Preserving Our Past. Preparing For Our Future Bond Issue Financial Responsibility Report Card

Size: px
Start display at page:

Download "Preserving Our Past. Preparing For Our Future Bond Issue Financial Responsibility Report Card"

Transcription

1 Preserving Our Past. Preparing For Our Future Bond Issue Financial Responsibility Report Card Scott Cole Deputy Superintendent, Kern High School District

2 Overview Measure N 2004 General Obligation Bond Leveraging Local Taxpayer Dollars Fruits of Labor Future Growth and District Needs Career Technical Education Facilities Funding Options

3 Measure N: $219 Million Bond To address student overcrowding in our local high schools and to repair and renovate many of the district s school sites, Measure N was placed on the ballot in November Measure N passed with 67% of the vote. Goal: To ensure school facilities made it possible for our local students to be well prepared for success in college or to begin their careers.

4 Measure N Funds Issued Responsibly The district issued authorized bonds only as needed: Series A: $50 million deposited in the Kern County Treasurer s office on May 12, 2005 Series B: $70 million deposited July 13, 2006 Series C: $50 million deposited July 13, 2007 Series D: $20 million deposited July 15, 2011 Series E: $28.5 million to be sold June 2016

5 Leveraging Funds GOB 2004 $190,151, State $119,551, Dev Fees $29,806, District Funds $18,387, NOTE: $28,549,000 of unissued bonds remain for future projects.

6 Fruits of Labor New Construction $198,534,000 Repair & Upgrades $133,111,000 Career Technical Education (CTE) Projects $9,382,000 Tierra Del Sol Mira Monte High Independence High Shafter Upgrades $11.8 M East Upgrades $12.8 M East Growth $12.8 M North Upgrades $29.9 M (in progress) Arvin Upgrades $24.0 M Shafter Growth $24.5 M South Upgrades $29.9 M North High CTE Ag Mira Monte CTE Arvin CTE Media & Design North High CTE Bldg Trad East CTE Arvin CTE Mach & Form Grand Total: $342,337,000

7 $190 million of GO Bond Funding produced $342 million of district projects

8 Mira Monte High School Administration

9 Mira Monte High Computer Lab

10 Shafter High - Cafeteria

11 Citizens Oversight Committee Per Proposition 39, Measure N was subject to annual audits and was overseen by a Citizens Oversight Committee. Each audit confirmed all funds were spent as promised.

12 Opening Opportunities with Students and the Community In Mind All classrooms are wirelessly connected. Integration of electronic devices to augment daily instruction is increasing. Programs like Apex, Kern Learn and Dual Enrollment are offering educational alternatives to meet our students personal demand for credit recovery, accelerated learning, and flexible scheduling.

13 Future Growth & District Needs Preserving Our Past Preparing For Our Future

14 KHSD - 10 Year Growth Projection 41,000 40,000 39,000 38,000 37,000 36,000 35,000 Enrollment Capacity

15 Projected New Construction Projects ( ) Start Year Cost Career Training Center (SW) 2016 $ 60,000,000 Career Training Center (NW) 2017 $ 63,000,000 Special Education Facility (NW) 2018 $ 9,200,000 Comprehensive School (South) 2019 $ 125,000,000 Comprehensive School (NW) 2021 $ 138,000,000 TOTAL: $ 395,200,000

16 A Leader in Career and Technical Education (CTE)

17 Career Technical Education Accomplishments State and National awards for competitions in Virtual Enterprise, Future Farmers of America (FFA), Health Occupation Student Association (HOSA), Distributive Education Clubs of America (DECA), Future Business Leaders of America (FBLA), and many other CTE programs Alignment of career pathways with local industry labor needs and local college certificate and degree programs

18 Career Technical Education Accomplishments (continued) Partnerships with over 300 local businesses and community organizations Recipient of a California Career Pathway Trust Grant of $4,837,000 to expand and improve career pathways Recipient of a Career and Technical Education Incentive Grant of $5,800,000 to develop new CTE programs or to enhance existing programs

19 Career Technical Education Accomplishments (continued) 13 California Partnership Academy (CPA) programs funded by the California Department of Education 8 Project Lead the Way (PLTW) programs focused on engineering or bio-medical careers The Regional Occupational Center (ROC) provides job-readiness and technical training for over 1,000 high school students annually

20 Career Technical Education Accomplishments (continued) Implementation of Dual Enrollment course for over a dozen CTE courses taught in high schools across the District Annual placement of nearly 400 students into internships with local businesses But, we need to do more!

21 Career Technical Education Courses Existing Courses: Auto Technology Law Enforcement Certified Nursing Assistant Early Childhood Education Film and Video Production Graphic Arts Engineering Design Carpentry and Construction Computer Programming Biotechnology (partial list) Future Courses: Pharmacy Technician Physical Therapy Technician and Sports Medicine Forensic Science Robotics Engineering X-Ray Technician Dental Assistant Veterinary Science Supply-Chain Logistics Culinary Arts (partial list)

22

23

24 Future Culinary Arts

25 Future Dental Lab and Medical Facility

26 Future Auto Shop

27 Projected Repair & Upgrades Projects ( ) Start Year Cost Foothill / 50 year 2016 $ 23,729,658 North High - Phase 2A 2016 $ 8,900,000 Arvin / 30 year 2017 $ 28,000,000 BHS (Warren Hall) 2017 $ 42,500,000 East / 30 year 2017 $ 35,000,000 North / 30 year 2018 $ 32,500,000 ROC and BAS / 30 year 2018 $ 28,400,000 Kern Valley / 30 year 2019 $ 20,400,000 Kern Valley / 50 year 2019 $ 16,755,000 Shafter / 50 year 2020 $ 18,200,000 $650 million x.65 = $423 million TOTAL: $ 254,384,658

