WATER RATE STUDY CITY OF SALIDA. Revised March West Sixth Street, Suite 200 Glenwood Springs, CO

Size: px
Start display at page:

Download "WATER RATE STUDY CITY OF SALIDA. Revised March West Sixth Street, Suite 200 Glenwood Springs, CO"

Transcription

1 WATER RATE STUDY CITY OF SALIDA Revised March 2011 Prepared by Tyler Harpel, PE In Conjunction with City Staff 118 West Sixth Street, Suite 200 Glenwood Springs, CO fax

2 WATER RATE STUDY CITY OF SALIDA REVIEWED BY CHRIS LEHRMAN, PE SGM Project # DOCUMENT2

3 TABLE OF CONTENTS Report Summary Executive Summary Components Involved in Rate Study Existing Rate Summary Need for Rate Increase Proposed Changes to the Rate Structure Capital and Development Fees Discussion Existing Infrastructure Summary Expenditures Operations, Maintenance and Repair Management and Administrative Upcoming Capital Projects Total Annual Expenditures Revenues and Recommendations Revenues Additional Recommendations 5-2 LIST OF TABLES Table Water Rate Increase Per Current Table Historical Rates Table Historical Revenues/Expenditures Table Proposed Tiers Table Water Storage Summary Table Distribution Pipe Summary Table 5.1 Rate Increase Options Table 5.2 Rates in other Communities Water Rate Study i

4 LIST OF FIGURES Figure Historical Development Fees 2-6 Figure Total Estimated Expenditures 4-2 Figure 5.1 Expenditures vs Revenue and Growth 5-3 Figure 5.2 Expenditures vs. Revenue with 0.5% Growth and Annual Rate Increases 5-4 LIST OF ACRONYMS DIP EQR GPM In. K-Gal LF MG Mi. O&M PVC SGM The City WTP Ductile Iron Pipe Equivalent Residential Unit Gallons per Minute Inches Thousands of Gallons Linear foot Million Gallons Miles Operations and Maintenance Polyvinyl chloride ( plastic ) pipe Schmueser Gordon Meyer, Inc. The City of Salida Water Treatment Plant APPENDICES A Water Rate Model with No Rate Increase B Alternative Rate Increase Models C City of Salida Capital Projects Water Rate Study ii

5 [This page is left blank intentionally.] Water Rate Study iii

6 Report Summary The purpose of this report is to provide analysis results for the City of Salida s current water service rates to recommend the rate adjustments needed to meet anticipated expenditures. This report summarizes current and anticipated expenditures associated with operations and maintenance of the City s Water Distribution System as well as the water treatment plant (WTP) including long-term recommended operations and maintenance (O&M) costs and identified upcoming capital projects, in addition to known budgeted and historical expenses. This report is also created in conjunction with an overall water rates spreadsheet providing the City Staff with the tools to make appropriate future rate adjustments beyond the initial immediate recommended rate adjustments. Finally, recommendations are made for all components of the water rates including the service charge base rate, residential maintenance fee, commercial/industrial water demand charge and water usage charge to meet all of the identified expenditures including several options to weigh the importance between the different components. The rate study factored in estimates of all known costs. It should be noted that other unexpected costs could result in additional need for rate increases. As well as other capital projects not anticipated in this study may drive further increases. 1.0 Executive Summary Water service is provided to residents and property owners in Salida through an enterprise fund. This accounting structure is used for business-type activities. Water operations are not operated as a governmental fund supported by tax dollars. Revenue generated from the business activity (providing water) needs to be sufficient to pay for that activity. It is not a profit activity and revenues and expenditures need to balance appropriately. It does cost the City over $3.00 per thousand gallons actual cost to treat and provide water to the customers. The City has followed a revenue model whereby quarterly fees pay for operations and routine maintenance or upgrades; development fees pay for capital improvements and debt service on those improvements. In recent years, revenue has not kept pace with the capital needs and debt service requirements. The City made substantial investments in capital infrastructure including the high zone water tank, new transmission lines, upgrades to the treatment plant, the purchase and installation of radio-read meters and acquisition of water rights. Strong development activity in the mid 2000 s paid for a substantial portion of the capital improvements; however, it was not sufficient to fully pay for all improvements. In addition, aging facilities are continuing to require upgrades and maintenance to extend their service period. Development has now slowed substantially and is not sufficient to pay existing debt service or cover capital requirements. In 2010 the City depleted reserves and obtained a commitment for additional debt to pay for capital improvements of the Galleries Water Tank. Future capital requirements need to be paid for with water service fees and not depend on development fees. This rate study is conducted with the goal of determining reasonable rates based on actual water service charges and have included significant input from City Staff as well as elected officials and a concurrent ongoing capital improvement plan. Water Rate Study 1-1

7 Rates need to be raised to generate sufficient revenue to pay for current operating expenditures, debt service and capital requirements. Council has also considered whether or not rates need to be sufficiently increased to begin rebuilding reserves. Future development fees will be used to add to reserves. The City s goal is to operate the water system efficiently and design a rate structure whereby users of the water system share in its cost of operations in a fair and equitable manner. No one welcomes rate increases, but the culmination of several years (without sufficiently increasing these rates) proves that the City needs to substantially increase rates in order to cover costs because available reserves have been completely depleted. The revenue structure includes two types of fixed components and a third variable component on each quarterly bill. A flat service (or ready to serve ) fee. A maintenance fee (for residential customers) or a demand fee (for commercial customers). Charges per thousands of gallons of water used during the quarter. Many communities bill for water using tiered rates. The City will begin this practice as well. This method of billing creates an incentive for water conservation and fairly distributes costs between high and low water users. Under this method of billing, per gallon water usage charges increase if more than a certain number of gallons are used each quarter. Although the City needs to generate the fixed amount of total revenue, Council may choose to structure the rates differently to achieve the same result. Three alternatives are presented for council s consideration: Alternative A raises the service and maintenance fees more moderately than the per thousand gallons usage fee (40:60 model) Alternative B raises the service and maintenance fees by a greater percentage than the per thousand gallon usage fee (50:50 model) Alternative C raises the service fee substantially and the maintenance fee moderately; the per gallon usage fees are relatively unchanged except for the high usage category (60:40 model) Alternative D uses B s user rates and C s fixed rates to increase rates sufficient enough to ad an estimated $100,000 to $150,000 to reserves. The existing rate structure generates revenue at a ratio of roughly 40:60 from fixed fees versus usage. By increasing the service and maintenance fees by a greater percentage than the per thousand gallon usage fee, the City would achieve a more reliable and predictable revenue stream. Water Rate Study 1-2

8 2.0 Components Involved in Rate Study 2.1 Existing Rate Summary The City has been operating on a rate plan outlined in section of the City Code effective as of April 1, This plan contained four different divisions of revenues that combine to pay for the O&M of the water related expenditures. Water Service Charge (or Base Rate for both residential and commercial/industrial) Residential Maintenance Fee Commercial/Industrial Water Demand Fee Water Usage Charge (for both residential and commercial/industrial) All four components of water revenues are set in the code to increase annually across the board per the following table: Table Water Rate Increase Per Current Year % Increase % % % % % Following the increases outlined in the code the historical rates have been as follows: Table Historical Rates Quarterly Charges for Service Water Quarterly Charges Detail Rate Schedule Q Residential $ $ $ $ Service charge - Residential Service charge - 2nd living unit Maintenance Charge per quarter Commercial / Industrial $ $ $ $ 3/4 inch inch line inch line inch line inch line inch line Usage charge* $ $ $ $ per 1,000 gallons of water * Residential only - first 3,000 gallons/qtr exempt Water Rate Study 2-1

9 Demand charge for commercial $ $ $ $ Up to 100,000 gallons , ,000 gallons ,000-1,000,000 gallons Over 1,000,000 gallons Out of City limits 2x 2x 2x 2x Annual Percentage increase - water 3% 3% 3% 5% Some of the philosophies behind the existing rate structures are: A separate maintenance fee from the water service charge allows the City to maintain a separate fee that is sized respectively to the amount of ongoing maintenance required at the WTP and distribution system The water usage charge per 1,000 gallons used is in place to fairly distribute cost relative to how much a customer uses and also helps promote water conservation The water service charge (base rate fixed fee) provides a consistent, predictable and reliable revenue source The water usage charge does not apply until more then 3,000 gallons per quarter are used means that everyone gets some water at the base rate fixed fee only but typical house holds will use more than this The larger commercial/industrial water demand fee than the residential maintenance fee puts a little more of the burden on commercial/industrial customers than the residential customers Currently, the total revenue from the water rates (about 40%) comes from the fixed fees and about 60% comes from water usage, which places a stronger emphasis on the water usage portion 2.2 Need for Rate Increase Even with the above historical rate increases the City has been unable to keep up with the expenditures. The combination of rising cost of services, significant capital improvement projects over the past few years and the stunted growth has prevented the City from keeping up with the rising costs. This has not been a single year issue, but rather the culmination of more than three years of water fund operations. Table 2.3 shows historical revenues and expenditures for the last 3 years. WATER FUND Table Historical Revenues/Expenditures Actual 2008 Actual 2009 Actual Actual 2010 Actual (Prelim) Operating Revenues $ 581,562 $ 711,398 $ 826,492 $ 857,535 $ 871,240 Capital Revenues $ 255,405 $ 389,719 $ 378,177 $ 134,878 $ 136,488 Other Revenues $ 170,323 $ 674,080 $ 311,243 $ 33,380 $ 49,528 Total Revenues $ 1,007,290 $ 1,775,197 $ 1,515,912 $ 1,025,793 $ 1,057,256 Operating Expenditures $ 423,104 $ 520,323 $ 603,442 $ 533,710 $ 651,669 Capital Expenditures $ 707,690 $ 881,153 $ 1,715,414 $ 1,061,373 $ 312,491 Dept Expenditures $ 357,118 $ 280,402 $ 590,664 $ 1,275,657 $ 469,614 Total Expenditures $1,487,912 $1,681,878 $2,909,520 $2,870,740 $1,433,773 Over (Under) ($480,622) $93,319 ($1,393,609) ($1,844,948) (376,517) Water Rate Study 2-2

