Analyst Call. Annual Results Outlook th March 2012
|
|
- Isabel Mitchell
- 5 years ago
- Views:
Transcription
1 Analyst Call Annual Results Outlook th March 2012
2 Disclaimer This document ( Document ) has been prepared by Eurogrid GmbH ( Company ) and its wholly-owned subsidiary 50Hertz Transmission GmbH ( 50Hertz ) for the analyst call Annual Results Outlook 2012 ( Analyst Call ). No representation or warranty, no liability Although all reasonable care has been taken to ensure that the content of the Document and the information and statements provided during the Analyst Call are accurate no representation or warranty, express or implied, is or will be made, and no liability is or will be accepted, by the Company, 50Hertz or by any of their respective officers, employees, representatives or agents ( Representatives ) in relation to the fairness, accuracy, completeness or reasonableness of this Document and/or the information and statements contained herein (including, inter alia, all estimates, valuations, forecasts, assumptions or statements of opinion or expectation) or any other information and statements made available in this context, in writing, in the Analyst Call or otherwise; in fact the information and the statements may be incomplete, condensed and may not contain all information which might be material to a person receiving the Document or information respectively statement for the purpose contemplated above. In particular, no reliance on forward looking statements, statistical and third-party data In particular, to the extent provided statements in the Document and/or Analyst Call are forward looking such as inter alia expectations, projections or prospects they are based on Representatives' current views and on numerous assumptions which involve known and unknown risks and uncertainties such as regulatory changes that could cause actual results, performances or events to differ materially from those expressed or implied in such statements. This Document (together with any other information that may be furnished by the Company and/or 50Hertz in particular in the Analyst Call) also includes or may include statistical data and cites or may cite third-party data such as projections regarding the future growth of the market. This data is taken or derived from information published by industry sources. Neither the Company nor 50Hertz nor their Representatives have independently verified this data. No reliance should therefore be placed on the statistical data and third-party data cited in this Document. No obligation to update or to carry out transactions This Document and the Analyst Call speak only as of their dates. Neither the Company, nor 50Hertz, nor any Representative undertakes any obligation to update the Document or any other written, electronic or oral information supplied in this context (including, in particular, all expectations and other forward looking statements) or to correct any inaccuracies which may become apparent whether as a result of new information, future events or otherwise. The issue of this Document and the information respectively statements provided during the Analyst Call shall not be taken as any form of commitment on the part of the Company or 50Hertz to proceed with any transaction. Page 2 of 27
3 Content Highlights 2011 Financials Outlook 2012 and summary Page 3 of 27
4 Portrait of 50Hertz Transmission Value (Share in Germany) Area* Length of Lines Maximum Load Electricity consumption Installed capacity: - thereof renewables* - thereof wind energy* 109,360 km² (31%) 9,840 km (28%) ca. 17 GW (20%) 98 TWh (20%) ca. 37,400 MW (~35%) 16,750 MW (~29%) 11,570 MW (~41%) Employees 694 * Preliminary data Turnover - as of grid 6.9 bn 0.6 bn Page 4 of 27
5 Business Highlights 2011 System Security - June 27th: TCC inauguration in Neuenhagen/ Berlin. 150 guests from politics and economy. TCC is technically state of the art - Reliability of network operation in Hamburg in spite of extraordinary situation Development Network Expansion - May 2nd: Chancellor Angela Merkel switched on the connection of Offshore- Windfarm Baltic I - Regional Planning Procedure approved for SW-Coupling Line (3rd section) - Regional Planning Procedure approved for 380-kV-North Ring Berlin EEG-Integration - Increasing integration of wind energy (>10 GW!) - 45 days of 13 (2) measures (shutdown of renewables) - Redispatch costs of about 100m (thereof 41m in 12/2011) - Regulated RoE for 2nd regulatory period set at 9.05% Page 5 of 27
6 Draw Off From the 50Hertz Grid TWh 6,0 5,0 50Hertz s network: 59.0 TWh 4,0 Mild weather Decentralised generation Renewables 3,0 2,0 1,0 0,0 jan feb mar apr may june july aug sep oct nov dec Total 58.9 TWh Total 63.0 TWh Total 59.0 TWh Page 6 of 27
