1 March 2011 Frontier Economics, Atkins, ITS Introduction Project overview Location The Lisbon Algarve railway project covers a significant part of the overall modernisation of the Algarve railway line (covering the Linha do Sul and Linha do Algarve). The part included in the current study covers the segment from Coina (near Lisbon) to Faro, including a branch to Porto de Sines. The project is part of the TEN-T Priority Project 8 (Multimodal Axis Portugal/Spain Rest of Europe). Figure 1. Algarve line from Lisbon to Faro Lisbon Pinhal Novo Coina PK 94 Sines Ermidas Funcheira Tunes Faro Source: Openstreetmap.org Description During the period 2000 to 2006, the Cohesion Fund contributed to the funding the following subprojects of the Algarve railway line: Subproject 2000PT16CPT003: This subproject covered two sections:

2 2 Frontier Economics, Atkins, ITS March 2011 Pinhal Novo Poceirão Pinheiro Ermidas (excluding section from Pinheiro to Km 94). Work on this section included the complete renewal of 35 kilometres of track, the construction of sidings for another 30.5 kilometres and the installation of the automatic control system. Linha de Sines (Ermidas to Porto de Sines). This involved mostly minor works as well as the partial renewal of 5 kilometres of track Subproject 2000PT16CPT012: Coina Pinhal Novo. This subproject involved the construction of a 800-metre tunnel, a 475-metre viaduct, and three new stations and 15 kilometres of track duplication. Subproject 2001PT16CPT001: Pinheiro to Km 94. This subproject involved the modernisation of 35 kilometres of track and the installation of the automatic control system. Subproject 2001PT16CPT003: This subproject covered two sections: Ermidas Faro. This involved the redoubling of 20 kilometres of track and the renewal of over 138 kilometres of track (complete renewal for 41 kilometres and partial renewal for 97 kilometres). It also involved the renewal of twelve stations, and the construction of a viaduct, a bridge and a station. Funcheira Ourique. This involved the complete electrification of the railway section and the installation of an automatic control system. The modernisation work started in 1997 and, according to the ex post capital expenditure data provided by REFER, it was mostly completed by However, based on the ex post passenger data, we believe that the line has been open to traffic since 2003, even without reaching maximum capacity. This maximum capacity on the line should coincide with the end of 2006 and beginning of 2007, when capital expenditures in the line stopped. Final reports show some delays in the completion of the projects. These time delays range between one and two years. Further evidence of delays happening in the project is the time indicated by the ex ante CBA regarding when the capital investments were supposed to take place and the actual time when these capital investments happened. The total aggregate value for the project was 419,026,183, while the total amount eligible for funding was 405,043,302 or 96 per cent of the total. The total Cohesion Fund contribution in the period was 323,486,946, equal to about 80% of the eligible project costs.

3 March 2011 Frontier Economics, Atkins, ITS Context Socio-economic context The line connects by rail Lisbon and the Algarve region in Portugal, and allows for future improvements in the railway connections between Portugal and the south of Spain, in Andalucía. It is worth noting that before the modernisation of the line started, there was no direct rail connection between Lisbon and the Algarve region, the renovation of the existing track was required and the line had important speed limitations due to the track and the obsolete signalling equipment. The part included in the current study covers the segment from Coina (near Lisbon) to Faro, including a branch to Porto de Sines. The project involved, among other works, the duplication of the track in some sections of the line, the electrification of parts of the line which were previously non-electrified, the construction of various new stations, and the installation of a new automatic control system to increase maximum speed in various sections of the line. Strategic policy context At the time when the ex ante cost benefit analysis was carried out, and the applications for funding submitted, the stated objectives of the project were: to increase the maximum speed on the line to 220km/h; to reduce the journey time between Lisbon and Faro to 2h 45min; to allow for better railway connections between the south and the north of Portugal; to reduce the operating costs of the line; to improve safety conditions and the quality of service on the line; and to reduce transportation costs and increase productivity levels in the area covered by the railway line. As mentioned above, the project is part of the TEN-T Priority Project 8 (Multimodal Axis Portugal/Spain Rest of Europe). This axis is expected to reinforce multimodal corridors linking Portugal and Spain, to contribute to the improvement of links between the centre of the EU and its peripheral regions, and to strengthen the Iberian Peninsula s position as a western European gateway. In relation to the objectives of the TEN-T Priority Project 8, the project contributes to the development in Portugal of a service platform that articulates the long-run transport between Europe on one side and America and Africa on

4 4 Frontier Economics, Atkins, ITS March 2011 the other side. This is one of the objectives stated by the Portuguese government in its transport policy strategy for the period Sources To carry out the analysis we have relied on a variety of different sources of information provided by DG REGIO and by stakeholders in Portugal. This allowed us to review the ex ante analysis undertaken to apply for EU funds. We have obtained Funding Applications and Funding Decisions for each of the four subprojects listed above from DG REGIO. Each application provided a detailed description of each subproject, its objectives and the costs and benefits that it was expected to generate. DG REGIO also provided additional supporting documentation, such as the initial overall cost-benefit analysis and final reports for each of the four subprojects to check the section have been completed. In addition, REFER also made available the spreadsheet containing the calculation underpinning the initial comprehensive cost-benefit analysis of the project The complete list of documents obtained, mainly related with the review of the ex ante analysis, is provided in Table 1.

5 March 2011 Frontier Economics, Atkins, ITS 5 Table 1. Summary of project-related documentation Documents Funding Applications All subprojects Funding Decisions All subprojects Ex ante CBA Intraplant Consult study (1996) Ferbritas study (1997) Pinhal Novo to Faro by REFER, covering 3 subprojects Ex ante CBA Spreadsheet calculation Pinhal Novo to Faro, covering 3 subprojects EIB Initial and Final reaction Subproject 2000PT16CPT003 Evaluation study (POVT) Subproject 2001PT16CPT001 Ex post evaluation, Projecto Lisboa Algarve Slide pack presentation of the completed project Environmental Impact reports All subprojects Final Payment declarations All subprojects Ex ante CBA Variante da Trofa (2010) Current ex ante CBA of a different rail link Obtained from DG REGIO DG REGIO DG REGIO and REFER REFER DG REGIO DG REGIO REFER DG REGIO DG REGIO REFER To carry out an ex post analysis of the project, REFER and CP (the train operating company) made available significant amounts of data, including outturn costs (capex and opex) and passenger numbers and updated values for other parameters (such as Value of Time). We provide a list of the data provided in Table 2.

6 6 Frontier Economics, Atkins, ITS March 2011 Table 2. Summary of Primary & Secondary Data Availability Data Source Issues Passenger and Freight numbers Infrastructure investment costs Infrastructure operating costs Train operating costs Revenues Value of time REFER REFER REFER REFER and CP REFER and CP REFER REFER and CP provided average operating costs for electric rolling stock CP provided average fares per passenger Based on two studies: For passengers: Calculating Transport Congestion and Scarcity Costs Final Report of the Expert Advisors to the High Level Group on Infrastructure charging (Working Group 2) May 1999 ; and For freight: Developing Harmonised European Approaches for Transporting Costing and Project Assessment Annex A An International Meta-Analysis of Values of Time March 2000 Vehicle operating costs REFER Based on 2000 and 2004 INFRAS/IWW studies Marginal costs of road travel and congestion Number of trains and train capacity REFER Based on 2000 and 2004 INFRAS/IWW studies REFER We had a meeting with REFER, CP, and POVT (Programa Operacional Temático Valorização do Território, the government programme for the implementation of infrastructure projects) with two key objectives: To clarify our understanding of the calculations and assumptions underpinning the ex ante CBA; and, To discuss the usefulness of the CBA in the decision-making process as experienced in the pilot project experience and in Portugal. Throughout this pilot project study we have also received regular support and advice (via and telephone) from POVT, REFER and CP in Portugal and from representatives of the DG REGIO Portuguese Geographic Unit Overview of any overall issue and challenges with the evaluation. REFER carried out two separate ex ante CBAs. The first covers three sections of the project, between Pinhal Novo and Faro. The second CBA, for the section

7 March 2011 Frontier Economics, Atkins, ITS 7 Coina-Pinhal Novo, covers a longer suburban route between Chelas and Pinhal Novo. It was not possible to extract the ex ante results applicable just to the Coina-Pinhal Novo section. For this reason, we have carried out an ex post CBA only for the section Pinhal Novo-Faro, which is directly comparable to the ex ante CBA. 3.2 Ex post cost-benefit analysis This section presents the results of the ex post evaluation of the section Pinhal Novo Faro Headline results from the analysis This section describes the key results obtained from the analysis we have carried out to assess the ex post outcome of this project, using historic data until Further details could be found in the Annexes Economic analysis We have identified two scenarios, a pessimistic one (low case) and an optimistic one (high case), which define a range of possible outcomes for the ex post CBA. To define the pessimistic scenario (Low case), we have considered the low outcome for benefits (driven by traffic volume). We have used the opposite assumption (i.e. high outcome for benefits) to define the optimistic scenario (High case). Table 3 summarises the results of the ex post analysis for each scenario. Table 3. Summary of ex post economic analysis (2008 prices) Low case High case Net Present Value ( m) Economic IRR (%) 6.7% 7.5% Benefit-cost ratio Source: Own calculation According to our analysis, the ex post NPV of the project, assessed for the period 1997 to 2004 and discounted at 5.5%, ranges between 48.5m and 79.5m in 2008 prices. The economic IRR ranges between 6.7% and 7.5%. Finally, the benefit-cost ratio ranges between 1.15 and 1.24, implying that the economic benefits of the project exceed its costs. The detailed results of the analysis are provided in Annexe 1.