10 Water Fund reserves have been completely diminished before 2011 (in fact funds from the sewer fund were borrowed at the end of 2010). With the standard 5% increase for the 2011 budget, the final net revenue will still be in the red at approximately $650,000. In summary, the City s current water rate problem has been ongoing and will now take a substantial increase for a more balanced operation. 2.3 Proposed Changes to the Rate Structure As seen in the previous section each component of a rate structure has a related philosophy or emphasis associated with it, some of which have quantitative components tied to them. For example, the more water customers use (regardless of the capacities available) the higher the treatment cost and wear and tear on parts (but many of these are qualitative issues); therefore the rate structure for a specific community needs to be in line with the values, beliefs and needs of that specific community. Over the past several months there have been many conversations between City Staff, SGM and elected officials. SGM and City Staff has combined the information obtained is such discussions to propose minor changes to the rate structure itself independently of the rates. In general, due to the idea that rates will have to increase substantially to meet existing expenditures, it was decided to maintain the core of the rate structure with the same four fees/charges. Water Service Charge (or Base Rate for both residential and commercial/industrial) Residential Maintenance Fee Commercial/Industrial Water Demand Fee Water Usage Charge (for both residential and commercial/industrial) The first three are fixed and the last one (water usage) is variable and dependent on how much water the customer uses. There have been various discussions about eliminating the maintenance and water demand fees and simplifying it to one fixed and one variable fee. The main arguments behind this are its simplicity, along with the fact that the City currently does not have the size of the maintenance water demand fees respective to the maintenance/replacement cost. In the end it was decided that they would continue to buffer the change shock, and provide additional detail about the use of revenue. The second significant item of discussion was where to base the emphasis of the rates on the water usage or the fixed base service charge. The majority of Colorado water suppliers have been trying to put a larger emphasis on water usage over the past several years to promote water conservation in light of the West s ever increasing water shortages. One of the main tools that has been used for this are water usage tiers that have different water usage rates per 1000 gallons of water used. For example water may only cost $1.00 per 1000 gallons of water used up to 10,000 gallons per month (tier one) but then cost $2.00 per 1000 gallons for all water used between 10,000 and 20,000 per month (tier two). Many water suppliers have as many as four to six tiers. The advantages of this method are that it distributes the higher costs to the larger water users as well as gives incentive to conserve water. Disadvantages are that it makes it harder for both the customer and supplier to Water Rate Study 2-3

11 predict bills (customers like knowing just a fixed fee, suppliers like to be able to rely on the revenue), they required additional accounting and billing set up work, and if to expensive of tiers are implemented it can cause too much of a conservation and also effect the suppliers budget. In addition Salida has more than sufficient water resources for its exiting population and projected growth. On the flip side there were discussions of providing more free water and or fully eliminating the variable fee and just having a fixed fee. This gives the ability to very accurately predict revenues and then adjust them to easily match estimated expenditures. It does not however give any ability to control how much water is used and does not give any tool to fairly distribute larger cost to larger water users and lower cost to lower water users. In light of these discussions two things were done with the idea to utilize the best qualities from both sides: 1. Two tiers were added in to promote water conservation and fairness 2. The first tier was set to start at 6,000 gallons per quarter before any water usage fees kick in (it was only 3,000 gallons per quarter before; the 6,000 gallons per quarter, double the previous amount included in the base fee, is a reasonable level for a somewhat conservative individual customer to actually be at or under giving the lowest water users the possibility to only have the fixed fee) Table Proposed Tiers Charge Per Thousand Gallons Gallons per Quarter Residential Commercial Up to 6,000 No water usage charge Tier 1 rate 6,000 to 40,000 Tier 1 rate Tier 1 rate 40,001 + Tier 2 rate Tier 2 rate The last main discussion item was how to proportion the rate increase on both the fixed fees and the variable water usage fees. They could be simply raised across the board to maintain the historic 40% of revenues out of the fixed fees and 60% out of the variable water usage. Or bump up the emphasis on the fixed fees so the percent of revenues are 50:50. Or push the emphasis on fixed fees way up to 60:40 cut of the total revenues. At the end of the day the same bottom line needs to be achieved so revenues cover expenditures but how the rates are weighed can be moved around and this will manifest itself if how the bills look and what types of customers more of the weight gets distributed to. Today approximately 20% of customers use 18,000 gallons per quarter or less, and approximately 20% (25% of commercial customers) use more then 40,000 or more, with 60% within the tier 1 bracket. In the final Revenues and Recommendations section we will give three alternatives Alternative A (40:60 model) Alternative B (50:50 model) Alternative C (60:40 model) Alternative D (54:46 model) Under these scenarios a portion of the $3.00 per thousand gallons of water is covered by the fixed fees enabling the City to charge less for actual gallons used. Water Rate Study 2-4

12 2.4 Capital and Development Fees Discussion It is the typical industry standard that development pays its own way and therefore it is standard that water rates are to cover operations and maintenance and new development pays for capital improvements through development fees. This idea makes sense so that existing customers are not paying for additional infrastructure for new customers. One of the biggest issues however is the confusion that arises from definition of Capital and what would be considered a capital project that new development would pay for. If one was to scan across different municipalities they would many different definitions of a Capital project some saying it has to be new construction, some saying it has to be over a particular dollar amount. In reality the Capital Improvements that should be paid for by system development fees should only be Expansion Capital Improvements For example if a WTP is simply being expanded, say a new branch is being added, simply for more capacity then that project theoretically should be paid for fully by development fees (and if enough reserves are not built up at the time of the project for the debt service for that project). New distribution mains that only serve new areas or additional water rights would also fall into this category. However, the replacement of an existing main because of old age within a distribution system that serves existing customers should not be paid for by development fees but by the existing users. In Salida s case this is what the maintenance and demand fees should be used for. Other assets as well or even a full WTP that needs to be replaced (say you were completely building a new WTP but not increasing capacity at all) due to old age, wear and tear, decay, or even changes in technology or regulation would also fall under this category. But often all of such projects come out of a Capital budget and many think they should try to pay for this primarily off of development fees. Of course many projects are not this straight forward and should require an appropriate mix of existing user fees and development fees, new WTP that replaces an old one and adds capacity or the upsizing of an old dated water line that will serve new and existing customers. The engineering industry has tried to alleviate this problem by calling funds set aside to replace aging or outdated infrastructure as depreciation funds however this causes conflicts in the financing industry with the definition of depreciation. So for this report we will separate them out as capacity or expansion projects verses capital maintenance or replacement projects verses ongoing routine maintenance activities that also require funds. In the past the City of Salida has followed this traditional method relying on system development fees to pay for Capital Improvement projects and substantial development during the mid 2000 s did pay for a substantial portion Capital projects. Development and growth has significantly dropped off over the past two years and the City has determined that it not only relied too much on development fees but for the next few years with the volatility of the economy that it can not rely at all on development fees. Therefore the City has made the decision that it will not count on any development fees in the rate study and that all capital projects in the next few years are not growth or capacity related but asset maintenance and replacement and needs to be paid for out of the rates and more specifically the maintenance and demand charges. None of the projects on the CIP list are for expansion. All represent upgrades or replacements of existing system. Water Rate Study 2-5

13 Figure Historical Development Fees Development Fees $450,000 $400,000 $350,000 $300,000 Dollars $250,000 $200,000 $150,000 $100,000 $50,000 $ Development Fees As can be seen in the above chart development fees have dropped off significantly and show no signs of significant rebound anytime soon, but it is also not reasonable to assume there will be no development fees. In fact for the 2011 budget approximately $175,000 in development fees was anticipated. However they will not be included in the evaluation of the rate study and all actual development fees that come in will be set aside in reserves for true expansion capital projects. As can be seen later in the report under the capital projects section this rate study is being completed in concurrence with a water capital improvement plan that is determining the future water capital needs in the next ten years. One of the items in approximately 8-10 years is significant replacement of the flocculator in the WTP and this comes in two options MGD capacity replacement at approximately $1,014, MGD capacity replacement doubling the capacity at approximately $1, 520,000 For this rate study and determining how to increase rates in order to cover expenditures it needs to be anticipated that in 8-10 years $1,000,000 needs to be spent on the WTP to upgrade major aging equipment and this is independent of any kind of growth. If growth does not happen then only the 2 MGD replacement is needed and the existing customers need to cover that cost (and or debt service). If growth does happen and a 4 MDG replacement is needed then the existing customers still need to cover approximately $1,000,000 but the remaining $520,000 would be covered by the development fees that Water Rate Study 2-6

14 have been set aside as it was not included into the rate study for the operations and maintenance type capital improvement projects. Water Rate Study 2-7

