The Reader s Guide (Section A) at the beginning of the budget document provides a brief overview of how the City s budget is organized.

Size: px
Start display at page:

Download "The Reader s Guide (Section A) at the beginning of the budget document provides a brief overview of how the City s budget is organized."

Transcription

1 Under Washington Law, the City Manager presents a balanced annual or biennial budget for the City s upcoming fiscal period for consideration and adoption by the City Council. Mercer Island s biennial budget serves a number of essential functions. The budget is more than a checkbook posting of proposed revenues and expenditures. It is a financial plan that looks out over two-year (operating budget) and six-year (Capital Improvement Program) horizons, balancing planned income and expenses in a fiscally responsible manner. It is a policy plan, guiding and assuring the City s long-term financial health. And, most importantly, it is a detailed description of the goods and services for which the City and its elected officials will be held accountable. It documents the social contract between the citizens and their government. The budget also serves in a broader policy context. It draws upon many City Council decisions and discussions that precede it, and it will leave a legacy of policy influence for future budgets helping to give the City s finances long-term stability and continuity. How the Budget is Organized The Reader s Guide (Section A) at the beginning of the budget document provides a brief overview of how the City s budget is organized. The budget covers two operating years for all City departments and functions. However, in order to assess revenue and expenditure trends, most budget sections also show actual data for 2007 and forecast data for Service Packages Reflecting the City Council s desire to focus on significant changes in the proposed budget for the coming biennium, City staff has prepared departmental service packages for , which represent new (or renewed) requests for temporary or ongoing positions, contracted services, and/or equipment costing at least $10,000. This budgeting approach recognizes that most of the services provided by a city extend from one year to the next, especially in a city that isn t growing very much. Consequently, the scope of the budget review process is narrowed to notable increases and decreases in each department s operating budget. In addition, the City Council will review the changes to each department s base (i.e. ongoing) budget. These changes are broken down into two major components: 1) general inflationary increases, and 2) other significant changes. Within the latter component, prior year one-time costs are called out collectively as a decrease, because they will not be re-budgeted in within each department s base budget. If such a cost needs to be budgeted again in and it is $10,000 or more, it will be proposed as a service package. Service package request detail sheets are provided in Section K. Examples of notable proposed initiatives include the following: Parks & Recreation: CCMV Staffing; CCMV Drop-in Child Care Program; Boating Program; and Community Art Programs. Development Services: Maintain Plan Review & Inspection Levels of Service; Digital Plan Review Option; Transportation Plan; Building Code Update; and Comprehensive Plan Update. Maintenance: Tree Planting Program (Sustainability); Puget Sound Energy Conservation Program (Sustainability); and Town Center Improvements. Municipal Court: Conversion of Temporary Court Clerk to Regular Status. City of Mercer Island Budget B-1

2 Information & Geographic Services: Computer Support Technician. City Manager s Office: Production of 4 Episodes of MI View. Priorities of Government Over the past two biennia, the City has shown how it spends its resources against the City Council s stated or implied priorities. The Council has sought this information so that it can better understand and consider tradeoff decisions among and across services and cost centers. In 2004, using a process loosely based on the State of Washington s Priorities of Government, the City Council adopted six City priorities to serve as a filter through which significant changes to City services and programs could be evaluated: 1. The community will be safe. 2. The community will support effective, efficient and legal delivery of public services. 3. The community will support reliable public infrastructure and protect its considerable public investments (e.g. water, sewer, storm water utilities, streets, parks, and buildings). 4. The community will support attractive, high quality neighborhood and business environments. 5. The community will support a broad range of recreational, cultural, health and educational opportunities. 6. The community will support open and informed public involvement processes within the structure of representative, democratic decision making. A complete listing of the priorities and their sub-priorities can be found in Appendix A at the end of the. The proposed Budget confirms what was discovered back in 2004 with the development of the Budget, namely that: The City spends most of its resources on its highest priority services and projects. The City provides the highest tax support for its highest priority services police; fire; infrastructure maintenance (streets and parks); and administrative services that ensure the legal and efficient running of the City like Finance, Human Resources, City Attorney s Office, and City Manager s Office. The services that are least tax-supported are those for which the City can sell the service through user fees and utility rates (recreation, youth and family counseling, development permits, and utility services). The services for which the City has some of its most accurate data on individuals served are those services most associated with user fees. Those services are also often associated with active and supportive constituencies (recreation programs, leagues, seniors, and schools-related groups). The City spends comparatively less in services aimed at public information and public involvement. B-2 City of Mercer Island Budget

3 Performance Measures This biennial budget will continue to identify key performance measures that can be tracked through the budget period. Performance measures are linked to the City s budgetary resources (inputs) and to the City Council s values (outputs and outcomes) as expressed in the City Priorities. By tracking performance measures over time, the City hopes to create an ongoing link between its stated goals and priorities and how resources are applied. Periodic reporting of performance objectives and results will be presented to the City Council and community via the MI Dashboard Report compiled by the Finance Department. Financial Status Financial Forecast Due to a long history of constraining expenditure growth, conservatively estimating revenues, and maintaining a sizeable debt capacity, the City s financial condition is still solid. However, the City s finances have become increasingly sensitive to fluctuations in the local and regional economy that are beyond its control. The current economic downturn coupled with the effects of taxpayer initiatives have had notable impacts on some City revenue streams most notably sales tax, real estate excise tax, and property tax receipts. Meanwhile, labor cost increases continue to significantly outpace both the CPI for the Seattle metro area and the 1% ceiling on annual property tax increases. These expenditure and revenue trends are discussed below. Expenditure Trends Public Safety Costs A continuing challenge facing the City Council now and in the future is constant growth in the cost of providing Public Safety services. During the coming biennium, the Council will face significant increases in wages and health care benefits for our existing police and fire personnel, increases in health care costs for our police and fire retirees, and start-up and ongoing operation costs for transitioning to NORCOM for police and fire dispatching services. In addition, the Police Department continues to grapple with the broader regional issue of housing misdemeanant prisoners at affordable rates. If the City is unable to reduce its current daily bed commitment to Yakima County from 4 beds to 1 bed, the Police Department s jail costs will increase $71,000 in In subsequent biennia, the City will face replacement of aging 800 MHz radio (local and regional) technology and an aging South Fire Station. Labor and Fuel Costs National and regional inflation rates have continued to climb over the past year. For the Seattle metro area, the June 2008 CPI-W was 6.2% and the First Half 2008 CPI- W was 4.9%. Back in 2006, when the biennial budget was developed, the corresponding inflation rates were 4.6% and 3.5% respectively. Employee cost of living increases are tied to one of these two inflation indexes in the City s various labor contracts. In addition, rising costs for fuel have resulted in significant increases in fleet operating costs. In 2008, the City will absorb an estimated $95,000 over the budgeted amount for gas and diesel fuels (i.e. $145,200). Development Staffing Development activity locally and regionally has slowed measurably from the record pace experienced over the past four years. More specifically, residential development, which is down 33% as of mid-2008 (as measured by the number of building permits issued), is not expected to pick up significantly until 2010, with one notable exception. Shorewood Heights is planning to build 124 apartment or condominium units in As for the Town Center, City of Mercer Island Budget B-3

4 Development Services staff predicts that development activity will continue to slow in 2009 and During the biennium, the City increased its temporary development staff to handle the increased permit activity. Still, permit activity increased to levels where permit revenues substantially exceeded the 65% cost recovery policy set by the City Council. In the biennium, some temporary positions were converted to regular, ongoing positions, other temporary staff contracts were extended, and 2.5 more temporary staff were added to service the permit load. These actions brought the City back to its 65% cost recovery policy and reset the permit processing level of service to match expectations of the City s development customers. For the coming biennium, 3.0 contract FTE s won t be renewed. By Spring 2009, the administration will re-evaluate staffing versus permit activity to ensure the proper balance of permit activity, cost recovery, and service levels. Revenue Trends Citizen Initiatives With the Legislature s 2000 enactment of Initiative 695, the City experienced a loss of approximately $1.1 million per year in annual Motor Vehicle Excise Taxes (via sales tax equalization) approximately 9% of General Fund revenues. The City continues to adjust to this loss of General Fund revenue through a mixture of constrained expenditures and growth in more volatile revenues such as sales taxes and permit fees. Property Taxes Further constraining revenues, the City s single largest source, property taxes, saw relatively low growth during the early part of the decade. Since passage of Initiative 747 in 2001, the City has been limited to annual property tax increases of 1%. Throughout the past ten years the cost of basic services has increased an average of 5.0% per year. In three of the past seven years, the City Council increased the property tax 1% but refunded 1% back to taxpayers from yearend revenue surplus in the General Fund. In 2007, the City Council approved a slight increase in property taxes above the 1% threshold using banked capacity to generate a long-term funding stream for fire apparatus replacement. Fortunately, new construction during the past five years has helped to re-index the Island s total assessed value and has generated new property taxes in the range of 1% to 2% per year. Sales Taxes Counteracting the effects of these revenue reductions, sales tax receipts have been strong during the past two biennia; however, this trend is expected to change in the coming biennium. Compared to 2008, Finance staff is estimating a cumulative reduction of $1.1 million in construction-related sales tax in The projected decline can be primarily attributed to the mid-2009 completion of two major projects in the Town Center and a significant decline in residential construction. On a positive note, the Legislature enacted the Streamlined Sales Tax measure during the 2007 session. Destination-based sales tax revenues will begin flowing to the City in September While it is too early to accurately predict annual receipts from this new source, Finance staff is only budgeting an additional $200,000 in sales tax revenue for 2009 and $350,000 for 2010 relative to 2008 given the current and projected state of the economy. This represents a $400,000 reduction in 2009 and a $300,000 reduction in 2010 from the streamlined sales tax forecast by the Washington State Department of Revenue. The table below displays actual and projected total sales tax revenues as well as constructionrelated sales tax revenues for B-4 City of Mercer Island Budget

