1 IPA Components III, IV and V: Conditions for successful preparation and absorption of assistance Joint presentation by respective units in DGs AGRI, EMPL and REGIO

2 IPA framework: Structures and programming for Components III, IV and V Essentials for the progress to be achieved How to ensure e a good absorption o of funds State of play in preparations for implementation 2

3 IPA framework I. Transition Assistance and Institution Building II. Cross-Border Cooperation Candidate and potential candidate countries III. Regional Development IV. Human Resources Development V. Rural Development (IPARD) Only candidate countries 3

4 IPA framework Main IPA objectives Progressive alignment with the standards and policies of the EU: Cohesion policy, Common Agricultural Policy Prepare countries to implement and manage Community funds: European Regional Development Fund and Cohesion Fund, European Social Fund European Agricultural Fund for Rural Development Strengthening public management capacities 4

5 IPA framework IPA side effect - Strengthening gpublic management capacities Guiding countries in creating modern public management structures, based on the principles of good governance: Openness (transparency) Participation (partnership) Accountability Effectiveness Coherence 5

6 IPA framework Structures and authorities to be in place: National IPA Co-ordinator [NIPAC] (CI-V) Strategic co-ordinator (CIII-IV) Competent Accrediting Officer [CAO] (CI-V) National Authorising Officer [NAO] (CI-V) A National Fund [NF] (CI-V) An Operating Structure [OS] (for each Component/Programme) Audit Authority [AA](CI-V) End recipients (CIII-V) line ministry; water, rail or road company; regional waste operator; municipality; SME; farmer 6

7 Example - IPARD structures European Commission IPA Monitoring Committee National IPA Coordinator Competent Accrediting Officer Audit Authority IPARD Monitoring Committee Managing Authority National Authorising Officer National Fund IPARD Agency reporting audit, control management and control system (MCS) Delegated Bodies Internal Audit Regional Offices FINAL BENEFICIARIES E I I E Technical lbodies 7

8 Multi-annual programmes should be established: Example - Component III+IV Strategic Framework Pre-accession Partnership (Political Framework) Multi-annual Indicative Financial Framework Community Strategic Guidelines for Cohesion Relevant Community policies National development plans and programmes (national development priorities) Relevant National Sectoral Strategies Multi-annual Indicative Planning Document (all IPA components) Strategic Coherence Framework (IPA Regional Development and Human Resources Development components) Multi-annual Operational Programmes

9 Main steps to implementation of IPA CIII-V Receiving of a "Candidate Country" status Adoption of Multi-annual Programmes Framework (and Sectoral) Agreements National accreditation ti of operating structures t Accreditation and conferral of management decision Multi-annual Financing Agreement

10 Preparation takes from 2 to 3.5 years Conferral granted Programme implementation starts Starting preparation 16 Months Becoming a candidate country Years

11 IPA framework: Structures and programming for Components III, IV and V Essentials for the progress to be achieved How to ensure a good absorption of funds State t of play in preparations for implementation ti 11

12 Essentials for the progress Strategic aspects: Clear and shared political vision for the sectors concerned, reflecting consensus on where the country wants to be within a set time horizon Clear and approved strategy for getting there (environment; water sector; transport infrastructure; re; rural ral development) elopment) Identification of investments needed to implement the strategy Overall - ownership of programming, g preparation p and implementation by beneficiary country 12

13 Essentials for the progress Institutional aspects: Commitment by all at all time during planning and implementation Central coordination and leadership Institution building at central level (staffing, relevant competencies, training, i internal procedures) and ownership in core and line ministries Partnership with relevant stakeholders: administration bodies, regions, municipalities, economic and social partners, NGOs 13

14 Essentials for the progress In summary - to make a good progress: National legal and institutional structures must be in place More importantly - political back-up and commitment Which leads to allocation of appropriate human and financial resources 14

15 Essentials for the progress With the political backing and commitment: Strategic decisions on the programming would be taken more easily and effectively Sufficient resources would be allocated Countries would take less time to set-up the necessary legal and institutional i i lframework kfor implementation i of IPA CIII-V Hence, upon gaining a status of a Candidate Country would experience lesser delays in absorption of the funds 15

16 IPA framework: Structures and programming for Components III, IV and V Essentials for the progress to be achieved How to ensure a good absorption of funds State of play in preparations for implementation 16

17 Absorption of funds Well defined programmes, well functioning structures, trained staff in place Early start of project preparation Strong awareness of stakeholders and beneficiaries Availability of co-financing 17

18 Absorption of funds Strong awareness of stakeholders and beneficiaries: Early involvement of relevant stakeholders - raising their interest and keeping them informed from the very beginning Strong project preparation is essential - hands-on advice to the prospective beneficiaries from the early stages of preparation; on how to prepare projects; how to make projects which h would be accepted! 18

19 Absorption of funds Availability of co-financing: i Timely setting aside of financial resources in the budgets of public bodies Good credit system, loan accessibility. State guarantee fund? To involve the financial sector from early stages. Close interaction between the Government and a banking sector 19

20 IPA framework: Structures and programming for Components III, IV and V Essentials for the progress to be achieved How to ensure a good absorption of funds State of play in preparations for implementation 20

21 State of play Candidate Countries HR III Programmes Conferral of Management Financing Agreements Absorption IV V MK III IV V TR III IV V

