1 Second Jharkhand State Road Project (RRP IND 49125) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) A. Sector Performance, Problems, and Opportunities 1. State context. The state of Jharkhand was established on 15 November 2000 in India through bifurcation from Bihar state. It comprises 24 districts with a total geographic area of about 79,700 square kilometers (km 2 ). Jharkhand is surrounded by five states: Bihar in the north, West Bengal in the east, Orissa in the south, and Chhattisgarh and Uttar Pradesh in the west. Jharkhand is known as a tribal and forest state with scheduled tribes and castes making up about 38% of its 33 million population; forest covers about 28% of its area. 2. Railways, with a total length of about 2,000 km, largely serve the traffic needs of interstate traffic. Air transport service caters only to interstate traffic. As a result, roads are the predominant mode of transport services. 3. Roads. National Highway No. 2 (NH2), which connects Delhi and Kolkata, runs through Jharkhand. The state highway network was developed to improve connectivity with the NH2 with various parts of the state and other categories of roads, including rural and forest roads built to connect villages with state arteries (Table 1). Industry is concentrated in the central and eastern parts of the state taking advantage of easier access to the NH2. Table 1: Road Network in Jharkhand (kilometers) Roads Length National highways 2,402 State highways 1,361 Major district roads 4,954 Rural and forest roads 49,601 Other roads 1,888 Total 60,206 Source: Road Construction Department, Government of Jharkhand. 4. Transport characteristics. At the end of fiscal year (FY) 2012, 3,157,986 vehicles were registered in Jharkhand. The number of registered vehicles has increased on average about 15% per annum since FY2004; this exceeds the national average of about 10% per annum. About 60% of these are two-wheelers. With the increase in the number of vehicles, road capacity needs to be increased with adequate maintenance to maintain service. 5. Road safety. The loss to the Indian economy due to fatalities and accident injuries, estimated at 3.0% of gross domestic product in , is particularly severe as 53.1% of road accident victims were years of age. 1 The road accident data in Jharkhand show a mixed picture. While the road accident rate was 18.0/10,000 vehicles in 2012, better than the national average of 30.7/10,000 vehicles, it was 2,119.3/10,000 km, about 72% higher than the national average of 1, Most accidents are caused by drivers (67.0%), followed by other road users (6.9%), defects in road condition (4.5%), and defects in the mechanical condition of motor vehicles (3.9%). Most drivers at fault are speeding and/or have taken alcohol or drugs. In 1 Planning Commission Report of the Working Group on Accidents, Injury Prevention and Control. New Delhi. This is the latest official report on the economic loss due to road accidents. Various studies conducted to update the figure also show the economic loss at about 2% 3 % of gross domestic product. 2 Government of India, Ministry of Road Transport and Highways, Transport Research Wing Road Accidents in India New Delhi.

2 2 Jharkhand, state and district road safety councils conduct road safety awareness campaigns annually in accordance with national government initiatives to promote road safety, but no state initiatives address road safety from the perspective of road engineering or road user awareness. Currently, road safety audits are not mandatory for road engineering. A nodal agency should be designated to promote road safety in the state. 6. Road agencies. Fourteen states in India have established separate bodies in the form of corporations, authorities, or boards for road development and maintenance. Some have utilized private sector participation to a great extent in generating funds for development and maintenance, and others function as a part of the state government with the main budget sources from the departments in charge of road development and maintenance, i.e., public works department or road construction department. Experience from these states shows that these bodies tend to be more efficient in project development, implementation, and service provision, mainly due to the flexibility of institutional management, including staff recruitment and performance management. 7. In Jharkhand, the Road Construction Department (RCD) is the main agency for development and maintenance of state highways and major district roads. The Department of Rural Works is responsible for constructing and maintaining rural roads. As in other states, national highways in Jharkhand are managed by central government agencies: National Highways Authority of India and Ministry of Road Transport and Highways. The state government has created three autonomous bodies for road development and maintenance. The State Highway Authority of Jharkhand (SHAJ) was established in accordance with the State Highways Authority of Jharkhand Act 2007 and mandated to develop, maintain, and manage any state highways entrusted by the state government. SHAJ was expected to become independent from government funding within 3 years of its establishment. However, no single road has been entrusted to SHAJ to date; SHAJ has been executing nine RCD road improvement works of about 450 km. It currently functions as a semi-autonomous RCD agency. The state government established Jharkhand State Rural Roads Development Authority as an autonomous single purpose agency to implement the 100% centrally sponsored rural road connectivity program, Pradhan Mantri Gram Sadak Yojana. 3 Jharkhand Accelerated Road Development Company was established as a special purpose vehicle to develop 1,500 lane-km of state highways on a build operate transfer (annuity) basis. The company is a joint venture between the state government (26% of shares) and IL&FS Transportation Networks (India) (74% of shares). B. Government s Sector Strategy 8. The state government, through RCD, has been improving the state road network through a combination of budgetary support, Asian Development Bank (ADB) assistance, and public private partnerships. Using funds from the rural road connectivity program, rural roads have also been substantially improved. RCD s target is to increase road density by constructing state roads and to improve the existing road network by widening and rehabilitating existing roads. About a $2.5 billion investment is planned for this for In addition, the state government is allocating $228 million to construct 1,500 lane-km of state roads through build operate transfer (annuity) during the same period. 9. Budgetary resources. Increasing budget amounts have been allocated in recent years. In FY2014, about Rs21,275 million (about $355 million) was allocated for roads and bridges 3 Of the total rural road network of 42,252 km, about 40% (17,252 km) was developed under the national rural road mission: Pradhan Mantri Gram Sadak Yojana.

