FINANCIAL ANALYSIS. 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1.

Size: px
Start display at page:

Download "FINANCIAL ANALYSIS. 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1."

Transcription

1 Padma Multipurpose Bridge Project (RRP BAN 35049) FINANCIAL ANALYSIS A. Introduction 1. A financial analysis assessed the viability of the proposed project investment based on the capacity of Bangladesh Bridge Authority (BBA) to generate sufficient revenues to cover the capital costs of the project. The analysis was carried out on an incremental basis, using the discounted cash flow method and measuring the financial internal rate of return of the project. B. Project Cost 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1. Table1: Project Financing Plan World Bank ADB JICA IDB Government Component Total A. Main Bridge A1 Main bridge and viaducts A1.1 Main bridge and viaducts ,339.8 A1.2 Construction yards A2 Approach roads and bridge-end facilities A2.1 Mawa side A2.2 Janjira side Subtotal (A) ,626.2 B. River Training Works C. Implementation of SAP and EMP C1 SAP C2 EMP Subtotal (C) D. Consultancies for Supervision D1 Construction supervision and project management support D2 M&E and supervision of EMP and SAP Subtotal (D) E. Project Management, TA, Training E1 Project management support and audits E2 BBA strengthening, TA, POE, and training E3 Strategic studies Subtotal (E) Total Project Cost 1, ,816.0 Financing Costs Total Project Cost 1, ,915.0 ADB = Asian Development Bank, BBA = Bangladesh Bridge Authority, EMP = environmental management plan, IDB = Islamic Development Bank, JICA = Japan International Cooperation Agency, POE = panel of experts, SAP = social action plan, TA = technical assistance. Sources: Government of Bangladesh, Asian Development Bank estimates

2 2 3. Project financing needs were determined with the financing terms shown in Table 2. For the purpose of analysis, the term of the ADB loan from the ordinary capital resources is 25 years with a 5-year grace period. Table 2: Financing Terms ADB OCR ADF World Bank JICA IDB Loan or credit amount ($million) , Interest rate LIBOR +0.3% floating 1.0% 1.5% 0.75% 0.01% LIBOR +1.2% Fixed at the end of construction Other fees and charges 0.15% 0% 0% 0% 0% Loan period (years) Grace period (years) ADB = Asian Development Bank, ADF = Asian Development Fund, IDA = International Development Association, IDB = Islamic Development Bank, JICA = Japan International Cooperation Agency, LIBOR = London interbank offered rate, OCR = ordinary capital resources, SDR = special drawing right. Sources: Asian Development Bank estimates C. Traffic Forecast 4. Using detailed information on socioeconomics and travel patterns, a transport model was developed to forecast traffic volumes and revenues for the Padma bridge. The basic steps involved in the transport modeling are to (i) build the base and future year networks; (ii) determine base year river crossing demand using an origin destination survey undertaken in May 2009 and calibrate it to current conditions of road traffic; (iii) determine growth in future demand by forecasting growth in car ownership and changes in socio-demographics, including population and employment; (iv) calculate, based on the relative costs of each mode, how mode choice may change for future year demand; (v) assess freight movements; and (vi) assign motorized traffic to a representation of the road network. 5. Two traffic scenarios have been analyzed. A high-traffic scenario, considered the base case, results from the traffic model run and is based on sustained traffic growth rates as well as a high diversion rate of approximately 80% from other ferry crossings, mainly the Paturia ferry crossing. As part of a sensitivity analysis requested by the cofinanciers, a low-traffic scenario is also presented. This scenario is an adjusted result based on lower traffic growth rates, especially for , and on a 70% diversion rate from Paturia. The lower diversion rate from Paturia has a significant impact, as diversion from Paturia should contribute approximately 65% of Padma bridge traffic. 6. In both cases, the following toll increases agreed by the government were applied: a graduated increase in toll rates from the current Jamuna bridge schedule of 40% in 2011, 80% in 2016, and 100% in 2021 (over 2009 levels). Table 3: Toll Rates Taka per Vehicle Vehicle type Truck 935 1,309 1,683 1,870 Bus 795 1,113 1,431 1,590 Car Motorcycle Source: Design Consultant calculations.

