1 Validation Report Reference Number: PCV: PHI Project Number: Loan Number: 1843 September 2011 Philippines: Mindanao Basic Urban Services Sector Project Independent Evaluation Department

2 ABBREVIATIONS ADB Asian Development Bank DILG Department of Interior and Local Government EA executing agency EIRR economic internal rate of return FIRR financial internal rate of return IED Independent Evaluation Department LBP Land Bank of the Philippines LGU local government unit NDF Nordic Development Fund OCR ordinary capital resources PCR project completion report PSC project steering committee RRP report and recommendation of the president TA technical assistance NOTE In this report $ refers to US dollars. Key Words adb, asian development bank, dilg, lbp, mindanao, urban, sector, water supply, philippines Director General Director Team leader Team members H. Hettige, Officer-in-Charge, Independent Evaluation Department (IED) H. Hettige, Independent Evaluation Division 2, IED K. Mohit, Evaluation Specialist, IED O. Nuestro, Evaluation Officer, IED E. Li-Mancenido, Associate Evaluation Analyst, IED C. Roldan, Associate Evaluation Analyst, IED The guidelines formally adopted by IED on avoiding conflict of interest in its independent evaluations were observed in the preparation of this report. To the knowledge of the management of IED, there were no conflicts of interest of the persons preparing, reviewing, or approving this report. In preparing any evaluation report, or by making any designation of or reference to a particular territory or geographic area in this document, the Independent Evaluation Department does not intend to make any judgments as to the legal or other status of any territory or area.

3 PROJECT COMPLETION REPORT VALIDATION REPORT PROJECT BASIC DATA Project Number: PCR Circulation Date: 26 November 2010 Loan Number: 1843 PCR Validation Date: September 2011 Project Name: Mindanao Basic Urban Services Sector Project Country: Philippines Approved Actual Sector: Water and other municipal infrastructure and services Total Project Costs ($ million): ADB Financing ($ million) ADF: 0.00 Loan ($ million): OCR: Borrower ($ million): Land Bank of the Philippines Beneficiaries ($ million): National Government LGUs Cofinancier: NDF Others ($ million) Total Cofinancing ($ million): Approval Date: 27 Sep 2001 Effectiveness Date: 15 Aug Sep 2002 Signing Date: 15 May 2002 Completion Date: 31 Dec Jun 2009 Project Officers: Validator: Name: A. Weitz M. Senapaty F. Steinberg O. Nuestro, Evaluation Officer, IED2 Closing Date: 30 Jun Nov 2009 Location: From To ADB headquarters ADB headquarters ADB headquarters Team Leader: K. Mohit, Evaluation Specialist, IED2 Quality Reviewers: N. Bestari, Advisor, IEOD Director: H. Hettige, IED2 ADB = Asian Development Bank, ADF = Asian Development Fund, IED2 = Independent Evaluation Department (Division 2), IEOD = Independent Evaluation Department (Office of the Director General), LGU = local government unit, NDF = Nordic Development Fund, OCR = ordinary capital resources, PCR = project completion report. I. PROJECT DESCRIPTION 1 A. Rationale 1. Mindanao experienced high rates of urban growth in recent years with inadequate local investment in basic urban infrastructure and municipal services, remaining among the poorest regions of the Philippines despite abundant natural resources. High urbanization and low institutional capacity, affected local government units (LGUs ) ability to meet the demand for basic urban services. Consequently, there was an urgent need to improve urban service delivery by upgrading and expanding infrastructure, and improving the capability and capacity of LGUs to provide and manage services. Improved basic urban services would help reduce poverty and raise living standards, strengthen links between urban and rural areas, and support the peace process. 1 ADB Report and Recommendation of the President to the Board of Directors: Proposed Loan to the Republic of the Philippines for the Mindanao Basic Urban Services Sector Project. Manila.

4 2 B. Expected Impact 2. The project was expected to improve the quality of life of urban residents in Mindanao, supported by balanced and equitable regional development in the urban sector. It was expected to benefit more than 1 million urban residents by improving access to municipal services and supporting higher environmental standards. C. Objectives or Expected Outcomes 3. The project had three primary objectives: (i) improve access to basic urban services through provision, upgrading, and rehabilitation of basic infrastructure and services; (ii) increase urban poor communities access to basic municipal services; and (iii) improve the institutional capacity and capability of LGUs to provide, manage, and maintain adequate municipal services and basic urban infrastructure. The project was expected to provide better access for (i) water for 250,000 persons; (ii) drainage and flood control for 120,000 persons; (iii) bus terminals and public markets for 550,000 persons; (iv) solid waste management for 280,000 persons; (v) urban roads and bridges for 470,000 persons; and (vi) other public facilities for 350,000 persons. D. Components and/or Outputs 4. The chief components and related outputs were (i) part A: infrastructure investment: water supply, drainage and flood control, bus terminals and public markets, solid waste management, urban roads and bridges, public markets, and other public facilities; (ii) part B: institutional capacity building program: project management and implementation support, subproject preparation and implementation support, LGU capacity building program, and Department of Interior and Local Government (DILG) institutional strengthening program. Under part A, a total of 39 subprojects were approved and implemented, with 36 subprojects completed as of November Part B supported about 68 LGUs through various training modules, depending on the needs and requirements of the LGU. Each LGU was able to avail of technical skills training or attend workshops and relevant training and coaching sessions. E. Provision of Inputs 5. Activities undertaken under part A included (i) identification of subprojects; (ii) preparation of feasibility studies, detailed design, and contract documents; (iii) bid evaluation, contract award, and procurement; (iv) construction of facilities; and (v) overall project implementation and coordination. Part B activities included project management support, subproject preparation and implementation support, capacity building for LGUs, and a DILG institutional strengthening program. F. Implementation Arrangements 6. The Land Bank of the Philippines (LBP) was the executing agency for part A, and the DILG was the executing agency for part B. To undertake its responsibilities, the LBP designated its program management department to administer the project lending facility, while the DILG established the project development office to provide capacity building support to the LGUs. The national project steering committee (PSC) chaired by DILG comprised representatives from the Department of Budget and Management, the Department of Environment and Natural Resources, the Department of Finance, the Department of Public Works and Highways, the Housing and Urban Development Coordinating Council, the LBP, and the National Economic and Development Authority. At the regional level, the project established a technical review and coordinating committee chaired by LBP s executive vice-president for Mindanao. The committee