15 3.0 Existing Infrastructure Summary This rate study is being produced concurrently with a water capital improvement plan (CIP). The CIP has the extended detail on the existing infrastructure and its required needs. 3.1 Source of Supply The City currently has three main sources of water supply. South Arkansas (Little River) surface water. This water is directed to the WTP through the Harrington Ditch, treated and distributed through the distribution system. The infiltration gallaries, groundwater source. This water is collected in an infiltration gallery and simply chlorinated and pumped into the distribution system, not ever going through the WTP. The pasquale springs groundwater source. This is also simply chlorinated and put into the distribution system without going through the WTP. There has been much discussion on looking into a well field water source and more detail on this can be found in the CIP; this does however have the potential to significantly rearrange how the City treats and supplies water also having a big effect on the rates no longer needing the WTP to treat surface water. For now it is assumed that funds are spent on the feasibility study for this alternative but nothing beyond that. 3.2 Water Storage The City currently has the possibility for approximately 4.5 MG of total water storage in various above-ground and below ground tanks. These tanks have been and are a large portion of the resent and ongoing capital projects. Table 3.1 below summarizes the City s water storage facilities. 3.3 Transmission Table Water Storage Summary Tank Capacity (MG) Condition Airport Tank 1.0 Newer, Glass line Gravity feed Tank 1.0 Concrete Tenderfoot 1.0 Not used, needs Telemetry work Gallaries Tank 1.5 Currently being relined Small Pasquale Springs Tank Unknown Small Needs to be relined Potable water is distributed to City customers through approximately 42 mi. of piping. Estimated distribution pipe size varies from 4-inch to 16-inch and includes primarily ductile iron (DIP) with some older galvanized steel pipes. The approximate installation period of the oldest operational pipe is before the 1950 s. It is unknown how much is old cast iron pipe and it is unknown how much at this time is more then 50 years old and at the end of its life cycle. It is generally accepted that the life of DIP water line is 50 years, however it is often pushed longer. Table 3.2 provides linear foot estimates for pipes. Water Rate Study 3-1

16 Table Distribution Pipe Summary Total Length of Pipe Material Size (in.) in Distribution System 1 (LF) 4 67, ,200 DIP or 8 37,160 Cast Iron 10 13, ,400 4 and to some extent 6 pipe is generally considered too small for any portion of distribution system. It is currently industry standard to not install less then 8 pipe for fire flow requirements in any new construction (with the exception that short isolated sections to a few users can be 6 but not part of the main distribution system. Therefore most anytime, such as on Sackett Street, if old smaller line is replaced it is upsized to a minimum of 8 to meet current fire flow requirements. Water Rate Study 3-2

17 4.0 Expenditures The City s water distribution system expenditures were estimated based on staff input, recent water fund budgets, CIP, and recent maintenance costs. Expenditures are broken up into the following categories: o Plant Operation, Maintenance and Repair o Management and Administrative o Public Works (distribution system) Operation, Maintenance and Repair o Anticipated Capital Projects o Existing Dept Service 4.1 Operations, Maintenance and Repair Expenses associated with operation, maintenance and repair of the system were determined for each the water treatment plant side and the distribution system side (responsibility of the Public Works Department). Staff salaries and related expenses are included as well as the share of equipment general operating equipment parts and supplies. Not included in this portion are larger maintenance/replacement capital cost such as line or pump replacement. They are included in the Anticipated Capital Projects section Cost estimates for this study are based on the City s actual historical costs. A 3% annual inflation factor for operating expenditures was factored into the model. The inflation % is one of the input factors into the model so it can be adjusted easily to actual values in the future. A summary of the anticipated expenses can be seen in the appendix models. 4.2 Management and Administrative Management and administrative costs are primarily related to billing activities, obtaining capital financing, processing new service applications, insurance coverage, and administrating the utilities codes such costs include expenditures related to staff salaries and overhead, professional services and source water rights and development. They have been provided by City staff and are based on past actual financial data. No additional staff is anticipated to be required in the scope of this rate study. 4.3 Upcoming Capital Projects Upcoming capital projects have been determined with assistance from City staff and are looked at in more detail in the CIP. Appendix C has the table of all anticipated upcoming capital projects. It should be noted that cost for waterline upgrades to meet fire flow demands were omitted from the list at this time pending data resolution. There is a line item place holder but this needs to be updated as better information is obtained. 4.4 Total Annual Expenditures The anticipated total annual expenditures for the City s water system are represented as the sum of all costs associated with Operations, Maintenance and Repair, Water Rate Study 4-1

18 Management and Administrative, Upcoming Capital Projects and Debt services. Such costs average approximately $1.4 million annually based upon current levels of billed water usage, it costs the City just over $3.00 per thousand gallons produced and delivered. Figure Total Estimated Expenditures Total Expenditures $2,500, $2,000, Dollars $1,500, $1,000, $500, $ Year Treatment Plant Public Works Administration Debt Service Total Expenditures Capital There are three important factors in the above chart to point out. First, in 2011 the total net expenditures take a noticeable drop even though even though all the individual line item expenditures increase. This is due to an $525,000 intergovernmental funding source, a loan, primarily set aside for storage tank liner costs and other capital projects. It is possible that additional such funding sources could be available in the future for other projects but this can not be anticipated. Debt coverage ratios are also unlikely to be met for water operations. Secondly there is a huge increase for 2014, 2015 and This is due to water treatment plant upgrades identified in the CIP. The reserves would not be there to fully fund these capital projects by 2014 with out population growth so it may have to require a loan and or pushing it off to a later date. Please see the Appendix for a detail spreadsheet of anticipated upcoming capital projects. Next is the drop in the next expenditures in This can be seen as a direct relationship to the drop in the Debt Service at that time. This will help alleviate future rate increase needs at that time. Last is the significant spike in 2019, this is for $1 million dollar plus water treatment plant replacement project. Water Rate Study 4-2

19 5.0 Revenues and Recommendations Revenues Revenues allow the City to ensure delivery of adequate, high-quality water to its customers and offset the City s water distribution system expenditures. Revenues typically come from both non-service fee sources, as well as standard quarterly service fees. As noted above if all components of the water rate are only increased by 5% that would put the 2011 year end revenue/expenditure balance at approximately a negative $650,000 and reserves have already been completely depleted. Per the recommended rate structure changes we are providing three options of rate increase to balance revenues with expenditures for All of the three options have more or less the same City with water fund bottom line but each of the three distribute them differently. Table 5.1 Rate Increase Options Quarterly Charges for Water Services Alternatives Residential Service Charges A B C D Service charge - Residential $ $ $ $ Service charge - 2nd living unit $ $ $ $ Maintenance charge per quarter $ $ $ $ Commercial / Industrial A B C C 3/4 inch $ $ $ $ inch line $ $ $ $ inch line $ $ $ $ inch line $ $ $ $ inch line $ $ $ $ inch line $ $ $ $ Usage charge A B C C Tier I (up to 40,000 gallons/qtr) * $ 1.85 $ 1.50 $ 1.25 $ 1.50 Tier II (over 40,000 gallons/qtr) $ 2.25 $ 2.00 $ 1.50 $ 2.00 Demand charge for commercial *Residential only - first 6,000 gallons/qtr exempt Up to 100,000 gallons $ $ $ $ , ,000 gallons $ $ $ $ ,000-1,000,000 gallons $ $ $ $ Over 1,000,000 gallons $ $ $ $ Out of City Limits 2x 2x 2x 2x Base Fee : Usage Fee Ratio 40:60 50:50 60:40 54:46 Water Rate Study 5-1

20 These three options increase the fixed fee rates considerably but they also double the amount of water that is included in the fixed fee rate. In evaluating the rate increase it is important to also understand how the potential rates compare to other Colorado Communities. It is not just Salida but most all communities that have to look at significant water rate increases. In the table below all rates are current updated for 2011 rates. The exception are the two lower rate communities, Gunnison and Alamosa which are January 2010 rates and it is unknown if these two communities are currently looking at rate increases. Comparable Community Rates Table 5.2 Rates in other Communities Gallons included # of Tiers in Base Fee Quarterly Base Fee * Tier One Range gallons Cost of Tier One Per 1,000 gallons Typical Residential Using 30,000 per Quarter Gunnison $12.63 None Three 0-5,000 $1.46 $57.93 Buena Vista** $ ,000 One 15,000+ $2.19 $ Canon City*** $27.90 None Three 0-12,000 $1.30 $84.85 Alamosa $15.60 None Three 0-8,000 $1.10 $49.80 Crested Butte $ ,000 Six 24,000-39,000 $2.85 $83.10 Roaring Fork Water and Sanitation District $66.00 None Four 0-31,500 $1.70 $ Town of Basalt $51.00 None Four 0-31,500 $1.60 $99.00 Existing 2011 Salida $ ,000 One 3,000+ $1.24 $66.18 Salida Option A $ Two 6,000-40,000 $1.85 $88.40 Salida Option B $ Two 6,000-40,000 $1.50 $92.00 Salida Option C $ Two 6,000-40,000 $1.25 $96.00 Salida Option D $ Two 6,000-40,000 $1.50 $ *Many communities bill monthly but for this table all are compared per Quarter **Buena Vista has a Senior Citizen discounted rate of approximately 75% ***Canon City is the only community that has a separate base fee and usage fee for commercial One of the important issues the above table highlights is the differences between the proposed options A, B and C. As more emphasis is put on the fix fee rather then the water usage from option A to C the quarterly increase for the typical residential user is about $4.00 per quarter. Again all three alternatives produce the same amount of total revenue for the City but distribute it differently between different types of customers. Option C with higher fixed fee and lower water usage moves more of the weight to all customers evenly but provides a more reliable and predictable income regardless of water usage. Option A puts more weight on high water users having them pay for the more water that they are using, but is a less stable source of revenue (a high water user with a high bill could try harder to use less water, also an increase in % of second or part time home owners would also have a negative impact on revenues decreasing the typical amount of water used per customer). 5.2 Additional Recommendations Annual Rate Increase beyond 2011 Above are the three alternatives for rate increases in 2011, but it is important to look out farther then that into The hard part is the predictability of future revenues becomes Water Rate Study 5-2

