1 Railway Rolling Stock Project (RRP BAN 49094) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves procurement of 214 meter gauge (MG) passenger carriages, 50 broad gauge (BG) passenger carriages, and 10 MG diesel-electric locomotives. Bangladesh Railway (BR) is experiencing a shortage of passenger carriages due to non-replacement of the outdated carriages and the increasing demand on passenger trains. The newly procured carriages and locomotives will be used to increase the availability of MG and BG carriages and operate more trains. The project will contribute to the efficiency of the BR system by providing modern, safe, and improved carriages and locomotives. 2. Economic analyses have been undertaken to assess the economic viability of the project in accordance with the Asian Development Bank s (ADB s) Guidelines for the Economic Analysis of Projects (1997). 1 The analyses compare the benefits and costs of with- and withoutproject situations to estimate the economic internal rate of return (EIRR) and the net present value (NPV) at a discount rate of 12%. The Bangladesh taka is used as the currency unit in the analyses. Customs duty and value-added tax (VAT) are included in the project cost estimate, but are excluded in the economic analysis. Price contingencies are excluded as they do not reflect the real changes in the volume of resources consumed. 2 A standard conversion factor of 0.8 was used to translate the domestic price of non-tradable components into the border price. A shadow wage-rate factor of 0.8 has been applied to unskilled labour. 3 The analysis period is 30 years. The exchange rate used in the analysis is Tk77.80 = $1. 3. Financial analyses have been undertaken to assess the financial viability of the project using a similar approach to that for the economic analysis. For the financial analysis, the criterion rate of return is the weighted average cost of capital (WACC). Based on the funding mix, the interest rates, and inflation rates, the WACC for this project is estimated to be 2.8%. The project s financial internal rate of return (FIRR) is calculated using the financial terms of BR costs and revenues. Customs duty and VAT are included in the costs. Local costs are not modified by the standard conversion factor. The analysis period and exchange rate used in the financial analysis are the same as those used in the economic analysis. B. Project Details: Procurement of 214 Meter-Gauge (MG) Carriages, 50 Broad-Gauge (BG) Carriages, and 10 MG Diesel-Electric Locomotives 4. The BR rail system runs on a mix of lines, including broad gauge (BG), meter gauge (MG), and dual gauge (DG). The service area is divided into a West Zone and an East Zone. The Jamuna River is the main dividing line between the zones. The railway system is dominated by passenger trains, divided into intercity (IC), mail express (M/E), and local trains. 5. BR is in need of new coaches with modern facilities to replace the aged coaches. At present, there are 312 BG and 1,164 MG carriages. BR considers a carriage over 35 years old 1 ADB Guidelines for the Economic Analysis of Projects. Manila. 2 Due to the nature of procurement of goods, there is no physical contingency for this project. 3 The standard conversion factor and shadow wage-rate factor are based on recently approved ADB-financed projects in Bangladesh: (i) ADB Report and Recommendation of the President to the Board of Directors: Proposed Loans and Technical Assistance Grant, People s Republic of Bangladesh: South Asia Subregional Economic Cooperation Railway Connectivity: Akhaura Laksam Double Track Project. Manila; and (ii) ADB Periodic Financing Request Report, Bangladesh: Railway Sector Investment Program Proposed Tranche 3. Manila.
2 2 to be economically over-aged. BR data show that 24.1% of BG and 38.6% of MG carriages are over 35 years old. A carriage whose economic life has expired is to be condemned because of its low availability and lack of reliability. However, due to the shortage of carriages, some economically over-aged carriages are refurbished and continue to be used, depending on the individual carriage condition. 6. In addition to new passenger carriages, investment is needed to procure new locomotives. At present, BR owns 97 BG locomotives and 196 MG locomotives. Of the 196 MG locomotives owned by BR, only 125, or 64%, are available for effective service. The remaining 66 MG locomotives are considered ineffective stock, implying that they are awaiting condemnation, under or awaiting repairs, or lying in the traffic yard. 7. BR carriage occupancy rates are very high. For example, IC passenger trains, which account for more than 70% of BR s total passenger traffic, have an average occupancy rate of over 120% in the total system. This indicates that there are people who wish to buy a ticket but cannot get one, or that tickets are sold for standing passengers once all seats have been sold. 8. Given BR s past reluctance to abandon existing carriages and extremely high carriage occupancy rates, it is assumed that new carriages will be added to the existing number of carriages. The deployment of new carriages is assumed to be allocated to the Dhaka Chittagong corridor for MG carriages, the critical corridor of the country, and to the Dhaka Khulna corridor for BG carriages. 9. Without the project, the carriages that have been in operation will continue to operate with no new carriages. The number of carriages will continue to decline as the old carriages are condemned and withdrawn from service. With the project, 264 carriages and 10 locomotives will be the incremental effect. Additional passenger carriages imply more seats and more tickets sold. The project will bring in 1,434 million additional passenger kilometers (km) a year (Table 1). Passenger-km per year is calculated as the product of seats per coach, load factor, carriages number of days in operation per year, km running on the system per day, and the number of carriages procured. For the last 6 years, the number of passengers carried on BR s system increased by 36%, while the number of passenger trains running on the system increased by only 6%. It is assumed that the newly procured passenger carriages will have an occupancy rate similar to that of the existing overall passenger carriages. It is a conservative assumption to use the existing average occupancy rate in the analysis because the new carriages will be allocated to Dhaka Chittagong IC trains, whose occupancy rate is approximately 1.4 times higher than that of overall carriages. Table 1: Seating and Operation of New Carriages Total Passengerkm/year per of Number Seats/ Load Days/ Km/ passengerkm/year carriage factor year day coach (million) carriages (million) MG carriage % ,018 BG carriage % BG = broad gauge, km = kilometer, MG = meter gauge. Source: Asian Development Bank assessment.