7 RES Development as the Main Driver for TSO Business other RES wind offshore (Prognose) wind onshore (Prognose) wind onshore RES - dena-netzstudie II Actual numbers Prognosis Installed capacity in MW Installed capacity (MW): State: 31/12/2011 Wind Onshore Offshore 50 Biomass Photovoltaik Others Year Data for 2000 until 2010 (acutal): from Data for 2015 until 2023 (Prognosis): EEG-Prognosis 50Hertz Transmission (temporarily), State of 2011 Data for : EEG data base elected on Page 7 of 27
8 A Lack of Transport Capacities - Especially From North to South ca GW 3.6 GW ca. +25 GW Especially the North-South connections were working on maximum capacity in periods of strong wind! ca GW new installed capacities vs. 12 GW new transport capacities! 3.6 GW 4.8 GW Current projects are not sufficient to prevent bottlenecks in the future. Centre of demand RES production Source: 50Hertz Transmission & TenneT GmbH Prognosen für 2020 Capacity of Lines see Bundestag Drucksache 16/10491, Begründung zum EnLAG Fast realization of installing RES systems and long-term permitting processes of network expansion lead to asynchronous development. Page 8 of 27
9 System Security: Days of Interventions System interventions (Days with 13.1 EnWG) Costs Costs in m Amount in GWh Amount Shutdown of Renewables (Days with 13.2 EnWG) Amount Amount in GWh Page 9 of 27
10 A Growing Company FTE* % % Hertz prepares for the future. * FTE = full time equivalent (Vollzeitarbeitskräfte) Page 10 of 27
11 Content Highlights 2011 Financials Outlook 2012 and summary Page 11 of 27
12 Investments Mainly Driven by Offshore Total m * Onshore : 114,5 m Offshore : 130,9 m Maintenance Offshore Onshore Ø360 Very high reliability: only 1,21 incidents per 100km 51 Non electrical investments, 8% Replacements, 7% Internal consumption, 17% Renewables & generaton localisation, 68% Ø * HGB Ø Ø Constantly increasing capital expenditure to integrate Renewable Energy Sources (RES) and to develop the EU market. Page 12 of 27
13 Total Revenues m * m * EEG EOG EEG EOG 570 Others Others *Revenues gross benefits EEG Erneuerbare-Energien-Gesetz - Revenues of Renewable Energy (Nonprofit) EOG Erlösobergrenze Revenue Cap (Revenues from accepted grid fees incl. measuring and accounting) Others mainly revenues from supply of services for third parties EEG Energy balancing and TSO area management (Nonprofit) Increasing revenue is mainly driven by increasing EEG-business. Page 13 of 27
14 Profit and Loss* Total revenues Neutral business Net revenues Other operating income Consolidated turnover Energy costs Maintenance Personnel costs Other operating costs EBITDA Depreciation Financial result Income tax Net result in m ,885 6, ** 5,496 4, % 28.0% 3.7% -10.9% 0.5% 8.2% 18.6% 16.0% -3.6% -20.2% -7.2% -29.6% -47.5% -12.9% * IFRS Eurogrid GmbH, 50Hertz Transmission GmbH und 50Hertz Offshore GmbH consolidated ** Unaudited proforma figures on 12 month basis due to two formal rump years Revenues (incl. and excl. EEG) increased again. Influencable operating expenses in line with growth of 50Hertz. Page 14 of 27
15 Break Down of Net Profit* Base year Corridor model EEG & other non profit Other non influencable costs Offshore TenneT Investment Budget offshore Investment Budget onshore Eurogrid GmbH IFRS adjustments Net result in m * IFRS Eurogrid GmbH, 50Hertz Transmission GmbH und 50Hertz Offshore GmbH consolidated Page 15 of 27
16 Balance Sheet* Assets Fixed assets in m , , % Current assets % Liquid assets % Total Assets % Liabilities Equity % Provisions % Long-term debt % Other liabilities 1, % (Net) regulatory liabilities % Total Liabilities % Equity ratio (= Equity/ Total Assets) Gearing (= Net debt**/ Equity) * IFRS Eurogrid GmbH, 50Hertz Transmission GmbH and 50Hertz Offshore GmbH ** s. page % 0.16 A solid balance sheet structure % Page 16 of 27
17 Monitoring of Key Credit Ratios to Maintain a Solid Baa1 Rating Key Credit Ratios Goals FFO interest cover > 3.0 Net debt / Regulatory asset base 15% 29% FFO / Net debt 56% 52% > 12% RCF / Capex RCF / Net debt 15% 52% > 8% FFO Regulatory asset base 1, Net debt RCF Capex* Net interest w/o non cash * incl. capitalized interest during construction FFO interest cover = (FFO + Net interest w/o non cash) Net interest w/o non cash RCF = FFO dividends Net debt = debt cash Decrease of ratios in line with planned investment programme. Communicated to rating agencies. Page 17 of 27
18 HGB FY 2011 Heavily Impacted by Weather and by Offshore Investments Weather and Offshore Investments 3,6 75,7 54,3 49,8 36,4 44,5 IFRS 2011 no consideration in HGB Special effects HGB Valuation differences HGB 2011 No consideration of regulatory receivables in HGB impact the dividend distribution ability negatively. Regulatory return on equity (7.82%) Page 18 of 27