5 3 comprised members from the DILG and other government agencies. Neither the PSC nor the technical review coordination committee met frequently. The project implementation units under the aegis of the LGUs coordinated with local bids and awards committees on procurement matters. The performance of LGUs varied considerably depending on local leadership and motivation. There was one case of misprocurement (project completion report [PCR], para. 29) and implementation of most subprojects took longer than planned. 2 II. EVALUATION OF PERFORMANCE AND RATING A. Relevance of Design and Formulation 7. The PCR concluded that the project remains relevant given its support to the Medium- Term Philippine Development Plan, The report appropriately points out that the sector loan modality was flexible enough to accommodate the changing demands of the LGUs, including the financing mechanisms. The design of parts A and B was innovative, and their synergy improved LGUs access to urban infrastructure and services and strengthened their capacity to deliver services. However, the project failed to deliver on drainage, flood control, and solid waste management components (footnote 2, para. 40) as the LGUs did not want to borrow for drainage and flood control, reflecting a weakness of project design. Given the substantial accomplishments of parts A and B, built-in design flexibility, and appropriateness of the lending modality (sector lending) in view of project complexity (with LGUs and 39 subprojects), this validation concurs with the PCR that overall the project was relevant. B. Effectiveness in Achieving Project Outcomes 8. Appendix 1 of the PCR provided a complete picture of accomplishments compared with targets at the output and outcome level. Para. 3 describes the outcome performance indicators. Seventy-three percent of the target population was served, with targets exceeded for the bus terminals and public markets and other public facilities component. However, no result was obtained for the drainage and flood control and solid waste management components. Additionally, several of the shortlisted subprojects dropped out and fund utilization was lower than expected at 63.8%, resulting in the project s appraisal target only being partly met (footnote 2, para. 42). Several factors contributed to subprojects dropping out of the project, including lack of adequate staff from the LBP to assist with the preparation of subproject appraisal reports. As stated, expected outcomes in the project design and monitoring framework were only partly met. This validation concurs with the PCR rating of less effective. C. Efficiency of Resource Use in Achieving Outputs and Outcomes 9. The PCR rated the project less efficient. The reevaluation of completed revenuegenerating subprojects showed that of the 14 reevaluated subprojects, only five remained financially and economically viable, while three were marginal, and the rest had negative results. 3 The high cost of capacity building (e.g., part B) made the project less efficient in achieving its outputs and outcomes. Several subprojects in the public markets component registered marginal to negative financial and economic internal rates of return (FIRRs and EIRRs). The reduced financial viability of these subprojects was attributed to the adoption of lower tariffs or fees than those proposed in the feasibility studies. For the water supply component, it was also due to the number of unmet household connections. Furthermore, the 2 ADB Completion Report: Mindanao Basic Urban Services Sector Project in the Philippines. Manila. 3 Reevaluation was not carried out for nonrevenue subprojects such as equipment, gymnasiums and sports centers, and municipal halls. These were designed as social projects in the subproject appraisal reports.

6 4 impact of two local elections (in 2004 and 2007) caused substantial project delays (footnote 2, para. 43). 4 The government s PCR was critical of the project s implementation framework, which contributed to delays in the approval and implementation of subprojects Project costs, disbursement, and borrower contribution. The project cost at completion was $40.3 million equivalent, comprising $15.6 million equivalent in foreign exchange and $24.6 million equivalent in local currency, against the estimated $60 million at appraisal, comprising $27.6 million in foreign exchange costs and $32.4 million in local currency costs. This included partial loan cancellation of $9.27 million equivalent because of slow disbursements and delays in subproject implementation. The government s inability to provide capital grant funds also contributed to the low utilization of the infrastructure investment (part A). The Asian Development Bank (ADB) resolved this by approving a new financing mix in July Disbursements remained slow until implementation consultants were fielded in The PCR stated that appropriate ADB guidelines were adopted in consultant recruitment and procurement procedures, although there was one case of mis-procurement (PCR, para. 29). Consultant performance is reported as satisfactory. 11. Cancellation and delays to subprojects; mis-procurement, minor as it may be; and a poor EIRR all lend credence to a less efficient rating. This validation concurs with the PCR rating of less efficient. Results of the FIRR and EIRR computation are summarized in Table 1. Table 1: Results of Financial and Economic Reevaluation (%) Financial Evaluation (FIRR) As After Appraised a Completion b Economic Evaluation (EIRR) As After Appraised a Completion b Type of Subproject/Name of LGU A. Water Supply System 1. Naawan, Misamis Oriental Impasugong, Bukidnon Alubijid, Misamis Oriental B. Public Market 1. Roseller T. Lim, Zamboanga del Norte 12.7 negative 17.5 negative 2. Alicia, Zamboanga Sibugay 11.1 negative Dumalinao, Zamboanga del Sur 15.7 negative 20.1 negative 4. Guipos, Zamboanga del Sur 14.6 negative Barobo, Surigao del Sur Hagonoy, Davao del Sur Makilala, North Cotabato Mati, Davao Oriental 14.7 negative 18.7 negative 9. Ozamis City, Misamis Occidental C. Transport Terminal 1. Kidapawan City, North Cotabato 14.0 negative Panabo City, Davao del Norte EIRR = economic internal rate of return, FIRR = financial internal rate of return, LGU = local government unit. a FIRR and EIRR were based on subproject appraisal report. b FIRR and EIRR were based on updated actual data as of project completion review mission. Source: Asian Development Bank Completion Report: Mindanao Basic Urban Services Sector Project in the Philippines. Manila. 4 The Independent Evaluation Department fielded a Philippines country assistance program evaluation mission (2008), which found out that processing and implementation of the initial LGU projects took an average of 627 days from the date of submission of a letter of interest to the release of the 15% mobilization for project implementation. 5 LBP Completion Report: Mindanao Basic Urban Services Sector Project. Manila. 6 Footnote 2, para. 21. The new financing mix was 90% loan financing and 10% LGU equity against the planned financing mix in the RRP of 70% loan financing and 30% LGU equity, which included a government grant component for qualified LGUs. 7 Disbursement projections in the RRP (15% in year 1, 30% in year 2, etc.) were unrealistic. No disbursements occurred during the first two quarters, when the project was in development.