8 8 Frontier Economics, Atkins, ITS March 2011 Financial analysis We have also carried a financial analysis for the Low case and High case scenarios. For each scenario, we have calculated the Financial Net Present Value and Financial Rate of Return, for both the investment FNPV(C) and FRR(C) and the capital employed FNPV(K) and FRR (K). Finally, by taking into account the EU and national contribution, we have also undertaken a financial sustainability analysis. Table 4 summarises the results of the financial analysis for each scenario. The analysis shows that, under each scenario, the project is not revenue-generating as the net present value of the costs over the assessment period exceeds the value of revenues. Table 4. Summary of ex post financial analysis (2008 prices) Low case High case Net Present Value Investment ( m) Financial IRR Investment (%) -3.6% -3.6% Net Present Value Capital ( m) Financial IRR Capital (%) 0.17% 0.17% Source: Own calculation The detailed results of the analysis are provided in Annexe 1. Wider socio-economic impacts As this project involved the upgrading of an existing railway line, rather than the construction of a new route, most of its benefits would come from time and maintenance savings, as well as from positive externalities such as the reduction in noise and pollution. These effects are already largely captured by the core CBA. Moreover, the lack of any form of impact monitoring since the opening, makes identifying a causal link between the project and any wider effect very problematic. In this kind of situations, it is difficult to separate the impacts of the project from the impact of other ongoing changes in the economy. Nonetheless, there is some evidence that per capita income might have improved in the regions connected by the railway line. It is however problematic to attribute these changes just to this project.

9 EUR (Millions) March 2011 Frontier Economics, Atkins, ITS Costs Costs are divided into two different categories. One-off costs According to REFER s historic data, the first expenditure on the Pinhal Novo- Faro section was made in 1997, on the sub-section Pinhal Novo-Poceirão- Ermidas, while the last substantial one was made in 2007, on the sub-section Ermidas-Faro. According to the cost data we have had access to, construction of the suburban section Coina-Pinhal Novo began in 2000 and was completed in Figure 2 shows the evolution of capital expenditure over time between 1997 and Figure 2. Capital expenditure 1997 to 2009 (, 2008 prices) Source: REFER We assume that REFER will not incur any further capital costs for both sections of the project as they are both complete. We further assume that, had REFER not undertaken this project, it would have not incurred any capital cost. 1 1 We recognise that this assumption is very conservative. It is likely that REFER would have incurred capital costs even in the absence of the intervention, mainly for renewals. However, as the ex ante CBA does not provide values for the do-nothing scenario, we have not been able to obtain an appropriate estimate for capital costs in the counterfactual. Assuming that REFER would have not incurred additional costs in the do-nothing scenario implies an overestimation of capital costs in the ex post evaluation

10 10 Frontier Economics, Atkins, ITS March 2011 Unit cost calculation REFER to provided disaggregated cost information by components and to provide unit costs for the various components. Table 5 presents, both in nondiscounted and in NPV terms (discounted at 5.5%), the unit costs of different investments (all in 2008 prices) we have been able to calculate using the information we received from REFER. Table 5. Summary of ex post unit costs (2008 prices) Non-discounted NPV (@ 5.5%) Level 1 All-in ( /km) 1,723,149 1,286,975 Track ( /km) 947, ,120 Stations ( /station) 4,084,850 2,995,137 Level 2 Stations ( /m2) Bridges ( /bridge) 3,053,717 2,237,135 Bridges ( /m2) 1,860 1,362 Source: Own calculation based on REFER data Ongoing costs. Operation costs REFER also provided data on historic operating costs for the period For the Pinhal Novo-Faro, operating costs start at about 8m per annum in 2004 and increase to 15m per annum in 2009 (with a peak of 16m in 2008).

11 EUR (Millions) March 2011 Frontier Economics, Atkins, ITS 11 Figure 3. Operating expenditure 2004 to 2009 (, 2008 prices) Source: REFER Because we were not provided with historic total operating cost information for CP, the train operator, it was calculated the average operating cost for electric rolling stock ( per train/km) reported by REFER and CP together with utilisation data described below. Also, to approximate the incremental operating costs in the ex post analysis, we assume that operating costs were 20% higher than what they would have been in a do-nothing scenario. Results are shown in Table 6. We note that, due to the uncertainty surrounding the assumptions that underpin this calculation, these values should be treated only as an indicative estimate of historic ex post costs.

12 12 Frontier Economics, Atkins, ITS March 2011 Table 6. Calculation of CP s operating costs (2008 prices) Passengers (000s) Passenger kms (millions)* Train kms (millions) Operating costs ( millions) Source: Own calculation using REFER and CP parameters (*) Assuming average travel length of 150 km Foregone government revenues The modal shift from road into rail implies that there will be a reduction in government revenues from fuel tax. REFER do not estimate this cost in the 1997 analysis. However, we believe that the ex post analysis should consider this effect to fully capture the costs of the project. Table 7 shows our estimate of the amount of foregone fuel tax revenues for the period 2003 to Table 7. Foregone revenue from fuel tax (2008 prices) million Foregone revenues Source: Our calculation, based on data from the OECD/EEA database on instruments used for environmental policy and natural resources management ( The future foregone fuel tax revenues are driven by the number of passenger kms on the line and they have been obtained using the average consumption for cars and light goods vehicles based on a small sample of popular vehicles 2. 2 For cars, we considered the extra-urban consumption of a Volkswagen Golf, a Seat Ibiza and a Renault Megane. For light goods vehicles, we considered the extra-urban consumption of a Renault Kangoo and a Volkswagen Caddy.

13 March 2011 Frontier Economics, Atkins, ITS Direct benefits To calculate the benefits of the project, we use the same approach, which REFER used for the 1999 cost-benefit analysis. However, REFER has since updated the parameters it uses to estimate the monetary value of time savings and of any reduction in road traffic. Given that these values are those currently used for assessing Portuguese rail projects, we believe it is appropriate to use them for this analysis. Traffic volumes For the section Pinhal Novo-Faro, REFER/CP provided us with the historic passenger numbers from 2003 the year of opening to Table 8 summarises the historic passenger numbers, and our assumptions relative to the breakdown into different sources of traffic. Table 8. Historic number of passengers (000s) (Pinhal Novo Faro) Total Existing New Of which: Induced (49%) Modal shift from cars (46%) Modal shift from collective vehicles (5%) Source: REFER/CP and our calculation based on initial REFER assumptions on sources of new traffic Because no forecast passenger numbers were available, we have decided to use a range of possible values for passenger numbers between 2009 and 2024, based around the assumptions of the ex ante analysis. Also we assume that the breakdown between induced traffic and modal shift remains constant over time. Regarding freight volumes, REFER provided data on total tonnes transported on the line between 2004 and 2009, as shown in Table 9.

14 14 Frontier Economics, Atkins, ITS March 2011 Table 9. Historic freight volumes (Pinhal Novo Faro) Million tonnes Freight Source: Our calculation based on CP data and initial REFER assumptions on sources of new traffic Time savings REFER now assumes a value of (in 2008 prices) per minute for each passenger. This value is based on the study Calculating Transport Congestion and Scarcity Costs Final Report of the Expert Advisors to the High Level Group on Infrastructure charging (Working Group 2) May In addition to considering time saving for passengers, REFER now also considers time savings for freight. Specifically, it assumes a benefit of 1.22 per hour per tonne of freight, based on the study Developing Harmonised European Approaches for Transporting Costing and Project Assessment Annex A An International Meta-Analysis of Values of Time March Finally, based on the ex post data provided, we assume that the average time saving per journey is 75 minutes. To calculate the benefits originating from modal shift, we assume that the average length of the journeys that are shifted away from road to rail is 150 km. This is the same assumption that REFER used in the ex ante CBA. In the absence of more detailed information, we believe it is appropriate to use the same assumption. Resource cost savings REFER has also updated the values it uses to estimate the resource cost savings associated with moving traffic away from road. These savings are due to a reduction in vehicle operating costs and road maintenance costs. REFER now assumes the cost for cars to be per kilometre and that each car carries, on average, 1.8 passengers. This implies a cost per passenger/km for cars of about For buses and goods vehicles, REFER assumes that the cost is both per passenger/km and per tonne/km. Revenues In the ex ante analysis, REFER considers only its expected incremental revenues under Option MAX, compared with the do-nothing scenario. However, for an ex ante CBA to capture the entire set of benefits, all revenues, including those accruing to the train operator, should be included. Table 10 shows the evolution of estimated incremental revenues from 2003 to 2009 using average fares per passenger km and passengers traffic distribution by