3 3 C. Economic Analysis 1. Project s The costs to be incurred for this project include: (i) capital cost, including equipment; (ii) operation and maintenance (O&M) cost; (iii) incremental fuel cost; and (iv) maintenance cost of the permanent way. The project s capital cost estimate is based on a development project proforma/proposal (DPP) prepared in May The costs over the analysis period were estimated using constant 2015 economic prices. Customs duty and VAT are excluded from the economic costs. The O&M costs were also estimated for each year of the analysis period. Carriage maintenance costs are set to start at 50% of the average maintenance cost in the first year and increase linearly to 150% of the average maintenance cost at 30 years. This means the carriage maintenance cost reaches the average figure at 15 years. A salvage value has been included to capture the remaining value of the investment. A straight-line depreciation method is used to calculate the salvage value of investment at the end of the analysis period. Incremental fuel and track maintenance costs are assumed to increase in proportion to the gross ton-km. 2. Project Benefits 11. The project will result in such benefits to the existing traffic as (i) a change in generalized cost; (ii) savings in vehicle operating cost; and (iii) time savings for road passengers. (i) Change in generalized cost. An important benefit to the project will be a change in generalized costs. In the with-project case, a passenger s perceived cost of travel, or the generalized cost, will be affected. The generalized cost includes the fare, travel time, accident risk, level of service such as comfort, and ability to travel at the passenger s preferred time. The per passenger generalized cost is calculated by comparing and taking the difference between the weighted average generalized cost in Tk per passenger-km for railway passengers and bus passengers. By adding modern and safe carriages, the generalized cost of rail travel for normal passengers, those who are already traveling or would travel in the future in the without-project case, will decrease. A change in demand due to the fare increase is factored in. (ii) Savings in vehicle operating cost. Some passengers will switch from the bus to the train since the trains are cheaper, safer, and more comfortable. A reduction in the number of bus passengers will reduce the traffic volume on the road, which will lead to an increase in the speed of bus operation. The average operating cost per bus passenger has been estimated at Tk1.2 per passenger-km, excluding infrastructure costs. The equivalent for rail can be as low as Tk0.7 per passenger-km for Shovan Class, excluding track costs. Rail provides a more economically efficient solution to the public transport needs of such a densely populated country. Bus revenue reduction due to a reduction in the number of bus passengers is considered in the analysis. (iii) Time savings for road passengers. Bus passengers will benefit from the increased speed of bus operation. The value of this benefit was estimated using valueof-time factors drawn from the Road User s Report of the Roads and 4 Annual operation and maintenance (O&M) costs for MG trains and the maintenance cost of the permanent way were calculated during the preparation of the Dhaka Tongi project, financed by an Indian line of credit. These costs were updated to 2015 using the consumer price index (CPI) to adjust for inflation.
4 4 Highways Department (RHD). 5 RHD has been conducting a travel-time cost survey in major divisional cities for both main and feeder roads, and it has estimated a common national set of travel-time costs according to vehicle type. An assessment of the number of travelers in work time and non-work time is made for each vehicle type. The traveltime cost for work time is then taken as the estimated wage rate (net of tax but including employers costs directly associated with employment) and the value for non-work time as a proportion of the wage rate (35%, according to advice from the United Kingdom s Transport Research Laboratory). The recommended financial and economic travel-time cost were taken from the RHD report and updated to 2015 (base year) prices on the basis of an annual price escalation factor consistent with gross domestic product and gross national product growth in recent years. The economic benefit was calculated as the product of recommended economic travel-time cost, time saved per trip, and number of passenger trips. 3. Results of Economic Analysis 12. An economic evaluation was carried out for the project, comparing with- and withoutproject options. The results are shown in Table 2, which gives the EIRR and NPV for the proposed project option. The EIRR is estimated at about 26.4%. The NPV of the project, at a 12% discount rate, is Tk17,886 million. 4. Sensitivity Analysis 13. A sensitivity analysis was carried out over the base case with respect to adverse changes in the costs and benefits. The result of the sensitivity analysis (Table 3) shows that all scenarios have an EIRR of more than 12%. The project is therefore recommended for implementation. Year Capital Coach O&M Table 2: Economic Analysis Results (Tk million) Locomotive Fuel Maintenance of PW Generalized Change VOC Saving VOT Saving Net Benefit ,821-3, ,821-3, ,114-6, , , , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, ,734 5 Government of the People s Republic of Bangladesh, Ministry of Communications, Roads and Highways Department Road User s Report Dhaka.
