1 B-1 Janet Fraser Chief Regulatory Officer Phone: Fax: October 24, 2011 Ms. Alanna Gillis Acting Commission Secretary British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3 Dear Ms. Gillis: RE: British Columbia Utilities Commission (BCUC) British Columbia Hydro and Power Authority (BC Hydro) Application (the Application) On October 12, 2011, BC Hydro submitted the New Westminster Substation Operating Agreement (Agreement) Application. Subsequently, BC Hydro determined that the incorrect tariff supplement number was referenced in the Application. Specifically, the Application refers to Tariff Supplement No. 79 when it should have referred to Tariff Supplement No. 83. As a result, BC Hydro wishes to withdraw the application filed on October 12, BC Hydro is re-filing, with this letter, an updated application with the correct Tariff Supplement references. The re-filed application also includes two evidentiary updates to section 3.1 of the application. First, the City of New Westminster and BC Hydro have agreed to waive the condition precedent in section 2.4(c) of the Agreement. Second, BC Hydro and the City of New Westminster have agreed to extend the condition precedent date in section 2.4(a) of the Agreement (BCUC approval or acceptance of the Agreement) from December 31, 2011 to January 27, For further information, please contact Sylvia von Minden at or by at bchydroregulatorygroup@bchydro.com. Yours sincerely, Janet Fraser Chief Regulatory Officer kd/ma Enclosure (1) 2/ British Columbia Hydro and Power Authority, 333 Dunsmuir Street, Vancouver BC V6B 5R3

2 October 24, 2011 Ms. Alanna Gillis Acting Commission Secretary British Columbia Utilities Commission Application (the Application) Page 2 of 2 Copy to: AMPC Attention: Brian Wallace rbw@bht.com BCOAPO Attention: Leigha Worth lworth@bcpiac.com Attention: BCOAPO support@bcpiac.com BCSEA Attention: William J. Andrews wjandrews@shaw.ca CEC Attention: Christopher P. Weafer cweafer@owenbird.com City of New Westminster Attention: R.E. Carle rcarle@newwestcity.ca COPE Attention: Jim Quail jquail@cope378.ca FortisBC Inc. Attention: Dennis Swanson electricity.regulatory.affairs@fortisbc.com Attention: Diane Roy gas.regulatory.affairs@fortisbc.com

3 Application October 2011

4 Table of Contents 1 Introduction Background Overview of Agreement Effective Date Term Operation of NWR Substation NWR Substation Upgrades System Reinforcement Cost Recovery General Principle Operating and Maintenance Costs (OMA) Annual Charges System Reinforcement Costs (Schedule 3, Clause 3) Security The Risk of Stranded Costs Summary Proposed Regulatory Review Process and Communications Proposed Regulatory Review Process Communications List of Tables Table 1 Reduction in Security Ledger for Year... 8 List of Appendices Appendix A Draft Order Appendix B September 16, 2011 Application - October 2011 Page i

5 Introduction BC Hydro is filing, and requesting the approval of, the New Westminster Substation Operating Agreement between the City of New Westminster (City) and BC Hydro made as of September 16, 2011 (2011 NW Operating Agreement) as Electric Tariff Supplement No. 83 under sections 58 to 61 of the Utilities Commission Act (UCA). The proposed draft form of the BCUC order is attached as Appendix A and a copy of Electric Tariff Supplement No. 83 (the 2011 NW Operating Agreement) is attached as Appendix B. The City is a municipal utility that buys its electricity from BC Hydro as an existing transmission service rate customer on Rate Schedule Transmission Service Rate for Exempt Customers (RS 1827). The 2011 NW Operating Agreement arises out of a request by the City to increase the contract demand at BC Hydro s New Westminster Substation (NWR Substation) point of delivery from 55 MVA to 100 MVA in view of anticipated increases in electricity demand in the City. As a result, upgrades are required to the NWR Substation as well as upstream transmission system reinforcement (System Reinforcement). Consistent with past practices, and for the reasons described in section 2 of this application, the City has agreed to pay both the NWR Substation upgrade cost as well as the System Reinforcement cost in accordance with the terms and conditions of the 2011 NW Operating Agreement. The following is a brief summary of the background to the 2011 NW Operating Agreement and a review of the pricing and cost recovery approach in the agreement. Finally, there is a suggested regulatory process for this application Background The City has for many years owned and operated its own municipal electricity utility, providing electricity services to customers within the City boundaries. Since 1904 the Application - October 2011 Page 1

6 City has purchased electricity for resale to its electricity customers, first from B.C. Electric Railway Company Ltd and subsequently from BC Hydro. Under the terms of a five-year agreement dated January 1, 1985, BC Hydro and the City agreed that the City would purchase electricity from BC Hydro under RS 1821 Transmission Service (RS 1821). It was also agreed that BC Hydro would continue to own and operate two substations substantially for the benefit of the City the Royal Substation and the NWR Substation - and that the City would reimburse BC Hydro for substation costs in addition to paying the RS 1821 rates. The underlying rationale for the City paying the substation costs is that RS 1821 customers owned and operated, at their own cost, the substation facilities downstream of a transmission voltage point of delivery. Since the City did not own the substations, it was agreed that the City would pay the costs associated with the substations, in addition to the RS 1821 rates, so that the financial impact on BC Hydro and other ratepayers of serving the City as a RS 1821 customer would be approximately the same as if the City owned the substations. The 1985 agreement was approved by the BCUC. 1 In 1988, a new substation was constructed to replace BC Hydro s Royal Substation. The new substation is owned by the City and is known as Royal No. 2 Substation (R2 Substation). BC Hydro and the City entered into a new five-year agreement made as of January 1, 1990 under which the point of delivery for electricity supplied by BC Hydro to the BC Hydro-owned Royal Substation was changed to the City-owned R2 Substation. The 1990 arrangement did not change BC Hydro s delivery of electricity to the NWR Substation or the City s responsibility for the costs of the NWR Substation. Under a separate agreement, BC Hydro agreed to operate 1 BCUC Order No. G By Order No. G-60-90, the BCUC subsequently approved an amended agreement as Tariff Supplement No. 1 and Order No. G approved the renewal of Tariff Supplement No. 1. BCUC Order No. G cancelled Tariff Supplement No. 1 and the City has since been supplied electricity under Tariff Supplement No. 5. Application - October 2011 Page 2