5 Year Sales Tax Revenue Total Construction 2003 $2,685,252 $917, $2,565,501 $912, $2,643,672 $1,303, $2,627,512 $1,244, $3,949,552 $1,607, $3,675,000 $1,600, $3,340,000 $1,250, $3,460,000 $850,000 Development Fees Relative to 2008, permit fees are expected to decrease by $446,000 in 2009 and by $466,000 in Over the biennium, this represents a cumulative projected reduction of $912,000. Of course, this revenue is cyclical and directly tied to the level of construction in the community. As development activity subsides permit revenues fall, and as development activity picks up so do the permit fees along with the staff costs required to process the increased permit load. However, there is a timing delay between revenue collection and staff work. Permit fees are collected up front before a project breaks ground, but the related staff work can extend for a year or more depending on the size of the development project. Budget Summary At its highest level of generalization, this budget can best be summarized in the following ways. The Budget: Maintains existing service levels without unexpected tax increases. Provides for Council-sought initiatives in Sustainability, Pedestrian/Bicycle Facilities, Shoulderwidening, and Town Center Improvements. Provides needed investments in basic infrastructure for Streets, Water, Sewer, and Storm Water facilities with associated utility rate increases. Provides for addition of necessary staff in basic services: CIP project management, Municipal Court, facilities maintenance/project management, and information technology support. General Fund Revenue Sources Reflecting the recent trends mentioned above, the General Fund continues to receive nearly all of its operating revenues from the same tax sources in approximately the same proportions as previous years. A breakdown of the budgeted major revenue sources for is provided on the following page. City of Mercer Island Budget B-5

6 Licenses & Permits 8% Recreation Programs 5% General Fund Revenues Budget Property Tax 42% Property Tax Sales Tax Business & Utility Taxes Shared Revenues Utility Overhead EMS Revenues Recreation Programs Licenses & Permits Utility Taxes 15% Sales Tax 14% District Court Fines All Other Revenues Total budgeted General Fund resources for 2009 and 2010 are $23,208,210 and $24,459,585 respectively. The ten year history of General Fund revenues and expenditures is displayed in the table and graph below. Actual Actual Actual Actual Actual Actual Actual Forecast Budget Budget Revenues $19.53 $18.18 $17.51 $17.66 $19.11 $20.07 $22.98 $25.55 $23.21 $ % -6.9% -3.7% 0.9% 8.2% 5.0% 14.5% 11.2% -9.2% 5.6% Expenses $16.00 $16.34 $16.61 $17.58 $19.11 $18.79 $21.74 $23.98 $23.21 $ % 2.1% 1.7% 5.8% 8.7% -1.7% 15.7% 10.3% -3.2% 5.6% Reserves $3.53 $1.84 $0.90 $0.08 $0.00 $1.28 $1.24 $1.57 $0.00 $0.00 Average annual expenditure increase ( ) = 5.0% General Fund Revenue & Expenditure History Millions Year Revenues Expenses B-6 City of Mercer Island Budget

7 Department Operating Budgets The City continues to dedicate the largest portions of its resources to Public Safety (police, fire, and medical aid) and Maintenance. As shown below, the combined operating budgets for these areas account for $48.10 million, or 60%, of total operating expenditures for the biennium Operations by Department Millions $30.0 $25.0 $20.0 $15.0 $10.0 $5.0 $ Maintenance Police Fire Parks & Recreation Non-Departmental Development Services Youth & Family Services Finance City Manager Human Resources City Attorney Muicipal Court City Council Staffing Reflecting only the organization s most pressing staffing needs given the current economic environment, a 0.5 employee net decrease is proposed for , which is broken down as follows: Proposed Changes in Regular Employees: Convert 1.0 FTE DARE Police Officer to 1.0 FTE Patrol Officer. Eliminate 1.0 FTE Right of Way Maintenance Team Member. Add 1.0 FTE Computer Support Technician (funded by elimination of ROW Maintenance Team Member and overtime savings from DARE Officer conversion). Add 1.0 FTE Municipal Court Clerk (funded by court revenues). Proposed Changes in Contract Employees: Eliminate 3.0 contract FTE s in DSG (part of temporary development staffing approved for Budget). Add 1.5 contract FTE s for CIP project management and support (1.0 FTE Facilities Project Manager and 0.5 FTE Administration Clerk, which would be wholly funded by CIP revenues). City of Mercer Island Budget B-7

8 The total number of regular (i.e. ongoing) and contract employees approved for and proposed for is displayed below. 10 Year Staffing (FTE s) History Contract FTE's Regular FTE's Outstanding Debt The City continues to carry a low level of outstanding debt. The general-purpose debt capacity, according to state statute, is $221,955,901 for voted and non-voted debt. The debt capacity for Parks and Open Space is an additional $221,955,901. Mercer Island s bonded and lease obligation as of 12/31/2007 is $5,502,008 representing only 1.2% of that allowed under state law. Biennial Budget Issues & Initiatives Listed below are the major issues, initiatives, and changes in the proposed biennium. The proposed General Fund increases and decreases are explained in greater detail below and in Section C (Budget Policies). Sustainability Since the early 1990 s, the City has been a regional leader in resource conservation. The City has experienced significant success in recycling and solid waste stream diversion, water conservation, storm water quality improvements, building energy efficiencies, and invasive species removal. In the coming biennium, the City will step up its activities in the following areas: Fleet Operations Achieve platinum status in the Evergreen Fleets Initiative. B-8 City of Mercer Island Budget

9 Healthy Neighborhoods Bicycle and pedestrian emphasis, Citizens Climate Action Task Force, carbon emission challenge with Bainbridge Island. Water Quality Stage 2 NPDES storm water discharge permits, Sewer Lake Line project, and Luther Burbank demonstration area projects. Energy & Resource Conservation Continued recycling goals, water conservation, tree bank and tree planting pilot program, partnership with Puget Sound Energy and the School District for energy conservation in City and School buildings. The costs for most of these activities will be covered by savings generated from higher resource efficiencies and one-time funding, as needed. See Sustainability policy in Section C (Budget Policies) for more details. Look for this logo throughout the budget document for sustainable activities. Public Safety The Police Chief has conducted a thorough review of departmental needs in light of the resources that are available. He has concluded that by restructuring how the Department undertakes drug and alcohol education in the schools (DARE) the City can maintain the most effective aspects of DARE while addressing staffing concerns in routine police patrol. Simply stated, the proposal involves shifting drug and alcohol education to the Middle School level, using school instructional staff, Police School Resource Officer, and YFS staff for curriculum instruction, and re-converting the DARE Officer back to a patrol officer position from which it originally came. This proposal would result in a net savings of almost $58,000 to the City due mostly to a reduction in expected Police Patrol overtime. Finally, it has the understanding and support of the School District and YFS staff. NORCOM is expected to go live in July At that time, police and fire 911 calls will be received and dispatched from the NORCOM Regional Communication Center in Bellevue. As a consolidation of public safety communications for the entire Eastside, NORCOM has significant start-up and transition costs. In , Mercer Island s share of start-up, technology, and transition costs is budgeted at $346,000; however, this amount will be reduced to $232,000 provided that the recommended $1.5 million federal Homeland Security grant to NORCOM receives final approval. This would result in onetime technology costs being significantly below what was projected when the Council approved the NORCOM interlocal agreement. Annual operating costs for Mercer Island will be $475,000 in 2009 and $605,000 in 2010, representing an increase of $383,000 over the biennium. In addition to communication costs, the Police Department continues to see increasing jail costs driven by King County s notification to displace all city misdemeanant prisoners by Jail contracts with King County, Yakima County, and Issaquah will cost the City $169,000 in 2009 and $174,000 in Efforts are underway to reduce the City s daily jail bed commitment with Yakima County from 4 beds to 1 bed, thereby reducing jail costs. See Police & Fire Dispatching and Jail Services policies in Section C (Budget Policies) for more details. Community Center The Community Center at Mercer View (CCMV) continues to experience expanding usage and demand for increased hours of operation. Over the past biennium, the CCMV increased its holiday and weekend operations. Weekday operations continue to run from 7:30am to 9:00pm. It should be noted that CCMV staff has managed to stay within the authorized General Fund subsidy for the City of Mercer Island Budget B-9

