1 Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel ; Fax ; evaluation@adb.org; Evaluation Approach Paper Project Performance Evaluation Report for the Greater Mekong Subregion: Northern Economic Corridor Project (Loan 1989-LAO) February 2014 Team Leader: Srinivasan Palle Venkata, Evaluation Specialist ( pvsrinivasan@adb.org) Contact: evaluation@adb.org A. Introduction 1. This evaluation approach paper (EAP) presents the background, issues to be addressed and the proposed approach and schedule for the evaluation of the Greater Mekong Subregion (GMS) Northern Economic Corridor Project (Loan 1989). The resulting project performance evaluation report (PPER) will be used as input to the ongoing Thematic Evaluation Study (TES) on Regional Cooperation and Integration (RCI). The PPER has been scheduled more than 3 years after the completion of the project completion report (PCR) in December This provides sufficient time for the outputs and outcomes to be re assessed and the impacts to become apparent. B. Background 1. Country/Region and Strategic Context 2. The Lao People s Democratic Republic is landlocked by five countries: Myanmar, People s Republic of China, Viet Nam, Cambodia and Thailand. In the absence of direct access to the sea and the lack of a railway system, depends primarily on road transport and, to less extent, on river (via the Mekong River and its tributaries) and air transport. In 2012, the Lao PDR s total road network of about 43,604 kilometers (km) carried approximately 92% of the total passenger traffic. 2 The Lao PDR however, lies strategically at the heart of the six-nation GMS and plays an increasingly pivotal role as a transnational road link, facilitating rising cross-border trade, tourism, and investment The government recognized that strengthening the country s role as land link at the center of the GMS could help narrow the gap between Lao PDR and other regional economies. At the time of project formulation, regional trade had gained importance in Lao PDR, in view of its increasing overall share of total exports and imports with neighboring countries such as Thailand. ADB had supported strengthening the road network in Lao PDR to enhance its 1 ADB Project Completion Report: Greater Mekong Subregion-Northern Economic Corridor Project (Lao People s Democratic Republic (Loan 1989). Manila. 2 Passenger traffic by land accounts for 2,618.9 million-persons per kilometer against the total passenger traffic of 2,849.6 million persons per kilometer. Lao Statistics Bureau Website. Data accessed online on October 2013 at: 3 ADB Development Effectiveness Brief: Lao People s Democratic Republic - At the Crossroads of Change.

2 2 linkages with its neighbors, e.g., the East-West Corridor Project, linking central Lao PDR with northern Thailand and central Viet Nam The GMS: Northern Economic Corridor Project (the project) was identified as a highpriority regional road at the 1994 Hanoi Meeting of the Transport Ministers of the GMS Program. It included improving the existing road in the Lao PDR linking two of its remote provinces with Yunnan Province in the People s Republic of China (PRC) and Chiang Rai in Thailand, thus creating an international north south corridor in the GMS. ADB had earlier provided regional technical assistance to examine the viability of a project linking Chiang Rai in Thailand to Kunming, Yunnan Province via the Lao PDR Description of the Project 5. The project was envisaged to create an international north-south corridor linking the People's Republic of China (PRC) and Thailand (see project map below). It comprised three main components project road, area development and capacity building. The road component consisted of reconstruction and upgrading to international expressway standards, the 228 km of roads from Houayxay in Bokeo province to Boten in Louang Namtha province, including bridges, a new bypass road, upgrade of ferry facilities, and consulting services for design and supervision. The road works were divided into three sections, the northern section of approximately 69 km to be funded by PRC, the middle section of 74 km to be funded by ADB, and the southern section of approximately 85 km funded by Thailand. 6. The area development plan included a resettlement plan and a social action plan involving, among other things, training of health care workers, awareness raising workshops on hygiene and sanitation, preventing HIV/AIDS, and construction of community rural access roads. The capacity building component was intended to enable, at the provincial and sector levels, independent third-party monitoring of the project s environmental aspects including sensitive issues such as protected areas and wildlife trafficking. 7. The project s main objective was to strengthen regional infrastructure linkages between GMS members through more efficient infrastructure networks. The expected impact of the project was to accelerate regional development at the subregional level and to reduce poverty at the national level. A direct link between the PRC and Thailand via the Lao PDR was intended to reduce transport costs, increase efficiency in the movement of vehicles, goods, and passengers, increase volume of interregional trade via this route, and increase the amount of investments in the project influence area. 4 ADB Report and Recommendation of the President to the Board of Directors on a Proposed Loan to Lao PDR for the Greater Mekong Subregion: Northern Economic Corridor Project. Manila. 5 ADB Regional Technical Assistance for Chiang Rai-Kunming Road Improvement Project via Lao PDR. Manila.