7 5 D. Preliminary Assessment of Sustainability 12. The FIRR data presented in Table 1 (footnote 2, Appendix 12) potentially affects the sustainability of project outcomes. The FIRR is negative to marginal at best. The PCR, however, rated the project likely sustainable in light of the various initiatives and measures proposed by the LBP and DILG to sustain project outputs, e.g., completed markets, terminals, and water supply systems. However, these measures are in the nature of legislative codes, operation manuals, cost recovery plans, and policy commitments only. There is no evidence in the PCR that these measures actually translated to flow of funds for financial sustainability and selfsufficiency of the subprojects. The PCR noted that most income-generating projects required a government subsidy in the first 3 years of operation. However, there is no information on how the poor FIRR of subprojects would be addressed to sustain the project financially after the 3- year grace period. The current practice of keeping tariffs and fees at levels lower than those proposed by the project feasibility study is not expected to change in the foreseeable future. In light of the foregoing, this validation rates the project less likely sustainable. E. Impact (both intended and unintended) 13. The PCR did not rate the impact of the project. It reports that appropriate environmental laws and policies were complied with in the project s implementation, and environmental protection measures were built into the feasibility study where negative impacts were envisaged. Economic impact is expected to be positive, resulting from employment opportunities generated from the subprojects. The financial viability of the subproject leaves a question mark on the long-term and sustained economic benefits of the project. The PCR did not present any information on the impact on institutions, which this validation considers was important given the emphasis of part B (institutional capacity building program) of the project. Taking into account the sustainability assessment in para. 12, this validation rates the project as having had moderate impact. III. OTHER PERFORMANCE ASSESSMENTS A. Performance of the Borrower and Executing Agency 14. The PCR rated the overall performance of the LBP and DILG satisfactory, as both executing agencies did their best to complete the complex project. However, the difficult working relationship between the LBP and DILG affected project performance, including subprojects cancellation, delays, and low fund utilization. Lack of adequate staff provision by the LBP to assist with subproject preparation and withdrawal of government funding after 2005 when the government introduced the no grant policy adversely affected the project. The project development office of the DILG failed to establish the project performance monitoring system, and subsequent attempts at data management (e.g., results monitoring and evaluation systems) did not succeed. There was partial compliance with the project covenant regarding establishment of the program management department and provision of counterpart funding. Of the 15 project covenants (footnote 2, Appendix 10), the borrower had partial compliance with two and compliance with amendment for three covenants. Finally, the financial viability of the project was affected by the government s decision to keep tariffs and fees (public market rent, transport terminal fees, water supply user fees, etc.) lower than the project feasibility study recommendations. Notwithstanding project complexity, this validation rates the performance of the borrower and executing agency partly satisfactory. B. Performance of the Asian Development Bank 15. The PCR rated ADB performance satisfactory, with adequate project review missions facilitating resolution of numerous project issues. ADB participation in the PSC and technical