21 much more difficult to predict. The hardest component to predict is the population (customer) growth. Since the 1950 Salida has experience decades of large 20-30% growth followed by decades of slight decline and it is anticipated that for the next 10 years growth should be fairly flat. The requirement for rate increases beyond 2011 depends significantly on the growth rate. At a growth rate of between 2-3% the rate is sustainable without any increase in the next 10 years, at.5-1.5% growth annual rate increases are required on the range of 2-5% annually depending on inflation rate and growth rate. The model gives City Staff the ability to update annually the growth rate and inflation rate and determine what if any rate increase is required for that year. This eliminates the current situation where rates did not keep pace with needs for several years. Figure 5.1 Expenditures vs Revenue and Growth Expenditures vs Revenue and Growth 3,500,000 3,000,000 2,500,000 Dollars 2,000,000 1,500,000 1,000, , Years.5% annual growth 2% annual growth 3% growth rate Expenditures Based on the above chart due to the capital expenses anticipated in 2014, 2015 and 2016 expenditures can not be balanced with revenues in without significant rate increases in those years as well. But as can be seen in years beyond 2016 significant rate increases in 2014 would not be warranted beyond those years. An annual growth rate of.5% does not keep up with expenditures without additional rate increases. But as little at 2% annually does, and 3% growth would more then sustain revenues over expenditures. Two points can be drawn from the above figure. First, needed capital projects in 2014, 2015, 2016 and 2019 can not happen as planed without financing (new loans) and significant population increase or else they need to be pushed off. Second the percent rate increase beyond 2011 is strongly dependent on the growth rate that occurs; 2% annual growth rate will sustain long term expenditures without rate increases in the future. If less then 2% growth is seen in the future annual rate increases will need to take place on the range of 1-5% a year depending on the growth rate. The City staff can use the provided model and Water Rate Study 5-3

22 update it annually depending on true growth rate and see what 1-5% rate increase is needed. Figure 5.2 Expenditures vs. Revenue with 0.5% Growth and Annual Rate Increases Expenditures vs Revenue with.5% growth and annual rate increases Dollars Years 3% annual rate increase 5% annual rate increase Expenditures So both a 3% and 5% annual rate increase each year from 2012 and on balance out expenditures over the long run with even just a.5% annual growth rate but because of capital projects in the next three years there is no reasonable rate increase in 2012 and beyond to fund then as they are without financing. Also as noted several times in the report the actual cost per thousand gallons of to supply water is greater then what is charged in the water usage rate. The difference is made up in the fixed fees. Because there is a larger percentage of residential customers verses high use commercial customers the residential customers carry a heavier weight of the overall cost in the fixed fees. Also as stated above this helps provide a more reliable and predictable revenue streams. If it is desired to shift how the expense weight is balanced the it is common to add an additional tier or tiers that have for high water users that is above that actual $3.00 per thousand gallons number. Water Rate Study 5-4

23 Appendix A Water Rate Model with No Rate Increase Preliminary Engineering Report Appendix A

24 Water Rate Model NO RATE INCREASE BEYOND % Quarterly Billing Cycle Key Metrics: Usage (gallons - in thousands): Assumptions: Residential 150,000 33% Residential/commercial base fee $ /4" inch line; increase commensuate with line size for commercial accounts Commercial 300,000 67% Gallons considered "base usage" 3,000 Residential only commercial 450,000 Percentage of readings less than base usage 2000% 1,516 8,143 # readings under base to total readings Residential usage (thousands) - estimate 150,000 Water cost: Avg / Customer Residential gallons estimated over "base usage" 160,000 Based on 2010 usage totals Avg Cost $ 1,398,000 $ 527 Higher tier usage - residential 20% Based on 2010 usage totals / gallon (000's) $3.11 Higher tier usage - commercial 25% Usage Charges (per thousand gallons): Cost to customers based on gallons used Charge for base usage $ - 3,000 gallons/qtr Residential $ 466,000 $ % Residential usage fee > base $ 1.25 Commercial 932,000 2,076 67% Commercial usage fee $ 1.25 $ 1,398,000 Tier II usage fee $ % increase factor Flat cost per number of customers: Tier III usage fee $ % increase factor Residential $ 1,161,580 $ % Residential maintenance fee $ Commercial 236, % Commercial demand fee base $ % of residential maint fee. Increase according to usage tiers. $ 1,398,000 Commercial usage (thousands) - estimate 300,000 Costs to customers based on model: Out of city limits multiplier 2.00 times in city rates Residential $ 516,210 $ % Inflation factor for operating expenditures 3.00% annual Commercial 499,755 1,113 49% Residential growth factor 0.50% annual $ 1,015, Expenditures Plant operation, maintenance and repair $ 461,622 $ 450,500 $ 464,015 $ 477,935 $ 492,274 $ 507,042 $ 522,253 $ 537,921 $ 554,058 $ 570,680 $ 587,800 Management and administration 81,179 91,800 94,554 97, , , , , , , ,778 Public works operation, maintenance and repair 108, , , , , , , , , , ,581 Operating expenditures (cash basis) 651, , , , , , , , , , ,159 Debt Service 469, , , , , , , , , , ,200 Interfund loan repayment - 250, Capital 312, , , , , , , , ,000 1,181, ,000 Total expenditures 1,433,773 1,857,400 1,408,821 1,451,455 1,884,619 1,688,734 1,814,918 1,378,391 1,224,875 2,284,890 1,296,359 Less: New financing sources - (525,000) Cash requirements $ 1,433,773 $ 1,332,400 $ 1,408,821 $ 1,451,455 $ 1,884,619 $ 1,688,734 $ 1,814,918 $ 1,378,391 $ 1,224,875 $ 2,284,890 $ 1,296,359 Revenue Customers or Usage Residential: 2,206 Single Family Residential 2, , , , , , , , , , , ,293 Single Family out of city 9 1,298 1,363 1,370 1,377 1,384 1,390 1,397 1,404 1,411 1,418 1,426 Multi-Family Residential (2 units) ,809 26,048 26,178 26,309 26,440 26,573 26,705 26,839 26,973 27,108 27,244 Multi-Family out of city Maintenance Fee - in city 2, , , , , , , , , , , ,391 Maintenance Fee - out of city 10 2,043 1,102 1,107 1,118 1,135 1,158 1,187 1,223 1,267 1,318 1,379 Billed usage (thousand gallons) 150, , , , , , , , , , , ,182 Incremenetal revenue from higher tier usage 13,333 13,400 13,467 13,534 13,602 13,670 13,738 13,807 13,876 13,945 Commercial: 449 In City base 3/4" line ,194 21,202 21,202 21,202 21,202 21,202 21,202 21,202 21,202 21,202 21,202 1" line 109 9,435 10,977 10,977 10,977 10,977 10,977 10,977 10,977 10,977 10,977 10, " line 19 2,329 2,877 2,877 2,877 2,877 2,877 2,877 2,877 2,877 2,877 2,877 2" line 26 4,500 5,256 5,256 5,256 5,256 5,256 5,256 5,256 5,256 5,256 5,256 3" line 7 2,084 1,590 1,590 1,590 1,590 1,590 1,590 1,590 1,590 1,590 1,590 4" line 8 3,846 2,423 2,423 2,423 2,423 2,423 2,423 2,423 2,423 2,423 2,423 Out of City base 3/4" line " line " line " line " line " line Commercial Demand up to 100,000 gallons ,881 29,284 29,284 29,284 29,284 29,284 29,284 29,284 29,284 29,284 29, , ,000 gallons ,017 18,911 18,911 18,911 18,911 18,911 18,911 18,911 18,911 18,911 18, ,000-1,000,000 gallons 17 5,945 11,705 11,705 11,705 11,705 11,705 11,705 11,705 11,705 11,705 11,705 over 1,000,000 gallons 20 10,490 18,360 18,360 18,360 18,360 18,360 18,360 18,360 18,360 18,360 18,360 Usage (thousand gallons) 300, , , , , , , , , , , ,250 Tier II fee 25% 93,750 93,750 93,750 93,750 93,750 93,750 93,750 93,750 93,750 93,750 Tier III fee 0% Late fees and other revenue 41,997 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 Total revenue 907,835 1,025,965 1,028,546 1,031,757 1,035,615 1,040,150 1,045,400 1,051,416 1,058,262 1,066,016 1,074,773 Over (under) cash requirements $ (525,938) $ (306,435) $ (380,275) $ (419,698) $ (849,004) $ (648,584) $ (769,518) $ (326,975) $ (166,613) $ (1,218,874) $ (221,586) I:\2008\ City of Salida Engineer\ Water Rate Study\Data\Tyler's spreadsheets\march Revised\2011 Water Rate Study NO Rate Increase.xls