19 Cash Flow Statement Net result Change of non-cash items Operating Cash Flow (FFO) Investment Cash Flow thereof Capex** Free Cash Flow Cash flow from financing activities thereof dividend payments Change in cash & cash equivalents * * unaudited pro-forma figures ** difference to slide 12 arises from different treatment of deconstruction obligations in HGB and IFRS Page 19 of 27
20 Liquidity Overview Substantial Improvement of Liquidity Eurogrid GmbH, 50Hertz Transmission, 50Hertz Offshore (Total incl. EEG) in m /- 284 Ø /-223 Ø Actual Avg Avg only EEG Periodic variation in liquidity mainly driven by EEG-business. Page 20 of 27
21 Financing Issuer Guarantors Eurogrid GmbH 50Hertz Transmission GmbH 50Hertz Offshore GmbH Funding 2.5 bn Euro Medium Term Note Programme (EMTN) EUR Bond 500 m Coupon Maturity Maturity Date Joint Bookrunners Terms and Conditions 3.875% 10Y Oct 2020 BNPP, Dexia, ING and RBS Revolving Credit Facility 350 m (undrawn) Participation of 11 (core) banks: Commerzbank, BNPP, KBC, HSBC, ING, Helaba, Morgan Stanley, Rabobank, RBS, IL Brandenburg, IB Berlin Duration until 06/2016 Cash Management Line 120 m (undrawn) Overdraft facility with cash management bank BNPP Page 21 of 27
22 Content Highlights in 2011 Financials Outlook 2012 and summary Page 22 of 27
23 Current Projects of 50Hertz (Selection) North Line (Krümmel - Görries) Mecklenburg-Western Pomerania: built Schleswig-Holstein: Planning approval in final stage Uckermark Line (Neuenhagen - Bertikow) Planning approval in progress 380-kV North Ring Berlin Regional Planning Procedure approved (Q3/2011) Southwest Coupling Line (3rd section) Lauchstädt-Vieselbach: connected 2008 Vieselbach-Altenfeld: Planning approval approved Altenfeld-Redwitz: Regional Planning Procedure approved (Q1/2011), Planning approval in progress 3rd Interconnector to Poland Project conference end of 2011 Offshore-Projects in Baltic-Sea Baltic I connected Baltic II in progress Further projects in planning Page 23 of 27
24 Grid Connection Applications of Offshore Wind Farms at 50Hertz Cable routes (schematic diagram) Grid connection in planning Grid connection in process of realisation Grid connection in operation Grid connector applied Grid connector under construction Grid connector in operation No Beta Baltic Beltsee Fairwind Name EnBW Baltic 1 * EnBW Baltic 2 ** Arcadis-Ost 1 ArkonaSee-West ArkonaSee-Süd Baltic Eagle Strom-Nord ArkonaSee-Ost Wikinger-Nord Wikinger ** Adlergrund Gap [MW] Adlergrund Arkona-Becken-Südost ** 1, Ostseeperle 210 * Operating since Spring 2011 ** Approved projects (BSH) *** Project name was changed from Wikinger AO2 to Wikinger-Süd New applications Strom-Süd Ostseeschatz Windanker Wikinger-Süd *** Page 24 of 27
25 Outlook 2012 T=0 for investment budgets and replacements lump sum compromise will lead to significant improvement of HGB results 1st year after base year higher focus on efficiency Increased challenges in the system (redispatch measures) - Accounting improvements lead to reduced P&L impact - Discussion with regulator to define such costs as non-influencable Increased liquidity demand from EEG - Direct marketing of RE producers (market premium) - Including the legally defined liquidity buffer of 10% into EEG allocation necessary Page 25 of 27
26 Challenges of the Turnaround in the Energy Policy Acceptance Network expansion Permitting Network expansion System security Financing Regulatory Framework Page 26 of 27
27 Many thanks for your attention!
Analyst Call 2017 Eurogrid/ 50Hertz. 12 March 2018 Marco Nix, CFO
Analyst Call 2017 Eurogrid/ 50Hertz 12 March 2018 Marco Nix, CFO Highlights 2017 Further progress in grid extension Stabilising costs for congestion management Huge export from 50Hertz area Decreasing
More informationFull year 2012 results. Analyst meeting Brussels, 01 March 2013
Full year 2012 results Analyst meeting Brussels, 01 March 2013 Disclaimer This presentation is only provided for general information purpose about Elia and its activities. The included statements are neither
More informationElia Group FY2016 results. At the heart of the European Electricity grid
Elia Group FY2016 results At the heart of the European Electricity grid Disclaimer - This presentation provides information about Elia and its activities and is provided for general information purposes
More informationElia Group FY2017. At the interest of society
Elia Group FY2017 At the interest of society 2 Elia Group FY 2017 Chris Peeters Chief Executive Officer Disclaimer You must read the following before continuing. This presentation is only provided for
More informationStatkraft Investor Update. March 2014
Statkraft Investor Update March 2014 Disclaimer This presentation has been prepared by, and the information contained herein (unless otherwise indicated) has been provided by Statkraft AS (the "Company").