15 March 2011 Frontier Economics, Atkins, ITS 15 train type provided by CP. The assumption that total existing passengers do not change over time implies that revenues in the do-nothing scenario do not change over time. We have made this assumption in the absence of more specific information. Table 10. Estimated historic CP s incremental revenues (2008 prices) millions Total ex post revenues Do-nothing revenues Incremental revenues Source: Our calculation based on CP data and initial REFER assumptions on sources of new traffic Finally, we note that we have not been able to obtain sufficient information to estimate incremental revenues associated to the increase in freight volumes. However, as this amount is likely to be relatively small compared to total benefits, we do not consider its exclusion to have a significant impact on the overall ex post CBA. Terminal value In the ex ante analysis, REFER depreciates capital expenditure over 40 years, using a linear depreciation approach. For the ex post analysis, we apply the same approach to the historic capital expenditure that REFER incurred between 1997 and Externalities To calculate the total annual benefit of the project arising from reduction in pollution, climate change, noise, accidents and congestion, we multiply the unitary values shown below by the number of passengers assumed to travel on the line after re-opening that previously were travelling using road transport. Therefore these benefits only apply to modal shifters. In fact, they are the cost reductions achieved thanks to removing traffic from the roads. Pollution, climate change, noise and accidents Savings from reduction in pollution, climate change (mundança de clima), noise and accidents have been estimated. REFER has updated these values on the basis of two INFRAS/IWW studies. Specifically, these are External Costs of Transport Accident, Environmental and Congestion Costs in Western Europe March 2000 and

16 16 Frontier Economics, Atkins, ITS March 2011 External Costs of Transport Update Study, Final Report October The following tables summarise these marginal cost values, for both passengers and freight. We have used these values for our assessment of the ex post benefits of the project. Table 11. Marginal costs of road travel passengers ( per passenger/km) (2008 prices) Car Bus Light Goods Vehicle Heavy Goods Vehicle Pollution Climate change Noise Accidents Source: REFER, based on 2000 and 2004 INFRAS/IWW studies Congestion Savings from reduction in congestion have also been calculated. In the ex ante analysis, REFER did not have any reliable estimate for these benefits. For this reason, the ex ante CBA does not quantify the monetary value of the reduction in congestion associated with modal shift. However, REFER now includes an estimate of this cost in its cost-benefit analyses. Therefore, we have included a quantification of these benefits in our ex post analysis. The marginal values that REFER uses are shown in the following tables. Table 12. Marginal costs of congestion passengers ( per passenger/km) (2008 prices) Car Bus Light Goods Vehicle Heavy Goods Vehicle Congestion Source: REFER, based on 2000 and 2004 INFRAS/IWW studies Wider socio-economic impacts We have discussed the wider socio-economic impact of this project with stakeholders. It should be noted that this project involved the upgrading of an existing railway line, rather than the construction of a new route. Therefore, most of the benefits from this project would come from time and maintenance

17 March 2011 Frontier Economics, Atkins, ITS 17 savings, as well as from positive externalities such as the reduction in noise and pollution. These effects are already largely captured by the core CBA. Moreover, the lack of any form of impact monitoring since the opening, makes identifying a causal link between the project and any wider effect very problematic. In this kind of situations, it is difficult to separate the impacts of the project from the impact of other ongoing changes in the economy. Socio-economic impacts Information from Statistics Portugal (Instituto Nacional de Estatística) provided by REFER shows that those counties (concelhos) that have a direct relation with the Lisbon Algarve railway have increased their IPC (Indicador per Capita) with the exception of Setúbal. This index compares the purchasing power of a county with the average purchasing power of the whole country. Table 13 presents the figures. Table 13. IPC of Portuguese counties (Portugal = 100) County Palmela 92,77 90,03 103,96 Setúbal 119,94 114,46 113,03 Alcácer do Sal 52,47 58,58 80,96 Grândola 72,40 72,02 94,16 Santiago do Cacém 76,60 76,90 94,55 Ourique 49,27 56,44 64,59 Odemira 52,39 53,17 68,92 Silves 68,05 64,27 80,30 Source: Instituto Nacional de Estatística Environmental impacts REFER provided a list of studies related with environmental impact of the railway. These are listed in Table 14. All studies were undertaken either during construction or immediately after opening.

18 18 Frontier Economics, Atkins, ITS March 2011 Table 14. List of studies on environmental impact Section Date Author Traffic data? Estimation of Emissions Estimation of Noise effect Pinhal Novo / Setubal Jun Gibb Portugal No No Yes Km 94 / Ermidas Jan Febritas / Seia Yes Yes Yes Ermidas / Funcheira Sept Febritas / Seia Yes Yes Yes Pinheiro / Km 94 May 2003 Febritas /Ecossistema Yes Yes Yes Source: REFER According to these studies, there were no significant actions to undertake, apart from those already anticipated to mitigate any environmental impact during construction or afterwards. The only additional action was the implementation of a noise barrier in Funcheira, according to legal requirements. Additional issues According to stakeholders, the success of the project may have been limited by the capacity on the 25 de April bridge for medium and long distance trains in and out of Lisbon. Because of this constraint, according to REFER, journey times to Setúbal, Évora, Beja and Faro are normally higher than for road transport. Other projects RAVE (Rede Ferroviária de Alta Velocidade), is the Portuguese company whose mission is to develop and co-ordinate the necessary studies and projects to facilitate decisions on the planning, construction, financing, provision and operation of a high-speed rail network to be created in mainland Portugal and its connection with a similar Spanish network. Three routes are being considered: Lisbon Porto, Porto Vigo (Spain), and Lisbon Madrid. The latter will use part of the Lisbon Algarve railway track, specifically the Lisbon Évora section. According to RAVE, the Lisbon Porto service will be launched in 2015 and will reduce journey time from 2h35 to 1h15. The one hour Porto Vigo (Spain) service will be finished in Finally the Lisbon Madrid high-speed train will

19 March 2011 Frontier Economics, Atkins, ITS 19 start functioning in 2013 and will reduce travel time from 9 hours to less than 3 hours. Utilisation rates As requested by the TORs, we have considered the evolution of the utilisation rate of the project since opening. We have calculated this by considering, for each year, the ratio between the actual total number of passengers and the total potential number of passengers that could have travelled on the line given the installed capacity. Due to lack of appropriate data we consider only long distance trains ( longo curso ) and, based on the information received by REFER, we have estimated the average capacity to be 230 passengers per train. Table 15 shows the total number of trains between Pinhal Novo and Faro for each year in the period The table also shows the total maximum capacity available, the actual number of long distance passengers that travelled on the line during the same period and the utilisation rate. Table 15. Utilisation rates on the Pinhal Novo Faro route ( ) Number of trains 4,869 4,980 4,483 Maximum number of passengers (000s) Actual number of longdistance passengers (000s) 1,124 1,150 1, Utilisation rate 58% 61% 63% Source: Own calculation based on REFER data Based on our calculation, we have found that utilisation rates, on long distance trains only, ranges between 58% and 63%, with an average of about 61%. However, we note that, due the assumptions underpinning this calculation and the fact that it considers only one type of train service, this result should be treated as indicative Uncertainty and sensitivity analysis Despite the provision of generally comprehensive historic information we have had to assume certain parameters to be able to estimate some of the project impacts. This makes the results of the ex post evaluation dependent on these assumptions thereby increasing uncertainty.

20 20 Frontier Economics, Atkins, ITS March 2011 Historic data and current impacts Information provided by REFER/CP on historic passenger numbers from 2003 to 2009 should be treated with careful because it relies on strong assumptions: Existing passenger volumes before the implementation of the project. REFER/CP confirmed the assumption of 410,000 passengers per annum used in the original CBA. REFER has assumed that, in the do-nothing scenario, the total number of passenger would not change. New passengers. The data does not differentiate between induced traffic (that is, passengers that were not travelling before) and traffic from modal shift from road. Therefore, in the absence of specific information, we have used the same assumptions underpinning the traffic forecasts in the ex ante analysis. Forecast of impacts As mentioned above, we have identified two scenarios, a pessimistic one (low case) and an optimistic one (high case), which define a range of possible outcomes for the ex post CBA. The two scenarios differ on the traffic volume considered. Specifically, we have decided to use a range of possible values for passenger and numbers and freight volume between 2010 and 2024, based around the assumptions of the ex ante analysis. Low case: we assume that the total number of passengers reached in 2009 (824,000) remains constant until the end of the appraisal period. We also assume that the total number of tonnes of freight is 1,863,000 (subtracting 10% to the central value assumed) High case: we assume that the total number of passengers grows from the level reached in 2009 (824,000) to the value assumed in the ex ante CBA at the end of the period (830,000). We also assumed that the total number of tonnes of freight is 2,277,000 (adding 10% to the central value assumed) 3.3 Review ex ante cost-benefit analysis The first assessments of this project were carried in and These were mainly financial assessments and did not include an economic CBA. In Intraplan Consult Gmbh, Previsões de Procura e Avaliação Financeira para a Linha Lisboa/Algarve (November 1996) 4 Ferbritas/SMA, Estudo de Modernização da Linha Lisboa/Algarve (February 1997)