7 and maintain the R2 Substation on a cost-recovery basis. These arrangements were subsequently renewed or extended. As of 2002, BC Hydro continued to own the NWR Substation and the City owned the R2 Substation. There were two operating agreements between the City and BC Hydro related to the substations: Royal No. 2 Substation Operating Agreement (R2 Operating Agreement) and the New Westminster Substation Operating Agreement (2002 NW Operating Agreement), both made as of December 23, In 2006 the City became a RS 1827 customer when RS 1821 was cancelled and replaced with the new transmission services stepped rates. As noted above, the City has requested an increase in contract demand from 55 MVA to 100 MVA at the NWR Substation point of delivery and, as a result, the City and BC Hydro entered into the 2011 NW Operating Agreement. The purpose of the 2011 NW Operating Agreement is to, among other things, clarify responsibility for the NWR Substation upgrade costs and the costs of related up-stream transmission system reinforcements. The 2011 NW Operating Agreement replaces the 2002 NW Operating Agreement Overview of Agreement The 2011 NW Operating Agreement incorporates a number of the principles from BC Hydro s Electric Tariff Supplement No. 6 - Agreement for New Transmission Service Customers (Facilities Agreement) (TS No. 6), particularly with respect to the treatment of upgrade costs, but also includes unique provisions for the on-going costs related to the NWR Substation. This section of the application provides a brief overview of the substantive terms and conditions of the 2011 NW Operating Agreement (referred to as the agreement) as well as a discussion of cost recovery and the risk of stranded costs: Application - October 2011 Page 3

8 Effective Date The agreement is effective when the following three condition precedents in section 2.4 of the agreement are satisfied or waived: (i) acceptance and approval by the BCUC on or before January 27, 2012 (section 2.4(a) of the agreement); 6 7 (ii) approval by the City of New Westminster Electric Utility Commission on or before September 22, 2011 (section 2.4(b) of the agreement); and (iii) the City has provided notice, on or before October 17, 2011, that various local government legislative approvals have been obtained by the City (section 2.4(c) of the agreement). If all the conditions are not satisfied or waived BC Hydro and the City will not be bound by the obligations in the agreement. On September 20, 2011, the City s Electric Utility Commission approved the agreement. On October 20, 2011, the City provided notice in the form required by section 2.4(c) of the agreement and BC Hydro and the City subsequently waived the condition precedent in section 2.4(c). Conditions (ii) and (iii) have therefore been satisfied or waived. 3.2 Term The term of the agreement is five years, commencing on the Effective Date. The City has the option of extending the term for additional five year periods or, if neither party elects to terminate the agreement on one year s notice, the agreement is deemed to be renewed for an additional five year term. BC Hydro or the City may terminate the agreement, effective at the end of the applicable five-year term, on at least one years notice. 3.3 Operation of NWR Substation BC Hydro agrees to plan, operate, manage and maintain the NWR Substation, at the City s cost, for the sole benefit of the City. BC Hydro agrees to supply the NWR Application - October 2011 Page 4

9 Substation in accordance with the City s contracted demand which is currently 55 MVA and would increase to 100 MVA after the upgrades are installed. 3.4 NWR Substation Upgrades The agreement contemplates BC Hydro undertaking the upgrades to the NWR Substation and related facilities to be able to meet the City s increase in contracted demand at the NWR Substation point of delivery. The agreement describes how the City will pay Annual Investment Related Costs, or Annual Charges, for the NWR Substation upgrades (discussed in section of this application). The estimated cost of the upgrades is $23,458,260 as set out in Schedule 4 of the agreement. 3.5 System Reinforcement The agreement contemplates BC Hydro undertaking consequential transmission reinforcements upstream of the NWR Substation, at an estimated cost of $12,494,200. The City s contribution to these costs is discussed in section of this application. 3.6 Cost Recovery In general, the City will make two types of payments to BC Hydro: Monthly Charges (OMA) and Annual Investment Related Cost. The Monthly Charges are described in section and the Annual Investment Related Cost is described in section General Principle Section 5.3 of the agreement describes the underlying principle regarding the recovery of costs: reimbursing BC Hydro for all actual costs incurred by BC Hydro, which would otherwise not be incurred by BC Hydro if the City owned its own substation for the NWR Point of Delivery, for owning, planning, operating, managing and maintaining the NWR Substation Application - October 2011 Page 5

10 The NWR Point of Delivery is defined in the agreement as where the City effectively receives transmission service from BC Hydro at 69 kv at the NWR Substation. As with previous agreements related to the NWR Substation, the intent of the agreement is that the City will pay the costs associated with the NWR Substation so that the financial impact on BC Hydro and other ratepayers would be approximately the same if the City owned the NWR Substation itself Operating and Maintenance Costs (OMA) At the beginning of each fiscal year, BC Hydro will provide to the City an OMA cost estimate for that year. The City will pay one twelfth of the estimated costs each month (Monthly Charges, as described in section 5.1 of the agreement). At the end of the fiscal year, BC Hydro will true-up the total estimated charges paid in that fiscal year against the actual OMA costs incurred for that year and will either credit, or invoice, the City for the difference Annual Charges At the end of each fiscal year, the City must pay to BC Hydro the annual charge for all Investment Related Costs as defined and determined in accordance with Part II of Schedule 2. Investment Related Costs means capital-related costs for the NWR Substation and includes the cost of facility upgrades and additions, equipment replacement, and property. The actual cost of upgrading the NWR Substation from 55 MVA to 100 MVA would form part of the Investment Related Costs under the agreement. The City will pay the costs of the NWR Substation upgrade over time via the Annual Investment Related Costs which is an annual payment made at the end of the fiscal year and is determined based on the formula set out in Part II of Schedule 2. The Annual Investment Related Costs payment is comprised of the following: (i) annual depreciation; (ii) annual finance charges based on BC Hydro s weighted average cost of capital and the average net book value of the NWR Substation, as defined in Application - October 2011 Page 6