3 3 Source: ADB Project Completion Report of the Greater Mekong Subregion Northern Economic Corridor Project (Loan 1989 to the Lao People s Democratic Republic. Manila. 8. Within the Lao PDR, the project linked two of Lao s remote and poorest provinces, Louang Namtha and Bokeo, to Chiang Rai in Thailand and Yunnan province in the PRC. The road link is expected to help accelerate development process in these provinces by providing better access to markets, agricultural support services and social services (e.g., health and educational facilities), increasing income and employment opportunities and reducing poverty. 9. The project was classified as environmental category A and as a poverty intervention project as the project road passes through national biodiversity conservation area and areas with significant ethnic minority populations. According to the project documents adequate loan covenants, system of performance bonds and third-party monitoring were said to have been built into the project design and cost estimates to cover risk related to environmental and social safeguard policies during implementation period.

4 4 3. Major Findings and Recommendations of Previous Evaluations The 2010 PCR gave the project a rating score just above the minimum required to be rated as successful. It rated the project highly relevant as it was consistent with the respective strategies of the government and ADB. The PCR also rated the project to be effective in achieving outcomes as travel time and vehicle operating costs were reduced and traffic grew at a rate higher than forecasted. However, it rated the project less than efficient in achieving outcome and outputs due to implementation delays and cost overruns. The project was financially closed 2 years later than planned at appraisal and total project cost increased by $33.3 million from the appraisal estimate. This was attributed partly due to the fact that ADB had no leverage over consultant supervision and contractors in the bilaterally funded sections. Although under protocol 2 of the GMS Cross Border Trade Agreement, Lao PDR could collect tolls on cross border traffic, it has been reluctant to do so for diplomatic reasons. Lack of toll revenues from PRC and Thailand meant that the project was less than likely to be sustainable as there were no alternative revenue collection mechanisms for the required maintenance of the project roads. 11. The PCR Validation undertaken in 2012, agreed with most of the PCR s assessments, but gave a lower rating to project relevance. It rated the project relevant as opposed to the highly relevant given by the PCR due to poor initial design of implementation procedures. The weakness in project s design resulted from lack of ADB s leverage over supervision of consultants and contractors of the bilaterally funded sections of the road affecting construction quality. Based on the findings noted in the PCR, the validation rated the project s impact as significant. Between the years 2004 and 2008, per capita incomes in Bokeo and Louang Namtha provinces increased by 11.5% and 14.1% respectively compared to 7.6% increase in GDP. Anecdotal evidence also suggested increase in commodity trading and individual purchasing power since the completion of the project. 12. The PCR identified the following lessons. Undue delays can occur in triggering ADB loan effectiveness if the borrower does not ensure that commitments under ADB s loan covenants are included in the bilateral loan agreements (i.e., with the PRC and Thailand, respectively). Bilateral agencies commitment to adhere to the specified ADB conditions can be complied with if it is effectively communicated to their contractors. When additional financing through bilateral loans is involved, a common understanding on implementation arrangements is needed for ADB to have influence over consultant supervision and contractors in the bilaterally funded sections. For sustainability of regional projects, it is important to ensure that any implementation arrangements agreed to, such as international transit and cross-border agreements, are actually implemented. 13. The validation report identified a few other lessons. All parties involved should agree on uniform standards (e.g. vehicular movements across international boundaries) in the early stages of project preparation to avoid enforcement issues on permissible axle load limits. Moreover, the project design and validation could have been further strengthened by a wellformulated monitoring component. Data collection for vehicle traffic should have included origin destination survey results to back up traffic forecasts on subregional flows and axle load surveys for overloaded vehicles. 6 Sources: PCR (2010) and Validation (2012).