22 State of play Albania, Bosnia and Herzegovina, Montenegro, Serbia, and Kosovo (under UN Security Council Resolution 1244) Applications for EU accession received from Albania and Montenegro. Serbia expected shortly IPA kick-off meetings held in BiH, Montenegro and Serbia Strategies and timeframes for preparation Institutional and management capacity building to start implementation of IPARD IPA Component I 22

23 Closing remarks Involvement of donors in successful preparation and absorption of assistance for IPA Components III, IV and V: Facilitate programming? Institutional building? Capacity building of stakeholders and prospective beneficiaries? Developing credit systems? 23

Republic of Serbia BILATERAL SCREENING Chapter 22 Regional Policy and Coordination of Structural Instruments INSTITUTIONAL FRAMEWORK

Republic of Serbia BILATERAL SCREENING Chapter 22 Regional Policy and Coordination of Structural Instruments INSTITUTIONAL FRAMEWORK Republic of Serbia BILATERAL SCREENING Chapter 22 Regional Policy and Coordination of Structural Instruments INSTITUTIONAL FRAMEWORK PART I DESIGNATION OF AUTHORITIES RESPONSIBLE FOR THE PROGRAMMING AND

More information

GUIDE THROUGH THE PROCESS OF PROGRAMMING AND MONITORING OF IMPLEMENTATION OF IPA II IN THE REPUBLIC OF SERBIA FOR MEMBERS OF SECO MECHANISM

GUIDE THROUGH THE PROCESS OF PROGRAMMING AND MONITORING OF IMPLEMENTATION OF IPA II IN THE REPUBLIC OF SERBIA FOR MEMBERS OF SECO MECHANISM GUIDE THROUGH THE PROCESS OF PROGRAMMING AND MONITORING OF IMPLEMENTATION OF IPA II IN THE REPUBLIC OF SERBIA FOR MEMBERS OF SECO MECHANISM The Guide Through the Process of Programming and Monitoring of

More information

Instrument for Pre-accession Assistance (IPA): the Rural Development Component IPARD

Instrument for Pre-accession Assistance (IPA): the Rural Development Component IPARD Instrument for Pre-accession Assistance (IPA): the Rural Development Component IPARD Elitsa Yanakieva European Commission, DG AGRI, Unit for Pre-accession assistance 5th meeting of EU-the former Yugoslav

More information

Preparations for IPA II - EU State Enlargement. Iwona Lisztwan European Commission Directorate General Agriculture and Rural development

Preparations for IPA II - EU State Enlargement. Iwona Lisztwan European Commission Directorate General Agriculture and Rural development Preparations for IPA II - EU State Enlargement of play Iwona Lisztwan European Commission Directorate General Agriculture and Rural development A new set of instruments for external action for the period

More information

Evaluation to support the preparation of pre-accession financial instruments beyond Final Report

Evaluation to support the preparation of pre-accession financial instruments beyond Final Report Evaluation to support the preparation of pre-accession financial instruments beyond 2013 13 June 2011 Evaluation to support the preparation of pre-accession financial instruments beyond 2013 A report submitted

More information

Use of Pre-Accession EU Grants by Municipalities

Use of Pre-Accession EU Grants by Municipalities Use of Pre-Accession EU Grants by Municipalities Hasan Çoban ( hcoban@dpt.gov.tr ) 04 March 2008 Iller Bank Facilities Ankara Seminar on Strengthening the Capacity for Absorption of EU Funds by Municipalities

More information

State-of-play of Managing Authority in Albania. Grigor Gjeci Head of the MA May 27 th, 2015

State-of-play of Managing Authority in Albania. Grigor Gjeci Head of the MA May 27 th, 2015 State-of-play of Managing Authority in Albania Grigor Gjeci Head of the MA May 27 th, 2015 Structure of the Managing Authorities Secretary General Directory of Programing and Evaluation of Rural Policies

More information

IPA II Serbia ( )

IPA II Serbia ( ) IPA II Serbia (2014-2020) Technical Assistance Projects The better the question. The better the answer. The better the world works. IPA II - OVERVIEW The Instrument for Pre-accession Assistance (IPA) is

More information

POLICY BRIEF IPA II MORE STRATEGY AND OVERSIGHT

POLICY BRIEF IPA II MORE STRATEGY AND OVERSIGHT POLICY BRIEF IPA II MORE STRATEGY AND OVERSIGHT November 2014 Authors: Dr. Malinka Ristevska Jordanova, Editor and senior expert Aleksandar Jovanoski, Junior expert European Policy Institute (EPI) - Skopje,

More information

EU Enlargement. its Financial Support. Istanbul 27 June European Commission. EU Enlargementand

EU Enlargement. its Financial Support. Istanbul 27 June European Commission. EU Enlargementand and its Financial Support Istanbul 27 June 2012 European Commission The 2012 enlargement agenda How to get in: conditions for membership Copenhagen criteria (1993) Political Stable democratic institutions

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

REPORT FROM THE COMMISSION TO THE COUNCIL, THE EUROPEAN PARLIAMENT AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE

REPORT FROM THE COMMISSION TO THE COUNCIL, THE EUROPEAN PARLIAMENT AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE EN EN EN EUROPEAN COMMISSION Brussels, 23.12.2009 COM(2009)699 final REPORT FROM THE COMMISSION TO THE COUNCIL, THE EUROPEAN PARLIAMENT AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE 2008 ANNUAL REPORT