11 the agreement; (iii) grants and taxes; and (iv) other BC Hydro costs. The City has the option of pre-paying part or all of the Investment Related Costs System Reinforcement Costs (Schedule 3, Clause 3) The City is responsible for System Reinforcement costs, subject to an offset provided by BC Hydro, consistent with the general approach used for other transmission service customers. The formula for calculating the offsets is substantially the same as the formula set out in clause 5 of the Facilities Agreement (TS No. 6). In the usual course, a transmission service customer would enter into a Facilities Agreement with BC Hydro that would require the customer to post security for system reinforcement costs. The amount of security would decline over time as the system reinforcement costs were reimbursed via revenues and other system benefits. In this case, and as discussed below in section 3.6.5, BC Hydro is not requiring the City to post security. Rather, BC Hydro and the City have agreed to establish a security ledger which will account for the remaining cost of the System Reinforcement to be collected from the City (Schedule 3, Clause 6). The balance of the security ledger will decline over time as the offsets are applied against the security ledger. If the agreement is terminated or expires, the City must pay the outstanding balance of the security ledger, less the value of the System Reinforcements that will, in BC Hydro s reasonable opinion, continue to be used and useful. If, at the end of 12 years, there is a balance in the security ledger, the City must pay that balance to BC Hydro. As illustrated in Table 1, BC Hydro estimates that the $12,494,200 security ledger balance will be reduced to zero by Application - October 2011 Page 7

12 1 Table 1 Reduction in Security Ledger for Year Period Ended (March 31 st ) Reduction in Security Ledger for Year ($) , ,365, ,048, ,704, ,967, ,672,353 Total Release 12,494, Security BC Hydro is not requiring the City to post security for the NWR Substation upgrade costs and the System Reinforcement costs. In BC Hydro s view, and for the reasons that follow, the risk of default by the City is low because: 6 7 (i) (ii) the City has a lengthy history with BC Hydro, including a positive credit history; the City is a municipal government with a population of 60,000; and (iii) the City has taxation authority to raise revenues. In addition, the risk of a substantial and sustained loss of load is quite low relative to other transmission service customers. This is particularly relevant to the recovery of the System Reinforcement costs since those costs are recovered out of customer revenues The Risk of Stranded Costs Section 2.3 of the agreement provides that, upon expiry or termination of the agreement, all amounts outstanding under the agreement are immediately due and must be paid by the City. Such amounts include the remaining balance in the security ledger for the System Reinforcement costs (discussed in section of this application) and the net book value of the NWR Substation (as defined in Application - October 2011 Page 8

13 Schedule 2, Part II of the agreement), less the value of the NWR Substation and System Reinforcements which, in the reasonable opinion of BC Hydro, will continue to be used and useful in the foreseeable future. In BC Hydro s opinion, the risk of stranded costs is low in view of the City s commitment to pay any such costs if and when the agreement expires or is terminated. As discussed in section of this application, the risk of default by the City is also considered low Summary BC Hydro respectfully submits that the proposed Electric Tariff Supplement No. 83 (2011 NW Operating Agreement) is in the public interest and should be approved by the BCUC because: 1. The agreement is consistent with historical arrangements between BC Hydro and the City; 2. Under the agreement, the City contributes to the actual costs incurred in respect of the NWR Substation and, as a result, other ratepayers are not adversely affected by those costs; and 3. If the agreement expires or is terminated, the City must pay to BC Hydro the net book value of the NWR Substation and the remaining balance in the System Reinforcement security ledger, less the value of the assets that continue to be, in BC Hydro s reasonable opinion, used and useful. This commitment by the City, along with the low likelihood of default, mitigates the risk of stranded costs to BC Hydro and other ratepayers. Application - October 2011 Page 9

14 Proposed Regulatory Review Process and Communications 5.1 Proposed Regulatory Review Process Under the 2011 NW Operating Agreement, approval of the agreement by the BCUC is a condition precedent that must be satisfied or waived by January 27, BC Hydro is also providing a copy of this filing to the parties identified on the cover letter to this application. BC Hydro proposes the following written regulatory process: Application Filed October 24, 2011 Intervener registration November 4, 2011 BCUC Information Requests (IRs) November 4, 2011 Intervener IRs November 16, 2011 Response to BCUC and Intervener IRs November 25, 2011 Intervener Final Submissions December 2, 2011 BC Hydro Final Submissions December 9, Communications All communications regarding this proceeding are to be addressed to: Janet Fraser Chief Regulatory Officer BC Hydro Dunsmuir Street Vancouver, BC V6B 5R3 Telephone: bchydroregulatorygroup@bchydro.com Ken Duke Solicitor and Counsel BC Hydro Dunsmuir Street Vancouver, BC V6B 5R3 Telephone: ken.duke@bchydro.com Application - October 2011 Page 10

15 New Westminster Substation Operating Agreement Application Appendix A Draft Order

16 BC Hydro Application Appendix A - Draft Order BRITISH COLUMBIA UTILITIES COMMISSION ORDER NUMBER G- SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC V6Z 2N3 CANADA web site: TELEPHONE: (604) BC TOLL FREE: FACSIMILE: (604) IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473 and Application by British Columbia Hydro and Power Authority (BC Hydro) To Approve the City of New Westminster (City) 2011 NWR Substation Operating Agreement as Electric Tariff Supplement No. 83 BEFORE:, 2011 ORDER WHEREAS: A. The City owns and operates a municipal electricity utility and purchases its electricity from BC Hydro for such purposes as a Rate Schedule 1827 transmission service customer; and B. BC Hydro owns and operates the New Westminster Substation (NWR Substation) which is used primarily to provide electricity service to the City; and C. The City has requested an increase in contract demand at the NWR Substation point of delivery and, to meet that increased contract demand, BC Hydro must undertake upgrades to the NWR Substation and undertake certain upstream transmission system reinforcements; and D. The City and BC Hydro entered into an agreement made as of September 16, 2011 that, among other things, provides that the City will pay the cost of upgrades to the NWR Substation and upstream transmission system reinforcements (2011 NWR Agreement); and E. BC Hydro filed on October 24, 2011, pursuant to sections 58 to 61 of the Utilities Commission Act (Act) an application (Application) in which BC Hydro has applied for approval of the 2011 NWR Agreement as Electric Tariff Supplement No. 83; and F. The BCUC has reviewed the Application and has determined that approval of the 2011 NWR Agreement as set out in the Application is in the public interest. Page 1 of 2

17 BC Hydro Application Appendix A - Draft Order BRITISH COLUMBIA UTILITIES COMMISSION ORDER NUMBER G- 2 NOW THEREFORE the Commission orders as follows: 1. The 2011 NWR Operating Agreement, attached as Appendix B to the Application, is approved as Electric Tariff Supplement No. 83. DATED at the City of Vancouver, in the Province of British Columbia, this day of, BY ORDER Page 2 of 2

18 New Westminster Substation Operating Agreement Application Appendix B September 16, 2011

19 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 1 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

20 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 2 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

21 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 3 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

22 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 4 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

23 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 5 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

24 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 6 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

25 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 7 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

26 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 8 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

27 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 9 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

28 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 10 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

29 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 11 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