10 biennium, but this won t be possible in the coming biennium at current levels of service. Accordingly, to properly staff and maintain the CCMV within current operating hours, hourly ( casual ) staff and custodial budgets need to be increased by a combined total of $120,000 in 2009 and $123,000 in These expenditures can be partially offset by improved room rental revenue from increased marketing efforts. However, even after bumping up room rental revenue by almost $57,000 in 2009 and $69,000 in 2010, Parks & Recreation and Finance staff are still projecting a funding shortfall of $63,000 in 2009 and $65,000 in 2010, assuming no change in the current budget policy regarding General Fund support. It is recommended that the General Fund subsidy be increased to cover this difference and that this issue be re-visited at the mid-biennial budget review in November This will give CCMV staff 10 months to see how much room rental revenue can be realistically generated from increased marketing efforts. See Parks & Recreation Financing policy in Section C (Budget Policies) for more details. Development Services Permit Processing Since 1999, the City has seen a significant increase in single-family home development/remodeling and commercial construction. In 2000, the Development Services Group (DSG) processed a record 2,973 land use, single family, commercial, and over-the-counter permits. That pace increased to 3,205 permits in During the same time period ( ), building valuations for permits increased from $48.1 million to $80.1 million. This was largely driven by home remodels and the redevelopment of the Town Center. To provide some additional context, key development statistics for are presented below. Development Statistic Single Family Residential Permits Issued Commercial/Multi-Family Permits Issued Over the Counter Permits Issued 1,896 2,465 2,656 2,589 2,572 Total Building Valuation $26.83M $93.53M $80.13M $95.91M $86.26M Total Development Fees $1.26M $1.42M $2.10M $2.03M $2.25M With permit activity having hit a plateau at significantly higher levels than in the 1990 s, the budget included a number of staffing changes to reset the core staff complement. Staff changes included conversion of an Associate Planner, Permit Technician, and Utility Site Inspector from contract to regular status. In addition, resources to fund temporary contracts for a Plans Examiner, a Building Inspector, and a Permit Coordinator were approved. Each of these contingent positions was approved for a two year period as long as the permit workload could justify the position. In the proposed Budget, the DSG contingent staff has been reduced by 3.0 FTE s, leaving 2.0 contract FTE s. Should development activity slow further than projected, additional reductions will be enacted in order to maintain the overall cost recovery policy of 65% from permit fees. See Development Review Fees policy in Section C (Budget Policies) for more details. B-10 City of Mercer Island Budget

11 Revenues Property Taxes 1% Increase Mercer Island continues to be highly dependent upon the property tax for funding its basic services (40% of total revenues in ). As primarily a residential community, Mercer Island s commercial/retail tax base yields revenues that fall below the statewide average for similar sized communities. Generally, Mercer Island and other bedroom communities have lower reliance on sales tax receipts and, consequently, a higher reliance on local property taxes. In contrast to past trends, the development boom over the past four years has generated significant increases in construction-related sales taxes and new construction property taxes. However, as previously mentioned, construction-related sales taxes are projected to decline beginning in 2009, and if the redevelopment of the old Safeway site and phase II of The Mercer don t move forward in 2009, this revenue decline will become much steeper. Given the uncertainty around construction-related sales tax and the current rate of inflation as measured by the Seattle metro area CPI-W (6.2% in June 2008 and 6.2% in August 2008), the proposed Budget assumes a 1% Council-approved property tax increase in 2009 and See Property Tax policy in Section C (Budget Policies) for more details. Utility Rates The utility rates discussed below are preliminary estimates. Any significant changes in water consumption (from budget planning assumptions) or new project cost information will be factored into the rate recommendation, which will be presented to the City Council on November 17 th. Water Rates In 2003, the City Council approved a new 60 year water supply agreement with Seattle Public Utilities. As expected with Seattle s new rate structure, wholesale rates rose in 2005, 2006, 2007, and Wholesale water rates will also increase by 10% in In order to meet revenue requirements for these expenses and for planned capital improvement needs, the Utility Board and City Manager recommend an overall increase (across all customer classes) of 10.5% in For a single family residential customer, the 2009 rate increase is estimated to be 9.5%, which translates into a $4.25 increase in the bi-monthly bill, assuming normal water usage. Sanitary Sewer Rates Since 2004, the City Council has approved significant annual increases in the sewer line maintenance rate in order to fund the repair and replacement of the lake line along the northwest shore of Mercer Island. This covers the City s portion of operating and maintaining the sanitary sewer system and equals about 50% of the total bi-monthly sewer bill paid by the average single family residential customer. For 2009, the City Manager recommends a rate increase of 12.0% to fund lake line construction, which is expected to begin early in This represents a $6.40 increase to the average single family residential customer s bi-monthly bill. [The Utility Board recommended a higher rate increase of 18.0% for 2009 in order to cover project bids that come in higher than expected.] Sewage Treatment Rates Sewage Treatment rates from King County METRO, which represent a pass through charge, will increase in 2009 by 14.13%, which represents a $7.90 increase to the bi-monthly bill for an average single family residential customer. Storm Water Rates To give utility customers a break in 2008 (in light of the approved 18.1% increase in sewer line maintenance rates that year), storm water rates were held at the adopted 2007 levels. In order to maintain the capital improvement program expectation of the Utility Board (one major basin project per year) as well as ongoing small neighborhood projects each year, a rate City of Mercer Island Budget B-11

12 increase of 5.5% is recommended for In dollar terms, this translates into a $1.43 increase in the bi-monthly bill of a single family residential customer. Emergency Medical Service (EMS) Rates Emergency Medical Service rates are adjusted annually for inflation based on the Seattle metro area s CPI-W. A rate increase of 4.94% is recommended for 2009, which corresponds to the First Half 2008 CPI-W. This represents a $0.19 increase to the average single family residential customer s bi-monthly bill. Taken together, the total (i.e. water, sewer, storm water, and EMS) bi-monthly utility bill for the average single family residential customer is preliminarily budgeted to go up by 11.0% in 2009 and 6.9% in 2010, which equates to a $20.17 increase and a $14.09 increase respectively, as noted in the table below. Description Bi-Monthly Bill $ $ $ Rate Increase over Prior Year 6.9% 11.0% 6.9% Dollar Increase over Prior Year $11.88 $20.17 $14.09 See Section F (Utility Funds Summary) for more details. Capital Improvement Program The Capital Budget is part of the broader six-year Capital Improvement Program (CIP). The policy basis for the CIP is explained in detail in Section C (Budget Policies). Actual project details and financing strategies are also detailed in Section H (Capital Improvement Program). Listed below are the key issues and initiatives associated with the proposed CIP. Financing Strategies The CIP continues to be largely a pay-as-you-go program. Utility rates cover all capital expenditures for water, sewer, and storm water facilities. Public building, streets, trails, and parks capital maintenance are supported in whole or in part by real estate excise tax receipts. Major technology system and public safety equipment costs are funded by General Fund revenues. Finally, fleet and computer replacements are funded by annual contributions to their respective sinking funds. In addition to REET revenues, the City Street Fund receives revenues from local portions of the fuel tax. Real Estate Excise Taxes The Real Estate Excise Tax (REET) is the main revenue source to the Street Fund and the CIP Fund. REET revenues have been volatile over the last 10 years. During , the City received unprecedented levels of REET revenue, owing to a strong housing market and rapidly increasing housing prices. During the biennium, actual REET revenue dropped below the $1,600,000 level budgeted for the biennium, as the economy slowed down. During , we again experienced unprecedented levels of REET revenue due to a boost in the number of home sales amidst a very low interest rate environment. In 2005, the City received about $1.0 million in extraordinary REET revenue from two major commercial property sales Shorewood Apartments and Farmer s New World Life. The exceptional REET revenue receipts from , and again in , allowed the City to build up fund balances in the Street Fund and CIP Fund. In the case of the CIP Fund, most of this fund balance (approximately $3,000,000) was contributed to the construction of the Community Center, reducing the amount of debt financing needed for the project. B-12 City of Mercer Island Budget

13 In 2008, the nation and region experienced a major contraction in the housing market. As a result, the number of annual home sales on Mercer Island is projected to drop by 46% in 2008, and REET revenue in 2008 is projected to fall to $2.2 million. A modest rebound in REET revenue is forecast for 2009 ($2.67 million) and 2010 ($3.21 million). Actual and forecasted REET revenues for the period of are shown in the chart below. Real Estate Excise Tax Revenues $4.00 $3.50 $3.00 $2.50 $2.00 $1.50 $1.00 $0.50 $0.00 $1.27 $1.61 $1.97 $1.62 $1.17 $1.51 $1.82 $2.50 $3.71 $2.77 $2.93 $ Fcst 2009 Budget $3.21 $ Budget Project Management A financing policy approved by the City Council in 2007 states, whenever possible, capital projects will be scheduled and completed in the same year [for which funding is approved]. In addition, City staff has made it a consistent practice to show how all CIP projects will account for their project management expenses in their project budgets. Project management staffing will come from staff or otherwise be outsourced at skill levels and quantities to design and construct CIP projects in the timeframes approved by the City Council. In order to implement these Council policies and management practices for the projects slated for 2009 and 2010, the City will need to increase its project management and support staff by 1.5 FTE s. Each of these positions will be contracted labor for the biennium. Parks and Open Spaces Major park improvement projects in the biennium will be focused on Open Space Vegetation Management and local trail connections to the regional I-90 trail system. Should the Parks Bond and Levy ballot measures pass in November 2008, significant new investments will be made in Luther Burbank Park, Island athletic fields, and open space management. Streets, Pedestrian and Bicycle Facilities The proposed Transportation Improvement Program includes over $5.5 million in roads, streets, and pedestrian/bicycle improvements. Among them are the following major projects: Arterial Streets: The City will reconstruct 72 nd Avenue SE encompassing both water mains and street/pedestrian facilities. In addition, a decision on Island Crest Way and Merrimount intersection improvements will be determined after a public involvement effort has been conducted. Town Center street overlays will be designed in 2010 while traffic signals on SE 27 th Street will be installed in City of Mercer Island Budget B-13

