1 Flood Risk Management in Ireland The National CFRAM Programme & overview of the Capital Works Programme Click to add text Dr. John Martin Office of Public Works Engineers Ireland's Local Government Seminar Athlone, 18th February 2016
2 FLOOD RISK IN IRELAND HISTORIC & POLICY CONTEXT EU FLOODS DIRECTIVE 2007 CFRAM PROGRAMME Click to add text FLOOD MAPS FLOOD RISK MANAGEMENT PLANs Prevention / Protection / Preparedness
3 FLOOD RISK IN IRELAND WINTER STORMS:
4 FLOOD RISK IN IRELAND WINTER FLOODING: Click to add text
5 FLOOD RISK IN IRELAND 4th FEBRUARY 2014 CORK CITY
6 FLOOD RISK IN IRELAND 6th FEBRUARY CLONMEL
7 FLOOD RISK IN IRELAND NOVEMBER CORK Click to add text
8 FLOOD RISK IN IRELAND NOVEMBER ATHLONE Click to add text
9 FLOOD RISK IN IRELAND DUBLIN Click to add text
10 FLOOD RISK IN IRELAND NATIONAL RISK ASSESSMENT (GTF) Flooding: No. 1 National Risk NATIONAL PFRA Appx. 70,000 Homes at Risk (in Undefended Floodplains) RECENT FLOODS December 2015/January 2016: TBC... November 2009: >1,600 Properties, Insured Losses Circa 250m October 2011: Nearly 1,700 Properties, Insured Losses Circa 130m
11 IMPACTS OF CLIMATE CHANGE SEA LEVEL RISE : Rise of 190mm Current Rate of Rise: 3.2mm/yr Significant Increase in Tidal / Coastal Risk for a 500mm Rise in MSL FLUVIAL, PLUVIAL & GROUNDWATER No Significant Signal for Change in Annual Rainfall Projected Wetter Winters / Warmer Summers Potential for Increase in Flooding Uncertain!
12 FLOOD RISK IN IRELAND HISTORIC & POLICY CONTEXT EU FLOODS DIRECTIVE 2007 CFRAM PROGRAMME Click to add text FLOOD MAPS FLOOD RISK MANAGEMENT PLANs Prevention / Protection / Preparedness
13 HISTORIC & POLICY CONTEXT HISTORICAL CONTEXT Land Commission Embankments (1800 s) Flood (Typically Coastal) Protection Embankments Became Land Commission Embankments Almost All Now in Private Ownership Remaining Embankments (Very Few) Trustee in DAFM
14 HISTORIC & POLICY CONTEXT HISTORICAL CONTEXT Land Commission Embankments (1800 s) Drainage Districts (Acts 1925, 1929) Minor / Local Drainage Schemes Local Authorities Responsible for Maintenance
15 HISTORIC & POLICY CONTEXT HISTORICAL CONTEXT Land Commission Embankments (1800 s) Drainage Districts (Acts 1925, 1929) Arterial Drainage Act, 1945 River-basin Arterial Drainage / Embankment Schemes 1950 s-80 s (+ Monaghan Blackwater) OPW Statutory Duty for Maintenance Channels / Embankments Typically Maintained on a 5-yr Cycle (Appx. 2,200kms Channel / year)
16
17 HISTORIC & POLICY CONTEXT HISTORICAL CONTEXT Land Commission Embankments (1800 s) Drainage Districts (Acts 1925, 1929) Arterial Drainage Act, 1945 OPW Statutory Duty for Maintenance Annual Maintenance Budget: Circa 15m Section 47 Consent for Weirs Section 48 Protection of Scheme Channels Section 50 Consent for Bridges
18 HISTORIC & POLICY CONTEXT HISTORICAL CONTEXT Land Commission Embankments (1800 s) Drainage Districts (Acts 1925, 1929) Arterial Drainage Act, 1945 River-basin Arterial Drainage / Embankment Schemes OPW Statutory Duty for Maintenance Hydrometric Monitoring Appx. 390 WL/Q Fluvial / Tidal Gauges Appx. 60 Rainfall gauges HydroData.ie, Waterlevel.ie
19 HISTORIC & POLICY CONTEXT HISTORICAL CONTEXT Land Commission Embankments (1800 s) Drainage Districts (Acts 1925, 1929) Arterial Drainage Act, 1945 A.D. (Amendment) Act, 1995 Local, Urban Flood Protection Schemes
20
21 HISTORIC & POLICY CONTEXT HISTORICAL CONTEXT Land Commission Embankments (1800 s) Drainage Districts (Acts 1925, 1929) Arterial Drainage Act, 1945 A.D. (Amendment) Act, 1995 Local, Urban Flood Protection Schemes Appx. 325m on 34 Schemes Providing Protection to nearly 6,000 Properties (to end 2014) Benefits > 1bn Annual Capital Budget: 45m
22 HISTORIC & POLICY CONTEXT NATIONAL FLOOD POLICY REVIEW: 2004 OPW: Lead Agency Proactive, Catchment-based Approach Flood Mapping Flood Risk Management Plans Flood Risk Management, rather than just Flood Protection (Flood Relief Schemes): Prevention Protection Preparedness (Resilience)
23 FLOOD RISK IN IRELAND HISTORIC & POLICY CONTEXT EU FLOODS DIRECTIVE 2007 CFRAM PROGRAMME Click to add text FLOOD MAPS FLOOD RISK MANAGEMENT PLANs Prevention / Protection / Preparedness
24 EU FLOODS DIRECTIVE 2007 TRANSPOSED: SI No. 122 of 2010 KEY REQUIREMENTS Preliminary Flood Risk Assessment Flood Maps Flood Risk Management Plans OTHER PROVISIONS Co-ordination with WFD implementation Trans-boundary co-operation Public dissemination / engagement
25 PFRA BASED ON: Historical Records Predictive Assessment (Fluvial, Pluvial Coastal, Groundwater Indicative Mapping + FRI Analysis)
26
27
28
29 PFRA BASED ON: Historical Records Predictive Assessment (Fluvial, Pluvial Coastal, Groundwater Indicative Mapping + FRI Analysis) Stakeholder Consultation PUBLIC CONSULTATION COMPLETED AFAs
30 300 AFAs
31 FLOOD RISK IN IRELAND HISTORIC & POLICY CONTEXT EU FLOODS DIRECTIVE 2007 CFRAM PROGRAMME Click to add text FLOOD MAPS FLOOD RISK MANAGEMENT PLANs Prevention / Protection / Preparedness