30 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 12 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

31 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 13 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

32 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 14 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

33 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 15 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

34 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 16 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

35 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 17 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

36 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 18 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

37 BC Hydro Electric Tariff Supplement No. 83 Effective: [DATE OF ORDER], 2011 Original Page 19 of 19 ACCEPTED: ORDER NO. ACTING COMMISSION SECRETARY

38 BChlldro m FOR GENERATIONS Rod Carle General Manager, Electrical Utility City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9 October 19, 2011 Dear Rod, Re: made of 16 September 2011 Agreement) Regulatory Approval Date Extension As you know, BC Hydro has now filed an application with the British Columbia Utilities Commission (BCUC) requesting approval of the Agreement as Tariff Supplement No. 79. The purpose of this letter is to confirm that BC Hydro and the City of New Westminster (City) have agreed to extend the date by which the British Columbia Utilities Commission must accept or approve the Agreement, as described in section 2.4(a) of the Agreement. Specifically, BC Hydro and the City have agreed to amend section 2.4(a) of the Agreement by deleting "December 31, 2011" and replacing that date with "January 27, 2012", Please sign a copy of this leuer below confirming the City's agreement to extend the date and amend the Agreement. Please return a signed copy of this letter to me at your earliest convenience so we may advise the BCUC of the extension and amendment in a timely manner. A PDF signed copy sent by is satisfactory. Rick Truong Senior Key Account Manager, BC Hydro The City of New Westminster agrees that section 2.4(a) of the Agreement is amended as des~rlbed In thl~ Per ~?L Name: O'll'~?4-.z.-L ', ~ Title: d'm E:./e:;c:..;/--t.IC?-/,J./'/cl 'IY'.-v/~~();J Date: tf/~/. I 2-t?1 C-DII British Columbia Hydro and Power Authority Street Address, City, BC, Postal Code bchydro.com

BC HYDRO CONTRACTED GBL EXHIBIT A-6

BC HYDRO CONTRACTED GBL EXHIBIT A-6 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

BC HYDRO F2012 F2014 REVENUE REQUIREMENTS EXHIBIT A2 8

BC HYDRO F2012 F2014 REVENUE REQUIREMENTS EXHIBIT A2 8 ERICA M. HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL bchydroregulatorygroup@bchydro.com March 31, 2011 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

November 8, Dear Mr. Wruck:

November 8, Dear Mr. Wruck: B-23 Fred James Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com November 8, 2017 Mr. Patrick Wruck Commission Secretary and Manager Regulatory Support

More information

FORTISBC ENERGY CEC ROE 2016 EXHIBIT A-7

FORTISBC ENERGY CEC ROE 2016 EXHIBIT A-7 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

Re: FortisBC Inc. Application for Approval of Demand Side Management Expenditures for the Period of 2015 and 2016

Re: FortisBC Inc. Application for Approval of Demand Side Management Expenditures for the Period of 2015 and 2016 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL August 22, 2014 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604)

More information

1. Background. March 7, 2014

1. Background. March 7, 2014 Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com March 7, 2014 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

FortisBC Inc. Application for an Exempt Residential Rate

FortisBC Inc. Application for an Exempt Residential Rate B-1 Corey Sinclair Manager, Regulatory Affairs FortisBC Inc. Suite 100-1975 Springfield Road Kelowna, BC V1Y 7V7 Ph: (250) 469-8038 Fax: 1-866-335-6295 electricity.regulatory.affairs@fortisbc.com www.fortisbc.com

More information

BC HYDRO F2017 F2019 REVENUE REQUIREMENTS EXHIBIT A-29

BC HYDRO F2017 F2019 REVENUE REQUIREMENTS EXHIBIT A-29 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX: (604)

More information

FortisBC Inc. Annual Review of 2018 Rates Project No Final Order with Reasons for Decision

FortisBC Inc. Annual Review of 2018 Rates Project No Final Order with Reasons for Decision Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 February 13, 2018 Sent

More information

For further information, please contact Fred James at or by at

For further information, please contact Fred James at or by  at Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com December 6, 2011 Ms. Alanna Gillis Acting Commission Secretary British Columbia Utilities

More information

August 29, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

August 29, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Diane Roy Director, Regulatory Affairs - Gas FortisBC Energy Inc. August 29, 2012 British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 16705 Fraser Highway Surrey, B.C.

More information

FORTISBC INC. RECONSIDERATION AND VARIANCE OF ORDER G PHASE 2 EXHIBIT A-4

FORTISBC INC. RECONSIDERATION AND VARIANCE OF ORDER G PHASE 2 EXHIBIT A-4 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX: (604)

More information

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-3

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-3 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com April 4, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

Attached is BC Hydro s annual filing of the Report on Demand-Side Management Activities for the 12 months ending March 31, 2012.

Attached is BC Hydro s annual filing of the Report on Demand-Side Management Activities for the 12 months ending March 31, 2012. Janet Fraser Chief Regulatory Officer Phone: 60-6-06 Fax: 60-6-07 bchydroregulatorygroup@bchydro.com July 0, 01 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission Sixth Floor

More information

FEU COMMON RATES, AMALGAMATION RATE DESIGN RECONSIDERATION PHASE 2 EXHIBIT A-4

FEU COMMON RATES, AMALGAMATION RATE DESIGN RECONSIDERATION PHASE 2 EXHIBIT A-4 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com July 24, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

2015 Rate Design Application

2015 Rate Design Application 2015 Rate Design Application D-Wires Extension Policy Customer Workshops: July/August 2014 Discussion Guide Discussion Guide Distribution Extension Policy Review OVERVIEW Currently, BC Hydro is consulting

More information

CLASS EXEMPTION FOR BC HYDRO CUSTOMERS UNDER CERTAIN LEASE ARRANGEMENTS EXHIBIT A2-1

CLASS EXEMPTION FOR BC HYDRO CUSTOMERS UNDER CERTAIN LEASE ARRANGEMENTS EXHIBIT A2-1 Laurel Ross Acting Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX:

More information

FortisBC Inc. (FBC) Application for Approval of Demand Side Management (DSM) Expenditures for 2015 and 2016 FBC Final Submission

FortisBC Inc. (FBC) Application for Approval of Demand Side Management (DSM) Expenditures for 2015 and 2016 FBC Final Submission Dennis Swanson Director, Regulatory Affairs FortisBC Inc. Suite 100 1975 Springfield Road Kelowna, BC V1Y 7V7 Tel: (250) 717-0890 Fax: 1-866-335-6295 www.fortisbc.com Regulatory Affairs Correspondence

More information

BC Hydro writes in compliance with BCUC Order No. G to provide, as Exhibit B-3, its responses to BCUC Information Request No. 1.