3 3 1. High-Traffic Scenario (Base Case) Table 4: Traffic Forecast for Padma (Base Case) (annual average daily traffic) Year Truck Bus Light Vehicle Total ,389 2,812 1,491 7, ,323 3,413 2,015 9, ,257 4,013 2,539 12, ,192 4,614 3,063 14, ,285 5,294 3,701 16, ,572 6,074 4,471 18, ,086 6,969 5,402 20, ,094 9,474 7,731 28, ,910 11,041 12,267 38, ,204 12,032 16,816 48, ,060 13,081 22,205 60,460 Source: Design Consultant calculations. 2. Low-Traffic Scenario Table 5: Traffic Forecast (annual average daily traffic) Year Truck Bus Light Vehicle Total ,868 1, , ,685 2,191 1,193 6, ,802 3,088 1,697 8, ,334 3,490 1,952 9, ,941 3,943 2,245 11, ,633 4,259 2,716 12, ,513 5,794 5,822 21, ,755 7,320 11,084 33, ,249 8,080 13,703 39, ,425 8,835 15,892 44,925 Source: World Bank calculations. D. Financial Analysis 7. A financial benefit cost analysis was undertaken over a 30-year period following the opening of the Padma bridge. All costs and revenues were expressed in nominal prices. Surplus revenues from operation of the Jamuna bridge were incorporated in the analysis. 8. As the timeline for building a railway line across the Padma bridge has yet to be confirmed, the corresponding cost and benefits were not included in the analysis. However, the implementation of the railway line during the life span of the bridge, assuming a bridge life of 100 years, is highly likely. 1. Weighted Average Cost of Capital 9. The appropriate discount rate to use in the financial evaluation is the weighted average cost of capital (WACC). This rate serves as a proxy for the financial opportunity cost of capital to assess the financial viability of projects. It represents the cost incurred by the government in raising the capital necessary to implement the project.

4 4 10. Table 6 shows the calculation of the project WACC following Asian Development Bank (ADB) guidelines. The cost of government funds has been taken as the yield on the 20-year Bangladesh Government Treasury Bond, which was 8.97% in July Table 6: Weighted Average Cost of Capital (%) ADB OCR ADB ADF World Bank JICA IDB Government Total Amount , ,915 Weighting Nominal cost Tax rate Tax-adjusted nominal rate Inflation rate Real cost Weighted component WACC 2.16 ADB = Asian Development Bank, ADF = Asian Development Fund, IDB = Islamic Development Bank, JICA = Japan International Cooperation Agency, OCR = ordinary capital resources, WACC = weighted average cost of capital. 2. High-Traffic Scenario (Base Case) 11. The deficits and surpluses will have to be analyzed against the current financial situation of BBA. Although it is suspected that BBA may have a significant revenue surplus at present, this will have to be confirmed after reviewing the latest audited financial statements, which are under preparation. In the following tables, it is assumed that BBA has no reserve. Table 7: Net Surplus/(Deficit) for the High-Traffic Scenario Padma bridge 0 30 (8) 24 Jamuna bridge (68) Total (68) Considering the revenue stream presented in Table 7, the financial internal rate of return (FIRR) is 7.9% in nominal terms, and the payback period is 17 years, to fiscal year (FY) Low-Traffic Scenario Table 8: Net Surplus/(Deficit) for the Low-Traffic Scenario Padma bridge 0 (172) (226) (137) Jamuna bridge (86) Total (86) (88) (52) Source: Bangladesh Bank (2009).

5 5 13. Considering the revenue stream presented in Table 8, the FIRR is 6.5% in nominal terms, and the payback period is 19 years to FY Conclusion 14. In the low-traffic scenario, which constitutes a worst-case scenario for the Padma bridge, the critical period for the project is and, most importantly, the first 10 years after the Padma bridge opens. As such, the low-traffic scenario cannot be used as a basis to determine toll levels, as they would be unreasonable. However, ADB could contribute to improving financial sustainability during the critical period by extending the grace period, currently set at 5 years. If the government wished to pursue its objective to maintain BBA as a self-sustaining entity, the final recourse would be to keep maintenance at a minimum, which needs to be avoided. 15. Considering the revenue stream presented in table 9, the financial internal rate of return (FIRR) is 6.5% (in nominal terms); and the payback period is 19 years (FY2029), identical to the scenario with a 5 year grace period. Table 9: Net Surplus / (Deficit) for the Low Traffic Scenario with 7 year grace period (US$ million) Padma Bridge 0 (152) (220) (126) Jamuna Bridge (86) Total (86) (68) (46) The above analyses are based on the assumption that BBA currently has no cumulative income surplus. However BBA s financial statements for financial year , which have not been audited yet, appear to have a cumulative surplus in the order of $ 100 million equivalent. With this amount of cumulative surpluses, the objective of maintaining BBA as a self sustaining entity would be achievable, subject to appropriate financial management of BBA s resources.