More information

IPA 2009 National Programme for Albania Project Fiche N 5 Improvement of the Albanian's preparedness for Decentralised Management

IPA 2009 National Programme for Albania Project Fiche N 5 Improvement of the Albanian's preparedness for Decentralised Management IPA 2009 National Programme for Albania Project Fiche N 5 Improvement of the Albanian's preparedness for Decentralised Management 1 Basic Information 1.1 CRIS Number: 2009/021-642 1.2 Title: Improvement

More information

I N S T R U M E N T f o r P R E - A C C E S S I O N A S S I S T A N C E ( I P A I I ) Priorities incl. cross-border cooperation

I N S T R U M E N T f o r P R E - A C C E S S I O N A S S I S T A N C E ( I P A I I ) Priorities incl. cross-border cooperation I N S T R U M E N T f o r P R E - A C C E S S I O N A S S I S T A N C E 2014-2020 ( I P A I I ) Priorities incl. cross-border cooperation I N S T R U M E N T f o r P R E - A C C E S S I O N A S S I S T

More information

The Instrument for Pre accession. EU Enlargement. Assistance IPA II:

The Instrument for Pre accession. EU Enlargement. Assistance IPA II: The Instrument for Pre accession EU Enlargement Assistance IPA II: 2014-2020 General framework: a new set of instruments for external action for the period 2014-2020 Commission proposal for next Multi-annual

More information

Official Journal of the European Union

Official Journal of the European Union L 210/82 31.7.2006 COUNCIL REGULATION (EC) No 1085/2006 of 17 July 2006 establishing an Instrument for Pre-Accession Assistance (IPA) THE COUNCIL OF THE EUROPEAN UNION, Having regard to the Treaty establishing

More information

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 16 September 2013 (17.09) (OR. fr) 13649/13 PECOS 1 ESE 6 NT 6 ME 5 COWEB 128 ISL 6 FSTR 98 ELARG 117

COUNCIL OF THE EUROPEAN UNION. Brussels, 16 September 2013 (17.09) (OR. fr) 13649/13 PECOS 1 ESE 6 NT 6 ME 5 COWEB 128 ISL 6 FSTR 98 ELARG 117 COUNCIL OF THE EUROPEAN UNION Brussels, 16 September 2013 (17.09) (OR. fr) 13649/13 COVER NOTE from: PECOS 1 ESE 6 NT 6 ME 5 COWEB 128 ISL 6 FSTR 98 ELARG 117 Secretary-General of the European Commission,

More information

ENI & IPA II ESSENTIALS

ENI & IPA II ESSENTIALS ENI & IPA II ESSENTIALS European Neighbourhood Instrument (ENI) Reg. No 232/2014 Regulatory framework COMMON IMPLEMENTING REGULATION FOR EXTERNAL ACTIONS Reg. No 236/2014 Instrument for Pre-accession Assistance

More information

Challenges Of The Indirect Management Of Eu Funds In Albania

Challenges Of The Indirect Management Of Eu Funds In Albania Challenges Of The Indirect Management Of Eu Funds In Albania Neritan Totozani, Msc Central Financing & Contracting Unit, Ministry of Finance, Albania doi: 10.19044/esj.2016.v12n7p170 URL:http://dx.doi.org/10.19044/esj.2016.v12n7p170

More information

COMMISSION DECISION. C(2007)5980 of 10/12/2007

COMMISSION DECISION. C(2007)5980 of 10/12/2007 EN EN EN COMMISSION DECISION C(2007)5980 of 10/12/2007 adopting the Cross border programme between Serbia and Montenegro under the IPA- Cross border Co operation component, for the year 2007 THE COMMISSION

More information

Screening report Montenegro

Screening report Montenegro Screening report Montenegro Chapter 22 Regional policy and coordination of Structural Instruments Date of screening meetings: Explanatory meeting: 14-15 November 2012 Bilateral meeting: 18 December 2012

More information

IPA II Monitoring, Reporting and Performance Framework

IPA II Monitoring, Reporting and Performance Framework IPA II Monitoring, Reporting and Performance Framework Specific Contract N 2014/351-964 FINAL REPORT 25 January 2016 Implementing Partners: B&S EUROPE & Proman 1 The contents of this publication are the

More information

Standard Summary Project Fiche IPA centralised programmes

Standard Summary Project Fiche IPA centralised programmes Standard Summary Project Fiche IPA centralised programmes 1. Basic information Project number 2: Support to preparation of IPA component III 1.1 CRIS Number: 2009/021-765 1.2 Title: Support to preparation

More information

Minister of Economy, budget planning

Minister of Economy, budget planning Donor Coordination In country Systems ALBANIA Strategic Planning Committee (SPC) the Interministerial Chaired by the Prime Established in SPC: Minister and comprises January 2007. - approves the main directions

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE EUROPEAN COMMISSION Brussels, 30.9.2014 COM(2014) 610 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE 2013 Annual Report on Financial

More information

SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE)

SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE) SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE) FWC BENEFICIARIES 2009 - LOT 11: Macro Economy, Statistics, Public Finance Management EuropeAid/127054/C/SER/multi 1. BACKGROUND