5 5 14. The PCR and its validation made the following recommendations. More frequent monitoring of traffic, apprehension of overloaded vehicles and budgetary allocation to project road maintenance is needed to avoid faster road deterioration. Given ADB s strong relationship with GMS countries, ADB could assist the GMS as a whole to agree on a uniform standard for vehicle weights, axle loads, and dimensions in the GMS Cross Border Transport Agreement. ADB should also try to get an agreement between member countries on implementation of tolls for cross-border traffic which is permitted under protocol 2 of the GMS Cross Border Transport Agreement. C. Issues to be Addressed by the Independent Evaluation Mission 15. The Independent Evaluation Mission (IEM) will review the PCR s findings and expand on the PCR validation report by assessing project performance using the criteria relevance, effectiveness and efficiency in achieving outputs and outcomes, sustainability of outcomes achieved to date and impact. An indicative evaluation framework is presented in Appendix 1. In addition, the evaluation will identify issues related to social and environmental impacts and address specific concerns, omissions and limitations identified in the PCR. Specifically, it will focus on the following major issues: (i) (ii) (iii) (iv) Vehicle traffic flows. The extent of growth in volume of cross border passenger and cargo traffic, the type of vehicles (axle loads) and their origins and destinations, and the extent of traffic volume on community roads. Socio economic impacts. The extent of impact on incomes, access to markets, employment opportunities and other public services in the two provinces Louang Namtha and Bokeo. Development of economic corridor and constraints. The extent of domestic and foreign investments registered in the corridor provinces and the existing incentives and barriers to conversion of the transport corridor to an economic corridor. Operations and maintenance of road infrastructure. The progress in cross border transport agreement with border countries for collection of tolls and the use of vehicles with appropriate axle loads. D. PPER Approach and Schedule 16. In preparation for the IEM, the assigned team leader (S. Palle Venkata) has reviewed the pertinent project files and has familiarized himself with the main issues associated with the formulation and implementation of the project. It is envisaged that the consulting services of an international transport/evaluation consultant will be engaged for about 30 working days while the 2 in-country national consultants will be needed for a total of 40 working days. The international transport/evaluation consultant should have experience in evaluation of transport operations, including economic corridor development and related institutional issues. Familiarity with the economies in the GMS is desired for both international and national consultants. 17. The following proposed schedule is subject to the Government of Lao PDR s clearance of the mission as well as the engagement of suitable consultants:

6 6 Milestone Tentative Date Approval of evaluation approach paper III November 2013 Independent Evaluation Mission III February 2014 IV February 2014 Draft PPER for Internal Review IV March 2014 Draft PPER Interdepartmental Review II April 2014 Draft to Editor III April 2014 Submission to Director, IED2 III May 2014 Submission to Director General IV May Knowledge Dissemination Plan. The PPER will be available to the public after the Director General, IED, approves it. The report will be uploaded on ADB s external and internal websites. 19. Toshiyuki Yokota (Senior Evaluation Specialist) and Renato Lumain (Senior Evaluation Officer) will be the peer reviewers for this evaluation. Appendix: Evaluation Framework

7 7 Evaluation Criteria Relevance Evaluation Questions Was the project relevant to Lao PDR s national priorities? Was the project aligned with ADB s policies and strategies? Evaluation Framework Indicators/Information Required Lao PDR socio economic background Government development policies ADB s country operational strategy and sector strategy Source of Information RRP, PCR, PVR and BTORs Minutes of Board meetings, Staff review committee meetings, Management review meetings Methods/Analysis to be used Desk review Key informant interviews Analysis of program design indicators Was the project design appropriate in addressing the envisaged impact, outcome, and outputs? Did the project inputs, outputs and outcomes follow the logical results chain to achieve the project s objective? Project design and monitoring framework Relevant government documents government officials and other key stakeholders Were the relevant lessons learned from similar interventions earlier included in the design of the project? How was ownership and participation of beneficiaries included in the project design? Effectiveness To what extent were project outputs and outcomes achieved as indicated in the DMF? What are the factors that contributed to the achievement or non-achievement of expected outputs and outcomes? Was there adequate ownership and participation of beneficiaries in various project activities? Realized project outputs and outcomes in relation to the targets set Project monitoring framework Implementation process Issues and challenges related to achieving outputs and outcomes RRP, PCR, PVR and BTORs government officials and other key stakeholders Monitoring reports of outputs and outcomes Desk review Key informant interviews Analysis of program design indicators To what extent has travel time and

8 8 Evaluation Criteria Evaluation Questions transportation cost of goods and passenger traffic reduced? Indicators/Information Required Source of Information Methods/Analysis to be used Efficiency How well were the project s resources used in achieving the expected outcomes? Were there implementation delays? If so what were the reasons? Loan disbursement and fund utilization data Implementation and procurement arrangements Monitoring data on inputs and outputs Economic rate of return (EIRR) Project documents government officials and ADB procurement staff Traffic count, origin destination surveys Desk review Key informant interviews Cost-Benefit Analysis Sustainability What is the likelihood that project benefits would be sustained beyond the life of the project? Are there provisions for generating adequate revenue for operations and maintenance (e.g. agreement on user charges for transit traffic)? Assessment of revenue generating capacity and activities Assessment of progress in agreements between countries in the region Financial rate of return (FIRR) government officials Key informant interviews Has the government been able to effectively implement axle load limits on the road? Is there adequate progress in cross border trade agreements and trade facilitation measures at border crossings to maintain the momentum of cross border trade and investment? Impact What are the socio economic impacts of the project including on gender? To what extent employment opportunities increased and Information on beneficiaries (e.g. extent of access to services, livelihoods and income earning opportunities) Government reports and statistics government Analysis of data from focus group discussions/ small household surveys Direct observation

9 9 Evaluation Criteria Evaluation Questions poverty reduced? To what extent have envisaged project impacts such as access to markets, education and health services been achieved? Indicators/Information Required Source of Information officials, stakeholders Focus group discussions/ small household surveys Methods/Analysis to be used through field visits To what extent has there been an increase in national and transit trade passing through the corridor? To what extent has there been an increase in investment including FDI in the road influence area? Did the project have any unintended or adverse impact on the society and economy?