14 Residential Streets: Residential street overlays will be completed depending on street condition evaluations made early in The entire biennial allotment of $1.1 million will be programmed for expenditure in Roadside Shoulders: Improvements along East Mercer Way all the way to the south tip of the Island will be constructed to create safe areas for pedestrians and bicycle pull outs. This combines Phases 6 and 7 of the planned East Mercer Way shoulder work and will total $2.2 million. Pedestrian and Bicycle Facilities: Along with street improvements, pedestrian and bicycle improvements will be designed and constructed along 72 nd Avenue SE. The Gap Completion Program will be continued, connecting safe walk routes for Island schools. Utilities Sewer: The major project involving the Island s utilities continues to be the replacement of the Sewer Lake Line at the north end of the Island. The project involves replacement of one reach of the sewer lake line system. This reach stretches along the northwest corner of the island and includes some of the oldest piping in the system, originally constructed from 1956 to Construction costs of $25.3 million are budgeted for Storm Water: In , the City will design and construct improvements for Phase II of Basin 26 (this drainage basin is located between Island Crest Way and West Mercer Way at approximately the 4600 block of the Island). The estimated cost to construct the second phase of this basin is $1.3 million. Neighborhood drainage and small-to-medium drainage system improvements will also be undertaken in the biennium. Water: The City will continue with its annual water main, pressure reducing valve, and hydrant replacement programs. The 72 nd Avenue SE water main work will be coordinated with street and pedestrian/bicycle improvements. In addition, construction will commence on the Emergency Well Project in Other Projects Fleet Replacements: Fleet replacements will continue according to the vehicle replacement schedules in the Equipment Rental Fund. All future vehicle replacements will be made in accordance with Evergreen Fleet Initiative Standards. Mercer Island will achieve the highest possible certification under the standards within this biennium. Public Buildings: The City will make annual repair and maintenance investments in the following buildings: City Hall, North and South Fire Stations, Maintenance Center, Thrift Shop, Community Center, and Luther Burbank Administration. Consistent with Council direction, planned expenditures are based on specific repair and maintenance projects as identified in their respective CIP project sheets. Technology: Nearly all new Information Technology projects have been deferred into 2010 or later in order to focus the City s attention on maintaining existing IT systems, including the City s Financial System, PC network, server operating system, and database software. Website design improvements and Fire Department scheduling software and EOC Incident Management software projects are scheduled during the biennium. B-14 City of Mercer Island Budget

15 Acknowledgements Each budget development cycle represents a major planning, analysis and coordination effort by city staff. The process begins in March and continues through September, concurrently with delivery of all other public services to the City s many customers. Once again, we recognize the dedication and hard work that all staff put into the budget process. In particular, Finance Director Chip Corder, Deputy Finance Director Francie Lake, and Accounting Manager LaJuan Tuttle have all demonstrated the expertise and professionalism for which Mercer Island has become known. For all these fine efforts, the City Manager expresses his sincerest thanks. Postscript During a series of regular and special meetings held in October, November, and December 2008, the City Council reviewed the Preliminary Budget proposed by the City Manager. After making some changes to the Preliminary Budget, the City Council adopted the Final Budget on December 8, The changes made by the City Council and staff to the Preliminary Budget, along with any follow-up items, are summarized in the following two tables: 1) Operating Budget, and 2) CIP Budget. Operating Budget Revenues Category Budget Changes Made by Council & Staff and Follow-Up Items Economic downturn reductions by staff: Reduced budgeted revenues in the General Fund by $1.05 million in consisting of the following: 1) $350,000 reduction in streamlined sales tax; 2) $350,000 reduction in construction-related sales tax; and 3) $350,000 reduction in development fees. Council changes: 1. For 2009, the City will levy only $772,000 of the recently approved $900,000 Parks M&O lid lift, backing out the $128,000 in maintenance and operating costs related to the new parks capital projects that were to be funded by the bond levy that failed. Of the $772,000, $630,000 is for parks maintenance and operations ($370,000 for Luther Burbank Park + $260,000 for school-related parks and recreation activities). 2. Reduced 2009 rate increase on sewer line maintenance portion of utility bill from 12% to 8%, resulting in a $100,000 reduction in revenue to the sewer utility. Fund balance will be used to make up the difference. Expenditures: City Council No changes. City Attorney s Office Council change: Added $10,395 for cable franchise negotiations (AB 4362, 10/6/08). City of Mercer Island Budget B-15

16 Category Budget Changes Made by Council & Staff and Follow-Up Items Expenditures (cont d): City Manager s Office Council change: Eliminated Production of 4 Episodes of MI View service package ($44,000 one-time costs). Follow-up item: Council directed staff to negotiate with Comcast to help fund broadcasting/equipment costs as part of cable franchise negotiations. Human Resources Finance No changes. No changes. Follow-up items: 1. Make sure Contingency Fund is at target before 12/31/ Discuss Finance Director s proposed Rainy Day strategy during 1 st quarter of Municipal Court Non-Departmental No changes. Economic downturn reductions by staff: Reduced budgeted personnel costs in the General Fund by $56,654 in 2009 and $91,419 in 2010 based on planned position vacancy savings. Staff change: Increased ARCH administration budget by $1,982 in 2009 and $2,676 in Youth & Family Services Development Services No changes. Economic downturn reductions by staff: 1. Reduced the Maintain Plan Review & Inspection LOS service package by 3.0 contract FTE s ($538,585 in one-time costs to the General Fund). 2. Reduced the Transportation Plan service package by $40,000 and pushed it to 2010 (impacting the General Fund). Follow-up item: Re-visit the Development Review Fees budget policy (namely, cost recovery goals) and implement approved fee changes in Fire Police No changes. Economic downturn reductions by staff: Withdrew Ongoing Police Fleet Replacement Funding and Police Staff Vehicle service package requests ($10,900/yr in ongoing costs to the General Fund + $30,000 in onetime costs to the Beautification Fund). Follow-up item: Address patrol officer overtime issue with Public Safety Committee during 1st quarter of B-16 City of Mercer Island Budget

17 Category Budget Changes Made by Council & Staff and Follow-Up Items Expenditures (cont d): Maintenance Parks & Recreation Economic downturn reductions by staff: 1. Reduced budgeted fleet fuel costs in the General Fund by $67,500 in 2009 and 2010 respectively. 2. Eliminated a new 0.25 contract FTE included in the Resource Conservation Manager service package (impacting the General Fund) by allocating 0.25 of an existing contract FTE in the Stormwater Fund to this program in Economic downturn reductions by staff: Reduced the CCMV Staffing service package by $65,000 per year in 2009 and 2010 (impacting the General Fund). As a result, the General Fund subsidy level was increased from $235,100 in 2008 ($207,600 approved subsidy + $27,500 adjustment for utility and landscape maintenance costs accounted for in a different cost center) to $308,000 in Council change: Eliminated 77th Ave SE Floral Enhancements service package ($3,500/yr in ongoing costs to the Beautification Fund + $15,000 in one-time costs to the General Fund). Staff change: Increased budget by $241,520 in 2009 and $232,617 in 2010 per new Parks M&O levy lid lift, which passed on November 4, Of the $772,000 to be levied in 2009, $630,000 is for parks maintenance and operations ($370,000 for Luther Burbank Park + $260,000 for school-related parks and recreation activities). Because the Preliminary Budget was based on the November 2003 Luther Burbank Park M&O levy lid lift, an adjustment was required to increase the authorized expenditures up to $630,000 in 2009 and $637,720 in CIP Budget Revenues: Category Budget Changes Made by Council & Staff and Follow-Up Items Economic downturn reductions by staff: 1. Reduced budgeted REET revenue by $2.3 million in Re-directed the $1.15 million that had been originally transferred from the CIP Fund to the Street Fund for the EMW Shoulders project in June 2008 to fund other street projects instead in Used $113,808 that had been previously set aside for NORCOM startup costs to help bridge the $2.3 million funding gap. In addition, the 2009 interfund transfer from the Criminal Justice to the Technology & Equipment Fund for NORCOM start-up costs was reduced by $68, Used $291,000 of the Street Fund balance to help bridge the $2.3 million funding gap. 5. Allocated REET evenly between the Street Fund and the CIP Fund in to maintain a positive ending fund balance in each fund. City of Mercer Island Budget B-17