BC Hydro writes in compliance with BCUC Order No. G to provide, as Exhibit B-3, its responses to BCUC Information Request No. 1. Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com October 25, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

Ms. Laurel Ross, Acting Commission Secretary and Director

Ms. Laurel Ross, Acting Commission Secretary and Director Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report November 24, 2017

INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report November 24, 2017 Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report

More information

For further information, please contact Fred James at or by at

For further information, please contact Fred James at or by  at Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com August 30, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

BChgdro. lor\js. FOR GEt\JE B-1. September 30,2009

BChgdro. lor\js. FOR GEt\JE B-1. September 30,2009 BChgdro FOR GEt\JE lor\js B-1 Joanna Sofield Chief Regulatory Officer Phone: (0) -0 Fax: (0) -0 bchydroregulatorygroup@bchydro.com September 0,009 Ms. Erica M. Hamilton Commission Secretary British Columbia

More information

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-1

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-1 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com April 4, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support B-2 10 th Floor 1111 West Georgia Street Vancouver, BC, V6E 4M3 April 21, 2017 British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Mr. Patrick Wruck, Commission

More information

For further information, please contact Fred James at or by at

For further information, please contact Fred James at or by  at Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com February 28, 2014 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

BCUC INQUIRY RESPECTING SITE C A-4

BCUC INQUIRY RESPECTING SITE C A-4 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 August 11, 2017 Sent

More information

INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017

INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017 INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017 Vancouver The British Columbia Utilities Commission (BCUC) has responded to the letter from

More information

FORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-3

FORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-3 Laurel Ross Acting Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 00 Howe Street Vancouver, BC Canada VZ N TEL: (0) 0-00 BC Toll Free: -00-- FAX: (0) 0- Log No. VIA

More information

Diane Roy Vice President, Regulatory Affairs

Diane Roy Vice President, Regulatory Affairs B- Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

Diane Roy Vice President, Regulatory Affairs

Diane Roy Vice President, Regulatory Affairs Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

FortisBC Inc. Annual Review of 2018 Rates Project No British Columbia Utilities Commission Information Request No. 1

FortisBC Inc. Annual Review of 2018 Rates Project No British Columbia Utilities Commission Information Request No. 1 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 September 6, 2017 Sent

More information

Our File: Date: April 22, 2015

Our File: Date: April 22, 2015 B-2 BY E-MAIL British Columbia Utilities Commission 6th Floor - 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Erica Hamilton, Commission Secretary Dear Ms. Hamilton: Re: Reply Attention of: Matthew

More information

FORTISBC INC PERFORMANCE BASED RATEMAKING REVENUE REQUIREMENTS EXHIBIT A-27

FORTISBC INC PERFORMANCE BASED RATEMAKING REVENUE REQUIREMENTS EXHIBIT A-27 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL rhobbs@shaw.ca January 16, 2014 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z

More information

British Columbia Hydro and Power Authority (BC Hydro) Application for Approval of New Power Purchase Agreement (PPA) with FortisBC Inc.

British Columbia Hydro and Power Authority (BC Hydro) Application for Approval of New Power Purchase Agreement (PPA) with FortisBC Inc. C1-24 Reply Attention of: Ludmila B. Herbst Direct Dial Number: (604) 661-1722 Email Address: lherbst@farris.com Our File No.: 05497-0224 January 20, 2014 BY EMAIL British Columbia Utilities Commission

More information

Doug Slater Director, Regulatory Affairs

Doug Slater Director, Regulatory Affairs B- Doug Slater Director, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

Parties are invited to make submissions on IR responses and the additional topics to be issued by the Panel. ACTION DATE (2014)

Parties are invited to make submissions on IR responses and the additional topics to be issued by the Panel. ACTION DATE (2014) ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

January 23, Via Original via Mail. British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

January 23, Via  Original via Mail. British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 3700 2 nd Avenue Burnaby, BC V5C 6S4 January 23, 2014 Via Email Original via Mail 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Ms. Erica M. Hamilton, Commission Secretary Dear Ms. Hamilton:

More information

ORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and

ORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 ORDER NUMBER G-48-19 IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter

More information

For further information, please contact Fred James at or by at

For further information, please contact Fred James at or by  at Tom A. Loski Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com July 21, 2016 Ms. Laurel Ross Acting Commission Secretary British Columbia Utilities Commission

More information

Creative Energy Vancouver Platforms Inc. Creative NEFC Neighbourhood Energy Agreement Amendments Submission of FortisBC Energy Inc.

Creative Energy Vancouver Platforms Inc. Creative NEFC Neighbourhood Energy Agreement Amendments Submission of FortisBC Energy Inc. C5-2 April 22, 2016 File No.: 240148.00782/14797 Matthew Ghikas Direct +1 604 631 3191 Facsimile +1 604 632 3191 mghikas@fasken.com VIA EMAIL British Columbia Utilities Commission 6 th floor, 900 Howe

More information

Cascade Pacific Power Corporation

Cascade Pacific Power Corporation February 7, 2008 C23-3 BC Hydro and Power Authority 17 th Floor, 333 Dunsmuir Street Vancouver, BC V6B 5R3 Attention: Ms. Joanna Sofield, Chief Regulatory Officer Dear MS. Sofield RE: Standing Offer Program

More information

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and BRITISH C OLUMBIA U TILITIES C OMMISSION O RDER NUMBER C-10-07 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. V6Z 2N3 CANADA web site: http://www.bcuc.com TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

On June 10 and July 5, 2013, FEI and FBC, respectively, filed the Applications as referenced above.

On June 10 and July 5, 2013, FEI and FBC, respectively, filed the Applications as referenced above. Diane Roy Director, Regulatory Affairs FortisBC Energy 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 576-7349 Fax: (604) 576-7074 www.fortisbc.com Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com

More information

STARGAS APPLICATION TO ALTER RATES. Re: Stargas Utilities Ltd. Application to Alter Rates and Refinance

STARGAS APPLICATION TO ALTER RATES. Re: Stargas Utilities Ltd. Application to Alter Rates and Refinance ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660 4700 BC TOLL FREE:

More information

BC Hydro takes this opportunity to raise the following two matters.