More information

EU ENLARGEMENT PROCESS: THE INSTRUMENT for PRE-ACCESSION ASSISTANCE (IPA II) Leonetta Pajer, DG NEAR

EU ENLARGEMENT PROCESS: THE INSTRUMENT for PRE-ACCESSION ASSISTANCE (IPA II) Leonetta Pajer, DG NEAR EU ENLARGEMENT PROCESS: THE INSTRUMENT for PRE-ACCESSION ASSISTANCE 2014-2020 (IPA II) Leonetta Pajer, DG NEAR Outline Enlargement process Current Situation The new Instrument for Pre-Accession:IPA II

More information

Instrument for Pre-Accession Assistance (IPA) Multi-annual Indicative Planning Document (MIPD) Republic of Croatia

Instrument for Pre-Accession Assistance (IPA) Multi-annual Indicative Planning Document (MIPD) Republic of Croatia EN Instrument for Pre-Accession Assistance (IPA) Multi-annual Indicative Planning Document (MIPD) 2009-2011 Republic of Croatia EN EN TABLE OF CONTENTS Executive Summary... 4 Section 1... 7 Assessment

More information

At the latest by 31 December At the latest by 31 December 2016

At the latest by 31 December At the latest by 31 December 2016 ANNEX 1 ANNUAL ACTION PROGRAMME FOR KOSOVO * FOR THE YEAR 2015 1 IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget lines Management Mode/ Entrusted entities Final

More information

Implementation of the Technical Assistance measure Brussels, 14 December 2018

Implementation of the Technical Assistance measure Brussels, 14 December 2018 Implementation of the Technical Assistance measure Brussels, 14 December 2018 Agriculture and Rural Development Agenda for today Introduction Flowchart of the Technical Assistance measure Discuss the annex

More information

COMMISSION DECISION. C(2007)6376 on 18/12/2007

COMMISSION DECISION. C(2007)6376 on 18/12/2007 COMMISSION DECISION C(2007)6376 on 18/12/2007 adopting a horizontal programme on the Energy Efficiency Finance Facility for Albania, Bosnia and Herzegovina, Croatia, Montenegro, Serbia including Kosovo

More information

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary Project fiche 1.1: Strengthening the capacity of the institutions to manage and implement the Operational Programmes 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Strengthening the capacity

More information

COMMISSION STAFF WORKING PAPER. Background document. Accompanying the document

COMMISSION STAFF WORKING PAPER. Background document. Accompanying the document EUROPEAN COMMISSION Brussels, 11.10.2011 SEC(2011) 1198 final COMMISSION STAFF WORKING PAPER Background document Accompanying the document Report from the Commission to the European Parliament, the Council

More information

Cross-border Cooperation Action Programme Montenegro - Albania for the years

Cross-border Cooperation Action Programme Montenegro - Albania for the years ANNEX 1 Cross-border Cooperation Action Programme Montenegro - Albania for the years 2015-2017 1 IDENTIFICATION Beneficiaries CRIS/ABAC Commitment references Union Contribution Budget line Montenegro,

More information

The European Neighbourhood and Partnership Instrument. DG RELEX UNIT ER-D-1 European Neighbourhood Policy Coordination General Coordination

The European Neighbourhood and Partnership Instrument. DG RELEX UNIT ER-D-1 European Neighbourhood Policy Coordination General Coordination The European Neighbourhood and Partnership Instrument DG RELEX UNIT ER-D-1 European Neighbourhood Policy Coordination General Coordination Objectives of the presentation The EU s political geography Development

More information

CARDS 2004 NEIGHBOURHOOD PROGRAMME

CARDS 2004 NEIGHBOURHOOD PROGRAMME CARDS 2004 NEIGHBOURHOOD PROGRAMME 1. Identification Form of programme: Multi-country Title: CARDS Neighbourhood Programme Budget year: 2004 Budget Line: 19 07 01 Financial allocation 15 million Legal

More information

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9 Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9 1. Basic information 1.1 CRIS Number: 2009/021-170 1.2 Title: Strengthening the management and control systems for EU financial

More information

REGIONAL CONFERENCE FILLING IN THE BUDGET GAPS IN ROMA INTEGRATION POLICIES. Tirana, November 10, 2017.

REGIONAL CONFERENCE FILLING IN THE BUDGET GAPS IN ROMA INTEGRATION POLICIES. Tirana, November 10, 2017. REGIONAL CONFERENCE FILLING IN THE BUDGET GAPS IN ROMA INTEGRATION POLICIES Tirana, November 10, 2017. Purpose and objectives of the analysis and the conference Premise: 1. Decent living conditions; 2.

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MULTI-COUNTRY Support to Western Balkans Infrastructure Investment Projects for 2014 Action Summary This Action will allow financing Technical

More information

IPA TWINNING NEWS NEAR SPECIAL

IPA TWINNING NEWS NEAR SPECIAL IPA TWINNING NEWS NEAR SPECIAL European IPA Twinning Projects Pipeline 2018 Project title ALBANIA IPA 2015 (indirect management CFCU) Title "Support to the Bank of Albania for Q3 2018 the Technical Cooperation

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on the Instrument for Pre-accession Assistance (IPA II)

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on the Instrument for Pre-accession Assistance (IPA II) EUROPEAN COMMISSION Brussels, 7.12.2011 COM(2011) 838 final 2011/0404 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the Instrument for Pre-accession Assistance (IPA II)