18 Category Revenues (cont d): Budget Changes Made by Council & Staff and Follow-Up Items Staff changes: 1. Of the $772,000 from the recently approved Parks M&O lid lift, $142,000 will be used to fund parks capital projects ($77,000 for Pioneer Park Forest Management + $65,000 for Open Space Vegetation Management). In addition, $110,000 from the 2003 Luther Burbank Park lid lift will be levied in 2009 for small capital projects. 2. Staff learned after the Preliminary Budget was prepared that the City will receive $194,479 in property tax funding in 2009 from the King County Flood Control District, which can be used to fund stormwater CIP projects. 3. Staff reduced the projected investment interest allocation to the Capital Reserve Fund from $180,000 in 2009 and 2010 to $0. Follow-up items: 1. The REET allocation policy in effect for (i.e. 50/50 split between the Street Fund and the CIP Fund) will be re-visited again during the Budget process. 2. The City Attorney will prepare an amended Fee in Lieu of Stormwater Detention ordinance for the Council s consideration in January The current ordinance restricts the use of the fee to the same basin as the development for which the fee was collected. The proposed amendment would expand the use of the fee to any basin on the Island. The Stormwater CIP was prepared assuming the Council adopts the amended ordinance. Expenditures: Capital Facility Plan Capital Reinvestment Plan Council changes: 1. Remove Shoreline Restoration project ($150,000), which staff was able to add to the 2008 Luther Burbank Shoreline construction contract due to the favorable bids received. 2. Postpone East Mercer Way Shoulders project ($2,245,000) for 2 years until No changes. Because the General Fund is the primary focal point during the budget review process, a summary expenditure reconciliation between the Preliminary and the Final Budget is provided in the table on the following page. B-18 City of Mercer Island Budget

19 General Fund Expenditures 2009 Budget 2010 Budget Original Preliminary Budget $23,800,210 $24,901,585 Economic downturn reductions by staff* - 592, ,000 Revised Preliminary Budget $23,208,210 $24,459,585 Changes by Council: Eliminate Production of 4 Episodes of MI View service package - 22,000-22,000 Eliminate 77 th Ave SE Floral Enhancements service package -15,000 Changes by Staff: Adjust Parks & Recreation budget per Nov 2008 Parks M&O levy lid lift (reflects net increase) Shift 0.25 of existing 1.0 contract FTE from Stormwater Fund to serve as Resource Conservation Manager 241, ,617 20,000 21,200 Add funding for cable franchise negotiations 10,395 Final Budget $23,443,125 $24,691,402 % Change from Prior Year 2.2% decrease 5.3% increase * In addition to the $1,034,000 in expenditure reductions, staff increased CCMV hourly rental revenues by $8,000 per year. Taken together, the General Fund s Preliminary Budget was adjusted by $1,050,000. City of Mercer Island Budget B-19

20 B-20 City of Mercer Island Budget

21 Appendix A Priorities Mercer Island City Services 1. The community will be safe. 1.1 Make timely and effective responses to crime. Make timely and effective responses to fire. Make timely and effective responses to medical emergencies. Crime is investigated and prosecuted. Buildings are safely built. 1.2 The transportation system is safely built and operated. The City s drinking water will be safe. 1.3 Crime is prevented. Fires are prevented. Mental and physical health problems are prevented. Emergency responses are planned for. 2. The community will support effective, efficient and legal delivery of public services The City Council will have the information and forums necessary for making wellconsidered and informed decisions. The decisions of the City Council will be implemented. The City will comply with and enforce all applicable laws and ordinances. The City will account for its expenditures and revenues and manage its finances according to all applicable laws and ordinances. The City will provide for judicial services. The City will continually evaluate and improve upon the effectiveness and efficiency of its services. 3. The community will support reliable public infrastructure and protect its considerable public investments (e.g. water, sewer, storm water utilities, streets, parks, buildings). The City will operate and maintain its infrastructure to assure continuous, reliable and safe service. 3.1 The City will repair and replace its infrastructure before it fails. 3.2 The City will maintain its infrastructure to prevent failure and extend its useful life. City of Mercer Island Budget B-21

GENERAL FUND Revenues

GENERAL FUND Revenues GENERAL FUND Revenues The General Fund is used to account for general purpose revenues, which are used to fund general governmental services, excluding utilities. Following are descriptions of the City's

More information

Budget Summary. City Organization

Budget Summary. City Organization This section has been prepared as a general summary of the 2019-2020 biennial budget for the City of Mercer Island. It is designed to provide City residents and other interested readers with a quick overview

More information

City of Mercer Island. Section C Budget Summary

City of Mercer Island. Section C Budget Summary City of Mercer Island Section C Budget Summary This section has been prepared as a general summary of the 2017-2018 biennial budget for the City of Mercer Island. It is designed to provide City residents

More information

Section E. Recap By Fund. Table of Contents

Section E. Recap By Fund. Table of Contents Section E. Recap By Fund Table of Contents Fund # Fund Name Page # General Purpose Funds 001 General Fund... E-3 037 Self-Insurance Claim Reserve... E-9 061 Youth Services Endowment Fund... E-11 Special

More information

Section H. Capital Improvement Program. Table of Contents

Section H. Capital Improvement Program. Table of Contents Section H. Capital Improvement Program Table of Contents Introduction... H-1 Project Summary... H-13 Individual Project Sheets... H-21 Six-Year Fund Statements... H-129 Introduction Capital Improvement

More information

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA BUSINESS OF THE CITY COUNCIL, WA December 6, 2010 Public Hearing 2011-2012 PRELIMINARY BUDGET REVIEW: FINALIZE CHANGES TO PRELIMINARY BUDGET, RE-BALANCE GENERAL FUND, AND ADOPT 2011 EMS UTILITY RATES Proposed

More information

GENERAL FUND Revenues

GENERAL FUND Revenues GENERAL FUND Revenues The General Fund is the general operating fund of the City and encompasses the major activities of the City excluding utilities. The activities of fire and police services, street

More information

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM Presented by: Julie Underwood, City Manager Chip Corder, Assistant City Manager/Finance Director Presented to: Mercer Island

More information

City of Mercer Island CITY S FINANCIAL CHALLENGES: OPERATING BUDGET (PART II)

City of Mercer Island CITY S FINANCIAL CHALLENGES: OPERATING BUDGET (PART II) City of Mercer Island CITY S FINANCIAL CHALLENGES: OPERATING BUDGET (PART II) Presented by: Chip Corder, Assistant City Manager/Finance Director Presented to: Community Advisory Group Date: February 5,

More information

MAINTENANCE DEPARTMENT

MAINTENANCE DEPARTMENT MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,

More information

Section G. Capital Improvement Program. Table of Contents

Section G. Capital Improvement Program. Table of Contents Section G. Capital Improvement Program Table of Contents Introduction... G-1 Project Summary... G-13 Individual Project Sheets... G-21 Six-Year Fund Statements... G-135 INTRODUCTION Capital Improvement

More information

Minority Recommendation of the Community Advisory Group

Minority Recommendation of the Community Advisory Group Financial Challenges - Community Advisory Group (CAG) REPORT Minority Recommendation of the Community Advisory Group Lisa Anderl, Heather Cartwright, Doris Cassan, Bob Harper, El Jahncke, Elaine Kavalok

More information

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM Presented by: Julie Underwood, City Manager Chip Corder, Assistant City Manager/Finance Director Presented to: Community Advisory

More information

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA September 3, 2013 Regular Business 2 ND QUARTER 2013 FINANCIAL STATUS REPORT & 2013-2014 BUDGET ADJUSTMENTS Proposed Council Action: Receive report

More information

City of Mountlake Terrace. Second Quarter 2016 Financial Report September 19, 2016

City of Mountlake Terrace. Second Quarter 2016 Financial Report September 19, 2016 City of Mountlake Terrace Second Quarter 2016 Financial Report September 19, 2016 1 Overview Reviewing the City s finances on a regular basis, and posting the review on the City s website, highlights the

More information

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM Presented by: Julie Underwood, City Manager Chip Corder, Assistant City Manager/Finance Director Presented to: Mercer Island

More information

BUDGET POLICES Capital Improvement Program

BUDGET POLICES Capital Improvement Program BUDGET POLICES Capital Improvement Program D-38 City of Mercer Island 2007-2008 Budget Capital Improvement Program Background The City of Mercer Island separates the Capital Improvement Program (CIP) into

More information

City of Mountlake Terrace. Fourth Quarter 2014 Financial Report April 2, 2015

City of Mountlake Terrace. Fourth Quarter 2014 Financial Report April 2, 2015 City of Mountlake Terrace Fourth Quarter 2014 Financial Report April 2, 2015 1 Overview Reviewing the City s finances on a regular basis, and posting the review on the City s website, highlights the City

More information

UTILITY FUNDS SUMMARY

UTILITY FUNDS SUMMARY UTILITY FUNDS SUMMARY On the following pages is important information about the utilities as a whole. This section identifies the emerging issues for each of the utilities, followed by a brief discussion

More information

Biennial Budget Section II: Process/Policies

Biennial Budget Section II: Process/Policies BUDGET POLICIES This section of the budget sets forth the objectives of the budget as a policy document together with a description of the basis of the policy. Policy Context of the Budget The City budget

More information

Utility Board. Agenda topics. For Meeting of June 12, :00 PM to 9:00 PM City Council Chambers, City Hall

Utility Board. Agenda topics. For Meeting of June 12, :00 PM to 9:00 PM City Council Chambers, City Hall Utility Board For Meeting of June 12, 2012 7:00 PM to 9:00 PM City Council Chambers, City Hall Board Members: Council Liaison: Staff: David Laub, Chairman, Benjamin Levie, Vice Chairman, Suresh Malhotra,

