Use of Pre-Accession EU Grants by Municipalities
|
|
- Cora Robbins
- 6 years ago
- Views:
Transcription
1 Use of Pre-Accession EU Grants by Municipalities Hasan Çoban ( hcoban@dpt.gov.tr ) 04 March 2008 Iller Bank Facilities Ankara Seminar on Strengthening the Capacity for Absorption of EU Funds by Municipalities co-organized by the Undersecretariat of Treasury and Iller Bank Directorate General
2 AGENDA Funding Needs of Municipalities Instrument for Pre-Accession Assistance IPA Scope of IPA Operational Programs Legal Arrangements Fiscal and Administrative Framework EU Funds Available to Municipalities Process of Absorbing EU Financial Assistance 2
3 Service Cycle of Municipalities Own funds Loan (dom. & ext.) Grant (dom. & ext.) Services Funding Needs Operation, maintenance and repair Municipalities Investment Needs Inadequacy in services Needs Urban expansion and growth 3
4 Instrument for Pre-Accession Assistance IPA Instrument for Pre-Accession Assistance IPA: an instrument that determines the framework for the use of EU funds in the period Objective: To ensure that candidate states progress in line with the EU policies and standards; support the Harmonization Policy and assist them adopt the Acquis Communitaire, including the instruments on the path for membership. Implementation method: according to the IPA Regulation adopted by the EU Council on 17 July Covered states : candidate and potential candidate states. 4
5 Countries Covered by IPA and Funds Allocated Candidate states Turkey Croatia Potential candidate states Albania, Kosovo Bosnia and Herzegovina, Serbia, Monte Negro and Macedonia IPA draft budget 11.5 billion Euro ( ) 3.96 billion Euro ( ) Funds that can be allocated to Turkey under IPA 1.6 billion Euro ( ) 5
6 Instrument for Pre-Accession Assistance - Components Component 1 Transitional Period Support and Institution Building ( SG for EU Affairs) IPA Financial Assistance Components Component 5 Rural Development ( MARA) Component 2 Regional and Cross-Border Cooperation (SG for EU Affairs) Component 3 Regional Development ( SPO ) Component 4 HR Development ( MOLSS) 6
7 Instrument for Pre-Accession Assistance ( Scope of Components ) Transitional Period Support and Institution Building : This component covers the provision of technical assistance for improving the capacities of agencies and institutions. Regional and Cross-Border Cooperation: This component contributes to social and economic development through incentivizing entrepreneurship in border regions and increasing access to border regions. Regional Development Strategic Framework Document and Operational Plans (OPs) prepared Human Resources Development Rural Development: This component supports SMEs in rural areas and transportation and environmental protection infrastructure in rural areas (IPARD). 7
8 Legal, Regulatory and Administrative Structure of IPA Regulations in Turkey 9th Development Plan ( ) Medium-Term Program ( ) Preliminary National Dev. Plan ( ) Pre-Accession Economic Plan (2005) Sectoral Strategies - Rural Development SMEs Industry - Environment Transportation Regulations in the EU IPA Regulation ( ) Multi-Year Indicative Fiscal Framework Program (7-year) Accession Financial Strategy (7-year) Strategic Framework Document for Harmonization ( ) Trans. Per. Support and. Institution Building Regional and Cross-Border Cooperation Regional Development Human Resources Development Rural Development OP - Environment OP - Transportation OP Regional Competitivity OP- Human Resources Rural Development Plan (IPARD) 8
9 Institutional Organization for Use of IPA Funds HPC National IPA Coordinator (SGEU) Financial Cooperation Committee (FCC) Sectoral Coordinator (DPT) National Authorization Officer (National Fund) - (UoT) Implementing Agency (CFCU) Steering and Monitoring Committee Components 1 and 2 Ins. Building, Cross-Border Coop. Component 3: Reg. Dev. Component 4 : HR Dev. Component 5: Rural Dev. Ins. Build. C-B Coop SG for EU Affairs Steering Committee (Projects) Env MoEF Steering Committee (OP-1) Transport MoT Steering Committee (OP-2) Regional Comp. MoIT Steering Committee (OP-3) HR MoLSS Steering Committee (OP 4) Rural Development MoARA Agr. And Rur. Dev. Sup. Ag. Steering Committee (IPARD) Beneficiary Agencies: - Ministries - Municipalities - Public Agencies ( Project Impl. Units) 9
10 Steering and Monitoring Committees Sectoral Steering and Monitoring Committee Operational Program Steering Committee State Planning Organization (coordinator) Ministry of Transportation Ministry of Interior Ministry of National Education Ministry of Labor and Social Security Ministry of Industry Ministry of Environment and Forestry Ministry of Finance Ministry of Health Ministry of Energy Ministry of Culture and Tourism Undersecretariat of Treasury Secretariat General for EU Affairs Related Ministries or Agencies (coordinator) Representatives of agencies and institutions related with Operational Program 10
11 Instrument fort Pre-Accession Assistance ( Funds allocated for OPs between ) Total % Million Euro % Million Euro % Million Euro Million Euro Regional Development , , ,7 524,0 Regional Competitivity OP 25 41, , ,8 140,1 Environment OP 40 67, , ,6 204,1 Transportation OP 35 58, , ,3 179,7 HR Development - 50,2-52,9-55,6 158,7 Total - 217,7 226,7 238,3 682,7 11