8 6 meetings was active and productive. It made best efforts to process project approvals to avoid delays and make implementation smooth, including acting as an intermediary when relations became strained between government parties. In view of project complexity, the number of actors involved, and other events (e.g., national elections) outside of ADB s control that affected project performance, this validation endorses ADB s performance to be satisfactory. C. Other 16. The PCR reported positive gender impacts from the project through improved employment opportunities for women. None of the subprojects negatively affected the culture and beliefs of indigenous peoples and/or Mindanao's Muslim population (footnote 2, para. 48). Appropriate environmental laws and regulations were reported to have been complied with. Appendix 10 of the PCR reports that all environment and social covenants were complied with. No subprojects required land acquisition or resettlement. IV. OVERALL ASSESSMENT, LESSONS, AND RECOMMENDATIONS A. Overall Assessment and Ratings 17. The project made laudable efforts toward its goal of improving the quality of life of urban residents of Mindanao. The project design and lending modality were appropriate for the project objective and the design demonstrated sufficient flexibility to accommodate challenges encountered during implementation, hence rated relevant. Various subproject delays, and cancellation of the drainage, flood control, and solid waste management components reduced effectiveness. With 73% of the target population eventually being served and with fund utilization less than the anticipated 63.8%, the project s appraisal target was only partly met, and thus rated less effective. Efficiency was marred by a negative to marginal EIRR for most subprojects. Delays in subprojects implementation, one incident of mis-procurement, and poor EIRR resulted in the project being rated less efficient. Although well intentioned, LBP and DILG efforts to introduce policy and management initiatives for sustaining project outcomes remain in question. There is no evidence yet of actual flow of funds providing financial sustainability and self-sufficiency to the subprojects or a plan to address projects financial viability after the grace period. A poor FIRR also affects the financial sustainability of the project, rated less likely sustainable. This validation accords an overall rating of partly successful, as in the PCR. Ratings PCR IED Review Reason for Disagreement/Comments Relevance Relevant Relevant Effectiveness in Less effective Less effective achieving outcome Efficiency in achieving Less efficient Less efficient outcome and outputs Preliminary assessment of sustainability: Likely Less Likely Poor FIRR, low project tariffs, and absence of a plan to address long-term financial viability of the subprojects Borrower and executing agency: Satisfactory Partly satisfactory Strained working relationship of LBP and DILG; counterpart funding withdrawal, inadequate LBP staff time, and partial compliance of covenants Performance of ADB Satisfactory Satisfactory Impact Not rated Moderate Questionable project financial viability, no information on long-term institutional impact Overall assessment Partly successful Partly successful

9 7 Ratings PCR IED Review Reason for Disagreement/Comments Quality of PCR Satisfactory Information presented logically and with candor ADB = Asian Development Bank, DILG = Department of Interior and Local Government, IED = Independent Evaluation Department, LBP = Land Bank of the Philippines, PCR = project completion report. Sources: ADB Completion Report: Mindanao Basic Urban Services Sector Project in the Philippines. Manila; ADB Independent Evaluation Department. B. Identification of Lessons 18. The PCR generated a number of useful lessons. This validation agrees with all of the lessons identified in the PCR. Another lesson that merits attention is the need for improved and expeditious processing of approvals both within ADB business processes and within the government to avoid delays to approval of variation requests and other procurement matters. C. Recommendations for Follow-Ups 19. The PCR also included several recommendations, all of which this validation endorses. In particular, the recommendation on performance-based allocation of government assistance, taking into account full cost recovery of services, is critical for inducing a performance-based reward culture among government agencies seeking government or international assistance. V. OTHER CONSIDERATIONS AND FOLLOW-UP A. Monitoring and Evaluation Design, Implementation, and Utilization 20. Project design required implementation of a project performance and monitoring system. A results-based monitoring and evaluation system was adopted for the 39 completed subprojects in lieu of the project performance and monitoring system. However, the resultsbased monitoring and evaluation system was not very effective, and the project was implemented without an adequate data management system. B. Comments on Project Completion Report Quality 21. The PCR generally met the requirements for self-evaluation. This validation found both the ADB PCR and executing agency s PCR to be candid, thorough, and detailed with adequate documentation to support their findings and conclusions. An area where possibly more information could have been provided in ADB s PCR was the institutional impact of the project on organizational improvements within LBP, DILG, and LGUs as a result of the project s part B. This validation rates the quality of the PCR satisfactory. C. Data Sources for Validation 22. The primary data sources for the validation were the ADB PCR; the executing agency s PCR; the RRP; and mission memoranda of understanding, aide-mémoires, and back-to-office reports. D. Recommendation for Independent Evaluation Department Follow-Up 23. In view of the quality and findings of the PCR, this validation does not recommend the Independent Evaluation Department to conduct a project performance evaluation in the future.

10 8 REGIONAL DEPARTMENT S RESPONSE TO THE PROJECT COMPLETION REPORT VALIDATION REPORT On 28 June 2011, the director of the Independent Evaluation Division 2, Independent Evaluation Department (IED), received the following comments from the Urban Development and Water Division, Southeast Asia Department. We have reviewed the IED s draft project completion report validation report circulated to us on 24 June We agree with your findings and will address issues raised with regard to sustainability and pricing of services when processing and implementing future projects.

Completion Report. Project Number: PHI Loan Number: 1843-PHI November Philippines: Mindanao Basic Urban Services Sector Project

Completion Report. Project Number: PHI Loan Number: 1843-PHI November Philippines: Mindanao Basic Urban Services Sector Project Completion Report Project Number: PHI 30551 Loan Number: 1843-PHI November 2010 Philippines: Mindanao Basic Urban Services Sector Project CURRENCY EQUIVALENTS Currency Unit Philippine peso (P) At Appraisal

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

Philippines: Small and Medium Enterprise Development Support Project

Philippines: Small and Medium Enterprise Development Support Project Validation Report Reference Number: PCV: PHI 2011 28 Project Number: 36419 Loan Number: 2186 October 2011 Philippines: Small and Medium Enterprise Development Support Project Independent Evaluation Department

More information

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Validation Report Reference Number: PCV: PHI 2011-15 Project Number: 35379 Loan Number: 2012 July 2011 Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Independent

More information

Cambodia: Rural Credit and Savings Project

Cambodia: Rural Credit and Savings Project Project Validation Report Reference Number: CAM 2008-06 Project Number: 30327 Loan Number: 1741 July 2008 Cambodia: Rural Credit and Savings Project Operations Evaluation Department ABBREVIATIONS ADB Asian

More information

India: Karnataka Urban Development and Coastal Environmental Management Project

India: Karnataka Urban Development and Coastal Environmental Management Project Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation

More information

Validation Report Banking Sector Reform Program (Lao People s Democratic Republic) (Loan 1946-LAO)