More information

FINANCIAL POLICIES ADOPTED BIENNIAL BUDGET CITY OF MOUNTLAKE TERRACE

FINANCIAL POLICIES ADOPTED BIENNIAL BUDGET CITY OF MOUNTLAKE TERRACE Purpose: The primary purpose of financial management policies is to provide guidelines for the City Council and staff to use in making financial decisions that ensure core services are maintained and the

More information

BUDGET AT A GLANCE BUDGET OVERVIEW CITYWIDE BUDGET SUMMARY CITYWIDE FTE SUMMARY

BUDGET AT A GLANCE BUDGET OVERVIEW CITYWIDE BUDGET SUMMARY CITYWIDE FTE SUMMARY BUDGET AT A GLANCE BUDGET OVERVIEW CITYWIDE BUDGET SUMMARY CITYWIDE FTE SUMMARY BUDGET OVERVIEW 2017-2018 ADOPTED BUDGET CITY OF REDMOND The Budget Overview serves as a review of the recommended 2017-2018

More information

Operating Budget Overview 2019

Operating Budget Overview 2019 OPERATING BUDGET Operating Overview 2019 Introduction In planning for a vibrant, healthy and sustainable community, the Town of Halton Hills is committed to providing community leadership on issues of

More information

City of Mercer Island CITY S FINANCIAL CHALLENGES - UNDERSTANDING CITY SERVICES. Presented by: Chip Corder, Assistant City Manager/Finance Director

City of Mercer Island CITY S FINANCIAL CHALLENGES - UNDERSTANDING CITY SERVICES. Presented by: Chip Corder, Assistant City Manager/Finance Director City of Mercer Island CITY S FINANCIAL CHALLENGES - UNDERSTANDING CITY SERVICES Presented by: Chip Corder, Assistant City Manager/Finance Director City s Financial Challenges City Services Mandatory vs.

More information

REVENUE ASSUMPTIONS. Actual Actual Adopted Revised Adopted TOTAL SOURCES BEGINNING FUND BALANCE $

REVENUE ASSUMPTIONS. Actual Actual Adopted Revised Adopted TOTAL SOURCES BEGINNING FUND BALANCE $ General Government Funds Revenues REVENUE ASSUMPTIONS This section explains and illustrates the estimates for revenue sources included in the General Government funds of the 2009/ Biennial. Key funding

More information

Following the Budget Message is an Executive Summary of the Budget.

Following the Budget Message is an Executive Summary of the Budget. Budget Message Dear Mercer Island City Council and Island Residents: Houston, we have a problem. This oft-quoted line from Apollo 13 succinctly captures the City s projected financial status in the 2017-2018

More information

DEVELOPMENT PHILOSOPHY The recommended budget aligns the County s resources with the Council s identified governing priorities:

DEVELOPMENT PHILOSOPHY The recommended budget aligns the County s resources with the Council s identified governing priorities: County Administrator Joseph Kernell jkernell@greenvillecounty.org (864) 467-7105 www.greenvillecounty.org May 19, 2015 Dear Chairman Taylor and Members of County Council: I am pleased to present Greenville

More information

City of Mercer Island. Section I Budget Policies

City of Mercer Island. Section I Budget Policies City of Mercer Island Section I Budget Policies Section I. Budget Policies Table of Contents General Government Beautification Fund... I-3 Communications... I-5 Debt Financing... I-7 Investment Earnings...

More information

Biennial Budget PUBLIC HEARING NOVEMBER 13, 2018

Biennial Budget PUBLIC HEARING NOVEMBER 13, 2018 2019-2020 Biennial Budget PUBLIC HEARING NOVEMBER 13, 2018 This Evening s Session: 2 2019-2020 Public Hearing on Proposed Biennial Budget Receive public testimony Review of Proposed 3% tax levy increase

More information

Queen Creek Annual Budget Organizational Structure

Queen Creek Annual Budget Organizational Structure Organizational Structure Town Organizational Chart Employees by Department Staffing Level Changes Fund Structure Chart Fund Structure Narrative Where the Money Comes From Where the Money Goes 60 TOWN ORGANIZATIONAL

More information

City of Mercer Island CITY FINANCES: HOUSTON, WE HAVE A PROBLEM

City of Mercer Island CITY FINANCES: HOUSTON, WE HAVE A PROBLEM City of Mercer Island CITY FINANCES: HOUSTON, WE HAVE A PROBLEM Presented by: Julie Underwood, City Manager Chip Corder, Assistant City Manager/Finance Director Presented to: Chamber of Commerce Date:

More information

CITY OF ALBANY GENERAL FUND PROPOSED OPERATING BUDGET FISCAL YEAR & FISCAL YEAR

CITY OF ALBANY GENERAL FUND PROPOSED OPERATING BUDGET FISCAL YEAR & FISCAL YEAR CITY OF ALBANY GENERAL FUND PROPOSED OPERATING BUDGET FISCAL YEAR 2012-13 & FISCAL YEAR 2013-2014 Comparison Budget Budget Budget Budget FY 13 Year Year Year To 2011-12 2012-13 2013-14 Budget FY 14 REVENUES

More information

City Services Appendix

City Services Appendix Technical vices 1.0 Introduction... 1 1.1 The Capital Facilities Plan... 1 1.2 Utilities Plan... 2 1.3 Key Principles Guiding Bremerton s Capital Investments... 3 1.4 Capital Facilities and Utilities Addressed

More information

City of Milton 4th Qtr Financial Report

City of Milton 4th Qtr Financial Report 1 TO: CC: FROM: Debra Perry, Mayor Milton City Council City Administrator Department Directors Lisa Tylor, Finance Director DATE: March 17, 2014 SUBJECT: - Fourth Quarter/Year-End Financial Status Report

More information

Levy Lid Lift or Metropolitan Park District

Levy Lid Lift or Metropolitan Park District Levy Lid Lift or Metropolitan Park District Why We Are Discussing These Two Options April 2012 City Happenings The city has no funding to continue to rent its interim City Hall space beyond July of 2014.

More information

GENERAL FUND REVENUES BY SOURCE

GENERAL FUND REVENUES BY SOURCE BUDGET DETAIL BUDGET DETAIL The Budget Detail gives more information on the budget, than is shown in the Executive Summary. Detail information is provided on the General Fund, Special Revenue Funds, Enterprise

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

SECOND QUARTER FINANCIAL REPORT June 30, 2018

SECOND QUARTER FINANCIAL REPORT June 30, 2018 SECOND QUARTER FINANCIAL REPORT June 30, 2018 UpTown Cruisin Car Show June, 2018 Introduction The second quarter 2018 financial report is presented here. As has been the custom in the past, the report

More information

General Fund Revenues

General Fund Revenues Budget Overview General Fund Revenues $16.9 $4.0 $15.9 $54.5 Property Taxes Franchise & TLT State Rev Sharing Other Sources Total Revenues - $91.3 million Property Taxes 60% of total revenue Franchise

More information

OPERATING BUDGET - REVENUE CONTENTS

OPERATING BUDGET - REVENUE CONTENTS OPERATING BUDGET - REVENUE CONTENTS by Source... C-1 by... C-2 County Property Tax... C-3 ed Property Tax... C-3 Property Tax... C-4 Assessed Valuation & Residential Assessment Rate History... C-4 County

More information

THIRD QUARTER FINANCIAL REPORT September 30, 2018

THIRD QUARTER FINANCIAL REPORT September 30, 2018 THIRD QUARTER FINANCIAL REPORT September 30, 2018 2018 Cider Squeeze Introduction The 3rd Quarter 2018 Financial Report is presented here. As has been the custom in the past, the report has been prepared

More information

Proposed Biennial Budget

Proposed Biennial Budget 2017-2018 Proposed Biennial Budget T.C. Broadnax, City Manager City Council Budget Worksession October 4, 2016 3 Agenda Budget Overview Budget Development Process Financial Overview Proposed Budget Highlights

More information

MONTHLY FINANCIAL STATUS REPORT FOR THE PERIOD ENDED SEPTEMBER 30, 2018 (UNAUDITED)

MONTHLY FINANCIAL STATUS REPORT FOR THE PERIOD ENDED SEPTEMBER 30, 2018 (UNAUDITED) MONTHLY FINANCIAL STATUS REPORT FOR THE PERIOD ENDED SEPTEMBER 30, 2018 (UNAUDITED) M E M O R A N D U M TO: FROM: Charlotte Nash, Chairman District Commissioners Glenn Stephens, County Administrator Phil

More information

2013 Mercer Island Dashboard Report

2013 Mercer Island Dashboard Report 2013 Mercer Island Report Introduction The City s performance measurement model, called the Mercer Island, was developed in 2007 with the following objectives in mind: 1. To identify top tier indicators

More information

Agenda. Background Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement

Agenda. Background Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement 1 Agenda Background 2013-2014 Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement Sustainable Transportation Funding Dedicated Revenues Potential Rate Impact Clarification Proposed

More information

Fiscal Year Mid-Year Budget Status Report

Fiscal Year Mid-Year Budget Status Report Fiscal Year 2009 Mid-Year Budget Status Report Prepared by the Pinellas County Office of Management & Budget May 19, 2009 TABLE OF CONTENTS SECTION PAGE Report Format 3 I. Executive Summary 3 II. Economic

More information

MONTHLY FINANCIAL STATUS REPORT FOR THE PERIOD ENDED DECEMBER 31, 2018 (UNAUDITED)

