1 B-3 Janet P. Kennedy Vice President, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. 950, 1185 West Georgia Street Vancouver, BC V6E 4E6 Tel: (604) Fax: (604) Via August 7, 2015 B.C. Utilities Commission File No.: 4.2 (2015) 6 th Floor Howe Street Vancouver, B.C. V6Z 2N3 Attention: Erica M. Hamilton Commission Secretary Dear Ms. Hamilton: Re: Pacific Northern Gas (N.E.) Ltd. Dawson Creek Division Application for Approval of AltaGas Ltd. Industrial Firm Transportation Service Agreement and Proposed RS7 Industrial LNG Firm Transportation Service Tariff Supplemental Information AltaGas Costs for Bypass Scenario Accompanying this letter, please find the additional information requested by the Commission under Order G , specifically, a fulsome response to Directive 3(iii) of Order G The requested information on a bypass scenario has been provided by AltaGas Ltd. in the appended correspondence and includes: Estimated capital costs; Estimated operating costs; Calculation of estimated per gigajoule rate based on the estimated capital and operating costs; and Assumptions made in developing the foregoing estimates. Please direct any questions regarding the contents of this letter and the appended information to my attention. Yours truly, Janet P. Kennedy cc: Registered Interveners

2 AltaGas Ltd. 1700, 355 4th Ave SW Calgary, Alberta T2P 0J1 main fax August 7, 2015 Janet Kennedy Vice President, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. 950, 1185 West Georgia Street Vancouver, BC V6E 4E6 RE: PNG(NE) PROPOSED RS7 INDUSTRIAL LNG FIRM TRANSPORTATION SERVICE TARIFF SUPPLEMENTAL ALTAGAS COST INFORMATION Dear Ms. Kennedy, In response to the British Columbia Utilities Commission ( BCUC ) request for Pacific Northern Gas (N.E.) Ltd. ( PNG ) to provide detailed supplemental information regarding AltaGas s cost of connecting its proposed LNG facility directly to Spectra s transmission system at an alternative location to the proposed Dawson Creek location, please consider the information that follows. Estimated Capital and Operating Costs to Bypass Capital Costs AltaGas reviewed several locations in northeast British Columbia for siting the proposed LNG facility and has compiled a summary of estimated interconnection costs that reflect current market conditions in the region and are considered to be applicable and representative for the various locations under consideration. This capital cost summary is provided in Exhibit 1 that follows. Exhibit 1 RLNG Interconnection Capital Cost Summary Preliminary Work $ 72,417 Land $ 78,476 Contractor $ 68,522 Land $ 78,476 Land/ROW $ 3,895 Spectra Interconnection $ 500,000 Pipeline $ 292,827 Interconnection $ 500,000 Contractor $ 173,970 Land/ROW $ 57,078 Facility Total: $ 1,228,619 Materials $ 58,683 Other $ 3,096 Facility Excl Land/ROW: $ 1,089,171 Regulator Station/Meter Set $ 284,899 Materials $ 174,173 Contractor $ 89,674 Other $ 21,051 Page 1 of 4

3 AltaGas notes that these capital costs reflect a scenario assuming locations up to 1 km away from a Spectra interconnection point. AltaGas observes that it has reviewed the possibilities of locating directly adjacent to the Spectra transmission line and within the footprint of existing owned and operated gas processing facilities whereby some of the identified interconnection costs would be reduced. Operating Costs Annual operations and maintenance costs of the pipeline facilities in a standalone scenario as contemplated in this analysis would be included in the operations and maintenance budget for the LNG facility. Generally a facility of this nature, due to its small size and integration with the LNG facility, would not require significant operations and maintenance budget other than the scheduled annual inspections and any resulting maintenance which is not expected to be significant. Therefore, in its internal analysis AltaGas has allocated $10,000 per annum for pipeline operations and maintenance in its general plant maintenance at the LNG facility. Bypass Toll Analysis Further to the BCUC s request for a bypass toll analysis, AltaGas has prepared a cost of service model utilizing typical financial inputs AltaGas would make use of for developing pipeline assets. This analysis and the resultant toll are presented in Exhibit 2 that follows. The resulting analysis demonstrates that AltaGas cost of interconnecting on a standalone basis and bypassing PNG results in a tariff of $0.11 per GJ. AltaGas notes that, while it has many advantages in so far as its own internal capability to provide gas service to the proposed LNG facility, by leveraging its existing assets and gas supply agreements with producers and transporters in British Columbia, its final decision to locate in Dawson Creek was predicated on the intangible benefits that AltaGas receives by working with the local utility. These include: 1) Proximity to skilled labor. 2) Proximity to AltaGas existing facilities in Taylor and proposed facilities in Fort St. John. 3) Availability of serviced industrial land versus un-surveyed Crown land despite the significant savings of the latter. 4) Central location to a variety of markets including the far north, central BC and Alberta. 5) Excellent transportation corridors and road access. 6) Maintaining relationships with local communities and generating economic activity. 7) Social license and responsibility to the communities we impact. Page 2 of 4