More informationOffshore Grid Development in Germany
Offshore Grid Development in Germany Hamburg, 26 September 2017 Lukas Wienholt Federal Maritime and Hydrographic Agency Content of Presentation I. Current status of offshore wind energy in the German North
More informationVattenfall Q3 results 2009
Vattenfall Q3 results 2009 Presentations by Lars G. Josefsson, CEO and Dag Andresen, CFO Agenda CEO Lars G. Josefsson: CFO Dag Andresen: Financial highlights Generation volumes Electricity price development
More informationInvestor Conference Call. Financial Year April 2014
Investor Conference Call Financial Year 2013 24 April 2014 Agenda Presenter 1 2 Business Profile Regulatory Developments Dr. Jörg Bergmann Chief Financial Officer Open Grid Europe GmbH 3 Refinancing 4
More informationVattenfall Q2 Results 2008
Vattenfall Q2 Results 2008 Presentations by Lars G. Josefsson, CEO and Jan Erik Back, CFO Main topics to be discussed 2 CEO Lars G. Josefsson: Sales & earnings Production volumes Nuclear update Moorburg
More informationCredit Opinion: Eurogrid GmbH
Credit Opinion: Eurogrid GmbH Global Credit Research - 06 Apr 2016 Berlin, Germany Ratings Category Outlook Bkd Senior Unsecured -Dom Curr Bkd Other Short Term -Dom Curr Moody's Rating Stable Baa1 (P)P-2
More informationVattenfall Q1 results 2010
Vattenfall Q1 results 2010 Presentations by Øystein Løseth, CEO and Dag Andresen, CFO Agenda CEO Øystein Løseth: Financial highlights Generation volumes Market price development Important events CFO Dag
More informationUnaudited condensed consolidated interim financial statements for the first half-year 2015
Unaudited condensed consolidated interim financial statements for the first half-year 2015 Eurogrid GmbH Berlin Page 1 of 14 Consolidated income statement EUR m 1 January to 30 June 2015 1 January to 30
More informationElia Group continues to invest significantly in grid development and posts a solid operational performance
Keizerslaan 20 Boulevard de l'empereur, 20 B-1000 Brussels T +32 2 546 70 11 F +32 2 546 70 10 www.eliagroup.eu Elia Group continues to invest significantly in grid development and posts a solid operational
More informationVattenfall Q1 Results 2008
Vattenfall Q1 Results 2008 Presentations by Lars Josefsson, CEO and Jan Erik Back, CFO Highlights Q1 2008 2 Net sales increased 9.0% to SEK 45,404 million (41,644). EBIT increased slightly by 0.2% to SEK
More informationStatkraft Investor Update. European Energy & Utilities Credit Conference 2013
Statkraft Investor Update European Energy & Utilities Credit Conference 2013 Disclaimer This presentation has been prepared by, and the information contained herein (unless otherwise indicated) has been
More information9M 2017 results innogy SE 13 November 2017 Bernhard Günther CFO
9M 2017 results innogy SE 13 November 2017 Bernhard Günther CFO Notice This document contains forward-looking statements. These statements are based on the current views, expectations, assumptions and
More informationEurogrid GmbH Berlin
Eurogrid GmbH Berlin Short-form audit report Financial statements and management report 31 December 2011 Translation from the German language Ernst & Young GmbH Wirtschaftsprüfungsgesellschaft E e Translation
More informationUnaudited Interim Condensed Consolidated Financial Statements
Unaudited Interim Condensed Consolidated Financial Statements for the 9 month period ended 3 September 216 3.11.216 / RIGA Disclaimer This presentation and any materials distributed or made available in
More informationVattenfall Q1 results 2009
Vattenfall Q1 results 2009 Presentations by Lars G. Josefsson, CEO and Dag Andresen, CFO Agenda 2 CEO Lars G. Josefsson: Financial highlights Generation volumes Market and price development Other important
More informationLatvenergo Group Unaudited Results 1H 2016
Investor Conference Webinar Presentation Latvenergo Group Unaudited Results 1H 216 5 September 216 Guntars Baļčūns, CFO Disclaimer This presentation and any materials distributed or made available in connection
More informationVattenfall Capital Markets Day 2009
Vattenfall Capital Markets Day 2009 Presentation by: Dag Andresen First Senior Executive Vice President Group CFO Amsterdam, 23 September 2009 Contents Financial targets and outcome Nuon acquisition Actions
More informationSiemens Gamesa Renewable Energy Q Results
Siemens Gamesa Renewable Energy Q2 208 Results 04 May 208 Disclaimer This material has been prepared by Siemens Gamesa Renewable Energy, and is disclosed solely for information purposes. This document
More informationArise Windpower AB. Company presentation February 2013
Arise Windpower AB Company presentation February 2013 Cautionary statement This document does not constitute or form part of any offer or invitation to sell or issue, or any solicitation of any offer to
More informationVattenfall Q2 results 2011
Vattenfall Q2 results 2011 Øystein Løseth, CEO and Dag Andresen, CFO Conference Call, 28 July 2011 Business highlights German nuclear decision negatively impacts Vattenfall s Q2 result due to impairment
More informationDeutsche Wohnen SE.» 9M 2017 results. Conference Call, 14 November 2017
Deutsche Wohnen SE» 9M 2017 results Conference Call, 14 November 2017 1 » Agenda 1 Highlights 9M 2017 2 Portfolio 3 Financials 4 Appendix 2 » Highlights 9M 2017 Strong operating business L-f-l rental growth