People's Republic of Bangladesh: Padma Multipurpose Bridge Project

People's Republic of Bangladesh: Padma Multipurpose Bridge Project 1 Project Administration Manual Project Number: 35049 Loan and/or Grant Number(s): {LXXXX (OCR); LXXXX (ADF) to be determined} 26 October 2010 People's Republic of Bangladesh: Padma Multipurpose Bridge

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Railway Rolling Stock Project (RRP BAN 49094) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves procurement of 214 meter gauge (MG) passenger carriages, 50 broad gauge (BG) passenger

More information

FINANCIAL ANALYSIS. A. Background

FINANCIAL ANALYSIS. A. Background SASEC Second Bangladesh India Electrical Grid Interconnection Project (RRP BAN 44192) A. Background FINANCIAL ANALYSIS 1. The South Asia Subregional Economic Cooperation (SASEC) Second Bangladesh India

More information

FINANCIAL ANALYSIS A. Introduction

FINANCIAL ANALYSIS A. Introduction Green Energy Corridor and Grid Strengthening Project (RRP IND 44426) FINANCIAL ANALYSIS A. Introduction 1. The proposed Green Energy Corridor and Grid Strengthening Project funds (i) a portion of India

More information

FINANCIAL ANALYSIS OF TRANCHE 1

FINANCIAL ANALYSIS OF TRANCHE 1 Town Electrification Investment Program (RRP PNG 41504) FINANCIAL ANALYSIS OF TRANCHE 1 A. Financial Analysis 1. Introduction 1. The financial analysis of the project covers the first three subprojects

More information

FINANCIAL ANALYSIS. 1. Introduction and Methodology

FINANCIAL ANALYSIS. 1. Introduction and Methodology Third Urban Governance and Infrastructure Improvement (Sector) Project (RRP BAN 39295) 1. Introduction and Methodology FINANCIAL ANALYSIS 1. The project finances basic urban services improvements and aims

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Chittagong-Cox s Bazar Railway Project, Phase 1 (RRP BAN 46452-002) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will construct 102

More information

FINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis:

FINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis: Java Bali 500-Kilovolt Power Transmission Crossing Project (RRP INO 42362) FINANCIAL ANALYSIS 1. General Methodology. Financial analysis of the project has been undertaken in accordance with Asian Development

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 Appendix 6 ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 1. Background. The Second Rural Connectivity Investment Program will support the Government of India in improving rural connectivity through the

More information

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the Tanahu Hydropower Project was carried out in accordance with Financial Management and Analysis

More information

Bangladesh: Road Maintenance and Improvement Project

Bangladesh: Road Maintenance and Improvement Project Performance Evaluation Report Bangladesh: Road Maintenance and Improvement Project Independent Evaluation Performance Evaluation Report December 2014 Bangladesh: Road Maintenance and Improvement Project

More information

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP Hubei Enshi Qing River Upstream Environment Rehabilitation Project (RRP PRC 47048) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the project was carried out in accordance with the Asian

More information

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million) Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 46168-001 September 2014 Proposed Loans and Technical Assistance Grant People s Republic of Bangladesh: South Asia Subregional

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction Urban Water Supply and Wastewater Management Investment Project (RRP FIJ 491-2) A. Introduction FINANCIAL ANALYSIS 1. The Asian Development Bank (ADB) Urban Water Supply and Wastewater Management Investment

More information

FINANCIAL ANALYSIS. Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387)

FINANCIAL ANALYSIS. Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387) Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387) FINANCIAL ANALYSIS 1. The financial analysis follows Asian Development Bank (ADB) guidelines. 1 Subprojects

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting

More information

Country Operations Business Plan. August Bangladesh

Country Operations Business Plan. August Bangladesh Country Operations Business Plan August 2007 Bangladesh 2008 2010 CURRENCY EQUIVALENTS (as of 5 August 2007) Currency Unit taka (Tk) Tk1.00 = $0.015 $1.00 = Tk68.5 ABBREVIATIONS ADB Asian Development Bank