21 March 2011 Frontier Economics, Atkins, ITS 21 REFER extended these studies by preparing an ex ante CBA of the main implementation options. We focus our ex ante review on this analysis. 5 Given that it was not possible to extract an ex ante CBA for the Coina-Pinhal Novo section, the remainder of this review focuses on the main ex ante CBA which covers the route between Pinhal Novo and Faro Headline results from the analysis Economic analysis REFER carried out a complete ex ante CBA for two options, option MAX and option MIN. REFER assessed each option for a 28-year period, between 1997 and It assumed that capital costs would be incurred during the first three years. The line would open in 2000, with operating costs and revenues accounted for from that year onwards. Economic benefits (Beneficios Sociais) are also included from 2000 onwards. The CBA report presents the results of the calculations of benefits and costs for each year of the appraisal period. The CBA report shows the Net Present Value and the economic rate of return of each option, but it does not report the benefit-cost ratios. REFER calculates the NPV of the project using a 5% discount rate. Table 16 summarises the results of the cost-benefit analysis for both Option MAX and Option MIN. Table 16. Results of ex ante cost benefit analysis considering the period. Net Present Value (PTE million, 1997 prices) Net Present Value ( million, 2008 prices) Economic IRR (%) Option MAX 14, % Option MIN 16, % Source: REFER, Modernição da ligação ao Algarve, Estudio Económico-Financeiro, May 1999 Despite this lack of narrative, the financial and economic analyses included in the application forms for the various projects only provide the results corresponding to Option MAX. In addition, the 2000 revision of the ex ante CBA declares that 5 An updated analysis, from 2000, is also available. However, it only reports the results for one of the implementation options. The 1999 document is the last one providing the results of the CBA of all the main implementation options. 6 We have briefly reviewed the ex ante CBA covering the section between Chelas and Pinhal Novo. We believe that REFER used a similar approach to the one used in the section Pinhal Novo and Faro to carry out this CBA. Therefore, we believe that the methodological observation presented in Section 4.3 could be applied also to the Chelas to Pinhal Novo ex ante CBA, albeit at a high level.

22 22 Frontier Economics, Atkins, ITS March 2011 the option selected in the analysis coincides with Option MAX, 7 and as such only results corresponding to this option are shown. It is important to mention that the 2000 revision was recalculated with the inclusion of freight benefits that REFER omitted in the previous analysis. That version presents the results of the updated CBA, showing a benefit-cost ratio of 1.6. We note that this result refers only to three out of four subprojects, as it excludes the assessment of the section Coina Pinhal Novo. Table 17. Results of ex ante cost benefit analysis updated in 2000 Net Present Value (PTE million, 1997 prices) Net Present Value ( million, 2008 prices) Economic IRR (%) Benefit- Cost Ratio Option MAX 23, % 1.6 Source: REFER, Modernição da ligação ao Algarve, Estudio Económico-Financeiro (Actualização), November 2000 For comparisons purposes, we will consider this result when considering the ex post benefit-cost ratio of the project. Financial analysis The ex ante CBA documents we have reviewed provide the results of the financial analysis, but do not discuss the methodology REFER used to carry it out. Instead, the CBA documents simply refer to the 1997 and use the results of the financial analysis as starting point for the economic analysis. Table 18 presents the results of the financial analysis, showing the results of the financial analysis with and without EU contribution. REFER calculated the financial NPV using a 5% discount rate. 7 The ex ante REFER CBA of November 2000, used in the final version of the various application forms, literally indicates that the option chosen is Scenario C. The original ex ante CBA carried out by FERBRITAS in 1997 makes explicit that Scenario C corresponds to Option MAX.

23 March 2011 Frontier Economics, Atkins, ITS 23 Table 18. Results of ex ante cost benefit analysis NPV (PTE million, 1997 prices) NPV ( million, 2008 prices) FRR (%) Option MAX without EU grant Option MAX with 80% EU grant Option MIN without EU grant Option MIN with 80% EU grant -10, % 20, % -5, % 23, % Source: REFER, Modernição da ligação ao Algarve, Estudio Económico-Financeiro, May Key aspects of ex ante CBA The ex ante CBA considers two main options for implementation. These options are not defined within the CBA itself, but they are discussed in the financial study of February The 1997 study presents a very high level overview of the reference base case and of four alternative implementation scenarios. For each option, it provides a brief description of what type of works it entails, an indication of the type of rolling stock that would be used, its freight capacity and the estimated journey time. No further details are given. After providing this brief overview, the report selects, without any apparent justification, two of these four scenarios as the alternative implementation options. From this point onwards, these options, labelled option MAX, involving more significant works on the line, and option MIN, involving smaller interventions, are the only two alternatives that the CBA considers. Traffic forecast Using the information we received from REFER and the spreadsheet that was used to carry out the analysis in 1999, we have been able to re-construct the traffic forecasts assumptions underpinning the main cost-benefit analysis, including the implicit assumption about the number of existing passengers. Table 19 summarises the results of our analysis. We note that the assumptions on new traffic generated are lower than in the 1997 study. The shares of the various sources of traffic are similar to the initial assumptions, although now air

24 24 Frontier Economics, Atkins, ITS March 2011 and bus travel are not considered any longer. 8 Instead, REFER considers modal shift from cars and light good vehicles. 9 We note that the assumption on modal shift 51% of total new traffic is particularly high. However, this may be justified on the basis of the significant improvements to the line, which might have made rail a viable alternative for a large number of travellers. The analysis does not provide any justification for this assumption. Table 19. New annual passengers (in steady state) 1999 ex ante CBA Option MAX Option MIN Total existing passengers 410, ,000 Total new passengers 420, ,000 Of which: Induced traffic 205,800 (49%) 166,600 (49%) Modal shift from cars 193,200 (46%) 156,400 (46%) Modal shift from light goods vehicles 21,000 (5%) 17,000 (5%) Source: REFER, spreadsheet underpinning 1999 CBA calculations The analysis assumes that the number of new passengers from modal shift gradually builds up over the first four years since opening. The report does not disclose this assumption neither provides a justification for it. However, we have been able to re-construct it from the spreadsheet underpinning the analysis. Table 20 shows the increase in the number of new passengers from modal shift until it stabilises, while Table 21 shows the volume of induced traffic which is implied by the assumptions on modal shift. 8 The analysis does not provide any justification for this assumption. 9 Note that REFER considers light goods vehicles for their passenger traffic component, not for freight, which is not included in the 1999 analysis.

25 March 2011 Frontier Economics, Atkins, ITS 25 Table 20. Build-up of new passengers from modal shift and % of steady state Option Year 1 Year 2 Year 3 Year 4 Year 5 MAX 130,662 (61%) 167,076 (78%) 186,354 (87%) 190,638 (89%) 214,200 (100%) MIN 117,912 (68%) 142,188 (82%) 154,326 (89%) 157,794 (91%) 173,400 (100%) Source: REFER, spreadsheet underpinning 1999 CBA calculations Table 21. Build-up of new passengers from induced traffic and % of steady state Option Year 1 Year 2 Year 3 Year 4 Year 5 MAX 125,538 (61%) 160,524 (78%) 179,046 (87%) 183,162 (89%) 205,800 (100%) MIN 113,288 (68%) 136,612 (82%) 148,274 (89%) 151,606 (91%) 166,600 (100%) Source: REFER, spreadsheet underpinning 1999 CBA calculations Overall, the assumptions on traffic forecasts are complete and they allow the calculation of the project s key benefits (time savings and vehicle operating costs) and positive externalities (for example, reduction in pollution and number of traffic accidents). However, their presentation in the CBA documents is opaque. With rare exceptions, the documents provide a clear justification for the assumptions made, both in terms of existing traffic and new passengers. With regards to freight, it is unclear whether assuming an additional two million tonnes as a result of Option MAX was appropriate. Given that rail freight has increased significantly since the early 1990s, part of this growth could have taken place also under a do-nothing scenario Quality of ex ante CBA Overall, the ex ante analysis we have reviewed (both the original 1997 analysis and the subsequent 2000) appears to be complete in its core parts. The methodology used takes into account a variety of different impacts, including several externalities such as noise, pollution and congestion.this is not common for the projects we have reviewed in this evaluation. Despite the completeness of the core analysis, we found the approach used lacking in two aspects, specifically:

26 26 Frontier Economics, Atkins, ITS March 2011 the reports accompanying the ex ante applications are often too concise and somewhat cryptic, making the reconstruction of the analysis very difficult; the analysis does not consider a variety of different options, particularly in its latest iteration, where only one option (Option MAX) is actually analysed. 3.4 Differences between ex post and ex ante analysis Table 22 compares the results of the ex ante economic analysis of Option MAX with the results of the ex post CBA for the section Pinhal Novo Faro. Table 22. Comparison of ex ante and ex post economic CBA (2008 prices) Ex ante Ex post Low case High case Net Present Value ( m) Economic IRR (%) 9.1% 6.7% 7.5% Benefit-cost ratio Source: REFER for ex ante analysis and own calculation for ex post analysis Overall, REFER estimated that the project would deliver value for money, with an NPV of about 156m and a benefit-cost ratio of about 1.6. While this result is outside the range of the ex post CBA, the two analyses are largely consistent. The ex post analysis has confirmed the economic benefits of the project exceed its costs. The main differences between the two analyses stem from the following areas: forecast and actual traffic volumes, expected and actual capital cost, approach to the benefit calculation, inclusion of additional impacts, and discount rate. We briefly address each in turn. Traffic volumes With regards to traffic volumes, the main difference between the ex ante and ex post analyses lies in the number of passengers in the first ten years of the project assessment period. Specifically, the ex ante analysis assumes that: the line would be re-opened to traffic already from 2000; and, at the time of re-opening, total traffic would already be at about 80% of the long run level and it would reach that level in about four years.