MONTHLY FINANCIAL STATUS REPORT FOR THE PERIOD ENDED DECEMBER 31, 2018 (UNAUDITED) MONTHLY FINANCIAL STATUS REPORT FOR THE PERIOD ENDED DECEMBER 31, 2018 (UNAUDITED) M E M O R A N D U M TO: FROM: Charlotte Nash, Chairman District Commissioners Glenn Stephens, County Administrator Phil

More information

Town of Hudson, North Carolina Annual Budget Fiscal Year

Town of Hudson, North Carolina Annual Budget Fiscal Year Town of Hudson, North Carolina Annual Budget Fiscal Year 2017-2018 Board of Commissioners Janet H. Winkler Mayor Bill Warren, Mayor Pro-Tempore Larry Chapman, Commissioner Tony Colvard, Commissioner David

More information

2019 THREE YEAR OPERATING PLAN APPROVED BY COUNCIL DECEMBER 10, 2018

2019 THREE YEAR OPERATING PLAN APPROVED BY COUNCIL DECEMBER 10, 2018 2019 THREE YEAR OPERATING PLAN APPROVED BY COUNCIL DECEMBER 10, 2018 Preamble The Municipal Government Act (MGA) requires each municipality to prepare a written plan respecting its anticipated financial

More information

FY OPERATING BUDGET AND SIX-YEAR CAPITAL IMPROVEMENT PROGRAM

FY OPERATING BUDGET AND SIX-YEAR CAPITAL IMPROVEMENT PROGRAM FY 2013-14 OPERATING BUDGET AND SIX-YEAR CAPITAL IMPROVEMENT PROGRAM March 26, 2013 2040 VISION AND THE BUDGET Safe Community Family and Youth Quality Education Economic Vitality Cultural and Recreational

More information

City of Ocoee Quarterly Report First Quarter Fiscal Year

City of Ocoee Quarterly Report First Quarter Fiscal Year City of Ocoee Quarterly Report First Quarter Fiscal Year 2008-2009 Prepared by the Finance Department February 2009 TABLE OF CONTENTS Quarterly Overview...i-iii General Fund... 1 Revenue Comparison Graph...

More information

2018 BUDGET AND FINANCIAL PLAN

2018 BUDGET AND FINANCIAL PLAN Questionnaire 2018 BUDGET AND FINANCIAL PLAN January 1, 2018 - January 23, 2018 The Township of Langley is reviewing the Draft 2018 2022 Five-Year Financial Plan with emphasis on the 2018 Budget. Your

More information

PUBLIC WORKS DIRECTOR

PUBLIC WORKS DIRECTOR WASHINGTON PUBLIC WORKS DIRECTOR $109,865 - $129,254 Plus Excellent Benefits Apply by October 22, 2017 (First Review, open until filled) 1 P a g e WHY APPLY? Nestled east of famous Puget Sound and north

More information

TO: Mayor & Council Budget Advisory Committee FROM: Lyman Howard Dean Rohla DATE: February 12, 2019 SUBJ: ACTUAL 2018 YEAR END FINANCIAL INFORMATION

TO: Mayor & Council Budget Advisory Committee FROM: Lyman Howard Dean Rohla DATE: February 12, 2019 SUBJ: ACTUAL 2018 YEAR END FINANCIAL INFORMATION 9605 NE 24 th Street Clyde Hill, Washington 98004 425-453-7800 Fax: 425-462-1936 www.clydehill.org TO: Mayor & Council Budget Advisory Committee FROM: Lyman Howard Dean Rohla DATE: February 12, 2019 SUBJ:

More information

Budgeted Fund Structure

Budgeted Fund Structure I. Fund Type / Name ed Fund Structure as of Percent Change Over 3/31 General Fund and Sub Funds General Fund and Subfunds $ 917,708,943 $ 965,169,687 $ 2,311,394 $ 967,481,081 5.4 % $ 917,708,943 $ 965,169,687

More information

CITYOF MEDINA. - Expense increase due to Executive separation agreement.

CITYOF MEDINA. - Expense increase due to Executive separation agreement. CITYOF MEDINA ITEM PH-2/ OB-2 November 12, 2013 To: Mayor and City Council From: Robert J. Grumbach, Interim City Manager Re: 2014 Budget Message I am pleased to submit for review and adoption the City

More information

City of San Mateo San Mateo, California

City of San Mateo San Mateo, California City of San Mateo San Mateo, California Comprehensive Annual Financial Report For the Year Ended June 30, 2005 The City provides a full range of municipal services. These include police and fire

More information

MONTHLY FINANCIAL STATUS REPORT FOR THE PERIOD ENDED FEBRUARY 28, 2019 (UNAUDITED)

MONTHLY FINANCIAL STATUS REPORT FOR THE PERIOD ENDED FEBRUARY 28, 2019 (UNAUDITED) MONTHLY FINANCIAL STATUS REPORT FOR THE PERIOD ENDED FEBRUARY 28, 2019 (UNAUDITED) M E M O R A N D U M TO: FROM: Charlotte Nash, Chairman District Commissioners Glenn Stephens, County Administrator Phil

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

CITY OF WILLIAMSBURG MEMORANDUM. Mayor and City Council Planning Commission. From: Andrew O Trivette, Assistant City Manager

CITY OF WILLIAMSBURG MEMORANDUM. Mayor and City Council Planning Commission. From: Andrew O Trivette, Assistant City Manager CITY OF WILLIAMSBURG MEMORANDUM To: Mayor and City Council Planning Commission From: Andrew O Trivette, Assistant City Manager Date: Thursday, January 11, 2018 RE: Capital Improvements for FY18 Status

More information

Quarterly Budget Report

Quarterly Budget Report City of Chicago Quarterly Report 2 nd Quarter Mayor Rahm Emanuel Quarterly Report-2 nd Quarter Content and Purpose This quarterly report presents an overview of the City s operating revenues and expenditures

More information

DUPAGE COUNTY PROPOSED FY2012 FINANCIAL PLAN: Analysis and Recommendations

DUPAGE COUNTY PROPOSED FY2012 FINANCIAL PLAN: Analysis and Recommendations DUPAGE COUNTY PROPOSED FY2012 FINANCIAL PLAN: Analysis and Recommendations October 21, 2011 Table of Contents EXECUTIVE SUMMARY... 2 CIVIC FEDERATION POSITION... 4 ISSUES THE CIVIC FEDERATION SUPPORTS...

More information

CITY OF LANCASTER FISCAL BUDGET REVENUE SOURCES

CITY OF LANCASTER FISCAL BUDGET REVENUE SOURCES CITY OF LANCASTER FISCAL 2006-07 BUDGET REVENUE SOURCES TAXES The tax raising authority of cities has been severely limited for the past 25 years. Proposition 13 enacted in 1978 amended the California

More information

General Fund Revenue Summary

General Fund Revenue Summary Summary of General Fund Revenues and Expenditures Budget FY 2017-2018 FISCAL YEAR 2017-2018 General Fund Revenue Summary The City of Decatur has 7 broad revenue categories: taxes, licenses and permits,

More information

June 2018 Monthly Financial Report

June 2018 Monthly Financial Report GENERAL FUND OVERVIEW 2018 Budget YTD Projection YTD Actuals YTD YTD % $ 231,221,914 $ 122,469,971 $ 127,173,074 $ 4,703,104 3.8% Expenditures $ 253,846,860 $ 123,830,932 $ 111,880,437 $ 11,950,495 9.7%

More information

Municipalities are facing a decline in revenues and increases in expenditures

Municipalities are facing a decline in revenues and increases in expenditures 1 Municipalities are facing a decline in revenues and increases in expenditures Property taxes Revenue From State Revenue From Federal Revenues Expenditures Health Pension Personnel Aging Care costs costs

More information

2014 Mercer Island Dashboard Report

2014 Mercer Island Dashboard Report 2014 Mercer Island Report Introduction The City s performance measurement model, called the Mercer Island, was developed in 2007 with the following objectives in mind: 1. To identify top tier indicators

More information

Budgeted Funds & Purposes

Budgeted Funds & Purposes Budgeted Funds & Purposes General Fund 001 General is used to account for all financial resources applicable to the general operations of County government, which are not accounted for in other funds.