More information

FINANCIAL ANALYSIS. A. Financial Capacity Assessment of MWSS

FINANCIAL ANALYSIS. A. Financial Capacity Assessment of MWSS Angat Water Transmission Improvement Project (RRP PHI 46362-002) FINANCIAL ANALYSIS 1. The project is estimated to be $134.0 million of which $98.4 million is for the design and build contract, $6.0 million

More information

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project Validation Report Reference Number: PVR-360 Project Number: 40198 Loan Number: 2374 December 2014* Viet Nam: Ho Chi Minh CityLong ThanhDauGiay Expressway Technical Assistance Project Independent Evaluation

More information

ECONOMIC ANALYSIS. Table 1: Economic costs by project component

ECONOMIC ANALYSIS. Table 1: Economic costs by project component Jiangxi Fuzhou Urban Integrated Infrastructure Improvement Project (RRP PRC 44007) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. The project s capital costs include the civil works, land acquisition

More information

LINKING EAST AND WEST BANGLADESH: THE JAMUNA BRIDGE PROJECT

LINKING EAST AND WEST BANGLADESH: THE JAMUNA BRIDGE PROJECT LA REVUE The CANADIENNE Canadian Journal D'ÉVALUATION of Program Evaluation DE PROGRAMME Special Issue 1997 Pages 121 145 121 ISSN 0834-1516 Copyright 1997 Canadian Evaluation Society LINKING EAST AND

More information

STUDY SCHEDULE STUDY PURPOSE

STUDY SCHEDULE STUDY PURPOSE STUDY SCHEDULE This Open House is the last of three public meetings for the Route Centennial Bridge Study. The material presented previously at the second Open House in July 2015 focused upon Corridor

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

FINANCIAL ANALYSIS. A. Methodology and Major Assumptions

FINANCIAL ANALYSIS. A. Methodology and Major Assumptions Second Green Power Development Project (RRP BHU 44444) FINANCIAL ANALYSIS 1. The project s financial analysis was carried out in accordance with the Financial Management and Analysis of Project Guidelines

More information

ASIAN DEVELOPMENT BANK FINANCIAL REPORT MANAGEMENT S DISCUSSION AND ANALYSIS AND ANNUAL FINANCIAL STATEMENTS

ASIAN DEVELOPMENT BANK FINANCIAL REPORT MANAGEMENT S DISCUSSION AND ANALYSIS AND ANNUAL FINANCIAL STATEMENTS ASIAN DEVELOPMENT BANK FINANCIAL REPORT MANAGEMENT S DISCUSSION AND ANALYSIS AND ANNUAL FINANCIAL STATEMENTS Management s Discussion and Analysis and Annual Financial Statements 31 December 2017 Distribution

More information

India: National Highway Sector II Project

India: National Highway Sector II Project Validation Report October 2017 India: National Highway Sector II Project Reference Number: PVR-517 Project Number: 35335-013 Loan Number: 2154 ABBREVIATIONS ADB Asian Development Bank CSC construction

More information

Management s Discussion and Analysis and Condensed Quarterly Financial Statements

Management s Discussion and Analysis and Condensed Quarterly Financial Statements Management s Discussion and Analysis and Condensed Quarterly Financial Statements 31 March 201 (Unaudited) Distribution of this document is restricted until it has been approved by the Board of Directors.

More information

South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS

South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) A. Approach FINANCIAL ANALYSIS 1. Financial analysis of the project was carried out in accordance with the Financial

More information

FINANCIAL APPRAISAL OF PROJECTS

FINANCIAL APPRAISAL OF PROJECTS FINANCIAL APPRAISAL OF PROJECTS (Special Emphasis to Railways) S. N. BANERJEA Joint Economic Adviser Railway Board New Delhi BASIC THEORY OF PROJECT APPRAISAL PROJECT IDENTIFICATION PROJECT APPRAISAL PROJECT

More information

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Third Capital Market Development Program (RRP BAN 45253) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The attached technical assistance (TA) of $700,000 will support implementation of the proposed

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Additional Financing to the Third Primary Education Development Project (RRP BAN 42122) ECONOMIC AND FINANCIAL ANALYSIS 1. This document provides an analysis of the economic rationale for additional financing

More information

Comparison between new financial analysis and ECI-result (2002)

Comparison between new financial analysis and ECI-result (2002) REPORT FEHMARNBELT FIXED LINK Financial Analysis - February 23 Comparison between new financial analysis and ECI-result (22) Prepared by Sund & Bælt / Femer Bælt March 23 A division of Sund & Bælt Holding