3 3 capital expenditure. This includes Rs4,744 million (about $79 million) for road improvement works being financed by ADB and Rs2,759 million (about $46 million) for road development works being implemented under build operate transfer (annuity). Rs2,683 million (about $45 million) was allocated for maintenance under the nonplan budget category of state highways, which is sufficient for routine maintenance of all roads under RCD. 4 Periodic resurfacing (improvement of riding quality of pavement) has been conducted under the plan budget category. 5 Table 2 summarizes the plan and nonplan budget allocation from FY2010 to FY2014. Table 2: Road Construction Department Budget Allocation and Expenditure (Indian rupees million) Item FY2010 FY2011 FY2012 FY2013 FY2014 A. Budget allocation Plan 5,900 8,250 8,000 16,500 19,850 SHAJ ,965 Nonplan 1,936 1,813 2,127 3,062 2,683 SHAJ Total (A) 7,836 10,063 10,127 19,562 22,533 B. Expenditure Plan 5,135 6,870 7,913 15,241 19,111 SHAJ Nonplan 1,185 1,677 2,037 2,919 2,164 Wages and salaries Maintenance ,182 2,016 1,197 Total (B) 6,320 8,547 9,950 18,160 21,275 SHAJ = State Highways Authority of Jharkhand. Source: Road Construction Department. 10. Operation and maintenance schemes. To meet the maintenance demands of the increasing number of state roads, the state government has taken steps to ensure a sustainable funding mechanism for timely maintenance. Five state roads of 185 km, or 627 lane-km, have been constructed under a build operate transfer (annuity) scheme, which includes 15 years of maintenance by the contractor. The maintenance cost under the scheme is part of the annuity payment as allocated in the plan budget as per the contractual requirements. 11. The state government envisages entrusting a number of state roads to SHAJ for operation and maintenance. As state roads are generally not toll roads, the government will allocate the necessary budget for SHAJ. To ensure a sustainable funding mechanism for road development including maintenance, the government enacted the Jharkhand State Road Development Fund Act 2011, which empowers the government to establish the dedicated Jharkhand State Road Development Fund for development of state roads. In 2015, the government decided to introduce a fuel cess (tax) of Rs1/liter of fuel for this purpose. 12. The state government envisages promoting the use of performance-based maintenance contracts (PBMCs) to ensure the appropriate service of the state road network with proper maintenance. A PBMC will facilitate the prioritization of budget allocation for road maintenance in accordance with contractual obligations. SHAJ plans to use a PBMC for the four roads to be 4 Jharkhand Infrastructure Development Corporation Road Prioritization Study cum Vision Document for Identification of Viable Road Sections to be development in PPP Mode in the State of Jharkhand. Ranchi. RCD is responsible for maintenance of 6,876 km as of the end of April Routine maintenance cost is estimated at about $20 million assuming $3,000 per km. 5 Resurfacing cost is estimated at $48 million per year assuming $35,000/km every 5 years. This represents about 15% of the plan budget in FY2014.