32 CFRAM Programme Catchment-based Flood Risk Assessment & Management Programme; A key recommendation of the Report of the Flood Policy Review Group (approved by Government, 2004) Delivering on key requirements of the EU Directive 2007/EC/60 on the assessment & management of Flood Risk
33 CFRAM Programme FLOOD MAPPING (2014): Predictive maps of lands estimated to be flood prone, for a range of flood probabilities, for rivers through / coastlines of 300 areas around Ireland; FLOOD RISK MANAGEMENT PLANS (2016): Flood Risk Management Strategies for areas of Significant Risk as part of a series of Flood Risk Management Plans
34 CFRAM PROGRAMME Pilot Studies: Lee, Dodder, Fingal East Meath: National Programme:
35 6 Contract Areas - Shannon IRBD - Eastern RBD - South-Eastern RBD - South-Western RBD - Western RBD - North-Western & Click to add text - Neagh Bann IRBD 29 UoMs 1 FRMP per UoM 300 AFAs
36 MANAGEMENT STRUCTURES National National Steering Group National Stakeholder Group National Technical Coordination Group RBD-Level Steering Group Progress Group Stakeholder Group
37 SCOPE OF WORK Survey 10,000km2 LiDAR-based DTM Appx. 7,000km Channel (topo) Survey Data Collection Hydrology FSU Web-Portal (On-line Flood Estimation Tool) Hydraulics / Flood Mapping
38 FLOOD RISK IN IRELAND HISTORIC & POLICY CONTEXT EU FLOODS DIRECTIVE 2007 CFRAM PROGRAMME Click to add text FLOOD MAPS FLOOD RISK MANAGEMENT PLANs Prevention / Protection / Preparedness
39 Probability & Likelihood Best practice: To estimate the magnitude, level and extent of flood events that have a specific Likelihood or Probability of occurring/being exceeded; To plan accordingly for these theoretical events; e.g. 1:100 Chance of occurring or being exceeded in any given year = 1% A.E.P. (former 100 year flood ).
40 Flood mapping Analysis of long-term rainfall / river flow records; Quantifying flows for a range of Probabilities Detailed models of river channels & floodplain topography; Maps of fluvial (river) and tidal flood for 3 x Probabilities
41 300 areas; 6,700 km of river channel; 9,400 sq.km of floodplain survey/3d models Detailed computer models of flow, levels and extents in river channels & floodplain topography Inform Sustainable Planning, Emergency, Response Planning & Resilience
42 CFRAM STUDIES FLOOD MAPS Current Scenario Mapping 8 Event Probabilities Extent, Depth, Velocity, Risk-to-Life, Flood Zone
43
44
45
46
47
48 CFRAM STUDIES FLOOD MAPS Current Scenario Mapping 8 Probabilities Extent, Depth, Velocity, Risk-to-Life, Flood Zone 7 Risk Maps
49
50
51
52 CFRAM STUDIES FLOOD MAPS Current Scenario Mapping 8 Probabilities Extent, Depth, Velocity, Risk-to-Life, Flood Zone 7 Risk Maps Defence Failure Mapping Future Scenario Mapping Representative Climate Futures MRFS / HEFS (+20/30% Qp, 500/1000mm MSL Rise) Enhance for 2nd Cycle
53 CFRAM STUDIES FLOOD MAPS Public Consultation 208 PCDs (Completed) Formal SI Consultation Scope Floods Directive Maps Only (for AFAs ) Other Maps Available on Project Websites Submissions Observations Objections
54 FLOOD RISK IN IRELAND HISTORIC & POLICY CONTEXT EU FLOODS DIRECTIVE 2007 CFRAM PROGRAMME Click to add text FLOOD MAPS FLOOD RISK MANAGEMENT PLANs Prevention / Protection / Preparedness
55 CFRAM STUDIES FRMPs Objectives Technical, Social, Economic, Environmental / Cultural Framed in Terms of Risk Reduction Aspirational Targets / Basic Requirements Public Consultation: Objectives Weightings (Global)
56 CFRAM STUDIES FRMPs Objectives Screening Option Development Detailed Consideration of Climate Change Appraisal Scoring Options Vs Each Objective Weighted MCA Benefit Score Costed Unit Cost Database CBA (FHRC 2014 MCM)
57 CFRAM STUDIES FRMPs Objectives Screening Option Development - Detailed Appraisal SEA / Appropriate (Habitats) Assessment Flood Risk Management Plans (FRMPs)
58
59 CFRAM STUDIES FRMPs Objectives Screening Option Development - Detailed Appraisal SEA / Appropriate (Habitats) Assessment Flood Risk Management Plans (FRMPs) Consultation Another 2 Rounds of PCDs (Appx. 400 Events) Formal SI Consultation
60 FRMPs FUTURE TIMELINE Option Assessments: PCDs: ONGOING Draft Options Reports: January March 2016 Draft Flood Risk Management Plans: Summer PCDs & Formal SI Consultation Final Flood Risk Management Plans: End-2016 National Prioritisation of Measures (MCA) Ministerial Approval Council Adoption
61 FLOOD RISK IN IRELAND HISTORIC & POLICY CONTEXT EU FLOODS DIRECTIVE 2007 CFRAM PROGRAMME Click to add text FLOOD MAPS FLOOD RISK MANAGEMENT PLANs Prevention / Protection / Preparedness
62 PREVENTION PLANNING GUIDELINES OPW DoECLG Initiative Launched: November 2009 Framework For Sustainable Planning Sustainable Planning Critical for Sustainable FRM Avoids Creation of New Risks, Ever-Increasing Risk & Reduces Future Demands for Resources Lot of Work Required to Solve Existing Problems Let s Not Create New Ones! Flood Mapping (PFRA, CFRAM) & Web-Mapping Portal (in-hand)