More informationH results. innogy SE 11 August 2017 Bernhard Günther CFO
H1 2017 results innogy SE 11 August 2017 Bernhard Günther CFO Notice This document contains forward-looking statements. These statements are based on the current views, expectations, assumptions and information
More informationEurogrid GmbH Berlin
Dieser Prüfungsbericht richtet sich - unbeschadet eines etwaigen, gesetzlich begründeten Rechts Dritter zum Empfang oder zur Einsichtnahme - ausschließlich an Organe des Unternehmens. Soweit nicht im Rahmen
More informationLatvenergo Group Unaudited Results 9M 2016
Investor Conference Webinar Presentation Latvenergo Group Unaudited Results 9M 2016 7 December 2016 Guntars Baļčūns, CFO Disclaimer This presentation and any materials distributed or made available in
More informationInterim financial report TenneT Holding B.V. As at 30 June 2013
Interim financial report TenneT Holding B.V. As at 30 June 2013 Contents 1 Profile 3 2 Consolidated key financial figures 5 3 Management Board Report 6 Key events during the first half of 2013 6 Financial
More informationADMIE (IPTO) Holding S.A. 1H 17 earnings presentation September 2017
ADMIE (IPTO) Holding S.A. 1H 17 earnings presentation September 2017 Disclaimer This document contains forward-looking statements that involve risks and uncertainties. These statements may generally, but
More informationVattenfall Full Year results 2009
Vattenfall Full Year results 2009 Presentations by Lars G. Josefsson, CEO and Dag Andresen, CFO Agenda CEO Lars G. Josefsson: CFO Dag Andresen: 2009 highlights Financial highlights Generation volumes Electricity
More informationFixed Income Investor Update. innogy SE November 2016
Fixed Income Investor Update innogy SE November 2016 innogy at a glance Financial review innogy s credit profile innogy at a glance Successful implementation of innogy carve-out and IPO Dec Jan Feb Mar
More informationLatvenergo Group Unaudited Results 2016
Investor Conference Webinar Presentation Latvenergo Group Unaudited Results 216 9 March 217 Guntars Baļčūns, CFO Disclaimer This presentation and any materials distributed or made available in connection
More informationInvestor Conference Call. Financial Year April 2016
Investor Conference Call Financial Year 2015 20 April 2016 Agenda Presenter 1 2 Business Profile Regulatory Developments Dr. Jörg Bergmann Chief Financial Officer Open Grid Europe GmbH 3 Group Structure
More informationSiemens Gamesa Renewable Energy Q3 18 Results
Siemens Gamesa Renewable Energy Q3 18 Results 27 July 2018 Disclaimer This material has been prepared by Siemens Gamesa Renewable Energy, and is disclosed solely for information purposes. This document
More informationQuality assets. Selective and profitable growth. Self-funding business model
This presentation has been prepared by EDP Renováveis, S.A. (the "Company") solely for use at the presentation to be made on May 6 th, 2015. By attending the meeting where this presentation is made, or
More informationVattenfall Capital Markets Day 2006
Vattenfall Capital Markets Day 2006 Financial Review Presentation by Matts Ekman CFO Gothenburg, 9 August 2006 Content 2 1. Q2 results 2006 & Gap analysis 2. Regulated vs competitive business 3. Capital
More informationConsolidating our position in 50Hertz while delivering solid operational performance
27 July 2018 24 SEPTEMBER 2018 Consolidating our position in 50Hertz while delivering solid operational performance HIGHLIGHTS Grid investments of 234 million in Belgium and 104 million in Germany to ensure
More informationElectricity market in the. Simon-Erik Ollus Baltic Energy Forum, Vilnius 20 November 2014
Electricity market in the Baltic Sea area today Simon-Erik Ollus Baltic Energy Forum, Vilnius 20 November 2014 Disclaimer This presentation does not constitute an invitation to underwrite, subscribe for,
More informationVattenfall Full Year 2011 results
Vattenfall Full Year 2011 results Øystein Løseth, CEO and Peter Smink, acting CFO Conference Call, 9 February 2012 Delivering according to strategy during a demanding year Cost-reduction programme Divestment
More informationUnipro PJSC 2016 Full year results
Unipro PJSC 2016 Full year results 16 March 2017 2016 results stable operating earnings hit by a one off effect EBITDA 1,2 EBIT 1,2 Highlights 24.9bn 17.7bn 12M 2015 12M 2016 17.4bn 12M 2015 11.0bn 12M
More informationFINANCIAL RESULTS Q CEO Christian Rynning-Tønnesen CFO Irene Egset 26 October 2017
FINANCIAL RESULTS Q3 2017 CEO Christian Rynning-Tønnesen CFO Irene Egset 26 October 2017 Health, safety and environment TRI-rate 1 10 8 6 4 2 0 2014 2015 2016 2017 Health and safety - One serious incident
More informationGroup management report and group financial statements 2013
Group management report and group financial statements List of abbreviations 50Hertz 50Hertz Offshore 50Hertz Transmission BGH BIP BNetzA BVerwG CAO CEPS ct/kwh EEG EEX Elia EMCC EMTN EnWG EOG Eurogrid
More informationVattenfall Q3 and 9M 2012 results
Vattenfall Q3 and 9M 2012 results Øystein Løseth, CEO and Ingrid Bonde, CFO Conference Call, 30 October 2012 Q3 Highlights (1) Underlying operating profit SEK 1.3 bn below last year - 12% higher production
More informationINTERIM FINANCIAL REPORT FIRST NINE MONTHS 2013