More information

Implementation Status & Results Bosnia and Herzegovina Agriculture and Rural Development Project (P101213)

Implementation Status & Results Bosnia and Herzegovina Agriculture and Rural Development Project (P101213) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Bosnia and Herzegovina Agriculture and Rural Development Project (P101213) Operation Name: Agriculture and Rural

More information

Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Support for Rural Development Programming (SRDP) in B&H

Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Support for Rural Development Programming (SRDP) in B&H Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Support for Rural Development Programming (SRDP) in B&H 1. Basic information 1.1. CRIS Number: 43040 Rural Development 1.2. Title:

More information

LIMITE EN CONFERENCE ON ACCESSION TO THE EUROPEAN UNION CROATIA. Brussels, 15 April 2011 AD 13/11 LIMITE CONF-HR 8

LIMITE EN CONFERENCE ON ACCESSION TO THE EUROPEAN UNION CROATIA. Brussels, 15 April 2011 AD 13/11 LIMITE CONF-HR 8 CONFERENCE ON ACCESSION TO THE EUROPEAN UNION CROATIA Brussels, 15 April 2011 AD 13/11 LIMITE DOCUMENT PARTIALLY ACCESSIBLE TO THE PUBLIC (12.09.2011) CONF-HR 8 ACCESSION DOCUMENT Subject: EUROPEAN UNION

More information

Multi-annual Indicative Planning Document (MIPD) Republic of Croatia

Multi-annual Indicative Planning Document (MIPD) Republic of Croatia Multi-annual Indicative Planning Document (MIPD) Republic of Croatia 1 Preface The main objective of the Instrument for Pre-Accession Assistance (IPA) 1 is to help the beneficiary country to implement

More information

REPORT Regional Workshop Budgeting for Roma Integration Policies Skopje, March 2017

REPORT Regional Workshop Budgeting for Roma Integration Policies Skopje, March 2017 Roma Integration 2020 is co-funded by: European Union REPORT Regional Workshop Budgeting for Roma Integration Policies Skopje, 20-21 March 2017 Report prepared by: Merima Avdagić, Leading Consultant Zuhra

More information

OPERATIONAL MANUAL FOR PROGRAMMING COMPONENT I OF INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA)

OPERATIONAL MANUAL FOR PROGRAMMING COMPONENT I OF INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA) OPERATIONAL MANUAL FOR PROGRAMMING COMPONENT I OF INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA) Views expressed in this document represent the statements by consultants involved in project implementation.

More information

REPIM Curriculum Vitae Jolanda Trebicka

REPIM Curriculum Vitae Jolanda Trebicka RESEARCH ON ECONOMIC POLICY IMPLEMENTATION & MANAGEMENT FERNWOOD HOUSE, WEST WOODFOOT, SLALEY, HEXHAM, NE47 0DF, NORTHUMBERLAND, ENGLAND. TEL: 00 44-1434- 673385 e mail: enquiries@repim.eu Name: JOLANDA

More information

WATER AND WASTEWATER SERVICES IN THE DANUBE REGION SUMMER SCHOOL TSLR TORINO, SEPTEMBER, 2015

WATER AND WASTEWATER SERVICES IN THE DANUBE REGION SUMMER SCHOOL TSLR TORINO, SEPTEMBER, 2015 WATER AND WASTEWATER SERVICES IN THE DANUBE REGION SUMMER SCHOOL TSLR TORINO, SEPTEMBER, 2015 STRUCTURE A Framework for Sustainable Services The State of the Sector in the Danube region Context Access

More information

COMMISSION DECISION. of on technical provisions necessary for the operation of the transition facility in the Republic of Croatia

COMMISSION DECISION. of on technical provisions necessary for the operation of the transition facility in the Republic of Croatia EUROPEAN COMMISSION Brussels, 13.6.2013 C(2013) 3463 final COMMISSION DECISION of 13.6.2013 on technical provisions necessary for the operation of the transition facility in the Republic of Croatia EN

More information

Project Fiche IPA National programmes IPA 2012/Component I

Project Fiche IPA National programmes IPA 2012/Component I Project Fiche IPA National programmes IPA 2012/Component I 1 IDENTIFICATION Project Title Strengthening the capacity of the Central Financing and Contracting Unit (CFCU) for efficient implementation of

More information

EU Strategy for the Adriatic and Ionian Region. Towards a streamlined governance and management architecture for the EUSAIR

EU Strategy for the Adriatic and Ionian Region. Towards a streamlined governance and management architecture for the EUSAIR November 2014 EU Strategy for the Adriatic and Ionian Region Towards a streamlined governance and management architecture for the EUSAIR Working Paper devised by the EUSAIR National Coordinators in partnership

More information

Western Balkans Regional Investment Policy and Promotion Implementing the Investment Policy Aspects of the SEE 2020 Strategy

Western Balkans Regional Investment Policy and Promotion Implementing the Investment Policy Aspects of the SEE 2020 Strategy Western Balkans Regional Investment Policy and Promotion Implementing the Investment Policy Aspects of the SEE 2020 Strategy 1 Key Project Data Objective: contribute to an increase in direct investment

More information

IPA TWINNING NEWS NEAR SPECIAL

IPA TWINNING NEWS NEAR SPECIAL IPA TWINNING NEWS NEAR SPECIAL European IPA Twinning Projects Pipeline from July till December 2016 Project title ALBANIA IPA 2014 (Indirect management CFCU) - "Strengthening of capacities of the Consumer