4 Exhibit 2 Cost of Service and Bypass Toll Analysis Bypass Toll Calculation YEAR: Capital ($000) Gross Capex Opening $ - $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 Additions (Land) $ 139 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Additions (Pipeline and Facilities) $ 1,089 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Closing $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 $ 1,229 Depreciation (Facilities) Opening $ - $ (9) $ (30) $ (50) $ (71) $ (91) $ (112) $ (132) $ (153) $ (173) $ (194) $ (214) $ (235) $ (255) $ (276) $ (296) $ (317) $ (337) $ (358) $ (378) Additions $ (9) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) Closing $ (9) $ (30) $ (50) $ (71) $ (91) $ (112) $ (132) $ (153) $ (173) $ (194) $ (214) $ (235) $ (255) $ (276) $ (296) $ (317) $ (337) $ (358) $ (378) $ (399) Net Capex Opening $ - $ 1,220 $ 1,199 $ 1,178 $ 1,158 $ 1,137 $ 1,117 $ 1,096 $ 1,076 $ 1,055 $ 1,035 $ 1,014 $ 994 $ 973 $ 953 $ 932 $ 912 $ 891 $ 871 $ 850 Additions $ 1,229 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Depreciation/Amortizartion $ (9) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) $ (21) Closing $ 1,220 $ 1,199 $ 1,178 $ 1,158 $ 1,137 $ 1,117 $ 1,096 $ 1,076 $ 1,055 $ 1,035 $ 1,014 $ 994 $ 973 $ 953 $ 932 $ 912 $ 891 $ 871 $ 850 $ 830 Revenue Requirement ($000) Operating and Maintenance Expenses $ 10.0 $ 10.2 $ 10.3 $ 10.5 $ 10.6 $ 10.8 $ 10.9 $ 11.1 $ 11.3 $ 11.4 $ 11.6 $ 11.8 $ 12.0 $ 12.1 $ 12.3 $ 12.5 $ 12.7 $ 12.9 $ 13.1 $ 13.3 Allocation from A&G and Corp O/H $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Total OMAG $ 10 $ 10 $ 10 $ 10 $ 11 $ 11 $ 11 $ 11 $ 11 $ 11 $ 12 $ 12 $ 12 $ 12 $ 12 $ 13 $ 13 $ 13 $ 13 $ 13 Depreciation & Amortization $ 9 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 $ 21 Property Taxes $ 0.6 $ 1.2 $ 1.1 $ 1.2 $ 1.2 $ 1.2 $ 1.2 $ 1.2 $ 1.2 $ 1.2 $ 1.2 $ 1.1 $ 1.1 $ 1.1 $ 1.1 $ 1.1 $ 1.1 $ 1.1 $ 1.1 $ 1.1 Interest $ 12 $ 24 $ 24 $ 23 $ 23 $ 23 $ 22 $ 22 $ 21 $ 21 $ 20 $ 20 $ 20 $ 19 $ 19 $ 18 $ 18 $ 18 $ 17 $ 17 Return on Equity $ 30 $ 60 $ 59 $ 58 $ 57 $ 56 $ 55 $ 54 $ 53 $ 52 $ 51 $ 50 $ 49 $ 48 $ 47 $ 46 $ 45 $ 44 $ 43 $ 42 Income Tax $ - $ - $ 1 $ 3 $ 4 $ 6 $ 7 $ 8 $ 9 $ 10 $ 11 $ 12 $ 13 $ 13 $ 14 $ 14 $ 15 $ 15 $ 15 $ 15 Total Revenue Required $ 62 $ 116 $ 116 $ 117 $ 117 $ 117 $ 117 $ 117 $ 117 $ 117 $ 116 $ 116 $ 115 $ 114 $ 114 $ 113 $ 112 $ 111 $ 110 $ 109 Volumes (TJ) Average Rate Impact ($/GJ) $ 0.06 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.12 $ 0.11 $ 0.11 $ 0.11 $ 0.11 Levelized Rate Calculation (All Costs and Volumes) Discount Rate 7.00% 20-Year NPV Revenue Requirement ($000) $ 1, Year NPV Volumes 10,382 TJ Levelized Rate $ 0.11 /GJ Inputs & Assumptions Capital Costs ($000) Pipeline $ 236 Interconnection, Regulation and Metering $ 853 Land $ 139 OMAG & Taxes O&M ($000) $ 10 A&G Corporate Allocation Factor - Property Taxes and Taxes in Lieu 1.00% Financial Portion Equity 50.00% Return on Equity (before tax) 10.00% Return on Debt 4.00% WACC 7.00% Depreciation Rate 1.67% Effective Income Tax Rate 26.00% Capital Cost Allowance Rate Pipeline, Interconnection, Regulation and Metering 8.00% Inflation 1.50% Customer Volume (GJ/year) 980,000 Page 3 of 4

5 AltaGas is of the belief that the resulting negotiated tariff is fair and reasonable for both parties given that AltaGas is capable, both physically and financially, of bypassing PNG. AltaGas is cognizant of the value in working with PNG and believes that the agreed tariff is a fair compromise which provides long term benefits, both financial and intangible, to PNG customers, and which also affords valuable intangible benefits to AltaGas. Further, the negotiated arrangements are considered commercially reasonable for AltaGas in what is seen as a very competitive market for the new LNG business. Truly, Wayne Geis Divisional Vice President Regional LNG AltaGas Ltd. direct line main Page 4 of 4