More information

FINANCE & ECONOMIC DEVELOPMENT COMMITTEE MAY 4, :00 AM COUNCIL CHAMBERS

FINANCE & ECONOMIC DEVELOPMENT COMMITTEE MAY 4, :00 AM COUNCIL CHAMBERS FINANCE & ECONOMIC DEVELOPMENT COMMITTEE MAY 4, 2016 8:00 AM COUNCIL CHAMBERS 1. 2016 FIRST QUARTER FINANCIAL REPORT TROY WOO, FINANCE DIRECTOR (STAFF REPORT ATTACHED) FINANCE & ECONOMIC DEVELOPMENT COMMITTEE

More information

DEVELOPMENT PHILOSOPHY

DEVELOPMENT PHILOSOPHY County Administrator Joseph Kernell jkernell@greenvillecounty.org (864) 467-7105 www.greenvillecounty.org May 16, 2017 Dear Chairman Kirven and Members of County Council: I am pleased to present Greenville

More information

Fiscal Year Proposed Budget

Fiscal Year Proposed Budget Fiscal Year 2017-2018 Proposed Budget GFOA Budget Presentation Award Recognizes budget documents of the very highest quality that reflect best practices for clearly communicating budget information. Recently

More information

Quarterly Budget Report

Quarterly Budget Report City of Chicago Quarterly Report 1st Quarter Mayor Rahm Emanuel Quarterly Report-1st Quarter Content and Purpose This quarterly report presents an overview of the City s operating revenues and expenditures

More information

SPECIAL REVENUE FUNDS

SPECIAL REVENUE FUNDS SPECIAL REVENUE FUNDS INTEGRITY INNOVATION ACCOUNTABILITY COMMITMENT TO EXCELLENCE TEAMWORK This section provides a detailed spending plan to account for proceeds of specific revenue sources that are legally

More information

CITIZEN S POPULAR ANNUAL FINANCIAL REPORT

CITIZEN S POPULAR ANNUAL FINANCIAL REPORT Clearfield City 1 CITIZEN S POPULAR ANNUAL FINANCIAL REPORT A Summary Financial Report of the 2013 Fiscal Year (July 1, 2012 through June 30, 2013) 2 Clearfield City Purpose Statement The intent of the

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of November 14, 2006 DATE: November 8, 2006 SUBJECT: Fiscal Year (FY) 2008 Budget Guidance C. M. RECOMMENDATION: Provide guidance on the FY 2008

More information

First Public Budget Hearing September 12, 2012

First Public Budget Hearing September 12, 2012 First Public Budget Hearing September 12, 2012 2 Agenda Staff Presentation Budget adoption procedure (City Attorney) Resolution 2012-014: Non-Ad Valorem Special Assessment for Fire Services Resolution

More information

North East King County Regional Public Safety Communication Agency (NORCOM)

North East King County Regional Public Safety Communication Agency (NORCOM) Financial Statements Audit Report North East King County Regional Public Safety Communication Agency (NORCOM) For the period January 1, 2012 through December 31, 2013 Published November 17, 2014 Report

More information

Public Works Department

Public Works Department Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration 246,334 316,548 245,742 245,742 Municipal Trash Collection 57,049 57,000 58,169 58,169 Total Revenues

More information

City Council Budget Work Session. City of McKinney August 4, 2017

City Council Budget Work Session. City of McKinney August 4, 2017 City Council Budget Work Session City of McKinney August 4, 2017 Agenda Budget Process & FY18 Overview Property Tax General Fund Revenues & Expenditures Capital Improvements Program Debt Service Water

More information

Recommended by City Manager A.C. Gonzalez

Recommended by City Manager A.C. Gonzalez Recommended by City Manager A.C. Gonzalez Proposed budget is fiscally responsible, strategically begins restoring services, and positions City to continue growth FY 2014-15 budget is balanced and totals

More information

A Letter From The Mayor

A Letter From The Mayor A Letter From The Mayor 1 Each year, as we prepare the City of Spokane s annual budget, we look ahead to how we want to grow and change to meet the evolving needs and concerns of our citizens. The status

More information

AGENDA Committee of the Whole Meeting 5:30 PM - Monday, October 9, th Floor, Conferencing Center, 7th Floor, City Hall 1055 S.

AGENDA Committee of the Whole Meeting 5:30 PM - Monday, October 9, th Floor, Conferencing Center, 7th Floor, City Hall 1055 S. AGENDA Committee of the Whole Meeting 5:30 PM - Monday, October 9, 2017 7th Floor, Conferencing Center, 7th Floor, City Hall 1055 S. Grady Way 1. REVISION TO POLICE ASSIGNED VEHICLE POLICY a) Renton Police

More information

ORGANIZATION of the City of SIMI VALLEY

ORGANIZATION of the City of SIMI VALLEY ORGANIZATION of the City of SIMI VALLEY CITIZENS 1 MAYOR 4 MEMBER CITY COUNCIL (Elected at Large) (Appointed by City Council) COMMUNITY ENVIRONMENTAL POLICE DEPARTMENT Chief PUBLIC WORKS - Budget - Fiscal

More information

GENERAL FUND BUDGET SUMMARY AND DEPARTMENT BUDGET DETAIL

GENERAL FUND BUDGET SUMMARY AND DEPARTMENT BUDGET DETAIL GENERAL FUND BUDGET SUMMARY AND DEPARTMENT BUDGET DETAIL 2016-2017 ADOPTED JUNE 13, 2016 CITY OF PACIFICA 2016-2017 Proposed General Fund Budget Summary By Consolidated Revenue Source and Department 2015-16

More information

CITY MANAGER S PROPOSED BUDGET FY 2019

CITY MANAGER S PROPOSED BUDGET FY 2019 City Manager s Proposed FY 2019 Operating and Capital Improvement Budget March 5, 2018 CITY MANAGER S PROPOSED BUDGET FY 2019 1 GFOA Distinguished Budget Presentation Award Government Finance Officers

More information

2019 Adopted Budget. August 2019

2019 Adopted Budget. August 2019 2019 Adopted Budget August 2019 2019 City Budget The Overland Park City Council adopted a budget for fiscal year 2019 in August of 2018. The annual budget is the City s business plan to reflect the community

More information

COLE COUNTY MISSOURI

COLE COUNTY MISSOURI COLE COUNTY MISSOURI Budget Officer Recommended Budget For Fiscal Year 2019 Prepared by: Auditor s Office Kristen Berhorst County Auditor Cole County, Missouri 2019 Budget Table of Contents Budget Message

More information

Dear Denver City Council Members, City Employees and Residents of Denver:

Dear Denver City Council Members, City Employees and Residents of Denver: Michael B. Hancock Mayor City and County of Denver OFFICE OF THE MAYOR CITY AND COUNTY BUILDING DENVER, CO 80202-5390 TELEPHONE: (720) 865-9090 FAX: (720) 865-8787 TTY/ TTD: (720) 865-9010 September 12,

More information

INTERNAL CONTROL IMPACT OF STAFF REDUCTIONS

INTERNAL CONTROL IMPACT OF STAFF REDUCTIONS INTERNAL CONTROL IMPACT OF STAFF REDUCTIONS SPECIAL AUDIT JULY 1, 2009 THROUGH JANUARY 31, 2010 CITY OF CHESAPEAKE, VIRGINIA AUDIT SERVICES DEPARTMENT City of Chesapeake Internal Control Impact of Staff

More information

2016 Third Quarter Financial Report

2016 Third Quarter Financial Report W HATCO M COU NT Y 206 Third Quarter Financial Report Jack Louws, County Executive Compiled and Presented by the Administrative Services Department Finance Division Brad Bennett, Finance Manager November

More information

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED RECOMM. General Fund: Revenue Administration 494,646 501,667 501,035 508,551 Municipal Trash Collection 101,185 60,358 60,358 60,962 Total Revenues

More information

Financial Tables BUDGET SUMMARY ACTUAL ADOPTED AMENDED RECOMM. % TOTAL ALL CITY FUNDS - EXPENDITURE BUDGET General 150

Financial Tables BUDGET SUMMARY ACTUAL ADOPTED AMENDED RECOMM. % TOTAL ALL CITY FUNDS - EXPENDITURE BUDGET General 150 BUDGET SUMMARY 2016-17 ACTUAL ADOPTED AMENDED RECOMM. % TOTAL ALL CITY FUNDS - EXPENDITURE BUDGET General 150,772,063 157,004,711 155,448,503 158,973,765 26% Special Revenue 105,738,661 110,778,338 113,004,933

More information

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A Aid to Construction Fund The Aid to Construction Fund (Water) are funds received from customers for requested water service and

More information

2012 Mercer Island Dashboard Report

2012 Mercer Island Dashboard Report 2012 Mercer Island Report Introduction The City s performance measurement model, called the Mercer Island, was developed in 2007 with the following objectives in mind: 1. To identify top tier indicators

More information

Property tax revenues are expected to remain strong with a projected FY 08 growth rate of 8.7% mainly due to growth in reassessments.

Property tax revenues are expected to remain strong with a projected FY 08 growth rate of 8.7% mainly due to growth in reassessments. Operating Revenues Property Tax Property tax revenues are expected to remain strong with a projected FY 08 growth rate of 8.7% mainly due to growth in reassessments. Since 2000, the average home sale price

More information

City of Roseville City Manager Recommended 2017 Budget. July 18, 2016

City of Roseville City Manager Recommended 2017 Budget. July 18, 2016 City of Roseville City Manager Recommended 2017 Budget July 18, 2016 For tonight, we intend to: Provide the City Council and public more detail on the proposed 2017 operating and capital budget for the

More information

IMPLEMENTATION A. INTRODUCTION C H A P T E R

IMPLEMENTATION A. INTRODUCTION C H A P T E R C H A P T E R 11 IMPLEMENTATION A. INTRODUCTION This chapter addresses implementation of the General Plan. The Plan s seven elements include 206 individual actions. 1 Many are already underway or are on-going.

More information

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration 494,751 453,181 494,253 501,667 Municipal Trash Collection 59,158 59,760 59,760 60,358 Total Revenues

More information

MANAGEMENT S DISCUSSION & ANALYSIS

MANAGEMENT S DISCUSSION & ANALYSIS MANAGEMENT S DISCUSSION & ANALYSIS Our discussion and analysis of the City of Grand Junction s (the City) financial performance provides an overview of the City s financial activities for the fiscal year

More information