27 Passengers (000s) March 2011 Frontier Economics, Atkins, ITS 27 Looking at historic passenger data, we found that the line was instead re-opened in At re-opening, traffic was lower than estimated in the ex ante analysis. However we have noticed a faster growth rate, leading to traffic reaching a level very close to the ex ante steady state by Overall, while the traffic growth profile for the first years of operation has turned out to bee too optimistic, the long-term forecast is quite accurate. Figure 4 compares total passenger numbers in the ex ante and ex post analyses. Figure 4. Ex ante and ex post passenger numbers ( ) Ex ante assumption Ex post actual passengers Source: REFER Capital costs Capital costs are the main difference between the ex ante analysis and the ex post evaluation of the project. The nature of this difference relates to the time when the capital costs were incurred and the total amount of capital expenditures. In the ex ante analysis, REFER assumes that capital cost would be incurred in the first three years of the assessment period ( ). However, the ex post historic data shows that, while REFER started incurring costs in 1997, the bulk of the capital expenditure costs took place between 2001 and This has had the following implications: In nominal terms, REFER spent more than expected. In the ex ante analysis, it envisaged that capital expenditure would be 268m. Instead, the actual capital expenditure was 406m (about 51% higher). We could not identify the cause for this cost overrun.

28 EUR (millions) 28 Frontier Economics, Atkins, ITS March 2011 However, due to the different expenditure profile, the NPV of ex ante and ex post capital costs is not as different. Using a 5.5% discount rate, the NPV of capital expenditure in the ex ante analysis is 252m, while the NPV of the actual capital expenditure is 306m (21% higher). Ex post expenditure profile implies a higher terminal value for the project, as investment should be depreciated from the year in which it is incurred. Figure 5 shows the profiles of capital expenditure in the ex ante and ex post cases. Figure 5. Ex ante and ex post capital expenditure ( m, 2008 prices) 160 Ex post actual capital expenditure 140 Ex ante assumption Source: REFER Approach to benefit calculation With regards to benefit calculation, there are two main causes for the difference between the ex ante and ex post analyses. Different parameters. For the ex post CBA we have used updated values for all the parameters used to calculate the benefits of the project, ranging from the value of time to the reduction of vehicle operating costs and pollution thanks to modal shift. These updated values are those that

29 March 2011 Frontier Economics, Atkins, ITS 29 REFER currently uses. 10 In addition, REFER has now introduced a value to estimate the benefit from the reduction in road congestion, which was not available at the time of the ex ante analysis. The use of these updated values in the ex post analysis has had the effect of increasing the value of benefits, if compared with the ex ante analysis. Application of rule of half. We have used the rule of half for the calculation of the benefits from time savings (see Annexe 2). Based on the calculations for the ex ante analysis, REFER did not apply the rule of half. This has potentially led to an over-estimation of the project s benefits in the ex ante analysis. Accordingly, we have applied the rule of half in the ex post CBA. This has had the effect decreasing the value of benefits, if compared with the ex ante analysis. Inclusion of additional impacts The ex ante CBA does not include two elements that we believe should be included in analysis. Total revenues. REFER carried out the 1999 cost-benefit analysis (and its updated version) from the point of view of REFER itself. REFER is the network operator, while CP (and Fertagus) provide rail services. As REFER s revenues only amount to the network charges paid by the train operators, we believe that this analysis is not sufficiently comprehensive. For this reason, in the ex post CBA we have considered CP s revenues. Foregone government revenues from the fuel tax. The modal shift from road to rail implies a reduction in overall fuel consumption, which, in turn, implies lower government revenues from the fuel tax. This effect offsets the benefits of the project. REFER did not include this impact in the ex ante CBA. Discount rate Finally, we note that, in the ex ante analysis, REFER calculated the NPV of the project using a 5% discount rate, as suggested by the guidance available at the time. Currently, the EC Guide on Investment Appraisal recommends using a 5.5% discount rate. We have used this last value for the ex post evaluation. Table 23 compares the results of the ex post and ex ante economic CBA when holding constant the discount rate at 5%. The results of the ex post CBA are in this case closer to ex ante results, even though the later are still outside the range 10 We have extracted these updated values from an ex ante CBA that REFER has recently elaborated (March 2010) Variante da Trofa.

A Summary of Changes to the HS2 Economic Case

A Summary of Changes to the HS2 Economic Case A Summary of Changes to the HS2 Economic Case April 2011 Contents 1 Introduction 4 2 Cost Changes 6 3 Appraisal Changes 7 4 Summary of Changes 9 Annex 1: Capital Costs 10 Annex 2: Operating Costs 13 Annex

More information

Fertagus Concession Contract

Fertagus Concession Contract Fertagus Concession Contract 2013 FERTAGUS is a company part of the BARRAQUEIRO GROUP that won the public international contest for the railway exploitation of the north/south passage launched by the portuguese

More information

Thematic Evaluation of the Impact of Structural Funds on Transport Infrastructures. Final Report November 2000

Thematic Evaluation of the Impact of Structural Funds on Transport Infrastructures. Final Report November 2000 European Commission Directorate-General Regional Policy Thematic Evaluation of the Impact of Structural Funds on Transport Infrastructures Final Report November 2000 Oscar Faber - United Kingdom ECOTEC-

More information

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Massimo Marra JASPERS Networking and Competence Centre IPA Conference Impact Assessment What can we

More information

CBA of transport infrastructure projects in Germany

CBA of transport infrastructure projects in Germany CBA of transport infrastructure projects in Germany Dr. Catharina Horn Federal Transport Infrastructure Planning, Investment Policy Paris, 27th of February 2014 www.bmvi.de 1. The Federal Transport Infrastructure

More information

Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC)

Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) - Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) Final Submission November 2014 Email:- info@transportinsights.com Telephone:- + 353

More information

FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT

FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT This list of frequently asked questions is based on comments received from Member States (MS) on Part II of the Guidance on ex ante conditionalities

More information

Final report Appendix 9B: Socio-economic calculation

Final report Appendix 9B: Socio-economic calculation The Danish Road Directorate Trial with European Modular System Final report Final report Appendix 9B: Socio-economic calculation results This appendix shows the results of the socio-economic calculations

More information

Preparing a Cost Benefit Analysis and Cost-Effectiveness Analysis

Preparing a Cost Benefit Analysis and Cost-Effectiveness Analysis Preparing a Cost Benefit Analysis and Cost-Effectiveness Analysis 2017 CEF Transport SESAR call Information Day - 19 October 2017 Julien Bollati Financial Engineering Manager INEA - Innovation and Networks

More information

ENVIRONMENT AND TRANSPORT

ENVIRONMENT AND TRANSPORT EUROPEAN COMMISSION REF Nº:... ANNEX D PROJECT TITLE:.. THE COHESION FUND - 000-006 APPLICATION FOR ASSISTANCE COUNCIL REGULATION (EC) N 64/94 of 6 May 994 COUNCIL REGULATION (EC) N º 64/99 of June 999

More information

Marsh Barton Rail Station Draft Benefits Realisation Plan and Monitoring and Evaluation Plan

Marsh Barton Rail Station Draft Benefits Realisation Plan and Monitoring and Evaluation Plan Draft Benefits Realisation Plan and Monitoring and Evaluation Plan May 2014 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD Contents 1 Scheme Background and Context... 3 1.1 Description

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Chittagong-Cox s Bazar Railway Project, Phase 1 (RRP BAN 46452-002) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will construct 102

More information

Cost Benefit Analysis of Alternative Public Transport Funding in Four Norwegian Cities

Cost Benefit Analysis of Alternative Public Transport Funding in Four Norwegian Cities TØI report 767/2005 Author(s): Bård Norheim Oslo 2005, 60 pages Norwegian language Summary: Cost Benefit Analysis of Alternative Public Transport Funding in Four Norwegian Cities The Ministry of Transport

More information

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million) Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising

More information

Manual Cost Benefit Analysis

Manual Cost Benefit Analysis Republic of Serbia MINISTRY OF INFRASTRUCTURE Manual Cost Benefit Analysis Republic of Serbia Reference R20100299/31275000/ABU/EGR Version 6.0 Zoetermeer, December 2010 R20100299.doc Preface Serbia is

More information

Proposal for a COUNCIL DIRECTIVE

Proposal for a COUNCIL DIRECTIVE EUROPEAN COMMISSION Brussels, 31.5.2017 COM(2017) 276 final 2017/0115 (CNS) Proposal for a COUNCIL DIRECTIVE amending Directive 1999/62/EC on the charging of heavy goods vehicles for the use of certain

More information

THE RESEARCH INTO METHODOLOGY FOR EVALUATION OF TRANSPORT INFRASTRUCTURE INVESTMENTS

THE RESEARCH INTO METHODOLOGY FOR EVALUATION OF TRANSPORT INFRASTRUCTURE INVESTMENTS Proceedings of the 9th International Conference Reliability and Statistics in Transportation and Communication (RelStat 09), 21 24 October 2009, Riga, Latvia, p. 15-19. ISBN 978-9984-818-21-4 Transport

More information

Impact of Next Generation Infrastructure on Australian Cities

Impact of Next Generation Infrastructure on Australian Cities Impact of Next Generation Infrastructure on Australian Cities ISNGI 2017 Institution of Civil Engineers, London 13 September 2017 Dr. Fariba Ramezani Associate Research Fellow SMART Infrastructure Facility

More information

Prioritisation Methodology

Prioritisation Methodology Prioritisation Methodology March 2014 PRIORITISATION METHODOLOGY Table of contents 1 Introduction... 5 2 The Projects Prioritisation Process... 7 3 The Methodological Assumptions... 8 3.1 Background...