BC Hydro takes this opportunity to raise the following two matters. Tom A. Loski Chief Regulatory Officer Phone: 0--0 Fax: 0--0 bchydroregulatorygroup@bchydro.com September, 0 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission Sixth Floor 00

More information

PNG WEST 2013 REVENUE REQUIREMENTS EXHIBIT A-9

PNG WEST 2013 REVENUE REQUIREMENTS EXHIBIT A-9 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support

Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

September 10, Via Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C.

September 10, Via  Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C. C- Email: electricity.regulatory.affairs@fortisbc.comemail: electricity.regulatory.affairs@fortisbc.com Dennis Swanson Director, Regulatory Affairs FortisBC Inc. Suite 00 Springfield Road Kelowna, BC VY

More information

September 26, Via Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C.

September 26, Via  Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C. B-8 Diane Roy Director, Regulatory Affairs FortisBC Energy 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 576-7349 Cell: (604) 908-2790 Fax: (604) 576-7074 Email: diane.roy@fortisbc.com www.fortisbc.com

More information

Participant Assistance/Cost Award Guidelines Amendment

Participant Assistance/Cost Award Guidelines Amendment Received DC Office June 20/17 CA-2 From: Commission Secretary BCUC:EX [mailto:commission.secretary@bcuc.com] Sent: June-20-17 3:50 PM To: Commission Secretary BCUC:EX Subject:

More information

For further information, please contact Guy Leroux at

For further information, please contact Guy Leroux at BChydro m R GENE IONS Joanna Sofield Chief Regulatory Officer Phone: (604 623-4046 Fax: (604 623-4407 bchyd roregulatorygroup@bchydro.com July 13 2009 Ms. Erica M. Hamilton Commission Secretary British

More information

VIA October 27, 2005

VIA  October 27, 2005 ROBERT J. PELLATT COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL

More information

November 22, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

November 22, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Diane Roy Director, Regulatory Affairs - Gas FortisBC Energy Inc. November 22, 2012 British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 16705 Fraser Highway Surrey,

More information

FortisBC Energy Inc. (FEI) Project No Demand Side Management Expenditures Plan (the Application) Errata dated September 20, 2018

FortisBC Energy Inc. (FEI) Project No Demand Side Management Expenditures Plan (the Application) Errata dated September 20, 2018 B-1-1 Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

AGREEMENT FOR NEW TRANSMISSION SERVICE CUSTOMERS WITH AN INDIRECT INTERCONNECTION TO THE BC HYDRO SYSTEM

AGREEMENT FOR NEW TRANSMISSION SERVICE CUSTOMERS WITH AN INDIRECT INTERCONNECTION TO THE BC HYDRO SYSTEM Original of Page 1 AGREEMENT FOR NEW TRANSMISSION SERVICE CUSTOMERS WITH AN INDIRECT INTERCONNECTION TO THE BC HYDRO SYSTEM THIS FACILITIES AGREEMENT made as of the day of, 20 for. BETWEEN: BRITISH COLUMBIA

More information

June 22, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C. V6Z 2N3. Ms. Erica M. Hamilton, Commission Secretary

June 22, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C. V6Z 2N3. Ms. Erica M. Hamilton, Commission Secretary Diane Roy Director, Regulatory Affairs - Gas FortisBC Energy Inc. B1-7 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 576-7349 Cell: (604) 908-2790 Fax: (604) 576-7074 Email: diane.roy@fortisbc.com

More information

Insurance Corporation of British Columbia (ICBC) 2018 Basic Insurance Rate Design Application Project No ICBC s Reply to TREAD Submission

Insurance Corporation of British Columbia (ICBC) 2018 Basic Insurance Rate Design Application Project No ICBC s Reply to TREAD Submission September 18, 2018 File No.: 298298.00020/14797 Matthew Ghikas Direct +1 604 631 3191 Facsimile +1 604 632 3191 mghikas@fasken.com Electronic Filing British Columbia Utilities Commission Sixth Floor, 900

More information

For further information please contact Fred James at

For further information please contact Fred James at BChydro Joanna Sofield Chief Regulatory Officer Phone: (604) 6-4046 Fax: (604) 6-4407 regulatory. group@bchydro.com July,008 Ms. Erica M. Hamilton Commission Secretary British Columbia Utilities Commission

More information

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and BRITI SH COLUM BI A UTILITIE S COMMISSIO N OR DER NUMBER G-103-10 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC V6Z 2N3 CANADA web site: http://www.bcuc.com TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

Diane Roy Director, Regulatory Services

Diane Roy Director, Regulatory Services Diane Roy Director, Regulatory Services Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

British Columbia Hydro and Power Authority. F2017 to F2019 Revenue Requirements Application. Decision and Order G-47-18

British Columbia Hydro and Power Authority. F2017 to F2019 Revenue Requirements Application. Decision and Order G-47-18 Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 British Columbia Hydro and Power Authority F2017 to F2019 Revenue Requirements Application

More information

The following are the comments of Westcoast Energy Inc. ( Westcoast ) with respect to the referenced Application.

The following are the comments of Westcoast Energy Inc. ( Westcoast ) with respect to the referenced Application. C5-2 KIRSTEN B. JARON Director, Regulatory BC Pipeline and Field Services Divisions Duke Energy Gas Transmission Fifth Avenue Place, East Tower Suite 2600, 425 1 st Street SW Calgary, AB T2P 3L8 Telephone:

More information

Réponse du Transporteur et du Distributeur à l'engagement 4

Réponse du Transporteur et du Distributeur à l'engagement 4 Demande R-3842-2013 Réponse du Transporteur et du Distributeur à l'engagement 4 Original : 2013-11-05 HQTD-6, Document 4.4 En liasse Demande R-3842-2013 Engagement 4 (Demandé par l'aqcie-cifq le 2013-11-01,

More information

Diane Roy Director, Regulatory Services

Diane Roy Director, Regulatory Services Diane Roy Director, Regulatory Services Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

July 20, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3

July 20, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3 Insurance Corporation of British Columbia 151 W. Esplanade North Vancouver BC V7M 3H9 Phone: (604) 661-2800 regaffairs @ex.icbc.com B-14 July 20, 2007 British Columbia Utilities Commission Sixth Floor

More information

July 7, 2015 File No.: /14797 BY . British Columbia Utilities Commission 6 th floor, 900 Howe Street Vancouver, BC V6Z 2N3

July 7, 2015 File No.: /14797 BY  . British Columbia Utilities Commission 6 th floor, 900 Howe Street Vancouver, BC V6Z 2N3 C7-3 July 7, 2015 File No.: 240148.00782/14797 Matthew Ghikas Direct +1 604 631 3191 Facsimile +1 604 632 3191 mghikas@fasken.com BY E-MAIL British Columbia Utilities Commission 6 th floor, 900 Howe Street