63 PROTECTION MINOR WORKS: OPW funding of up to 500k to LAs 29m Approved for 430 Projects since 2009 Delivery of CFRAM Outcomes (< 0.5m) MAJOR SCHEMES: 34 Schemes Completed 8 Schemes In Construction & >20 Schemes In Design / Planning Schemes as Outcomes of CFRAM Programme Capital Programme: 250m > 1bn+
64 PREPAREDNESS (RESILIENCE) FLOOD WARNING Local Flood Warning Systems (Clonmel, Mallow, Fermoy) National Tidal & Storm Surge Forecasting Alert System Waterlevel.ie (real-time water level data) Radar-based Flood Forecasting
65 PREPAREDNESS (RESILIENCE) FLOOD WARNING National Flood Forecasting Centre? FLOOD EVENT EMERGENCY RESPONSE Guidance & Template Plans (MEM Framework)
66 PREPAREDNESS (RESILIENCE) FLOOD WARNING National Flood Forecasting Centre? FLOOD EVENT EMERGENCY RESPONSE Guidance & Template Plans (MEM Framework) AWARENESS, PREPAREDNESS & RESILIENCE 2005: National Plan, Prepare, Protect Campaign Bring down to Local Level with CFRAM Mapping
67 MULTI-FACETED OR HOLISTIC FLOOD RISK MANAGEMENT ARTERIAL DRAINAGE Ongoing Maintenance of Existing Schemes PREVENT Sustainable Planning and Development Management PROTECT Major & Minor Flood Relief Schemes PREPARE Effective Flood Forecasting & Warning Effective, Targeted Flood Event Response Plans Build Community Resilience
68 Flood Risk Management in Ireland The National CFRAM Programme & overview of the Capital Works Programme Click to add text Dr. John Martin Office of Public Works Engineers Ireland's Local Government Seminar Athlone, 18th February 2016
Engineers Ireland Annual Conference
Engineers Ireland Annual Conference MANAGING FLOOD RISK AND BUILDING SUSTAINABLE COMMUNITIES Mark Adamson Office of Public Works 15 th May, 2015 FLOOD RISK IN IRELAND RECENT FLOODS November 2009: >1,600
More information2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK
Ireland Water 2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK Mark Adamson Office of Public Works 25 th April, 2018 FLOOD RISK IN IRELAND NATIONAL RISK ASSESSMENT, OEP 2012 & 2017
More informationFLOOD RISK MANAGEMENT IN IRELAND
National Flood Management Conference 2018 FLOOD RISK MANAGEMENT IN IRELAND Mark Adamson Office of Public Works 15 th March, 2018 FLOOD RISK IN IRELAND NATIONAL RISK ASSESSMENT, OEP 2012 Flooding: Joint
More informationNational Flood Risk Management Plan. CFRAM Programme
National Flood Risk Management Plan AND THE CFRAM Programme Gerard O Connell, Engineer-in-Charge, Regional Projects & Flood Advisory Office Environmental SPC, 27 th June, 2018 HISTORIC & POLICY CONTEXT
More informationDRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT. Climate Change Sectoral Adaptation Plan for Flood Risk Management ( )
Office of Public Works DRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT Climate Change Sectoral Adaptation Plan for Flood Risk Management (2014-2019) Determination of the need for strategic environmental
More informationPLANNING FOR SAFE AND SUSTAINABLE COMMUNITIES
Flood Risk Management Protecting and Planning for our Communities PLANNING FOR SAFE AND SUSTAINABLE COMMUNITIES Mark Adamson Office of Public Works 12 th February, 2014 A WET START TO THE YEAR! STORM CHRISTINE
More informationDRAFT APPROPRIATE ASSESSMENT SCREENING REPORT
DRAFT APPROPRIATE ASSESSMENT SCREENING REPORT Climate Change Sectoral Adaptation Plan for Flood Risk Management (2014-2019) 2538_RP/003/C FRAM Section Office of Public Works 2538_RP/003/D CONTENTS 1.0
More informationTHE EU FLOODS DIRECTIVE:
Sixth Bulgarian Austrian Seminar THE EU FLOODS DIRECTIVE: EUROPEAN PRACTICE AND RESEARCH IN FLOOD RISK MANAGEMENT Mark Adamson Co-Chair, Working Group F Office of Public Works, IE 7 th November, 2013 PRESENTATION
More informationDOCUMENT CONTROL SHEET
Final Report Unit of Management 08 DOCUMENT CONTROL SHEET Client Project Title Document Title Document No. This Document Comprises The OPW IBE0600Rp0079 F02 IBE0600Rp0079 DCS TOC Text List of Tables List
More informationPlanning and Flood Risk
Planning and Flood Risk Patricia Calleary BE MEngSc MSc CEng MIEI After the Beast from the East Patricia Calleary Flood Risk and Planning Flooding in Ireland» Floods are a natural and inevitable part of
More informationIRISH FLOOD PREVENTION PROGRAMME Example of integrating climate change adaptation into projects
IRISH FLOOD PREVENTION PROGRAMME Example of integrating climate change adaptation into projects JASPERS Networking Platform Event Climate Change Adaptation: Vulnerability and Risk Assessment and the Resilience
More informationCLIMATE CHANGE SECTORAL ADAPTATION PLAN FLOOD RISK MANAGEMENT
CLIMATE CHANGE SECTORAL ADAPTATION PLAN FLOOD RISK MANAGEMENT (2015-2019) 2538_RP/002/E FRAM Section Office of Public Works PROJECT Climate Change Adaptation Plan PROJECT No. 2538 PROJECT ENGINEER: CLIENT:
More informationObjectives of this Briefing