More information

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1 PERIODIC FINANCING REQUEST Date: April 2012 To: Asian Development Bank 6 ADB Avenue Mandaluyong City, Metro Manila ATTENTION: Director General, Pacific Department Fax No. +632-632-6318 Sir: RE: Higher

More information

PROJECT AGREEMENT. (Greater Dhaka Sustainable Urban Transport Project) between ASIAN DEVELOPMENT BANK. and BANGLADESH BRIDGE AUTHORITY

PROJECT AGREEMENT. (Greater Dhaka Sustainable Urban Transport Project) between ASIAN DEVELOPMENT BANK. and BANGLADESH BRIDGE AUTHORITY LOAN NUMBER 2862/2863(SF)/2864(SF) -BAN PROJECT AGREEMENT (Greater Dhaka Sustainable Urban Transport Project) between ASIAN DEVELOPMENT BANK and BANGLADESH BRIDGE AUTHORITY DATED 17 DECEMBER 2012 BAN 42169

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:PHI 29226 ASIAN DEVELOPMENT BANK Li TECHNICAL ASSISTANCE TO THE REPUBLIC OF ThE PHILIPPINES FOR PREPARATION OF A NATIONAL TRANSPORT STRATEGY November 1995 CURRENCY EQUIVALENTS (as of 15 October 1995)

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 46452-002 September 2016 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project f Validation Report Reference Number: PVR-370 Project Number: 29041 Loan Number: 1947 December 2014 Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project Independent Evaluation Department

More information

Buenos Aires - Colonia Bridge Project, Financial and Economic Appraisal. Chun-Yan Kuo International Tax Program, Harvard University

Buenos Aires - Colonia Bridge Project, Financial and Economic Appraisal. Chun-Yan Kuo International Tax Program, Harvard University Buenos Aires - Colonia Bridge Project, Financial and Economic Appraisal Chun-Yan Kuo International Tax Program, Harvard University Glenn P. Jenkins HIID Harvard University Development Discussion Paper

More information

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 36330-043 MFF Number: 0060 November 2017 India: Railway Sector Investment Program (Tranche 3) Distribution of this document is restricted until it has

More information

Financial Results for Third Quarter of FY2011 (From April 1, 2010 to December 31, 2010)

Financial Results for Third Quarter of FY2011 (From April 1, 2010 to December 31, 2010) 1/19 1/20 Financial Results for Third of FY2011 (From April 1, 2010 to December 31, 2010) January 31, 2011 Hino Motors, Ltd. 1. Sales Turnover 2/20 Global Unit Sales 3/20 FY2011 3rd ('10/10-12) FY2010

More information

TABLE OF CONTENTS. 1. Title Definitions and Interpretation Billing Organization Dispute Resolution...12

TABLE OF CONTENTS. 1. Title Definitions and Interpretation Billing Organization Dispute Resolution...12 TABLE OF CONTENTS 1. Title...1 2. Definitions and Interpretation...1 3. Billing Organization...5 4. Requirement to Pay Designated Toll...5 5. Leasing or Licensing of Toll Devices...5 6. Designated Toll

More information

INFORMATION STATEMENT

INFORMATION STATEMENT INFORMATION STATEMENT The Asian Development Bank (ADB) intends to issue its notes and bonds (Securities) from time to time with maturities and on terms determined by market conditions at the time of sale.

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK RRP: PRC 33470 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE BOARD OF DIRECTORS ON A PROPOSED LOAN TO THE PEOPLE S REPUBLIC OF CHINA FOR THE GANSU ROADS DEVELOPMENT PROJECT November

More information

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa Briefing Memorandum: Second Nile Crossing at Jinja- Uganda ICA Meeting: Financing Transport for Growth in Africa December 3-4, 2007 TABLE OF CONTENTS 1. Summary 2. Economic Rationale 3. The Project 4.