Validation Report Banking Sector Reform Program (Lao People s Democratic Republic) (Loan 1946-LAO) Board of Directors IN.247-11 14 October 2011 Validation Report Banking Sector Reform Program (Lao People s Democratic Republic) (Loan 1946-LAO) The attached Report is circulated at the request of the Director

More information

Indonesia: Metropolitan Medan Urban Development Project

Indonesia: Metropolitan Medan Urban Development Project Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS

More information

Pakistan: Decentralization Support Program

Pakistan: Decentralization Support Program Validation Report Reference Number: PCV: PAK 2011-53 Program Number: 34328 Loan Numbers: 1935/1936/1937/1938 December 2011 Pakistan: Decentralization Support Program Independent Evaluation Department ABBREVIATIONS

More information

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project f Validation Report Reference Number: PVR-370 Project Number: 29041 Loan Number: 1947 December 2014 Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project Independent Evaluation Department

More information

Philippines: Philippine Energy Efficiency Project

Philippines: Philippine Energy Efficiency Project Validation Report Reference Number: PVR-436 Project Number: 42001-013 Loan/Grant Numbers: 2507 and 0142 December 2015 Philippines: Philippine Energy Efficiency Project Independent Evaluation Department

More information

Georgia: Emergency Assistance for Post-Conflict Recovery

Georgia: Emergency Assistance for Post-Conflict Recovery Validation Report Reference Number: PCV: GEO 2011-49 Project Number: 32023 Loan Number: 2469-GEO(SF) December 2011 Georgia: Emergency Assistance for Post-Conflict Recovery Independent Evaluation Department

More information

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project Validation Report Reference Number: PVR-360 Project Number: 40198 Loan Number: 2374 December 2014* Viet Nam: Ho Chi Minh CityLong ThanhDauGiay Expressway Technical Assistance Project Independent Evaluation

More information

Pakistan: Road Sector Development Program

Pakistan: Road Sector Development Program Validation Report Reference Number: PCV: PAK 2010-69 Project Number: 32058 Loan Number: 1891 December 2010 Pakistan: Road Sector Development Program Independent Evaluation Department ABBREVIATIONS ADB

More information

Completion Report. Project Number: Loan Number: 1472 August Philippines: Small Towns Water Supply Sector Project

Completion Report. Project Number: Loan Number: 1472 August Philippines: Small Towns Water Supply Sector Project Completion Report Project Number: 27250 Loan Number: 1472 August 2006 Philippines: Small Towns Water Supply Sector Project CURRENCY EQUIVALENTS Currency Unit Philippine peso (P) At Appraisal At Project

More information

Indonesia: Capacity Building in Urban Infrastructure Management Project

Indonesia: Capacity Building in Urban Infrastructure Management Project Validation Report Reference Number: PCV: INO 2008-68 Project Number: 27289 Loan Number: 1572-INO May 2009 Indonesia: Capacity Building in Urban Infrastructure Management Project Independent Evaluation

More information

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department Validation Report Reference Number: PVR-451 Project Number: 38254-033 Loan Number: 2312 August 2016 India: North Karnataka Urban Sector Investment Program, Tranche 1 Independent Evaluation Department ABBREVIATIONS

More information

Nepal: Rural Finance Sector Development Cluster Program (Subprogram 2)

Nepal: Rural Finance Sector Development Cluster Program (Subprogram 2) Validation Report July 2017 Nepal: Rural Finance Sector Development Cluster Program (Subprogram 2) Reference Number: PVR-497 Project Number: 36169-023 Loan Number: 2641 Grant Number: 0208 ABBREVIATIONS

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda Validation Report Reference Number: PVR-471 Project Number: 47337-001 Loan Number: 3080 December 2016 Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda Independent Evaluation

More information

Viet Nam: Microfinance Development Program (Subprograms 1 and 2)

Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Validation Report Reference Number: PVR-478 Project Numbers: 42235-013 and 42235-023 Loan Numbers: 2877 and 3213 December 2016 Viet Nam: Microfinance Development Program (Subprograms 1 and 2) Independent

More information

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent

More information

Bangladesh: Chittagong Hill Tracts Rural Development Project

Bangladesh: Chittagong Hill Tracts Rural Development Project Validation Report Reference Number: PVR-222 Project Number: 32467 Loan Number: 1771(SF) December 2012 Bangladesh: Chittagong Hill Tracts Rural Development Project Independent Evaluation Department ABBREVIATIONS

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.07A Page 1 of 4 PROJECT COMPLETION REPORT FOR SOVEREIGN OPERATIONS 1 A. Objective and Scope 1. The main objective of a project completion report (PCR) 1 is to

More information

Validation Report Rural Finance Project (Mongolia) (Loan 1848-MON)

Validation Report Rural Finance Project (Mongolia) (Loan 1848-MON) Board of Directors IN.365-10 21 December 2010 Validation Report Rural Finance Project (Mongolia) (Loan 1848-MON) The attached Report is circulated at the request of the Director General, Independent Evaluation

More information

Nepal: Road Connectivity Sector I Project

Nepal: Road Connectivity Sector I Project Validation Report October 2017 Nepal: Road Connectivity Sector I Project Reference Number: PVR-523 Project Number: 37266-032 Grant Number: 0051 ABBREVIATIONS ADB Asian Development Bank DOR Department of

More information

Cambodia: Small and Medium Enterprise Development Program

Cambodia: Small and Medium Enterprise Development Program Validation Report Reference Number: PCV: CAM 2010-73 Program Number: 36383 Loan Number: 2129(SF) December 2010 Cambodia: Small and Medium Enterprise Development Program Independent Evaluation Department