25 Appendix B Alternative Rate Increase Models Preliminary Engineering Report Appendix B

26 Water Rate Model ALTERNATIVE A Quarterly Billing Cycle Key Metrics: Usage (gallons - in thousands): Assumptions: Residential 150,000 33% Residential/commercial base fee $ /4" inch line; increase commensuate with line size for commercial accounts Commercial 300,000 67% Gallons considered "base usage" 6,000 Residential only commercial 450,000 Percentage of readings less than base usage 20% 1,516 8,143 # readings under base to total readings Residential usage (thousands) - estimate 150,000 Water cost: Avg / Customer Residential gallons estimated over "base usage" 120,000 Based on 2010 usage totals Avg Cost $ 1,398,000 $ 527 Higher tier usage - residential 20% Based on 2010 usage totals / gallon (000's) $3.11 Higher tier usage - commercial 25% Usage Charges (per thousand gallons): Cost to customers based on gallons used Charge for base usage $ - 6,000 gallons/qtr Residential $ 466,000 $ % Residential usage fee > base $ 1.85 Commercial 932,000 2,076 67% Commercial usage fee $ 1.85 $ 1,398,000 Tier II usage fee $ % increase factor Flat cost per number of customers: Tier III usage fee $ % increase factor Residential $ 1,161,580 $ % Residential maintenance fee $ Commercial 236, % Commercial demand fee base $ % of residential maint fee. Increase according to usage tiers. $ 1,398,000 Commercial usage (thousands) - estimate 300,000 Costs to customers based on model: Out of city limits multiplier 2.00 times in city rates Residential $ 654,944 $ % Inflation factor for operating expenditures 3.00% annual Commercial 711,744 1,585 52% Residential growth factor 0.50% annual $ 1,366, Expenditures Plant operation, maintenance and repair $ 461,622 $ 450,500 $ 464,015 $ 477,935 $ 492,274 $ 507,042 $ 522,253 $ 537,921 $ 554,058 $ 570,680 $ 587,800 Management and administration 81,179 91,800 94,554 97, , , , , , , ,778 Public works operation, maintenance and repair 108, , , , , , , , , , ,581 Operating expenditures (cash basis) 651, , , , , , , , , , ,159 Debt Service 469, , , , , , , , , , ,200 Interfund loan repayment - 250, Capital 312, , , , , , , , ,000 1,181, ,000 Total expenditures 1,433,773 1,857,400 1,408,821 1,451,455 1,884,619 1,688,734 1,814,918 1,378,391 1,224,875 2,284,890 1,296,359 Less: New financing sources - (525,000) Cash requirements $ 1,433,773 $ 1,332,400 $ 1,408,821 $ 1,451,455 $ 1,884,619 $ 1,688,734 $ 1,814,918 $ 1,378,391 $ 1,224,875 $ 2,284,890 $ 1,296,359 Revenue Customers or Usage Residential: 2,206 Single Family Residential 2, , , , , , , , , , , ,095 Single Family out of city 9 1,298 2,016 2,026 2,036 2,046 2,057 2,067 2,077 2,088 2,098 2,109 Multi-Family Residential (2 units) ,809 38,528 38,721 38,914 39,109 39,304 39,501 39,698 39,897 40,096 40,297 Multi-Family out of city Maintenance Fee - in city 2, , , , , , , , , , , ,902 Maintenance Fee - out of city 10 2,043 1,360 1,367 1,381 1,401 1,430 1,466 1,510 1,564 1,627 1,702 Billed usage (thousand gallons) 150, , , , , , , , , , , ,192 Incremenetal revenue from higher tier usage 14,800 14,874 14,948 15,023 15,098 15,174 15,250 15,326 15,402 15,479 Commercial: 449 In City base 3/4" line ,194 31,360 31,360 31,360 31,360 31,360 31,360 31,360 31,360 31,360 31,360 1" line 109 9,435 16,237 16,237 16,237 16,237 16,237 16,237 16,237 16,237 16,237 16, " line 19 2,329 4,256 4,256 4,256 4,256 4,256 4,256 4,256 4,256 4,256 4,256 2" line 26 4,500 7,775 7,775 7,775 7,775 7,775 7,775 7,775 7,775 7,775 7,775 3" line 7 2,084 2,352 2,352 2,352 2,352 2,352 2,352 2,352 2,352 2,352 2,352 4" line 8 3,846 3,584 3,584 3,584 3,584 3,584 3,584 3,584 3,584 3,584 3,584 Out of City base 3/4" line ,120 1,120 1,120 1,120 1,120 1,120 1,120 1,120 1,120 1,120 1" line " line " line " line " line Commercial Demand up to 100,000 gallons ,881 21,692 21,692 21,692 21,692 21,692 21,692 21,692 21,692 21,692 21, , ,000 gallons ,017 14,008 14,008 14,008 14,008 14,008 14,008 14,008 14,008 14,008 14, ,000-1,000,000 gallons 17 5,945 8,670 8,670 8,670 8,670 8,670 8,670 8,670 8,670 8,670 8,670 over 1,000,000 gallons 20 10,490 13,600 13,600 13,600 13,600 13,600 13,600 13,600 13,600 13,600 13,600 Usage (thousand gallons) 300, , , , , , , , , , , ,250 Tier II fee 25% 168, , , , , , , , , ,750 Tier III fee 0% Late fees and other revenue 41,997 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 Total revenue 907,835 1,376,688 1,379,962 1,384,014 1,388,867 1,394,555 1,401,127 1,408,645 1,417,188 1,426,852 1,437,755 Over (under) cash requirements $ (525,938) $ 44,288 $ (28,859) $ (67,440) $ (495,752) $ (294,179) $ (413,791) $ 30,253 $ 192,312 $ (858,039) $ 141,395 I:\2008\ City of Salida Engineer\ Water Rate Study\Data\Tyler's spreadsheets\march Revised\2011 Water Rate Study.5 growth rate.xls

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016 WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016 The Financial Link Executive Summary - Water In May 2015, the City of Whitefish (City) retained AE2S to complete a Water and

More information

2017 UTILITY RATE STUDY WORK SESSION #2: BACKGROUND, EDUCATIONAL/INFORMATIONAL

2017 UTILITY RATE STUDY WORK SESSION #2: BACKGROUND, EDUCATIONAL/INFORMATIONAL 2017 UTILITY RATE STUDY WORK SESSION #2: BACKGROUND, EDUCATIONAL/INFORMATIONAL Receive a presentation from Lewis Young Robertson & Burningham regarding the 2017 Utility Rate Study The purpose of the Council

More information

MONROE CITY COUNCIL. Agenda Bill No

MONROE CITY COUNCIL. Agenda Bill No MONROE CITY COUNCIL Agenda Bill No. 15149 TITLE: Discussion: Impact Fees DATE: DEPT: CONTACT: PRESENTER: ITEM: 08/25/2015 Public Works Brad Feilberg Brad Feilberg Discussion: 08/25/2015 Attachments: 1.

More information

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for Water & Sewer Cost of Service Rate Study for City of Norco, CA October 11, 2016 Table of Contents October 11, 2016 Chad Blais Director of Public Works City of Norco 2870 Clark Avenue Norco, CA 92860 Re:

More information

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc.

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc. 227 West Trade Street Phone 704 373 1199 www.raftelis.com Suite 1400 Fax 704 373 1113 Charlotte, NC 28202 Date: June 21, 2016 To: Mr. Bob Walker, Executive Director From: Lex Warmath and Elaine Conti,

More information

Water Rate Study FINAL January 31, 2018

Water Rate Study FINAL January 31, 2018 Water Rate Study FINAL January 31, 2018 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com January 31, 2018 Joshua Basin Water District P.O. Box 675 / 61750 Chollita Road Joshua

More information

Rate Comparison & Benchmarking Analysis

Rate Comparison & Benchmarking Analysis + Rate Comparison & Benchmarking Analysis Final Report September 2016 Firm Headquarters Redmond Town Center 7525 166 th Ave. NE Suite D-215 Redmond, WA 98052 T: (425) 867-1802 F: (425) 867-1937 www.fcsgroup.com

More information

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017 City Council Public Hearing February 13, 2017 Public Hearing on Proposed Water Rates PRESENTED BY Kelly J. Salt Partner 2016 Best Best & Krieger LLP Article X, section 2 (1928) The general welfare requires

More information

Official Minutes of MARION COUNTY BOARD OF COUNTY COMMISSIONERS. July 18, 2011

Official Minutes of MARION COUNTY BOARD OF COUNTY COMMISSIONERS. July 18, 2011 Official Minutes of MARION COUNTY BOARD OF COUNTY COMMISSIONERS July 18, 2011 The Marion County Board of County Commissioners met in a workshop session in Commission Chambers at 1:10 p.m. on Monday, July

More information

Water Rate Study for City of Lemoore

Water Rate Study for City of Lemoore Water Rate Study for City of Lemoore June 17, 2016 Prepared by: Dan Bergmann, Principal 15 Shasta Lane, Walnut Creek, CA 94597 Email: dan@igservice.com Office: 925-946-9090 Water Rate Study for City of

More information

CITY OF ANAHEIM WATER UTILITY FUND. Financial Statements. June 30, 2014 and (With Independent Auditors Report Thereon)

CITY OF ANAHEIM WATER UTILITY FUND. Financial Statements. June 30, 2014 and (With Independent Auditors Report Thereon) Financial Statements (With Independent Auditors Report Thereon) Table of Contents Page Independent Auditors Report 1 Management s Discussion and Analysis (Unaudited) 3 Financial Statements: Statements

More information

YORK COUNTY, SOUTH CAROLINA

YORK COUNTY, SOUTH CAROLINA YORK COUNTY, SOUTH CAROLINA Water and Sewer Financial Planning and Rate Study Report October 25, 2017 1031 S. Caldwell Street Suite 100 Charlotte, NC 28203 Phone 704.373.1199 Fax 704.373.1113 www.raftelis.com