4 4 improved by the project. The PBMC will be separate from the construction packages and be based on the result of a market survey of potential bidders. A relatively large PBMC will attract the participation of capable local firms expecting similar work opportunities in the near future, leading to sustainable road maintenance in the state. C. ADB Sector Experience and Assistance Program 13. The evaluation of ADB s assistance to transport operations found that (i) ADB s strategic selection and priority areas for involvement in the sector were significant and appropriate to the country s needs; (ii) ADB assistance helped to improve the quality and capability of roads and railway infrastructure; and (iii) ADB added significant value in the areas of policy development, institutional strengthening, encouragement to private sector participation, and increasing compliance and public awareness on social safeguards, road safety, and related issues. 6 The main weaknesses identified were poor project design, limited enforcement of safeguards, and lack of progress in addressing some of the key policy issues. To overcome these weaknesses, the project design for the transport sector was simplified to focus on improving executing agency performance in core functions, and providing assistance during preparatory and implementation stages to address the issues of safeguard compliance. Transport infrastructure development is a high priority for the Government of India, making ADB s strategy of reducing poverty through infrastructure-led growth especially relevant. 14. The goal of transport sector support under ADB s country partnership strategy, for India is to increase the movement of people and goods in a more efficient, safe, sustainable manner. 7 ADB will support (i) a multimodal mix of transport network development, including a focus on modes with low-carbon emissions; (ii) institutional and organizational changes to road system institutions; (iii) connectivity within the subregion to support regional cooperation and integration, and along economic corridors linking major domestic centers of economic activity with emerging centers of production and employment; (iv) an innovative financing mechanism in transport infrastructure development and maintenance; and (v) social inclusiveness, including safety improvement and gender inclusiveness. 15. ADB has extensive experience in India s road subsector, with a large number of loan and technical assistance projects targeting national highways, state roads, and rural road projects of the central and state governments. 6 ADB Country Assistance Program Evaluation: India. Manila. 7 ADB Country Partnership Strategy: India, Manila.

5 5 Problem Tree for Transport (Road Transport, Nonurban) Sector EFFECTS Limited mobility in Jharkhand CORE PROBLEM Poor road network, road quality, and road safety within Jharkhand state CAUSES Physical Nonphysical Low quality of existing roads Poor network capacity (insufficient new investment) Poor road design, especially for road safety Insufficient technical capacity in road engineering and road asset management Premature institutional setup of the State Highway Authority of Jharkhand Interventions Financing support from ADB Capacity development support from ADB

6 6 Sector Results Framework (Transport and Information and Communication Technology, ) Country Sector Outcomes Country Sector Outputs ADB Sector Operations Indicators with Indicators with Targets and Outputs with Incremental Planned and Ongoing ADB Baselines ADB Contribution Targets Interventions Outcomes with ADB Contribution Increased movement of people and goods in a more efficient and sustainable manner 100% of villages (population >1000) have access to all-weather roads by 2017 (2000 baseline: 90%) Road freight traffic reaches 1.8 trillion ton-km in 2016 (2011 baseline: 1.2 trillion) Road passenger-km reaches 11.4 trillion in 2016 (2011 baseline: 7.4 trillion) Transport systems with safety and accessibility features for women, the elderly, disabled, and children expanded, improved, and maintained 126,500 km of state roads built or upgraded during ,500 km of major district roads built or upgraded during ,181 km of rural roads built or upgraded by 2017 compared during EGM = effective gender mainstreaming, km = kilometer, TA = technical assistance. Sources: Asian Development Bank Country Partnership Strategy: India, Manila. Planned key activity areas State roads (58% of funds) Rural roads (18% of funds) Railways (4% of funds) Urban transport (20% of funds) Pipeline projects 12 projects amounting to $2,275 million for (including two projects categorized as EGM) Ongoing projects 15 ongoing loans amounting to $3,262 million as of 31 December 2012 (including two projects categorized as EGM) Main Outputs Expected from ADB Interventions Planned key activity areas 4,700 km of state roads improved with pedestrian lanes, crossing points, and other safety features, including 150 km of subregional connectivity 12,300 km of rural roads improved to include pedestrian lanes, crossing points, and other safety features Pipeline projects 3,600 km of state roads improved with pedestrian lanes, crossing points, and other safety features, including 600 km of subregional connectivity 6,000 km of rural roads improved to include pedestrian lanes, crossing points, and other safety features Ongoing projects 9,000 km of state roads improved 30,000 km of rural roads improved Road corporations established in three states

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities Chhattisgarh State Road Sector Project (RRP IND 44427) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR 1. Sector Performance, Problems, and Opportunities 1. The state of Chhattisgarh

More information

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 Appendix 6 ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 1. Background. The Second Rural Connectivity Investment Program will support the Government of India in improving rural connectivity through the

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

Validation Report. India: Rural Roads Sector I Project. Independent Evaluation Department

Validation Report. India: Rural Roads Sector I Project. Independent Evaluation Department Validation Report Reference Number: PVR-307 Project Number: 36320 Loan Number: 2018 May 2014 India: Rural Roads Sector I Project Independent Evaluation Department ABBREVIATIONS ADB Asian Development Bank