More information

The tasks of the Managing Authority under IPARD II. Multi-country workshop, 13 November 2015 Tirana

The tasks of the Managing Authority under IPARD II. Multi-country workshop, 13 November 2015 Tirana The tasks of the Managing Authority under IPARD II Multi-country workshop, 13 November 2015 Tirana 1 Whatsapp? Quick look Closer look Programme monitoring IPARD II monitoring committee Evaluation Reporting

More information

Bosnia and Herzegovina Federation of Bosnia and Herzegovina

Bosnia and Herzegovina Federation of Bosnia and Herzegovina First Interim Meeting on the Regional Expert Advisory Working group on LEADER 05 th June 07 th June 2017 Andrevlje, Serbia ASSESSMENT OF THE APPLICATION OF THE LEADER APPROACH IN THE WESTERN BALKAN COUNTRIES

More information

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information P R O C U R E M E N T N O T I C E Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information 1.1 Background information on the Regional School of

More information

SOCIO-ECONOMIC DEVELOPMENT AND PUBLIC ADMINISTRATION REFORM DEPARTMENT

SOCIO-ECONOMIC DEVELOPMENT AND PUBLIC ADMINISTRATION REFORM DEPARTMENT SOCIO-ECONOMIC DEVELOPMENT AND PUBLIC ADMINISTRATION REFORM DEPARTMENT Company Profile and Selection of Project References Version 16 January 2015 Leaders in Consulting Services in Southeast Europe Together

More information

AGENDA Participants' registration

AGENDA Participants' registration AGENDA 08.00 09.00 Participants' registration 09.00 09.30 Welcome address Štefan Füle, er for Enlargement and European Neighbourhood Policy (video message) Kristian Vigenin, Member of the European Parliament

More information

CAP, including rural development, and IPARD post-2013

CAP, including rural development, and IPARD post-2013 CAP, including rural development, and IPARD post-2013 Loretta Dormal-Marino, Deputy Director-General, DG AGRI Fifth Annual Working Meeting of the Ministers of Agriculture from SEE 11-12 November 2011 C

More information

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201 ANNEX to Commission Implementing Decision adopting an Annual Action Programme for Turkey under the Instrument for Pre-accession Assistance (IPA II) for the year 2017 1. IDENTIFICATION Beneficiary CRIS/ABAC

More information

COMMISSION IMPLEMENTING DECISION. of adopting a

COMMISSION IMPLEMENTING DECISION. of adopting a EUROPEAN COMMISSION Brussels, 10.12.2014 C(2014) 9351 final COMMISSION IMPLEMENTING DECISION of 10.12.2014 adopting a Cross-border cooperation Programme Bosnia and Herzegovina Montenegro for the years

More information

Progress on the Strengthening of the European Integration Structures

Progress on the Strengthening of the European Integration Structures TENTH MEETING OF THE STABILISATION AND ASSOCIATION PROCESS TRACKING MECHANISM CONCLUSIONS PRISTINA, 14 JULY 2006 The tenth meeting of the Stabilisation and Association Process Tracking Mechanism was held

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of 2008

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of 2008 EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION of 2008 adopting an Annual Programme II for Kosovo (under UNSCR 1244/99) 1 under the IPA Transition Assistance and Institution Building

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 02.05.2005 COM(2005) 178 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL GENERAL REPORT ON PRE-ACCESSION ASSISTANCE (PHARE ISPA

More information

STRATEGIC PLANNING AT CANTONAL LEVEL STEP CLOSER TO EU: CANTON SARAJEVO EXAMPLE

STRATEGIC PLANNING AT CANTONAL LEVEL STEP CLOSER TO EU: CANTON SARAJEVO EXAMPLE DOI 10.5644/PI2013-153-17 STRATEGIC PLANNING AT CANTONAL LEVEL STEP CLOSER TO EU: CANTON SARAJEVO EXAMPLE Emir Kurtović * Senad Softić ** Maida Fetahagić *** Gordana Memišević **** Abstract This article

More information

SERBIA. Support to participation in EU Programmes. Action Summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

SERBIA. Support to participation in EU Programmes. Action Summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2 0 1 4-2 0 2 0 SERBIA Support to participation in EU Programmes Action Summary This Action will facilitate Serbian participation in EU programmes during

More information

Annex 1 Citizen s summary 1

Annex 1 Citizen s summary 1 Programming process Annex 1 Citizen s summary 1 The process of preparation of the Cooperation Programme was coordinated by the Managing Authority (Ministry of Regional Development and EU Funds of the Republic

More information

Third EU Health Programme

Third EU Health Programme Third EU Health Programme 2014-2020 National Info day Rome, 16 March 2016 Irène Athanassoudis DG SANTE AIDS Prevention & communicable diseases EU Health actions and Programmes Injuries prevention Drug

More information

EN Official Journal of the European Union L 77/11

EN Official Journal of the European Union L 77/11 15.3.2014 EN Official Journal of the European Union L 77/11 REGULATION (EU) No 231/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 March 2014 establishing an Instrument for Pre-accession Assistance