5 5 Year Capital Coach O&M Locomotive Fuel Maintenance of PW Generalized Change VOC Saving VOT Saving Net Benefit ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , ,305 1, , , ,305 1, ,016 Net Present 12% 17,886 EIRR 26.4% EIRR = economic internal rate of return, O&M = operation and maintenance, PW = permanent way, VOC = vehicle operating cost, VOT = value of time. Item Table 3: Results of Sensitivity Analysis for Economic Analysis Change NPV (Tk million) EIRR (%) Sensitivity Indicator Switching Value (%) Base Case 0 17, All Investment (+)10% 16, Loco and Rolling Stock (+)10% 16, O&M s (+)10% 17, All Benefits (-)10% 14, Generalized Change (-)10% 15, Road Saving (-)10% 16, All Benefits and All s (-/+)10% 12, /-36 One Year Delay 13, EIRR = economic internal rate of return, NPV = net present value, O&M = operation and maintenance. Note: For switching values, the +/- indicate the percentage by which cost increases and benefit decreases to result in an NPV of 0.
6 6 D. Financial Analysis 14. BR is serving both as a commercial enterprise and as a public utility service provider. As a public utility service provider, BR has a special responsibility to operate specific services that are not commercially viable but are socially necessary. For instance, BR has to bear certain costs, namely a social cost, which includes i) carrying essential commodities and rendering transport facilities to passengers at lower prices than the cost of services; ii) operating uneconomic branch lines; iii) carrying relief materials at concessional rates; and iv) carrying military traffic at a less than normal tariff. BR is compensated under the Public Service Obligation system and has been able to cover its operating expenses by government subsidy. 15. As a matter of government policy, BR has been maintaining a low tariff regime for decades. Passenger fares had remained static for 20 years until the fare increase in October Despite this fare increase of up to 50%, it is not enough to cover the fuel price hikes in the last 20 years. Since BR plays a vital role in the country s socioeconomic development, serving both as a commercial enterprise and as a public service provider, the government subsidizes BR to cover its operating expenses. 16. A financial analysis has been carried out to assess the viability of the proposed project investment based on the incremental earnings and operational cost savings that would accrue to BR as a result of the procurement of passenger carriages. The analysis was carried out on an incremental basis using the discounted cash flow method, and calculating the internal rate of return of the project. 17. As with the economic analysis, it is assumed that new carriages will be added to the existing number of carriages. The deployment of new carriages is assumed to be allocated to the Dhaka Chittagong corridor, the critical corridor of the country. 18. It is assumed that there will be an increase in passenger fares by 20% in It is assumed that the Dhaka Chittagong corridor investment projects financed by ADB and the Japan International Cooperation Agency (JICA) will be completed by that time. The 20% fare increase is reasonable because passengers will benefit from a better traveling experience, including a reduction in travel time and enhanced safety and comfort. 19. An improvement in locomotive fuel efficiency of 30% is allowed in the analysis, limited to the newly procured locomotives. There is no change in the fuel efficiency to the existing locomotives. 20. Capital costs are based on the estimated project costs for The capital cost includes carriages, capital spares, maintenance spares, training, and taxes, but excludes price contingencies and financing charges during implementation. 21. Operational costs and earnings have been computed based on the incremental traffic derived by the project. The net of operational costs and earnings attributable to incremental traffic is considered in the revenue stream. 22. All financial projections are shown in 2015 nominal taka with no adjustment for inflation.
7 7 23. In the final year of the project, the residual value of investment was considered as per the economic life by applying the straight-line depreciation method The WACC in real terms for the project investment is estimated at 2.8%, as shown in Table 4. Based on recent auctions of 10-year Bangladesh government treasury bonds, the fund provided by the government is assumed to cost 10.8% in nominal costs. The WACC in real terms was used as the desired discount rate to compare the FIRR for the project and calculate the NPV. The with-subsidy FIRR and without-subsidy FIRR estimated for the proposed project was 5.2% and -3.7%, respectively. The results of the financial analysis are shown in Table A sensitivity analysis was carried out over the base case with respect to adverse changes in the costs and benefits. The result of the sensitivity analysis is shown in Table 6. A positive FIRR is only achieved when taking into account the government s subsidy to BR. In conclusion, the project s lending decision is based more on the economic viability than on the financial viability. Table 4: Weighted Average of Capital Description Financing Component ADB (OCR) GOB Total A Weighting 70.18% 29.82% % B Nominal 3.28% 10.80% C Tax Rate 0.00% 0.00% D Tax-adjusted Nominal 3.28% 10.80% E Inflation Rate 1.00% 6.50% F Real 2.26% 4.04% G Weighted Component of WACC 1.58% 1.20% 2.79% Weighted Average of Capital 2.80% ADB = Asian Development Bank, GOB = Government of Bangladesh, OCR = ordinary capital resources, WACC = weighted average cost of capital. Year Capital Coach O&M Table 5: Financial Analysis Results Locomotive Fuel Maintenance of PW Revenue from new passengers Government Subsidy Net Benefit ,484-5, ,484-5, ,774-8, , , ,049 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1,666 6 In the analysis, 35 years for rolling stock was assumed based on the technical standards with appropriate maintenance.