Exhibit B-3, pp. 1-2, Exhibit 1; Exhibit B-1, p. 3 Capital costs

Exhibit B-3, pp. 1-2, Exhibit 1; Exhibit B-1, p. 3 Capital costs Page 1 B-7 BRITISH COLUMBIA UTILITIES COMMISSION INFORMATION REQUEST ON BYPASS COSTS TO PACIFIC NORTHERN GAS (N.E.) LTD. [PNG (N.E.)] Dawson Creek Division Application for Approval of AltaGas Ltd. Industrial

More information

B.C. Utilities Commission File No.: 4.2.7(2013) 6th Floor Howe Street Vancouver, BC V6Z 2N3

B.C. Utilities Commission File No.: 4.2.7(2013) 6th Floor Howe Street Vancouver, BC V6Z 2N3 Janet P. Kennedy Vice President, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. Suite 950 1185 West Georgia Street Vancouver, BC V6E 4E6 Tel: (604) 691-5680 Fax: (604) 697-6210 Email: jkennedy@png.ca

More information

Re: Project No Pacific Northern Gas (N.E.) Ltd Revenue Requirements Application Update for Fort St. John/Dawson Creek Division

Re: Project No Pacific Northern Gas (N.E.) Ltd Revenue Requirements Application Update for Fort St. John/Dawson Creek Division B-7 Craig P. Donohue Director, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. Suite 950 1185 West Georgia Street Vancouver, BC V6E 4E6 Tel: (604) 691-5673 Tel: (604) 697-6210 Email: cdonohue@png.ca

More information

Re: Pacific Northern Gas (N.E.) Ltd. Project No /Order G Revenue Requirements Application

Re: Pacific Northern Gas (N.E.) Ltd. Project No /Order G Revenue Requirements Application ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

PNG WEST 2013 REVENUE REQUIREMENTS EXHIBIT A-9

PNG WEST 2013 REVENUE REQUIREMENTS EXHIBIT A-9 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

Pacific Northern Gas Ltd. (PNG-West)

Pacific Northern Gas Ltd. (PNG-West) (PNG-West) #2550-1066 West Hastings Street Vancouver, B.C. V6E 3X2 2016 ANNUAL REPORT TO THE BRITISH COLUMBIA UTILITIES COMMISSION For the period January 1, 2016 to December 31, 2016 LIST OF SCHEDULES

More information

November 22, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

November 22, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Diane Roy Director, Regulatory Affairs - Gas FortisBC Energy Inc. November 22, 2012 British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 16705 Fraser Highway Surrey,

More information

PACIFIC NORTHERN GAS (N.E.) LTD. (Fort St. John/Dawson Creek Division) 2005 Revenue Requirements Application to the B.C. Utilities Commission

PACIFIC NORTHERN GAS (N.E.) LTD. (Fort St. John/Dawson Creek Division) 2005 Revenue Requirements Application to the B.C. Utilities Commission PACIFIC NORTHERN GAS (N.E.) LTD. (Fort St. John/Dawson Creek Division) 2005 Revenue Requirements Application to the B.C. Utilities Commission December 17, 2004 Pacific Northern Gas (N.E.) Ltd. (Fort St.

More information

August 29, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

August 29, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Diane Roy Director, Regulatory Affairs - Gas FortisBC Energy Inc. August 29, 2012 British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 16705 Fraser Highway Surrey, B.C.

More information

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-3

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-3 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com April 4, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support B-2 10 th Floor 1111 West Georgia Street Vancouver, BC, V6E 4M3 April 21, 2017 British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Mr. Patrick Wruck, Commission

More information

FORTISBC ENERGY CEC ROE 2016 EXHIBIT A-7

FORTISBC ENERGY CEC ROE 2016 EXHIBIT A-7 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

Diane Roy Director, Regulatory Services

Diane Roy Director, Regulatory Services Diane Roy Director, Regulatory Services Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and BRITI SH COLUM BI A UTILITIE S COMMISSIO N OR DER NUMBER G-103-10 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC V6Z 2N3 CANADA web site: http://www.bcuc.com TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

September 26, Via Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C.

September 26, Via  Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C. B-8 Diane Roy Director, Regulatory Affairs FortisBC Energy 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 576-7349 Cell: (604) 908-2790 Fax: (604) 576-7074 Email: diane.roy@fortisbc.com www.fortisbc.com

More information

Diane Roy Director, Regulatory Services

Diane Roy Director, Regulatory Services Diane Roy Director, Regulatory Services Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

July 7, 2015 File No.: /14797 BY . British Columbia Utilities Commission 6 th floor, 900 Howe Street Vancouver, BC V6Z 2N3

July 7, 2015 File No.: /14797 BY  . British Columbia Utilities Commission 6 th floor, 900 Howe Street Vancouver, BC V6Z 2N3 C7-3 July 7, 2015 File No.: 240148.00782/14797 Matthew Ghikas Direct +1 604 631 3191 Facsimile +1 604 632 3191 mghikas@fasken.com BY E-MAIL British Columbia Utilities Commission 6 th floor, 900 Howe Street

More information

BC HYDRO F2012 F2014 REVENUE REQUIREMENTS EXHIBIT A2 8

BC HYDRO F2012 F2014 REVENUE REQUIREMENTS EXHIBIT A2 8 ERICA M. HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL bchydroregulatorygroup@bchydro.com March 31, 2011 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

STARGAS APPLICATION TO ALTER RATES. Re: Stargas Utilities Ltd. Application to Alter Rates and Refinance

