1 Country Operations Business Plan October 2015 Armenia This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011.

2 CURRENCY EQUIVALENTS (as of 31 August 2015) Currency unit dram (AMD) AMD1.00 = $ $1.00 = AMD ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund COBP country operations business plan CPS country partnership strategy NOTE In this report, "$" refers to US dollars. Vice-President W. Zhang, Operations 1 Director General S. O Sullivan, Central and West Asia Department (CWRD) Country Director D. Dole, Armenia Resident Mission, CWRD Team leader Team members G. Gyurjyan, Economics Officer, CWRD A. Barseghyan, Senior Portfolio Management Officer, CWRD F. Catacutan, Programs Officer, CWRD G. Mousaelyan, Senior Project Officer, CWRD L. Sabyrova, Principal Regional Economist, CWRD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

3 CONTENTS Page I. CONSISTENCY OF BUSINESS PLAN WITH THE COUNTRY PARTNERSHIP STRATEGY 1 II. INDICATIVE RESOURCE PARAMETERS 1 III. SUMMARY OF CHANGES TO LENDING AND NONLENDING PROGRAMS 2 APPENDIXES 1. Updated Country Partnership Strategy Results Framework 3 2. Indicative Assistance Pipeline 6 3. Assistance Program for Current Year 10

4

5 I. CONSISTENCY OF BUSINESS PLAN WITH THE COUNTRY PARTNERSHIP STRATEGY 1. The country operations business plan (COBP), of the Asian Development Bank (ADB) for Armenia is aligned with the government s Armenia Development Strategy, and the government s program for The COBP is consistent with the strategic priorities set out in ADB's Midterm Review of Strategy 2020, 3 and is in line with the main directions and strategic priorities outlined in ADB's country partnership strategy (CPS) for Armenia, The COBP also takes into account Armenia s graduation from Asian Development Fund (ADF) concessional financing in The overarching goal of the CPS is to help Armenia integrate its economy regionally and rebalance it toward more resilient, inclusive, and environmentally sustainable growth. This COBP supports the CPS s strategic directions on (i) transport, by focusing on improving regional roads and urban roads in Yerevan and in secondary cities; (ii) water and other urban infrastructure and services, by focusing on urban environments and on supporting targeted interventions in secondary cities; and (iii) energy, by helping enhance energy security through the diversification of energy sources, rehabilitation and upgrading of electricity transmission and distribution networks. Also promoted under this COBP are the main cross-cutting CPS strategic priorities of private sector development, regional cooperation, knowledge solutions, environmental sustainability, disaster risk management, gender, governance, and institutional strengthening. 3. In consultations with ADB during May August 2015, the government confirmed the assistance pipeline in this COBP. II. INDICATIVE RESOURCE PARAMETERS 4. Armenia is currently a Group B developing member country and has access to Asian Development Fund (ADF) and ordinary capital resources (OCR). 6 The indicative resources available during for sovereign operations amount to $364.6 million in market-based OCR. In addition, cofinancing and funding from other sources, including the ADF subregional pool and OCR regional cooperation and integration set-aside, will be actively explored. The total firm lending pipeline proposed for Armenia in amounts to $325 million from marketbased OCR. Projects included in the indicative pipeline as standby in 2017 and in 2018 can be reclassified as firm upon reaching project readiness and availability of resources. 5. ADB will consider supporting key sectors of the economy through private sector financing. Such support will aim to help the private sector play a greater role in export-oriented industry, trade, logistics, and infrastructure development, and to introduce international best practices in corporate responsibility and performance. 1 Government of Armenia Armenia Development Strategy for Yerevan. 2 Government of Armenia Republic of Armenia Government Program for Yerevan. 3 ADB Midterm Review of Strategy 2020: Meeting the Challenges of a Transforming Asia and Pacific. Manila. 4 ADB Country Partnership Strategy: Armenia, Manila. 5 In August 2014, the ADB Board of Directors approved the reclassification of Armenia for the purpose of access to ordinary capital resources, and its graduation from the ADF resources, effective 1 January Effective on 1 January 2017, Armenia is reclassified as a group C country for the purpose of access to marketbased OCR. Armenia retains access to ADF resources until 31 December 2016.