Eastern CFRAM Study (Catchment Flood Risk Assessment & Management) Stakeholders Briefing Poddle & Camac Watercourses Overview Grace Glasgow July 2013 Burns Beach near Brighton, Western Australia RPS has
More informationAcknowledgements. Legal Disclaimer. Copyright
SUMMARY REPORT 2018 Acknowledgements The Office of Public Works (OPW) gratefully acknowledges the assistance, input and provision of data by a large number of organisations towards the implementation
More informationComptroller and Auditor General Special Report. Strategic Planning for Flood Risk Management
Comptroller and Auditor General Special Report Strategic Planning for Flood Risk Management Report number 92 December 2015 2 Strategic Planning for Flood Risk Management Report of the Comptroller and Auditor
More informationFlood Risk Management Plan for the BALLYTEIGUE BANNOW River Basin (UoM13)
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 2015 Flood Risk Management Plan for the BALLYTEIGUE BANNOW
More informationBroad-Scale Assessment of Urban Flood Risk Mark G. E. Adamson 1
Broad-Scale Assessment of Urban Flood Risk Mark G. E. Adamson 1 1 Office of Public Works, Trim, Co. Meath, Ireland Abstract The Directive on the assessment and management of flood risks (2007/60/EC The
More informationFlood Risk Management Plan for the NORTH WESTERN River Basin (UoM01)
Appropriate Assessment Determination in accordance with Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulations 2011 2015 Flood Risk Management Plan for the NORTH WESTERN
More informationFOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013
APPENDIX II TO THE SEA ENVIRONMENTAL REPORT STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED AMENDMENT TO THE GAELTACHT LOCAL AREA PLAN 2008-2014 for: Galway County Council County Buildings Prospect
More information[Type the document. title] subtitle] GUIDANCE DOCUMENT 11 A GUIDE TO FLOOD EMERGENCIES
[Type the document title] [Type the document subtitle] GUIDANCE DOCUMENT 11 A GUIDE TO FLOOD EMERGENCIES JULY 2013 INTRODUCTION TO A GUIDE TO FLOOD EMERGENCIES A Framework for Major Emergency Management
More informationEast Meath Local Area Plan
East Meath Local Area Plan 2014-2020 Bettystown / Laytown / Mornington East / Donacarney / Mornington Volume 3 Appendix C Strategic Flood Risk Assessment Copyright JBA Consulting Engineers and Scientists
More informationStrategic Flood Risk Assessment. SFRA Report
Strategic Flood Risk Assessment SFRA Report on Strandhill Mini-Plan Variation No.1 of the Sligo County Development Plan 2011-2017 Prepared by Contents 1. The context for the Flood Risk Assessment 1 2.
More informationSTAGE 2 STRATEGIC FLOOD RISK ASSESSMENT (AS AMENDED)
STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT (AS AMENDED) FOR PROPOSED AMENDMENTS TO THE CLIFDEN LOCAL AREA PLAN 2009-2015 for: Galway County Council County Buildings Prospect Hill Galway by: CAAS Ltd. 2 nd
More informationWG F 20 Workshop - Berlin
WG F 20 Workshop - Berlin THE PLUVIAL PFRA IN IRELAND Mark Adamson Office of Public Works 4 th October, 2016 OVERALL APPROACH TO PFRA OVERALL APPROACH Risk Assessment Three-String Approach Historic FRA
More informationUnique ID: (from PFRA database) Location: Bridgetown, Co. Clare. Stage 1: Desktop Review
Location:, Co. Clare Unique ID: 250412 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 164500 Northing: 168500 River / Catchment / Sub-catchment Black River / Shannon Type
More informationLower Lee (Cork City) Flood Relief Scheme (Including Blackpool and Ballyvolane)
STUDY AREA MAP N LEGEND: Study Area (for which flood alleviation measures are to be identified) Additional Environmental Study Area (assessment area of environmental affects from proposed flood alleviation
More informationSTRATEGIC FLOOD RISK ASSESSMENT
STRATEGIC FLOOD RISK ASSESSMENT UNDERTAKEN AS PART OF THE PREPARATION OF PROPOSED VARIATION NO. 2 (A) TO THE GALWAY COUNTY DEVELOPMENT PLAN 2015-2021 BEARNA PLAN for: Galway County Council Áras an Chontae
More informationSTRATEGIC FLOOD RISK ASSESSMENT
STRATEGIC FLOOD RISK ASSESSMENT FOR PROPOSED VARIATION NO. 1 (CORE STRATEGY) TO THE LONGFORD TOWN DEVELOPMENT PLAN 2009-2015 for: Longford Local Authorities Great Water Street, Longford, Co. Longford by:
More informationA vibrant community offering a new way of living. Clonburris Strategic Development Zone (SDZ) Draft Planning Scheme. Strategic Flood Risk Assessment
A vibrant community offering a new way of living Clonburris Strategic Development Zone (SDZ) Draft Planning Scheme Strategic Flood Risk Assessment September 2017 Contents 1 Introduction... 1 1.1 Terms
More informationLaois County Council Comhairle Chontae Laoise STRATEGIC FLOOD RISK ASSESSMENT PORTLAOISE DRAFT LOCAL AREA PLAN
Laois County Council Comhairle Chontae Laoise STRATEGIC FLOOD RISK ASSESSMENT PORTLAOISE DRAFT LOCAL AREA PLAN 2018 2024 CONTENTS PORTLAOISE... 0 DRAFT LOCAL AREA PLAN... 0 2018 2024... 0 LIST OF FIGURES...