8 8 Year Capital Coach O&M Locomotive Fuel Maintenance of PW Revenue from new passengers Government Subsidy Net Benefit ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, ,134 1,259 1, , ,134 1,259 3,080 With-subsidy, Net Present Value at WACC 7,276 With-subsidy, FIRR 5.2% Without-subsidy, Net Present Value at WACC - Without-subsidy, FIRR -3.7% FIRR = financial internal rate of return, O&M = operation and maintenance, PW = permanent way, WACC = weighted average cost of capital. Table 6: Results of Sensitivity Analysis for Financial Analysis Item Change NPV Sensitivity Switching FIRR (%) (Tk million) Indicator Value (%) Base Case 0 7, All Investment (+)10% 4, Loco and Rolling Stock (+)10% 5, O&M s (+)10% 6, All Revenue (-)10% 3, One Year Delay 5, FIRR = financial internal rate of return, NPV = net present value, O&M = operation and maintenance.
ECONOMIC AND FINANCIAL ANALYSIS
South Asia Subregional Economic Cooperation Chittagong-Cox s Bazar Railway Project, Phase 1 (RRP BAN 46452-002) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will construct 102
More informationFINANCIAL ANALYSIS. A. Background
SASEC Second Bangladesh India Electrical Grid Interconnection Project (RRP BAN 44192) A. Background FINANCIAL ANALYSIS 1. The South Asia Subregional Economic Cooperation (SASEC) Second Bangladesh India
More informationECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)
Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising
More informationECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive
Western Regional Road Corridor Investment Program (RRP MON 41193) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. Project Costs. The project s capital costs include the costs of the road works, design,
More informationFINANCIAL ANALYSIS. 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1.
Padma Multipurpose Bridge Project (RRP BAN 35049) FINANCIAL ANALYSIS A. Introduction 1. A financial analysis assessed the viability of the proposed project investment based on the capacity of Bangladesh
More informationECONOMIC AND FINANCIAL ANALYSIS
Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state
More informationECONOMIC ANALYSIS. Table 1: Economic costs by project component
Jiangxi Fuzhou Urban Integrated Infrastructure Improvement Project (RRP PRC 44007) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. The project s capital costs include the civil works, land acquisition
More informationFINANCIAL ANALYSIS OF TRANCHE 1
Town Electrification Investment Program (RRP PNG 41504) FINANCIAL ANALYSIS OF TRANCHE 1 A. Financial Analysis 1. Introduction 1. The financial analysis of the project covers the first three subprojects
More informationFINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis:
Java Bali 500-Kilovolt Power Transmission Crossing Project (RRP INO 42362) FINANCIAL ANALYSIS 1. General Methodology. Financial analysis of the project has been undertaken in accordance with Asian Development
More informationFINANCIAL ANALYSIS. 1. Introduction and Methodology
Third Urban Governance and Infrastructure Improvement (Sector) Project (RRP BAN 39295) 1. Introduction and Methodology FINANCIAL ANALYSIS 1. The project finances basic urban services improvements and aims
More informationECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context
Dhaka Water Supply Network Improvement Project (RRP BAN 47254-003) ECONOMIC ANALYSIS A. Introduction and Macroeconomic Context 1. Economic growth in Bangladesh averaged an very healthy 6.1% during FY2006
More informationECONOMIC AND FINANCIAL ANALYSIS
Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting
More informationPeople s Republic of Bangladesh: Railway Rolling Stock Project
Railway Rolling Stock Project (RRP BAN 49094) Project Administration Manual Project Number: 49094-001 Loan Number: {LXXXX} September 2015 People s Republic of Bangladesh: Railway Rolling Stock Project
More informationPeople s Republic of Bangladesh: Updating the Road Master Plan
South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)
More informationFINANCIAL ANALYSIS: PROJECT 1
Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy
More informationECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2
Appendix 6 ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 1. Background. The Second Rural Connectivity Investment Program will support the Government of India in improving rural connectivity through the
More informationReport and Recommendation of the President to the Board of Directors
Report and Recommendation of the President to the Board of Directors Project Number: 46168-001 September 2014 Proposed Loans and Technical Assistance Grant People s Republic of Bangladesh: South Asia Subregional
More informationECONOMIC AND FINANCIAL ANALYSIS
Khyber Pakhtunkhwa Provincial Roads Improvement Project (RRP PAK 47360) A. Background ECONOMIC AND FINANCIAL ANALYSIS 1. The province of Khyber Pakhtunkhwa in northwest Pakistan covers almost six degrees
More informationECONOMIC AND FINANCIAL ANALYSIS
Additional Financing to the Third Primary Education Development Project (RRP BAN 42122) ECONOMIC AND FINANCIAL ANALYSIS 1. This document provides an analysis of the economic rationale for additional financing
More informationECONOMIC ANALYSIS. A. Introduction
Bridge Replacement for Improved Rural Access Sector Project (RRP PNG 43200) ECONOMIC ANALYSIS A. Introduction 1. The economic analysis of the proposed project has been carried out in accordance with ADB