6 2 III. SUMMARY OF CHANGES TO LENDING AND NONLENDING PROGRAMS 6. Changes in the lending program from the CPS and COBP for are as follows: (i) Transport. The allocation for tranche 2 of the multitranche financing facility (MFF) of the Sustainable Urban Development Investment Program 8 planned for 2015 increased from $80 million to $113.0 million to realign the program with the government s emerging priorities. The allocation for the tranche 3 of the MFF for improving the urban environment in secondary cities increased from $49 million to $80 million, and the project was rescheduled from 2016 to 2017 (standby in 2016). A new project ($45 million) for rehabilitation of the Armenia-Georgia Border Road was added for 2016 at the request of the government. The allocation of $100 million for the MFF North South Road Corridor Investment Program 9 planned for 2018 in the CPS was increased to $170 million and was included as a standby in 2016, 2017 and 2018, subject to availability of OCR resources. (ii) Water supply and other municipal infrastructure and services. A new results-based loan for the Seismic Safety Improvement Program is proposed for The $88.5 million ADF allocation for will be fully utilized for the program. The program will support the government in seismic strengthening and renovating priority school buildings and in improving seismic safety planning and management competencies. The Solid Waste Management Project ($20 million) was deferred to firm in 2017 from standby in 2015 and in 2016, and is pending the government s review and approval of the feasibility study for a landfill near Gyumri. 10 The $45 million Water Supply and Sanitation Improvement Project was moved from 2017 to 2018 (standby in 2017). The allocation for the tranche 4 of the MFF Sustainable Urban Development Investment Program (scheduled as firm in 2018) was decreased from $43 million to $20 million due to constraints on resources in (iii) Energy. The $20 million Renewable Energy Project, planned as firm for 2016, has been renamed the Utility-Scale Solar Photovoltaic Project and deferred to standby for 2017 and firm for 2018 at the request of the government. The phase 2 of the Power Transmission Rehabilitation project was rescheduled from 2017 firm to 2018 firm (standby in 2017) due to delays in implementation of phase 1 of the program. (iv) Finance. Phase 2 of the Women Entrepreneurship Support Sector Development Program was moved from firm in 2017 to standby in 2018, due to delays in implementation of phase The indicative nonlending technical assistance program is about $6.9 million for The nonlending program was prioritized and realigned to support the lending program. The main focus will be on supporting project preparation and on providing capacity building and advisory support for implementation of related reforms. 8. The summary of changes to the lending and nonlending programs is reflected in the revised results framework in Appendix 1, and in Appendix 2, Tables A2.1 and A ADB Armenia: Country Operations Business Plan, Manila. 8 ADB Report and Recommendation of the President to the Board of Directors: Proposed Multitranche Financing Facility to the Republic of Armenia for the Sustainable Urban Development Investment Program. Manila. 9 ADB Report and Recommendation of the President to the Board of Directors: Proposed Multitranche Financing Facility to the Republic of Armenia for the North South Road Corridor Investment Program. Manila. 10 ADB Technical Assistance to Armenia for the Solid Waste Management Improvement Investment Program. Manila

7 Appendix 1 3 UPDATED COUNTRY PARTNERSHIP STRATEGY RESULTS FRAMEWORK (Board endorsement of the CPS: January 2015; COBP: October 2015) Country Development Goals The main objective of the Armenia Development Strategy 2025 is the increase in employment through creation of quality and high-productivity jobs. The Armenia Development Strategy sets the following four priorities: (i) growth in employment, (ii) development of human capital, (iii) improvement of the social protection system, and (iv) institutional modernization of the public administration and governance. Sectors Selected by ADB Government Sector Objectives Sector Outcomes that ADB Contributes to and Indicators ADB Areas of intervention Transport (Core area 1: Infrastructure, and Core area 3: Regional integration) Improved internal and external transport links Outcome: Increased, more efficient, and safer movement of goods and people Indicator 1: Road freight traffic increases to million ton-km by 2018 Baseline (2012) : million ton-km Current value (2014): million ton-km Indicator 2: Road passenger traffic increases to 2,770 million passengerkm by 2018 Baseline (2012) : 2,611 million passenger-km Current value (2014): 2,536 million passenger-km Indicator 3: Number of road collisions falls to 2,400 by 2018 Baseline (2012): 2,602 Current value (2014): 3,156 Interstate and local roads Road transport policies and reforms Pilot projects and other KPS on road safety ADB Indicative Resource Allocation in the Next Pipeline and Thematic Priorities $423.0 million for , of which: ESG 46% RCI 51% PSD 27% $12.0 million approved in 2014 Changes from CPS or Last COBP No change from the CPS or last COBP. Changes from CPS or Last COBP ADB s resource allocation for increased from $244.0 million to $423.0 million. Allocation for Tranche 2 MFF Sustainable Urban Development Investment program increased from $80 million to $113.0 million. Allocation for Tranche 3 MFF Sustainable Urban Development Investment program increased from $49 million to $80 million. A new road project ($45 million) for rehabilitation of Armenia-Georgia Border Road was added for 2016 at the request of the government. Allocation for Tranche 4 MFF North South Road Corridor Investment program increased from $100 million to $170 million.

8 4 Appendix 1 Sectors Selected by ADB Government Sector Objectives Sector Outcomes that ADB Contributes to and Indicators ADB Areas of intervention ADB Indicative Resource Allocation in the Next Pipeline and Thematic Priorities Water and other urban infrastructure and services (Core area 1: Infrastructure, and Core area 2: Environment; Other areas of operations: disaster and emergency assistance) More even (balanced) urban development Outcome: More people use improved water supply, sanitation, and municipal services Indicator 1: Share of population connected to the centralized water supply system increased to 50.0% by 2020 (2013 baseline: 44.7%) Indicator 2: Share of the population connected to centralized sewerage system increased to 50.0% by 2020 (2013 baseline: 44.7%) Indicator 3: 90% of solid waste generated disposed of in sanitary landfills by 2018 (2012 baseline: 0%) Baseline (2012): 0% Current value (2013): 0% Indicator 4: 7,750 pupils in seismically strengthened schools by 2016 (2012 baseline: 0) Urban infrastructure (water supply, solid waste management, urban transport) Urban governance, planning, and environmental policies Pilot projects and other KPS on seismic safety and rural waste management $170.8 million for , of which: ESG 93% $12.0 million approved in 2014 Energy (Core area 1: Infrastructure, Core area 2: Environment, and Core area 3: Regional integration) Enhanced energy security through, in particular, greater utilization of domestic renewable energy and improved reliability of the electricity system Outcome: Increased and more efficient use of energy (including renewable energy) Indicator 1: Unplanned power interruptions reduced to 4 5 times per year in 2018 (2011 baseline: average of 8 10 times per year); Electrical power transmission Renewable energy subsector development Rehabilitation work and dams $55.0 million for , of which: ESG 100% PSD 36% RCI 64% $37 million approved in 2014, of which: ESG 100% Changes from CPS or Last COBP ADB s resource allocation increased from $123.0 million to $170.8 million. A new results- based program for seismic safety improvement (total $88.5 million, of which, water supply and other municipal infrastructure and services $70.8 million and education $17.7) has been added for Allocation for Tranche 4 MFF Sustainable Urban Development Investment program decreased from $43 million to $20 million. No changes