28 Proposed Projects ( ) Start Year Cost Career Training Center (SW) 2016 $ 60,000,000 Career Training Center (NW) 2017 $ 63,000,000 Special Education Facility (NW) 2018 $ 9,200,000 Comprehensive School (South) 2019 $ 125,000,000 Foothill / 50 year 2016 $ 23,729,658 North High - Phase 2A 2016 $ 8,900,000 Arvin / 30 year 2017 $ 28,000,000 BHS (Warren Hall) 2017 $ 42,500,000 ROC and BAS / 30 year 2018 $ 28,400,000 TOTAL: $ 388,729,658 $389 million x.70 = $253 million For Board Discussion Prior to June 27 th 1 Election - $440M or 2 Elections - $280/$160 M

29 New Election

30 millions per $100,000 of AV Kern High School District: Debt Review Alt #1: Conventional Bonds Require Taxpayer Payments for 30+ Years Debt Service* Tax Rates Value Title $50.0 $40.0 $30.0 $20.0 $10.0 Value Title $60 $50 $40 $30 $20 $10 $ $ Series A Series B Series C Alternative A: Conventional Year Principal Interest Total Series A 2017 $133,500,000 $106,694,300 $240,194,300 Series B 2020 $221,140,000 $254,197,118 $475,337,118 Series C 2023 $86,610,000 $90,012,977 $176,622,977 Total $441,250,000 $450,904,395 $892,154,395 * Assumes 2.5% annual increase in assessed value; 4.5% interest rate

31 millions per $100,000 of AV Kern High School District: Debt Review Alt #2: G.O. Flex-Bonds Reduce Interest Costs Debt Service* Tax Rates $50.0 $60 $50 Value Title $40.0 $30.0 $20.0 Value Title $40 $30 $20 $10 $ $10.0 $ Series A Series B Series C Series D Alternative B: G.O. Flex-Bonds Year Principal Interest Total Series A 2017 $89,600,000 $26,332,766 $115,932,766 Series B 2019 $96,740,000 $58,175,418 $154,915,418 Series C 2021 $168,300,000 $180,752,731 $349,052,731 Series D 2023 $86,610,000 $53,272,492 $139,882,492 Total $441,250,000 $318,533,407 $759,783,407 * Assumes 2.5% annual increase in assessed value; 4.0% interest rate 31 31

32 millions per $100,000 of AV Kern High School District: Debt Review Alt #3: Two Elections (2016/2020) with G.O. Flex-Bonds Reduce Interest Costs Debt Service* Tax Rates $50.0 $60 $50 Value Title $40.0 $30.0 $20.0 Value Title $40 $30 $20 $10 $ $10.0 $ A 2016B 2016C 2020A 2020B 32 32

33 Kern High School District: Debt Review Benefits of G.O. Flex-Bond Structure Benefit Comment Taxpayer Savings: Total interest costs reduced from 30% to 70% Repayment Term: Prudent Use of Taxpayer Dollars: Reduced by six to 21 years Taxes used to fund projects, not pay interest 33 33

34 Preserving Our Past. Preparing For Our Future Bond Issue Financial Responsibility Report Card Scott Cole Deputy Superintendent, Kern High School District

ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT MEASURE R GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2016

ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT MEASURE R GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2016 ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT 2004 MEASURE R GENERAL OBLIGATION BONDS PERFORMANCE AUDIT PERFORMANCE AUDIT CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2 ANTELOPE

More information

ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT Lancaster, California MEASURE R GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2015

ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT Lancaster, California MEASURE R GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2015 ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT Lancaster, California 2004 MEASURE R GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2015 PERFORMANCE AUDIT June 30, 2015 CONTENTS INDEPENDENT AUDITOR S REPORT...

More information

REDWOODS COMMUNITY COLLEGE DISTRICT

REDWOODS COMMUNITY COLLEGE DISTRICT REDWOODS COMMUNITY COLLEGE DISTRICT Eureka, California PROPOSITION 39 AND MEASURE Q GENERAL OBLIGATION BONDS TABLE OF CONTENTS Page Number Independent Auditors Report 1 Authority for Issuance 2 Purpose

More information

REDWOODS COMMUNITY COLLEGE DISTRICT

REDWOODS COMMUNITY COLLEGE DISTRICT REDWOODS COMMUNITY COLLEGE DISTRICT Eureka, California SCHEDULE OF PROCEEDS AND USE OF GENERAL OBLIGATION BONDS (ELECTION OF 2004, SERIES 2005 AND 2007) WITH INDEPENDENT AUDITORS REPORT TABLE OF CONTENTS

More information

FLORIDA COLLEGE SYSTEM VOCATIONAL PROGRAMS AGGREGATED OUTCOME DATA

FLORIDA COLLEGE SYSTEM VOCATIONAL PROGRAMS AGGREGATED OUTCOME DATA FLORIDA COLLEGE SYSTEM VOCATIONAL PROGRAMS AGGREGATED OUTCOME DATA 2016-17 AS Degree Completers FETPIP FOLLOW-UP OUTCOMES TOTAL FREQ = number of individuals reported for follow-up to FETPIP. # FOUND EMPLOYED

More information

BELLS INDEPENDENT SCHOOL DISTRICT

BELLS INDEPENDENT SCHOOL DISTRICT May 5, 2018 2018 BOND ELECTION Strong Schools BELLS INDEPENDENT SCHOOL DISTRICT Strong Community Committed to the Future \\\ Bond Election Information May 5, 2018 Bond to Improve Bells High School Committed

More information

HARTNELL COMMUNITY COLLEGE DISTRICT Salinas, California. MEASURE H GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2014

HARTNELL COMMUNITY COLLEGE DISTRICT Salinas, California. MEASURE H GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2014 Salinas, California PERFORMANCE AUDIT June 30, 2014 Salinas, California PERFORMANCE AUDIT June 30, 2014 CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2 HARTNELL COMMUNITY

More information

OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R

OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R Under this measure, the Oxnard School District ( District ) is submitting a bond measure, described below, to the voters for

More information

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2008

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2008 (MEASURE B, MARCH 2004) (MEASURE B, MARCH 2004) TABLE OF CONTENTS Page Independent Auditors Report 1 Objectives... 2 Scope of the Audit. 2 Background Information 2-3 Procedures Performed... 3-4 Results

More information

Redwoods Community College District Eureka, California SCHEDULE OF PROCEEDS AND USE OF GENERAL OBLIGATION BONDS INDEPENDENT AUDITORS REPORTS