More informationFINANCIAL ANALYSIS. A. Introduction
Urban Water Supply and Wastewater Management Investment Project (RRP FIJ 491-2) A. Introduction FINANCIAL ANALYSIS 1. The Asian Development Bank (ADB) Urban Water Supply and Wastewater Management Investment
More informationPROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2518 Operation Name
More informationFINANCIAL ANALYSIS. A. Introduction
Solar Power Development Project (RRP SOL 48346) A. Introduction FINANCIAL ANALYSIS 1. The scope of the financial analysis for the Solomon Islands Solar Power Development project includes (i) an estimate
More informationSouth Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS
South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) A. Approach FINANCIAL ANALYSIS 1. Financial analysis of the project was carried out in accordance with the Financial
More informationReport and Recommendation of the President to the Board of Directors
Report and Recommendation of the President to the Board of Directors Project Number: 46452-002 September 2016 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of
More informationECONOMIC AND FINANCIAL ANALYSIS
Coral Reef Rehabilitation and Management Program Coral Triangle Initiative Project (RRP INO 46421) A. Approach and Methodology ECONOMIC AND FINANCIAL ANALYSIS 1. The economic and financial analysis of
More informationCambodia: Second Power Transmission and Distribution Project
Validation Report Reference Number: PVR-464 Project Number: 37041-013 Loan Number: 2261 December 2016 Cambodia: Second Power Transmission and Distribution Project Independent Evaluation Department ABBREVIATIONS
More informationFINANCIAL ANALYSIS. A. Financial Capacity Assessment of MWSS
Angat Water Transmission Improvement Project (RRP PHI 46362-002) FINANCIAL ANALYSIS 1. The project is estimated to be $134.0 million of which $98.4 million is for the design and build contract, $6.0 million
More informationFINANCIAL ANALYSIS A. Introduction
Green Energy Corridor and Grid Strengthening Project (RRP IND 44426) FINANCIAL ANALYSIS A. Introduction 1. The proposed Green Energy Corridor and Grid Strengthening Project funds (i) a portion of India
More informationFINANCIAL ANALYSIS. Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387)
Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387) FINANCIAL ANALYSIS 1. The financial analysis follows Asian Development Bank (ADB) guidelines. 1 Subprojects
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])
CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities
More informationBangladesh: Road Maintenance and Improvement Project
Performance Evaluation Report Bangladesh: Road Maintenance and Improvement Project Independent Evaluation Performance Evaluation Report December 2014 Bangladesh: Road Maintenance and Improvement Project
More informationMINISTRY OF RAILWAYS DEMAND NO. 80 Ministry of Railways
Notes on Demands for Grants, 2017-2018 251 MINISTRY OF RAILWAYS DEMAND NO. 80 Ministry of Railways Gross 201308.96 123993.65 325302.61 239756.94 151795.95 391552.89 217489.97 154016.12 371506.09 236619.41
More informationFINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP
Hubei Enshi Qing River Upstream Environment Rehabilitation Project (RRP PRC 47048) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the project was carried out in accordance with the Asian
More informationTanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction
Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the Tanahu Hydropower Project was carried out in accordance with Financial Management and Analysis
More informationFINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited
Kathmandu Valley Wastewater Management Project (RRP NEP 43524) FINANCIAL ANALYSIS A. Kathmandu Upatyaka Khanepani Limited 1. Kathmandu Upatyaka Khanepani Limited (KUKL) is a public company registered under
More informationFreight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009
Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009 Introduction The formal benefit cost analysis has been conducted using best
More informationCHALLENGES BEFORE THE INDIAN RAILWAYS
1 INFRASTRUCTURE FINANCING CHALLENGES BEFORE THE INDIAN RAILWAYS 2 Structure Overview: Investment in Infrastructure: Needs & Stages Requirements: India Railways: Process Plans Requirements Finance: Sources
More informationPeople's Republic of China: Ganzhou Longyan Railway Project
Validation Report Reference Number: PCV: PRC 2009-22 Project Number: 33442 Loan Number: 1850 December 2009 People's Republic of China: Ganzhou Longyan Railway Project Independent Evaluation Department
More informationSECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities
Chhattisgarh State Road Sector Project (RRP IND 44427) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR 1. Sector Performance, Problems, and Opportunities 1. The state of Chhattisgarh
More informationPlanning & Economic Analysis I
Planning & Economic Analysis I Session on Planning & Policy Rita Nangia Asian Development Bank Session Description The session covers the following topics: Linkages between network planning and identification
More informationSECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1
Accelerating Infrastructure Delivery through Better Engineering Services Project (RRP INO 49141) Sector Road Map SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 1. Sector Performance, Problems, and Opportunities