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide

More information

ROAD DEVELOPMENT IN INDIA

ROAD DEVELOPMENT IN INDIA ROAD DEVELOPMENT IN INDIA - 2010 This report is the most up-to-date and comprehensive review of the Indian road sector. The report provides: The latest status of projects, programmes and policies (as on

More information

Road and Transport : Registered Motor Vehicles per 1000 Population and % Share of Registered Motor

Road and Transport : Registered Motor Vehicles per 1000 Population and % Share of Registered Motor and Transport 13.1: Surfaced & Length s in Arunachal Pradesh (A.P.) 13.2: Length of National Highways 13.3: Lane-wise Length of National Highways 13.4: and Surfaced Length of other PWD s 13.5: Length of

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 41127 August 2008 Proposed Loan India: Bihar State Highways Project CURRENCY EQUIVALENTS (as of 25 August

More information

THE ROAD TO ECONOMIC GROWTH

THE ROAD TO ECONOMIC GROWTH THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial

More information

Rural Road Connectivity in India

Rural Road Connectivity in India www.swaniti.in Rural Road Connectivity in India The 12th Five Year Plan (2012-17) identifies rural connectivity as one of the key priorities to achieve rural poverty alleviation and development. With over

More information

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Validation Report Reference Number: PVR-326 Project Number: 37066 Loan Number: 2248 October 2014 Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Independent Evaluation

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 51360-002 Transaction Technical Assistance Facility (F-TRTA) April 2018 Turkmenistan: Preparing the Central Asia Regional Economic Cooperation Corridors 2, 3

More information

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010 Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : 23383553 : 23388207 : anandpk@nic.in D.O. # P-10021/1/2010/P-III August 4, 2010 Dear Shri As you are aware, Government of India launched the Pradhan Mantri

More information

India: Bihar State Highways Project

India: Bihar State Highways Project Completion Report Project Number: 41127-013 Loan Number: 2443 Technical Assistance Number: 7130 August 2018 India: Bihar State Highways Project This document is being disclosed to the public in accordance

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 40423 June 2012 Proposed Multitranche Financing Facility, Technical Assistance, and Administration of Technical Assistance

More information

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 36330-043 MFF Number: 0060 November 2017 India: Railway Sector Investment Program (Tranche 3) Distribution of this document is restricted until it has

More information

Nepal: Road Connectivity Sector I Project

Nepal: Road Connectivity Sector I Project Validation Report October 2017 Nepal: Road Connectivity Sector I Project Reference Number: PVR-523 Project Number: 37266-032 Grant Number: 0051 ABBREVIATIONS ADB Asian Development Bank DOR Department of

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Chittagong-Cox s Bazar Railway Project, Phase 1 (RRP BAN 46452-002) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will construct 102

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 47926 April 2014 Proposed Equity Investment ReNew Power Ventures Private Limited ReNew Power Investment Project (India)

More information

Country Operations Business Plan. Armenia October 2015

Country Operations Business Plan. Armenia October 2015 Country Operations Business Plan October 2015 Armenia 2016 2018 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 31

More information

India: National Highway Sector II Project

India: National Highway Sector II Project Validation Report October 2017 India: National Highway Sector II Project Reference Number: PVR-517 Project Number: 35335-013 Loan Number: 2154 ABBREVIATIONS ADB Asian Development Bank CSC construction

More information

Bangladesh: Road Maintenance and Improvement Project

Bangladesh: Road Maintenance and Improvement Project Performance Evaluation Report Bangladesh: Road Maintenance and Improvement Project Independent Evaluation Performance Evaluation Report December 2014 Bangladesh: Road Maintenance and Improvement Project

More information

ASIAN DEVELOPMENT BANK RRP: IND 34420

ASIAN DEVELOPMENT BANK RRP: IND 34420 ASIAN DEVELOPMENT BANK RRP: IND 34420 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE BOARD OF DIRECTORS ON A PROPOSED LOAN TO INDIA FOR THE NATIONAL HIGHWAY CORRIDOR (SECTOR) I PROJECT November 2003

More information

India: Public Private Partnerships in Highways Sector

India: Public Private Partnerships in Highways Sector India: Public Private Partnerships in Highways Sector Prepared by World Bank as input for IDA paper, 2008 (provided by Tarun Sankar, PPIAF office, South Asia) India s transport program is one of the most

More information

Financial Snapshot October 2014

Financial Snapshot October 2014 Financial Snapshot October 2014 Financial Snapshot About the Financial Snapshot The Financial Snapshot provides answers to frequently asked questions regarding MoDOT s finances. This document provides