More information

Module 8 Rate Design Overview for Small Water Systems

Module 8 Rate Design Overview for Small Water Systems Module 8 Rate Design Overview for Small Water Systems Workbook Financial/Managerial Series This course includes content developed by the Pennsylvania Department of Environmental Protection in cooperation

More information

Wastewater Rate Study. Villa Park, Illinois

Wastewater Rate Study. Villa Park, Illinois Wastewater Rate Study Villa Park, Illinois June 2013 Executive Summary General The Village of Villa Park s Wastewater Utility is responsible for operation and maintenance of the Village s separate sanitary

More information

Study Workshops are designed to be both educational and to seek broad direction from the Board

Study Workshops are designed to be both educational and to seek broad direction from the Board Study Workshops are designed to be both educational and to seek broad direction from the Board Workshop #1 Financial Forecast & Cost of Service Water, recycled water, & sewer services Revenue requirement

More information

LAKE DON PEDRO COMMUNITY SERVICES DISTRICT Policy and Procedures Manual

LAKE DON PEDRO COMMUNITY SERVICES DISTRICT Policy and Procedures Manual EXHIBIT A LAKE DON PEDRO COMMUNITY SERVICES DISTRICT Policy and Procedures Manual POLICY TITLE: Reserve Policy POLICY NUMBER: (to be established) ADOPTED: July 18, 2016 AMENDED: This statement is intended

More information

Culinary and Pressure Irrigation Water System. Capital Facilities Plan

Culinary and Pressure Irrigation Water System. Capital Facilities Plan Culinary and Pressure Irrigation Water System Capital Facilities Plan September 2009 Prepared By: J-U-B ENGINEERS, Inc. 240 West Center St., Ste. 200 Orem, Utah 84057 (801) 226-0393 SANTAQUIN CITY CULINARY

More information

Asset Management Plan Summary Report Adopted May 2012

Asset Management Plan Summary Report Adopted May 2012 Asset Management Plan Summary Report Adopted TABLE OF CONTENTS Executive Summary..4 Introduction/Background...7 Meter Retrofit Plan..11 Distribution Main Asset Management Plan..14 Groundwater Well Asset

More information

PARKVILLE WATER DISTRICT

PARKVILLE WATER DISTRICT PARKVILLE WATER DISTRICT WATER RATE STUDY DECEMBER 2017 RPI Consulting LLC Durango, Colorado TABLE OF CONTENTS Table of Contents 2 Summary of Findings 3 Water Rate Analysis 6 Usage patterns and existing

More information

SPRINGVILLE CITY CULINARY WATER IMPACT FEE ANALYSIS (IFA) MAY 2014

SPRINGVILLE CITY CULINARY WATER IMPACT FEE ANALYSIS (IFA) MAY 2014 SPRINGVILLE CITY CULINARY WATER IMPACT FEE ANALYSIS (IFA) MAY 2014 Adopted May 20, 2014 TABLE OF CONTENTS IMPACT FEE CERTIFICATION... 3 SECTION 1: EXECUTIVE SUMMARY... 4 PROPOSED CULINARY WATER IMPACT

More information

Asset Management Plan... Your Blueprint to Success By Timothy Stinson, P.E.* Presented January 17, 2013

Asset Management Plan... Your Blueprint to Success By Timothy Stinson, P.E.* Presented January 17, 2013 Asset Management Plan... Your Blueprint to Success By Timothy Stinson, P.E.* Presented January 17, 2013 Abstract Water utilities are similar in nature to many production facilities. The water utility produces

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

Q Internal Financial Report (Unaudited)

Q Internal Financial Report (Unaudited) Q3 2013 Internal Financial Report (Unaudited) Index Financial Commentary... 1 Summary of All City Funds... 7 Second Quarter Year-to-Date Actuals by Fund compared to Current Budget and Prior Year: General

More information

Sewer Rate Study July 2016

Sewer Rate Study July 2016 July 2016 Prepared By The Finance Division TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY... 1 1.1 Background... 1 1.2 Purpose... 1 1.3 Current Sewer Rates... 1 1.4 Five Year Financial Projection... 1

More information

City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY

City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY Summary of Findings October 2003 Financial Consulting Solutions Group, Inc. 8201 -- 164th Ave. NE, Suite 300, Redmond, WA

More information

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN 15-013 GSS Engineering Consultants Ltd. Unit 104D 1010 9 th Avenue West Owen Sound ON N4K 5R7 519.372.4828 TABLE OF CONTENTS

More information

Water and Sewer Utility Rate Studies

Water and Sewer Utility Rate Studies Final Report Water and Sewer Utility Rate Studies July 2012 Prepared by: HDR Engineering, Inc. July 27, 2012 Mr. Mark Brannigan Director of Utilities 591 Martin Street Lakeport, CA 95453 Subject: Comprehensive

More information

CLASS "C" WATER AND/OR WASTEWATER UTILITIES. (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT. Exact Legal Name of Respondent

CLASS C WATER AND/OR WASTEWATER UTILITIES. (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT. Exact Legal Name of Respondent CLASS "C" WATER AND/OR WASTEWATER UTILITIES (Gross Revenue of Less Than $200,000 Each) ANNUAL REPORT OF Exact Legal Name of Respondent Certificate Number(s) Submitted To The Charlotte County Budget Office

More information

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Phase 2 Cost of Service and Rate Design BLACK & VEATCH PROJECT NO. 192366 Black & Veatch Holding Company 2017. All rights

More information

Santa Clarita Water Division

Santa Clarita Water Division Santa Clarita Water Division Retail Water Rate Cost of Service Study Report September 2017 445 S Figueroa St Suite 2270 Los Angeles, CA 90039 Phone 213.262.9300 www.raftelis.com September 11, 2017 Mr.

More information

WATER AND SEWER RATE STUDY

WATER AND SEWER RATE STUDY FINAL WATER AND SEWER RATE STUDY B&V PROJECT NO. 179322.0100 PREPARED FOR City of Lynwood, CA JANUARY 11, 2017 Black & Veatch Holding Company 2011. All rights reserved. City of Lynwood, CA WATER AND SEWER

More information

Water, Sewer and Storm Sewer Rate Analysis

Water, Sewer and Storm Sewer Rate Analysis Water, Sewer and Storm Sewer Rate Analysis August 8, 207 68 North Main Street Bowling Green, Ohio 43402 49-352-7537 www.poggemeyer.com Table of Contents Introduction................................................................

More information

WATER USER RATES & FEE STUDY

WATER USER RATES & FEE STUDY WATER USER RATES & FEE STUDY FINAL REPORT February 2016 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510/653-3399

More information

FORT COLLINS- LOVELAND WATER DISTRICT

FORT COLLINS- LOVELAND WATER DISTRICT FORT COLLINS- LOVELAND WATER DISTRICT Water Financial Planning and Rate Study Report March 16, 2018 District of Thousand Oaks Water and Wastewater Financial Plan Study Report March 16, 2018 Board of Directors

More information

City of Riverbank. Water Rate Study FINAL 6/18/2015

City of Riverbank. Water Rate Study FINAL 6/18/2015 Water Rate Study FINAL 6/18/2015 Bartle Wells Associates Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510-653-3399 June 18, 2015 6707

More information

Cost Recovery Policy. Revised January Mount Pleasant Waterworks Cost Recovery Policy

Cost Recovery Policy. Revised January Mount Pleasant Waterworks Cost Recovery Policy Cost Recovery Policy Revised January 2016 VISION Through the unified and committed efforts of each and every employee, Mount Pleasant Waterworks will be a leader in our industry and community. MISSION

More information

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 EXECUTIVE SUMMARY The functions and duties of the Oro Valley Water Utility Commission include reviewing and developing

More information

MONROE CITY COUNCIL. Agenda Bill No

MONROE CITY COUNCIL. Agenda Bill No MONROE CITY COUNCIL Agenda Bill No. 15-145 TITLE: Discussion: Utility Rates (Postponed from August 18, 2015) 1 DATE: DEPT: CONTACT: PRESENTER: ITEM: 08/18/2015 Public Works Brad Feilberg Brad Feilberg

More information

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study Capital Region Water Water and Wastewater Rate Study Report November 22, 2017 Capital Region Water Water and Wastewater Rate Study TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 RATE STUDY SCOPE AND OBJECTIVES...1

More information

2016 Asset Management Plan. March 14, 2016

2016 Asset Management Plan. March 14, 2016 2016 Asset Management Plan March 14, 2016 1 Presentation Outline History of Asset Management at the District Asset Management Culture Asset Management Plan Overview Water System Overview and Conclusions

More information

ENGINEERING AND OPERATIONS COMMITTEE. November 27, :30 PM Greenspot Road, Highland CA AGENDA

ENGINEERING AND OPERATIONS COMMITTEE. November 27, :30 PM Greenspot Road, Highland CA AGENDA ENGINEERING AND OPERATIONS COMMITTEE November 27, 2017-2:30 PM 31111 Greenspot Road, Highland CA 92346 CALL TO ORDER PLEDGE OF ALLEGIANCE PUBLIC COMMENTS NEW BUSINESS AGENDA 1. Approve the September 25,

More information

Sanitation Rate Study Final Report

Sanitation Rate Study Final Report Sanitation Rate Study Final Report City of Simi Valley April 24, 2015 Prepared by: Page 1 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626.583.1894 Fax 626.583.1411 www.raftelis.com April 24,

More information

CITY OF RIVIERA BEACH, FLORIDA UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010.