Redwoods Community College District Eureka, California SCHEDULE OF PROCEEDS AND USE OF GENERAL OBLIGATION BONDS INDEPENDENT AUDITORS REPORTS Eureka, California SCHEDULE OF PROCEEDS AND USE OF GENERAL OBLIGATION BONDS INDEPENDENT AUDITORS REPORTS June 30, 2016 General Obligation Bonds TABLE OF CONTENTS June 30, 2016 Page Number Independent Auditors

More information

CARLSBAD UNIFIED SCHOOL DISTRICT $265 MILLION BOND MEASURE July 2018

CARLSBAD UNIFIED SCHOOL DISTRICT $265 MILLION BOND MEASURE July 2018 CARLSBAD UNIFIED SCHOOL DISTRICT $265 MILLION BOND MEASURE July 2018 SDCTA Position: SUPPORT Rationale for Position: The District has provided all requested information and has adopted all SDCTA recommended

More information

Citizen s Bond Oversight Committee

Citizen s Bond Oversight Committee Citizen s Bond Oversight Committee July 21, 2015 *This presentation is based on a template and specific request for topics provided by the CBOC Chairperson Follow-up presentations are available at the

More information

2010 MEASURE G GENERAL OBLIGATION BONDS PERFORMANCE AUDIT

2010 MEASURE G GENERAL OBLIGATION BONDS PERFORMANCE AUDIT 2010 MEASURE G GENERAL OBLIGATION BONDS PERFORMANCE AUDIT FOR THE FISCAL YEAR ENDED JUNE 30, 2018 2010 Measure G GENERAL OBLIGATION BONDS Table of Contents June 30, 2018 Independent Auditors Report...

More information

GAVILAN JOINT COMMUNITY COLLEGE DISTRICT Gilroy, California. MEASURE E GENERAL OBLIGATION BOND PERFORMANCE AUDIT June 30, 2013

GAVILAN JOINT COMMUNITY COLLEGE DISTRICT Gilroy, California. MEASURE E GENERAL OBLIGATION BOND PERFORMANCE AUDIT June 30, 2013 Gilroy, California PERFORMANCE AUDIT June 30, 2013 PERFORMANCE AUDIT June 30, 2013 CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2 GAVILAN JOINT COMMUNITY COLLEGE DISTRICT

More information

Measure A Oxnard Union High School District

Measure A Oxnard Union High School District Impartial Analysis by County Counsel* Measure A was placed on the ballot by the governing Board of the Oxnard Union High School District. Under the Constitution, school districts may issue general obligation

More information

HARTNELL COMMUNITY COLLEGE DISTRICT. MEASURE T GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2017

HARTNELL COMMUNITY COLLEGE DISTRICT. MEASURE T GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2017 PERFORMANCE AUDIT PERFORMANCE AUDIT CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2 HARTNELL COMMUNITY COLLEGE DISTRICT... 2 PERFORMANCE AUDIT: OBJECTIVES... 4 SCOPE...

More information

FLORIDA COLLEGE SYSTEM VOCATIONAL PROGRAMS AGGREGATED OUTCOME DATA

FLORIDA COLLEGE SYSTEM VOCATIONAL PROGRAMS AGGREGATED OUTCOME DATA FLORIDA COLLEGE SYSTEM VOCATIONAL PROGRAMS AGGREGATED OUTCOME DATA 2014-15 PSAV Degree Completers FETPIP FOLLOW-UP OUTCOMES TOTAL FREQ = number of individuals reported for follow-up to FETPIP. # FOUND

More information

STATE CENTER COMMUNITY COLLEGE DISTRICT Fresno, California. MEASURE E GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2013

STATE CENTER COMMUNITY COLLEGE DISTRICT Fresno, California. MEASURE E GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2013 Fresno, California PERFORMANCE AUDIT June 30, 2013 Fresno, California PERFORMANCE AUDIT June 30, 2013 CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2 STATE CENTER COMMUNITY

More information

Exploration of a Future Bond Measure for San Leandro Unified School District

Exploration of a Future Bond Measure for San Leandro Unified School District Exploration of a Future Bond Measure for San Leandro Unified School District Special Board Meeting April 13, 2010 Cindy Cathey, Interim Superintendent Song Chin-Bendib, Assistant Superintendent, Business

More information

FLORIDA COLLEGE SYSTEM VOCATIONAL PROGRAMS AGGREGATED OUTCOME DATA

FLORIDA COLLEGE SYSTEM VOCATIONAL PROGRAMS AGGREGATED OUTCOME DATA FLORIDA COLLEGE SYSTEM VOCATIONAL PROGRAMS AGGREGATED OUTCOME DATA 2015-16 PSAV Degree Completers FETPIP FOLLOW-UP OUTCOMES TOTAL FREQ = number of individuals reported for follow-up to FETPIP. # FOUND

More information

NEWARK UNIFIED SCHOOL DISTRICT Newark, California. MEASURE G GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2013

NEWARK UNIFIED SCHOOL DISTRICT Newark, California. MEASURE G GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2013 Newark, California PERFORMANCE AUDIT June 30, 2013 PERFORMANCE AUDIT June 30, 2013 CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2 NEWARK UNIFIED SCHOOL DISTRICT... 2 PERFORMANCE

More information

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2010

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2010 (MEASURE B, MARCH 2004) (MEASURE B, MARCH 2004) TABLE OF CONTENTS Page Independent Auditors Report 1 Objectives... 2 Scope of the Audit.. 2 Background Information. 2-3 Procedures Performed... 3-4 Results

More information

ADOPTED OPERATING BUDGET FISCAL YEAR 2018

ADOPTED OPERATING BUDGET FISCAL YEAR 2018 ADOPTED OPERATING BUDGET FISCAL YEAR 2018 BOARD OF EDUCATION OF GARRETT COUNTY Monica L. Rinker, President Matthew A. Paugh, Vice President Charlotte A. Sebold, Associate Member Nathan M. Sorber, Associate

More information

Graduate Employment Report 2011 (Summer 2010, Fall 2010, Winter 2011)