9 Appendix 1 5 Sectors Selected by ADB Government Sector Objectives Deeper regional integration, with expanded cross-border electricity trade Sector Outcomes that ADB Contributes to and Indicators Indicator 2: Per capita consumption of power increases to 2,500 kwh by 2018 Baseline (2011): 1,950 kwh Current value (2012): 1,838 kwh ADB Areas of intervention Energy trade ADB Indicative Resource Allocation in the Next Pipeline and Thematic Priorities Changes from CPS or Last COBP Indicator 3: Annual CO 2 emissions (tco 2 per year) decreased by 20,000 tons by 2018 Baseline (2008): 5.5 million tco 2 Current value (2011): 5.0 million tco 2 Indicator 4: Exports of electricity increased to 2.5 billion kwh by 2018 Baseline (2011): 1.6 billion kwh Current value (2013): 1.2 billion kwh ADB = Asian Development Bank; CO 2 = carbon dioxide; COBP = country operations business plan; CPS = country partnership strategy; ESG = environmentally sustainable growth; km = kilometer; KPS = knowledge products and services; kwh = kilowatt-hour; MFF = multitranche financing facility; PSD = private sector development; RCI = regional integration; tco 2 = tons of carbon dioxide. Sources: Asian Development Bank estimates; Government of Armenia Armenia Development Strategy 2025 (April). Yerevan. National Statistical Service of Armenia (for current values of baseline data, accessed 30 July 2015).

10 6 Appendix 2 Project/Program Name 2016 Firm Infrastructure Sustainability Support Program, Phase 2 b Sector PSM, TRA, WUS, Poverty Targeting GI INDICATIVE ASSISTANCE PIPELINE Table A2.1: Lending Products, Strategic Agendas and Drivers of Change IEG, GCD, KNS, PAR Division Year of PPTA/ PDA Market -based OCR ADF Loans/Conce ssional OCR Loans Cost ($ million) ADB a ADF ADF Grants Gov t Cofinance CWPF Armenia-Georgia Border Road TRA GI IEG, RCI, CWTC (EIB) Rehabilitation Project GCD, PAR Standby MFF Sustainable Urban Development Investment Program, Tranche 3 (Secondary Cities) TRA GI IEG, ESG, GCD, KNS, PAR CWUW Solid Waste Management Project WUS GI IEG, ESG, GCD, KNS, PAR CWUW MFF North South Road Corridor TRA GI IEG, RCI, GCD CWTC Improvement Project, Tranche Firm MFF Sustainable Urban Development Investment Program, Tranche 3 (Secondary Cities) TRA GI IEG, ESG, GCD, PAR CWUW Solid Waste Management Project WUS GI IEG, ESG, GCD, KNS, PAR CWUW

11 Appendix 2 7 Strategic Agendas and Drivers of Change Project/Program Name Sector Poverty Targeting Division Market -based OCR ADF Loans/ Concessional OCR Loans ADF Grants Gov t Cofinance 2017 Standby MFF North South Road Corridor TRA GI IEG, RCI, CWTC Improvement Project, Tranche 4 GCD Utility Scale Solar for ENE GI IEG, ESG, CWEN Photovoltaic Project (formerly PSD, GCD, (IBRD, Renewable Energy Project) KNS, PAR SREP) Power Transmission ENE GI IEG, ESG, CWEN Rehabilitation Project, Phase 2 GCD, RCI Water Supply and Sanitation WUS TI-M IEG, ESG, CWUW Improvement Project RCI, GCD Year of PPTA/ PDA Cost ($ million) ADB a ADF 2018 Firm Power Transmission ENE GI IEG, ESG, CWEN Rehabilitation Project, Phase 2 GCD, RCI MFF Sustainable Urban WUS GI IEG, ESG, CWUW Development Investment Program, Tranche 4 GCD, KNS, PAR Water Supply and Sanitation WUS TI-M IEG, ESG, CWUW Improvement Project RCI, GCD Utility Scale Solar for Photovoltaic Project (formerly Renewable Energy Project) ENE GI IEG, ESG, PSD, GCD, KNS, PAR CWEN (IBRD, SREP) Standby MFF North South Road Corridor TRA GI IEG, RCI, CWTC Improvement Project, Tranche 4 GCD Women Entrepreneurship Support Sector Development Program, Phase 2 FIN GI IEG,GEM, PSD, GCD, PAR CWPF 2017/ ADB = Asian Development Bank; ADF = Asian Development Fund; CWEN = Energy Division; CWPF = Public Management, Financial Sector, and Trade Division; CWTC = Transport and Communications Division; CWUW = Urban Development and Water Division; EIB = European Investment Bank; ENE = energy; ESG = environmentally sustainable growth; FIN = finance; GCD = governance and capacity development; GEM = gender equity and mainstreaming; GI = general intervention; Gov t = government; IBRD = International Bank for Reconstruction and Development; IEG = inclusive economic growth; KNS = knowledge solutions; MFF = multitranche financing facility; OCR = ordinary capital resources; PAR = partnerships; PSD = private sector development; PDA = project design advance; PPTA = project preparatory technical assistance; PSM = public sector management; RCI = regional integration; SREP = Scaling Up Renewable Energy in Low Income Countries Program; TI-M = MDG targeting; TRA = transport; WUS = water and other urban infrastructure and services. a Reflecting the approved combination of ADF lending operations with the OCR balance sheet that will become effective on 1 January b Currently planned as two $30 million tranches, one for 2016 and one for The exact amounts and timing are pending final development of the reform program.