CITY OF RIVIERA BEACH, FLORIDA UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010. UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010 Overview The service area of the Utility District s Water System includes the entire City of Riviera Beach (approximately

More information

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN May 30, 2016 Atikokan Public Works Water & Wastewater Services WATER & WASTEWATER FINANCIAL PLAN TOWN OF ATIKOKAN Table of Contents 1.0 Introduction ----------------------------------------------------------

More information

WATER AND WASTEWATER FUND REVENUES

WATER AND WASTEWATER FUND REVENUES WATER AND WASTEWATER FUND REVENUES Water revenues comprise $12.11 million, or 70.6% of total revenues of the fund, while wastewater (sewer) charges comprise $4.25 million, or 24.7% of total revenues. Water

More information

An Integrated Water and Sewer Utility Planning and Rate Study for October 4 & 5, 2011

An Integrated Water and Sewer Utility Planning and Rate Study for October 4 & 5, 2011 An Integrated Water and Sewer Utility Planning and Rate Study for October 4 & 5, 2011 HID E 1 Integrated Study Scope of Study HID E 2 Scope of the Study Part 1: Capital Assets Inventory water & sewer system

More information

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260 April 6, 2016 Katherine Godbey Director of Finance, Coachella Valley Water District 75515 Hovley Lane East Palm Desert, CA 92260 Dear Ms. Godbey: Hawksley Consulting (a subsidiary of MWH Global) is pleased

More information

The Municipality of Callander. Callander Drinking Water System. Financial Plan #

The Municipality of Callander. Callander Drinking Water System. Financial Plan # The Municipality of Callander Callander Drinking Water System #187-301 January 4, 2012 Municipality of Callander Callander Drinking Water System Page i Table of Contents 1. INTRODUCTION... 1 1.1 LEGISLATIVE

More information

Rates and Fees for New Connections (Developer Fees)

Rates and Fees for New Connections (Developer Fees) Rates and Fees for New Connections (Developer Fees) Table V: New Connection (Developer) Rates and Fees Effective Date 1/1/2019 1/1/2020 1/1/2021 A. Plan Review Fees Per Linear Foot (LF) - Water $0.65 $0.65

More information

Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona

Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona Prepared for: Central Arizona Partnership August 2008 Prepared by: 7505 East 6 th Avenue, Suite 100 Scottsdale, Arizona

More information

Diablo Water District PRELIMINARY DRAFT 2016 Facility Reserve Charge & MERA Update

Diablo Water District PRELIMINARY DRAFT 2016 Facility Reserve Charge & MERA Update June 1, 2016 Diablo Water District PRELIMINARY DRAFT 2016 Facility Reserve Charge & MERA Update This technical memorandum describes the 2016 update of the existing funding mechanisms used by Diablo Water

More information

La Cañada Irrigation District

La Cañada Irrigation District La Cañada Irrigation District Water Rate Study Report - 2009 March, 2009 201 S. Lake Blvd, Suite 803 Pasadena CA 91101 Phone Fax 626 583 1894 626 583 1411 www.raftelis.com March 30, 2009 Mr. Douglas M.

More information

Temescal Valley Water District

Temescal Valley Water District Temescal Valley Water District Comprehensive Water, Recycled Water, and Wastewater Cost of Service Study Draft Report / December 7, 2016 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145

More information

TOWN OF PRESCOTT VALLEY

TOWN OF PRESCOTT VALLEY TOWN OF PRESCOTT VALLEY Management Services Department WATER & SEWER RATE STUDY July 27, 2017 TOWN OF PRESCOTT VALLEY REPORT OF PROPOSAL TO REVISE CERTAIN WATER AND WASTEWATER RATES, FEES AND SERVICE CHARGES

More information

VOLUME 2 - RULES AND REGULATIONS. Part B - Schedule of Rates, Fees and Other Charges. Table of Contents. 1. Definitions... 1

VOLUME 2 - RULES AND REGULATIONS. Part B - Schedule of Rates, Fees and Other Charges. Table of Contents. 1. Definitions... 1 VOLUME 2 - RULES AND REGULATIONS Part B - Schedule of Rates, Fees and Other Charges Table of Contents 1. Definitions... 1 1.1 Applicant... 1 1.2 Availability... 1 1.3 Availability Fees... 1 1.4 Availability

More information

Header Tile ATTACHMENT 2. City of Saskatoon

Header Tile ATTACHMENT 2. City of Saskatoon Header Tile ATTACHMENT 2 2 Building Better Infrastructure The Administration evaluates the condition of the City s assets in order to develop annual programs to maintain the assets at a minimum cost. Where

More information

Water and Wastewater Utility Rates

Water and Wastewater Utility Rates Water and Wastewater Utility Rates March 1, 2016 Presented By: Diana Langley Public Works Director 1 OVERVIEW 2 Uses of Funds Capital Investment Debt Service Operating Cost = Revenue Requirement 3 Source

More information

Long Range Financial Plan

Long Range Financial Plan Long Range Financial Plan SUMMARY Water for Life, Ka Wai Ola MARCH 2018 Table of Contents The Value of a Long Range Financial Plan................................... 3 The BWS s Large and Complex Water

More information

UTILITY RATE STUDY. Public Hearing

UTILITY RATE STUDY. Public Hearing UTILITY RATE STUDY Public Hearing. Public January 23, 2018 Resources Management Group, Inc. Utility, Rate, Financial, and Management Consultants Rate Guiding Principles Recognized Revenues Should Be Sufficient

More information

Managing Financial Risk and Declining Demand. Presentation Outline

Managing Financial Risk and Declining Demand. Presentation Outline Managing Financial Risk and Declining Demand Washington Association of Sewer & Water Districts Spring Conference April 13, 2012 John Ghilarducci Presentation Outline 1. Why Consumption is Declining Potential

More information

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY REPORT January 2017 WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY PREPARED BY: ECONOMICS STRATEGY STAKEHOLDERS SUSTAINABILITY www.newgenstrategies.net 3420

More information

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013 MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT September 2013 10540 TALBERT AVENUE, SUITE 200 EAST FOUNTAIN VALLEY, CALIFORNIA 92708 P. 714.593.5100 F. 714.593.5101 MARINA

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

Diablo Water District 2018 Facility Reserve Charge & MERA Update

Diablo Water District 2018 Facility Reserve Charge & MERA Update June 15, 2018 Diablo Water District 2018 Facility Reserve Charge & MERA Update This technical memorandum describes the 2018 update of the existing funding mechanisms used by Diablo Water District (DWD)

More information

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE I. INTRODUCTION City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE The City of Arroyo Grande, California (the City ) was incorporated as a general

More information

The City of Sierra Madre

The City of Sierra Madre The City of Sierra Madre Comprehensive Water and Wastewater Cost of Service Study Report / December 24, 2018 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145 www.raftelis.com December

More information

EASTERN MUNICIPAL WATER DISTRICT BIENNIAL BUDGET FISCAL YEARS AND

EASTERN MUNICIPAL WATER DISTRICT BIENNIAL BUDGET FISCAL YEARS AND EASTERN MUNICIPAL WATER DISTRICT BIENNIAL BUDGET FISCAL YEARS 2017-18 AND 2018-19 ADOPTED JUNE 7, 2017 STRATEGIC PLAN... 10 MISSION, VISION, AND GUIDING PRINCIPLES... 10 Mission... 10 Vision... 10 Guiding

More information

City Services Appendix

City Services Appendix Technical vices 1.0 Introduction... 1 1.1 The Capital Facilities Plan... 1 1.2 Utilities Plan... 2 1.3 Key Principles Guiding Bremerton s Capital Investments... 3 1.4 Capital Facilities and Utilities Addressed

More information

City of Ocoee Quarterly Report First Quarter Fiscal Year

City of Ocoee Quarterly Report First Quarter Fiscal Year City of Ocoee Quarterly Report First Quarter Fiscal Year 2008-2009 Prepared by the Finance Department February 2009 TABLE OF CONTENTS Quarterly Overview...i-iii General Fund... 1 Revenue Comparison Graph...

More information

Village of Baltimore Water & Wastewater Analysis. July 2018

Village of Baltimore Water & Wastewater Analysis. July 2018 Village of Baltimore Water & Wastewater Analysis July 2018 Table of Contents Introductory Summary... 1 Data... 1 Water Treatment Plant (WTP)... 1 Production... 2 Costs & Debts... 2 Wastewater Treatment

More information

Meeting & Outreach efforts

Meeting & Outreach efforts May 30, 2014 Meeting & Outreach efforts February 27th Proposed Compensation Plan Distributed to Joint Admin/WWOC March 5th Joint Admin/WWOC Meeting First discussion on proposed Compensation Plan April

More information

City of Rohnert Park SEWER FINANCIAL PLAN

City of Rohnert Park SEWER FINANCIAL PLAN City of Rohnert Park SEWER FINANCIAL PLAN AND RATE STUDY February 17, 2011 3053 Freeport Boulevard #158 Sacramento, CA 95818-4346 (916) 444-9622 www.thereedgroup.org TABLE OF CONTENTS I. EXECUTIVE SUMMARY...1

More information

Frequently Asked Questions from Claremont Customers

Frequently Asked Questions from Claremont Customers Frequently Asked Questions from Claremont Customers Why are Golden State s rates higher in Claremont than the neighboring communities of Rancho Cucamonga, Upland or La Verne? Golden State's rates reflect

More information

Water Rates DETERMINING THE REAL COST OF POTABLE WATER

Water Rates DETERMINING THE REAL COST OF POTABLE WATER Water Rates DETERMINING THE REAL COST OF POTABLE WATER Rates adopted in 2007 began producing sufficient revenue coverage to begin to develop an amount in the Water Capital Fund to be used on projects identified

More information

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente Final COST OF SERVICE STUDY SEPTEMBER 2017 City of San Clemente Contents CONTENTS Executive Summary... 1 Study Goals and Drivers... 1 Water Rate Analysis & Adoption... 2 Recycled Water Rate Analysis &

More information

River Edge Fiscal Impact Analysis

River Edge Fiscal Impact Analysis Final Report Prepared for: Carbondale Investments Prepared by: Economic & Planning Systems, Inc. EPS #20813 App. N-2 Table of Contents 1. INTRODUCTION AND SUMMARY OF FINDINGS... 1 Summary of Findings...