More information

ECONOMIC ANALYSIS. A. Introduction

ECONOMIC ANALYSIS. A. Introduction Bridge Replacement for Improved Rural Access Sector Project (RRP PNG 43200) ECONOMIC ANALYSIS A. Introduction 1. The economic analysis of the proposed project has been carried out in accordance with ADB

More information

Summary of Consolidated Earnings Report for the Second Quarter of the Fiscal Year Ending March 31, 2011 (Japanese GAAP)

Summary of Consolidated Earnings Report for the Second Quarter of the Fiscal Year Ending March 31, 2011 (Japanese GAAP) October 29, 2010 Summary of Consolidated Earnings Report for the Second Quarter of the Fiscal Year Ending March 31, 2011 (Japanese GAAP) Name of listed company: Nippon Express Co., Ltd. Listed stock exchanges:

More information

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities Chhattisgarh State Road Sector Project (RRP IND 44427) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR 1. Sector Performance, Problems, and Opportunities 1. The state of Chhattisgarh

More information

SR 520 BRIDGE. Investment Grade Traffic and Revenue Study Update. SR 520 Bridge and the Eastside plus West Approach Bridge Project

SR 520 BRIDGE. Investment Grade Traffic and Revenue Study Update. SR 520 Bridge and the Eastside plus West Approach Bridge Project SR 520 BRIDGE Investment Grade Traffic and Revenue Study Update SR 520 Bridge and the Eastside plus West Approach Bridge Project February 16, 2017 Photographs Courtesy of WSDOT Table of Contents Executive

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction Solar Power Development Project (RRP SOL 48346) A. Introduction FINANCIAL ANALYSIS 1. The scope of the financial analysis for the Solomon Islands Solar Power Development project includes (i) an estimate

More information

Economic Assessment of a Fixed Link across the Fehmarn Belt

Economic Assessment of a Fixed Link across the Fehmarn Belt Danish Ministry of Transport Economic Assessment of a Fixed Link across the Fehmarn Belt Summary Report March 2004 in cooperation with Danish Ministry of Transport Economic Assessment of a Fixed Link across

More information

Trung Son Hydropower Project. Financial Analysis

Trung Son Hydropower Project. Financial Analysis Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Trung Son Hydropower Project Financial Analysis Final Report February

More information

Financial Results for Second Quarter of FY2010 (From April 1, 2009 to September 30, 2009) October 28, Hino Motors, Ltd.

Financial Results for Second Quarter of FY2010 (From April 1, 2009 to September 30, 2009) October 28, Hino Motors, Ltd. Financial Results for Second Quarter of FY2010 (From April 1, 2009 to September 30, 2009) October 28, 2009 Hino Motors, Ltd. 1. Sales Turnover Japan s Truck and Bus Market Hino Registered Japan's Market

More information

The Development Status and Country Classification of Palau

The Development Status and Country Classification of Palau Board of Directors FOR OFFICIAL USE ONLY R280-05 17 October 2005 The Development Status and Country Classification of Palau 1. Attached for the consideration of the Board is a paper on the above subject.

More information

MTA 2018 Adopted Budget

MTA 2018 Adopted Budget BUD17013_Budget2018_Cover_Budget cover 1/16/18 10:00 AM Page 1 MTA 2018 Adopted Budget February Financial Plan 2018 2021 February 2018 TABLE OF CONTENTS I. Overview... I-1 II. MTA Consolidated Financial

More information

Team Leader: Srinivasan Palle Venkata, Evaluation Specialist ( Contact:

Team Leader: Srinivasan Palle Venkata, Evaluation Specialist (  Contact: Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Paper Project

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

Bangladesh: Greater Dhaka Sustainable Urban Transport Project

Bangladesh: Greater Dhaka Sustainable Urban Transport Project Project Administration Manual Project Number: 42169 Loan and/or Grant Number(s): LXXXX; LXXXX March 2012 Bangladesh: Greater Dhaka Sustainable Urban Transport Project Contents ABBREVIATIONS I. PROJECT

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. Page 1 of 4 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction FOREIGN EXCHANGE RISK 1. Article 13 of the Agreement Establishing

More information

Kazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program

Kazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program Validation Report December 2018 Kazakhstan: MFF-CAREC Corridor 1 (Zhambyl Oblast Section) Investment Program Reference Number: PVR-565 Project Numbers: 41121-023, 41121-033, 41121-043, and 41121-053 MFF

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Khyber Pakhtunkhwa Provincial Roads Improvement Project (RRP PAK 47360) A. Background ECONOMIC AND FINANCIAL ANALYSIS 1. The province of Khyber Pakhtunkhwa in northwest Pakistan covers almost six degrees

More information

People's Republic of China: Ganzhou Longyan Railway Project

People's Republic of China: Ganzhou Longyan Railway Project Validation Report Reference Number: PCV: PRC 2009-22 Project Number: 33442 Loan Number: 1850 December 2009 People's Republic of China: Ganzhou Longyan Railway Project Independent Evaluation Department

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 40540-016 September 2017 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

JCR-VIS Credit Rating Company Limited. Affiliate of Japan Credit Rating Agency, Ltd.