STARGAS APPLICATION TO ALTER RATES. Re: Stargas Utilities Ltd. Application to Alter Rates and Refinance ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660 4700 BC TOLL FREE:

More information

ORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and

ORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 ORDER NUMBER G-48-19 IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter

More information

Parties are invited to make submissions on IR responses and the additional topics to be issued by the Panel. ACTION DATE (2014)

Parties are invited to make submissions on IR responses and the additional topics to be issued by the Panel. ACTION DATE (2014) ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

FortisBC Inc. Application for an Exempt Residential Rate

FortisBC Inc. Application for an Exempt Residential Rate B-1 Corey Sinclair Manager, Regulatory Affairs FortisBC Inc. Suite 100-1975 Springfield Road Kelowna, BC V1Y 7V7 Ph: (250) 469-8038 Fax: 1-866-335-6295 electricity.regulatory.affairs@fortisbc.com www.fortisbc.com

More information

1.0 Reference: Exhibit B-1, Tab Application, page 3, Cost of Service Comparison

1.0 Reference: Exhibit B-1, Tab Application, page 3, Cost of Service Comparison B-6 BCPSO IR No. 1 Page 1 REQUESTOR NAME: BCPSO et al. INFORMATION REQUEST ROUND NO: #1 TO: Pacific Northern Gas (N.E.) Ltd ( PNG ) Tumbler Ridge Division DATE: February 8, 2013 PROJECT NO: 3698698 / BCPSO

More information

VIA October 27, 2005

VIA  October 27, 2005 ROBERT J. PELLATT COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL

More information

BC HYDRO CONTRACTED GBL EXHIBIT A-6

BC HYDRO CONTRACTED GBL EXHIBIT A-6 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

Re: FortisBC Inc. Application for Approval of Demand Side Management Expenditures for the Period of 2015 and 2016

Re: FortisBC Inc. Application for Approval of Demand Side Management Expenditures for the Period of 2015 and 2016 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL August 22, 2014 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604)

More information

March 4, RE: EXPERIMENTAL SCHEME APPROVAL, AMENDMENT #1 TATTOO AREA HORN RIVER FORMATION

March 4, RE: EXPERIMENTAL SCHEME APPROVAL, AMENDMENT #1 TATTOO AREA HORN RIVER FORMATION March 4, 2009 9000-8285-59240-15 Eugene Wasylchuk, P.Eng. Consultant Stone Mountain Resources Ltd. Sun Life Plaza, West Tower 2800, 144 4 th Avenue SW Calgary, Alberta T2P 3N4 Dear Mr. Wasylchuk: RE: EXPERIMENTAL

More information

January 23, Via Original via Mail. British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

January 23, Via  Original via Mail. British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 3700 2 nd Avenue Burnaby, BC V5C 6S4 January 23, 2014 Via Email Original via Mail 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Ms. Erica M. Hamilton, Commission Secretary Dear Ms. Hamilton:

More information

PACIFIC NORTHERN GAS LTD.

PACIFIC NORTHERN GAS LTD. IN THE MATTER OF PACIFIC NORTHERN GAS LTD. APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT AND OPERATE AND INTERCONNECTING PIPELINE BETWEEN KITIMAT AND DOUGLAS CHANNEL DECISION

More information

444 Seventh Avenue S.W. Calgary, Alberta T2P 0X8. Attention: Ms. Anne-Marie Erikson, Acting Secretary of the Board

444 Seventh Avenue S.W. Calgary, Alberta T2P 0X8. Attention: Ms. Anne-Marie Erikson, Acting Secretary of the Board 450-1 st Street S.W. Calgary, Alberta, Canada T2P 5H1 Tel: (403) 920-2046 Fax: (403) 920-2347 Email: murray_sondergard@transcanada.com February 26, 2010 National Energy Board 444 Seventh Avenue S.W. Calgary,

More information

BRITISH COLUMBIA UTILITIES COMMISSION Commission Information Request No. 2

BRITISH COLUMBIA UTILITIES COMMISSION Commission Information Request No. 2 B-6 BCUC IR No. 2 Page 1 BRITISH COLUMBIA UTILITIES COMMISSION Commission Information Request No. 2 Pacific Northern Gas Ltd. (PNG West Division) and Pacific Northern Gas (N.E.) Ltd. (Fort St John/Dawson

More information

PACIFIC NORTHERN GAS LTO and PACIFIC NORTHERN GAS (N.E.) LTO. GAS SALES TARIFF. Explanation of Symbols on Tariff Sheets. A - Signifies Increase

PACIFIC NORTHERN GAS LTO and PACIFIC NORTHERN GAS (N.E.) LTO. GAS SALES TARIFF. Explanation of Symbols on Tariff Sheets. A - Signifies Increase ~ Northem PacifiC Gas PACIFIC NORTHERN GAS LTO and PACIFIC NORTHERN GAS (N.E.) LTO. GAS SALES TARIFF Explanation of Symbols on Tariff Sheets A - Signifies Increase C - Signifies Change D - Signifies Decrease

More information

November 8, Dear Mr. Wruck:

November 8, Dear Mr. Wruck: B-23 Fred James Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com November 8, 2017 Mr. Patrick Wruck Commission Secretary and Manager Regulatory Support