12 8 Appendix 2 Table A2.2: Nonlending Products and Services, Sources of Funding ADB Others Assistance Name Sector Division Assistance Type Source Amount ($ 000) Source Amount ($ 000) ($ 000) 2016 Firm Infrastructure Sustainability Support Program, PSM, TRA, CWPF CDTA TASF Phase 2 WUS Power Transmission Rehabilitation Project, Phase 2 ENE CWEN S-PPTA TASF Utility-Scale Solar Photovoltaic Project ENE CWEN PPTA TASF Water Supply and Sanitation Improvement WUS CWUW PPTA TASF Innovation and Export Promotion for Industrial IND CWPF PATA TASF Development 2, , Standby Capacity Building for Implementing Complex TRA CWTC S-PATA TASF Transport Projects Promoting Civil Society s Monitoring of Public Works TRA, WUS, CWUW CDTA 0.0 TBD PSM Firm National Strategy and Pilot Project for Environmental WUS CWUW PATA TASF Remediation Support for Sustainable Development in the Energy Sector ENE CWEN PATA TASF Promoting Civil Society s Monitoring of Public Works TRA, WUS, PSM CWUW CDTA 0.0 TBD Capacity Building for Implementing Complex TRA CWTC S-PATA TASF Transport Projects 1, , Standby Preparing Women Entrepreneurship Support Sector FIN CWPF PPTA TASF Development Program, Phase

13 Appendix 2 9 Sources of Funding ADB Others Assistance Name Sector Division Assistance Type Source Amount ($ 000) Source Amount ($ 000) ($ 000) 2018 Firm Preparing Women Entrepreneurship Support FIN CWPF PPTA TASF Sector Development Program, Phase Standby Facility for Policy Reform and Poverty Reduction IND, PSM ARRM PATA TASF Women Entrepreneurship Support Sector FIN CWPF CDTA TASF Development Program, Phase 2 1, ,000.0 ADB = Asian Development Bank; ARRM = Armenia Resident Mission; CDTA = capacity development technical assistance; CWEN = Energy Division; CWPF = Public Management, Financial Sector, and Trade Division; CWTC = Transport and Communications Division; CWUW = Urban Development and Water Division; ENE = energy; FIN = finance; IND = industry and trade; PATA = policy and advisory technical assistance; PPTA = project preparatory technical assistance; PSM = public sector management; S-PATA = small-scale policy and advisory technical assistance; S-PPTA = small-scale project preparatory technical assistance; TASF = Technical Assistance Special Fund; TBD = to be determined; TRA = transport; WUS = water and other urban infrastructure and services. Source: ADB estimates.

14 10 Appendix 3 Project/Program Name 2015 Firm MFF Sustainable Urban Development Investment Program, Tranche 2 (Yerevan Bypass) Seismic Safety Improvement Program Sector ASSISTANCE PROGRAM FOR CURRENT YEAR Poverty Targeting Table A3.1: Lending Products, 2015 Strategic Agendas and Drivers of Change TRA GI IEG, ESG, PSD, GCD WUS, EDU GI IEG, ESG, GCD, KNS, PAR Division Year of PPTA/ PDA OCR Loans Cost ($ million) ADB ADF Grants Gov t Cofinance CWUW CWUW ADB = Asian Development Bank; ADF = Asian Development Fund; CWUW = Urban Development and Water Division; EDU = education; ESG = environmentally sustainable growth; GCD = governance and capacity development; GI = general intervention; Gov t = government; IEG = inclusive economic growth; KNS = knowledge solutions; MFF = multitranche financing facility; OCR = ordinary capital resources; PAR = partnerships; PDA = project design advance; PPTA = project preparatory technical assistance; PSD = Private Sector Development; TRA = transport; WUS = water and other urban infrastructure and services. Source: ADB estimates.