JCR-VIS Credit Rating Company Limited. Affiliate of Japan Credit Rating Agency, Ltd. Rating Agencies Methodologies for Takaful and Re-Takaful Firms By Sobia Maqbool Senior Manager JCR-VIS Credit Rating Company Limited Singapore, November 25, 2008 Honorable speakers, distinguished ladies

More information

Long-Term Financial Integrity of the ADF

Long-Term Financial Integrity of the ADF Long-Term Financial Integrity of the ADF Discussion paper ADF-11 Replenishment : Second Consultation Meeting June 2007 Tunis, Tunisia AFRICAN DEVELOPMENT FUND TABLE OF CONTENTS 1. INTRODUCTION 1 2. FINANCIAL

More information

Tampa Bay Express Planning Level Traffic and Revenue (T&R) Study

Tampa Bay Express Planning Level Traffic and Revenue (T&R) Study Tampa Bay Express Planning Level Traffic and Revenue (T&R) Study Project Report FPN: 437289-1-22-01 Prepared for: FDOT District 7 February 2017 Table of Contents Executive Summary... E-1 E.1 Project Description...

More information

Dr. Joseph A. Weinstock Asian Development Bank

Dr. Joseph A. Weinstock Asian Development Bank New Directions of Asian Development Bank in Reducing Disaster Risk Dr. Joseph A. Weinstock Asian Development Bank January 20, 2005 Kobe, Japan Global Disasters 1974 2003: People Affected Region Mean Annual

More information

ADF-14 Second meeting. Innovative Financial Instruments for ADF-14

ADF-14 Second meeting. Innovative Financial Instruments for ADF-14 ADF-14 Second meeting Innovative Financial Instruments for ADF-14 Discussion Paper ADF-14 Second Replenishment Meeting June July 2016 Abidjan, Côte d Ivoire AFRICAN DEVELOPMENT FUND Table of Contents Executive

More information

Papua New Guinea: Town Electrification Investment Program, Tranche 2

Papua New Guinea: Town Electrification Investment Program, Tranche 2 Periodic Financing Request Report Project Number: 41504-025 MFF Number: 0051 June 2017 Papua New Guinea: Town Electrification Investment Program, Tranche 2 Distribution of this document is restricted until

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

India: Supporting the Second West Bengal Development Finance Program

India: Supporting the Second West Bengal Development Finance Program Second West Bengal Development Finance Program (RRP IND 49209) Technical Assistance Report Project Number: 49209-001 Transaction Technical Assistance (TRTA) August 2017 India: Supporting the Second West

More information

Benefit-Cost Analysis

Benefit-Cost Analysis Benefit-Cost Analysis P&L Shortline Railroad Upgrade and Shuttle Train Loader Facility Project Conducted by Regional Economist, Steven Peterson with assistance from Jackie Tee, Project Manager, Cooperative

More information

Executive Summary: Review Result of Jakarta MRT Project

Executive Summary: Review Result of Jakarta MRT Project Executive Summary The Study on Integrated Transport Master Plan for JABOTABEK (Phase I) Final Report Volume III (Review of Jakarta MRT Project) Executive Summary Executive Summary: Review Result of Jakarta

More information

ADF Liquidity Policy

ADF Liquidity Policy ADF Liquidity Policy Technical Note ADF-14 Second Replenishment Meeting June 2016 Abidjan, Cote d Ivoire AFRICAN DEVELOPMENT FUND Executive Summary During the first meeting of the Fourteen General Replenishment

More information

BHU: Second Green Power Development Project

BHU: Second Green Power Development Project Second Green Power Development Project (RRP BHU 44444) Project Administration Manual Project Number: 44444 Loan and/or Grant Number(s): {LXXXX&XXXX; GXXXX; TAXXXX} November 2014 BHU: Second Green Power

More information

Bangladesh: Chittagong Port Trade Facilitation Project

Bangladesh: Chittagong Port Trade Facilitation Project Completion Report Project Number: 36105 Loan Number: 2147 June 2014 Bangladesh: Chittagong Port Trade Facilitation Project This document is being disclosed to the public in accordance with ADB s Public

More information

Planning & Economic Analysis I

Planning & Economic Analysis I Planning & Economic Analysis I Session on Planning & Policy Rita Nangia Asian Development Bank Session Description The session covers the following topics: Linkages between network planning and identification