Graduate Employment Report 2011 (Summer 2010, Fall 2010, Winter 2011) Related Program College Total 5751 2983 1077 311 571 225 47 73 $ 10,800 $ 166,858 $ 34,833 908 Program Name 2906 Accounting Clerk - Microcomputer 1 33 16 3 1 4 1 25 56 6419 Advertising - Account Management

More information

CABRILLO COMMUNITY COLLEGE DISTRICT MEASURE D 2004 GENERAL OBLIGATION BONDS PERFORMANCE AUDIT JUNE 30, 2013

CABRILLO COMMUNITY COLLEGE DISTRICT MEASURE D 2004 GENERAL OBLIGATION BONDS PERFORMANCE AUDIT JUNE 30, 2013 MEASURE D 2004 GENERAL OBLIGATION BONDS PERFORMANCE AUDIT JUNE 30, 2013 MEASURE D 2004 GENERAL OBLIGATION BONDS JUNE 30, 2013 TABLE OF CONTENTS Performance Audit Independent Auditors' Report 1 Authority

More information

P R E S E N T E D T O : S O L A N O C O M M U N I T Y C O L L E G E D I S T R I C T G O V E R N I N G B O A R D J U L Y

P R E S E N T E D T O : S O L A N O C O M M U N I T Y C O L L E G E D I S T R I C T G O V E R N I N G B O A R D J U L Y Measure Q Update P R E S E N T E D T O : S O L A N O C O M M U N I T Y C O L L E G E D I S T R I C T G O V E R N I N G B O A R D J U L Y 1 5 2 0 1 5 Agenda 1. P R E L I M I N A R Y R E S P O N S E T O

More information

CERRITOS COMMUNITY COLLEGE DISTRICT

CERRITOS COMMUNITY COLLEGE DISTRICT PROPOSITION 39 GENERAL OBLIGATION BONDS MEASURE G, NOVEMBER 2012 BOND BUILDING FUND FINANCIAL AND PERFORMANCE AUDITS June 30, 2018 TABLE OF CONTENTS June 30, 2018 Financial Audit of Measure G, November

More information

SOLANO COMMUNITY COLLEGE DISTRICT GENERAL OBLIGATION BONDS MEASURE G PERFORMANCE AUDIT JUNE 30, 2017

SOLANO COMMUNITY COLLEGE DISTRICT GENERAL OBLIGATION BONDS MEASURE G PERFORMANCE AUDIT JUNE 30, 2017 SOLANO COMMUNITY COLLEGE DISTRICT GENERAL OBLIGATION BONDS MEASURE G PERFORMANCE AUDIT JUNE 30, 2017 SOLANO COMMUNITY COLLEGE DISTRICT MEASURE G BUILDING FUND TABLE OF CONTENTS JUNE 30, 2017 INDEPENDENT

More information

GAVILAN JOINT COMMUNITY COLLEGE DISTRICT PROPOSITION 39 AND MEASURE E GENERAL OBLIGATION BONDS GILROY, CALIFORNIA

GAVILAN JOINT COMMUNITY COLLEGE DISTRICT PROPOSITION 39 AND MEASURE E GENERAL OBLIGATION BONDS GILROY, CALIFORNIA GAVILAN JOINT COMMUNITY COLLEGE DISTRICT PROPOSITION 39 AND MEASURE E GENERAL OBLIGATION BONDS GILROY, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditor s Report 1 Objectives 2 Scope of

More information

MEASURE AV GENERAL OBLIGATION BONDS PERFORMANCE AUDIT

MEASURE AV GENERAL OBLIGATION BONDS PERFORMANCE AUDIT MEASURE AV GENERAL OBLIGATION BONDS PERFORMANCE AUDIT FOR THE FISCAL YEAR ENDED JUNE 30, 2017 Measure AV GENERAL OBLIGATION BONDS Table of Contents June 30, 2017 Independent Auditors Report... 1 Page BACKGROUND

More information

MEASURE X GENERAL OBLIGATION BONDS PERFORMANCE AUDIT

MEASURE X GENERAL OBLIGATION BONDS PERFORMANCE AUDIT MEASURE X GENERAL OBLIGATION BONDS PERFORMANCE AUDIT FOR THE FISCAL YEAR ENDED JUNE 30, 2017 Measure X GENERAL OBLIGATION BONDS Table of Contents June 30, 2017 Independent Auditors Report... 1 Page BACKGROUND

More information

CSBA Leadership Institute:

CSBA Leadership Institute: July 16, 2016 CSBA Leadership Institute: Spotlight on Student Success and Facilities: Facilities Financing Options Part III Prepared by: 650 California Street, 8th Floor San Francisco, California 94108

More information

YOSEMITE COMMUNITY COLLEGE DISTRICT. MEASURE E GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2016

YOSEMITE COMMUNITY COLLEGE DISTRICT. MEASURE E GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2016 PERFORMANCE AUDIT June 30, 2016 Modesto, California PERFORMANCE AUDIT June 30, 2016 CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2... 2 PERFORMANCE AUDIT: OBJECTIVES...

More information

Yavapai College FY Preliminary Budget Overview

Yavapai College FY Preliminary Budget Overview Yavapai College FY2018-19 Preliminary Budget Overview Presented to the Yavapai College District Governing Board April 2018 Budget A budget is a list of all planned revenues and expenses. Yavapai College

More information

BANNING UNIFIED SCHOOL DISTRICT BUILDING FUND GENERAL OBLIGATION BONDS (MEASURE R) FINANCIAL AND PERFORMANCE AUDITS MARCH 31, 2017

BANNING UNIFIED SCHOOL DISTRICT BUILDING FUND GENERAL OBLIGATION BONDS (MEASURE R) FINANCIAL AND PERFORMANCE AUDITS MARCH 31, 2017 BUILDING FUND GENERAL OBLIGATION BONDS FINANCIAL AND PERFORMANCE AUDITS BUILDING FUND GENERAL OBLIGATION BONDS FINANCIAL AUDIT FINANCIAL AUDIT TABLE OF CONTENTS FINANCIAL SECTION Independent Auditor's