More informationFINANCIAL ANALYSIS. A. Methodology and Major Assumptions
Second Green Power Development Project (RRP BHU 44444) FINANCIAL ANALYSIS 1. The project s financial analysis was carried out in accordance with the Financial Management and Analysis of Project Guidelines
More informationExecutive Summary: Review Result of Jakarta MRT Project
Executive Summary The Study on Integrated Transport Master Plan for JABOTABEK (Phase I) Final Report Volume III (Review of Jakarta MRT Project) Executive Summary Executive Summary: Review Result of Jakarta
More informationECONOMIC ANALYSIS. A. Introduction
North Pacific Regional Connectivity Investment Project (RRP PAL 46382) ECONOMIC ANALYSIS A. Introduction 1. Project summary. The Asian Development Bank (ADB) will support Palau to develop a fiber optic
More informationIndia: National Highway Sector II Project
Validation Report October 2017 India: National Highway Sector II Project Reference Number: PVR-517 Project Number: 35335-013 Loan Number: 2154 ABBREVIATIONS ADB Asian Development Bank CSC construction
More informationChapter 9 Financial Considerations. 9.1 Introduction
9.1 Introduction Chapter 9 This chapter presents anticipated costs, revenues, and funding for the NEPA BART Extension Alternative. A summary of VTA s financial plan for the BART Extension Alternative is
More informationECONOMIC AND FINANCIAL ANALYSIS
Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project (RRP MON 48216) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. This document summarizes the results
More informationKEY QUESTIONS FOR CONSULTANTS ECONOMIC ANALYSIS OF PROJECTS. Project Economic Evaluation Division Economics and Development Resource Center
KEY QUESTIONS FOR CONSULTANTS ECONOMIC ANALYSIS OF PROJECTS Project Economic Evaluation Division Economics and Development Resource Center Copies of the Guidelines for the Economic Analysis of Projects
More informationKazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program
Validation Report December 2018 Kazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program Reference Number: PVR-565 Project Numbers: 41121-023, 41121-033, 41121-043, and 41121-053 MFF
More informationNew Development Bank. Policy on Financial Management and Financial Analysis, and Economic Analysis of Projects
New Development Bank Policy on Financial Management and Financial Analysis, and Economic Analysis of Projects Owner: Operations Division Approved Date: January 21, 2016 Policy on Financial Management and
More informationStudy on Private-Initiative Infrastructure Projects. in Developing Countries in FY2009. Project in Socialist Republic of Viet Nam SUMMARY.
Study on Private-Initiative Infrastructure Projects in Developing Countries in FY2009 Study on the Expressway Operation and Management Project in Socialist Republic of Viet Nam SUMMARY March 2010 Infrastructure
More informationSession 3.2 Estimation of Project Costs. Introductory Course on Economic Analysis of Investment Projects 1 July 2009
Session 3.2 Estimation of Project Costs Introductory Course on Economic Analysis of Investment Projects 1 July 2009 Financial versus economic analysis Different definitions of benefits and costs so FIRR
More informationEconomics Training Series Introductory Course. Benefit Estimation
Economics Training Series Introductory Course Benefit Estimation 1 Benefit Identification: The Project Framework and Economic Analysis Define Targets (from Project Framework) Target Goal Purpose Outputs
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT 1
Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet
More informationSECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)
Second Jharkhand State Road Project (RRP IND 49125) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) A. Sector Performance, Problems, and Opportunities 1. State context. The state of Jharkhand was
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT
SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Myanmar is the largest country in the Greater Mekong Subregion (GMS) with a total land area
More informationBangladesh: Chittagong Port Trade Facilitation Project
Completion Report Project Number: 36105 Loan Number: 2147 June 2014 Bangladesh: Chittagong Port Trade Facilitation Project This document is being disclosed to the public in accordance with ADB s Public
More informationEconomic Benefits of Secondary Bond Market Interventions
Economic Benefits of Secondary Bond Market Interventions By M. G. Mortaza, Asian Development Bank Mohammed Mahinur Alam, Bangladesh Bank SANEM Annual Economists Conference 2016 20 February 2016 Background
More informationFINANCIAL ANALYSIS. A. Introduction
Additional Financing of Agriculture and Rural Development Project (RRP MON 39229) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the additional financing of the Agriculture and Rural Development
More informationFINANCIAL ANALYSIS. A. Introduction
FINANCIAL ANALYSIS Henan Sustainable Livestock Farming and Product Safety Demonstration Project (RRP PRC 46081) A. Introduction 1. A financial analysis was conducted following relevant Asian Development
More informationPeriodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4
Periodic Financing Request Report Project Number: 43332 December 2013 People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 CURRENCY EQUIVALENTS
More informationStudy of High Speed Rail in Alberta