More information

FORTISBC INC PERFORMANCE BASED RATEMAKING REVENUE REQUIREMENTS EXHIBIT A-27

FORTISBC INC PERFORMANCE BASED RATEMAKING REVENUE REQUIREMENTS EXHIBIT A-27 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL rhobbs@shaw.ca January 16, 2014 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z

More information

IN THE MATTER OF AND DECISION. July 29, Before:

IN THE MATTER OF AND DECISION. July 29, Before: IN THE MATTER OF PACIFIC NORTHERN GAS LTD. AND AN APPLICATION TO RECAPITALIZE UNDER AN INCOME TRUST OWNERSHIP STRUCTURE DECISION July 29, 2004 Before: L.A. Boychuk, Panel Chair and Commissioner N.F. Nicholls,

More information

Terasen Gas Inc. ( Terasen Gas ) Extension of the Multi-Year Performance Based Rate Plan 2007 Annual Review

Terasen Gas Inc. ( Terasen Gas ) Extension of the Multi-Year Performance Based Rate Plan 2007 Annual Review Scott A. Thomson Vice President, Regulatory Affairs and Chief Financial Officer 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 592-7784 Fax: (604) 576-7074 Email: scott.thomson@terasengas.com www.terasengas.com

More information

PNG-West 2011 Revenue Requirements Application Response to BCOAPO Information Request No. 1 Project No

PNG-West 2011 Revenue Requirements Application Response to BCOAPO Information Request No. 1 Project No B-6 Craig P. Donohue Director, Regulatory Affairs & Gas Supply Pacific Northern Gas Ltd. Suite 950 1185 West Georgia Street Vancouver, BC V6E 4E6 Tel: (604) 691-5673 Tel: (604) 697-6210 Email: cdonohue@png.ca

More information

FORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-3

FORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-3 Laurel Ross Acting Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 00 Howe Street Vancouver, BC Canada VZ N TEL: (0) 0-00 BC Toll Free: -00-- FAX: (0) 0- Log No. VIA

More information

Northern Gateway is directed to submit its response with the Panel and send a copy to the OH Parties by noon, Mountain Time, 25 January 2012.

Northern Gateway is directed to submit its response with the Panel and send a copy to the OH Parties by noon, Mountain Time, 25 January 2012. File OF-Fac-Oil-N304-2010-01 01 8 December 2011 Mr. Kenneth MacDonald VP, Law and Regulatory Affairs Northern Gateway Pipelines Inc. Suite 3000, 425 1st Street SW Calgary, Alberta T2P 3L8 Facsimile 403-718-3525

More information

building trust. driving confidence.

building trust. driving confidence. ~ building trust. driving confidence. January 29, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Ms. Erica Hamilton, Commission Secretary and Director

More information

FEU COMMON RATES, AMALGAMATION RATE DESIGN RECONSIDERATION PHASE 2 EXHIBIT A-4

FEU COMMON RATES, AMALGAMATION RATE DESIGN RECONSIDERATION PHASE 2 EXHIBIT A-4 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com July 24, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

Form F6 British Columbia Report of Exempt Distribution

Form F6 British Columbia Report of Exempt Distribution Form 45-106F6 British Columbia Report of Exempt Distribution This is the form required under section 6.1 of National Instrument 45-106 for a report of exempt distribution in British Columbia. Issuer/underwriter

More information

INVESTOR PRESENTATION. January, 2019

INVESTOR PRESENTATION. January, 2019 INVESTOR PRESENTATION January, 2019 Forward Looking Information Certain statements contained in this presentation constitute forward-looking statements or forward-looking information (collectively, forward-looking

More information

June 22, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C. V6Z 2N3. Ms. Erica M. Hamilton, Commission Secretary

June 22, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C. V6Z 2N3. Ms. Erica M. Hamilton, Commission Secretary Diane Roy Director, Regulatory Affairs - Gas FortisBC Energy Inc. B1-7 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 576-7349 Cell: (604) 908-2790 Fax: (604) 576-7074 Email: diane.roy@fortisbc.com

More information

Form F6 British Columbia Report of Exempt Distribution

Form F6 British Columbia Report of Exempt Distribution Form 45-106F6 British Columbia Report of Exempt Distribution This is the form required under section 6.1 of National Instrument 45-106 for a report of exempt in British Columbia. Issuer/underwriter information

More information

CLASS EXEMPTION FOR BC HYDRO CUSTOMERS UNDER CERTAIN LEASE ARRANGEMENTS EXHIBIT A2-1

CLASS EXEMPTION FOR BC HYDRO CUSTOMERS UNDER CERTAIN LEASE ARRANGEMENTS EXHIBIT A2-1 Laurel Ross Acting Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX:

More information

The following are the comments of Westcoast Energy Inc. ( Westcoast ) with respect to the referenced Application.