More information

India: Assam Governance and Public Resource Management Sector Development Program

India: Assam Governance and Public Resource Management Sector Development Program Validation Report Reference Number: PVR-335 Project Number: 36308 Loan Numbers: 2141, 2142, and 2442 November 2014 India: Assam Governance and Public Resource Management Sector Development Program Independent

More information

Pakistan: Agribusiness Development Project

Pakistan: Agribusiness Development Project Validation Report Reference Number: PVR-354 Project Number: 33364 Loan Number: 2171 November 2014 Pakistan: Agribusiness Development Project Independent Evaluation Department ABBREVIATIONS ADB ASF DALPMG

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

Evaluation Approach Project Performance Evaluation Report for ADB Loans 1913/1914 Sri Lanka: Plantation Development Project July 2015 I.

Evaluation Approach Project Performance Evaluation Report for ADB Loans 1913/1914 Sri Lanka: Plantation Development Project July 2015 I. Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Project Performance

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

Validation Report. Indonesia: Second Decentralized Health Services Project. Independent Evaluation Department

Validation Report. Indonesia: Second Decentralized Health Services Project. Independent Evaluation Department Validation Report Reference Number: PVR-428 Project Number: 34149 Loan Numbers: 2074 and 2075 November 2015 Indonesia: Second Decentralized Health Services Project Independent Evaluation Department ABBREVIATIONS

More information

Maldives: Information Technology Development Project

Maldives: Information Technology Development Project Validation Report Reference Number: PVR-272 Project Number: 34276 Loan Number: 1882 December 2013 Maldives: Information Technology Development Project Independent Evaluation Department ABBREVIATIONS ADB

More information

Mongolia: Regional Road Development Project

Mongolia: Regional Road Development Project Validation Report Reference Number: PVR-481 Project Numbers: 35377-013 and 35377-023 Loan/Grant Numbers: 2087, 2621, and 0199 December 2016 Mongolia: Regional Road Development Project Independent Evaluation

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

People's Republic of China: Ganzhou Longyan Railway Project

People's Republic of China: Ganzhou Longyan Railway Project Validation Report Reference Number: PCV: PRC 2009-22 Project Number: 33442 Loan Number: 1850 December 2009 People's Republic of China: Ganzhou Longyan Railway Project Independent Evaluation Department

More information

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Validation Report Reference Number: PVR-326 Project Number: 37066 Loan Number: 2248 October 2014 Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Independent Evaluation

More information

Indonesia: Participatory Irrigation Sector Project

Indonesia: Participatory Irrigation Sector Project Validation Report Reference Number: PVR-393 Project Number: 32359 Loan/Grant Numbers: 2064, 2065, and 4229 February 2015 Indonesia: Participatory Irrigation Sector Project Independent Evaluation Department

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

Evaluation Study. Midterm Review Process. Operations Evaluation Department

Evaluation Study. Midterm Review Process. Operations Evaluation Department Evaluation Study Reference Number: SES:REG 2008-78 Special Evaluation Study Update December 2008 Midterm Review Process Operations Evaluation Department ABBREVIATIONS ADB Asian Development Bank BTOR back-to-office

More information

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 Technical Assistance Report Project Number: 40345 April 2008 Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 The views expressed herein are those

More information

Philippines: Third Airports Development Project (Southern Philippines)

Philippines: Third Airports Development Project (Southern Philippines) Validation Report Reference Number: PCV: PHI 2008-29 Project Number: 28270 Loan Number: 1536 August 2008 Philippines: Third Airports Development Project (Southern Philippines) Operations Evaluation Department

More information

Afghanistan: Regional Airports Rehabilitation Project (Phase 1)

Afghanistan: Regional Airports Rehabilitation Project (Phase 1) Validation Report Reference Number: PVR 225 Project Number: 37136 Loan Number: 2105 December 2012 Afghanistan: Regional Airports Rehabilitation Project (Phase 1) Independent Evaluation Department ABBREVIATIONS

More information

Validation Report. Indonesia: Coral Reef Rehabilitation and Management Project Phase II. Independent Evaluation Department

Validation Report. Indonesia: Coral Reef Rehabilitation and Management Project Phase II. Independent Evaluation Department Validation Report Reference Number: PVR-324 Project Number: 32176 Loan Number: 1962 September 2014 Indonesia: Coral Reef Rehabilitation and Management Project Phase II Independent Evaluation Department

More information

Policy Paper. March Establishing the Project Design Facility

Policy Paper. March Establishing the Project Design Facility Policy Paper March 2011 Establishing the Project Design Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund COBP country operations business plan DMC developing member country

More information

Tajikistan: Power Rehabilitation Project

Tajikistan: Power Rehabilitation Project Validation Report Reference Number: PCV: TAJ 2011-06 Project Number: 32513 Loan Number: 1817 April 2011 Tajikistan: Power Rehabilitation Project Independent Evaluation Department CURRENCY EQUIVALENTS (as

More information

Solomon Islands: Transport Sector Development Project

Solomon Islands: Transport Sector Development Project Validation Report September 2018 Solomon Islands: Transport Sector Development Project Reference Number: PVR-582 Project Number: 41171-022 Grant Number: 0243 ABBREVIATIONS ADB Asian Development Bank ADF

More information

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue Technical Assistance Report Project Number: 46429-001 Capacity Development Technical Assistance (CDTA) April 2013 Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