More information

Why Schools and Businesses Want More Proposition 51 Bonds to be Sold Now

Why Schools and Businesses Want More Proposition 51 Bonds to be Sold Now Why Schools and Businesses Want More Proposition 51 Bonds to be Sold Now The Coalition for Adequate School Housing (CASH) proposes that $3.0 billion in voter approved Proposition 51 state school bonds

More information

CERRITOS COMMUNITY COLLEGE DISTRICT

CERRITOS COMMUNITY COLLEGE DISTRICT PROPOSITION 39 GENERAL OBLIGATION BONDS MEASURE CC, MARCH 2004 BOND BUILDING FUND FINANCIAL AND PERFORMANCE AUDITS June 30, 2018 TABLE OF CONTENTS June 30, 2018 Financial Audit of Measure CC, March 2004,

More information

APPENDIX IIB UNIVERSITY SYSTEM OF GEORGIA GRADUATE & PROFESSIONAL PROGRAM TUITION RATES PER SEMESTER - FISCAL YEAR 2019 EFFECTIVE FALL SEMESTER

APPENDIX IIB UNIVERSITY SYSTEM OF GEORGIA GRADUATE & PROFESSIONAL PROGRAM TUITION RATES PER SEMESTER - FISCAL YEAR 2019 EFFECTIVE FALL SEMESTER Augusta University Graduate - Full Time $ 2,572.00 $ 2,572.00 $ 8,772.00 $ 8,772.00 Graduate - Less than 12 credit hours $ 215.00 $ 215.00 $ 731.00 $ 731.00 Health Sciences Graduate - Full Time $ 4,548.00

More information

Hampton City Schools Job Classification Listing SY 16/17

Hampton City Schools Job Classification Listing SY 16/17 G4010 21st Century Tutor N 12 249 NA NA NA NA G2067 ABE/GED Assessor N 12 249 NA NA NA NA G2055 ABE/GED Staff N 12 249 NA NA NA NA G1113 Academic Coordinator E 12 249 7.5 G-219 $ 57,100 $ 95,440 G2315

More information

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT Dublin, California. MEASURE B GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2016

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT Dublin, California. MEASURE B GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2016 CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT MEASURE B GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2016 PERFORMANCE AUDIT June 30, 2016 CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE

More information

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T Under this measure, the Hueneme Elementary School District ( District ) is submitting a bond measure, described below,

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

Proposition E: Escondido Union School District $182.1 Million Bond Measure

Proposition E: Escondido Union School District $182.1 Million Bond Measure Proposition E: Escondido Union School District $182.1 Million Bond Measure SDCTA is NEUTRAL on Proposition E. The measure meets most of the key provisions of the SDCTA Bond Support Criteria. The application

More information

BERKELEY UNIFIED SCHOOL DISTRICT Berkeley, California. MEASURE I GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2013

BERKELEY UNIFIED SCHOOL DISTRICT Berkeley, California. MEASURE I GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2013 PERFORMANCE AUDIT June 30, 2013 PERFORMANCE AUDIT June 30, 2013 CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2... 2 PERFORMANCE AUDIT: OBJECTIVES... 3 SCOPE... 3 METHODOLOGY...

More information

CABRILLO UNIFIED SCHOOL DISTRICT MEASURE S BOND BUILDING FUND AUDIT REPORT. For the Year Ended June 30, 2014 * * *

CABRILLO UNIFIED SCHOOL DISTRICT MEASURE S BOND BUILDING FUND AUDIT REPORT. For the Year Ended June 30, 2014 * * * MEASURE S BOND BUILDING FUND AUDIT REPORT For the Year Ended June 30, 2014 * * * CHAVAN & ASSOCIATES, LLP CERTIFIED PUBLIC ACCOUNTANTS 1475 SARATOGA AVE., SUITE 180 SAN JOSE, CA 95129 Table of Contents

More information

Build and Repair Schools Now Talking Points

Build and Repair Schools Now Talking Points Build and Repair Schools Now Talking Points The Coalition for Adequate School Housing (CASH) proposes that $3.0 billion in voter approved Proposition 51 state school bonds be sold in the 2018 19 fiscal

More information

Registration for Junior Year CLASS OF 2019

Registration for Junior Year CLASS OF 2019 Registration for Junior Year CLASS OF 2019 Junior Scheduling Know your grad plan requirements: 4 years of English, Math, Science, Social Studies 2 years of LOTE 1 year Fine Arts and 1 year technology.5

More information

Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation

Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation Workshop Items Citizens Oversight Committee Measure K Next Steps Projects in Planning Milestones Board s Vision

More information

FY 2017 APPROVED BUDGET. School Operating Budget

FY 2017 APPROVED BUDGET. School Operating Budget FY 2017 APPROVED BUDGET School Operating Budget Proposed by Superintendent February 17, 2016 Approved by the School Board March 15, 2016 Approved by the Board of Supervisors May 10, 2016 Approved by the

More information

APPENDIX IIB. Less than 12 credit hours $ $ $ $ Less than 12 credit hours $ $ $ 1, $ 1,092.

APPENDIX IIB. Less than 12 credit hours $ $ $ $ Less than 12 credit hours $ $ $ 1, $ 1,092. Augusta University Graduate - Full Time $ 2,572.00 $ 2,572.00 $ 8,772.00 $ 8,772.00 Graduate - Less than 12 credit hours $ 215.00 $ 215.00 $ 731.00 $ 731.00 Health Sciences Graduate - Full Time $ 4,548.00

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Year Ended June 30, 2015 Table of Contents Page Independent Auditors'

More information

SAN BERNARDINO COMMUNITY COLLEGE DISTRICT MEASURE M GENERAL OBLIGATION BONDS (ELECTION 2008) FINANCIAL AND PERFORMANCE AUDITS JUNE 30, 2018

SAN BERNARDINO COMMUNITY COLLEGE DISTRICT MEASURE M GENERAL OBLIGATION BONDS (ELECTION 2008) FINANCIAL AND PERFORMANCE AUDITS JUNE 30, 2018 SAN BERNARDINO COMMUNITY COLLEGE DISTRICT MEASURE M GENERAL OBLIGATION BONDS (ELECTION 2008) FINANCIAL AND PERFORMANCE AUDITS SAN BERNARDINO COMMUNITY COLLEGE DISTRICT MEASURE M GENERAL OBLIGATION BOND