The following are the comments of Westcoast Energy Inc. ( Westcoast ) with respect to the referenced Application. C5-2 KIRSTEN B. JARON Director, Regulatory BC Pipeline and Field Services Divisions Duke Energy Gas Transmission Fifth Avenue Place, East Tower Suite 2600, 425 1 st Street SW Calgary, AB T2P 3L8 Telephone:

More information

INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report November 24, 2017

INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report November 24, 2017 Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report

More information

ALTAGAS CANADA INC. ANNOUNCES THIRD QUARTER 2018 RESULTS AND DECLARES ITS FIRST DIVIDEND

ALTAGAS CANADA INC. ANNOUNCES THIRD QUARTER 2018 RESULTS AND DECLARES ITS FIRST DIVIDEND FOR IMMEDIATE RELEASE ALTAGAS CANADA INC. ANNOUNCES THIRD QUARTER 2018 RESULTS AND DECLARES ITS FIRST DIVIDEND Calgary, Alberta (October 31, 2018) AltaGas Canada Inc. ( ACI ) (TSX: ACI) today announced

More information

Doug Slater Director, Regulatory Affairs

Doug Slater Director, Regulatory Affairs B- Doug Slater Director, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

April 29, Filed Electronically Original via Mail

April 29, Filed Electronically Original via Mail Suite 1500, Bow Valley Square 4 250-6 th Ave SW Calgary, Alberta T2P 3H7 Declan Russell Manager, Regulatory Affairs April 29, 2016 Filed Electronically Original via Mail Ms. Sheri Young Secretary of the

More information

April 13, Via

April 13, Via ENMAX Corporation 141 50 Avenue SE Calgary, AB T2G 4S7 Tel (403) 514-3000 enmax.com April 13, 2007 Via Email Ms. Brenda Ambrosi Vancouver, BC V7X 1V5 Dear Ms. Ambrosi: Re: Network Economy Business Practices

More information

If you have any questions or concerns, please do not hesitate to contact the Commission.

If you have any questions or concerns, please do not hesitate to contact the Commission. August 23, 2017 Enforcement File: 2017-184FSJ Pembina NGL Corporation 4000, 585, 8th Avenue SW Calgary, Alberta T2P 1G1 Attention: Peter Miles, Supervisor of Regulatory Re: General Order 2017-086 Dear

More information

Our File: Date: April 22, 2015

Our File: Date: April 22, 2015 B-2 BY E-MAIL British Columbia Utilities Commission 6th Floor - 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Erica Hamilton, Commission Secretary Dear Ms. Hamilton: Re: Reply Attention of: Matthew

More information

National Energy Board. Reasons for Decision. Westcoast Energy Inc. RH-2-97 Part II. August 1997

National Energy Board. Reasons for Decision. Westcoast Energy Inc. RH-2-97 Part II. August 1997 National Energy Board Reasons for Decision Westcoast Energy Inc. RH-2-97 Part II August 1997 Multi-year Incentive Toll Settlement 1 January 1997 to 31 December 2001 National Energy Board Reasons for Decision

More information

VIA March 18, 2010 BCTC F2011 CAPITAL PLAN UPDATE EXHIBIT A 4

VIA  March 18, 2010 BCTC F2011 CAPITAL PLAN UPDATE EXHIBIT A 4 ERICA M. HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL Janet.fraser@bctc.com bctc.regulatory@bctc.com March 18, 2010 SIXTH FLOOR, 900 HOWE STREET,

More information

1. Background. March 7, 2014

1. Background. March 7, 2014 Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com March 7, 2014 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

Ms. Laurel Ross, Acting Commission Secretary and Director

Ms. Laurel Ross, Acting Commission Secretary and Director Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

FortisBC Inc. Annual Review of 2018 Rates Project No British Columbia Utilities Commission Information Request No. 1

FortisBC Inc. Annual Review of 2018 Rates Project No British Columbia Utilities Commission Information Request No. 1 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 September 6, 2017 Sent

More information

For further information, please contact Guy Leroux at

For further information, please contact Guy Leroux at BChydro m R GENE IONS Joanna Sofield Chief Regulatory Officer Phone: (604 623-4046 Fax: (604 623-4407 bchyd roregulatorygroup@bchydro.com July 13 2009 Ms. Erica M. Hamilton Commission Secretary British

More information

September 10, Via Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C.

September 10, Via  Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C. C- Email: electricity.regulatory.affairs@fortisbc.comemail: electricity.regulatory.affairs@fortisbc.com Dennis Swanson Director, Regulatory Affairs FortisBC Inc. Suite 00 Springfield Road Kelowna, BC VY

More information

For further information, please contact Fred James at or by at

For further information, please contact Fred James at or by  at Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com February 28, 2014 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-1

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-1 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com April 4, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

Decision D Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities. First Compliance Proceeding

Decision D Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities. First Compliance Proceeding Decision 22394-D01-2018 Rebasing for the 2018-2022 PBR Plans for February 5, 2018 Alberta Utilities Commission Decision 22394-D01-2018 Rebasing for the 2018-2022 PBR Plans for Proceeding 22394 February

More information

FORTISBC INC. RECONSIDERATION AND VARIANCE OF ORDER G PHASE 2 EXHIBIT A-4

FORTISBC INC. RECONSIDERATION AND VARIANCE OF ORDER G PHASE 2 EXHIBIT A-4 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX: (604)

More information

Requested Amendment to the National Energy Board Cost Recovery Regulations (Regulation)

Requested Amendment to the National Energy Board Cost Recovery Regulations (Regulation) File Ad-GA-RG-CR-03e 18 March 2011 To: Gas pipeline companies regulated by the National Energy Board, Canadian Association of Petroleum Producers, Canadian Energy Pipeline Association and Canadian Gas

More information

LMv CorporatJOn Also of the Yukon Bar

LMv CorporatJOn Also of the Yukon Bar C1-2 D Barry Kirkha.rn, QC~ James D Burns~ Jeffrey B L1ghtfoot~ Ch1stophN P We.1fcr' \chcha '1 P \'

More information

Diane Roy Vice President, Regulatory Affairs

Diane Roy Vice President, Regulatory Affairs Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

MEMBER REGULATION. notice

MEMBER REGULATION. notice MEMBER REGULATION notice W. D Silva: wdsilva@ida.ca MR0254 November 26, 2003 ATTENTION: Ultimate Designated Persons Chief Financial Officers Panel Auditors Distribute internally to: Corporate Finance Credit

More information

INVESTOR PRESENTATION JUNE 2018

INVESTOR PRESENTATION JUNE 2018 INVESTOR PRESENTATION JUNE 2018 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and Canadian Utilities Limited and information provided in this presentation may be considered forward-looking

More information

Sent via efile FEI 2016 RATE DESIGN EXHIBIT A2-10

Sent via efile FEI 2016 RATE DESIGN EXHIBIT A2-10 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 June 23, 2017 Sent via

More information

For further information, please contact Fred James at or by at

For further information, please contact Fred James at or by  at Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com August 30, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

Réponse du Transporteur et du Distributeur à l'engagement 4

Réponse du Transporteur et du Distributeur à l'engagement 4 Demande R-3842-2013 Réponse du Transporteur et du Distributeur à l'engagement 4 Original : 2013-11-05 HQTD-6, Document 4.4 En liasse Demande R-3842-2013 Engagement 4 (Demandé par l'aqcie-cifq le 2013-11-01,

More information

Cascade Pacific Power Corporation

Cascade Pacific Power Corporation February 7, 2008 C23-3 BC Hydro and Power Authority 17 th Floor, 333 Dunsmuir Street Vancouver, BC V6B 5R3 Attention: Ms. Joanna Sofield, Chief Regulatory Officer Dear MS. Sofield RE: Standing Offer Program

More information

INVESTOR PRESENTATION JUNE 2018

INVESTOR PRESENTATION JUNE 2018 INVESTOR PRESENTATION JUNE 2018 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and Canadian Utilities Limited and information provided in this presentation JUNE be considered forward-looking

More information

For further information, please contact Sylvia von Minden at or by at

For further information, please contact Sylvia von Minden at or by  at B-1 Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com October 24, 2011 Ms. Alanna Gillis Acting Commission Secretary British Columbia Utilities

More information

Form F6 British Columbia Report of Exempt Distribution

Form F6 British Columbia Report of Exempt Distribution Form 45-106F6 British Columbia Report of Exempt Distribution This is the form required under section 6.1 of National Instrument 45-106 for a report of exempt distribution in British Columbia. Issuer/underwriter

More information

Attached is BC Hydro s annual filing of the Report on Demand-Side Management Activities for the 12 months ending March 31, 2012.

Attached is BC Hydro s annual filing of the Report on Demand-Side Management Activities for the 12 months ending March 31, 2012. Janet Fraser Chief Regulatory Officer Phone: 60-6-06 Fax: 60-6-07 bchydroregulatorygroup@bchydro.com July 0, 01 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission Sixth Floor

More information

2018/19 SECOND QUARTER REPORT

2018/19 SECOND QUARTER REPORT 2018/19 SECOND QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

BRITISH COLUMBIA UTILITIES COMMISSION Annual Report

BRITISH COLUMBIA UTILITIES COMMISSION Annual Report BRITISH COLUMBIA UTILITIES COMMISSION 1981 Annual Report Vancouver, B.C. December 21, 1983 To His Honour The Lieutenant Governor In Council of the Province of British Columbia MAY IT PLEASE YOUR HONOUR:

More information

STAR GAS 2287 Selklrk Dr., Kelowna, BC. V I V 2Nh Tel. (250) i Fax: (250)

STAR GAS 2287 Selklrk Dr., Kelowna, BC. V I V 2Nh Tel. (250) i Fax: (250) B-1 STAR GAS 2287 Selklrk Dr., Kelowna, BC. V I V 2Nh Tel. (250) 260-53 1 i Fax: (250) 763-6764 Robert J. Pellatt Commission Secretary Sixth Floor, 900 Howe Street, Box 250 Vancouver B.C. V6Z 2N3 August

More information

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

August 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C August 1, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 700 Louisiana Street, Suite 700 Houston, Texas 77002-2700 John A. Roscher

More information

British Columbia Hydro and Power Authority (BC Hydro) Application for Approval of New Power Purchase Agreement (PPA) with FortisBC Inc.