12 Conditions of Eligibility for EU Projects Funds allocated to infrastructure projects with cost of more than 5 million Euro. 75% EU contribution provided to projects approved before For projects approved in 2008 and beyond, 55-75% of project financing deficit will be funded by EU. (EU contribution= (project cost project revenues) x 0.75) Projects linked with investment program. National contribution share to willing municipalities will be provided by Iller Bank in the form of loan. External loans may be used via Iller Bank as national contribution share. 12
13 Selection Criteria in Environmental Protection Projects 1. Compliance with environmental plans, sectoral strategies and policies. 2. Population (municipalities with higher population to be prioritized). 3. Municipalities facing financial constrains (municipalities with cofinancing capacities and municipalities capable of meeting operating costs will be prioritized). 4. Financial viability (selection in accordance with cost recovery principles and user and polluter pays principles). 5. Environmental priorities (infrastructure projects prioritizing the following objectives will be given priority). Public health improvement. Protection of vulnerable areas. Protection of natural resources. 13
14 Project Preparation and Execution Mechanism Project Preparation Stage Project Finance Project Implementation Municipalities Agencies Iller Bank IFI SPO -Ins. Cap. Dev. - Regional and Cross-Border Cooperation Pr. - Urban Infrastructure projects (water, wastewater and solid waste) National Contribution Share Financial Cooperation Com. SC for EU MFA, SPO, UoT Secretariat General for EU Affairs Ministry of Environment and Forestry National Fund (UoT) EU Commission EU Commission Beneficiary Agency, Municipality (PIU) CFCU 14
15 Infrastructure Projects under Environment OP Environment Operational Program (Environment OP) approved by HPC in Environment OP covers the period drinking water projects (70 million Euro) 12 wastewater projects ( million Euro) 10 solid waste projects ( million Euro) These projects, which will cost million Euro in total, will be carried out after the preparation of their feasibility reports. For the period , million Euro EU contribution and 68 million Euro national contribution are needed. Beneficiary agencies will be responsible for implementing the services relating to the tender process executed by CFCU. 15
16 Expectations - Recommendations Municipalities need to take a more active role in project preparation and implementation stages in order to absorb EU funds more efficiently. There is a need for implementing circular(s) on co-financing in the use of EU funds. International institutions should cooperate with Iller Bank to provide loans for EU-supported projects. Thank you! 16
EFFECTIVE USE OF FINANCIAL RESOURCES FOR PRIORITY INFRASTRUCTURE PROJECTS: THE ROLE OF DONOR COORDINATION
EFFECTIVE USE OF FINANCIAL RESOURCES FOR PRIORITY INFRASTRUCTURE PROJECTS: THE ROLE OF DONOR COORDINATION December 06, 2010 ÖZGÜR R PEHLİVAN Deputy Director General Undersecretariat of Turkish Treasury
More informationEU Enlargement. its Financial Support. Istanbul 27 June European Commission. EU Enlargementand
and its Financial Support Istanbul 27 June 2012 European Commission The 2012 enlargement agenda How to get in: conditions for membership Copenhagen criteria (1993) Political Stable democratic institutions
More informationConditions for successful preparation and absorption of assistance. Joint presentation by respective units in DGs AGRI, EMPL and REGIO
IPA Components III, IV and V: Conditions for successful preparation and absorption of assistance Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA framework: Structures and programming
More informationWestern Balkans and Europe 2020 Supporting Convergence and Growth
Western Balkans and Europe 2020 Supporting Convergence and Growth Regional Coordination Conference, Brussels, March 31, 2011 Panel 2: Infrastructure and Sustainable Growth Marta Szigeti Bonifert, executive
More informationWATER AND WASTEWATER SERVICES IN THE DANUBE REGION SUMMER SCHOOL TSLR TORINO, SEPTEMBER, 2015
WATER AND WASTEWATER SERVICES IN THE DANUBE REGION SUMMER SCHOOL TSLR TORINO, SEPTEMBER, 2015 STRUCTURE A Framework for Sustainable Services The State of the Sector in the Danube region Context Access
More informationIPA II Serbia ( )
IPA II Serbia (2014-2020) Technical Assistance Projects The better the question. The better the answer. The better the world works. IPA II - OVERVIEW The Instrument for Pre-accession Assistance (IPA) is
More informationIPA TWINNING NEWS NEAR SPECIAL
IPA TWINNING NEWS NEAR SPECIAL European IPA Twinning Projects Pipeline 2018 Project title ALBANIA IPA 2015 (indirect management CFCU) Title "Support to the Bank of Albania for Q3 2018 the Technical Cooperation
More informationIPA TWINNING NEWS NEAR SPECIAL
IPA TWINNING NEWS NEAR SPECIAL European IPA Twinning Projects Pipeline from July till December 2016 Project title ALBANIA IPA 2014 (Indirect management CFCU) - "Strengthening of capacities of the Consumer
More informationCOMMISSION DECISION. C(2007)6376 on 18/12/2007
COMMISSION DECISION C(2007)6376 on 18/12/2007 adopting a horizontal programme on the Energy Efficiency Finance Facility for Albania, Bosnia and Herzegovina, Croatia, Montenegro, Serbia including Kosovo
More informationStandard Summary Project Fiche IPA decentralised National programmes (maximum 12/15 pages without the annexes)
Standard Summary Project Fiche IPA decentralised National programmes (maximum 12/15 pages without the annexes) 1. Basic information 1.1 CRIS Number: TR2010/0327.02 1.2 Title: Implementation of by-law on
More informationI N S T R U M E N T f o r P R E - A C C E S S I O N A S S I S T A N C E ( I P A I I ) Priorities incl. cross-border cooperation
I N S T R U M E N T f o r P R E - A C C E S S I O N A S S I S T A N C E 2014-2020 ( I P A I I ) Priorities incl. cross-border cooperation I N S T R U M E N T f o r P R E - A C C E S S I O N A S S I S T
More informationInstrument for Pre-accession Assistance (IPA): the Rural Development Component IPARD
Instrument for Pre-accession Assistance (IPA): the Rural Development Component IPARD Elitsa Yanakieva European Commission, DG AGRI, Unit for Pre-accession assistance 5th meeting of EU-the former Yugoslav
More informationInfrastructure Projects Facility. Western Balkans Infrastructure Initiative
Infrastructure Projects Facility and the Western Balkans Infrastructure Initiative Brussels, 25 November 2008 Christos Gofas 1 IPF Objectives / Targets To support the development and upgrade of infrastructures
More informationThe Instrument for Pre accession. EU Enlargement. Assistance IPA II:
The Instrument for Pre accession EU Enlargement Assistance IPA II: 2014-2020 General framework: a new set of instruments for external action for the period 2014-2020 Commission proposal for next Multi-annual
More informationJASPERS Advisory and capacity building support for projects and investment
JASPERS Advisory and capacity building support for projects and investment Massimo Marra, Senior Officer JASPERS Networking and Competence Centre JASPERS-EPEC Seminar on Blending ESI Funds and PPPs Brussels,
More informationEach Programme is managed by EC services or executive agencies in Brussels with dedicated structures normally established at national level.
Introduction The Stabilization and Association Agreement (SAA) between Kosovo and the European Union was signed in October 2015 and entered into force on the 1 st of April 2016. By signing this Agreement
More informationGUIDE THROUGH THE PROCESS OF PROGRAMMING AND MONITORING OF IMPLEMENTATION OF IPA II IN THE REPUBLIC OF SERBIA FOR MEMBERS OF SECO MECHANISM
GUIDE THROUGH THE PROCESS OF PROGRAMMING AND MONITORING OF IMPLEMENTATION OF IPA II IN THE REPUBLIC OF SERBIA FOR MEMBERS OF SECO MECHANISM The Guide Through the Process of Programming and Monitoring of
More informationREPORT FROM THE COMMISSION TO THE COUNCIL, THE EUROPEAN PARLIAMENT AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE
EN EN EN EUROPEAN COMMISSION Brussels, 23.12.2009 COM(2009)699 final REPORT FROM THE COMMISSION TO THE COUNCIL, THE EUROPEAN PARLIAMENT AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE 2008 ANNUAL REPORT
More informationStandard Summary Project Fiche IPA Decentralised National Programmes Project Number TR
Standard Summary Project Fiche IPA Decentralised National Programmes Project Number TR 1. BASIC INFORMATION 1.1 CRIS Number : TR 2009/0740.01 1.2 Title : Support Activities to Strengthen the European Integration
More informationTAIEX AND TWINNING INSTRUMENTS FOR SHARING EU EXPERTISE
TAIEX AND TWINNING INSTRUMENTS FOR SHARING EU EXPERTISE Lazar Todorov Team Leader FINANCIAL INFORMATION: CATALYST FOR GROWTH SENIOR OFFICIALS WORKSHOP, 28-29 March 2017, Brussels DG Neighbourhood and Enlargement
More informationEU ENLARGEMENT PROCESS: THE INSTRUMENT for PRE-ACCESSION ASSISTANCE (IPA II) Leonetta Pajer, DG NEAR
EU ENLARGEMENT PROCESS: THE INSTRUMENT for PRE-ACCESSION ASSISTANCE 2014-2020 (IPA II) Leonetta Pajer, DG NEAR Outline Enlargement process Current Situation The new Instrument for Pre-Accession:IPA II
More informationChallenges Of The Indirect Management Of Eu Funds In Albania
Challenges Of The Indirect Management Of Eu Funds In Albania Neritan Totozani, Msc Central Financing & Contracting Unit, Ministry of Finance, Albania doi: 10.19044/esj.2016.v12n7p170 URL:http://dx.doi.org/10.19044/esj.2016.v12n7p170
More information1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary
Project fiche 1.1: Strengthening the capacity of the institutions to manage and implement the Operational Programmes 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Strengthening the capacity
More informationCOUNCIL OF THE EUROPEAN UNION. Brussels, 16 September 2013 (17.09) (OR. fr) 13649/13 PECOS 1 ESE 6 NT 6 ME 5 COWEB 128 ISL 6 FSTR 98 ELARG 117
COUNCIL OF THE EUROPEAN UNION Brussels, 16 September 2013 (17.09) (OR. fr) 13649/13 COVER NOTE from: PECOS 1 ESE 6 NT 6 ME 5 COWEB 128 ISL 6 FSTR 98 ELARG 117 Secretary-General of the European Commission,
More informationEBRD s Experience in the Water Sector in Romania Challenges for the future period
1 EBRD s Experience in the Water Sector in Romania Challenges for the future period 2 EBRD - Three Key Principles Promotes transition to market economies, private ownership and good governance with respect
More informationCOMMISSION STAFF WORKING PAPER. Background document. Accompanying the document
EUROPEAN COMMISSION Brussels, 11.10.2011 SEC(2011) 1198 final COMMISSION STAFF WORKING PAPER Background document Accompanying the document Report from the Commission to the European Parliament, the Council
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 02.05.2005 COM(2005) 178 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL GENERAL REPORT ON PRE-ACCESSION ASSISTANCE (PHARE ISPA
More informationCOMMISSION DECISION. C(2007)5980 of 10/12/2007
EN EN EN COMMISSION DECISION C(2007)5980 of 10/12/2007 adopting the Cross border programme between Serbia and Montenegro under the IPA- Cross border Co operation component, for the year 2007 THE COMMISSION
More informationCross-border Cooperation Action Programme Montenegro - Albania for the years
ANNEX 1 Cross-border Cooperation Action Programme Montenegro - Albania for the years 2015-2017 1 IDENTIFICATION Beneficiaries CRIS/ABAC Commitment references Union Contribution Budget line Montenegro,
More informationProject Fiche IPA centralised programmes Regional Programme on Disaster Risk Reduction in South-East Europe
Project Fiche IPA centralised programmes Regional Programme on Disaster Risk Reduction in South-East Europe 1. Basic information 1.1 CRIS Number: 2008/019-813 and 2008/020-047 1.2 Title: Disaster Risk
More informationIPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV
IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components
More informationReport of the eighth REReP Task Force meeting
Task Force for Implementation of the Regional Environmental Reconstruction Programme for South Eastern Europe (REReP Task Force) Eighth meeting September 23, 2005, Brussels, Belgium Report of the eighth
More informationPreparations for IPA II - EU State Enlargement. Iwona Lisztwan European Commission Directorate General Agriculture and Rural development
Preparations for IPA II - EU State Enlargement of play Iwona Lisztwan European Commission Directorate General Agriculture and Rural development A new set of instruments for external action for the period
More informationPlace based intervention in Pomurje. Jurij Kobal, Slovenia
Place based intervention in Pomurje Jurij Kobal, Slovenia Jurij Kobal Oikos, company working in Pomurje region on Government s Place Based Intervention. Working in Slovenia, Croatia, Montenegro, Serbia,
More informationHigher But Fragile Growth
WESTERN BALKANS Regular Economic Report No. 14 (Fall ) Higher But Fragile Growth Prishtina, 11 th October, Regional Messages Growth in the region strengthened primarily due to higher public spending. Limited
More informationAnnex 16 Template of Project Fiche for IPA programmes / component I - decentralised management
Annex 16 Template of Project Fiche for IPA programmes / component I - decentralised management 1 Standard Summary Project Fiche IPA decentralised National programmes (maximum 12/15 pages without the annexes)
More informationEU Strategy for the Adriatic and Ionian Region. Towards a streamlined governance and management architecture for the EUSAIR
November 2014 EU Strategy for the Adriatic and Ionian Region Towards a streamlined governance and management architecture for the EUSAIR Working Paper devised by the EUSAIR National Coordinators in partnership
More informationProgramme for Prevention, Preparedness and Response to Floods in the Western Balkans and Turkey IPA FLOODS Grant Contract ECHO/SUB/2014/692292
Programme for Prevention, Preparedness and Response to Floods in the Western Balkans and Turkey IPA FLOODS Grant Contract ECHO/SUB/2014/692292 Capacity building EU Floods Directive: achievements and work
More informationRepublic of Serbia BILATERAL SCREENING Chapter 22 Regional Policy and Coordination of Structural Instruments INSTITUTIONAL FRAMEWORK
Republic of Serbia BILATERAL SCREENING Chapter 22 Regional Policy and Coordination of Structural Instruments INSTITUTIONAL FRAMEWORK PART I DESIGNATION OF AUTHORITIES RESPONSIBLE FOR THE PROGRAMMING AND
More informationMinister of Economy, budget planning
Donor Coordination In country Systems ALBANIA Strategic Planning Committee (SPC) the Interministerial Chaired by the Prime Established in SPC: Minister and comprises January 2007. - approves the main directions
More informationSEE Achievements in view SEE ANNUAL EVENT. Ivana Sacco Andrea Vitolo Bucharest, 19th June 2013
SEE Achievements in view of the new programmes in the area SEE ANNUAL EVENT Ivana Sacco Andrea Vitolo Bucharest, 19th June 2013 SEE AREA TOWARDS 2014-2020: MAIN STEPS Task Force and Rules of Procedures
More informationDANUBE. (0) Introduction. (1) The DANUBE Transnational Cooperation Programme. (2) Relation of the Programme to the Danube Region Strategy.
Imre Csalagovits Content (0) Introduction (1) The Transnational Cooperation Programme (2) Relation of the Programme to the Danube Region Strategy 2 Transnational cooperation programmes in Europe (2000-2006)
More informationESF Programming Round CATEGORISATION OF EXPENDITURE. Informal Technical Working Group May 2007, Prague
ESF Programming Round 2007-2013 2013 CATEGORISATION OF EXPENDITURE Informal Technical Working Group 10-11 11 May 2007, Prague EARMARKING Article 9 39 3 Gen. Reg. 1083/2006 The assistance co-financed by
More informationInstrument for Pre-Accession Assistance (IPA) Multi-annual Indicative Planning Document (MIPD) Republic of Croatia
EN Instrument for Pre-Accession Assistance (IPA) Multi-annual Indicative Planning Document (MIPD) 2009-2011 Republic of Croatia EN EN TABLE OF CONTENTS Executive Summary... 4 Section 1... 7 Assessment
More informationPOLICY BRIEF IPA II MORE STRATEGY AND OVERSIGHT
POLICY BRIEF IPA II MORE STRATEGY AND OVERSIGHT November 2014 Authors: Dr. Malinka Ristevska Jordanova, Editor and senior expert Aleksandar Jovanoski, Junior expert European Policy Institute (EPI) - Skopje,
More informationWhat is WB EDIF? Updated to January 2017
What is WB EDIF? Updated to January 2017 1 Western Balkans Enterprise Development and Innovation Facility (WBEDIF) WB EDIF Platform is coordinated by the EIF and is comprised of four different and scalable
More informationPublic Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Project Information Document Report No. PID8416 Turkey-Marmara Earthquake
More informationLITHUANIA S CAPACITY TO ABSORB THE EU STRUCTURAL AND COHESION FUNDS ASSISTANCE. Summary. Authors: Haroldas Brožaitis Rimas Dumčius Vitalis Nakrošis
LITHUANIA S CAPACITY TO ABSORB THE EU STRUCTURAL AND COHESION FUNDS ASSISTANCE Summary Authors: Haroldas Brožaitis Rimas Dumčius Vitalis Nakrošis Vilnius, 2002 DESCRIPTION OF THE PROJECT The main purpose
More informationROSC - REPARIS The Advanced Program in Accounting and Auditing Regulation
Sept. 14, 2005 - Sarajevo Steering Committee Workshop ROSC - REPARIS The Advanced Program in Accounting and Auditing Regulation Mr. David Nagy Financial Management Unit Europe and Central Asia Region The
More informationProject number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.
` Standard Summary Project Fiche Project number: TR 0305.01 Twinning number: TR03-SPP-01 1. Basic Information 1.1 Title: SUPPORT TO THE STATE PLANNING ORGANIZATION GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT
More informationLIMITE EN CONFERENCE ON ACCESSION TO THE EUROPEAN UNION CROATIA. Brussels, 15 April 2011 AD 13/11 LIMITE CONF-HR 8
CONFERENCE ON ACCESSION TO THE EUROPEAN UNION CROATIA Brussels, 15 April 2011 AD 13/11 LIMITE DOCUMENT PARTIALLY ACCESSIBLE TO THE PUBLIC (12.09.2011) CONF-HR 8 ACCESSION DOCUMENT Subject: EUROPEAN UNION
More informationAssignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information
P R O C U R E M E N T N O T I C E Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information 1.1 Background information on the Regional School of
More informationIPA 2009 National Programme for Albania Project Fiche N 5 Improvement of the Albanian's preparedness for Decentralised Management
IPA 2009 National Programme for Albania Project Fiche N 5 Improvement of the Albanian's preparedness for Decentralised Management 1 Basic Information 1.1 CRIS Number: 2009/021-642 1.2 Title: Improvement
More informationStandard Summary Project Fiche IPA centralised programmes
Standard Summary Project Fiche IPA centralised programmes 1. Basic information Project number 2: Support to preparation of IPA component III 1.1 CRIS Number: 2009/021-765 1.2 Title: Support to preparation
More informationEnvironment and Climate Regional Accession Network (ECRAN) ECRAN Overview of Start up Activities and Work Plan 2014 for Environment Component
Environment and Climate Regional Accession Network (ECRAN) ECRAN Overview of Start up Activities and Work Plan for Environment Component January Environment and Climate Regional Accession Network (ECRAN)
More informationMulti-annual Indicative Planning Document (MIPD) Republic of Croatia
Multi-annual Indicative Planning Document (MIPD) Republic of Croatia 1 Preface The main objective of the Instrument for Pre-Accession Assistance (IPA) 1 is to help the beneficiary country to implement
More informationStandard Summary Project Fiche Project No. TR Twinning No. TR/2004/IB/EC/06
Standard Summary Project Fiche Project No. TR 0402.03 Twinning No. TR/2004/IB/EC/06 1. Basic Information 1.1 Title: Strengthening the Ministries of Health, Environment and Forests, and Agriculture and
More informationStandard Summary Project Fiche IPA decentralized National programmes
Standard Summary Project Fiche IPA decentralized National programmes 1. Basic information 1.1 CRIS Number: TR2011/02.04 1.2 Title: Strengthening of Local Investment Planning Capacity with the Participation
More informationSERBIA. Support to participation in EU Programmes. Action Summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)
INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 SERBIA Support to participation in EU Programmes Action Summary This Action represents continuation of Serbian participation in EU programmes
More informationThe European Neighbourhood and Partnership Instrument. DG RELEX UNIT ER-D-1 European Neighbourhood Policy Coordination General Coordination
The European Neighbourhood and Partnership Instrument DG RELEX UNIT ER-D-1 European Neighbourhood Policy Coordination General Coordination Objectives of the presentation The EU s political geography Development
More informationRoadmap for future regional action in disaster risk management with focus on flood risk management and aspects with a multi-beneficiary dimension
Grant Contract N. ECHO/SUB/2014/692292 Programme for Prevention, Preparedness and Response to Floods in the Western Balkans and Turkey IPA FLOODS IPA FLOODS implementing Consortium Italian Civil Protection
More informationCIVIL PROTECTION COOPERATION WITH THE CANDIDATE COUNTRIES AND POTENTIAL CANDIDATES PHASE II (IPA CP Cooperation Programme II)
CIVIL PROTECTION COOPERATION WITH THE CANDIDATE COUNTRIES AND POTENTIAL CANDIDATES PHASE II (IPA CP Cooperation Programme II) DPPI SEE Regional Meeting Sarajevo, 28 November 2013 BACKGROUND South Eastern
More informationHow TAIEX and Twinning support the adoption of Eurocodes in the Balkans
ADOPTION OF THE EUROCODES IN THE BALKAN REGION 5-6 December 2013, Milan & Ispra, Italy How TAIEX and Twinning support the adoption of Eurocodes in the Balkans Adriano Zilhão Head of the Institution Building
More informationPriority Environmental Investment Programme (PEIP) Regional Meeting for Senior Officials from SEE and Donors Community 19-20th June, Budva, Montenegro
Priority Environmental Investment Programme (PEIP) Regional Meeting for Senior Officials from SEE and Donors Community 19-20th June, Budva, Montenegro Draft Minutes Executive summary The PEIP regional
More informationANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.
EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority
More informationDANUBE DANUBE Transnational Programme and CENTRAL EUROPE 2020 Richárd GÖNCZI National Contact Point, Hungary Széchenyi Programme Office
preparation of a transnational cooperation programme 2014- Transnational Programme and CENTRAL EUROPE Richárd GÖNCZI National Contact Point, Hungary Széchenyi Programme Office 22. April 2015 Content (0)
More informationAssignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1
P R O C U R E M E N T N O T I C E Assignment Name: Workshop on EU Budget Support for civil servants from Montenegro, Trainer 1 Section 1. Introductory Information 1.1 Background information on the Regional
More informationProject Fiche: No. 14 Systematic Electronic Exchange of Data (SEED) in the Western Balkans
Project Fiche: No. 14 Systematic Electronic Exchange of Data (SEED) in the Western Balkans 1. Basic information 1.1 CRIS Number: 2010/022-030 1.2 Title: Systematic Electronic Exchange of Data (SEED) in
More informationThe EU Strategy for the Adriatic and Ionian Region and ADRION programme
The EU Strategy for the Adriatic and Ionian Region and ADRION programme EUSAIR Builds on the Adriatic- Ionian Initiative (2000.) Legal frame: Communicati on from the Commission (COM(2014) 357) and Action
More informationCentral Training TRIALOG Annual Exchange Meeting SERBIA Marija Dimitrijevic Miskovic Civic Initiatives Prague April 24-25, 2012
Central Training TRIALOG Annual Exchange Meeting SERBIA Marija Dimitrijevic Miskovic Civic Initiatives Prague April 24-25, 2012 Country situation and challenges Serbia and the EU The EU is the major partner
More informationCOMMISSION DECISION. C(2007)2497 of 18/06/2007. on a Multi-annual Indicative Planning Document (MIPD) for Serbia
COMMISSION DECISION C(2007)2497 of 18/06/2007 on a Multi-annual Indicative Planning Document (MIPD) 2007-2009 for Serbia THE COMMISSION OF THE EUROPEAN COMMUNITIES, Having regard to the Treaty establishing
More informationEvaluation to support the preparation of pre-accession financial instruments beyond Final Report
Evaluation to support the preparation of pre-accession financial instruments beyond 2013 13 June 2011 Evaluation to support the preparation of pre-accession financial instruments beyond 2013 A report submitted
More informationProposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on the Instrument for Pre-accession Assistance (IPA II)
EUROPEAN COMMISSION Brussels, 7.12.2011 COM(2011) 838 final 2011/0404 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the Instrument for Pre-accession Assistance (IPA II)
More informationENI Cross Border Cooperation Programme. Black Sea Basin
ENI Cross Border Cooperation Programme Black Sea Basin 2014-2020 Eligible area 2014-2020 8 participating countries: Romania, Bulgaria, Greece, Turkey, Ukraine, (With Black Sea Surrounding territories)
More informationImplementing arrangements: 1.5 Implementing Agency:
Standard Summary Project Fiche IPA decentralised National programmes (Maximum 12/15 pages without the annexes) 1. Basic information 1.1 CRIS Number: TR2010/0136.01 1.2 Title: Improved Strategic Management
More informationANNEX FINANCING PROPOSAL FOR THE YEAR 2008 OF THE CROSS BORDER PROGRAMME CROATIA MONTENEGRO. Montenegro IPA/2008/19-923
EN EN EN ANNEX FINANCING PROPOSAL FOR THE YEAR 2008 OF THE CROSS BORDER PROGRAMME CROATIA MONTENEGRO 1. IDENTIFICATION Beneficiaries CRIS number Year 2008 Cost Operating structures Implementing Authorities
More informationMulti-country European Integration Facility
1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries
More informationSummary Analysis IPA FUNDS IN BIH - (UN) UTILIZED OPPORTUNITES AND POSSIBILITIES
Summary Analysis IPA FUNDS IN BIH - (UN) UTILIZED OPPORTUNITES AND POSSIBILITIES INTRODUCTION: During the years long monitoring of the executive and legislative authorities performance in BiH, which the
More informationREPIM Curriculum Vitae Jolanda Trebicka
RESEARCH ON ECONOMIC POLICY IMPLEMENTATION & MANAGEMENT FERNWOOD HOUSE, WEST WOODFOOT, SLALEY, HEXHAM, NE47 0DF, NORTHUMBERLAND, ENGLAND. TEL: 00 44-1434- 673385 e mail: enquiries@repim.eu Name: JOLANDA
More informationOVERVIEW OF CURRENT FINANCIAL INSTRUMENTS ON TRANSNATIONAL WATER MANAGEMENT
Zsuzsanna Kocsis-Kupper Danube Region Strategy Water Quality Priority Area Coordination Team OVERVIEW OF CURRENT FINANCIAL INSTRUMENTS ON TRANSNATIONAL WATER MANAGEMENT 25-26 APRIL 2017 BRATISLAVA EUSDR
More informationStandard Summary Project Fiche IPA decentralised National programmes. Project number: TR
Standard Summary Project Fiche IPA decentralised National programmes Project number: TR 07 02 22 1. Basic information 1.1 CRIS Number: 1.2 Title: Capacity Building of Social Security Institution 1.3 Sector:
More informationCOMMISSION IMPLEMENTING DECISION. of adopting a
EUROPEAN COMMISSION Brussels, 10.12.2014 C(2014) 9351 final COMMISSION IMPLEMENTING DECISION of 10.12.2014 adopting a Cross-border cooperation Programme Bosnia and Herzegovina Montenegro for the years
More informationREGIONAL CONFERENCE FILLING IN THE BUDGET GAPS IN ROMA INTEGRATION POLICIES. Tirana, November 10, 2017.
REGIONAL CONFERENCE FILLING IN THE BUDGET GAPS IN ROMA INTEGRATION POLICIES Tirana, November 10, 2017. Purpose and objectives of the analysis and the conference Premise: 1. Decent living conditions; 2.
More informationStandard Summary Project Fiche IPA centralised programmes
Standard Summary Project Fiche IPA centralised programmes Project number 12: Establishment of first level control and support for the implementation of Cross-border-cooperation (CBC) programmes 1 BASIC
More informationENI & IPA II ESSENTIALS
ENI & IPA II ESSENTIALS European Neighbourhood Instrument (ENI) Reg. No 232/2014 Regulatory framework COMMON IMPLEMENTING REGULATION FOR EXTERNAL ACTIONS Reg. No 236/2014 Instrument for Pre-accession Assistance
More informationStanding Working Group for Regional Rural Development in SEE (SWG) Operational Plan January December 2016 Time Frame
3/8/2016 Standing Working Group for Regional Rural Development in () Operational Plan January 2016 - December 2016 Time Frame Description of the activity Beneficiary/Target group Location of implementation
More informationMULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)
INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MULTI-COUNTRY Support to Western Balkans Infrastructure Investment Projects for 2014 Action Summary This Action will allow financing Technical
More informationFinal PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection
Final PF2 Project Fiche IPA centralised programmes Part II of the Horizontal Programme on Nuclear Safety and Radiation Protection 1. Basic information 1.1 CRIS Number: 2007/019-301 1.2 Title: Assessment
More informationSTRATEGIC PLANNING AND MONITORING OF PUBLIC EXPENDITURES
BOSNIA AND HERZEGOVINA COUNCIL OF MINISTERS MINISTRY OF FINANCE AND TREASURY STRATEGIC PLANNING AND MONITORING OF PUBLIC EXPENDITURES Methodology, development and implementation of Public Investment Programme
More informationOfficial Journal of the European Union
L 210/82 31.7.2006 COUNCIL REGULATION (EC) No 1085/2006 of 17 July 2006 establishing an Instrument for Pre-Accession Assistance (IPA) THE COUNCIL OF THE EUROPEAN UNION, Having regard to the Treaty establishing
More informationEU Regional Policy. EU Structural Funds
EU Regional Policy EU Structural Funds EU Regional Policy Regional policy is the vehicle for delivering regional aid Biggest slice of the EU budget which helps: poorer regions catch up areas undergoing
More informationOPERATIONAL MANUAL FOR PROGRAMMING COMPONENT I OF INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA)
OPERATIONAL MANUAL FOR PROGRAMMING COMPONENT I OF INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA) Views expressed in this document represent the statements by consultants involved in project implementation.
More informationON STRATEGIC INVESTMENTS IN THE REPUBLIC OF KOSOVO. Based on Article 65 (1) of the Constitution of the Republic of Kosovo,
LAW No. 05/L-079 ON STRATEGIC INVESTMENTS IN THE REPUBLIC OF KOSOVO The Assembly of the Republic of Kosovo; Based on Article 65 (1) of the Constitution of the Republic of Kosovo, Approves LAW ON STRATEGIC
More informationCOMMISSION DECISION. on a Multi-annual Indicative Planning Document (MIPD) for Montenegro
EN EN EN COMMISSION DECISION of on a Multi-annual Indicative Planning Document (MIPD) 2009-2011 for Montenegro THE COMMISSION OF THE EUROPEAN COMMUNITIES, Having regard to the Treaty establishing the European
More informationEN Official Journal of the European Union L 77/11
15.3.2014 EN Official Journal of the European Union L 77/11 REGULATION (EU) No 231/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 March 2014 establishing an Instrument for Pre-accession Assistance
More informationOVERVIEW OF CURRENT FINANCIAL INSTRUMENTS ON TRANSNATIONAL WATER MANAGEMENT
Zsuzsanna Kocsis-Kupper Danube Region Strategy Water Quality Priority Area Coordination Team OVERVIEW OF CURRENT FINANCIAL INSTRUMENTS ON TRANSNATIONAL WATER MANAGEMENT 1 DECEMBER 2016 BUDAPEST EUSDR PA4
More informationAnnex 1 Citizen s summary 1
Programming process Annex 1 Citizen s summary 1 The process of preparation of the Cooperation Programme was coordinated by the Managing Authority (Ministry of Regional Development and EU Funds of the Republic
More informationSteering Committee for the Development of the South East Europe Regional Core Transport Network Sixth Meeting Present: Members Osman Metalla
Steering Committee for the Development of the South East Europe Regional Core Transport Network Sixth Meeting April 27/28 th, 2006 Sveti Stefan, Montenegro Present: Members (Voting) Osman Metalla, Director,
More informationREPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE
EUROPEAN COMMISSION Brussels, 30.9.2014 COM(2014) 610 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL AND THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE 2013 Annual Report on Financial
More informationIFC - WESTERN BALKANS A PARTNER TO THE WBIF. December 2014
IFC - WESTERN BALKANS A PARTNER TO THE WBIF December 2014 IFC: A MEMBER OF THE WORLD BANK GROUP IBRD IDA IFC MIGA ICSID International Bank for Reconstructio n and Development International Development
More information