More information

SIERRA JOINT COMMUNITY COLLEGE DISTRICT Rocklin, California

SIERRA JOINT COMMUNITY COLLEGE DISTRICT Rocklin, California Rocklin, California FINANCIAL STATEMENTS CITIZENS' BOND OVERSIGHT COMMITTEE MEMBERS The Board of Trustees of the Sierra Joint Community College District acting as the Governing Board of the School Facilities

More information

APPENDIX IB. Master of Business Administration Full-time $ 13, $ 14, $ 19, $ 19,742.00

APPENDIX IB. Master of Business Administration Full-time $ 13, $ 14, $ 19, $ 19,742.00 Georgia Institute of Technology Graduate - Full Time $ 6,172.00 $ 6,726.00 $ 13,800.00 $ 13,936.00 Graduate - Less than 12 credit hours $ 515.00 $ 561.00 $ 1,150.00 $ 1,162.00 Full-time $ 13,743.00 $ 14,448.00

More information

Purpose and Responsibility of the Committee

Purpose and Responsibility of the Committee Manhattan Beach Unified School District Measure BB Oversight Committee Annual Report Dated March 11, 2010 I. Purpose of the Report The Manhattan Beach Unified School District ( MBUSD ) Resolution No. 2008-12

More information

CABRILLO UNIFIED SCHOOL DISTRICT MEASURE S BOND BUILDING FUND AUDIT REPORT. For the Year Ended June 30, 2013 * * *

CABRILLO UNIFIED SCHOOL DISTRICT MEASURE S BOND BUILDING FUND AUDIT REPORT. For the Year Ended June 30, 2013 * * * MEASURE S BOND BUILDING FUND AUDIT REPORT For the Year Ended June 30, 2013 * * * CHAVAN & ASSOCIATES, LLP CERTIFIED PUBLIC ACCOUNTANTS 1475 SARATOGA AVE., SUITE 180 SAN JOSE, CA 95129 Table of Contents

More information

SIERRA JOINT COMMUNITY COLLEGE DISTRICT Rocklin, California

SIERRA JOINT COMMUNITY COLLEGE DISTRICT Rocklin, California Rocklin, California FINANCIAL STATEMENTS CITIZENS' BOND OVERSIGHT COMMITTEE MEMBERS The Board of Trustees of the Sierra Joint Community College District acting as the Governing Board of the School Facilities

More information

Salary Scales

Salary Scales Frederick County Public Schools Salary Scales 2017-2018 1415 Amherst Street 540-662-3888 Winchester, Virginia 22601 www.frederick.k12.va.us Approved by the School Board April 20, 2017 2017-2018 Salary

More information

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE R, NOVEMBER 2001) PERFORMANCE AUDIT.

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE R, NOVEMBER 2001) PERFORMANCE AUDIT. (MEASURE R, NOVEMBER 2001) (MEASURE R, NOVEMBER 2001) CONTENTS Page Independent Auditor s Report... 1 Objectives... 2 Scope of the Audit... 2 Background Information... 3 Procedures Performed... 3 Results

More information

DeKalb County School District FY Proposed Budget SUPERINTENDENT S PROPOSED BUDGET

DeKalb County School District FY Proposed Budget SUPERINTENDENT S PROPOSED BUDGET DeKalb County School District FY 2012-2013 Proposed Budget SUPERINTENDENT S PROPOSED FISCAL YEAR 2012 2013 DeKalb County School District FY 2012-2013 Proposed Budget DEKALB COUNTY SCHOOL DISTRICT FISCAL

More information

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012 Thomas County School System Performance Audit on 2008 and 2013 SPLOST Revenues 300 Mulberry Street, Suite 300 P.O. Box 1877 Macon, Georgia 31202-1877 Phone: (800) 277-0050 Facsimile: (478) 464-8051 Web:

More information

SOUTHWESTERN OKLAHOMA STATE UNIVERSITY ASSOCIATE'S DEGREE EXIT SURVEY 2017

SOUTHWESTERN OKLAHOMA STATE UNIVERSITY ASSOCIATE'S DEGREE EXIT SURVEY 2017 SOUTHWESTERN OKLAHOMA STATE UNIVERSITY ASSOCIATE'S DEGREE EXIT SURVEY 2017 1. What is your undergraduate CATC General Studies 0 0.00% major? Computer Science 0 0.00% Other: English Education Parks and

More information

Measure G Quarterly Progress Update

Measure G Quarterly Progress Update Measure G Quarterly Progress Update May 4, 2016 Table of Contents Section I. Program and Projects Update...1 Section II. Financial Summary...4 I. Program & Projects Update PROGRAM UPDATE: Measure G is

More information

JERICHO SCHOOL DISTRICT BUDGET

JERICHO SCHOOL DISTRICT BUDGET JERICHO SCHOOL DISTRICT BUDGET 2014-15 WORKSHOP # 2 Codes: 2250, 2820, 2825, 2815, 2610, 2810, 2850, 2855 JERICHO SCHOOL DISTRICT QR Code for smart devices. Scan code below to keep up to date throughout

More information

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2016 * * *

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2016 * * * SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT For the Year Ended June 30, 2016 * * * CHAVAN & ASSOCIATES, LLP CERTIFIED PUBLIC ACCOUNTANTS 1475 SARATOGA AVE., SUITE 180

More information

2018 Dr. Walts Budget Intro Speech

2018 Dr. Walts Budget Intro Speech 2018 Dr. Walts Budget Intro Speech Good evening School Board members, colleagues, ladies, and gentlemen. Tonight, it s my privilege to introduce a proposed Budget and Capital Improvement Program for the

More information

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S Under this measure, the Somis Union School District ( District ) is submitting a bond measure, described below, to the voters