More information

hydro /Yl- Fax: (604) Y,-- ww.bchydro. com Yours sinc

hydro /Yl- Fax: (604) Y,-- ww.bchydro. com Yours sinc -".... /Yl- -.-'- BC hydro Tony Morris Acting Chief Regulatory Offcer Phone: (604) 623-4046 Fax: (604) 623-4407 June 27, 2005 Mr. Robert J. Pellatt Commission Secretary British Columbia Utilities Commission

More information

Please find attached BC Hydro's supplemental responses to BCUC IR and BCUC IR

Please find attached BC Hydro's supplemental responses to BCUC IR and BCUC IR B16-12 Joanna Sofield Chief Regulatory Officer Phone: (604) 623-4046 Fax: (604) 623-4407 regulatory.group@bchydro.com September 29, 2006 Mr. Robert J. Pellatt Commission Secretary British Columbia Utilities

More information

FEI 2017 PRICE RISK MANAGEMENT PLAN EXHIBIT A-6

FEI 2017 PRICE RISK MANAGEMENT PLAN EXHIBIT A-6 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 March 8, 2018 Sent via

More information

Bull, Housser. &Tupper LLP. BC Utilities Commission 6th Floor Howe Street Vancouver, BC V6Z 2V3

Bull, Housser. &Tupper LLP. BC Utilities Commission 6th Floor Howe Street Vancouver, BC V6Z 2V3 C4-2 Bull, Housser &Tupper LLP 3000 Royal Centre. PO Box 11130 1055 West Georgia Street Vancouver BC Canada V6E 3R3 Phone 604.687.6575 Fax 604 641 4949 www.bht.com Reply Attention of: David Bursey Direct

More information

Creative Energy Response to BCOAPO IR 1 May 30, 2018

Creative Energy Response to BCOAPO IR 1 May 30, 2018 B-8 Creative Energy Response to BCOAPO IR 1 May 30, 2018 1.0 Reference: Exhibit B1, Application, page 1, 2017 Load Forecast The applied for method for setting rates for Steam customers is simple; it begins

More information

LMv CorporatJOn Also of the Yukon Bar

LMv CorporatJOn Also of the Yukon Bar C1-2 D Barry Kirkha.rn, QC~ James D Burns~ Jeffrey B L1ghtfoot~ Ch1stophN P We.1fcr' \chcha '1 P \'

More information

ANNEXE D BRITISH COLUMBIA UTILITIES COMMISSION ORDER G-23-01

ANNEXE D BRITISH COLUMBIA UTILITIES COMMISSION ORDER G-23-01 A Demande R-3500-2002 ANNEXE D BRITISH COLUMBIA UTILITIES COMMISSION ORDER G-23-01 22 FÉVRIER 2001 Original : 2003-03-12 En liasse B R I T I S H C O L U M B I A U T I L I T I E S C O M M I S S I O N O

More information

VIA March 18, 2010 BCTC F2011 CAPITAL PLAN UPDATE EXHIBIT A 4

VIA  March 18, 2010 BCTC F2011 CAPITAL PLAN UPDATE EXHIBIT A 4 ERICA M. HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL Janet.fraser@bctc.com bctc.regulatory@bctc.com March 18, 2010 SIXTH FLOOR, 900 HOWE STREET,

More information

SUMMARY OF APPLICATION

SUMMARY OF APPLICATION Filed: September, 00 EB-00-00 Schedule Page of SUMMARY OF APPLICATION Hydro One Networks ( Hydro One or Hydro One Transmission ) is applying for an Order approving the revenue requirement, cost allocation

More information

This is in response to your July 17, 2006 letter (attached) in which you state that

This is in response to your July 17, 2006 letter (attached) in which you state that 1 ROBERT J. PELLATT COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA E-MAIL nfnsn_hrly@yahoo.ca July 26, 2006 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA

More information

Ms. Joanna Sofield Chief Regulatory Officer British Columbia Hydro and Power Authority 17 Floor, 333 Dunsmuir Street Vancouver, B.C.

Ms. Joanna Sofield Chief Regulatory Officer British Columbia Hydro and Power Authority 17 Floor, 333 Dunsmuir Street Vancouver, B.C. ROBERT J. PELLATT COMMISSION SECRETARY Commission. Secretary@bcuc.com web site: http:l/www.bcuc.corn SIXTH FLOOR, 900 HOW STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL

More information

BC Hydro F2017-F2019 Revenue Requirement Application (RRA) Association of Major Power Customer of BC (AMPC) Supplemental Final Argument

BC Hydro F2017-F2019 Revenue Requirement Application (RRA) Association of Major Power Customer of BC (AMPC) Supplemental Final Argument VIA COMMISSION E-FILING SYSTEM British Columbia Utilities Commission 6th floor, 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Mr. Patrick Wruck, Commission Secretary Barristers & Solicitors / Patent

More information

FORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-6

FORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-6 Laurel Ross Acting Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX:

More information

Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd. ( PNG ) 2012 Pension and Non-Pension Benefits Application. Final Submission of

Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd. ( PNG ) 2012 Pension and Non-Pension Benefits Application. Final Submission of Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd. ( PNG ) 2012 Pension and Non-Pension Benefits Application Final Submission of British Columbia Pensioners and Seniors Organization, Active

More information

B.C. Utilities Commission File No.: 4.2 (2015) 6 th Floor Howe Street Vancouver, B.C. V6Z 2N3

B.C. Utilities Commission File No.: 4.2 (2015) 6 th Floor Howe Street Vancouver, B.C. V6Z 2N3 B-3 Janet P. Kennedy Vice President, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. 950, 1185 West Georgia Street Vancouver, BC V6E 4E6 Tel: (604) 691-5680 Fax: (604) 697-6210 Email: jkennedy@png.ca

More information

April 13, Via

April 13, Via ENMAX Corporation 141 50 Avenue SE Calgary, AB T2G 4S7 Tel (403) 514-3000 enmax.com April 13, 2007 Via Email Ms. Brenda Ambrosi Vancouver, BC V7X 1V5 Dear Ms. Ambrosi: Re: Network Economy Business Practices

More information

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and BRITISH C OLUMBIA U TILITIES C OMMISSION O RDER NUMBER G-52-06 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. V6Z 2N3 CANADA web site: http://www.bcuc.com TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