More information

Economic Assessment of a Fixed Link across the Fehmarn Belt

Economic Assessment of a Fixed Link across the Fehmarn Belt Danish Ministry of Transport Economic Assessment of a Fixed Link across the Fehmarn Belt Summary Report March 2004 in cooperation with Danish Ministry of Transport Economic Assessment of a Fixed Link across

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 2.0 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was updated further

More information

I-75 at Overpass Road Interchange

I-75 at Overpass Road Interchange Benefit-Cost Analysis Supplementary Documentation TIGER Grant Program I-75 at Overpass Road Interchange Pasco County, FL October 16, 2017 0 Benefit-Cost Analysis Supplementary Documentation 1. Introduction

More information

Draft Environmental Impact Statement. Appendix G Economic Analysis Report

Draft Environmental Impact Statement. Appendix G Economic Analysis Report Draft Environmental Impact Statement Appendix G Economic Analysis Report Appendix G Economic Analysis Report Economic Analyses in Support of Environmental Impact Statement Carolina Crossroads I-20/26/126

More information

Official Journal of the European Union

Official Journal of the European Union L 70/36 COMMISSION IMPLEMTING REGULATION (EU) 2015/429 of 13 March 2015 setting out the modalities to be followed for the application of the charging for the cost of noise effects (Text with EEA relevance)

More information

ECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive

ECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive Western Regional Road Corridor Investment Program (RRP MON 41193) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. Project Costs. The project s capital costs include the costs of the road works, design,

More information

Lancashire County Council. A682 Centenary Way Viaduct Refurbishment Scheme. Benefit Cost Analysis and Gross Value Added Assessment Technical Note

Lancashire County Council. A682 Centenary Way Viaduct Refurbishment Scheme. Benefit Cost Analysis and Gross Value Added Assessment Technical Note Lancashire County Council A682 Centenary Way Viaduct Refurbishment Scheme Benefit Cost Analysis and Gross Value Added Assessment Technical Note March 2015 Document Control Sheet BPP 04 F8 Version 15; March

More information

Major projects CBA for transport sector Brussels, 30 September 2015

Major projects CBA for transport sector Brussels, 30 September 2015 Regional Major projects 2014-2020 - CBA for transport sector Brussels, 30 September 2015 Major projects 2007-2013 Witold Willak Head of Sector, Major Projects, Unit G1 for Smart and Sustainable growth,

More information

PROJECT DESCRIPTIONS. 15 th March Frontier Economics Ltd, London.

PROJECT DESCRIPTIONS. 15 th March Frontier Economics Ltd, London. Ex post evaluation of cohesion policy interventions 2000-2006 financed by the Cohesion Fund Work Package B: Cost-benefit analysis of selected transport projects PROJECT DESCRIPTIONS 15 th March 2010 Frontier

More information

1 Malta. 1.1 Introduction

1 Malta. 1.1 Introduction 1 Malta 1.1 Introduction This Country Summary for Malta has been produced as part of the Task 5 of the Ex Post Evaluation of Cohesion Policy Interventions 2000-2006 by the Cohesion Fund (including former

More information

UPDATED BRIEFING NOTE

UPDATED BRIEFING NOTE UPDATED BRIEFING NOTE Transport Aspects of Budget 2018 and Mid-Term Review of the Capital Plan Budget 2018 The general taxation changes have already been widely reported in media coverage of Budget 2018

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 12.0 07/01/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was

More information

Investing In Our Transport Future: A Strategic Framework for Investment in Land Transport. Background Paper Thirteen

Investing In Our Transport Future: A Strategic Framework for Investment in Land Transport. Background Paper Thirteen Investing In Our Transport Future: A Strategic Framework for Investment in Land Transport Background Paper Thirteen Analysis of Steady State Cost of Transport in Ireland Issued by: Economic and Financial

More information

Department for Transport. Transport Analysis Guidance (TAG) Unit Guidance on Rail Appraisal

Department for Transport. Transport Analysis Guidance (TAG) Unit Guidance on Rail Appraisal Department for Transport Transport Analysis Guidance (TAG) Unit 3.13.1 Guidance on Rail Appraisal August 2007 1 Contents 1 Introduction 3 1.1 Background 3 1.2 Scope and Structure 3 2 SRA Appraisal Criteria

More information

SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP. Module 6 Implementation Plan

SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP. Module 6 Implementation Plan SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP Module 6 Implementation Plan Sustainable Urban Mobility Plans: Delivery & Implementation Plans Identifying phased approach to delivery and programming

More information

Project Appraisal Guidelines for National Roads Unit Minor Projects ( 0.5m to 5m)

Project Appraisal Guidelines for National Roads Unit Minor Projects ( 0.5m to 5m) Project Appraisal Guidelines for National Roads Unit 14.0 - Minor Projects ( 0.5m to 5m) February 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII)

More information

DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT

DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT DRAFT 21.05.2013 DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT OF THE OPERATIONAL PROGRAMME Version 3 21.05.2013 This document is based on the Presidency compromise text (from 19 December 2012), which

More information

COMMISSION OPINION. of

COMMISSION OPINION. of EUROPEAN COMMISSION Brussels, 10.12.2014 C(2014) 9313 final COMMISSION OPINION of 10.12.2014 in accordance with Article 7h(2) of Directive 1999/62/EC concerning the introduction of a new tolling arrangement

More information

! " #"! $%& "%! ' "!( )

!  #! $%& %! ' !( ) !" #$ 1! " #"! $%& "%! ' "!( ) 2 This appendix report comprises the pre-feasibility analyses conducted in connection with the REBIS project. This section provides a description of the process, the methodology

More information

Projections for the Portuguese economy:

Projections for the Portuguese economy: Projections for the Portuguese economy: 217-19 7 Projections for the Portuguese economy: 217-19 1. Introduction The projections for the Portuguese economy point to a continued economic activity recovery

More information

Transport & Environment Does the money match the targets? Aligning EU investments in transport infrastructure with EU climate targets

Transport & Environment Does the money match the targets? Aligning EU investments in transport infrastructure with EU climate targets Transport & Environment Does the money match the targets? Aligning EU investments in transport infrastructure with EU climate targets Pia Nieminen 7.12.2016 EIB: The EU Bank Independent institution founded

More information

This update fully addresses the issues raised by DfT in its response to the February 2008 submission.

This update fully addresses the issues raised by DfT in its response to the February 2008 submission. Executive Summary Introduction 1. This document forms the Major Scheme Business Case (MSBC) submission to the Department for Transport (DfT), seeking Programme Entry for Croxley Rail Link. It is the culmination

More information

Options for Breich Station. Appraisal Report

Options for Breich Station. Appraisal Report Options for Breich Station Appraisal Report Updated document dated August 2017 Contents Executive Summary 3 Introduction and Objectives 5 Scheme Options and Base Case 8 Costs and Benefits 11 Appraisal

More information

Cost Benefit Analysis (CBA) Economic Analysis (EA)

Cost Benefit Analysis (CBA) Economic Analysis (EA) Cost Benefit Analysis (CBA) Economic Analysis (EA) This is an overview of the preliminary work that should be completed before launching into a full CBA to determine the net economic worth of a proposal

More information

TRANS-EUROPEAN NETWORKS GUIDELINES

TRANS-EUROPEAN NETWORKS GUIDELINES TRANS-EUROPEAN NETWORKS GUIDELINES The Treaty on the Functioning of the European Union (TFEU) retains the trans-european networks (TENs) in the areas of transport, energy and telecommunications, first

More information

32 nd Street Corridor Improvements

32 nd Street Corridor Improvements Benefit-Cost Analysis Supplementary Documentation TIGER Discretionary Grant Program 32 nd Corridor Improvements USDOT TIGER BCA Results City of Joplin, MO April 29, 2016 32nd Corridor Improvements Contents...

More information

Project Appraisal Guidelines for National Roads Unit Guidance on using COBALT

Project Appraisal Guidelines for National Roads Unit Guidance on using COBALT Project Appraisal Guidelines for National Roads Unit 6.4 - Guidance on using COBALT October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is

More information

GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER TWO PROGRAMMING PERIODS

GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER TWO PROGRAMMING PERIODS 29/03/2012 COCOF_12-0047-02-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DIRECTORATE-GENERAL EMPLOYMENT, SOCIAL AFFAIRS and EQUAL OPPORTUNITIES GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER

More information

Pre-seen analysis. T Railways. Note: The enclosed document in no way indicates what is likely to be examined in the un-seen information on exam day.