More information

Summary Analysis IPA FUNDS IN BIH - (UN) UTILIZED OPPORTUNITES AND POSSIBILITIES

Summary Analysis IPA FUNDS IN BIH - (UN) UTILIZED OPPORTUNITES AND POSSIBILITIES Summary Analysis IPA FUNDS IN BIH - (UN) UTILIZED OPPORTUNITES AND POSSIBILITIES INTRODUCTION: During the years long monitoring of the executive and legislative authorities performance in BiH, which the

More information

:: MEETING NOTES :: 1 ST MEETING OF THE WORKING GROUP FOR DEVELOPING REGIONAL STANDARDS FOR ROMA RESPONSIBLE BUDGETING

:: MEETING NOTES :: 1 ST MEETING OF THE WORKING GROUP FOR DEVELOPING REGIONAL STANDARDS FOR ROMA RESPONSIBLE BUDGETING 1 ST MEETING OF THE WORKING GROUP FOR DEVELOPING REGIONAL STANDARDS FOR ROMA RESPONSIBLE BUDGETING :: MEETING NOTES :: The First meeting of the Working Group for Developing Regional Standards for Roma

More information

Western Balkans and Europe 2020 Supporting Convergence and Growth

Western Balkans and Europe 2020 Supporting Convergence and Growth Western Balkans and Europe 2020 Supporting Convergence and Growth Regional Coordination Conference, Brussels, March 31, 2011 Panel 2: Infrastructure and Sustainable Growth Marta Szigeti Bonifert, executive

More information

Project Fiche IPA centralised programmes Regional Programme on Disaster Risk Reduction in South-East Europe

Project Fiche IPA centralised programmes Regional Programme on Disaster Risk Reduction in South-East Europe Project Fiche IPA centralised programmes Regional Programme on Disaster Risk Reduction in South-East Europe 1. Basic information 1.1 CRIS Number: 2008/019-813 and 2008/020-047 1.2 Title: Disaster Risk

More information

Serbia European Integration Facility - Indirect management -

Serbia European Integration Facility - Indirect management - 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Serbia European Integration Facility - Indirect management - Action Summary The contents of the IPA 2014 Action on European Integration is being

More information

Pre-Accession Study visit to the Croatian food safety authorities. European Food Safety Authority

Pre-Accession Study visit to the Croatian food safety authorities. European Food Safety Authority EVENT REPORT APPROVED: 3 February 2017 doi:10.2903/sp.efsa.2017. EN- Pre-Accession Study visit to the Croatian food safety authorities European Food Safety Authority Abstract This report summarises the

More information

TWINNING: A TESTED EXPERIENCE IN A BROADER EUROPEAN CONTEXT

TWINNING: A TESTED EXPERIENCE IN A BROADER EUROPEAN CONTEXT TWINNING: A TESTED EXPERIENCE IN A BROADER EUROPEAN CONTEXT European Commission Directorate General Enlargement Institution Building Unit INTRODUCTION The Twinning programme was established in 1998 to

More information

COMMISSION IMPLEMENTING DECISION. of adopting a

COMMISSION IMPLEMENTING DECISION. of adopting a EUROPEAN COMMISSION Brussels, 10.12.2014 C(2014) 9352 final COMMISSION IMPLEMENTING DECISION of 10.12.2014 adopting a Cross-border cooperation Programme Montenegro- Albania for the years 2014-2020 and

More information

Standing Working Group for Regional Rural Development in SEE (SWG) Operational Plan January December 2016 Time Frame

Standing Working Group for Regional Rural Development in SEE (SWG) Operational Plan January December 2016 Time Frame 3/8/2016 Standing Working Group for Regional Rural Development in () Operational Plan January 2016 - December 2016 Time Frame Description of the activity Beneficiary/Target group Location of implementation

More information

EFSE Annual Meeting 2009 Structure and Performance of EFSE

EFSE Annual Meeting 2009 Structure and Performance of EFSE EFSE Annual Meeting 2009 Structure and Performance of EFSE Arial EFSE 24and the Financial Crisis Responsible Finance NOVI SAD, SERBIA 27 MAY 2009 A Unique Blend of Commercial and Social Values EFSE - A

More information

Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1

Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1 P R O C U R E M E N T N O T I C E Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1 Section 1. Introductory Information 1.1 Background information on the Regional

More information

How TAIEX and Twinning support the adoption of Eurocodes in the Balkans

How TAIEX and Twinning support the adoption of Eurocodes in the Balkans ADOPTION OF THE EUROCODES IN THE BALKAN REGION 5-6 December 2013, Milan & Ispra, Italy How TAIEX and Twinning support the adoption of Eurocodes in the Balkans Adriano Zilhão Head of the Institution Building

More information

STRATEGIC PLANNING AND MONITORING OF PUBLIC EXPENDITURES

STRATEGIC PLANNING AND MONITORING OF PUBLIC EXPENDITURES BOSNIA AND HERZEGOVINA COUNCIL OF MINISTERS MINISTRY OF FINANCE AND TREASURY STRATEGIC PLANNING AND MONITORING OF PUBLIC EXPENDITURES Methodology, development and implementation of Public Investment Programme

More information

SEE Achievements in view SEE ANNUAL EVENT. Ivana Sacco Andrea Vitolo Bucharest, 19th June 2013

SEE Achievements in view SEE ANNUAL EVENT. Ivana Sacco Andrea Vitolo Bucharest, 19th June 2013 SEE Achievements in view of the new programmes in the area SEE ANNUAL EVENT Ivana Sacco Andrea Vitolo Bucharest, 19th June 2013 SEE AREA TOWARDS 2014-2020: MAIN STEPS Task Force and Rules of Procedures