Study of High Speed Rail in Alberta Presentation to Standing Committee on Alberta s Economic Future Marc-Andre Roy February 4, 2014 Via Videoconference Many options, varying capital costs: $3-$8 billion
More informationTechnical Assistance Report
Technical Assistance Report Project Number: 51360-002 Transaction Technical Assistance Facility (F-TRTA) April 2018 Turkmenistan: Preparing the Central Asia Regional Economic Cooperation Corridors 2, 3
More informationQUARTERLY ECONOMIC UPDATE BANGLADESH
QUARTERLY ECONOMIC UPDATE BANGLADESH December 2005 Asian Development Bank Bangladesh Resident Mission CONTENTS MACROECONOMIC DEVELOPMENTS 1 Highlights 1 Agriculture 1 Industry 2 Services 3 Economic Growth
More informationECONOMIC ANALYSIS. A. Economic Analysis
Climate Resilience Sector Project (RRP TON 46351) ECONOMIC ANALYSIS 1. Tonga is one of the most isolated countries in the Pacific Region. Its population of 103,036 inhabits 48 of its 176 islands. 1 Approximately
More informationPUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT
PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT Pruethipong Singhatiraj 1, Chatchai Chuangching 1 and Boonkua Janbanjong 1 1 Department of Highways,
More informationFINANCIAL ANALYSIS. A. Introduction
A. Introduction Air Quality Improvement in the Greater Beijing Tianjin Hebei Region China National Investment and Guaranty Corporation s Green Financing Platform Project (RRP PRC 50096) FINANCIAL ANALYSIS
More informationResult of Power System Analysis
ATTACHMENT 5 Result of Power System Analysis List of Attachments 1. Power Flow and Voltage Analysis Fault: One Circuit Tripped Point (N-1 Criteria) Case Bheramara [MW] Generation [MW] Fault Point Voltage
More informationPeriodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)
Periodic Financing Request Report Project Number: 36330-043 MFF Number: 0060 November 2017 India: Railway Sector Investment Program (Tranche 3) Distribution of this document is restricted until it has
More informationSession 1.2 Discounting and Project Alternatives. Introductory Course on Economic Analysis of Investment Projects
Session 1.2 Discounting and Project Alternatives Introductory Course on Economic Analysis of Investment Projects Project statements Comparison of benefits and costs Typically investment costs (equipment,
More informationRailway Budget Budget overview. Budget estimates (Details in Appendix I) Key highlights and proposals. Finances
Railway Budget 2013 Key highlights and proposals Surplus expected to increase with operating ratio projected to fall to 88.8% in 2012-13 and 87.8% by 2013-14. Introduction of a fuel adjustment component
More informationKosovo Railways JSC Hekurudhat e Kosovës Sh.A. Kosovske Železnice D.D. Pristina, Kosovo. Financial statements for the year ended 31 December 2005
Hekurudhat e Kosovës Sh.A. Kosovske Železnice D.D. Pristina, Kosovo Financial statements for the year ended 31 December Table of Contents Balance Sheet...2 Income Statement...3 Statement of Changes in
More informationBangladesh: Road Network Improvement and Maintenance Project II
Validation Report Reference Number: PVR-435 Project Number: 34415 Loan Number: 2021 November 2015 Bangladesh: Road Network Improvement and Maintenance Project II Independent Evaluation Department ABBREVIATIONS
More informationTeam Leader: Srinivasan Palle Venkata, Evaluation Specialist ( Contact:
Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Paper Project
More informationI-75 at Overpass Road Interchange
Benefit-Cost Analysis Supplementary Documentation TIGER Grant Program I-75 at Overpass Road Interchange Pasco County, FL October 16, 2017 0 Benefit-Cost Analysis Supplementary Documentation 1. Introduction
More informationConsolidated income statement For the year ended 31 March
Consolidated income statement For the year ended 31 March Continuing Operations Revenue 3,5 5,653.3 5,218.1 Operating costs (5,369.7) (4,971.8) Operating profit 5,6 283.6 246.3 Investment income 8 1.2
More informationNotes to the Consolidated Accounts For the year ended 31 December 2017
National Express Group PLC Annual Report Financial Statements 119 Notes to the Consolidated Accounts 1 Corporate information The Consolidated Financial Statements of National Express Group PLC and its
More informationEconomic Analysis Concepts
Economic Analysis Concepts Questions & Decisions (1) Is the project justified?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive alternatives? If funds
More informationCHAPTER 9 FINANCIAL CONSIDERATIONS
CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the Berryessa Extension Project (BEP) Alternative and the Silicon Valley Rapid Transit
More informationHRTPO Strategic Campaign and Vision Plan for Passenger Rail
Presentation To HRTPO Steering Committee Agenda Item #1 HRTPO Strategic Campaign and Vision Plan for Passenger Rail Presentation By March 17, 2010 Transportation Economics & Management Systems, Inc. Study
More informationKazakhstan: on the wave of structural reforms. Aset Irgaliyev, PhD First Deputy Chairman Economic Research Institute
Kazakhstan: on the wave of structural reforms Aset Irgaliyev, PhD First Deputy Chairman Economic Research Institute September 2015 New economic reality: transformation of global economy Over the last 12
More information32 nd Street Corridor Improvements
Benefit-Cost Analysis Supplementary Documentation TIGER Discretionary Grant Program 32 nd Corridor Improvements USDOT TIGER BCA Results City of Joplin, MO April 29, 2016 32nd Corridor Improvements Contents...