More information

Pradhan Mantri Ujjwala Yojana Free LPG Gas Connection

Pradhan Mantri Ujjwala Yojana Free LPG Gas Connection Latest laws Helping good people to do good things. https://www.latestlaws.com Pradhan Mantri Ujjwala Yojana, PMUY Pradhan Mantri Ujjwala Yojana Free LPG Gas Connection (PMUY) Apply Pradhan Mantri Ujjwala

More information

ALL Counties. ALL Districts

ALL Counties. ALL Districts TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation

More information

ROLE OF INFRASTRUCTURE IN PROMOTING ECONOMIC GROWTH IN INDIA

ROLE OF INFRASTRUCTURE IN PROMOTING ECONOMIC GROWTH IN INDIA Volume 5, Issue 3 (March, 2016) Online ISSN-2277-1166 Published by: Abhinav Publication Abhinav National Monthly Refereed Journal of Research in ROLE OF INFRASTRUCTURE IN PROMOTING ECONOMIC GROWTH IN INDIA

More information

HIGHWAY ENGINEERING MODULE-IV

HIGHWAY ENGINEERING MODULE-IV HIGHWAY ENGINEERING MODULE-IV 1 HIGHWAY DRAINAGE. 2 HILL ROAD 3 ROADSIDE DEVELOPMENT. 4 ROAD ADMINISTRATION AND FINANCE Prof. Ujjval J. Solanki DEPARTMENT OF CIVIL ENGINEERING, DARSHAN INSTITUTE OF ENGINEERING

More information

Forthcoming in Yojana, May Composite Development Index: An Explanatory Note

Forthcoming in Yojana, May Composite Development Index: An Explanatory Note 1. Introduction Forthcoming in Yojana, May 2014 Composite Development Index: An Explanatory Note Bharat Ramaswami Economics & Planning Unit Indian Statistical Institute, Delhi Centre In May 2013, the Government

More information

Review and Update of Year 2035 Regional Transportation Plan

Review and Update of Year 2035 Regional Transportation Plan Review and Update of Year 2035 Regional Transportation Plan #217752 1 Background Every four years, the Year 2035 Plan is reviewed Elements of review Validity of Plan Year 2035 forecasts Transportation

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:NEP 37266 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE KINGDOM OF NEPAL FOR PREPARING THE TRANSPORT CONNECTIVITY SECTOR PROJECT June 2004 CURRENCY EQUIVALENTS

More information

ADB INDIA PORTFOLIO,

ADB INDIA PORTFOLIO, CAPE India, Supplementary Linked Document 1 ADB INDIA PORTFOLIO, 2007 2015 Table 1: Sovereign Loans Loan No. Project Name Amount ($ million) PCR (PVR) Agriculture, Natural Resources, and Rural Development

More information

INVESTMENT STRATEGIES

INVESTMENT STRATEGIES 3 INVESTMENT STRATEGIES 70 INVESTMENT STRATEGIES 71 A key role of Mobilizing Tomorrow is to outline a strategy for how the region will invest in transportation infrastructure over the next 35 years. This

More information

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

Financial. Snapshot An appendix to the Citizen s Guide to Transportation Funding in Missouri

Financial. Snapshot An appendix to the Citizen s Guide to Transportation Funding in Missouri Financial Snapshot An appendix to the Citizen s Guide to Transportation Funding in Missouri November 2017 Financial Snapshot About the Financial Snapshot The Financial Snapshot provides answers to frequently

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 46168-001 September 2014 Proposed Loans and Technical Assistance Grant People s Republic of Bangladesh: South Asia Subregional

More information

Transportation Finance Overview. Presentation Contents

Transportation Finance Overview. Presentation Contents Transportation Finance Overview Matt Burress House Research Department matt.burress@house.mn Andy Lee House Fiscal Analysis andrew.lee@house.mn January 5 th & 10 th, 2017 Presentation Contents 2 Part 1:

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million) Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising

More information

Proposed Loan Sindh Provincial Road Improvement Project (Pakistan)

Proposed Loan Sindh Provincial Road Improvement Project (Pakistan) SUMMARY PROCEDURE FOR OFFICIAL USE ONLY R94-15 21 September 2015 Proposed Loan Sindh Provincial Road Improvement Project (Pakistan) 1. The Report and Recommendation of the President (RRP: PAK 46377-002)

More information

Strategy beyond Twelfth Five Year Plan - Achievement of Sustainable Development Goals

Strategy beyond Twelfth Five Year Plan - Achievement of Sustainable Development Goals Strategy beyond Twelfth Five Year Plan - Achievement of Sustainable Development Goals Demographic Indicators Indicator Himachal Pradesh (Census 2011) All India Population (million) 6.8 1210 Decennial Growth