15 Appendix 3 11 Table A3.2: Nonlending Products and Services, 2015 Sources of Funding ADB Others Assistance Name Sector Division Assistance Type Source Amount ($'000) Source Amount ($'000) ($'000) 2015 Firm Solid Waste Management Solutions WUS ARRM CDTA 0.0 JFPR for Remote and Small Communities Preparing School Seismic Safety WUS CWUW PPTA TASF Improvement Program Project Management Support to the TRA CWTC CDTA TASF Ministry of Transport Preparing the Armenia-Georgia TRA CWTC S-PPTA TASF Border Road Rehabilitation Project Seismic Safety Improvement WUS CWUW CDTA TASF Preparing Infrastructure Sustainability PSM, TRA, CWPF PPTA TASF Support Program, Phase 2 WUS 2, , Standby Utility-Scale Solar Photovoltaic Project ENE CWEN PPTA TASF Innovation and Export Promotion for IND CWPF PATA TASF Industrial Development 1, ,450.0 ADB = Asian Development Bank; ARRM = Armenia Resident Mission; CDTA = capacity development technical assistance; CWEN = Energy Division; CWPF = Public Management, Financial Sector, and Trade Division; CWTC = Transport and Communications Division; CWUW = Urban Development and Water Division; ENE = energy; IND = industry and trade; JFPR = Japan Fund for Poverty Reduction; PATA = policy and advisory technical assistance; PPTA = project preparatory technical assistance; PSM = public sector management; S-PPTA = small-scale project preparatory technical assistance; TASF = Technical Assistance Special Fund; TRA = transport; WUS = water and other urban infrastructure and services. Source: ADB estimates.

Country Operations Business Plan. Afghanistan November 2015

Country Operations Business Plan. Afghanistan November 2015 Country Operations Business Plan November 2015 Afghanistan 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Georgia September 2018

Country Operations Business Plan. Georgia September 2018 Country Operations Business Plan September 2018 Georgia 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Uzbekistan Country Operations Business Plan. Project Number: October 2017

Uzbekistan Country Operations Business Plan. Project Number: October 2017 1 Country Operations Business Plan Number: 26194 October 2017 Uzbekistan 2018 2020 This document is being disclosed to the public in accordance with s Public Communications Policy 2011. CURRENCY EQUIVALENTS

More information

Country Operations Business Plan. Papua New Guinea August 2016

Country Operations Business Plan. Papua New Guinea August 2016 Country Operations Business Plan August 2016 Papua New Guinea 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Kazakhstan September 2017

Country Operations Business Plan. Kazakhstan September 2017 Country Operations Business Plan September 2017 Kazakhstan 2018 2020 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Afghanistan November 2017

Country Operations Business Plan. Afghanistan November 2017 Country Operations Business Plan November 2017 Afghanistan 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. 1 CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Timor-Leste March 2017

Country Operations Business Plan. Timor-Leste March 2017 Country Operations Business Plan March 2017 Timor-Leste 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS The currency

More information

Nauru Country Operations Business Plan. August 2015

Nauru Country Operations Business Plan. August 2015 Country Operations Business Plan August 2015 Nauru 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 1 July

More information

Country Operations Business Plan. Myanmar September 2015

Country Operations Business Plan. Myanmar September 2015 Country Operations Business Plan September 2015 Myanmar 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Country Operations Business Plan. Kazakhstan September 2018

Country Operations Business Plan. Kazakhstan September 2018 Country Operations Business Plan September 2018 Kazakhstan 2019 2021 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Fiji October 2016

Country Operations Business Plan. Fiji October 2016 1 Country Operations Business Plan October 2016 Fiji 2017 2019 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 29

More information

Country Operations Business Plan. Fiji December 2015

Country Operations Business Plan. Fiji December 2015 1 Country Operations Business Plan December 2015 Fiji 20162018 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. ADB COBP CPS GDP MOL OCR PDA CURRENCY

More information

Country Operations Business Plan. Bangladesh October 2015

Country Operations Business Plan. Bangladesh October 2015 Country Operations Business Plan October 2015 Bangladesh 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Country Operations Business Plan. Fiji September 2017

Country Operations Business Plan. Fiji September 2017 Country Operations Business Plan September 2017 Fiji 2018 2020 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 13

More information

Country Operations Business Plan. Cambodia September 2016

Country Operations Business Plan. Cambodia September 2016 Country Operations Business Plan September 2016 Cambodia 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Country Operations Business Plan. Bhutan Asian Development Bank. September 2017

Country Operations Business Plan. Bhutan Asian Development Bank. September 2017 Country Operations Business Plan September 2017 Bhutan 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. Asian Development Bank CURRENCY

More information

Country Operations Business Plan. Nepal August 2018

Country Operations Business Plan. Nepal August 2018 Country Operations Business Plan August 2018 Nepal 2019 2021 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 3 August

More information

Country Operations Business Plan. Maldives June 2018

Country Operations Business Plan. Maldives June 2018 Country Operations Business Plan June 2018 Maldives 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 2 May

More information

Country Operations Business Plan. Nauru October 2016

Country Operations Business Plan. Nauru October 2016 Country Operations Business Plan October 2016 Nauru 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 7 September

More information

Country Operations Business Plan. Afghanistan September 2018

Country Operations Business Plan. Afghanistan September 2018 Country Operations Business Plan September 2018 Afghanistan 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan: Maldives,

Country Operations Business Plan: Maldives, IN.309-16 19 August 2016 Country Operations Business Plan: Maldives, 2017 2019 Attached for information is a paper on the above subject. For Inquiries: M. Nakane, South Asia Department (Ext. 5346) Country

More information

Country Operations Business Plan. Papua New Guinea July 2017

Country Operations Business Plan. Papua New Guinea July 2017 Country Operations Business Plan July 2017 Papua New Guinea 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. May 2013 Number: Malaysia