Viet Nam: Northern Power Transmission Expansion Sector Project

Viet Nam: Northern Power Transmission Expansion Sector Project Validation Report Reference Number: PVR-485 Project Number: 38196-013 Loan Number: 2225 December 2016 Viet Nam: Northern Power Transmission Expansion Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Validation Report. India: Rural Roads Sector I Project. Independent Evaluation Department

Validation Report. India: Rural Roads Sector I Project. Independent Evaluation Department Validation Report Reference Number: PVR-307 Project Number: 36320 Loan Number: 2018 May 2014 India: Rural Roads Sector I Project Independent Evaluation Department ABBREVIATIONS ADB Asian Development Bank

More information

Multitranche Financing Facility Annual Report 2017

Multitranche Financing Facility Annual Report 2017 May 2018 Multitranche Financing Facility Annual Report 2017 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. ABBREVIATIONS ADB Asian Development

More information

Indonesia: Infrastructure Financing Facility Company Project

Indonesia: Infrastructure Financing Facility Company Project Validation Report December 2017 Indonesia: Infrastructure Financing Facility Company Project Reference Number: PVR-532 Program Number: 42109-013 Loan Number: 2516 ABBREVIATIONS ADB Asian Development Bank

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

Completion Report. Project Number: Loan Number: 1990 October Viet Nam: Housing Finance Project

Completion Report. Project Number: Loan Number: 1990 October Viet Nam: Housing Finance Project Completion Report Project Number: 35497 Loan Number: 1990 October 2013 Viet Nam: Housing Finance Project CURRENCY EQUIVALENTS Currency Unit dong (D) At Appraisal At Project Completion 15 November 2002

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH LOAN NUMBER 2499-PAK (SF) PROJECT AGREEMENT (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF SINDH NORTH SINDH URBAN SERVICES CORPORATION LIMITED DATED

More information

Validation Report. Kazakhstan and Kyrgyz Republic: Almaty Bishkek Regional Road Rehabilitation Project. Operations Evaluation Department

Validation Report. Kazakhstan and Kyrgyz Republic: Almaty Bishkek Regional Road Rehabilitation Project. Operations Evaluation Department Validation Report Reference Number: PCV:KAZ/KGZ 2008-35 Project Number: 29568 and 32463 Loan Numbers: 1774 and 1775(SF) November 2008 Kazakhstan and Kyrgyz Republic: Almaty Bishkek Regional Road Rehabilitation

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

Pakistan: National Highway Development Sector Investment Program Tranche 2

Pakistan: National Highway Development Sector Investment Program Tranche 2 Validation Report December 2017 Pakistan: National Highway Development Sector Investment Program Tranche 2 Reference Number: PVR-521 MFF Number: 0002 Project Number: 37559-023, 37559-033, and 37559-043

More information

ASIAN DEVELOPMENT BANK PPA: PHI 24112

ASIAN DEVELOPMENT BANK PPA: PHI 24112 ASIAN DEVELOPMENT BANK PPA: PHI 24112 PROJECT PERFORMANCE AUDIT REPORT ON THE THIRD DEVELOPMENT BANK OF THE PHILIPPINES (Loan 1088-PHI) I N THE PHILIPPINES December 1999 CURRENCY EQUIVALENTS Currency Unit

More information

Bangladesh: Road Maintenance and Improvement Project

Bangladesh: Road Maintenance and Improvement Project Performance Evaluation Report Bangladesh: Road Maintenance and Improvement Project Independent Evaluation Performance Evaluation Report December 2014 Bangladesh: Road Maintenance and Improvement Project

More information

Tonga: Integrated Urban Development Sector Project

Tonga: Integrated Urban Development Sector Project Validation Report Reference Number: PVR-457 Project Number: 38160-032 Grant Number: 0108 October 2016 Tonga: Integrated Urban Development Sector Project Independent Evaluation Department ABBREVIATIONS

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

Establishment of the High-Level Technology Fund

Establishment of the High-Level Technology Fund April 2017 Establishment of the High-Level Technology Fund Distribution of this document is restricted until it has been approved by Management. Following such approval, ADB will disclose the document

More information

Tajikistan: Microfinance Systems Development Program

Tajikistan: Microfinance Systems Development Program Validation Report Reference Number: PCV: TAJ 2010-55 Project Number: 33040 Loan Number: 2000; 2001 November 2010 Tajikistan: Microfinance Systems Development Program Independent Evaluation Department ABBREVIATIONS

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

Viet Nam: Health Care in the Central Highlands Project

Viet Nam: Health Care in the Central Highlands Project Validation Report Reference Number: PVR-344 Project Number: 37115 Loan Number: 2076 (SF) October 2014 Viet Nam: Health Care in the Central Highlands Project Independent Evaluation Department ABBREVIATIONS

More information

Kazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program

Kazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program Validation Report December 2018 Kazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program Reference Number: PVR-565 Project Numbers: 41121-023, 41121-033, 41121-043, and 41121-053 MFF

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:NEP 37266 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE KINGDOM OF NEPAL FOR PREPARING THE TRANSPORT CONNECTIVITY SECTOR PROJECT June 2004 CURRENCY EQUIVALENTS

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

India: Supporting the Second West Bengal Development Finance Program

India: Supporting the Second West Bengal Development Finance Program Second West Bengal Development Finance Program (RRP IND 49209) Technical Assistance Report Project Number: 49209-001 Transaction Technical Assistance (TRTA) August 2017 India: Supporting the Second West

More information

Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project

Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project Validation Report December 2017 Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project Reference Number: PVR-545 Program Number: 41013-013 Loan/Grant Number: 2511, 0147 ADB CDIA DMF EIRR