Pre-seen analysis. T Railways. Note: The enclosed document in no way indicates what is likely to be examined in the un-seen information on exam day. Pre-seen analysis T Railways Note: The enclosed document in no way indicates what is likely to be examined in the un-seen information on exam day. Contents Pre-seen analysis of T Railways E3 Tips and Guidance

More information

A Rede Ferroviária Nacional REFER, E.P.

A Rede Ferroviária Nacional REFER, E.P. A Rede Ferroviária Nacional REFER, E.P. Sede: Estação de Santa Apolónia 1100-105 Lisboa Capital Social: Eur 305.200.000 Matriculada na C.R.C. Lisboa n.º 646 Pessoa Colectiva n.º 503 933 813 A REFER, E.P.

More information

Funding and financing solutions for urban rail systems

Funding and financing solutions for urban rail systems Funding and financing solutions for urban rail systems Arturs Alksnis Public Affairs Manager 5 th European Conference on Sustainable Urban Mobility Plans 15 May 2018, Nicosia, Cyprus UNIFE is the European

More information

The EIB: 40 years supporting your projects in Portugal

The EIB: 40 years supporting your projects in Portugal The EIB: 40 years supporting your projects in Portugal The European Investment Bank (EIB) is a long-standing partner of Portugal. The Bank started supporting the Portuguese economy even before the country

More information

COMMON APPRAISAL FRAMEWORK FOR TRANSPORT PROJECTS AND PROGRAMMES

COMMON APPRAISAL FRAMEWORK FOR TRANSPORT PROJECTS AND PROGRAMMES COMMON APPRAISAL FRAMEWORK FOR TRANSPORT PROJECTS AND PROGRAMMES March 2016 OVERVIEW OF 2016 COMMON APPRAISAL FRAMEWORK This guidance document replaces the 2009 Guidelines on a Common Appraisal Framework

More information

Review of Operating Expenses

Review of Operating Expenses Review of Operating Expenses Workstream Report 31 March 2011 Page 1 of 14 Table of contents 1 Executive Summary... 1 2 Summary of Business Case... 2 2.1 Summary of Business Case content relating to workstream...

More information

REVISED GUIDANCE NOTE ON ARTICLE 55 FOR ERDF AND CF

REVISED GUIDANCE NOTE ON ARTICLE 55 FOR ERDF AND CF Final version of 30/11/2010 COCOF 07/0074/09 EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY REVISED GUIDANCE NOTE ON ARTICLE 55 FOR ERDF AND CF OF COUNCIL REGULATION (EC) NO 1083/2006: REVENUE-GENERATING

More information

SEMINAR PARIS NOVEMBER 2003 CONTRIBUTION

SEMINAR PARIS NOVEMBER 2003 CONTRIBUTION UNECE - TRANSPORT INFRASTRUCTURE DEVELOPMENT FOR A WIDER EUROPE SEMINAR PARIS 27-28 NOVEMBER 2003 SESSION 2 FINANCING OF THE INFRASTRUCTURE CONTRIBUTION FINANCING OF TRANSPORT INFRASTRUCTURE IN SLOVENIA

More information

Departmental Spending. Department for Transport

Departmental Spending. Department for Transport Departmental Spending Day-to-day Spending (Resource DEL) DfT spends 1.2% of total Resource DEL Spending Review 2015 The SR planned overall decreases to the Resource DEL Transport Budget over the period

More information

Major projects in the programming period

Major projects in the programming period Regional Major projects in the 2014-2020 programming period Major Project Team Unit G.1 Competence Centre: Smart and Sustainable Growth DG Regional and Urban Legal framework 2014-2020 Regional New Cohesion

More information

Ex-Ante Evaluation (for a Japanese ODA Loan)

Ex-Ante Evaluation (for a Japanese ODA Loan) Ex-Ante Evaluation (for a Japanese ODA Loan) 1. Name of the Project Country: The Republic of Tunisia Project: Metropolitan Railway Electrification Project (II) Loan Agreement: March 11, 2010 Loan Amount:

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

Extended impact assessment of the

Extended impact assessment of the COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 01.10.2003 SEC(2003) 1060 COMMISSION STAFF WORKING PAPER Extended impact assessment of the proposal amending the amended proposal for a decision amending

More information

NATIONAL LAND TRANSPORT PROGRAMME / INformation sheet / october 2012

NATIONAL LAND TRANSPORT PROGRAMME / INformation sheet / october 2012 NATIONAL LAND TRANSPORT PROGRAMME 2012 15 / INformation sheet / october 2012 Creating transport solutions for a thriving New Zealand The NZ Transport Agency Board has adopted the 2012 15 National Land

More information

Support for the construction of airport infrastructure (investment aid); Support for the operation of airport infrastructure (operating aid); and

Support for the construction of airport infrastructure (investment aid); Support for the operation of airport infrastructure (operating aid); and INFRASTRUCTURE ANALYTICAL GRID N 2 1 CONSTRUCTION OF AIRPORT INFRASTRUCTURES Disclaimer: The contents seek to reflect the current rules and decisional practice and do not prejudge possible developments

More information

Alchemy Economics the UK government s conjuring trick to justify airport expansion"

Alchemy Economics the UK government s conjuring trick to justify airport expansion Alchemy Economics the UK government s conjuring trick to justify airport expansion" Prepared by: Keith Buchan of Transport Climate Commissioned by WWF-UK June 2008 Page 1 of 6 Alchemy Economics the UK

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ANNUAL REPORT ON THE COHESION FUND (2003) (SEC(2004) 1470)

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ANNUAL REPORT ON THE COHESION FUND (2003) (SEC(2004) 1470) COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 15.12.2004 COM(2004) 766 final. REPORT FROM THE COMMISSION ANNUAL REPORT ON THE COHESION FUND (2003) (SEC(2004) 1470) EN EN TABLE OF CONTENTS 1. Budget

More information

European Company Copyright 2005 Italplan Engineering, Environment & Transports S. p. A. Italy - All Rights Reserved

European Company Copyright 2005 Italplan Engineering, Environment & Transports S. p. A. Italy - All Rights Reserved www.italplan.com European Company Copyright 2005 Italplan Engineering, Environment & Transports S. p. A. Italy - All Rights Reserved Who We Are Italplan is an Italian engineering company in depth experience

More information

Ex ante evaluation of the TEN-T Multi Annual Programme

Ex ante evaluation of the TEN-T Multi Annual Programme Ex ante evaluation of the TEN-T Multi Annual Programme 2007-2013 Framework Contract for Ex-ante evaluations and Impact Assessments (TREN/A1/46-2005) FINAL REPORT-2 Date: 22 October 2007 Client: European

More information

Chapter 8: Lifecycle Planning

Chapter 8: Lifecycle Planning Chapter 8: Lifecycle Planning Objectives of lifecycle planning Identify long-term investment for highway infrastructure assets and develop an appropriate maintenance strategy Predict future performance

More information

Planeamento e Gestão da Mobilidade Urbana. Sessão 3:

Planeamento e Gestão da Mobilidade Urbana. Sessão 3: Mestrado em Ordenamento do Território e Urbanismo Planeamento e Gestão da Mobilidade Urbana João de Abreu e Silva Sessão 3: - Organização e Custos do Sistema de Transportes (agradecimentos: Prof Rosário

More information

Presentation at Civitas Forum

Presentation at Civitas Forum 12/10/2017 1 Presentation at Civitas Forum Kim Kreilgaard Head of EIB Group Office in Portugal 28th September at Torres Vedras European Investment Bank Group 12/10/2017 2 Largest multilateral lender and

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ANNUAL REPORT OF THE COHESION FUND (2004) {SEC(2005)1396}

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ANNUAL REPORT OF THE COHESION FUND (2004) {SEC(2005)1396} COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 7.11.2005 COM(2005) 544 final REPORT FROM THE COMMISSION ANNUAL REPORT OF THE COHESION FUND (2004) {SEC(2005)1396} EN EN TABLE OF CONTENTS REPORT FROM THE

More information

European Fund for Strategic Investments (EFSI) EFSI 2.0 New Opportunities for Cities & Regions?