Evaluation Approach Project Performance Evaluation Report for ADB Loans 1913/1914 Sri Lanka: Plantation Development Project July 2015 I.

Evaluation Approach Project Performance Evaluation Report for ADB Loans 1913/1914 Sri Lanka: Plantation Development Project July 2015 I. Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Project Performance

More information

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance

More information

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017 Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Paper Project

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

Mongolia: Regional Road Development Project

Mongolia: Regional Road Development Project Validation Report Reference Number: PVR-481 Project Numbers: 35377-013 and 35377-023 Loan/Grant Numbers: 2087, 2621, and 0199 December 2016 Mongolia: Regional Road Development Project Independent Evaluation

More information

Cambodia: Greater Mekong Subregion: Cambodia Northwest Provincial Road Improvement Project

Cambodia: Greater Mekong Subregion: Cambodia Northwest Provincial Road Improvement Project Validation Report December 2017 Cambodia: Greater Mekong Subregion: Cambodia Northwest Provincial Road Improvement Project Reference Number: PVR-520 Project Number: 42358-013 Loan Number: 2539 CURRENCY

More information

Assessing Impact in the Greater Mekong Subregion. An Analysis of Regional Cooperation Projects

Assessing Impact in the Greater Mekong Subregion. An Analysis of Regional Cooperation Projects Assessing Impact in the Greater Mekong Subregion An Analysis of Regional Cooperation Projects Assessing Impact in the Greater Mekong Subregion An Analysis of Regional Cooperation Projects 2014 Asian Development

More information

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam Technical Assistance Report Project Number: 49400-001 Policy and Advisory Technical Assistance (PATA) January 2017 Policy Coordination and Planning of Border Economic Zones of the People's Republic of

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project Validation Report Reference Number: PVR-360 Project Number: 40198 Loan Number: 2374 December 2014* Viet Nam: Ho Chi Minh CityLong ThanhDauGiay Expressway Technical Assistance Project Independent Evaluation

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

SECTOR ASSESSMENT (SUMMARY): TRANSPORT SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Myanmar is the largest country in the Greater Mekong Subregion (GMS) with a total land area

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent

More information

People's Republic of China: Ganzhou Longyan Railway Project

People's Republic of China: Ganzhou Longyan Railway Project Validation Report Reference Number: PCV: PRC 2009-22 Project Number: 33442 Loan Number: 1850 December 2009 People's Republic of China: Ganzhou Longyan Railway Project Independent Evaluation Department

More information

Indonesia: Metropolitan Medan Urban Development Project

Indonesia: Metropolitan Medan Urban Development Project Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

Pakistan: National Highway Development Sector Investment Program Tranche 2

Pakistan: National Highway Development Sector Investment Program Tranche 2 Validation Report December 2017 Pakistan: National Highway Development Sector Investment Program Tranche 2 Reference Number: PVR-521 MFF Number: 0002 Project Number: 37559-023, 37559-033, and 37559-043

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:PRC 36432 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF CHINA FOR PREPARING THE DALI-LIJIANG RAILWAY PROJECT June 2003 CURRENCY EQUIVALENTS (as of 14 May 2003) Currency Unit

More information

RCI as Driver of Inclusive Growth

RCI as Driver of Inclusive Growth RCI as Driver of Inclusive Growth 19 July 2013 Alfredo Perdiguero Principal Economist Thailand Resident Mission Southeast Asia Department Asian Development Bank Disclaimer: In preparing any country program

More information

Evaluation Study. Midterm Review Process. Operations Evaluation Department

Evaluation Study. Midterm Review Process. Operations Evaluation Department Evaluation Study Reference Number: SES:REG 2008-78 Special Evaluation Study Update December 2008 Midterm Review Process Operations Evaluation Department ABBREVIATIONS ADB Asian Development Bank BTOR back-to-office

More information

Afghanistan: Regional Airports Rehabilitation Project (Phase 1)

Afghanistan: Regional Airports Rehabilitation Project (Phase 1) Validation Report Reference Number: PVR 225 Project Number: 37136 Loan Number: 2105 December 2012 Afghanistan: Regional Airports Rehabilitation Project (Phase 1) Independent Evaluation Department ABBREVIATIONS

More information

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project Appendix 3 11 Technical Assistance Report Project Number: 51329-002 Transaction Technical Assistance (TRTA) November 2017 Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade

More information

People s Republic of China: Yunnan Integrated Road Network Development Project

People s Republic of China: Yunnan Integrated Road Network Development Project Validation Report December 2017 People s Republic of China: Yunnan Integrated Road Network Development Project Reference Number: PVR-541 Project Number: 40626-013 Loan Number: 2709 ABBREVIATIONS ADB Asian

More information

Technical Assistance to the People s Republic of China for Preparing the Railway Development Project

Technical Assistance to the People s Republic of China for Preparing the Railway Development Project Technical Assistance TAR: PRC 39153 Technical Assistance to the People s Republic of China for Preparing the Railway Development Project September 2005 CURRENCY EQUIVALENTS (as of 14 August 2005) Currency

More information

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 Accelerating Infrastructure Delivery through Better Engineering Services Project (RRP INO 49141) Sector Road Map SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 1. Sector Performance, Problems, and Opportunities

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide

More information

India: National Highway Sector II Project

India: National Highway Sector II Project Validation Report October 2017 India: National Highway Sector II Project Reference Number: PVR-517 Project Number: 35335-013 Loan Number: 2154 ABBREVIATIONS ADB Asian Development Bank CSC construction

More information

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms Technical Assistance Report Project Number: 47137-004 Capacity Development Technical Assistance (CDTA) September 2016 Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance

More information

Environmental Assessment and Review Framework. Mongolia: Western Regional Road Corridor Investment Program

Environmental Assessment and Review Framework. Mongolia: Western Regional Road Corridor Investment Program Western Regional Road Corridor Investment Program (RRP MON 41193) Environmental Assessment and Review Framework September 2011 Mongolia: Western Regional Road Corridor Investment Program Prepared by the

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

Bangladesh: Road Maintenance and Improvement Project

Bangladesh: Road Maintenance and Improvement Project Performance Evaluation Report Bangladesh: Road Maintenance and Improvement Project Independent Evaluation Performance Evaluation Report December 2014 Bangladesh: Road Maintenance and Improvement Project

More information

Nepal: Road Connectivity Sector I Project

Nepal: Road Connectivity Sector I Project Validation Report October 2017 Nepal: Road Connectivity Sector I Project Reference Number: PVR-523 Project Number: 37266-032 Grant Number: 0051 ABBREVIATIONS ADB Asian Development Bank DOR Department of

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49267-001 October 2016 Proposed Equity Investment VI (Vietnam Investments) Fund III, L.P. (Regional) This is an abbreviated

More information

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million) Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising

More information

Viet Nam: Microfinance Development Program (Subprograms 1 and 2)

Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Validation Report Reference Number: PVR-478 Project Numbers: 42235-013 and 42235-023 Loan Numbers: 2877 and 3213 December 2016 Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Independent

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Flood Damage and Post-Flood Rehabilitation. Economic Performance in Q1/2012 and Outlook for 2012

Flood Damage and Post-Flood Rehabilitation. Economic Performance in Q1/2012 and Outlook for 2012 Presentation Outline 1 Flood Damage and Post-Flood Rehabilitation 2 Investment Plans of Strategic Committee for Reconstruction and Future Development 3 Economic Performance in Q1/2012 and Outlook for 2012

More information

ASIAN ECONOMIC INTEGRATION REPORT 2017

ASIAN ECONOMIC INTEGRATION REPORT 2017 ASIAN ECONOMIC INTEGRATION REPORT 2017 HIGHLIGHTS ASIAN ECONOMIC INTEGRATION REPORT 2017 HIGHLIGHTS Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) 2017 Asian Development Bank 6 ADB Avenue,

More information

Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project

Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project PD 00001-PAK June 6, 2016 PROJECT DOCUMENT Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project This document has a restricted distribution and may be used by recipients

More information

Viet Nam: Greater Mekong Subregion Kunming-Hai Phong Transport Corridor: Yen Vien-Lao Cai Railway Upgrading Project

Viet Nam: Greater Mekong Subregion Kunming-Hai Phong Transport Corridor: Yen Vien-Lao Cai Railway Upgrading Project Completion Report Project Number: 39175-013 Loan Numbers: 2302 and 8227 June 2017 Viet Nam: Greater Mekong Subregion Kunming-Hai Phong Transport Corridor: Yen Vien-Lao Cai Railway Upgrading Project This

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

India: Karnataka Urban Development and Coastal Environmental Management Project

India: Karnataka Urban Development and Coastal Environmental Management Project Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation

More information

Viet Nam: Northern Power Transmission Expansion Sector Project

Viet Nam: Northern Power Transmission Expansion Sector Project Validation Report Reference Number: PVR-485 Project Number: 38196-013 Loan Number: 2225 December 2016 Viet Nam: Northern Power Transmission Expansion Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Kazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program

Kazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program Validation Report December 2018 Kazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program Reference Number: PVR-565 Project Numbers: 41121-023, 41121-033, 41121-043, and 41121-053 MFF

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:LAO 29284 ASIAN DEVELOPMENT BANK TECHNICAL ASSISTANCE TO ThE LAO PEOPLE'S DEMOCRATIC REPUBLIC FOR ThE CORPORATE AND FINANCIAL DEVELOPMENT OF ELECTRICIT DU LAO LI LI May 1996 - -I CURRENCY EQUIVALENTS

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

Evaluation Approach Technical Assistance Performance Evaluation Report on ADB Support for Social Protection: Responding to Shocks and Risks July 2017

Evaluation Approach Technical Assistance Performance Evaluation Report on ADB Support for Social Protection: Responding to Shocks and Risks July 2017 Asian Development Bank. 6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Technical Assistance

More information

Project Administration Memorandum. People s Republic of China: Dali-Lijiang Railway Project. Project Number: Loan Number: 2116 October 2005

Project Administration Memorandum. People s Republic of China: Dali-Lijiang Railway Project. Project Number: Loan Number: 2116 October 2005 Project Administration Memorandum Project Number: 36432 Loan Number: 2116 October 2005 People s Republic of China: Dali-Lijiang Railway Project The project administration memorandum is an active document,

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 40626-01 November 2010 Proposed Loan People s Republic of China: Yunnan Integrated Road Network Development Project

More information

Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project

Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project Validation Report December 2017 Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project Reference Number: PVR-545 Program Number: 41013-013 Loan/Grant Number: 2511, 0147 ADB CDIA DMF EIRR

More information

Validation Report. Kazakhstan and Kyrgyz Republic: Almaty Bishkek Regional Road Rehabilitation Project. Operations Evaluation Department

Validation Report. Kazakhstan and Kyrgyz Republic: Almaty Bishkek Regional Road Rehabilitation Project. Operations Evaluation Department Validation Report Reference Number: PCV:KAZ/KGZ 2008-35 Project Number: 29568 and 32463 Loan Numbers: 1774 and 1775(SF) November 2008 Kazakhstan and Kyrgyz Republic: Almaty Bishkek Regional Road Rehabilitation

More information

Georgia: Emergency Assistance for Post-Conflict Recovery

Georgia: Emergency Assistance for Post-Conflict Recovery Validation Report Reference Number: PCV: GEO 2011-49 Project Number: 32023 Loan Number: 2469-GEO(SF) December 2011 Georgia: Emergency Assistance for Post-Conflict Recovery Independent Evaluation Department

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

Cambodia: Second Power Transmission and Distribution Project

Cambodia: Second Power Transmission and Distribution Project Validation Report Reference Number: PVR-464 Project Number: 37041-013 Loan Number: 2261 December 2016 Cambodia: Second Power Transmission and Distribution Project Independent Evaluation Department ABBREVIATIONS

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section F1/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ENVIRONMENTAL

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) GAP or Gender Action Plan means the gender action plan for the Project, including any update thereto, prepared and agreed between the Borrower and ADB and further set out in the PAM; (g) Goods means

More information

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project f Validation Report Reference Number: PVR-370 Project Number: 29041 Loan Number: 1947 December 2014 Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project Independent Evaluation Department

More information

ECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive

ECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive Western Regional Road Corridor Investment Program (RRP MON 41193) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. Project Costs. The project s capital costs include the costs of the road works, design,

More information

11 June 2015 Kunming, Yunnan Province People s Republic of China REVISITING THE GMS ECONOMIC CORRIDOR STRATEGIES AND ACTION PLANS

11 June 2015 Kunming, Yunnan Province People s Republic of China REVISITING THE GMS ECONOMIC CORRIDOR STRATEGIES AND ACTION PLANS 11 June 2015 Kunming, Yunnan Province People s Republic of China REVISITING THE GMS ECONOMIC CORRIDOR STRATEGIES AND ACTION PLANS REVISITING THE GMS ECONOMIC CORRIDOR STRATEGIES AND ACTION PLANS Discussion

More information

Nepal: Preparing the North South Fast Track Road Project

Nepal: Preparing the North South Fast Track Road Project Technical Assistance Report Project Number: 40011 September 2006 Nepal: Preparing the North South Fast Track Road Project (Financed by the Japan Special Fund) CURRENCY EQUIVALENTS (as of 15 September 2006)

More information

Viet Nam: Health Care in the Central Highlands Project

Viet Nam: Health Care in the Central Highlands Project Validation Report Reference Number: PVR-344 Project Number: 37115 Loan Number: 2076 (SF) October 2014 Viet Nam: Health Care in the Central Highlands Project Independent Evaluation Department ABBREVIATIONS