More information

Policy Brief. Citizens Guide to Spokane Streets Levy & Park Bond. Key Findings

Policy Brief. Citizens Guide to Spokane Streets Levy & Park Bond. Key Findings Policy Brief Citizens Guide to Spokane Streets Levy & Park Bond by Chris Cargill, Eastern Washington Office Director and Allison Walther, Research Assistant October 2014 Key Findings 1. Proposition 1 would

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

Local ballot measure: B. Redding School District Bond Measure

Local ballot measure: B. Redding School District Bond Measure B Redding School District Bond Measure Ballot question To improve the quality of education; repair/replace leaky roofs; modernize and construct classrooms, restrooms and school facilities; and make health,

More information

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA KERN COUNTY NORTH EDWARDS, CALIFORNIA ANNUAL FINANCIAL STATEMENTS WITH REPORT OF INDEPENDENT CERTIFIED PUBLIC ACCOUNTANT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF

More information

Mission Statement of the Menands School District

Mission Statement of the Menands School District SPECIAL BUDGET ISSUE MAY 2013 Mission Statement of the Menands School District The Menands School District, in partnership with students, teachers, parents, and the community, is committed to excellence.

More information

FOOTHILL-DE ANZA COMMUNITY COLLEGE DISTRICT COUNTY OF SANTA CLARA LOS ALTOS HILLS, CALIFORNIA FINANCIAL STATEMENTS WITH SUPPLEMENTAL INFORMATION

FOOTHILL-DE ANZA COMMUNITY COLLEGE DISTRICT COUNTY OF SANTA CLARA LOS ALTOS HILLS, CALIFORNIA FINANCIAL STATEMENTS WITH SUPPLEMENTAL INFORMATION COUNTY OF SANTA CLARA LOS ALTOS HILLS, CALIFORNIA FINANCIAL STATEMENTS WITH SUPPLEMENTAL INFORMATION FOR THE YEAR ENDED JUNE 30, 2010 AND INDEPENDENT AUDITOR'S REPORT FINANCIAL STATEMENTS WITH SUPPLEMENTAL

More information

COVINA-VALLEY UNIFIED SCHOOL DISTRICT ANNUAL FINANCIAL REPORT JUNE 30, 2016

COVINA-VALLEY UNIFIED SCHOOL DISTRICT ANNUAL FINANCIAL REPORT JUNE 30, 2016 ANNUAL FINANCIAL REPORT TABLE OF CONTENTS FINANCIAL SECTION Independent Auditor's Report 2 Management's Discussion and Analysis 5 Basic Financial Statements Government-Wide Financial Statements Statement

More information

Discipline Review for Blue River

Discipline Review for Blue River Section I: Student Demographics Gender Discipline Review for Blue River Fall 7 Fall 8 Fall 9 Fall Fall Female 89 7% 9 7 9 69% 7% 76% Male 6 9% 7% % % 9 77 7 Ethnicity Am. Indian % % % % % Asian % % % %

More information

PARK HILL SCHOOL DISTRICT EXECUTIVE SUMMARY

PARK HILL SCHOOL DISTRICT EXECUTIVE SUMMARY EXECUTIVE SUMMARY The Executive Summary is the first major section of the school budget document. It highlights important information contained in the budget. Users may rely on this section for an overview

More information

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of

More information

Adoption of the FY17 Budget Post-Secondary Technical Funds EXECUTIVE SUMMARY

Adoption of the FY17 Budget Post-Secondary Technical Funds EXECUTIVE SUMMARY Adoption of the FY17 Budget Post-Secondary Technical Funds EXECUTIVE SUMMARY Purpose of Report: To receive School Board approval of the FY17 Budget for the Post- Secondary Technical Funds. The Southeast

More information

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Year Ended June 30, 2013 Table of Contents Page Independent Auditors'

More information

Measure K Bond Program Update. August 18, 2009 Board of Education Workshop

Measure K Bond Program Update. August 18, 2009 Board of Education Workshop Measure K Bond Program Update August 18, 2009 Board of Education Workshop Presentation Summary I. Implementation Update II. Current Project Updates III. Project Prioritization IV. Master Program Budget

More information

Attached please find the FY 2018 Proposed Operating Budget. Included are the following attachments:

Attached please find the FY 2018 Proposed Operating Budget. Included are the following attachments: DATE: August 30, 2017 TO: Dr. Metke FROM: Sarah Van Cleef SUBJECT: Proposed Operating Budget Attached please find the Proposed Operating Budget. Included are the following attachments: 2018 Proposed Budget

More information

Proposed Budget

Proposed Budget 2018-19 Proposed Budget #SCSDBudget Jaime Alicea Superintendent of Schools February 14, 2018 New Budget Book Design 2 Agenda Foundations, Priorities & Focus Budget Investments and Spending Plan Revenue

More information

MONTGOMERY COUNTY PUBLIC SCHOOLS PAY PLAN FISCAL YEAR 2018

MONTGOMERY COUNTY PUBLIC SCHOOLS PAY PLAN FISCAL YEAR 2018 Pay Plan and Pay Scales 2017 2018 Contents Board Policy... 1 Teacher 10 Month Pay Scale... 2 Teacher 10½ Month Pay Scale... 3 Teacher 11 Month Pay Scale... 4 Teacher 12 Month Pay Scale... 5 Classified

More information

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT LOS ANGELES COUNTY

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT LOS ANGELES COUNTY LOS ANGELES COUNTY REPORT ON AUDIT OF FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION INCLUDING REPORTS ON COMPLIANCE AUDIT REPORT CONTENTS Page INDEPENDENT AUDITOR S REPORT MANAGEMENT S DISCUSSION

More information

PRELIMINARY OFFICIAL STATEMENT DATED APRIL 10, 2017

PRELIMINARY OFFICIAL STATEMENT DATED APRIL 10, 2017 This Preliminary Official Statement and the information contained herein are subject to completion or amendment. These securities may not be sold nor may offers to buy be accepted prior to the time the

More information

LINDSAY UNIFIED SCHOOL DISTRICT ANNUAL FINANCIAL REPORT JUNE 30, 2015

LINDSAY UNIFIED SCHOOL DISTRICT ANNUAL FINANCIAL REPORT JUNE 30, 2015 ANNUAL FINANCIAL REPORT TABLE OF CONTENTS FINANCIAL SECTION Independent Auditor's Report 2 Management's Discussion and Analysis 5 Basic Financial Statements Government-Wide Financial Statements Statement

More information

DELAWARE COUNTY COMMUNITY COLLEGE

DELAWARE COUNTY COMMUNITY COLLEGE FINANCIAL AND COMPLIANCE REPORT Years Ended TABLE OF CONTENTS Pages INDEPENDENT AUDITOR S REPORT... 1-2 MANAGEMENT S DISCUSSION AND ANALYSIS... 3-12 BASIC FINANCIAL STATEMENTS Statements of Net Position...