INTERIM FINANCIAL REPORT FIRST NINE MONTHS 2013 Moving Energy Forward 23 October 2013 Disclaimer Certain statements in this presentation are based on the beliefs of our management as well as assumptions
More information2009 Results Presentation. Warsaw, March 16, 2010
2009 Results Presentation Warsaw, March 16, 2010 Summary Results Key Achievements Comments Successful IPO Largest IPO in Europe since May 2008 Very large investors oversubscription demonstrating good reception
More informationUnaudited condensed consolidated interim financial statements for the first half-year 2018
Unaudited condensed consolidated interim financial statements for the first half-year 2018 Eurogrid GmbH Berlin Page 1 of 17 Consolidated income statement 1 Jan to 30 June 2018 1 Jan to 30 June 2017 (restated*)
More information1H 2016 EP Energy Results Call
1H 2016 EP Energy Results Call Prague, August 26, 2016 Filip Bělák Chief Financial Officer of EP Energy, a.s. Disclaimer Forward-looking statements This Report contains forward-looking statements within
More informationEurogrid GmbH Berlin. Short-form audit report Consolidated financial statements and group management report 31 December 2013
Dieses Testatsexemplar richtet sich - unbeschadet eines etwaigen, gesetzlich begründeten Rechts Dritter zum Empfang oder zur Einsichtnahme - ausschließlich an Organe des Unternehmens. Soweit nicht im Rahmen
More informationLegal Notice DISCLAIMER
Legal Notice DISCLAIMER This document has been prepared by Iberdrola, S.A. exclusively for use during the presentation of financial results of the first quarter of the 2018 fiscal year. As a consequence
More informationFY 2017 Presentation
FY 2017 Presentation 1 2 At a glance Overview FY 2017 YoY revenue growth of 2.2% to EUR 82.5 mn (FY 2016: EUR 80.7 mn) in a challenging year after 13.5% decline at the end of H1/17 (compared YoY) New order
More informationFINANCIAL RESULTS Q CEO Christian Rynning-Tønnesen CFO Irene Egset 25 October 2018
FINANCIAL RESULTS Q3 2018 CEO Christian Rynning-Tønnesen CFO Irene Egset 25 October 2018 Health, safety and environment TRI-rate 1 7 6 5 4 3 2 1 0 2016 2017 2018 Health and safety - Two serious injuries
More informationSabancı Holding Q Earnings Presentation
Sabancı Holding Q4 2017 Earnings Presentation Disclaimer 2 The information and opinions contained in this document have been compiled by Hacı Ömer Sabancı Holding A.Ş. ( Holding ) from sources believed
More informationElia Group strengthens and expands electrical grid while delivering a strong financial performance
23 FEBRUARY 2018 24 SEPTEMBER 2018 Elia Group strengthens and expands electrical grid while delivering a strong financial performance HIGHLIGHTS 2017 Grid investments of 486 million in Belgium and 461
More informationStatkraft Investor Update July 2014
Statkraft Investor Update July 2014 Disclaimer This presentation has been prepared by, and the information contained herein (unless otherwise indicated) has been provided by Statkraft AS (the "Company").
More information-3% Recurring +5% -16% Recurring EBITDA (1) : 1,740m Sound underlying growth in Brazil & renewables
Recurring EBITDA (1) : 1,740m Sound underlying growth in Brazil & renewables -6% Forex impact on BRL and USD depreciation vs. Euro Hydro recovery YoY in Iberia and strong opex performance YoY -3% Recurring
More informationResults FY 2017 Schaeffler AG. Conference Call March 7, 2018 Munich
Results FY 2017 Schaeffler AG Conference Call Munich Disclaimer This presentation contains forward-looking statements. The words "anticipate", "assume", "believe", "estimate", "expect", "intend", "may",
More informationFINANCIALS MONTHS RESULTS. 7 November 2011
FINANCIALS 211 9 MONTHS RESULTS 7 November 211 Disclaimer Certain statements in this presentation are based on the beliefs of our management as well as assumptions made by and information currently available
More informationAnalyst Presentation Q May 8, 2014 Dr Matthias Zieschang, CFO
Analyst Presentation Q1 2014 May 8, 2014 Dr Matthias Zieschang, CFO Slide 2 Disclaimer This document has been prepared by Fraport solely for use in this presentation. The information contained in this
More informationInvestor Relations ABN AMRO Q BofAML Annual Financials CEO Conference 25 September 2018
Investor Relations ABN AMRO Q2 2018 BofAML Annual Financials CEO Conference 25 September 2018 ABN AMRO has shown strong capital generation since IPO Profit development Dividends per share and pay-out 1)
More informationINTERIM STATEMENT. As it was the case for previous years, the regulated results after tax of Elia for 2010 will consist of three elements:
Keizerslaan 20 Tel.: +32 (0)2 546 70 11 Boulevard de l'empereur, 20 Fax: +32 (0)2 546 70 10 B-1000 Brussels REGULATED INFORMATION PRESS RELEASE 7 May 2010 INTERIM STATEMENT Elia publishes interim information
More informationCorral Q August 2017
Corral Q2 2017 August 2017 Disclaimer This presentation has been prepared by Corral Petroleum Holdings AB (publ) and/or its subsidiaries and affiliates ( Corral ). The information contained in this presentation
More informationFINANCIAL RESULTS Q CEO Christian Rynning-Tønnesen CFO Irene Egset 26 April 2018
FINANCIAL RESULTS Q1 2018 CEO Christian Rynning-Tønnesen CFO Irene Egset 26 April 2018 Health, safety and environment TRI-rate 1 10 8 6 4 2 0 2016 2017 2018 Health and safety - No serious injuries in Q1