More informationPre-seen analysis. T Railways. Note: The enclosed document in no way indicates what is likely to be examined in the un-seen information on exam day.
Pre-seen analysis T Railways Note: The enclosed document in no way indicates what is likely to be examined in the un-seen information on exam day. Contents Pre-seen analysis of T Railways E3 Tips and Guidance
More informationFinancial Statements
Financial Statements Management s Responsibility Statement Year ended December 31, 2003 Management of the Corporation is responsible for the preparation and integrity of the financial statements contained
More informationKarnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS
Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product
More informationCountry Operations Business Plan. August Bangladesh
Country Operations Business Plan August 2007 Bangladesh 2008 2010 CURRENCY EQUIVALENTS (as of 5 August 2007) Currency Unit taka (Tk) Tk1.00 = $0.015 $1.00 = Tk68.5 ABBREVIATIONS ADB Asian Development Bank
More informationImpacts of Amtrak Service Expansion in Kansas
Impacts of Amtrak Service Expansion in Kansas Prepared for: Kansas Department of Transportation Topeka, KS Prepared by: Economic Development Research Group, Inc. 2 Oliver Street, 9 th Floor Boston, MA
More informationPeople s Republic of China: Yunnan Integrated Road Network Development Project
Validation Report December 2017 People s Republic of China: Yunnan Integrated Road Network Development Project Reference Number: PVR-541 Project Number: 40626-013 Loan Number: 2709 ABBREVIATIONS ADB Asian
More informationFINANCIAL APPRAISAL OF PROJECTS
FINANCIAL APPRAISAL OF PROJECTS (Special Emphasis to Railways) S. N. BANERJEA Joint Economic Adviser Railway Board New Delhi BASIC THEORY OF PROJECT APPRAISAL PROJECT IDENTIFICATION PROJECT APPRAISAL PROJECT
More informationSECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT
A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide
More informationFINANCIAL ANALYSIS Western Freeway Sea Link. Aditya Vikram ( )
FINANCIAL ANALYSIS Western Freeway Sea Link Aditya Vikram (03004003) 03004003 WFSL 03004003 Salient Features Total length 14.77 Km Alignment about 200m away from Shore line Starting from interchange at
More informationHighlights of Indian Railway Budget
14-03-2012 Highlights of Indian Railway Budget 2012-13 Minister for Railways, Dinesh Trivedi has presented his maiden Railway Budget for the financial year 2012-2013 in Parliament. The budget emphasized
More informationSummary. 1. Aviation taxation. February a briefing by
How the undertaxed, polluting aviation sector can help fix the EU budget Taxing climate-intensive transport would encourage smarter transport behaviour February 2018 Summary Transport is Europe s biggest
More informationFeasibility: Creating Railroads on Paper
Feasibility: Creating Railroads on Paper Vanness was called upon to determine the overall financial feasibility of a rail line and operations to support moving various tonnage levels of coal traffic (50,
More informationFinancing Strategies: Improving Public Expenditure Efficiency
Financing Strategies: Improving Public Expenditure Efficiency National Workshop on Infrastructure Financing Strategies for Sustainable Development Organized by The United Nations ESCAP and National Planning
More informationASIAN DEVELOPMENT BANK
. ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)
More informationDocument of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING (CREDIT)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL
More informationCountry Operations Business Plan. Armenia October 2015
Country Operations Business Plan October 2015 Armenia 2016 2018 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 31
More informationOlivier Le Ber Lead Transport Specialist World Bank
World Bank Transport Projects in TRACECA Countries Olivier Le Ber Lead Transport Specialist World Bank 2 WB has 16 transport projects total US$ 4.8 billion in TRACECA countries (3 projects under preparation)
More information