Country Operations Business Plan. May 2013 Number: Malaysia Country Operations Business Plan May 2013 Number: 26194 Malaysia 20132014 CURRENCY EQUIVALENTS (as of 15 May 2013) Currency unit ringgit (RM) RM1.00 = $0.3342 $1.00 = RM2.9925 ABBREVIATIONS ADB AIF COBP

More information

Country Operations Business Plan. Nepal September 2016

Country Operations Business Plan. Nepal September 2016 Country Operations Business Plan September 2016 Nepal 2017 2019 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 30

More information

Country Operations Business Plan. August Bangladesh

Country Operations Business Plan. August Bangladesh Country Operations Business Plan August 2007 Bangladesh 2008 2010 CURRENCY EQUIVALENTS (as of 5 August 2007) Currency Unit taka (Tk) Tk1.00 = $0.015 $1.00 = Tk68.5 ABBREVIATIONS ADB Asian Development Bank

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 51360-002 Transaction Technical Assistance Facility (F-TRTA) April 2018 Turkmenistan: Preparing the Central Asia Regional Economic Cooperation Corridors 2, 3

More information

Country Operations Business Plan. Sri Lanka August 2018

Country Operations Business Plan. Sri Lanka August 2018 Country Operations Business Plan August 2018 Sri Lanka 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 9

More information

Country Operations Business Plan. Philippines October 2018

Country Operations Business Plan. Philippines October 2018 Country Operations Business Plan October 2018 Philippines 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Country Operations Business Plan. September Nepal

Country Operations Business Plan. September Nepal Country Operations Business Plan September 2011 Nepal 2012 2014 CURRENCY EQUIVALENTS (as of 31 August 2011) Currency Unit Nepalese rupee/s (NRe/NRs) NRe1.00 = $0.014 $1.00 = NRs73.35 ABBREVIATIONS ADB

More information

Statement of the Asian Development Bank s Operations in 2017

Statement of the Asian Development Bank s Operations in 2017 February 208 Statement of the Asian Development Bank s Operations in 207 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 20. I. OVERVIEW OF OPERATIONS.

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Islamic Republic of Pakistan: Update on Energy Sector Plan

Islamic Republic of Pakistan: Update on Energy Sector Plan Technical Assistance Report Project Number: 50081-001 Knowledge and Support Technical Assistance (KSTA) August 2017 Islamic Republic of Pakistan: Update on Energy Sector Plan This The views document expressed

More information

Kazakhstan Country Partnership Strategy. August 2012

Kazakhstan Country Partnership Strategy. August 2012 Country Partnership Strategy August 2012 Kazakhstan 20122016 This document is being disclosed to the public prior to Board consideration in accordance with ADB s Public Communications Policy (2011). Subject

More information

2015 Annual Portfolio Performance Report

2015 Annual Portfolio Performance Report April 2016 2015 Annual Portfolio Performance Report This is a redacted version of the document that excludes information that is subject to exceptions to disclosure set forth in ADB's Public Communications

More information

Proposed Policy-Based Loans, Grants, and Technical Assistance Grant Pacific Disaster Resilience Program

Proposed Policy-Based Loans, Grants, and Technical Assistance Grant Pacific Disaster Resilience Program Concept Paper Project Number: 50028-001 July 2017 Proposed Policy-Based Loans, Grants, and Technical Assistance Grant Pacific Disaster Resilience Program This document is being disclosed to the public

More information

Georgia Country Partnership Strategy. December 2014

Georgia Country Partnership Strategy. December 2014 Country Partnership Strategy December 2014 Georgia 2014 2018 Distribution of this document is restricted until it has been endorsed by the Board of Directors. Following such endorsement, ADB will disclose

More information

Establishment of the Leading Asia s Private Sector Infrastructure Fund

Establishment of the Leading Asia s Private Sector Infrastructure Fund March 2016 Establishment of the Leading Asia s Private Sector Infrastructure Fund This document is being disclosed to the public prior to Board consideration in accordance with ADB s Public Communications

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

2016 Annual Portfolio Performance Report

2016 Annual Portfolio Performance Report May 2017 2016 Annual Portfolio Performance Report This is a redacted version of the document that excludes information that is subject to exceptions to disclosure set forth in ADB's Public Communications

More information

Country Partnership Strategy. Bhutan

Country Partnership Strategy. Bhutan Country Partnership Strategy June 2014 Bhutan 2014 2018 Distribution of this document is restricted until it has been endorsed by the Board of Directors. Following such endorsement, ADB will disclose the

More information

Interim Country Partnership Strategy. Maldives October 2014

Interim Country Partnership Strategy. Maldives October 2014 Interim Country Partnership Strategy October 2014 Maldives 2014 2015 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Policy Paper. March Establishing the Project Design Facility

Policy Paper. March Establishing the Project Design Facility Policy Paper March 2011 Establishing the Project Design Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund COBP country operations business plan DMC developing member country

More information

Georgia: Preparing the Second Domestic Resource Mobilization Program

Georgia: Preparing the Second Domestic Resource Mobilization Program Technical Assistance Report Project Number: 52161-002 Transaction Technical Assistance (TRTA) September 2018 Georgia: Preparing the Second Domestic Resource Mobilization Program This document is being

More information

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project Technical Assistance Report Project Number: 51107-001 Transaction Technical Assistance (TRTA) October 2017 Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project This

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

2014 Annual Portfolio Performance Report

2014 Annual Portfolio Performance Report April 2015 2014 Annual Portfolio Performance Report This is a redacted version of the document that excludes information that is subject to exceptions to disclosure set forth in ADB's Public Communications