More information

ASIAN DEVELOPMENT FUND (ADF) ADF X MIDTERM REVIEW MEETING. Development Effectiveness of Regional Cooperation and Integration Initiatives

ASIAN DEVELOPMENT FUND (ADF) ADF X MIDTERM REVIEW MEETING. Development Effectiveness of Regional Cooperation and Integration Initiatives ASIAN DEVELOPMENT FUND (ADF) ADF X MIDTERM REVIEW MEETING Development Effectiveness of Regional Cooperation and Integration Initiatives October 2010 ABBREVIATIONS ADB Asian Development Bank ADBI Asian

More information

Pakistan: Road Sector Development Program

Pakistan: Road Sector Development Program Validation Report Reference Number: PCV: PAK 2010-69 Project Number: 32058 Loan Number: 1891 December 2010 Pakistan: Road Sector Development Program Independent Evaluation Department ABBREVIATIONS ADB

More information

Improving public investment efficiency for infrastructure development

Improving public investment efficiency for infrastructure development National Workshop on Infrastructure Financing Strategies for Sustainable Development in Viet Nam Hanoi, 3 October 2017 Improving public investment efficiency for infrastructure development Mr Mathieu Verougstraete

More information

Project Administration Memorandum. Project Number: Loan Number: 2181 July PRC: Central Sichuan Roads Development Project

Project Administration Memorandum. Project Number: Loan Number: 2181 July PRC: Central Sichuan Roads Development Project Project Administration Memorandum Project Number: 34174 Loan Number: 2181 July 2006 PRC: Central Sichuan Roads Development Project CURRENCY EQUIVALENTS (as of 31 August 2005) Currency Unit yuan (CNY) CNY1.00

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:NEP 37266 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE KINGDOM OF NEPAL FOR PREPARING THE TRANSPORT CONNECTIVITY SECTOR PROJECT June 2004 CURRENCY EQUIVALENTS

More information

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project FINAL EVALUATION VIE/033 Climate Adapted Local Development and Innovation Project PROJECT SUMMARY DATA Country Long project title Short project title LuxDev Code Vietnam Climate Adapted Local Development

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:PHI 29226 ASIAN DEVELOPMENT BANK Li TECHNICAL ASSISTANCE TO THE REPUBLIC OF ThE PHILIPPINES FOR PREPARATION OF A NATIONAL TRANSPORT STRATEGY November 1995 CURRENCY EQUIVALENTS (as of 15 October 1995)

More information

MINISTRY OF TRANSPORT OF VIETNAM

MINISTRY OF TRANSPORT OF VIETNAM MINISTRY OF TRANSPORT OF VIETNAM Presentation by Mr. Pham Thanh Tung, Director General of International Cooperation Department f the Ministry of Transport of Viet Nam cum chief of office of the National

More information

Systems for Promoting Private Capital Flows for Infrastructure Development in Lao PDR

Systems for Promoting Private Capital Flows for Infrastructure Development in Lao PDR Systems for Promoting Private Capital Flows for Infrastructure Development in Lao PDR The National Economic Research Institute (NERI) Saykham VOLADET Mercure Hotel, Vientiane, Lao PDR 15-16 th September

More information

LAOS: Land of Ample Opportunities Successes

LAOS: Land of Ample Opportunities Successes INVESTMENT POLICY & OPPORTUNITIES IN LAOS: Land of Ample Opportunities Successes Dr. Phonesay Vilaysack Investment Promotion Department Ministry of Planning and Investment Contents Laos in Brief Why Laos?

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 51360-002 Transaction Technical Assistance Facility (F-TRTA) April 2018 Turkmenistan: Preparing the Central Asia Regional Economic Cooperation Corridors 2, 3

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Chittagong-Cox s Bazar Railway Project, Phase 1 (RRP BAN 46452-002) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will construct 102

More information

FINANCIAL ANALYSIS. Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387)

FINANCIAL ANALYSIS. Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387) Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387) FINANCIAL ANALYSIS 1. The financial analysis follows Asian Development Bank (ADB) guidelines. 1 Subprojects

More information

ADB Support for BEZ: TAs and Investments for BEZ in PRC and Viet Nam

ADB Support for BEZ: TAs and Investments for BEZ in PRC and Viet Nam ADB Support for BEZ: TAs and Investments for BEZ in PRC and Viet Nam Ha Noi 28 June 2017 Outline of Presentation Part I ADB RCI Strategy and GMS overview Part II BEZ Experiences: History and Lessons Part

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) Goods means equipment and materials to be financed out of the proceeds of the Loan, including related services such as transportation, insurance, installation, commissioning, training, and initial