More informationUnique ID: (from PFRA database) Location: Nenagh, Co. Tipperary. Stage 1: Desktop Review
Location: Nenagh, Co. Tipperary Unique ID: 250432 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 186604 Northing: 178781 River / Catchment / Sub-catchment Nenagh River
More informationNavan Development Plan
Navan Development Plan 2013-2019 Flood Risk Assessment and Management Plan Adopted Report June 2014 County Hall Navan Meath 2013s7163 Navan DP SFRA v1 4 tracked changes accepted.docx JBA Consulting 24
More informationSTAGE 2 STRATEGIC FLOOD RISK ASSESSMENT
STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT FOR THE GORT LOCAL AREA PLAN2013-2019 for: Galway County Council County Buildings Prospect Hill Galway by: CAAS Ltd. 2 nd Floor, The Courtyard 25 Great Strand Street
More informationFlood Risk Management Business Plan 2013
Flood Risk Management Business Plan 2013 SECTION 1: OVERVIEW Vision To minimise the impacts of flooding on society, households and businesses, through sustainable planning, guidance, information and effective
More informationStrategic Flood Risk Assessment January 2018
January 2018 As part of the preparation of the Proposed Variation No. 6, Limerick County Development Plan 2010-2016 (as extended) Proposed Variation No. 6 to the Limerick County Development Plan 2010-2016
More informationInterim Report to Government. Interdepartmental Flood Policy Co-ordination Group. 8 November 2016.
Interim Report to Government Interdepartmental Flood Policy Co-ordination Group 8 November 2016. Table of Contents INTRODUCTION... 3 ABBREVIATIONS... 5 EXECUTIVE SUMMARY... 7 1. GOVERNMENT S FLOOD RISK
More informationMONAGHAN COUNTY COUNCIL. Strategic Flood Risk Assessment for County Monaghan
MONAGHAN COUNTY COUNCIL Strategic Flood Risk Assessment for County Monaghan November2017 Table of Contents 1.0: Introduction Page: 5 1.1: Objectives Page: 5 1.2: Study Area Page: 5 1.3: EU Floods Directive
More informationCYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Flood Risk Management Plan (FRMP)
CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September 2018 REPORT AUTHOR: SUBJECT: County Councillor Phyl Davies Portfolio Holder for Highways, Recycling and Assets Flood Risk Management Plan
More informationVolume. 10c. Clare County Development Plan Strategic Flood Risk Assessment
Volume 10c Clare County Development Plan 2017 2023 Strategic Flood Risk Assessment Elizabeth Russell 24 Grove Island Corbally Limerick Ireland This report describes work commissioned by Brian McCarthy,
More informationConsider the risks to your own business as well as to your operations
Hayley Bowman Flood and Coastal Risk Management Mapping, Modelling and Data 07919 544 551 Hayley.bowman@environment-agency.gov.uk DataInfo@environment-agency.gov.uk EA covers England only. Wales covered
More informationSolway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee
Flood Risk Management Strategy Solway Local Plan District Section 1: Flood Risk Management in Scotland 1.1 What is a Flood Risk Management Strategy?... 1 1.2 How to read this Strategy... 1 1.3 Managing
More informationStrategic Flood Risk Assessment Report. Ireland 2040 Our Plan Draft National Planning Framework
Strategic Flood Risk Assessment Report Ireland 2040 Our Plan Draft National Planning Framework TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 OBJECTIVE... 1 1.2 SFRA INTEGRATION WITH THE DRAFT NPF... 1 1.3
More informationDraft Regional Spatial & Economic Strategy
Eastern & Midland Regional Assembly Draft Regional Spatial & Economic Strategy Regional Flood Risk Appraisal Report Tionól Reigiúnach Oirthir agus Lár-Tíre Eastern and Midland Regional Assembly TABLE OF
More informationFlood Risk Management in the EU and the Floods Directive's 1 st Cycle of Implementation ( )
COMMON IMPLEMENTATION STRATEGY FOR THE WATER FRAMEWORK DIRECTIVE AND THE FLOODS DIRECTIVE Flood Risk Management in the EU and the Floods Directive's 1 st Cycle of Implementation (2009-15) A questionnaire
More informationSTRATEGIC FLOOD RISK ASSESSMENT
STRATEGIC FLOOD RISK ASSESSMENT UNDERTAKEN AS PART OF THE PREPARATION OF PROPOSED VARIATION NO. 2 (B) TO THE GALWAY COUNTY DEVELOPMENT PLAN 2015-2021 GAELTACHT PLAN (INCLUDING SETTLEMENTS OF AN CHEATHRÚ
More informationShannon Flood Risk State Agency Co-ordination Working Group - Open Days on Work Programme
Shannon Flood Risk State Agency Co-ordination Working Group - Open Days on Work Programme Questions and Answers What is the purpose of the Shannon Flood Risk State Agency Co-ordination Working Group? The
More informationSFRA for Variation 6a of the Limerick City Development Plan