More information

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT Supporting National Urban Health Mission (RRP IND 47354) PROGRAM EXPENDITURE AND FINANCING ASSESSMENT 1. The Supporting National Urban Health Program will support the implementation of the National Urban

More information

15 th International Road Federation World Meeting

15 th International Road Federation World Meeting 15 th International Road Federation World Meeting Bangkok, June 2005 Guang Z. Chen Sector Manager, Transport South Asia Region The World Bank Today s Presentation Principles of Road User Charges Objectives

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 40540-016 September 2017 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

Scaling up investment in Infrastructure: The Indian experience

Scaling up investment in Infrastructure: The Indian experience Scaling up investment in Infrastructure: The Indian experience - Gajendra Haldea November 30, 2010 IMF, Washington Infrastructure Deficit Power 14% peaking deficit and 11% energy shortage; 27% T&D losses;

More information

Odisha Budget Analysis

Odisha Budget Analysis -6.7% -0.4% 4.4% 1.3% 3.1% 1.8% 4.7% 5.4% 7.8% 7.8% 8.1% 9.3% 11. 10.7% 12.4% 8.2% 10.4% 7.1% 15. 15.1% Budget Analysis The Finance Minister of, Mr. Sashibhusan Behera, presented the Budget for financial

More information

Welcome to Presentation of Twelfth Five Year Plan and Annual Plan Proposal Madhya Pradesh. May 11, 2012

Welcome to Presentation of Twelfth Five Year Plan and Annual Plan Proposal Madhya Pradesh. May 11, 2012 Welcome to Presentation of Twelfth Five Year Plan and Annual Plan Proposal Madhya Pradesh May 11, 2012 1 ACHIEVEMENTS OF ELEVENTH PLAN (ECONOMY) Targets and Achievement Sector Target for Growth Expected

More information

Pradhan Mantri Awaas Yojana - Gramin (PMAY-G) Ministry of Rural Development Government of India

Pradhan Mantri Awaas Yojana - Gramin (PMAY-G) Ministry of Rural Development Government of India Pradhan Mantri Awaas Yojana - Gramin (PMAY-G) Ministry of Rural Development Government of India Presentation Plan 1 Erstwhile Indira Awaas Yojana (IAY) 2 Findings of Performance Audit of IAY by CAG 2014

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:PHI 29226 ASIAN DEVELOPMENT BANK Li TECHNICAL ASSISTANCE TO THE REPUBLIC OF ThE PHILIPPINES FOR PREPARATION OF A NATIONAL TRANSPORT STRATEGY November 1995 CURRENCY EQUIVALENTS (as of 15 October 1995)

More information

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product

More information

Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project

Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project PD 00001-PAK June 6, 2016 PROJECT DOCUMENT Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project This document has a restricted distribution and may be used by recipients

More information

SRI LANKA ROAD SECTOR POLICY REVIEW NOTE

SRI LANKA ROAD SECTOR POLICY REVIEW NOTE SRI LANKA ROAD SECTOR POLICY REVIEW NOTE December 4, 2003 EXECUTIVE SUMMARY 1. Context. This policy note aims to: (i) facilitate the sector reform dialogue with the Government of Sri Lanka (GOSL); and

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 Periodic Financing Request Report Project Number: 43332 December 2013 People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 CURRENCY EQUIVALENTS

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Energy and Infrastructure Unit India Country Management Unit South Asia Regional Office

More information

Transportation Trust Fund Overview

Transportation Trust Fund Overview Transportation Trust Fund Overview Created pursuant to New Jersey Transportation Trust Fund Authority Act of 1984 Established to finance the cost of planning, acquisition, engineering, construction, reconstruction,

More information

PROGRAM FOR ALTERNATIVE FINANCING MECHANISM FOR ROAD INFRASTRUCTURE DEVELOPMENT

PROGRAM FOR ALTERNATIVE FINANCING MECHANISM FOR ROAD INFRASTRUCTURE DEVELOPMENT PROGRAM FOR ALTERNATIVE FINANCING MECHANISM FOR ROAD INFRASTRUCTURE DEVELOPMENT ENG. M.O. KIDENDA, MBS DIRECTOR GENERAL KENYA NATIONAL HIGHWAYS AUTHORITY Wednesday 30 th July, 2014 1 PRESENTATION OUTLINE

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

SECTOR ASSESSMENT (SUMMARY): TRANSPORT SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Myanmar is the largest country in the Greater Mekong Subregion (GMS) with a total land area

More information

MoDOT Dashboard. Measurements of Performance

MoDOT Dashboard. Measurements of Performance MoDOT Dashboard Measurements of Performance 1997 1998 1999 2000 2001 2002 MoDOT Dashboard Executive Summary Performance measurement is not new to MoDOT. In July 2001, MoDOT staff began completing quarterly

