016 BE IT ORDAINED by the Board of Trustees of the Lisle-Woodridge Fire Protection District DuPage and

More information

BID PACKAGE LEGAL NOTICE - BIDS WANTED. Water Well and Pump Related Maintenance and Repair Services GENERAL INFORMATION AND INSTRUCTION

BID PACKAGE LEGAL NOTICE - BIDS WANTED. Water Well and Pump Related Maintenance and Repair Services GENERAL INFORMATION AND INSTRUCTION BID PACKAGE CITY OF BEVERLY HILLS PURCHASING DIVISION 455 NORTH REXFORD DRIVE BEVERLY HILLS, CALIFORNIA 90210 (310) 285-2440 LEGAL NOTICE - BIDS WANTED Water Well and Pump Related Maintenance and Repair

More information

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) - Charlotte County Board Of County Commissioners Agenda Item Summary Item Number: R- 5 1 DEPARTMENT MAKING REQUEST 2 MEETING DATE Purchasing 6/24/2014 9:00:00 AM 3 REQUESTED MOTION/ACTION Award Bid #14-209

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

List Price Sheet March 28, 2016

List Price Sheet March 28, 2016 List Price Sheet March 28, 2016 Welcome to Clear Water Manufacturing In this booklet you will find products for the water and wastewater treatment industry. Whether you re involved in building water or

More information

List Price Sheet

List Price Sheet List Price Sheet November 2012 Welcome to Clear Water Manufacturing In this booklet you will find products for the water and wastewater treatment industry. Whether you re involved in building water or

More information

REQUEST FOR PROPOSAL FOR ELECTRODE REPLACEMENT AT BLACK MOUNTAIN AND REACH 6 PIPELINE

REQUEST FOR PROPOSAL FOR ELECTRODE REPLACEMENT AT BLACK MOUNTAIN AND REACH 6 PIPELINE REQUEST FOR PROPOSAL FOR ELECTRODE REPLACEMENT AT BLACK MOUNTAIN AND REACH 6 PIPELINE CENTRAL ARIZONA WATER CONSERVATION DISTRICT RFP C1630 PROPOSAL DUE MAY 25, 2016 3:00 PM ARIZONA TIME Table of Contents

More information

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307) Phone (307) 633-4303 Fax (307) 633-4616 GRADING, SEDIMENT AND EROSION CONTROL PROCESS The applicant shall meet with a Laramie County Planning and Development Office (Planning Office) representative prior

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE