1 EUROPEAN COMMISSION Brussels, C(2013) 3463 final COMMISSION DECISION of on technical provisions necessary for the operation of the transition facility in the Republic of Croatia EN EN

2 COMMISSION DECISION of on technical provisions necessary for the operation of the transition facility in the Republic of Croatia THE EUROPEAN COMMISSION, Having regard to the Treaty of Accession of the Republic of Croatia, in particular Article 3(4) thereof, Having regard to the Act of Accession of the Republic of Croatia, in particular Article 30(5) thereof. Whereas: (1) Article 30 of the Act of Accession establishes the Transition Facility with commitment appropriations of EUR 29 million in total in 2013 to address national and horizontal priorities. (2) The Transition Facility is intended to continue the assistance to the Republic of Croatia in its efforts to develop and strengthen its administrative and judicial capacity to implement and enforce EU law and to foster the exchange of best practice amongst peers through action which cannot be financed by the Structural Funds or by the Rural Development Funds. (3) It is important to maintain stability, continuity and simplicity as regards the implementation structures and systems. Article 30 (5) of the Act of Accession establishes that assistance under the Transition Facility shall be decided and implemented in accordance with Council Regulation (EC) No 1085/2006, or on the basis of other technical provisions necessary for the operation of the Transition Facility, to be adopted by the Commission. (4) It is necessary to lay down the conditions and implementing rules necessary for the management of the Transition Facility. (5) The conferral of management granted to the Republic of Croatia for IPA Component I under the conditions laid down in the Commission Decision C(2008)6002 of 28 October 2008, and amended by the Commission Implementing Decision C(2013)642 of 12 February 2013 shall apply for the management of the Transition Facility. (6) The Financing Decision for the Transition Facility shall be adopted separately by 31 December HAS ADOPTED THIS DECISION: EN 2 EN

3 CHAPTER I GENERAL PROVISIONS Article 1 Purpose 1. The assistance activities under the Transition Facility shall be financed and implemented within the legal, administrative and technical framework laid down in this Implementing Decision, in addition to the IPA Framework Regulation and the IPA Implementing Regulation, in particular the provisions applicable to IPA Component I. 2. The Republic of Croatia takes all necessary steps in order to ensure the proper execution of all assistance activities and to facilitate the implementation of the Transition Facility programme. CHAPTER II GENERAL RULES ON EU FINANCIAL ASSISTANCE Article 2 General rules on financial assistance 1. The following principles shall apply to financial assistance by the EU under the Transition Facility: (a) (b) (c) (d) (e) (f) (g) Assistance shall respect the principles of coherence, complementarity, coordination, partnership and concentration; Assistance shall be coherent with EU policies and shall support the completion of alignment to the EU acquis; Assistance shall comply with the budgetary principles laid down in the Financial Regulation and its Rules of Application; In accordance with Articles 212(a) and 214 of the Financial Regulation, Articles 53 to 57 of Council Regulation (EC, Euratom) No 1605/ will continue to apply for budgetary commitments made in 2013; Assistance shall be consistent with the needs identified in the monitoring process. It shall also take account of lessons learned; The Commission and the Republic of Croatia shall ensure coordination of their respective assistance programmes to increase effectiveness and efficiency in the delivery of assistance and to prevent double funding. Operations shall have clear and verifiable objectives, which are to be achieved within a given period; the results obtained should be assessed through measurable indicators; 1 OJ L 248, , p.1. EN 3 EN

4 (h) Any discrimination based on sex, racial or ethnic origin, religion or belief, disability, age or sexual orientation shall be prevented during the various stages of the implementation of assistance; 2. All operations receiving assistance under the Transition Facility shall in principle require joint co-financing by the Republic of Croatia and the EU. 3. Where the execution of activities depends on financial commitments from the Republic of Croatia's own resources or from other sources of funds, the funding of the EU shall become available at such time as the financial commitments of the Republic of Croatia and/or the other sources of funds themselves become available. 4. The provision of EU financing under the Transition Facility shall be subject to the fulfilment by the Republic of Croatia's obligations under this Implementing Decision. Article 3 Eligibility of expenditure 1. Expenditure financed under the Transition Facility shall not be subject to any other financing under the EU budget. 2. Taxes, customs and import duties or other charges having equivalent effect are not eligible under the Transition Facility. The detailed provisions laid down by Article 66 of the IPA Implementing Regulation continue to apply. Article 4 Aid intensities and rate of EU contribution The EU contribution shall be calculated in relation to the eligible expenditure, as defined in Article 67 of the IPA Implementing Regulation. CHAPTER III MANAGEMENT AUTHORITIES Article 5 Definitions For the purposes of this Implementing Decision the following definitions shall apply: (1) National IPA Co-ordinator (NIPAC) is a representative of the national administration who is responsible for the overall coordination of assistance under the Transition Facility, as well as the functions detailed in Article 22 of the IPA Implementing Regulation. S/he shall ensure partnership between the Commission and the Republic of Croatia. S/he shall, in particular, bear responsibility for: (a) The coherence and coordination of the Transition Facility programme (b) The programming for the Transition Facility (c) The preparation of the annual and final implementation reports for the Transition Facility EN 4 EN

5 (2) Competent Accrediting Officer (CAO) is a representative of the national administration who shall be responsible for issuing, monitoring and suspending or withdrawing the accreditation of the National Authorising Officer and the National Fund, in accordance with Articles 12 and 15 of the IPA Implementing Regulation. (3) National Authorising Officer (NAO) is a representative of the national administration who shall fulfil the following functions and assume the following responsibilities: (a) As the head of the National Fund, is bearing overall responsibility for the financial management of EU funds in the Republic of Croatia and is responsible for the legality and regularity of the underlying transactions. For this purpose the NAO shall particularly fulfil the tasks laid down in Article 25(3) of the IPA Implementing Regulation. (b) Is responsible for the effective functioning of management and control systems for the Transition Facility. The NAO shall make an annual management declaration, which shall take the form of a statement of assurance to be presented to the Commission by 28 February each year in accordance with Article 27 of the IPA Implementing Regulation. He shall forward a copy of the statement of assurance to the CAO. (4) National Fund (NF) is a body located in a State level Ministry of the Republic of Croatia and shall have central budgetary competence and act as central treasury entity. The NF shall be in charge of tasks of financial management of assistance under the Transition Facility, under the responsibility of the NAO. The NF shall, in particular, be in charge of organising the bank accounts, requesting funds from the Commission, authorising the transfer of funds from the Commission to the operating structures, and the financial reporting to the Commission. (5) The Audit Authority is an authority which shall be responsible for the verification of the effective and sound functioning of the management and control systems. The audit authority shall be functionally independent from all actors in the management and control system and comply with internationally accepted audit standards. (6) The Operating Structure: Central Finance and Contracting Agency (CFCA) is a body within the national administration responsible for the management and implementation of assistance under IPA Component I. It shall assume the management and implementation of assistance under the Transition Facility and it shall be responsible for managing and implementing the Transition Facility programme concerned in accordance with the principle of sound financial management. (7) iperseus is the current financial reporting system of the European Commission used in decentralised implementation of EU financial assistance. Article 6 Functions and responsibilities The functions and responsibilities of the bodies and authorities defined in the Article 5 shall comply with the functions and responsibilities set out for them in the IPA Implementing Regulation. EN 5 EN

6 Article 7 Staff, location and operational costs of the National Fund and the other bodies and authorities 1. The Republic of Croatia shall ensure at its own cost the availability of the necessary human resources for the timely and correct implementation of the tasks entrusted to the bodies and authorities referred to in above Article 5 related to the implementation of the Transition Facility. 2. The Republic of Croatia shall provide at its own costs the necessary premises, office furniture and other facilities for the aforementioned bodies and authorities. 3. The operational costs of those bodies and authorities shall be borne by the Republic of Croatia. CHAPTER IV GENERAL RULES FOR IMPLEMENTATION Article 8 Implementation Methods 1. The implementation of assistance under the Transition Facility in the Republic of Croatia, will be done in decentralised management, whereby the Commission confers the management of certain actions to the Republic of Croatia, while retaining overall final responsibility for general budget implementation in accordance with Articles 212(a) and 214 of the Financial Regulation as referring to Article 53c of Regulation (EC, Euratom) No 1605/2002, and the relevant provisions of the EU Treaties shall apply as a rule. Decentralised management shall cover at least tendering, contracting and payments by the national administration of the Republic of Croatia. Operations shall be implemented in accordance with the provisions laid down in Articles 212(a) and 214 of the Financial Regulation as referring to Article 53(c) of Regulation (EC, Euratom) No 1605/2002 and the ones referred to in this Article. 2. The national structures designed and accredited for the management of assistance provided under IPA Component I conferred to the Republic of Croatia under the conditions laid down in the Commission Decision C(2008)6002 of 28 October 2008, as amended by the Amending Commission Decision C(2013)642 of 12 February 2013 shall also be applicable to the implementation of the Transition Facility. 3. The Commission may withdraw or suspend its conferral of management at any time, if it is found not to comply with the requirements laid down in Articles 212(a) and 214 of the Financial Regulation as referring to Article 56(2) of Regulation (EC, Euratom) No 1605/2002 and in Article 11 of the IPA Implementing Regulation. EN 6 EN

7 Article 9 Procurement 1. Public procurement procedures will be carried out in accordance with the relevant EU Directives and national procurement rules. 2. For twinning projects, the Twinning Manual as applied to IPA continues to apply, in accordance with the provision of Article 30(3) of the Act of Accession. 3. Grant award procedures shall follow the provisions of Part One, Title VI of the Financial Regulation and Part One, Title VI of its Rules of Application. Article 10 Bank accounts 1. The National Fund shall open up for the Transition Facility a separate euro bank account in the Central Bank or in a Government guaranteed bank account. The account shall, in principle, be interest-generating. 2. Any interest earned remains the property of the Republic of Croatia. Interest generated by EU financing of a programme shall be posted exclusively to that programme, being regarded as a resource for the Republic of Croatia in the form of a national public contribution, and shall be declared to the Commission whenever a payment application is submitted to the Commission. 3. The bank account shall be operated on the basis of a double signature system, requiring the signatures of the NAO and a senior accounting officer. 4. The National Fund shall communicate to the Commission all relevant information on the accounts at the National Fund, as well as on all other accounts of the CFCA and others to which Transition Facility funds have been transferred. Relevant information encompasses the name and address of the bank, the account number, the names of the account holders, the interest rates and any other information that the Commission deems appropriate. Article 11 Payments by the Commission 1. Payments by the Commission of the EU contribution for the Transition Facility programme shall be done following the rules established by Article 40 of the IPA Implementing Regulation. 2. In addition to the rules under paragraph 1, the certified statements of expenditure submitted by the NAO shall also include information distinguishing between cost incurred and pre-financing. Article 12 Request for funds from the Commission 1. Requests for payments, to be certified and approved by the NAO, are submitted to the Commission for approval and transfer of funds. EN 7 EN

8 2. Requests for payments shall be supported by: (a) A declaration of expenditure showing the cumulative amount of national (for co-financing) and Transition Facility funds contracted and paid distinguishing between cost incurred and pre-financing broken down by priority axis and measure and operations (where appropriate) - so demonstrating the link between the indicative budget (i.e. National Programme) and the expenditure and payments actually made based on the financial reporting as presented by the CFCA. To this end, a table displaying the operations/projects managed and the relevant contracts and payments should be enclosed. (b) Appropriate regular financial reporting (iperseus) indicating signed contracts and payments made. (c) Bank reconciliation, including interest earned, corresponding to the bank accounts opened by the National Fund and CFCA. (d) Progress reports on the implementation of the programme. (e) A written declaration by the NAO stating that the information contained in the request for payment is correct and that the implementation of the Transition Facility assistance is progressing at a satisfactory rate and according to the objectives laid down in the Transition Facility Programme. The Commission retains the right to request additional information in support of transfers of funds. 3. In order for the Commission to approve a payment application, the minimum requirements set out in Articles 42(1), 43(1), and 45(1) of the IPA Implementing Regulation must be fulfilled. 4. If it appears that the rules applicable have not been complied with or that EU funds have been improperly used, the Commission may reduce interim payments to the Republic of Croatia, or temporarily suspend them, in accordance with the provisions of Article 46 of the IPA Implementing Regulation. It shall inform the Republic of Croatia accordingly. The suspension or reduction of interim payments shall comply with the principle of proportionality and shall be without prejudice to the decisions of conformity and clearance-of-account decisions and financial corrections. In the case of the final payment, failure to meet the conditions laid down in Article 45(1) of the IPA Implementing Regulation shall immediately result in the decommitment of the final balance. Article 13 Modalities for the approval of a payment application by the National Fund 1. A first payment of up to 50% of the funds, representing pre-financing will be sent to the National Fund upon the submission of a request for funds application when the conditions specified in Article 42(1) if the IPA Implementing Regulation have been met. 2. One further interim payment up to the threshold of 95% of the funds will be made. The second transfer will be triggered when 35% of the budget has been disbursed by the CFCA. EN 8 EN

9 3. The final payment application for up to 100% of the budget allocation in force has to be submitted within 4 months as from the end of the disbursement period. The following documentation has to be attached to this payment application: (a) A final payment application and a final statement of expenditure. (b) The sectoral final reports for the Transition Facility programme. (c) (d) An opinion from the Audit Authority on any final statement of expenditure supported by a final audit activity report. The accreditation delivered by the Competent Accrediting Officer and the NAO are in force and the conferral of management by the Commission remains valid. Even if no final payment application is made, the National Fund needs to submit a final statement of expenditure to the Commission within 4 months from the end of disbursement period. If the payments received from the Commission exceed the final certified expenditure then the National Fund should return the excess to the Commission at the time of submitting the final statement of expenditure. If there are any outstanding payments (with the exception of any contractual retention money), the National Fund should provide an explanation and a forecast, when payment will be finalized. The National Fund shall report on progress on contractual retention money and outstanding payments on a quarterly basis. If they are not paid to the contractor, they should also be returned to the Commission. Article 14 Clearance of Accounts In order to ensure that the funds are used in accordance with applicable rules, the Commission shall apply Clearance of Accounts procedure or financial corrections mechanisms in accordance with Article 53c (2) of the of Council Regulation (EC, Euratom) No 1605/2002 and as detailed in the Framework Agreement between the Government of the Republic of Croatia and the Commission of the European Communities on the Rules for Co-operation concerning EC-financial Assistance to the Republic of Croatia in the Framework of the Implementation of the Assistance under the Instrument for Pre-accession Assistance (IPA) signed on 27th August Article 15 Changes to the Programme 1. The NIPAC may request to the Commission changes to the Transition Facility or reallocation of funds. 2. The contracting deadline of the Transition Facility will be 3 years from the date of adoption of the Financing Decision. No extensions shall be granted for the contracting period of the programme. Exceptionally, and in duly justified cases, limited extensions in terms of duration may be granted for the execution of contracts. Article 16 Monitoring EN 9 EN

10 1. The Commission may undertake any actions it deems necessary to monitor the programmes concerned. 2. The IPA Transition Assistance and Institution Building component sectoral monitoring committee shall be responsible to ensure coherence and coordination of assistance under the Transition Facility. 3. The IPA sectoral monitoring meeting shall be co-chaired by a representative of the Commission and the NIPAC. Article 17 Reporting 1. The operating structure shall draw up an annual report and a final report on the implementation of the programme, in compliance with the procedures defined for IPA Transition Assistance and Institution Building component in Part II of the IPA Implementing Regulation. 2. The annual report on implementation shall cover the financial year. The final report on implementation shall cover the whole period of implementation and may include the last annual report. 3. The reports referred to in paragraph 1 shall be sent to the NIPAC, the NAO and to the Commission, after examination by the sectoral monitoring committee. 4. The annual and final reports for the Transition Facility referred to in paragraph 1 shall be prepared and transmitted as part of the annual and final reports on the implementation of assistance under the IPA Regulation prepared by the NIPAC. Article 18 Visibility/Publicity 1. The Republic of Croatia, in particular the NIPAC, shall provide information on and publicise programmes and operations. The information shall be addressed to the citizens and beneficiaries, with the aim of highlighting the role of the EU and ensuring transparency. 2. The operating structure shall be responsible for organising the publication of the list of the final beneficiaries, the names of the operations and the amount of EU funding allocated to the operations by means of the award of grants in the following way: (a) (b) (c) The publication shall be made according to a standard presentation, in a dedicated and easily accessible internet site. If such internet publication is impossible, the information shall be published by any other appropriate means, including the national official journal. Publication shall take place during the first half of the year following the closure of the budget year in respect of which the funds were attributed to the Republic of Croatia. The Republic of Croatia shall communicate to the Commission the address of the place of publication. If the information is published otherwise, the Republic of Croatia shall give the Commission full details of the means used. EN 10 EN

11 (d) The operating structure shall ensure that the final beneficiary is informed that acceptance of funding is also an acceptance of their inclusion in this list of beneficiaries published. Any personal data included in this list shall nevertheless be processed in accordance with the requirements of Regulation (EC) No 45/2001 of the European Parliament and the Council of 18 December 2000 on the protection of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free movement of such data 2, and with due observance of the requirements of security. Article 19 Closure of the programme 1. After an application for final payment has been received by the Commission from the Republic of Croatia, a programme is considered closed as soon as one of the following occurs: (a) payment of the final balance due by the Commission; (b) issuance of a recovery order by the Commission; (c) de-commitment of appropriations by the Commission. 2. The closure of a programme does not prejudice the right of the Commission to undertake a financial correction at a later stage. 3. The closure of a programme does not affect the obligations of the Republic of Croatia to continue to retain related documents. Article 20 Supervision, control and audit by the Commission and the European Court of Auditors 1. The Transition Facility and subsequent contracts shall be subject to supervision and financial control by the Commission including the European Anti-Fraud Office (OLAF) and audits by the European Court of Auditors. The duly authorised agents or representatives of the Commission and of OLAF shall have the right to carry out any technical and financial verification that the Commission or OLAF consider necessary to follow the implementation of a programme including visits of sites and premises at which EU financed activities are implemented. The Commission shall give the national authorities concerned advance notice of such missions. 2. The Republic of Croatia shall supply all requested information and documents including any computerised data and take all suitable measures to facilitate the work of the persons instructed to carry out audits or inspections. 3. The Republic of Croatia shall maintain records and accounts adequate to identify the services, supplies, works and grants financed under the related Financing Decision in accordance with sound accounting procedures. The Republic of Croatia shall also ensure that the agents or representatives of the Commission including OLAF have the right to inspect all relevant documentation and accounts pertaining to items financed under the Transition Facility and assist the European Court of Auditors to carry out audits relating to the use of EU funds. 2 OJ L 8, , p. 1. EN 11 EN

12 4. In order to ensure the efficient protection of the financial interests of the EU, the Commission including OLAF may also conduct documentary and on-the-spot checks and inspections in accordance with the procedural provisions of Council Regulation (EC, Euratom) No 2185/1996 of 11 November These checks and inspections shall be prepared and conducted in close collaboration with the competent authorities designated by the Republic of Croatia, which shall be notified in good time of the object, purpose and legal basis of the checks and inspections, so that they can provide all the requisite help. The Republic of Croatia shall identify a service which will assist at OLAF s request in conducting investigations in accordance with Council Regulation (EC, Euratom) No 2185/1996. If the Republic of Croatia wishes, the on-the-spot checks and inspections may be carried out jointly with them. Where the participants in EU financed activities resist an on-the-spot check or inspection, the Republic of Croatia, acting in accordance with national rules, shall give Commission/OLAF inspectors such assistance as they need to allow them to discharge their duty in carrying out an on-the-spot check or inspection. The Commission/OLAF shall report as soon as possible to the Republic of Croatia any fact or suspicion relating to an irregularity which has come to its notice in the course of the on-the-spot check or inspection. In any event, the Commission/OLAF shall be required to inform the above-mentioned authority of the result of such checks and inspections. 5. The controls and audits described above are applicable to all contractors and subcontractors who have received EU funds including all related information to be found in the documents of the National Fund of the Republic of Croatia concerning the national contribution. 6. Without prejudice to the responsibilities of the Commission and the European Court of Auditors, the accounts and operations of the National Fund and, where applicable, operating structures may be checked at the discretion of the Commission by the Commission itself or by an external auditor assigned by the Commission. Article 21 Prevention of irregularity and fraud, measures against corruption 1. The Republic of Croatia shall ensure investigation and effective treatment of suspected cases of fraud and irregularities and shall ensure the functioning of a control and reporting mechanism equivalent to that foreseen in the Commission Regulation (E(C) No 1828/2006 of 8 December In the case of suspected fraud or irregularity, the Commission shall be informed without delay. 2. Furthermore, the Republic of Croatia shall take any appropriate measure to prevent and counter any active or passive corruption practices at any stage of the procurement procedure or grant award procedure or during the implementation of corresponding contracts. 3. The Republic of Croatia, including the personnel responsible for the implementation tasks of the EU financed activities, undertakes to take whatever precautions are necessary to avoid any risk of conflict of interests and shall inform the Commission 3 4 OJ L 292, , p. 2. OJ L 371, , p. 4. EN 12 EN

13 immediately of any such conflict of interest or any situation likely to give rise to any such conflict. 4. The following definitions shall apply: (a) (b) (c) (d) Irregularity shall mean any infringement of a provision of applicable rules and contracts resulting from an act or an omission by an economic operator which has, or would have, the effect of prejudicing the general budget of the European Union by charging an unjustified item of expenditure to the general budget. Fraud shall mean any intentional act or omission relating to: the use or presentation of false, incorrect or incomplete statements or documents, which has as its effect the misappropriation or wrongful retention of funds from the general budget of the European Union or budgets managed by, or on behalf of, the European Union; non-disclosure of information in violation of a specific obligation with the same effect; the misapplication of such funds for purposes other than those for which they are originally granted. Active corruption is defined as the deliberate action of whosoever promises or gives, directly or through an intermediary, an advantage of any kind whatsoever to an official for himself or for a third party for him to act or to refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties in a way which damages or is likely to damage the financial interests of the European Union. Passive corruption is defined as the deliberate action of an official, who, directly or through an intermediary, requests or receives advantages of any kind whatsoever, for himself or a third party, or accepts a promise of such advantage, to act or to refrain from acting in accordance with his duty or in the exercise of his functions in breach of his official duties in a way which damages or is likely to damage the financial interests of the European Union. Article 22 Recovery of funds in case of irregularity or fraud 1. Any proven case of irregularity or fraud discovered at any time during the implementation of assistance under the Transition Facility or as the result of an audit will lead to the recovery of the funds by the Commission from the Republic of Croatia. 2. The NAO shall recover the EU contribution paid to the Republic of Croatia from those who committed the irregularity, fraud or corruption or benefited from it, in accordance with national recovery procedures. The fact that the NAO does not succeed in recovering all or part of the funds shall not prevent the Commission from recovering the funds from The Republic of Croatia. Article 23 Financial corrections (1) A financial correction may arise following either: (a) identification of a specific irregularity, including fraud; EN 13 EN

14 (b) identification of a weakness or deficiency in the management and control systems of the Republic of Croatia; (2) If the Commission finds that expenditure under the programmes covered by the Transition Facility has been incurred in a way that has infringed applicable rules, it shall decide what amounts are to be excluded from EU financing. Article 24 Financial adjustments The NAO, who bears in the first instance the responsibility for investigating irregularities, shall make the financial adjustments where irregularities or negligence are detected in operations, by cancelling all or part of the EU contribution to the operations concerned. The NAO shall take into account the nature and gravity of the irregularities and the financial loss to the EU contribution. Article 25 Entry into force This Implementing Decision shall apply subject to and as of the date of the entry into force of the Accession Treaty of the Republic of Croatia. Done at Brussels, For the Commission Štefan FÜLE Member of the Commission EN 14 EN

COMMISSION DECISION. C(2007)6121 of 12/12/2007

COMMISSION DECISION. C(2007)6121 of 12/12/2007 EN EN EN COMMISSION DECISION C(2007)6121 of 12/12/2007 adopting a Programme on financing the participation of Croatia in the ERDF European Territorial Co operation transnational programmes "South East

More information

COMMISSION DECISION. of ON THE MANAGEMENT AND CONTROL OF THE SCHENGEN FACILITY IN CROATIA. (only the English text is authentic)

COMMISSION DECISION. of ON THE MANAGEMENT AND CONTROL OF THE SCHENGEN FACILITY IN CROATIA. (only the English text is authentic) EUROPEAN COMMISSION Brussels, 22.4.2013 C(2013) 2159 final COMMISSION DECISION of 22.4.2013 ON THE MANAGEMENT AND CONTROL OF THE SCHENGEN FACILITY IN CROATIA (only the English text is authentic) EN EN

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

European GNSS Supervisory Authority

European GNSS Supervisory Authority GSA-AB-06-10-07-04 European GNSS Supervisory Authority 7 th meeting of the Administrative Board Brussels, 27 October 2006 Regulation of the European GNSS Supervisory Authority laying down detailed rules

More information

Official Journal of the European Union

Official Journal of the European Union L 210/82 31.7.2006 COUNCIL REGULATION (EC) No 1085/2006 of 17 July 2006 establishing an Instrument for Pre-Accession Assistance (IPA) THE COUNCIL OF THE EUROPEAN UNION, Having regard to the Treaty establishing

More information

(Acts whose publication is obligatory) REGULATION (EC) No 1927/2006 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 20 December 2006

(Acts whose publication is obligatory) REGULATION (EC) No 1927/2006 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 20 December 2006 30.12.2006 EN Official Journal of the European Union L 406/1 I (Acts whose publication is obligatory) REGULATION (EC) No 1927/2006 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 20 December 2006 on establishing

More information

ANTI-FRAUD STRATEGY INTERREG IPA CBC PROGRAMMES BULGARIA SERBIA BULGARIA THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA BULGARIA TURKEY

ANTI-FRAUD STRATEGY INTERREG IPA CBC PROGRAMMES BULGARIA SERBIA BULGARIA THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA BULGARIA TURKEY ANTI-FRAUD STRATEGY INTERREG IPA CBC PROGRAMMES 2014-2020 BULGARIA SERBIA BULGARIA THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA BULGARIA TURKEY VERSION NOVEMBER 2016 1 TABLE OF CONTENTS PRINCIPLE 3 FOREWORD

More information

INTERREG - IPA CBC ROMANIA-SERBIA PROGRAMME

INTERREG - IPA CBC ROMANIA-SERBIA PROGRAMME ANTI-FRAUD STRATEGY INTERREG - IPA CBC ROMANIA-SERBIA PROGRAMME VERSION 2016 1 TABLE OF CONTENTS PRINCIPLE 4 FOREWORD 4 LEGAL BASIS 4 DEFINITIONS 5 I. GENERAL CONSIDERATIONS 5 I.1. AIM 5 I.2. MISSION 6

More information

Official Journal of the European Union L 111/13

Official Journal of the European Union L 111/13 28.4.2007 Official Journal of the European Union L 111/13 COMMISSION REGULATION (EC, EURATOM) No 478/2007 of 23 April 2007 amending Regulation (EC, Euratom) No 2342/2002 laying down detailed rules for

More information

Official Journal of the European Union DECISIONS

Official Journal of the European Union DECISIONS 6.7.2018 L 171/11 DECISIONS DECISION (EU) 2018/947 OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 4 July 2018 providing further macro-financial assistance to Ukraine THE EUROPEAN PARLIAMT AND THE COUNCIL

More information

GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY. for the programming period

GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY. for the programming period Final version of 25/07/2008 COCOF 08/0014/02-EN GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY for the 2007 2013 programming period Table of contents 1. Introduction... 3 2. Main functions

More information

FINANCIAL REGULATION

FINANCIAL REGULATION FINANCIAL REGULATION The present Financial Regulation shall enter into force on the 1 st of January 2014 Adopted in Parma on 19 December 2013 For EFSA s Management Board [SIGNED] Sue Davies Chair of the

More information

OFFICE FOR HARMONIZATION IN THE INTERNAL MARKET

OFFICE FOR HARMONIZATION IN THE INTERNAL MARKET OFFICE FOR HARMONIZATION IN THE INTERNAL MARKET (TRADE MARKS AND DESIGNS) REGULATION NO CB-1-10 OF THE BUDGET COMMITTEE OF THE OFFICE FOR HARMONIZATION IN THE INTERNAL MARKET (Trade Marks and Designs)

More information

ANNEX. 1. IDENTIFICATION The former Yugoslav Republic of Macedonia CRIS number 2010/ , 2010/ Year 2010 Cost EUR

ANNEX. 1. IDENTIFICATION The former Yugoslav Republic of Macedonia CRIS number 2010/ , 2010/ Year 2010 Cost EUR EN EN EN ANNEX NATIONAL PROGRAMME FOR THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA UNDER THE IPA TRANSITION ASSISTANCE AND INSTITUTION BUILDING COMPONENT FOR 2010 1. IDENTIFICATION Beneficiary The former

More information

A8-0183/ Proposal for a decision (COM(2018)0127 C8-0108/ /0058(COD)) AMENDMENTS BY THE EUROPEAN PARLIAMENT *

A8-0183/ Proposal for a decision (COM(2018)0127 C8-0108/ /0058(COD)) AMENDMENTS BY THE EUROPEAN PARLIAMENT * 7.6.2018 A8-0183/ 001-001 AMDMTS 001-001 by the Committee on International Trade Report Jarosław Wałęsa Further macro-financial assistance to Ukraine A8-0183/2018 Proposal for a decision (COM(2018)0127

More information

(Legislative acts) REGULATIONS

(Legislative acts) REGULATIONS 12.3.2014 Official Journal of the European Union L 72/1 I (Legislative acts) REGULATIONS REGULATION (EU) No 223/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 March 2014 on the Fund for European

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL REGULATION

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL REGULATION COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 20.3.2007 COM(2007) 122 final 2007/0045 (CNS) Proposal for a COUNCIL REGULATION amending Regulation (EC) No 1290/2005 on the financing of the common agricultural

More information

9228/18 SBC/sr 1 DGG 1A

9228/18 SBC/sr 1 DGG 1A Council of the European Union Brussels, 24 May 2018 (OR. en) Interinstitutional File: 2018/0058 (COD) 9228/18 'I' ITEM NOTE From: General Secretariat of the Council ECOFIN 477 CODEC 826 RELEX 443 COEST

More information

COMMISSION DELEGATED REGULATION (EU) No /.. of

COMMISSION DELEGATED REGULATION (EU) No /.. of EUROPEAN COMMISSION Brussels, 11.3.2014 C(2014) 1565 final COMMISSION DELEGATED REGULATION (EU) No /.. of 11.3.2014 supplementing Regulation (EU) No 1306/2013 of the European Parliament and of the Council

More information

COMMISSION DELEGATED REGULATION (EU)

COMMISSION DELEGATED REGULATION (EU) L 148/54 20.5.2014 COMMISSION DELEGATED REGULATION (EU) No 532/2014 of 13 March 2014 supplementing Regulation (EU) No 223/2014 of the European Parliament and of the Council on the Fund for European Aid

More information

COMMISSION DECISION. Having regard to the Treaty establishing the European Community,

COMMISSION DECISION. Having regard to the Treaty establishing the European Community, EN EN EN COMMISSION DECISION of approving the programme for agriculture and rural development of the Republic of Croatia under the instrument for pre-accession assistance (IPA) THE COMMISSION OF THE EUROPEAN

More information

Table of contents. Introduction Regulatory requirements... 3

Table of contents. Introduction Regulatory requirements... 3 COCOF 08/0020/02-EN DRAFT Guidance document on management verifications to be carried out by Member States on projects co-financed by the Structural Funds and the Cohesion Fund for the 2007 2013 programming

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2006R1083 EN 25.06.2010 004.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COUNCIL REGULATION (EC) No 1083/2006 of 11 July

More information

Education, Audiovisual and Culture Executive Agency

Education, Audiovisual and Culture Executive Agency Education, Audiovisual and Culture Executive Agency MEDIA Unit EUROPEAN UNION - MEDIA 2007 PROGRAMME established by European Parliament and Council Decision N 1718/2006/EC (JO L 327 of 24.11.2006) SUPPORT

More information

Official Journal of the European Union. (Legislative acts) DECISIONS

Official Journal of the European Union. (Legislative acts) DECISIONS 17.4.2015 L 100/1 I (Legislative acts) DECISIONS DECISION (EU) 2015/601 OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 15 April 2015 providing macro-financial assistance to Ukraine THE EUROPEAN PARLIAMT

More information

DG REGIO, DG EMPL and DG MARE in cooperation with OLAF. Joint Fraud Prevention Strategy. for ERDF, ESF, CF and EFF

DG REGIO, DG EMPL and DG MARE in cooperation with OLAF. Joint Fraud Prevention Strategy. for ERDF, ESF, CF and EFF EUROPEAN COMMISSION REGIONAL POLICY EMPLOYMENT,SOCIAL AFFAIRS AND EQUAL OPPORTUNITIES OLAF MARE DG REGIO, DG EMPL and DG MARE in cooperation with OLAF Joint Fraud Prevention Strategy for ERDF, ESF, CF

More information

Guidance document on. management verifications to be carried out by Member States on operations co-financed by

Guidance document on. management verifications to be carried out by Member States on operations co-financed by Final version of 05/06/2008 COCOF 08/0020/04-EN Guidance document on management verifications to be carried out by Member States on operations co-financed by the Structural Funds and the Cohesion Fund

More information

EN Official Journal of the European Union L 77/95

EN Official Journal of the European Union L 77/95 15.3.2014 EN Official Journal of the European Union L 77/95 REGULATION (EU) No 236/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 March 2014 laying down common rules and procedures for the implementation

More information

DG Regional Policy DG Employment, Social Affairs and Equal Opportunities

DG Regional Policy DG Employment, Social Affairs and Equal Opportunities Final version of 17/03/2010 COCOF 10/0002/02/EN EUROPEAN COMMISSION DG Regional Policy DG Employment, Social Affairs and Equal Opportunities Guidance note to Certifying Authorities on reporting on withdrawn

More information

Guidance for Member States on the Drawing of Management Declaration and Annual Summary

Guidance for Member States on the Drawing of Management Declaration and Annual Summary EGESIF_15-0008-02 19/08/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on the Drawing of Management Declaration and Annual Summary Programming period 2014-2020

More information

FELLOWSHIP AGREEMENT

FELLOWSHIP AGREEMENT Annex B: FELLOWSHIP AGREEMENT Eastern Partnership Civil Society Facility GDSI Limited within the EU-funded project the Eastern Partnership Civil Society Facility

More information

COMMISSION DELEGATED REGULATION (EU) /... of

COMMISSION DELEGATED REGULATION (EU) /... of EUROPEAN COMMISSION Brussels, 30.10.2015 C(2015) 7554 final COMMISSION DELEGATED REGULATION (EU) /... of 30.10.2015 amending Delegated Regulation (EU) No 110/2014 on the model financial regulation for

More information

MODEL CONTRACT. Marie Curie individual fellowships

MODEL CONTRACT. Marie Curie individual fellowships MODEL CONTRACT Marie Curie individual fellowships CONTRACT NO The [European Community] [European Atomic Energy Community] ( the Community ), represented by the Commission of the European Communities (

More information

COMMISSION DECISION. C(2007)6376 on 18/12/2007

COMMISSION DECISION. C(2007)6376 on 18/12/2007 COMMISSION DECISION C(2007)6376 on 18/12/2007 adopting a horizontal programme on the Energy Efficiency Finance Facility for Albania, Bosnia and Herzegovina, Croatia, Montenegro, Serbia including Kosovo

More information

Financial Regulation of the European Maritime Safety Agency. Adopted by the Administrative Board on 18 December 2013

Financial Regulation of the European Maritime Safety Agency. Adopted by the Administrative Board on 18 December 2013 of the Adopted by the Administrative Board on 18 December 2013 TABLE OF CONTENT TITLE I GENERAL PROVISIONS... 4 TITLE II BUDGETARY PRINCIPLES... 5 CHAPTER 1 PRINCIPLE OF UNITY AND BUDGET ACCURACY... 5

More information

European Commission Directorate General for Development and Cooperation - EuropeAid

European Commission Directorate General for Development and Cooperation - EuropeAid European Commission Directorate General for Development and Cooperation - EuropeAid Practical guide to procedures for programme estimates (project approach) Version 4.0 December 2012 CONTENTS 1. INTRODUCTION...

More information

Financial Regulation. Applicable to the budget of the European Medicines Agency. 15 January 2014 EMA/MB/789566/2013 Management Board

Financial Regulation. Applicable to the budget of the European Medicines Agency. 15 January 2014 EMA/MB/789566/2013 Management Board 15 January 2014 EMA/MB/789566/2013 Management Board Applicable to the budget of the European Medicines Agency 7 Westferry Circus Canary Wharf London E14 4HB United Kingdom Telephone +44 (0)20 7418 8400

More information

Charter of tasks and responsibilities of the accounting officer

Charter of tasks and responsibilities of the accounting officer 19 March 2015 EMA/MB/655670/2014 Adopted Management Board meeting of 19 March 2015 Charter of tasks and responsibilities of the accounting officer applicable from 1 April 2015 1. Preamble 1.1 This Charter

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 19.10.2011 C(2011) 7321 final COMMISSION DECISION of 19.10.2011 on the approval of guidelines on the principles, criteria and indicative scales to be applied in respect of

More information

COMMISSION DELEGATED REGULATION (EU) /... of

COMMISSION DELEGATED REGULATION (EU) /... of EUROPEAN COMMISSION Brussels, 16.5.2018 C(2018) 2857 final COMMISSION DELEGATED REGULATION (EU) /... of 16.5.2018 amending Commission Delegated Regulation (EU) No 1042/2014 of 25 July 2014 supplementing

More information

CB/15/S48/4/AN1/REV2/EN(O)

CB/15/S48/4/AN1/REV2/EN(O) CB/15/S48/4/AN1/REV2/EN(O) REGULATION NO CB-1-15 OF THE BUDGET COMMITTEE OF THE EUROPEAN UNION INTELLECTUAL PROPERTY OFFICE of 26 November 2015 laying down the financial provisions applicable to the Office

More information

Proposal for a COUNCIL DECISION

Proposal for a COUNCIL DECISION EUROPEAN COMMISSION Brussels, 18.2.2016 COM(2016) 75 final 2016/0047 (NLE) Proposal for a COUNCIL DECISION amending Decision 2008/376/EC on the adoption of the Research Programme of the Research Fund for

More information

MARCO POLO GRANT AGREEMENT 1

MARCO POLO GRANT AGREEMENT 1 The Director MARCO POLO GRANT AGREEMENT 1 AGREEMENT NUMBER [ ] The Executive Agency for Competitiveness and Innovation (EACI), which is acting under delegated powers of the European Commission, (hereinafter

More information

EUROPEAN COMMISSION. EGESIF_ final 22/02/2016

EUROPEAN COMMISSION. EGESIF_ final 22/02/2016 EGESIF_14-0015-02 final 22/02/2016 EUROPEAN COMMISSION GUIDELINES FOR DETERMINING FINANCIAL CORRECTIONS TO BE MADE TO EXPENDITURE CO-FINANCED BY THE EU UNDER THE STRUCTURAL FUNDS AND THE EUROPEAN FISHERIES

More information

Article 2 The maximum amount of Community assistance shall be 20 million to be financed through Budget line in 2005.

Article 2 The maximum amount of Community assistance shall be 20 million to be financed through Budget line in 2005. COMMISSION DECISION PH /2005/2054 OF 24/11/2005 Establishing a Phare Cross Border Co-operation Programme between Bulgaria and Greece in 2005, THE COMMISSION OF THE EUROPEAN COMMUNITIES, Having regard to

More information

Education, Audiovisual and Culture Executive Agency

Education, Audiovisual and Culture Executive Agency Education, Audiovisual and Culture Executive Agency Citizenship Brussels, 05.12.2012 12DO39926 OBEC VEL'KY KYR Dojcan MIROSLAV NAMESTIE SV J AN A C 1, SK - 941 07 VELKY KYR Re: Europe for Citizens Programme

More information

Official Journal of the European Union

Official Journal of the European Union 13.5.2014 L 138/5 COMMISSION DELEGATED REGULATION (EU) No 480/2014 of 3 March 2014 supplementing Regulation (EU) No 1303/2013 of the European Parliament and of the Council laying down common provisions

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

FINANCIAL REGULATION

FINANCIAL REGULATION PARLIAMTARY ASSEMBLY OF THE UNION FOR THE MEDITERRANEAN WORKING GROUP ON FINANCING THE ASSEMBLY AND REVISION OF THE PA UfM S RULES OF PROCEDURE FINANCIAL REGULATION of the Parliamentary Assembly of the

More information

Official Journal of the European Union L 379/49

Official Journal of the European Union L 379/49 28.12.2006 Official Journal of the European Union L 379/49 COMMISSION REGULATION (EC) No 2003/2006 of 21 December 2006 laying down detailed rules for the financing by the European Agricultural Guarantee

More information

AUDIT REFERENCE MANUAL FOR THE STRUCTURAL FUNDS

AUDIT REFERENCE MANUAL FOR THE STRUCTURAL FUNDS Final version of 28/05/2009 COCOF 09/0023/00-EN EUROPEAN COMMISSION AUDIT REFERENCE MANUAL FOR THE STRUCTURAL FUNDS Commission européenne, B-1049 Bruxelles / Europese Commissie, B-1049 Brussel - Belgium.

More information

South East Europe (SEE) SEE Control Guidelines

South East Europe (SEE) SEE Control Guidelines South East Europe (SEE) SEE Control Guidelines Version 1.4. Final version approved by the MC 10 th June 2009 1 st amendment to be approved by MC (2.0) 1 CONTENTS 1 Purpose and content of the SEE Control

More information

MARCO POLO GRANT AGREEMENT 1

MARCO POLO GRANT AGREEMENT 1 MARCO POLO GRANT AGREEMENT 1 AGREEMENT NUMBER [INSERT REFERENCE NUMBER] The Executive Agency for Competitiveness and Innovation (EACI) (hereinafter referred to as the Agency ), acting under powers delegated

More information

Partnership Agreement between the Lead Partner and the other project partners

Partnership Agreement between the Lead Partner and the other project partners Partnership Agreement between the Lead Partner and the other project partners Foreword This Partnership Agreement is signed on the basis of the following documents that form the legal framework applicable

More information

Amended proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Amended proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 22.4.2013 COM(2013) 246 final 2011/0276 (COD) Amended proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL laying down common provisions on the European

More information

Having regard to the opinion of the European Economic and Social Committee ( 1 ),

Having regard to the opinion of the European Economic and Social Committee ( 1 ), 27.6.2014 Official Journal of the European Union L 189/143 REGULATION (EU) No 661/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 15 May 2014 amending Council Regulation (EC) No 2012/2002 establishing

More information

(Legislative acts) REGULATIONS

(Legislative acts) REGULATIONS 24.6.2010 Official Journal of the European Union L 158/1 I (Legislative acts) REGULATIONS REGULATION (EU) No 539/2010 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 June 2010 amending Council Regulation

More information

Financial Regulation European Insurance and Occupational Pensions Authority (EIOPA) December 2013

Financial Regulation European Insurance and Occupational Pensions Authority (EIOPA) December 2013 EIOPA/13/474 31 December 2013/TL Financial Regulation European Insurance and Occupational Pensions Authority (EIOPA) December 2013 EIOPA Westhafen Tower, Westhafenplatz 1 60327 Frankfurt Germany Tel. +

More information

DGB 2 EUROPEAN UNION. Brussels, 17 September 2014 (OR. en) 2013/0398 (COD) PE-CONS 90/14 AGRI 310 AGRIFIN 67 AGRIORG 75 CODEC 1092

DGB 2 EUROPEAN UNION. Brussels, 17 September 2014 (OR. en) 2013/0398 (COD) PE-CONS 90/14 AGRI 310 AGRIFIN 67 AGRIORG 75 CODEC 1092 EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Brussels, 17 September 2014 (OR. en) 2013/0398 (COD) PE-CONS 90/14 AGRI 310 AGRIFIN 67 AGRIORG 75 CODEC 1092 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject:

More information

Interreg IPA Cross-border Cooperation Programme Greece-Albania

Interreg IPA Cross-border Cooperation Programme Greece-Albania Interreg IPA Cross-border Cooperation Programme Greece-Albania 2014-2020 SUBSIDY CONTRACT No. In Thessaloniki, today, the , at the premises of the Managing Authority located at 65, Leoforos

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2006R1828 EN 01.12.2011 003.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B C1 COMMISSION REGULATION (EC) No 1828/2006 of

More information

DECISION No 20 OF THE MANAGEMENT BOARD OF THE EUROPEAN ASYLUM SUPPORT OFFICE of 27 December 2013 on the EASO Financial Regulation

DECISION No 20 OF THE MANAGEMENT BOARD OF THE EUROPEAN ASYLUM SUPPORT OFFICE of 27 December 2013 on the EASO Financial Regulation DECISION No 20 OF THE MANAGEMENT BOARD OF THE EUROPEAN ASYLUM SUPPORT OFFICE of 27 December 2013 on the EASO Financial Regulation THE MANAGEMENT BOARD, HAVING REGARD to Regulation (EU) No. 439/2010 of

More information

ANNEX. to the Comission Decision. amending Decision C(2013) 1573

ANNEX. to the Comission Decision. amending Decision C(2013) 1573 EUROPEAN COMMISSION Brussels, 30.4.2015 C(2015) 2771 final ANNEX 1 ANNEX to the Comission Decision amending Decision C(2013) 1573 on the approval of the guidelines on the closure of operational programmes

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2008R1235 EN 06.11.2015 017.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COMMISSION REGULATION (EC) No 1235/2008 of 8

More information

COMMISSION IMPLEMENTING DECISION. of adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015

COMMISSION IMPLEMENTING DECISION. of adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015 EUROPEAN COMMISSION Brussels, 7.12.2015 C(2015) 8777 final COMMISSION IMPLEMENTING DECISION of 7.12.2015 adopting a Country Action Programme on Bosnia and Herzegovina for the year 2015 EN EN COMMISSION

More information

FRAMEWORK PARTNERSHIP AGREEMENT

FRAMEWORK PARTNERSHIP AGREEMENT NUMBER FPA2016/EIT/CLIMATE-KIC Ref.: 00198.EIT.2016.I FRAMEWORK PARTNERSHIP AGREEMENT NUMBER FPA2016/EIT/CLIMATE-KIC This Framework Partnership Agreement is between the following parties: on the one part,

More information

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Support to the Tax Administration Action summary This Action aims to support Montenegro in the process of fulfilling the EU preaccession

More information

MODEL BONUS GRANT AGREEMENT

MODEL BONUS GRANT AGREEMENT 12 November 2012 MODEL BONUS GRANT AGREEMENT PROJECT: FULL NAME AND ACRONYM CONTRACTING PARTIES: The BONUS-Baltic Organisations Network for Funding Science EEIG (hereinafter referred to as "the BONUS EEIG")

More information

(Legislative acts) REGULATIONS

(Legislative acts) REGULATIONS 5.12.2011 Official Journal of the European Union L 321/1 I (Legislative acts) REGULATIONS REGULATION (EU) No 1255/2011 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 30 November 2011 establishing a Programme

More information

ENIAC JOINT UNDERTAKING GRANT AGREEMENT AGREEMENT NUMBER - [ ] PROJECT TITLE [ACRONYM]

ENIAC JOINT UNDERTAKING GRANT AGREEMENT AGREEMENT NUMBER - [ ] PROJECT TITLE [ACRONYM] ENIAC-GB-30-08 1/60 ENIAC JOINT UNDERTAKING GRANT AGREEMENT AGREEMENT NUMBER - [ ] PROJECT TITLE [ACRONYM] The ENIAC Joint Undertaking (hereinafter referred to as the 'Joint Undertaking'), represented

More information

CENTRAL FINANCE AND CONTRACTS UNIT (CFCU) POLAND MEMORANDUM OF UNDERSTANDING. Article 1 - Explanatory Statement

CENTRAL FINANCE AND CONTRACTS UNIT (CFCU) POLAND MEMORANDUM OF UNDERSTANDING. Article 1 - Explanatory Statement CENTRAL FINANCE AND CONTRACTS UNIT (CFCU) POLAND MEMORANDUM OF UNDERSTANDING Article 1 - Explanatory Statement The Establishment of a Central Finance and Contracts Unit (CFCU) is to be seen against the

More information

COMMISSION DECISION. C(2007)5980 of 10/12/2007

COMMISSION DECISION. C(2007)5980 of 10/12/2007 EN EN EN COMMISSION DECISION C(2007)5980 of 10/12/2007 adopting the Cross border programme between Serbia and Montenegro under the IPA- Cross border Co operation component, for the year 2007 THE COMMISSION

More information

ANNEX FINANCING PROPOSAL FOR THE YEAR 2008 OF THE CROSS BORDER PROGRAMME CROATIA MONTENEGRO. Montenegro IPA/2008/19-923

ANNEX FINANCING PROPOSAL FOR THE YEAR 2008 OF THE CROSS BORDER PROGRAMME CROATIA MONTENEGRO. Montenegro IPA/2008/19-923 EN EN EN ANNEX FINANCING PROPOSAL FOR THE YEAR 2008 OF THE CROSS BORDER PROGRAMME CROATIA MONTENEGRO 1. IDENTIFICATION Beneficiaries CRIS number Year 2008 Cost Operating structures Implementing Authorities

More information

15536/17 FP/aga 1 DGC 2B

15536/17 FP/aga 1 DGC 2B Council of the European Union Brussels, 8 December 2017 (OR. en) Interinstitutional File: 2017/0125 (COD) 15536/17 'I/A' ITEM NOTE From: To: No. prev. doc.: 15165/17 General Secretariat of the Council

More information

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Official Journal of the European Union. (Non-legislative acts) REGULATIONS 10.1.2017 L 5/1 II (Non-legislative acts) REGULATIONS COMMISSION IMPLEMTING REGULATION (EU) 2017/39 of 3 November 2016 on rules for the application of Regulation (EU) No 1308/2013 of the European Parliament

More information

Decision of the Administrative Board adopting the

Decision of the Administrative Board adopting the European GNSS Agency Written Procedure Nr. 32 Prague, 25 April 2014 Decision of the Administrative Board adopting the GSA Financial Regulation 2014 EXPLANATORY MEMORANDUM CONTEXT OF THE DECISION: The Framework

More information

Annex C. The objectives of the 2003 Phare External Border Initiative for Romania are

Annex C. The objectives of the 2003 Phare External Border Initiative for Romania are Annex C 1. Objectives and Description The 2003 Phare External Border Initiative for Romania has been designed following bilateral discussions between the Romanian authorities and the European Commission

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2014-2021 Adopted by the EEA Financial Mechanism Committee pursuant to Article 10.5 of Protocol 38c to the EEA Agreement on 8 September 2016 and confirmed

More information

Guide to Financial Issues relating to ICT PSP Grant Agreements

Guide to Financial Issues relating to ICT PSP Grant Agreements DG COMMUNICATIONS NETWORKS, CONTENT AND TECHNOLOGY ICT Policy Support Programme Competitiveness and Innovation Framework Programme Guide to Financial Issues relating to ICT PSP Grant Agreements Version

More information

GRANT DECISION APPROVING NATIONAL PROGRAMMES AND ASSOCIATED FUNDING. Decision Number SANTE/2018/ES/SI

GRANT DECISION APPROVING NATIONAL PROGRAMMES AND ASSOCIATED FUNDING. Decision Number SANTE/2018/ES/SI Ref. Ares(2018)592514-31/01/2018 EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY Food Chain: Stakeholders and International Relations Director GRANT DECISION APPROVING NATIONAL PROGRAMMES

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL ANNEX Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on information provision and promotion measures for agricultural products on the internal market and in third countries Having

More information

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9 Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9 1. Basic information 1.1 CRIS Number: 2009/021-170 1.2 Title: Strengthening the management and control systems for EU financial

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER [EPLUS LINK Generated No.] This Agreement ( the Agreement ) is concluded between the following

More information

Greece The former Yugoslav Republic of Macedonia IPA Cross-Border Programme SUBSIDY CONTRACT A

Greece The former Yugoslav Republic of Macedonia IPA Cross-Border Programme SUBSIDY CONTRACT A Greece The former Yugoslav Republic of Macedonia IPA Cross-Border Programme 2007-2013 SUBSIDY CONTRACT A No. : < > SUBSIDY CONTRACT No. In Athens, today, the , at the Ministry of Development,

More information

Model Grant Agreement. Pilot Project on defence research

Model Grant Agreement. Pilot Project on defence research Model Grant Agreement For the Pilot Project on defence research 29 April 2016 GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT NUMBER [insert] This Pilot Project is funded by the European

More information

COMMISSION OF THE EUROPEAN COMMUNITIES DIRECTORATE-GENERAL INFORMATION SOCIETY AND MEDIA

COMMISSION OF THE EUROPEAN COMMUNITIES DIRECTORATE-GENERAL INFORMATION SOCIETY AND MEDIA COMMISSION OF THE EUROPEAN COMMUNITIES DIRECTORATE-GENERAL INFORMATION SOCIETY AND MEDIA [title of the project] Grant agreement Number 1 GRANT AGREEMENT NO The European Community ( the Community ), represented

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 8.12.2015 C(2015) 8873 final COMMISSION IMPLEMENTING DECISION of 8.12.2015 on the Annual Action Programme 2015 (part 2) and 2016 (part 1) in favour of Afghanistan to be financed

More information

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No. GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER [EPLUS LINK Generated No.] This Agreement ( the Agreement ) is concluded between the following

More information

Project Fiche IPA National programmes IPA 2012/Component I

Project Fiche IPA National programmes IPA 2012/Component I Project Fiche IPA National programmes IPA 2012/Component I 1 IDENTIFICATION Project Title Strengthening the capacity of the Central Financing and Contracting Unit (CFCU) for efficient implementation of

More information

EUROPEAN UNION. Strasbourg, 16 April 2014 (OR. en) 2013/0238 (COD) LEX 1514 PE-CONS 43/2/14 REV 2 DEVGEN 37 ACP 27 RELEX 145 CODEC 474

EUROPEAN UNION. Strasbourg, 16 April 2014 (OR. en) 2013/0238 (COD) LEX 1514 PE-CONS 43/2/14 REV 2 DEVGEN 37 ACP 27 RELEX 145 CODEC 474 EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Strasbourg, 16 April 2014 (OR. en) 2013/0238 (COD) LEX 1514 PE-CONS 43/2/14 REV 2 DEVG 37 ACP 27 RELEX 145 CODEC 474 DECISION OF THE EUROPEAN PARLIAMT AND

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2007D0198 EN 05.03.2015 002.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COUNCIL DECISION of 27 March 2007 establishing

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 2.0 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was updated further

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 26.1.2017 C(2017) 308 final COMMISSION DECISION of 26.1.2017 authorising the use of reimbursement of indirect costs on the basis of a maximum flatrate of 25% for the actions

More information

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms 2014-2021 Table of Contents 1. Introduction... 3 1.1 Objectives

More information

COMMISSION IMPLEMENTING DECISION. of adopting a

COMMISSION IMPLEMENTING DECISION. of adopting a EUROPEAN COMMISSION Brussels, 10.12.2014 C(2014) 9352 final COMMISSION IMPLEMENTING DECISION of 10.12.2014 adopting a Cross-border cooperation Programme Montenegro- Albania for the years 2014-2020 and

More information

Mono-Beneficiary Model Grant Agreement

Mono-Beneficiary Model Grant Agreement Justice Programme & Rights, Equality and Citizenship Programme Mono-Beneficiary Model Grant Agreement (JUST/REC MGA Mono) Version 2.0 10 January 2017 Disclaimer This document is aimed at assisting applicants

More information

Proposal for a COUNCIL REGULATION

Proposal for a COUNCIL REGULATION EUROPEAN COMMISSION Brussels, 30.1.2019 COM(2019) 64 final 2019/0031 (APP) Proposal for a COUNCIL REGULATION on measures concerning the implementation and financing of the general budget of the Union in

More information

THE COOPERATION PROGRAMME BETWEEN SWITZERLAND AND ROMANIA PROJECT AGREEMENT

THE COOPERATION PROGRAMME BETWEEN SWITZERLAND AND ROMANIA PROJECT AGREEMENT THE COOPERATION PROGRAMME BETWEEN SWITZERLAND AND ROMANIA PROJECT AGREEMENT BETWEEN SWITZERLAND REPRESENTED BY THE STATE SECRETARIAT FOR ECONOMIC AFFAIRS (SECO) AND THE GOVERNMENT OF ROMANIA REPRESENTED

More information

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components

More information