British Columbia Hydro and Power Authority (BC Hydro) Application for Approval of New Power Purchase Agreement (PPA) with FortisBC Inc. C1-24 Reply Attention of: Ludmila B. Herbst Direct Dial Number: (604) 661-1722 Email Address: lherbst@farris.com Our File No.: 05497-0224 January 20, 2014 BY EMAIL British Columbia Utilities Commission

More information

BMO Infrastructure & Utilities Conference February 8, 2018 Toronto

BMO Infrastructure & Utilities Conference February 8, 2018 Toronto BMO Infrastructure & Utilities Conference February 8, 2018 Toronto LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and Canadian Utilities Limited and information provided in this presentation

More information

Diane Roy Vice President, Regulatory Affairs

Diane Roy Vice President, Regulatory Affairs B- Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

CAPP SCOTIABANK INVESTMENT SYMPOSIUM

CAPP SCOTIABANK INVESTMENT SYMPOSIUM CAPP SCOTIABANK INVESTMENT SYMPOSIUM TORONTO APRIL 12-13, 2016 Paul Myers - President & Chief Executive Officer Rob Froese - Chief Financial Officer Forward looking information Certain statements included

More information

The University of Calgary

The University of Calgary Decision 23147-D01-2018 Application for an Order Permitting the Sharing of Records Not Available to the Public Between the University of Calgary and URICA Energy Real Time Ltd. January 30, 2018 Alberta

More information

Registration Exemption for Trades in Connection with Certain Prospectus-Exempt Distributions

Registration Exemption for Trades in Connection with Certain Prospectus-Exempt Distributions . IN THE MATTER OF THE SECURITIES ACT, S.N.W.T. 2008, c. 10, AS AMENDED - and - Registration Exemption for Trades in Connection with Certain Prospectus-Exempt Distributions BLANKET ORDER 32-501 WHEREAS

More information

SUBSCRIPTION AGREEMENT. THIS SUBSCRIPTION AGREEMENT is dated this day of, 20

SUBSCRIPTION AGREEMENT. THIS SUBSCRIPTION AGREEMENT is dated this day of, 20 SUBSCRIPTION AGREEMENT THIS SUBSCRIPTION AGREEMENT is dated this day of, 20 BETWEEN: ANTRIM BALANCED MORTGAGE FUND LTD., a mortgage investment corporation having an office at 9089 Glover Road Box 520 Fort

More information

FortisBC Energy Inc. (FEI) Project No Demand Side Management Expenditures Plan (the Application) Errata dated September 20, 2018

FortisBC Energy Inc. (FEI) Project No Demand Side Management Expenditures Plan (the Application) Errata dated September 20, 2018 B-1-1 Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

BC Hydro writes in compliance with BCUC Order No. G to provide, as Exhibit B-3, its responses to BCUC Information Request No. 1.

BC Hydro writes in compliance with BCUC Order No. G to provide, as Exhibit B-3, its responses to BCUC Information Request No. 1. Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com October 25, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

NEWS RELEASE ALTAGAS LTD. REPORTS THIRD QUARTER RESULTS; SIGNS DEFINITIVE PROJECT AGREEMENT FOR CANADIAN WEST COAST PROPANE EXPORT SITE

NEWS RELEASE ALTAGAS LTD. REPORTS THIRD QUARTER RESULTS; SIGNS DEFINITIVE PROJECT AGREEMENT FOR CANADIAN WEST COAST PROPANE EXPORT SITE NEWS RELEASE ALTAGAS LTD. REPORTS THIRD QUARTER RESULTS; SIGNS DEFINITIVE PROJECT AGREEMENT FOR CANADIAN WEST COAST PROPANE EXPORT SITE Calgary, Alberta (October 29, 2015) Highlights 28 percent increase

More information

FEI Annual Review of 2018 Rates

FEI Annual Review of 2018 Rates B-10 FEI Annual Review of 2018 Rates Workshop October 17, 2017 Agenda PBR Overview Diane Roy Vice President, Regulatory Affairs Revenue Requirements & Rates Rick Gosselin Manager, Cost of Service Demand

More information

. CANADIAN DIRECT INSURANCE Canadian Western Bank Group

. CANADIAN DIRECT INSURANCE Canadian Western Bank Group . CANADIAN DIRECT INSURANCE Canadian Western Bank Group C10-3 Ms. June Elder Manager, Corporate Regulatory Affairs, Insurance Corporation of British Columbia, 151 West Esplanade, North Vancouver, BC V7M

More information

AMENDED Form F6 British Columbia Report of Exempt Distribution

AMENDED Form F6 British Columbia Report of Exempt Distribution AMENDED Form 45-106F6 British Columbia Report of Exempt Distribution This is the form required under section 6.1 of National Instrument 45-106 for a report of exempt distribution in British Columbia. Issuer/underwriter

More information

~ LAWSON /a LUNDEL~ I

~ LAWSON /a LUNDEL~ I ~ LAWSON /a LUNDEL~ I Suite 1600 Cathedral Pl ace 925 West Georgia Street Vancouver, BC Canada V6C 3L2 T: 604.685.3456 C1-6 ELECTRONICALLY FILED Keith Bergner D: 604.631.9119 I 403.218.7538 F: 604.694.2910

More information

Red Rock Energy Inc. Management Discussion & Analysis March 31, 2016

Red Rock Energy Inc. Management Discussion & Analysis March 31, 2016 Management Discussion and Analysis Management s discussion and analysis of the operating results and financial condition of Red Rock Energy Inc. ( Red Rock or the Company ) for the twelve months ended

More information

INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017

INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017 INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017 Vancouver The British Columbia Utilities Commission (BCUC) has responded to the letter from

More information

File OF-Surv-Inc May 2013

File OF-Surv-Inc May 2013 File OF-Surv-Inc-2010 02 23 May 2013 Mr. Al Monaco Chief Executive Officer Enbridge Inc. 3000 Fifth Avenue Place 425 1 st Street S.W. Calgary, AB T2P 3L8 Facsimile 403-231-3920 Dear Mr. Monaco: Enbridge

More information