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

NORTH LUZON, PHILIPPINES. Case Study (Transportation) Project Summary:

NORTH LUZON, PHILIPPINES. Case Study (Transportation) Project Summary: NORTH LUZON, PHILIPPINES Case Study (Transportation) Project Summary: The Republic of the Philippines is an archipelagic nation in Southeast Asia comprised of 7,107 islands. The Philippines is home to

More information

ROADS For updated information, please visit July 2018

ROADS For updated information, please visit   July 2018 ROADS July 2018 Table of Content Executive Summary.3 Advantage India......4 Market Overview..6 Growth Drivers...15 Key Industry Associations.......23 Useful Information... 25 EXECUTIVE SUMMARY One of the

More information

SECTOR ASSESSMENT (SUMMARY): Multi sector

SECTOR ASSESSMENT (SUMMARY): Multi sector Capital Market and Infrastructure Capacity Support Project (RRP NEP 43490-01) SECTOR ASSESSMENT (SUMMARY): Multi sector A. Overview of the Financial and Capital Markets in Nepal 1. Nepal began its first

More information

Infrastructure Development Finance Company Limited

Infrastructure Development Finance Company Limited Infrastructure Development Finance Company Limited Presentation on Road Sector Financing Our four sector focus: Energy. Telecom. Transport Industrial & Commercial Infrastructure Agenda 1 Road Sector Overview

More information

ROADS For updated information, please visit June 2018

ROADS For updated information, please visit   June 2018 ROADS June 2018 Table of Content Executive Summary...3 Advantage India.....4 Market Overview...6 Growth Drivers...15 Key Industry Associations.....23 Useful Information....25 EXECUTIVE SUMMARY One of the

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan India: Jaipur Metro Rail Line 1-Phase B Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan India: Jaipur Metro Rail Line 1-Phase B Project Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 46417 October 2013 Proposed Loan India: Jaipur Metro Rail Line 1-Phase B Project CURRENCY EQUIVALENTS (as

More information

ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program)

ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program) ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program) A. Road Sector Road Map 1. Strategic Objective 1. The strategic objective of the National Road Development

More information

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing TESTIMONY The Texas Transportation Challenge Testimony Before the Study Commission on Transportation Financing Ric Williamson Chairman Texas Transportation Commission April 19, 2006 Texas Department of

More information

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 Accelerating Infrastructure Delivery through Better Engineering Services Project (RRP INO 49141) Sector Road Map SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 1. Sector Performance, Problems, and Opportunities

More information

CMA Analysis of the Union Budget

CMA Analysis of the Union Budget CMA Analysis of the Union Budget 2018-19 On the macroeconomic front, post the uncertainties created by demonetisation and the efforts involved to streamline GST implementation, the recovery of economy

More information

THE WORLD BANK, WASHINGTON, DC Transport Note No. TN-Draft August THE WORLD BANK, WASHINGTON, DC Transport Note No. TRN-37 December 2008

THE WORLD BANK, WASHINGTON, DC Transport Note No. TN-Draft August THE WORLD BANK, WASHINGTON, DC Transport Note No. TRN-37 December 2008 Public Disclosure Authorized TRANSPORT NOTES THE WORLD BANK, WASHINGTON, DC Transport Note No. TN-Draft August 2008 ROADS AND RURAL TRANSPORT THEMATIC GROUP 47431 THE WORLD BANK, WASHINGTON, DC Transport

More information

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction FY 2009-2018 Statewide Capital Investment Strategy.. asset management, performance-based strategic direction March 31, 2008 Governor Jon S. Corzine Commissioner Kris Kolluri Table of Contents I. EXECUTIVE

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 40626-01 November 2010 Proposed Loan People s Republic of China: Yunnan Integrated Road Network Development Project

More information

Section 4c. Our services: Land transport

Section 4c. Our services: Land transport Section 4c Our services: Land transport Land transport LAND TRANSPORT Local roads and footpaths Bridges Road safety Amenities Contribution to public transport Cycle ways Our land transport activity is

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Khyber Pakhtunkhwa Provincial Roads Improvement Project (RRP PAK 47360) A. Background ECONOMIC AND FINANCIAL ANALYSIS 1. The province of Khyber Pakhtunkhwa in northwest Pakistan covers almost six degrees

More information

Social Security Provisioning in Bihar: A Case for Universal Old Age Pension

Social Security Provisioning in Bihar: A Case for Universal Old Age Pension Social Security Provisioning in Bihar: A Case for Universal Old Age Pension First Author: Dr. Manjur Ali (Research Officer) Second Author: Nilachala Acharya Authors Organisation: Centre for Budget and