More informationVattenfall Q results
Vattenfall Q1 2012 results Øystein Løseth, CEO and Peter Smink, acting CFO Press Conference, 3 May 2012 Successful first quarter continued consolidation Vattenfall continues to deliver on its strategy:
More informationEurogrid GmbH. 50Hertz Transmission GmbH. 50Hertz Offshore GmbH
Base Prospectus 24 May 2017 This document constitutes the base prospectus of Eurogrid GmbH in respect of non-equity securities within the meaning of Art. 22 No. 6 (4) of the Commission Regulation (EC)
More informationCorral Q May 2017
Corral Q1 2017 May 2017 Disclaimer This presentation has been prepared by Corral Petroleum Holdings AB (publ) and/or its subsidiaries and affiliates ( Corral ). The information contained in this presentation
More information9M 2018 RESULTS 09 NOVEMBER 2018 TLG IMMOBILIEN AG 9M 2018 RESULTS
TLG IMMOBILIEN AG 9M 208 RESULTS DISCLAIMER This presentation includes statements, estimates, opinions and projections with respect to anticipated future performance of TLG IMMOBILIEN ("Forward-Looking
More informationEVN energy company and environmental services provider. August 2017
EVN energy company and environmental services provider August 2017 Agenda EVN at a glance Business development (FY 2015/16) Back-up information 2 Integrated business model as basis for our value chain
More informationJanda III - Cádiz - Spain 15:00 CET 14:00 UK / LISBON
Janda III - Cádiz - Spain 15:00 CET 14:00 UK / LISBON This presentation has been prepared by EDP Renováveis, S.A. (the "Company ; LEI 529900MUFAH07Q1TAX06) solely for use at the presentation to be made
More informationSupport regimes for offshore wind in Europe Florian Bauernfeind
Winter Academy 2018 Trading, Sales and Financing in the European Energy Market and Industry Support regimes for offshore wind in Europe Florian Bauernfeind Vattenfall Agenda 1. Wind Power in Vattenfall
More informationFINANCIAL RESULTS Q4 2010
FINANCIAL RESULTS Q4 2010 CEO CHRISTIAN RYNNING-TØNNESEN CFO STEIN DALE 17 FEBRUARY 2011 HIGHLIGHTS Q4 2010 Strong financial results driven by unusual cold and dry Nordic weather Underlying 1 pre-tax
More informationInvestor presentation. innogy SE August 2018
Investor presentation innogy SE August 2018 Notice This document contains forward-looking statements. These statements are based on the current views, expectations, assumptions and information of the management,
More informationQ1 Results Conference Call May 29, 2008
Q1 Results 2008 Conference Call May 29, 2008 Agenda Operational Update Financial Highlights Outlook 2 Agenda Operational Update Financial Highlights Outlook 3 Portfolio Overview Deutsche Wohnen Group Residential
More informationIgnacio Galán Chairman& CEO
Ignacio Galán Chairman& CEO Legal Notice DISCLAIMER This document has been prepared by Iberdrola, S.A. exclusively for use during the presentation Outlook 2016-2020 update. As a consequence thereof, this
More information+0.6GW additions of wind and solar capacity Efficiency savings of 141m (26% above 2017 target for OPEX IV Programme)
0 EBITDA +6% at 3.99bn, benefiting from the gain on Naturgas disposal (+ 0.5bn one-offs) Recurring EBITDA -5% to 3.52bn, penalised by severe drought in Iberian peninsula (- 0.3bn) +0.6GW additions of wind
More informationInvestor presentation. innogy SE March 2019
Investor presentation GROUP innogy is a stable business with a platform for growth innogy is active along the energy value chain in three divisions Sustainable generation of electricity Efficient distribution
More informationVattenfall Q2 and H1 results 2015
Vattenfall Q2 and H1 results 2015 Magnus Hall, CEO and Ingrid Bonde, CFO Presentation 21 July 2015 Financial highlights SEK bn Q2 2015 Q2 2014 H1 2015 H1 2014 FY 2014 Net Sales 36.1 36.6 81.5 82.5 165.9
More informationInvestor Conference Call FY March 2018»
Investor Conference Call FY 22 March 2018» Thomas Kusterer, Chief Financial Officer Ingo Peter Voigt, Head of Finance, M&A and Investor Relations Earnings turnaround achieved in Adjusted EBITDA in bn turnaround
More informationVFB-Happening Rik Scheerlinck, KBC Group CFO
Rik Scheerlinck, KBC Group CFO Important information for investors This presentation is provided for information purposes only. It does not constitute an offer to buy or sell any security issued by an
More informationPNE WIND AG OFFSHORE PROJECT ATLANTIS I SOLD. FIRST BERLIN Equity Research. Good start to PRICE TARGET P N
FIRST BERLIN Equity Research PNE WIND AG RATING Germany / Cleantech Good start to Primary exchange: Frankfurt PRICE TARGET 3.00 Bloomberg: PNE3 GR the new year Return Potential 43.8% ISIN: DE000A0JBPG2
More information50Hertz Transmission GmbH Berlin
Dieses Testatsexemplar richtet sich - unbeschadet eines etwaigen, gesetzlich begründeten Rechts Dritter zum Empfang oder zur Einsichtnahme - ausschließlich an Organe des Unternehmens. Soweit nicht im Rahmen
More informationFINANCIAL RESULTS Q CFO Irene Egset 4 th May 2017
FINANCIAL RESULTS Q1 2017 CFO Irene Egset 4 th May 2017 Health, safety and environment TRI-rate 1 10 8 6 4 2 0 2014 2015 2016 2017 Health and safety - Quarterly injuries rate is down in Q1 - Continuously
More informationIs the "Energiewende" Still Financially Viable?