More information

Water Services Rate Study

Water Services Rate Study Report on the Water Services Rate Study Town of Telluride, Colorado Project No. 72447 August 2013 Water Services Rate Study prepared for Town of Telluride, Colorado August 2013 Project No. 72447 prepared

More information

Preliminary Rates Customer Workshop April 10, 2014 Gary Given, Sr. Business Analyst Doug Dunlap, Finance and Accounting Manager

Preliminary Rates Customer Workshop April 10, 2014 Gary Given, Sr. Business Analyst Doug Dunlap, Finance and Accounting Manager Preliminary 2015 2020 Rates Customer Workshop April 10, 2014 Gary Given, Sr. Business Analyst Doug Dunlap, Finance and Accounting Manager Topics for Today Base Case Assumptions Considerations Costs / Rate

More information

Charging arrangements for new connection services. Our latest proposals. December 2017.

Charging arrangements for new connection services. Our latest proposals. December 2017. Charging arrangements for new connection services. Our latest proposals. December 2017. 1 April 2018 to 31 March 2019 1 Index. Charging arrangements 1. Introduction... 2. You have a choice... Water charging

More information

Introduction to Water and Sewer Fund Needs August 11, 2017

Introduction to Water and Sewer Fund Needs August 11, 2017 Introduction to Water and Sewer Fund Needs August 11, 2017 A lot of good things are happening in Buffalo and we hope to make some exciting announcements in the months to come, especially about possible

More information

ES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives

ES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives Table of Contents Executive Summary ES.1 Findings and Recommendations... ES-1 Chapter 1. Introduction 1.1 Overview... 1-1 1.2 Current Rates... 1-1 1.3 Rate Making Objectives... 1-1 Chapter 2. Revenue Requirement

More information

SPRINGVILLE CITY PRESSURIZED IRRIGATION IMPACT FEE ANALYSIS (IFA) MAY 2014

SPRINGVILLE CITY PRESSURIZED IRRIGATION IMPACT FEE ANALYSIS (IFA) MAY 2014 SPRINGVILLE CITY PRESSURIZED IRRIGATION IMPACT FEE ANALYSIS (IFA) MAY 2014 Adopted May 20, 2014 TABLE OF CONTENTS IMPACT FEE CERTIFICATION... 3 SECTION 1: EXECUTIVE SUMMARY... 4 PROPOSED PRESSURIZED IRRIGATION

More information

PUBLIC ANNOUNCEMENT REQUEST FOR QUALIFICATIONS

PUBLIC ANNOUNCEMENT REQUEST FOR QUALIFICATIONS PUBLIC ANNOUNCEMENT REQUEST FOR QUALIFICATIONS of the Morrow Roachester & Morrow-Cozaddale Sewer Improvement Areas, Warren County Sewer District April, 2019 Warren County is accepting sealed statement

More information

Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges

Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges UNC School of Government EFC 2017 Water & Wastewater Finance Workshop February 28 March 1, 2017 The William & Ida Friday

More information

Public Hearing on Water and Sewer Rates. September 20, 2017

Public Hearing on Water and Sewer Rates. September 20, 2017 Public Hearing on Water and Sewer Rates September 20, 2017 Agenda Discuss Proposed Rates Impacts to Reserves and Financial Performance Rate Protest Comments Cost of Service and Rate Structure Study Recommendation

More information

City of Fridley Water and Sewer Rate Study. Jessica Cook 9/25/17

City of Fridley Water and Sewer Rate Study. Jessica Cook 9/25/17 City of Fridley Water and Sewer Rate Study Jessica Cook 9/25/17 1 Utility Funds They are Enterprise Funds 1. Should pay for Capital Outlays Operations Replacement Reserves Debt 2. Should be flush with

More information

CENTRAL WYOMING REGIONAL WATER SYSTEM JOINT POWERS BOARD MEETING PROCEEDINGS. February 20, 2018

CENTRAL WYOMING REGIONAL WATER SYSTEM JOINT POWERS BOARD MEETING PROCEEDINGS. February 20, 2018 CENTRAL WYOMING REGIONAL WATER SYSTEM JOINT POWERS BOARD MEETING PROCEEDINGS February 20, 2018 A public meeting of the Central Wyoming Regional Water System Joint Powers Board (Board) was held Tuesday,

More information

Final Report Water and Sewer Rate Model Town of Denton, MD

Final Report Water and Sewer Rate Model Town of Denton, MD Final Report Water and Sewer Rate Model Town of Denton, MD January 30, 2014 MCET Water and Sewer Rate Model for Denton, MD Page 1 Table of Contents Water and Sewer Rate Model Study Town of Denton, MD January

More information

Water Rate Study Final Report

Water Rate Study Final Report Phelan Pinon Hills Community Services District March 6, 2013 Water Rate Study Final Report Corporate Office: Anaheim, California Temecula Office: 27368 Via Industria, Suite 110 Temecula, California 92590

More information

TOWN OF CENTREVILLE, MARYLAND. Financial Statements Together with Report of Independent Public Accountants

TOWN OF CENTREVILLE, MARYLAND. Financial Statements Together with Report of Independent Public Accountants Financial Statements Together with Report of Independent Public Accountants For the Year Ended JUNE 30, 2010 TABLE OF CONTENTS Report of Independent Public Accountants 1 Management s Discussion and Analysis

More information

ANNUAL FINANCIAL REPORT CITY OF GROVES, TEXAS

ANNUAL FINANCIAL REPORT CITY OF GROVES, TEXAS ANNUAL FINANCIAL REPORT For the fiscal year ended September 30, 2010 3411 Richmond Avenue Suite 500 Houston, TX 77046 (P) 713.621.1515 (F) 713.621.1570 www.null-lairson.com ANNUAL FINANCIAL REPORT TABLE

More information

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS Black & Veatch Holding Company 2011. All rights reserved. COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 26 MAY 2015 B&V PROJECT NO.

More information

Eagle River Water and Sanitation District Vail, Colorado. Financial Statements December 31, 2014

Eagle River Water and Sanitation District Vail, Colorado. Financial Statements December 31, 2014 Vail, Colorado Financial Statements Financial Statements Table of Contents Page INDEPENDENT AUDITOR S REPORT Management s Discussion and Analysis A1 A2 B1 B8 Basic Financial Statements: Statement of Net

More information

Frequently Asked Questions

Frequently Asked Questions Welcome to the Shady Cove Municipal Water System Frequently Asked Questions Date Released: 7/6/12 The purpose of this document is to provide a list of frequently ask questions (FAQ s) relating to the proposed

More information

STORM WATER USER RATE STUDY

STORM WATER USER RATE STUDY LY STORM WATER USER RATE STUDY STORM WATER UTILITY OREM CITY, UTAH JANUARY 2016 PREPARED BY LEWIS YOUNG ROBERTSON & BURNINGHAM, INC. TABLE OF CONTENTS SECTION I: EXECUTIVE SUMMARY... 3 SECTION II: OVERVIEW

More information

FISCAL YEAR 2017 BUDGET PREPARATION MANUAL

FISCAL YEAR 2017 BUDGET PREPARATION MANUAL FISCAL YEAR 2017 BUDGET PREPARATION MANUAL Prepared by: County Manager' s Office October 30, 2015 This page left blank intentionally. Introduction and Background This budget preparation manual is designed

More information

CITY OF. Dixon. Water Enterprise Financial Plan Overview. City Council Meeting - March 27, 2018

CITY OF. Dixon. Water Enterprise Financial Plan Overview. City Council Meeting - March 27, 2018 t CITY OF Dixon Water Enterprise Financial Plan Overview City Council Meeting - March 27, 2018 1 STEPS IN CONDUCTING A RATE STUDY Financial Plan Evaluation of CIP and financing options Cash flow analysis

More information

The Village has had Village. age of. repair. were were 10,000 9,000. 8,000 Gallons 7,000 6,000 5,000 4, Even with the.

The Village has had Village. age of. repair. were were 10,000 9,000. 8,000 Gallons 7,000 6,000 5,000 4, Even with the. VILLAGE OF BUFFALO GROVE TO: Dane C. Bragg, Village Manager FROM: Scott D. Anderson, Finance Director DATE: September 14, 2011 RE: Water Fund 20 Year Pro Forma / Rate Recommendations History of Water and

More information

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT February 2, 218 This page was intentionally left blank. City of Calistoga Water Rate Study Report Page 2 February 2, 218 Dylan Feik City Manager City of

More information

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR Black & Veatch Holding Company 2011. All rights reserved. DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 21 MAY 2015 B&V PROJECT

More information