SFRA for Variation 6a of the Limerick City Development Plan 2010-2016 Strategic Flood Risk Assessment February 2017 Economic Development & Strategic Planning Limerick City & County Council 7-8 Patrick
More informationFlood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan
Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan Forward Planning Kilkenny County Council 18/8/2011 1 Introduction
More informationImplementation of Water Framework and Flood Directive in Finland. Markku Maunula Finnish Environment Institute
Implementation of Water Framework and Flood Directive in Finland Markku Maunula Finnish Environment Institute Finland is rich in freshwater About 11 % of surface is covered by water The number of lakes
More informationComhairle Baile Cheanntair~ Nás na Ríogh
Comhairle Baile Cheanntair~ Nás na Ríogh DRAFT STRATEGIC FLOOD RISK ASSESSMENT NAAS TOWN DEVELOPMENT PLAN 2011 ~ 2017 Kildare County Council Water Services Department Aras Chill Dara Devoy Park Naas County
More informationFlood Risk Assessment and Management Plan for proposed Variation 3 to the Meath CDP
Flood Risk Assessment and Management Plan for proposed Variation 3 to the Meath CDP 2013-2019 SFRA Report December 2015 County Hall Navan Meath JBA Project Manager Ross Bryant BSc MSc CEnv MCIWEM C.WEM
More informationSOUTH GALWAY GORT LOWLANDS
SOUTH GALWAY GORT LOWLANDS FLOOD RELIEF SCHEME TENDER DOCUMENTS: PROJECT BRIEF AUGUST 2017 GALWAY COUNTY COUNCIL ROADS, TRANSPORTATION, MARINE AND GENERAL SERVICES TABLE OF CONTENTS 1 BACKGROUND AND SCOPE
More informationCelbridge, Co Kildare
Celbridge, Co Kildare Flood Risk Assessment December 2018 Oldtown, Celbridge, Co. Kildare. JBA Project Manager David Casey Unit 3, Block 660 Greenogue Business Plaza, Greenogue Rathcoole, Dublin Revision
More informationPRESENTATION BY OPW TO JOINT OIREACHTAS COMMITTEE ON CULTURE, HERITAGE, AND THE GAELTACHT
PRESENTATION BY OPW TO JOINT OIREACHTAS COMMITTEE ON CULTURE, HERITAGE, AND THE GAELTACHT THE LOWER LEE (CORK CITY) FLOOD RELIEF SCHEME The first image shown here is the proposed view at Merchant s Quay
More informationFlood Risk Management
Flood Risk Management COUNTY SUMMARY COUNTY: MONAGHAN (Information correct as of 31/12/2017) CONTENTS: 1. OPW Capital Investment to 31 December 2017 a. Major Flood Relief Schemes 1995 2017 b. Minor Flood
More informationFlood Risk Management Planning in Scotland: Arrangements for February 2012
Flood Risk Management Planning in Scotland: Arrangements for 2012 2016 February 2012 Flood Risk Management (Scotland) Act 2009 1 Contents Forewords 1. Introduction to this document... 5 2. Sustainable
More informationMapping flood risk its role in improving flood resilience in England
Mapping flood risk its role in improving flood resilience in England Catherine Wright Director of Digital and Skills Flood and Coastal Risk Management Environment Agency 6 October 2017 The Environment
More informationAppendix 12.3 Flood Risk Assessment
Appendix 12.3 Flood Risk Assessment Contents A12.3-1.1 Scope of Work 1 A12.3-1.2 Summary of Data Used 1 A12.3-1.3 Proposed Project 2 A12.3-2.1 The Planning System and Flood Risk Management Guidelines 2
More informationBackground to the PFRA European Overview - UC9810.5b
Background to the PFRA European Overview - UC9810.5b The individual Member State Reports reflect the situation as reported by the Member States to the European Commission in 2012 The situation in the MSs
More informationFlood Risk Management
Flood Risk Management COUNTY SUMMARY COUNTY: CAVAN (Information correct as of 31/12/2017) CONTENTS: 1. OPW Capital Investment to 31 December 2017 a. Major Flood Relief Schemes 1995 2017 b. Minor Flood
More informationFloods Directive (2007/60/EC) : Reporting sheets Version November 2009
Floods Directive (2007/60/EC) : Reporting sheets Version November 2009 Endorsed by Water Directors 30 November 2009 1 of 19 Title:, version November 2009 Version no.: Final Date: 30 November 2009 History
More informationWhat can be done to minimise future economic and social harm caused by flooding and improve resilience. Flood Warning and Informing
What can be done to minimise future economic and social harm caused by flooding and improve resilience Flood Warning and Informing Marc Becker SEPA Flood Risk Manager (Hydrology) 16 th September 2016 The
More informationStrategic Flood Risk Assessment
Strategic Flood Risk Assessment Draft Claremorris Local Area Plan 2012 2018 Prepared by Forward Planning Section Mayo County Council 1 Table of Contents Section 1: Overview of the Guidelines... 4 1.1 Introduction...