Sent via efile FEI 2016 RATE DESIGN EXHIBIT A2-10

Sent via efile FEI 2016 RATE DESIGN EXHIBIT A2-10 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 June 23, 2017 Sent via

More information

included in the survey is published in the Quarterly Reports and the Budget and Fiscal Plan.

included in the survey is published in the Quarterly Reports and the Budget and Fiscal Plan. Information Request No. 2.23.0(a) Dated: 5 April 2004 23.0 Reference: BC Hydro letter of March 29, 2004 indicating, among other things, that BC Hydro is prepared to call Mr. Robert Fairholm to testify

More information

April 6, 2018 VIA OVERNIGHT MAIL. Sheri Young, Secretary of the Board National Energy Board th Avenue SW Calgary, Alberta T2R 0A8

April 6, 2018 VIA OVERNIGHT MAIL. Sheri Young, Secretary of the Board National Energy Board th Avenue SW Calgary, Alberta T2R 0A8 !! April 6, 2018 VIA OVERNIGHT MAIL Sheri Young, Secretary of the Board National Energy Board 517 10 th Avenue SW Calgary, Alberta T2R 0A8 Re: North American Electric Reliability Corporation Dear Ms. Young:

More information

Terasen Gas Inc. ( Terasen Gas ) Customer Choice Program 2010 Program Summary and Recommendations

Terasen Gas Inc. ( Terasen Gas ) Customer Choice Program 2010 Program Summary and Recommendations Diane Roy Director, Regulatory Affairs 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 576-7349 Cell: (604) 908-2790 Fax: (604) 576-7074 Email: diane.roy@terasengas.com www.terasengas.com Regulatory

More information

B.C. Utilities Commission File No.: 4.2.7(2013) 6th Floor Howe Street Vancouver, BC V6Z 2N3

B.C. Utilities Commission File No.: 4.2.7(2013) 6th Floor Howe Street Vancouver, BC V6Z 2N3 Janet P. Kennedy Vice President, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. Suite 950 1185 West Georgia Street Vancouver, BC V6E 4E6 Tel: (604) 691-5680 Fax: (604) 697-6210 Email: jkennedy@png.ca

More information

SUBMISSION BRITISH COLUMBIA HYDRO AND POWER AUTHORITY F2017 TO F2019 REVENUE REQUIREMENTS APPLICATION

SUBMISSION BRITISH COLUMBIA HYDRO AND POWER AUTHORITY F2017 TO F2019 REVENUE REQUIREMENTS APPLICATION British Columbia Old Age Pensioners Organization, Active Support Against Poverty, Council of Senior Citizens Organizations of BC, Disability Alliance BC, Tenant Resource and Advisory Centre and Together

More information

BC HYDRO SITE C CLEAN ENERGY PROJECT SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT. for the Site C Clean Energy Project

BC HYDRO SITE C CLEAN ENERGY PROJECT SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT. for the Site C Clean Energy Project BC HYDRO SITE C CLEAN ENERGY PROJECT SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT for the Site C Clean Energy Project British Columbia Hydro and Power Authority and Voith Hydro Inc. Dated:

More information

Re: Docket No R.I. Office of Energy Resources Response to the Commission s Set of Data Requests Dated June 30, 2016

Re: Docket No R.I. Office of Energy Resources Response to the Commission s Set of Data Requests Dated June 30, 2016 STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Department of Administration DIVISION OF LEGAL SERVICES Tel: (401) 222-8880 One Capitol Hill, 4 th Floor Fax: (401) 222-8244 Providence, RI 02908-5890 July

More information

BC HYDRO INQUIRY OF EXPENDITURES SAP PLATFORM EXHIBIT A2-5. Commission staff submits the following document for the record in this proceeding:

BC HYDRO INQUIRY OF EXPENDITURES SAP PLATFORM EXHIBIT A2-5. Commission staff submits the following document for the record in this proceeding: Laurel Ross Acting Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX:

More information

PURSUANT TO THE MORTGAGE BROKERS ACT. Mortgage Broker Address City Province Postal Code Phone Fax Name of Designated Individual

PURSUANT TO THE MORTGAGE BROKERS ACT. Mortgage Broker Address City Province Postal Code Phone Fax  Name of Designated Individual Page 1 of 5 FORM 13 - for Fiscal Year End ENGAGEMENT LETTER Between Accountant and Client Registrar of Mortgage Brokers 2800-555 West Hastings Vancouver, BC V6B 4N6 Ph. 604-660-3555 / Toll-free: 1-866-206-3030

More information

THE WORKERS COMPENSATION BOARD OF BRITISH COLUMBIA RESOLUTION OF THE BOARD OF DIRECTORS. Transitional Provision Regarding Recurrence of Disability

THE WORKERS COMPENSATION BOARD OF BRITISH COLUMBIA RESOLUTION OF THE BOARD OF DIRECTORS. Transitional Provision Regarding Recurrence of Disability BOARD OF DIRECTORS Douglas J. Enns, Chair David Anderson Terry Brown Stephen Hunt Roslyn Kunin Peter Morse Arlene Ward 2006/06/20-01 THE WORKERS COMPENSATION BOARD OF BRITISH COLUMBIA RESOLUTION OF THE

More information

building trust. driving confidence.

building trust. driving confidence. ~ building trust. driving confidence. January 29, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Ms. Erica Hamilton, Commission Secretary and Director

More information

BC Hydro 2008 Long Term Acquisition Plan. Request by Mr. Ludo Bertsch to represent other organizations

BC Hydro 2008 Long Term Acquisition Plan. Request by Mr. Ludo Bertsch to represent other organizations BC Hydro 2008 Long Term Acquisition Plan C23-5 Request by Mr. Ludo Bertsch to represent other organizations By: Ludo Bertsch, Horizon Technologies Inc. (250) 592-1488; ludob@horizontec.com Date: December

More information

Fasken Martineau DuMoulin LLP * Barristers and Solicitors Patent and Trade-mark Agents

Fasken Martineau DuMoulin LLP * Barristers and Solicitors Patent and Trade-mark Agents Fasken Martineau DuMoulin LLP * Barristers and Solicitors Patent and Trade-mark Agents www.fasken.com 2900-550 Burrard Street Vancouver, British Columbia, Canada V6C 0A3 604 631 3131 Telephone 604 631

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Wellington North Power

More information

Ms. Laurel Ross, Acting Commission Secretary and Director

Ms. Laurel Ross, Acting Commission Secretary and Director B- Diane Roy Director, Regulatory Services Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information