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

Indonesia: Financial Market Development and Integration Program

Indonesia: Financial Market Development and Integration Program Validation Report January 2018 Indonesia: Financial Market Development and Integration Program Reference Number: PVR-534 Program Number: 44252-013 Loan Number: 2895 ABBREVIATIONS ADB Asian Development

More information

Bangladesh: Road Network Improvement and Maintenance Project II

Bangladesh: Road Network Improvement and Maintenance Project II Validation Report Reference Number: PVR-435 Project Number: 34415 Loan Number: 2021 November 2015 Bangladesh: Road Network Improvement and Maintenance Project II Independent Evaluation Department ABBREVIATIONS

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

Validation Report. Nauru: Public Financial Management Reform Program. Independent Evaluation Department

Validation Report. Nauru: Public Financial Management Reform Program. Independent Evaluation Department Validation Report Reference Number: PVR-475 Project Number: 45032-001 Grant Number: 0300 December 2016 Nauru: Public Financial Management Reform Program Independent Evaluation Department ABBREVIATIONS

More information

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization Completion Report Project Number: 46-01 Technical Assistance Number: 7857 April 016 Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization This document is being disclosed

More information

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

Completion Report. Project Number: Loan Number: 1367 May Philippines: Regional Municipal Development Project

Completion Report. Project Number: Loan Number: 1367 May Philippines: Regional Municipal Development Project Completion Report Project Number: 22102 Loan Number: 1367 May 2006 Philippines: Regional Municipal Development Project CURRENCY EQUIVALENTS Currency Unit peso (P) At Appraisal At Project Completion (1

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section F1/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ENVIRONMENTAL

More information

GAMAS means Mongolia Customs Automated Data Processing

GAMAS means Mongolia Customs Automated Data Processing 2 System; (c) GAMAS means Mongolia Customs Automated Data Processing (d) Grant Account means the account opened by ADB on its books in the name of Mongolia for the purposes of the Project and to which

More information

Validation Report. Tonga: Economic Support Program. Independent Evaluation Department

Validation Report. Tonga: Economic Support Program. Independent Evaluation Department Validation Report Reference Number: PVR-318 Program Number: 43152-01 Grant Number: 0185 September 2014 Tonga: Economic Support Program Independent Evaluation Department ABBREVIATIONS ADB Asian Development

More information

Solomon Islands: Second Road Improvement (Sector) Project

Solomon Islands: Second Road Improvement (Sector) Project Validation Report Reference Number: PVR-477 Project Number: 43381-012 Grant Numbers: 0175, 0176, 0177, 0207, 0210 December 2016 Solomon Islands: Second Road Improvement (Sector) Project Independent Evaluation

More information

Policy Paper. November 2016

Policy Paper. November 2016 Policy Paper November 2016 Ordinary Operations (Concessional) Loan Regulations and Revised Ordinary Operations Loan Regulations, Special Operations Grant Regulations, and Externally Financed Grant Regulations

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. Page 1 of 1 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction FINANCIAL INTERMEDIATION

More information

Kazakhstan: Countercyclical Support

Kazakhstan: Countercyclical Support Validation Report August 2018 Kazakhstan: Countercyclical Support Reference Number: PVR-567 Project Number: 49083-001 Loan Number: 3272 ABBREVIATIONS ADB CPS - - Asian Development Bank country partnership

More information

ASIAN DEVELOPMENT BANK PPA: PRC 25013

ASIAN DEVELOPMENT BANK PPA: PRC 25013 ASIAN DEVELOPMENT BANK PPA: PRC 25013 PROJECT PERFORMANCE AUDIT REPORT ON THE DALIAN WATER SUPPLY PROJECT (Loan 1313-PRC) IN THE PEOPLE S REPUBLIC OF CHINA November 2003 At Appraisal (May 1994) CURRENCY

More information

Republic of the Philippines: Islamic Finance for the Philippines

Republic of the Philippines: Islamic Finance for the Philippines Technical Assistance Report Project Number: 50325-001 Knowledge and Support Technical Assistance (KSTA) December 2017 Republic of the Philippines: Islamic Finance for the Philippines This document is being

More information

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project Technical Assistance Report Project Number: 51107-001 Transaction Technical Assistance (TRTA) October 2017 Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project This

More information

Indonesia: Java-Bali Electricity Distribution Performance Improvement Project

Indonesia: Java-Bali Electricity Distribution Performance Improvement Project Validation Report November 2017 Indonesia: Java-Bali Electricity Distribution Performance Improvement Project Reference Number: PVR-535 Program Number: 40061-013 Loan Number: 2619 and 8245 Grant Number:

More information

Completion Report. Project Number: Loan Number: 1978 September Indonesia: Small and Medium Enterprise Export Development Project

Completion Report. Project Number: Loan Number: 1978 September Indonesia: Small and Medium Enterprise Export Development Project Completion Report Project Number: 34113 Loan Number: 1978 September 2009 Indonesia: Small and Medium Enterprise Export Development Project CURRENCY EQUIVALENTS Currency Unit rupiah (Rp) At Appraisal At

More information

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT Country Operations Business Plan: Philippines, 2014 2016 SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT A. Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector performance.

More information

People s Republic of China: Guangdong Energy Efficiency and Environment Improvement Investment Program, Tranche 3 and Multitranche Financing Facility

People s Republic of China: Guangdong Energy Efficiency and Environment Improvement Investment Program, Tranche 3 and Multitranche Financing Facility Completion Report Project Number: 39653-043 Loan Number: 2773 MFF Number: 0020 August 2015 People s Republic of China: Guangdong Energy Efficiency and Environment Improvement Investment Program, Tranche

More information