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Technical Assistance Report Project Number: 46220 Policy and Advisory Technical Assistance (PATA) December 2012 Armenia: Infrastructure Sustainability Support Program The views expressed herein are those

More information

Multitranche Financing Facility Annual Report 2017

Multitranche Financing Facility Annual Report 2017 May 2018 Multitranche Financing Facility Annual Report 2017 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. ABBREVIATIONS ADB Asian Development

More information

Additional Cofinancing

Additional Cofinancing Additional Cofinancing Sri Lanka Sri Lanka Project Number: 45148 Loan Number: 3029/3030-SRI May 2014 Proposed Administration of Loan Democratic Socialist Republic of Sri Lanka: Greater Colombo Water and

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) Second Jharkhand State Road Project (RRP IND 49125) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) A. Sector Performance, Problems, and Opportunities 1. State context. The state of Jharkhand was

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities

More information

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

More information

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project Appendix 3 11 Technical Assistance Report Project Number: 51329-002 Transaction Technical Assistance (TRTA) November 2017 Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade

More information

Partnership Brief. Cofinancing with Spain

Partnership Brief. Cofinancing with Spain Partnership Brief Cofinancing with Spain Contents 3 Defining the Partnership 5 Project Portfolio 6 Highlights Boxes and Tables 4 Organizational Structure 7 Trust Funds 2011 Asian Development Bank All rights

More information

Proposed Programmatic Approach and Policy- Based Loan for Subprogram 1 Republic of Fiji: Sustained Private Sector-Led Growth Reform Program

Proposed Programmatic Approach and Policy- Based Loan for Subprogram 1 Republic of Fiji: Sustained Private Sector-Led Growth Reform Program Concept Paper Project Number: 48490-002 November 2017 Proposed Programmatic Approach and Policy- Based Loan for Subprogram 1 Republic of Fiji: Sustained Private Sector-Led Growth Reform Program This document

More information

Unlocking Investment in Transport Infrastructure: The role of ADB

Unlocking Investment in Transport Infrastructure: The role of ADB Unlocking Investment in Transport Infrastructure: The role of ADB Asian Highway Investment Forum 8 October, 2013 Hideaki Iwasaki Principal Infrastructure Specialist Asian Development Bank Asian Development

More information

Policy Paper. June Mainstreaming the Multitranche Financing Facility

Policy Paper. June Mainstreaming the Multitranche Financing Facility Policy Paper June 2008 Mainstreaming the Multitranche Financing Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund CPS country partnership strategy DMC developing member country

More information

RCI as Driver of Inclusive Growth

RCI as Driver of Inclusive Growth RCI as Driver of Inclusive Growth 19 July 2013 Alfredo Perdiguero Principal Economist Thailand Resident Mission Southeast Asia Department Asian Development Bank Disclaimer: In preparing any country program

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

Country Partnership Strategy. October Nepal

Country Partnership Strategy. October Nepal Country Partnership Strategy October 2013 Nepal 2013 2017 CURRENCY EQUIVALENTS (as of 4 October 2013) Currency unit Nepalese rupee/s (NRe/NRs) NRe1.00 = $0.01001 $1.00 = NRs99.15 ABBREVIATIONS ADB Asian

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 42180-016 February 2017 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

Management s Discussion and Analysis and Annual Financial Statements

Management s Discussion and Analysis and Annual Financial Statements Management s Discussion and Analysis and Annual Financial Statements 31 December 2015 Asian Development Bank CONTENTS Management s Discussion and Analysis I. Overview 1 II. Combination of OCR and ADF

More information

May Fiji: Update This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011.

May Fiji: Update This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. May 2014 Fiji: Update 2014 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 6 May 2014) Currency unit Fiji dollar (F$)

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 50138-001 September 2017 Proposed Loan Walkers Colombo Shipyard (Private) Limited Shipyard Rehabilitation and Infrastructure

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund)

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund) Technical Assistance Report Program Number: 48207-003 Transaction Technical Assistance (TRTA) June 2017 Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49107-003 September 2018 Proposed Multitranche Financing Facility, Technical Assistance Grant, and Administration of

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 36330-043 MFF Number: 0060 November 2017 India: Railway Sector Investment Program (Tranche 3) Distribution of this document is restricted until it has

More information

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2 Periodic Financing Request Report Project Number: 42417-033 MFF Number: 0056 September 2015 Armenia: Sustainable Urban Development Investment Program Tranche 2 This document is being disclosed to the public

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

Republic of the Philippines: Preparing the Road Sector Improvement Project

Republic of the Philippines: Preparing the Road Sector Improvement Project Technical Assistance Report Project Number: 41076 July 2008 Republic of the Philippines: Preparing the Road Sector Improvement Project (Financed by the Japan Special Fund) The views expressed herein are

More information

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 Periodic Financing Request Report Project Number: 43332 December 2013 People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 CURRENCY EQUIVALENTS

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK BUDGET OF THE ASIAN DEVELOPMENT BANK FOR 2017 NOVEMBER 2016 ASIAN DEVELOPMENT BANK November 2016 Budget of the Asian Development Bank for 2017 Distribution of this document is restricted until it has been

More information

Country Partnership Strategy. Tajikistan August 2016

Country Partnership Strategy. Tajikistan August 2016 Country Partnership Strategy August 2016 Tajikistan 2016 2020 Distribution of this document is restricted until it has been endorsed by the Board of Directors. Following such endorsement, ADB will disclose