More information

1/21 Financial Results for First Quarter of FY2011 (From April 1, 2010 to June 30, 2010)

1/21 Financial Results for First Quarter of FY2011 (From April 1, 2010 to June 30, 2010) 1/21 Financial Results for First Quarter of FY2011 (From April 1, 2010 to June 30, 2010) July 27, 2010 Hino Motors, Ltd. 1. Sales Turnover 2/21 Global Unit Sales 3/21 FY2011 1Q ('10/4-6) FY2010 1Q ('09/4-6)

More information

FRAMEWORK FINANCING AGREEMENT (Greater Mekong Subregion Ben Luc-Long Thanh Expressway Project)

FRAMEWORK FINANCING AGREEMENT (Greater Mekong Subregion Ben Luc-Long Thanh Expressway Project) FRAMEWORK FINANCING AGREEMENT (Greater Mekong Subregion Ben Luc-Long Thanh Expressway Project) Parties MFF Investment Program This Framework Financing Agreement ( FFA ) dated [ ] is between the Socialist

More information

ECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context

ECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context Dhaka Water Supply Network Improvement Project (RRP BAN 47254-003) ECONOMIC ANALYSIS A. Introduction and Macroeconomic Context 1. Economic growth in Bangladesh averaged an very healthy 6.1% during FY2006

More information

Draft TransAction Plan: Overview and Findings. Martin E. Nohe, Chairman July 13, 2017

Draft TransAction Plan: Overview and Findings. Martin E. Nohe, Chairman July 13, 2017 Draft TransAction Plan: Overview and Findings Martin E. Nohe, Chairman July 13, 2017 1 NVTA s Long Range Transportation Planning Responsibility NVTA is legislatively required to prepare a long range regional

More information

Validation Report. Sri Lanka: Colombo Port Efficiency and Expansion Project. Independent Evaluation Department

Validation Report. Sri Lanka: Colombo Port Efficiency and Expansion Project. Independent Evaluation Department Validation Report Reference Number: PVR-474 Project Number: 33019-013 Loan Number: 1841 December 2016 Sri Lanka: Colombo Port Efficiency and Expansion Project Independent Evaluation Department ABBREVIATIONS

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE Presentation for Texas Transportation Commission March 28, 2018 Purposes of the Workshop The Texas Transportation

More information

Equity Dimensions of Transportation Funding in the Central Puget Sound Region May 2015

Equity Dimensions of Transportation Funding in the Central Puget Sound Region May 2015 Equity Dimensions of Transportation Funding in the Central Puget Sound Region May 2015 White Paper for the Transportation Futures Task Force Prepared by Chris Mefford, CAI Table of Contents Page Executive

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2518 Operation Name

More information

Alleviating Traffic Congestion in Manila, Appraisal of the Pasig Expressway. Baher El-Hifnawi Cambridge Resources International Inc.

Alleviating Traffic Congestion in Manila, Appraisal of the Pasig Expressway. Baher El-Hifnawi Cambridge Resources International Inc. Alleviating Traffic Congestion in Manila, Appraisal of the Pasig Expressway Baher El-Hifnawi Cambridge Resources International Inc. Glenn P. Jenkins Queen s University, Kingston, Canada. Eastern Mediterranean

More information

IFAD s lending terms and conditions: Interest rate for the year 2010 for loans on ordinary and intermediate terms

IFAD s lending terms and conditions: Interest rate for the year 2010 for loans on ordinary and intermediate terms Document: EB 2009/98/R.14 Agenda: 10(b) Date: 23 November 2009 Distribution: Public Original: English E IFAD s lending terms and conditions: Interest rate for the year 2010 for loans on ordinary and intermediate

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

FINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited

FINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited Kathmandu Valley Wastewater Management Project (RRP NEP 43524) FINANCIAL ANALYSIS A. Kathmandu Upatyaka Khanepani Limited 1. Kathmandu Upatyaka Khanepani Limited (KUKL) is a public company registered under

More information

Piloting Results-Based Lending for Programs: Proposed Increase in Resource Allocation Ceiling

Piloting Results-Based Lending for Programs: Proposed Increase in Resource Allocation Ceiling Policy Paper March 2018 Piloting Results-Based Lending for Programs: Proposed Increase in Resource Allocation Ceiling Distribution of this document is restricted until it has been approved by the Board

More information