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK RRP: PRC 33470 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE BOARD OF DIRECTORS ON A PROPOSED LOAN TO THE PEOPLE S REPUBLIC OF CHINA FOR THE GANSU ROADS DEVELOPMENT PROJECT November

More information

The Role of Special Economic Zones in Improving Effectiveness of GMS Economic Corridors

The Role of Special Economic Zones in Improving Effectiveness of GMS Economic Corridors The Role of Special Economic Zones in Improving Effectiveness of GMS Economic Corridors Mr. Aekapol Chongvilaivan Country Economist Philippines Country Office www.adb.org Disclaimer: The views expressed

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.07A Page 1 of 4 PROJECT COMPLETION REPORT FOR SOVEREIGN OPERATIONS 1 A. Objective and Scope 1. The main objective of a project completion report (PCR) 1 is to

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 43309-015 Loan Number: 2839-CAM September 2016 Proposed Loan for Additional Financing Kingdom of Cambodia: Provincial

More information

Cambodia. Impacts of Global Financial Crisis

Cambodia. Impacts of Global Financial Crisis Cambodia Impacts of Global Financial Crisis Cambodia s economy has significant vulnerabilities to the global economic crisis. Cambodia is a small open economy with a dynamism based on a non-diversified

More information

Philippines: Philippine Energy Efficiency Project

Philippines: Philippine Energy Efficiency Project Validation Report Reference Number: PVR-436 Project Number: 42001-013 Loan/Grant Numbers: 2507 and 0142 December 2015 Philippines: Philippine Energy Efficiency Project Independent Evaluation Department

More information

Solomon Islands: Second Road Improvement (Sector) Project

Solomon Islands: Second Road Improvement (Sector) Project Validation Report Reference Number: PVR-477 Project Number: 43381-012 Grant Numbers: 0175, 0176, 0177, 0207, 0210 December 2016 Solomon Islands: Second Road Improvement (Sector) Project Independent Evaluation

More information

Multitranche Financing Facility Annual Report 2017

Multitranche Financing Facility Annual Report 2017 May 2018 Multitranche Financing Facility Annual Report 2017 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. ABBREVIATIONS ADB Asian Development

More information

India: Bihar State Highways Project

India: Bihar State Highways Project Completion Report Project Number: 41127-013 Loan Number: 2443 Technical Assistance Number: 7130 August 2018 India: Bihar State Highways Project This document is being disclosed to the public in accordance

More information

COUNTRY ECONOMIC INDICATORS (CAMBODIA)

COUNTRY ECONOMIC INDICATORS (CAMBODIA) OrbiMed Asia Partners III, LP Fund (RRP REG 51072) COUNTRY ECONOMIC INDICATORS (CAMBODIA) Item 2012 2013 2014 2015 2016 Est. 1. GDP per capita ($, current) 973 1,042 1,131 1,218 1,331 2. GDP growth (%,

More information

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 Periodic Financing Request Report Project Number: 43332 December 2013 People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 CURRENCY EQUIVALENTS

More information

Philippines: Mindanao Basic Urban Services Sector Project

Philippines: Mindanao Basic Urban Services Sector Project Validation Report Reference Number: PCV: PHI 2011-25 Project Number: 30551 Loan Number: 1843 September 2011 Philippines: Mindanao Basic Urban Services Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Evaluation. Technical Assistance Grants to Support Development of Cross-Border Bond Markets in the ASEAN+3 Countries. Performance. Evaluation.

Evaluation. Technical Assistance Grants to Support Development of Cross-Border Bond Markets in the ASEAN+3 Countries. Performance. Evaluation. Performance Evaluation Report Technical Assistance Grants to Support Development of Cross-Border Bond Markets in the ASEAN+3 Countries Independent Evaluation Performance Evaluation Report October 2015

More information

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda Validation Report Reference Number: PVR-471 Project Number: 47337-001 Loan Number: 3080 December 2016 Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda Independent Evaluation

More information

Regional integration in Asia:

Regional integration in Asia: Regional integration in Asia: Trends and Issues Cyn-Young Park Director Economic Research and Regional Cooperation Department Asian Development Bank ADB-ASIAN THINK TANK DEVELOPMENT FORUM 2017: Financing

More information

6 Report No.: JSDSC1361 1

6 Report No.: JSDSC1361 1 Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE 6 Report No.: JSDSC1361 1,2 Date ISDS Prepared/Updated: 05-Nov-2015 Date ISDS Approved/Disclosed: 06-Nov-2015 Public Disclosure

More information

Solomon Islands: Transport Sector Development Project

Solomon Islands: Transport Sector Development Project Validation Report September 2018 Solomon Islands: Transport Sector Development Project Reference Number: PVR-582 Project Number: 41171-022 Grant Number: 0243 ABBREVIATIONS ADB Asian Development Bank ADF