More information

Country Operations Business Plan. October Cambodia

Country Operations Business Plan. October Cambodia Country Operations Business Plan October 2009 Cambodia 2009 2012 CURRENCY EQUIVALENTS (as of 14 August 2009) Currency Unit riel/s (KR) $1.00 = KR4,136 ABBREVIATIONS ADB Asian Development Bank ADF Asian

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 48141-001 November 2014 Proposed Loan and Technical Assistance Grant Republic of Fiji: Transport Infrastructure

More information

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China Technical Assistance Report Project Number: 49401-001 Policy and Advisory Technical Assistance (PATA) April 2016 People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

SECTOR ASSESSMENT (SUMMARY): TRANSPORT SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Myanmar is the largest country in the Greater Mekong Subregion (GMS) with a total land area

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam Technical Assistance Report Project Number: 49400-001 Policy and Advisory Technical Assistance (PATA) January 2017 Policy Coordination and Planning of Border Economic Zones of the People's Republic of

More information

Establishment of the High-Level Technology Fund

Establishment of the High-Level Technology Fund April 2017 Establishment of the High-Level Technology Fund Distribution of this document is restricted until it has been approved by Management. Following such approval, ADB will disclose the document

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

Concept Paper. Project Number: October Lao People s Democratic Republic: Road Maintenance Project

Concept Paper. Project Number: October Lao People s Democratic Republic: Road Maintenance Project Concept Paper Project Number: 47085 October 2013 Lao People s Democratic Republic: Road Maintenance Project CURRENCY EQUIVALENTS (as of 9 October 2013) Currency Unit kip (KN) KN1.00 = $0.000127 $1.00 =

More information

Mongolia: Developing an Information System for Development Policy and Planning

Mongolia: Developing an Information System for Development Policy and Planning Technical Assistance Report Project Number: 51136-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Developing an Information System for Development Policy and Planning This

More information

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program Concept Paper Project Number: 49041-002 January 2016 Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program This document

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 48025-003 March 2017 Proposed Loan Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 (Pap

More information

Cook Islands: Preparing the Infrastructure Development Project (Cofinanced by the Japan Special Fund and Government of New Zealand)

Cook Islands: Preparing the Infrastructure Development Project (Cofinanced by the Japan Special Fund and Government of New Zealand) Technical Assistance Report Project Number: 40287 December 2007 Cook Islands: Preparing the Infrastructure Development Project (Cofinanced by the Japan Special Fund and Government of New Zealand) The views

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT Country Operations Business Plan: Philippines, 2014 2016 SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT A. Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector performance.

More information

ASIAN DEVELOPMENT BANK FINANCIAL REPORT MANAGEMENT S DISCUSSION AND ANALYSIS AND ANNUAL FINANCIAL STATEMENTS

ASIAN DEVELOPMENT BANK FINANCIAL REPORT MANAGEMENT S DISCUSSION AND ANALYSIS AND ANNUAL FINANCIAL STATEMENTS ASIAN DEVELOPMENT BANK FINANCIAL REPORT MANAGEMENT S DISCUSSION AND ANALYSIS AND ANNUAL FINANCIAL STATEMENTS Management s Discussion and Analysis and Annual Financial Statements 31 December 2017 Distribution

More information

People s Republic of China: Preparing Yangtze River Economic Belt Projects

People s Republic of China: Preparing Yangtze River Economic Belt Projects Technical Assistance Report Project Number: 50343-001 Transaction Technical Assistance Facility (F-TRTA) April 2017 People s Republic of China: Preparing Yangtze River Economic Belt Projects Cofinanced

More information

Interim Country Partnership Strategy. October Malaysia

Interim Country Partnership Strategy. October Malaysia Interim Country Partnership Strategy October 2011 Malaysia 2011 2012 CURRENCY EQUIVALENTS (as of 23 September 2011) Currency Unit ringgit (RM) RM1.00 = $0.31 $1.00 = RM3.18 ABBREVIATIONS ADB Asian Development

More information

Republic of Kazakhstan: Enhancing Insurance Market Efficiency and Outreach

Republic of Kazakhstan: Enhancing Insurance Market Efficiency and Outreach Technical Assistance Report Project Number: 48037-001 Policy and Advisory Technical Assistance (PATA) October 2014 Republic of Kazakhstan: Enhancing Insurance Market Efficiency and Outreach (Cofinanced

More information

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms Technical Assistance Report Project Number: 47137-004 Capacity Development Technical Assistance (CDTA) September 2016 Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance

More information

Periodic Financing Request Report. Afghanistan: Energy Supply Improvement Investment Program (Tranche 3)

Periodic Financing Request Report. Afghanistan: Energy Supply Improvement Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 47282 005 MFF Number: 0090 September 2017 Afghanistan: Energy Supply Improvement Investment Program (Tranche 3) Distribution of this document is restricted

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Completion Report Project Number: 46220-001 Loan Number: 3155 June 2017 Armenia: Infrastructure Sustainability Support Program This document is being disclosed to the public in accordance with ADB s Public

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:NEP 37266 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE KINGDOM OF NEPAL FOR PREPARING THE TRANSPORT CONNECTIVITY SECTOR PROJECT June 2004 CURRENCY EQUIVALENTS

More information