More informationCanada s exposure to flood risk. Who is affected, where are they located, and what is at stake
Canada s exposure to flood risk Who is affected, where are they located, and what is at stake Why a flood model for Canada? Catastrophic losses Insurance industry Federal government Average industry CAT
More informationStrategic Flood Risk Assessment for County Meath
Strategic Flood Risk Assessment for County Meath Draft Meath County Development Plan 2013-2019 May 2012 Meath County Council County Hall Navan County Meath JBA Consulting 24 Grove Island Corbally Limerick
More informationCommittee Brief Public Accounts Committee Vote 13 Office of Public Works Appropriation Account 2017
Committee Brief Public Accounts Committee Vote 13 Office of Public Works Appropriation Account 1 PROGRAMME A - Flood Risk Management High level goal of the programme To minimise the extent of coastal and
More informationA brief introduction to the Flood (Risk) Directive. Jan Verkade, M.A. Delft Hydraulics
A brief introduction to the Flood (Risk) Directive Jan Verkade, M.A. Delft Hydraulics Flood Risk Directive s full name: Directive 2007/60/EC of the European Parliament and of the Council on the assessment
More informationFlood Risk Management Strategy. Shetland
Flood Risk Management Strategy Shetland Publication date: 14 December 2015 Terms and conditions Ownership: All intellectual property rights for Flood Risk Management Strategies are owned by SEPA or its
More informationFlood issues in the Danube RBD. Igor Liska ICPDR Secretariat
Flood issues in the Danube RBD Igor Liska ICPDR Secretariat PFRA report Introduction; Overall approach and methodology of PFRA; Historical floods in the Danube River Basin; Potential adverse consequences
More informationThe Planning System and Flood Risk Management Guidelines for Planning Authorities
Technical Appendices November 2009 Contents PAGE A. Identification and Assessment of Flood Risk 1 B. Addressing Flood Risk Management in Design of Development 35 A Appendix A: Identification and Assessment
More informationStrategic Flood Risk Assessment
Gorey Town and Environs Local Area Plan 207-2023 Appendix 4 Strategic Flood Risk Assessment April 207 Table of Contents Introduction and Context.... Introduction....2 Legislative and Planning context....2.
More informationPrepared by... Ross Bryant BSc MSc CEnv MCIWEM C.WEM Chartered Senior Analyst
JBA Project Manager Ross Bryant 24 Grove Island Corbally Limerick Ireland Revision History Revision Ref / Date Issued Amendments Issued to V1.0 February 2017 First Issue Clare County Council V2.0 March
More informationSTATUTORY INSTRUMENTS. S.I. No. 122 of EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010.
STATUTORY INSTRUMENTS. S.I. No. 122 of 2010. EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010. (Prn. A10/0432) 2 [122] S.I. No. 122 of 2010. EUROPEAN COMMUNITIES (ASSESSMENT
More informationStrategic Flood Risk Assessment
Strategic Flood Risk Assessment Ireland West Airport Knock Local Area Plan 2012 2018 Prepared by Forward Planning Section Mayo County Council 0 1 Table of Contents Section 1: Overview of the Guidelines...
More informationBilateral screening: Chapter 27 PRESENTATION OF THE REPUBLIC OF SERBIA
REPUBLIC OF SERBIA Negotiating Group for the Chapter 27, Environment and Climate Change Bilateral screening: Chapter 27 PRESENTATION OF THE REPUBLIC OF SERBIA Directive 2007/60/EC of the European Parliament
More informationVulnerability and Risk Assessment for the PFRA in Ireland
Vulnerability and Risk Assessment for the PFRA in Ireland Mark Adamson 1, Anthony Badcock 2 1 Office of Public Works, Ireland 2 Mott MacDonald Group, U.K. Abstract The Preliminary Flood Risk Assessment
More informationFloods Directive (2007/60/EC) : Reporting sheets Endorsed by Water Directors : - 30 November December 2010
Floods Directive (2007/60/EC) : Reporting sheets Endorsed by Water Directors : - 30 November 2009-3 December 2010 Version 2 - February 2011 1(25) Title: Floods Directive (2007/60/EC) : Reporting sheets,
More informationDerry City & Strabane District Council 17th July 2015, 3pm.
Derry City & Strabane District Council 17th July 2015, 3pm Malcolm Calvert, (Principal Engineer, Mapping & Modelling Unit) Sean O Neill, (Regional Engineer - Western) Flood Hazard & Risk Mapping www.riversagencyni.gov.uk
More informationDirective 2007/60/EC. A new EU legal context on the assessment and management of flood risks. OJ L288, , p.27. water.europa.
Directive 2007/60/EC A new EU legal context on the assessment and management of flood risks OJ L288, 6.11.2007, p.27 Maria Brättemark, WFD Team, DG ENV.D.1, European Commission water.europa.eu This presentation
More informationBackground to the PFRA European Overview UC10508
Background to the PFRA European Overview UC10508 The individual Member State Reports reflect the situation as reported by the Member States to the European Commission in 2014 The situation in the MSs may
More informationSEPA Update (How can Kemnay become a PVA?)
SEPA Update (How can Kemnay become a PVA?) Kemnay Flood Action Group 21 st September 2017 Steve McFarland, Flood Risk Planning Manager (North) SEPA Duties DO Flood risk management planning Flood forecasting
More informationShropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014
Shropshire Local Flood Risk Management Strategy Summary for Consultation July 2014 SHROPSHIRE LOCAL FLOOD RISK MANAGEMENT STRATEGY 1 Introduction This Strategy is about managing flooding in Shropshire.