More information

EAST SIDE UNION HIGH SCHOOL DISTRICT 2002 MEASURE G GENERAL OBLIGATION BONDS PERFORMANCE AUDIT JUNE 30, 2011

EAST SIDE UNION HIGH SCHOOL DISTRICT 2002 MEASURE G GENERAL OBLIGATION BONDS PERFORMANCE AUDIT JUNE 30, 2011 2002 MEASURE G GENERAL OBLIGATION BONDS PERFORMANCE AUDIT 2002 MEASURE G GENERAL OBLIGATION BOND FUND TABLE OF CONTENTS Independent Auditor s Report 1 Authority for Issuance 2 Purpose of Issuance 2 Authority

More information

Salt Lake Community College

Salt Lake Community College 2014-2015 Operating Budget Report State of Utah 2015 Appropriated Budget Law Enforcement 5% Higher Education 12% Public Education 30% Social Services 34% General Gov't 7% Transportation 7% Debt Service

More information

PERKINS CORRECTIONAL INSTITUTIONS GRANTS

PERKINS CORRECTIONAL INSTITUTIONS GRANTS PERKINS CORRECTIONAL INSTITUTIONS GRANTS 2015 2016 RFP April 2015 GRANT APPLICATION DUE DATE: 5:00 P.M. ON MAY 1, 2015 Notice of Nondiscrimination It is the policy of the Office of the Commissioner of

More information

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR

More information

COACHELLA VALLEY UNIFIED SCHOOL DISTRICT TABLE OF CONTENTS JUNE 30, 2010

COACHELLA VALLEY UNIFIED SCHOOL DISTRICT TABLE OF CONTENTS JUNE 30, 2010 TABLE OF CONTENTS FINANCIAL SECTION Independent Auditors' Report 2 Management's Discussion and Analysis 4 Basic Financial Statements Government-Wide Financial Statements Statement of Net Assets 14 Statement

More information

&MISSION VISION. Mission. Vision. Vincennes University

&MISSION VISION. Mission. Vision. Vincennes University Vincennes University &MISSION VISION Mission Vincennes University, Indiana s first college, is the State s premier transfer institution and leader in innovative career programming. The VU community ensures

More information

LAKESIDE UNION SCHOOL DISTRICT COUNTY OF SAN DIEGO LAKESIDE, CALIFORNIA AUDIT REPORT JUNE 30, 2016

LAKESIDE UNION SCHOOL DISTRICT COUNTY OF SAN DIEGO LAKESIDE, CALIFORNIA AUDIT REPORT JUNE 30, 2016 COUNTY OF SAN DIEGO LAKESIDE, CALIFORNIA AUDIT REPORT JUNE 30, 2016 Wilkinson Hadley King & Co. LLP CPA's and Advisors 218 W. Douglas Ave. El Cajon, California Introductory Section Lakeside Union School

More information

COUNTY COUNSEL'S IMPARTIAL ANALYSIS OF MEASURE E ANALYSIS BY THE ALAMEDA COUNTY COUNSEL OF THE DUBLIN UNIFIED SCHOOL DISTRICT BOND MEASURE

COUNTY COUNSEL'S IMPARTIAL ANALYSIS OF MEASURE E ANALYSIS BY THE ALAMEDA COUNTY COUNSEL OF THE DUBLIN UNIFIED SCHOOL DISTRICT BOND MEASURE COUNTY COUNSEL'S IMPARTIAL ANALYSIS OF MEASURE E ANALYSIS BY THE ALAMEDA COUNTY COUNSEL OF THE DUBLIN UNIFIED SCHOOL DISTRICT BOND MEASURE Measure E, a Dublin Unified School District ( District ) bond

More information

NATOMAS UNIFIED SCHOOL DISTRICT. FINANCIAL STATEMENTS June 30, 2016

NATOMAS UNIFIED SCHOOL DISTRICT. FINANCIAL STATEMENTS June 30, 2016 FINANCIAL STATEMENTS June 30, 2016 FINANCIAL STATEMENTS WITH SUPPLEMENTARY INFORMATION For the Year Ended June 30, 2016 CONTENTS INDEPENDENT AUDITOR'S REPORT... 1 MANAGEMENT'S DISCUSSION AND ANALYSIS...

More information

THREE-YEAR COMPARISON ALL FUNDS FY TENTATIVE BUDGET

THREE-YEAR COMPARISON ALL FUNDS FY TENTATIVE BUDGET THREE-YEAR COMPARISON ALL FUNDS FY 2011-12 TENTATIVE BUDGET INCREASE FY 2009-10 FY 2010-11 FY 2011-12 (DECREASE) ACTUAL PROJECTED TENTATIVE OVER RESULTS RESULTS BUDGET FY 2010-11 General Fund $ 2,638,024,332

More information

Palo Alto Unified School District

Palo Alto Unified School District 2014-15 Fiscal Facts As of 9/23/14 Board of Education Barb Mitchell, President Melissa Baten Caswell, Vice President Heidi Emberling Dana Tom Camille Townsend Central Administration Glenn Max McGee, Ph.D.,

More information

Orange Unified School District (C) Copyright March 2018 All Rights Reserved

Orange Unified School District (C) Copyright March 2018 All Rights Reserved ORANGEUNIFIED UNIFIEDSCHOOL SCHOOLDISTRICT DISTRICT ORANGE Orange Unified School District (C) Copyright March 2018 All Rights Reserved 1 The Office of the Assistant Superintendent of Business Services

More information