European Fund for Strategic Investments (EFSI) EFSI 2.0 New Opportunities for Cities & Regions? European Fund for Strategic Investments (EFSI) EFSI 2.0 New Opportunities for Cities & Regions? Matthieu Bertrand, EFSI Mandate Officer, Mandate Management, Operations Directorate, EIB Lunchtime briefing,

More information

Consideration of applications to increase cash, Leap and pre-paid fares from Bus Éireann for 2014

Consideration of applications to increase cash, Leap and pre-paid fares from Bus Éireann for 2014 Consideration of applications to increase cash, Leap and pre-paid fares from Bus Éireann for 2014 Determination No. 4 for period Nov/Dec 2013 to Nov/Dec 2014 October 2013 1 Table of contents Executive

More information

General terms and conditions for the reimbursement of travel and subsistence expenses to outside persons

General terms and conditions for the reimbursement of travel and subsistence expenses to outside persons European Aviation Safety Agency General terms and conditions for the reimbursement of travel and subsistence expenses to outside persons Doc # Annex 1 ED Decision 2013/010/F General terms and conditions

More information

Economic Bulletin. June Lisbon,

Economic Bulletin. June Lisbon, Economic Bulletin June 2017 Lisbon, 2017 www.bportugal.pt Economic Bulletin June 2017 Banco de Portugal Av. Almirante Reis, 71 1150-012 Lisboa www.bportugal.pt Edition Economics and Research Department

More information

EN 1 EN. Rural Development HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK. Guidance document. September 2006

EN 1 EN. Rural Development HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK. Guidance document. September 2006 Rural Development 2007-2013 HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK Guidance document September 2006 Directorate General for Agriculture and Rural Development EN 1 EN CONTENTS 1. A more

More information

Fingal/ North Dublin Transport Study Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC)

Fingal/ North Dublin Transport Study Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) Fingal/ North Dublin Transport Study Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) Final Submission January 2015 Document Control Contract Name Contract Number C066

More information

SPAIN Zaragoza Tramway SUMMARY OVERVIEW ZARAGOZA TRAMWAY. Location Zaragoza, Aragón, Spain

SPAIN Zaragoza Tramway SUMMARY OVERVIEW ZARAGOZA TRAMWAY. Location Zaragoza, Aragón, Spain SPAIN Zaragoza Tramway Image: Tramway through Plaza Lanuza in Zaragoza by Thierry Llansades / CC BY-NC-ND 2.0 OVERVIEW Location Zaragoza, Aragón, Spain Sector Transport Rail Procuring Authority Municipality

More information

Gas Innovation Reporting Framework

Gas Innovation Reporting Framework An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Gas Innovation Reporting Framework Information Paper Information Paper Reference: CRU/18/180 Date Published: 30/08/2018 Closing Date:

More information

Government Policy Statement on land transport 2018 release for public engagement

Government Policy Statement on land transport 2018 release for public engagement In Confidence Office of the Minister of Transport Chair, Cabinet Economic Development Committee Government Policy Statement on land transport 2018 release for public engagement Proposal 1. This paper seeks

More information

Cost Benefit Analysis TAG Unit 3.5.4

Cost Benefit Analysis TAG Unit 3.5.4 TAG Unit 3.5.4 June 2003 Department for Transport Transport Analysis Guidance (TAG) This Unit is part of a family which can be accessed at www.webtag.org.uk Contents 1 Introduction 1 2 1 3 The Method of

More information

THE NEW EUROPEAN COMMISSION PROPOSAL ON COMMERCIAL FUEL DUTY

THE NEW EUROPEAN COMMISSION PROPOSAL ON COMMERCIAL FUEL DUTY CLTM/B3627/DVI Brussels, 6 April 2007 THE NEW EUROPEAN COMMISSION PROPOSAL ON COMMERCIAL FUEL DUTY Overview of the new Commission proposal for amening Council Directive 2003/96 concerning commercial diesel

More information

Study of High Speed Rail in Alberta

Study of High Speed Rail in Alberta Study of High Speed Rail in Alberta Presentation to Standing Committee on Alberta s Economic Future Marc-Andre Roy February 4, 2014 Via Videoconference Many options, varying capital costs: $3-$8 billion

More information

Financial Instruments in Cohesion Policy

Financial Instruments in Cohesion Policy Financial Instruments in Cohesion State of play, lessons learned and outlook 2014-2020 Directorate General for and Urban Unit B3 : Financial Instruments and IFI Relations Workshop on Financial Instruments

More information

The New Programming Period Working Document No. 4

The New Programming Period Working Document No. 4 EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Thematic development, impact, evaluation and innovative actions Evaluation and additionality The New Programming Period 2007-2013 GUIDANCE ON THE

More information

Important Note. Airport Authority Hong Kong

Important Note. Airport Authority Hong Kong Important Note Airport Authority Hong Kong (AAHK) is responsible for preparing the Hong Kong International Airport (HKIA) Master Plan 2030 and commissioning the associated consultancies. At different stages

More information

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes 2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes Reviewing and Approving TYNDP A Regulatory Perspective Evangelos Penglis Partner, VIS Economic & Energy Consultants 08/12/2017

More information

GUIDE FOR THE REIMBURSEMENT OF TRAVEL AND ACCOMMODATION EXPENSES AND PAYMENT OF SUBSISTENCE ALLOWANCES

GUIDE FOR THE REIMBURSEMENT OF TRAVEL AND ACCOMMODATION EXPENSES AND PAYMENT OF SUBSISTENCE ALLOWANCES Helsinki, 29 September 2009 Doc: MB/59/2009 final GUIDE FOR THE REIMBURSEMENT OF TRAVEL AND ACCOMMODATION EXPENSES AND PAYMENT OF SUBSISTENCE ALLOWANCES to Management Board members, Committee and Forum

More information

Vladimir Ramirez Soberanis Unidad de Inversiones SHCP October 21, 2010

Vladimir Ramirez Soberanis Unidad de Inversiones SHCP October 21, 2010 ITF-OECD Round Table on Improving the Practice of Cost- Benefit Analysis in Transport THE PRACTICE OF COST BENEFIT ANALYSIS IN THE TRANSPORT SECTOR MEXICO PERSPECTIVE Vladimir Ramirez Soberanis Unidad

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 31.1.2003 COM(2003) 44 final 2003/0020 (COD) Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL establishing a general Framework for

More information

Investment in rail: the economic benefits

Investment in rail: the economic benefits www.oxera.com Investment in rail: the economic benefits Note prepared for Rail Delivery Group October 2017 Summary of key points 50bn+ of investment to improve Britain s railway into the early 2020s by

More information

Appendix H Page 1. Harmonising differences in definitions of solvent consumption between IPPC and SE Directives (scenario 2.4).

Appendix H Page 1. Harmonising differences in definitions of solvent consumption between IPPC and SE Directives (scenario 2.4). Appendix H Page 1 Introduction This appendix provides some of the detailed calculations supporting the quantitative analyses reported in the main report, particularly in relation to the detailed description

More information

Auckland City Rail Link. Updated Economic Evaluation

Auckland City Rail Link. Updated Economic Evaluation Auckland City Rail Link Updated Economic Evaluation 20 May 2011 Auckland Transport and Auckland Council Advisors This report has been prepared with international support of the following advisors : John

More information

Keswick to Penrith Railway

Keswick to Penrith Railway Keswick to Penrith Railway Stage 2 Report: H6-08 Keswick to Penrith Railway Stage 2 Report: JMP CONSULTING MINERVA HOUSE, EAST PARADE, LEEDS, LS1 5PS. T 0113 244 4347 F 0113 242 3753 E leeds@jmp.co.uk

More information

Not in my kitchen: the economics of HS2

Not in my kitchen: the economics of HS2 Agenda Advancing economics in business The economics of HS2 Not in my kitchen: the economics of HS2 HS2, a high-speed rail link between London and Birmingham, has been given approval by the UK Secretary

More information

Financing Megaprojects In The Rail Sector. Andreas Klocke, Head of KfW Regional Office, Bangkok

Financing Megaprojects In The Rail Sector. Andreas Klocke, Head of KfW Regional Office, Bangkok Financing Megaprojects In The Rail Sector Andreas Klocke, Head of KfW Regional Office, Bangkok Agenda 1. Background to KfW 2. PPP and the allocation interests and risks 3. Examples of PPP projects in the

More information

Impact Assessment (IA)

Impact Assessment (IA) Title: Amendment of the Road Traffic Act (RTA) 1988 to remove the requirement of a policyholder to return a motor insurance certificate if they cancel their policy mid term IA No: DfT00223 Lead department

More information

Connecting Europe: Trans-European Networks [ :25]

Connecting Europe: Trans-European Networks [ :25] Connecting Europe: Trans-European Networks [18-11-2013-18:25] "Connecting Europe Facility" (CEF) is the EU's new funding mechanism for infrastructure projects of common interest for trans-european transport,

More information

Experiences from India Related to Railway Planning & Development. Prof. Hemant Godbole, National Academy of Indian Railways, Vadodara

Experiences from India Related to Railway Planning & Development. Prof. Hemant Godbole, National Academy of Indian Railways, Vadodara Experiences from India Related to Railway Planning & Development Prof. Hemant Godbole, National Academy of Indian Railways, Vadodara 1 Agenda 1 2 3 4 5 6 Background Planning Sources of Financing the CAPEX

More information

The new Trans-European Transport Network Policy

The new Trans-European Transport Network Policy The new Trans-European Network Policy A STRONG BASIS FOR THE EUROPEAN ECONOMY AND FOR TERRITORIAL DEVELOPMENT Gudrun Schulze, European Commission, DG MOVE, B1 Milano, 7 May 2015 TEN-T policy: Key to Europe's

More information

This note has been prepared by the Directorate-General for Regional Policy.

This note has been prepared by the Directorate-General for Regional Policy. COCOF 08/0006/00-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DRAFT INFORMATION NOTE TO THE COCOF MAJOR PROJECTS IN THE PROGRAMMING PERIOD 2007-2013: THRESHOLDS AND CONTENTS OF COMMISSION

More information