More informationDocument Control Sheet
Strategic Flood Risk Assessment of the Maynooth Local Area Plan 2013-2019 Proposed Amendment No. 1 Document Control Sheet Client: Project Title: Document Title: Document No: Kildare County Council Strategic
More informationDanube Flood Risk Management Plan. Igor Liska & Raimund Mair ICPDR Secretariat
Danube Flood Risk Management Plan Igor Liska & Raimund Mair ICPDR Secretariat 800.000 km 2 80 Mio. people 19 countries Most international River Basin in the World Danube River Protection Convention signed
More informationFlood Risk Assessment Cobh Town Plan Cobh Town Development Plan Volume 2: Strategic Flood Risk Assessment
Flood Risk Assessment Cobh Town Plan 2013 Cobh Town Development Plan 2013 Volume 2: Strategic Flood Risk Assessment Cobh Town Plan 2013 Flood Risk Assessment Document Verification Page 1 of 1 Job Title:
More informationFloods Directive: The European Perspective Ioannis Kavvadas, DG ENV
Floods Directive: The European Perspective Ioannis Kavvadas, DG ENV Paris, 5 November 2014 paste dramatic photo with floating houses and piled up cars -> here
More informationSTAGE 2 STRATEGIC FLOOD RISK ASSESSMENT LONGFORD COUNTY DEVELOPMENT PLAN FEBRUARY 2015 FOR THE. Longford County Council. CAAS Ltd.
STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT FOR THE LONGFORD COUNTY DEVELOPMENT PLAN 2015-2021 for: Longford County Council Great Water Street Longford County Longford by: CAAS Ltd. 2 nd Floor, The Courtyard
More informationCzech Republic 2007/60/EC
Czech Republic 2007/60/EC Methodology & Results of the Flood Risk Mapping Budapest, 16.11.2009 V4 on Flood Protection Ing. Vaclav Jirasek Ing. Petr Brezina Present situation overview Legislation status
More informationChelmsford City Council. Level 1 and Level 2 Strategic Flood Risk Assessment. Final Report
Chelmsford City Council Level 1 and Level 2 Strategic Flood Risk Assessment Final Report October 2017 This page has been left intentionally blank 2015s3715 Chelmsford SFRA L1 and L2 Final Report v1.0.docx
More informationRoadmap for future regional action in disaster risk management with focus on flood risk management and aspects with a multi-beneficiary dimension
Grant Contract N. ECHO/SUB/2014/692292 Programme for Prevention, Preparedness and Response to Floods in the Western Balkans and Turkey IPA FLOODS IPA FLOODS implementing Consortium Italian Civil Protection
More informationVolume Three. Pluvial Flood Risk Management
EU Interreg IVB FloodResilienCity Project Final Report Dublin Volume Three Pluvial Flood Risk Management Document control sheet BPP 04 F8 Client: Project: Document Title: Dublin City Council Job No: 32102500
More informationFlood risk management plans the interlink between Floods Directive and Water Framework Directive a creative approach to authorities work
Flood risk management plans the interlink between Floods Directive and Water Framework Directive a creative approach to authorities work Gimo, 11.06.2014 Iveta Teibe, iveta.teibe@varam.gov.lv What s explicitly
More informationFlood Risk Assessment Appendix 1 to Strategic Environmental Assessment of Ferrybank/Belview Local Area Plan 2017
Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment of Ferrybank/Belview Local Area Plan 2017 Forward Planning Kilkenny County Council June 2017 Contents 1 Introduction... 1 1.1 Disclaimer...
More informationRegulations Regarding Preliminary Flood Risk Assessment, Flood Maps and Flood Risk Management Plan
Text consolidated by Valsts valodas centrs (State Language Centre) with amending regulations of: 20 March 2012 [shall come into force from 23 March 2012]. If a whole or part of a paragraph has been amended,
More informationIMPLEMENTING THE FLOOD DIRECTIVE IN PRUT AND SIRET
IMPLEMENTING THE FLOOD DIRECTIVE IN PRUT AND SIRET Legal and Institutional aspects Iasi, 28-29 January, 2014 Mary-Jeanne ADLER, Scientific Director INHGA, Ministerial Consulter Timetable for adoption &
More informationCelbridge. Local Area Plan STRATEGIC FLOOD RISK ASSESSMENT
Celbridge Local Area Plan 2017-2023 Dréachtphlean Ceantair Áitiúil Cill Droichid STRATEGIC FLOOD RISK ASSESSMENT Planning Department Kildare County Council September 2017 Strategic Flood Risk Assessment
More informationGuildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016
Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report January 2016 What is this document? This document provides a summary of Guildford Borough Strategic Flood Risk Assessment (SFRA,
More informationWorking with natural processes to help manage flood risk natural flood management Dr. Heather Forbes. Scottish Environment Protection Agency
Working with natural processes to help manage flood risk natural flood management Dr. Heather Forbes Senior Policy Officer Programme Scottish Environment Protection Agency Scotland s flood risk 56% 21%
More informationGood Practice Guide. GPG 101 Document Owner: Steve Cook. Page 1 of 7.
Good Practice Guide Producing flood risk hydraulic models and flood consequence assessments for development planning purposes Date Published: September 2015 GPG 101 Document Owner: Steve Cook Page 1 of
More informationStrategic Flood Risk Assessment (SFRA)
Draft Sligo County Development Plan 2017-2023 for public consultation September 2016 Strategic Flood Risk Assessment (SFRA) Strategic Flood Risk Assessment (SFRA) of the Draft Sligo County Development