Is the "Energiewende" Still Financially Viable? Roman Waleczek Morgan Stanley Bank AG 11 October 2012 What Needs To Be Financed? Example Germany 200-300 Bn Energiewende Equity and Debt Investments Required
More informationEesti Energia Unaudited Financial Results for Q2 2014
Eesti Energia Unaudited Financial Results for Q2 2014 31 July 2014 Eesti Energia Aulepa Wind Park in Noarootsi, Estonia Disclaimer This presentation and any materials distributed or made available in connection
More information12 th Annual General Meeting. + Vienna, 8 May 2013
12 th Annual General Meeting + Vienna, 8 May 2013 conwert is a fully integrated real estate company focusing on residential properties and apartment buildings in Germany and Austria. This focus is complemented
More informationCreating value in a sustainable way
Creating value in a sustainable way financial results to 31 march 2018 and business update 25 May 2018 Creating value in a sustainable way - strategy Building on SSE s Strength to create value Richard
More informationTenneT Holding B.V. HALF-YEAR REPORT
TenneT Holding B.V. HALF-YEAR REPORT 2018 Interim report INTERIM REPORT At TenneT, we have a clear and critical task: to keep the lights on for 41 million people across the Netherlands and Germany, 24
More informationNINE MONTHS FINANCIAL RESULTS NOVEMBER 19, 2015
NINE MONTHS FINANCIAL RESULTS NOVEMBER 19, 2015 01 ADO OVERVIEW AND INVESTMENT HIGHLIGHTS Overview ADO the pure play Berlin residential specialist Investment highlights 1 2 3 Berlin residential pure play
More informationSabancı Holding Q Earnings Presentation
Sabancı Holding Q1 2018 Earnings Presentation Disclaimer 2 The information and opinions contained in this document have been compiled by Hacı Ömer Sabancı Holding A.Ş. ( Holding ) from sources believed
More informationUBS Global Real Estate CEO/CFO Conference. December 1/2, 2015
UBS Global Real Estate CEO/CFO Conference December 1/2, 2015 01 ADO OVERVIEW AND INVESTMENT HIGHLIGHTS Overview ADO the pure play Berlin residential specialist Investment highlights 1 2 3 Berlin residential
More informationZSE Group. Investor presentation September 2018
ZSE Group Investor presentation September 2018 Disclaimer THIS PRESENTATION IS NOT AN OFFER OR SOLICITATION OF AN OFFER TO BUY OR SELL SECURITIES. IT IS SOLELY FOR USE AT AN INVESTOR PRESENTATION AND IS
More informationPress release Regulated information
Keizerslaan 20 Boulevard de l'empereur, 20 B-1000 Brussels T +32 2 546 70 11 F +32 2 546 70 10 www.eliagroup.eu 28/08/2015 For further information, please contact: Media Kathleen Iwens +32 2 546 75 11
More informationPOWER cluster The Northern European competence network for offshore wind energy
POWER cluster competence network Martin Schmidt, windcomm schleswig-holstein POWER cluster Agenda 1. Partner Consortium 2. Project Aims 3. Contents & Innovation 4. Offshore wind energy in Germany POWER
More informationVattenfall Q3 and 9M 2013 results
Vattenfall Q3 and 9M 2013 results Øystein Løseth, CEO and Ingrid Bonde, CFO Conference call for analysts and investors, 29 October 2013 Q3 Highlights Underlying EBIT SEK 4.0 bn (4.5) - Higher costs for
More information27 April 2016 Q RESULTS 1
FINANCIAL REPORT Q1 2016 I NVESTO R PRESENTATION 27 April 2016 Q1 2016 RESULTS 1 Disclaimer Certain statements in this presentation are based on the beliefs of our management as well as assumptions made
More informationTenneT Holding B.V. Update following affirmation of A3/P-2 ratings. CREDIT OPINION 20 May Update
CREDIT OPINION TenneT Holding B.V. Update following affirmation of A3/P-2 ratings Update Summary Rating Rationale TenneT Holding B.V.'s (TenneT) A3/P-2 senior unsecured debt ratings are underpinned by
More informationInvestor Presentation 16 th German Corporate Conference Frankfurt, January innogy SE status as per December 2016
Investor Presentation 16 th German Corporate Conference Frankfurt, 16-18 January 2017 innogy SE status as per December 2016 Notice This document contains forward-looking statements. These statements are
More informationNordex AG. Nordex AG. Conference Call Q Nordex AG Conference Call Q May 26, May 26, Page 1
Nordex AG Nordex AG Conference Call Q1 2008 Nordex AG Conference Call Q1 2008 May 26, 2008 May 26, 2008 Page 1 Highlights in Q1/2008 Financial highlights Total revenue up 50% in Q1/08 compared to Q1/07
More informationElia Group CEO Jacques Vandermeiren comments on the first six months of 2014:
Keizerslaan 20 Boulevard de l'empereur, 20 B-1000 Brussels T +32 2 546 70 11 F +32 2 546 70 10 www.eliagroup.eu 29/08/2014 For further information, please contact: Media Barbara Verhaegen +32 2 546 73
More informationThe BKW Group «We are shaping the future of energy straightforward, reliable and integrated»
The BKW Group «We are shaping the future of energy straightforward, reliable and integrated» COMPANY PRESENTATION, LONDON 28.04.2016 ROADSHOW LONDON BKW 28.04.2016 Contents Overview Financial results 2015
More information