More information

Infrastructure Projects Facility. Western Balkans Infrastructure Initiative

Infrastructure Projects Facility. Western Balkans Infrastructure Initiative Infrastructure Projects Facility and the Western Balkans Infrastructure Initiative Brussels, 25 November 2008 Christos Gofas 1 IPF Objectives / Targets To support the development and upgrade of infrastructures

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE EUROPEAN COMMISSION Brussels, 30.10.2015 COM(2015) 548 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE Annual Report on Financial

More information

Project References Bosnia and Herzegovina

Project References Bosnia and Herzegovina Project References Bosnia and Herzegovina Name applicant: Arbeiter-Samariter-Bund, Deutschland e.v Project title: Support of socioeconomic Sector: 73010 Reconstruction relief and rehabilitation inclusion

More information

Experience with the Development and Carrying-out of CAP Audits

Experience with the Development and Carrying-out of CAP Audits Experience with the Development and Carrying-out of CAP Audits Auditing the CAP from the European Commission s Perspective Michael Niejahr European Commission Directorate General for Agriculture and Rural

More information

Central Training TRIALOG Annual Exchange Meeting SERBIA Marija Dimitrijevic Miskovic Civic Initiatives Prague April 24-25, 2012

Central Training TRIALOG Annual Exchange Meeting SERBIA Marija Dimitrijevic Miskovic Civic Initiatives Prague April 24-25, 2012 Central Training TRIALOG Annual Exchange Meeting SERBIA Marija Dimitrijevic Miskovic Civic Initiatives Prague April 24-25, 2012 Country situation and challenges Serbia and the EU The EU is the major partner

More information

COMMISSION DECISION. on a Multi-annual Indicative Planning Document (MIPD) for Montenegro

COMMISSION DECISION. on a Multi-annual Indicative Planning Document (MIPD) for Montenegro EN EN EN COMMISSION DECISION of on a Multi-annual Indicative Planning Document (MIPD) 2009-2011 for Montenegro THE COMMISSION OF THE EUROPEAN COMMUNITIES, Having regard to the Treaty establishing the European

More information

SERBIA. Support to participation in EU Programmes. Action Summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

SERBIA. Support to participation in EU Programmes. Action Summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 SERBIA Support to participation in EU Programmes Action Summary This Action represents continuation of Serbian participation in EU programmes

More information

LOGFRAME. Strategy of Intervention Key Indicators Data Sources Means of Verification. Impact (Overall Goal) Impact Indicators

LOGFRAME. Strategy of Intervention Key Indicators Data Sources Means of Verification. Impact (Overall Goal) Impact Indicators LOGFRAME Strategy of Intervention Key Indicators Data Sources Means of Verification Impact (Overall Goal) Local Governments access additional financial resources to deliver on their competences; the resources

More information

Open Call for Consulting Services Consultant for Mapping of funding opportunities for Roma integration measures, policies and programs

Open Call for Consulting Services Consultant for Mapping of funding opportunities for Roma integration measures, policies and programs Roma Integration 2020 is co-funded by the European Union Open Call for Consulting Services Consultant for Mapping of funding opportunities for Roma integration measures, policies and programs 022-017 Reference

More information

COMMISSION IMPLEMENTING DECISION. of adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015

COMMISSION IMPLEMENTING DECISION. of adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015 EUROPEAN COMMISSION Brussels, 7.12.2015 C(2015) 8777 final COMMISSION IMPLEMENTING DECISION of 7.12.2015 adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015 EN EN COMMISSION

More information

Adriatic-Ionian area European Territorial Cooperation Programme and EUSAIR - the experience of the Emilia-Romagna Region

Adriatic-Ionian area European Territorial Cooperation Programme and EUSAIR - the experience of the Emilia-Romagna Region Adriatic-Ionian area European Territorial Cooperation Programme and EUSAIR - the experience of the Emilia-Romagna Region Umea, 24 September 2014 CPMR task force meeting Stefania Leoni Senior Officer Institutional

More information

IPA 2011 NATIONAL PROGRAMME - BOSNIA AND HERZEGOVINA

IPA 2011 NATIONAL PROGRAMME - BOSNIA AND HERZEGOVINA ANNEX: IPA 2011 NATIONAL PROGRAMME - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS decision number 2011/023-436 Year 2011 Cost EUR 91 280 000 Implementing Authority European

More information

New Zealand Vanuatu. Joint Commitment for Development

New Zealand Vanuatu. Joint Commitment for Development New Zealand Vanuatu Joint Commitment for Development 2 The Joint Commitment for Development between the Governments of New Zealand and Vanuatu establishes a shared vision for achieving long-term development

More information

Programme for Prevention, Preparedness and Response to Floods in the Western Balkans and Turkey IPA FLOODS Grant Contract ECHO/SUB/2014/692292

Programme for Prevention, Preparedness and Response to Floods in the Western Balkans and Turkey IPA FLOODS Grant Contract ECHO/SUB/2014/692292 Programme for Prevention, Preparedness and Response to Floods in the Western Balkans and Turkey IPA FLOODS Grant Contract ECHO/SUB/2014/692292 Capacity building EU Floods Directive: achievements and work

More information