More information

Visit us at Gosarkari.com

Visit us at Gosarkari.com Visit us at Union Budget 2019-2020 of India was presented by the Union Minister for Finance, Corporate Affairs, Railways & Coal, Shri Piyush Goyal. The knowledge about yearly Union Budget is very important

More information

Sunrise Andhra Pradesh Achieving Sustainable Development Goals by 2030

Sunrise Andhra Pradesh Achieving Sustainable Development Goals by 2030 Sunrise Andhra Pradesh Achieving Sustainable Development Goals by 2030 Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all. Towards Double

More information

Investment in Infrastructure

Investment in Infrastructure 14 Investment in Infrastructure INTRODUCTION 14.1 The Eleventh Plan emphasized the importance of investment in infrastructure for achieving a sustainable and inclusive growth of 9 to 10 per cent in GDP

More information

THE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA

THE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA THE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA Roy Harry MUMU, John Belly Kelly KAIO PNG National Roads Authority Boroko, National Capital District, Papua New Guinea roymumu@daltron.com.pg, johnkaio@datec.net.pg

More information

RESPONSIBLE MINISTER FOR MINISTRY OF TRANSPORT: Minister of Transport

RESPONSIBLE MINISTER FOR MINISTRY OF TRANSPORT: Minister of Transport Vote Transport APPROPRIATION MINISTER(S): Minister of Transport (M72) APPROPRIATION ADMINISTRATOR: Ministry of Transport RESPONSIBLE MINISTER FOR MINISTRY OF TRANSPORT: Minister of Transport THE ESTIMATES

More information

Nepal: Preparing the North South Fast Track Road Project

Nepal: Preparing the North South Fast Track Road Project Technical Assistance Report Project Number: 40011 September 2006 Nepal: Preparing the North South Fast Track Road Project (Financed by the Japan Special Fund) CURRENCY EQUIVALENTS (as of 15 September 2006)

More information

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION 2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION TEMPO Meeting July 21, 2016 Current Initiatives On-going efforts to address performance-based planning and programming processes as required

More information

Post and Telecommunications

Post and Telecommunications Post and Telecommunications This section presents operating and financial data relating to the different branches of the Department of Posts including the Post Office Savings Banks. It comprises statistics

More information

Pakistan: National Highway Development Sector Investment Program Tranche 2

Pakistan: National Highway Development Sector Investment Program Tranche 2 Validation Report December 2017 Pakistan: National Highway Development Sector Investment Program Tranche 2 Reference Number: PVR-521 MFF Number: 0002 Project Number: 37559-023, 37559-033, and 37559-043

More information

Indian Railway Finance Corporation Ltd. Green Bond Framework

Indian Railway Finance Corporation Ltd. Green Bond Framework Indian Railway Finance Corporation Ltd. Green Bond Framework Table of Contents Introduction... 3 Rationale... 3 Framework overview... 3 Use of proceeds... 3 Selection process... 4 Management of proceeds...

More information

Implementing the MTO s Priority Economic Analysis Tool

Implementing the MTO s Priority Economic Analysis Tool Implementing the MTO s Priority Economic Analysis Tool presented at 6th National Conference on Transportation Asset Management presented by Alison Bradbury Ontario Ministry of Transportation November 2,

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE 1

SECTOR ASSESSMENT (SUMMARY): FINANCE 1 Policy-Based Loan for Subprogram 3 of the Third Financial Sector Program (RRP CAM 42305) SECTOR ASSESSMENT (SUMMARY): FINANCE 1 1. Sector Performance, Problems, and Opportunities 1. Overall finance sector.

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting

More information

RAJYA SABHA List of Questions for ORAL ANSWERS

RAJYA SABHA List of Questions for ORAL ANSWERS RAJYA SABHA List of Questions for ORAL ANSWERS to be asked at a sitting of the Rajya Sabha to be held on Monday, July 30, 2018/Shravana 8, 1940 (Saka) (Ministries: Defence; Drinking Water Sanitation; Earth

More information

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Technical Assistance Report Project Number: 51308-002 Transaction Technical Assistance Facility (F-TRTA) December 2017 India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Distribution

More information

ROLE OF PRIVATE SECTOR BANKS FOR FINANCIAL INCLUSION

ROLE OF PRIVATE SECTOR BANKS FOR FINANCIAL INCLUSION 270 ROLE OF PRIVATE SECTOR BANKS FOR FINANCIAL INCLUSION ABSTRACT DR. BIMAL ANJUM*; RAJESHTIWARI** *Professor and Head, Department of Business Administration, RIMT-IET, Mandi Gobindgarh, Punjab. **Assistant

More information