1 Preparing a Cost Benefit Analysis and Cost-Effectiveness Analysis 2017 CEF Transport SESAR call Information Day - 19 October 2017 Julien Bollati Financial Engineering Manager INEA - Innovation and Networks Executive Agency

2 Agenda CBA in the CEF Transport SESAR call CBA in practice Recommendations

3 CBA in the CEF Transport SESAR call

4 Why a CBA is requested? TEN-T Regulation Article 7.2.c "A project of common interest shall be economically viable on the basis of a socio-economic cost-benefit analysis." CEF Regulation Article 10.6 "The amount of financial assistance ( ) shall be modulated on the basis of a cost-benefit analysis of each project, availability of Union budget resources and the need to maximize the leverage of Union funding."

5 How is it used? Additional evidence of socio-economic performance (impact criterion) Economic analysis To identify cases of potential overfunding Financial analysis

6 Is a CEA acceptable? "Common project" category "Other projects" category CBA (PCP CBA is acceptable as it is) or CEA based on the methodological guidance provided in the context of the SESAR Deployment Programme CBA based on the DG REGIO methodology complemented by sectorial guidance (PCP CBA is not acceptable) + funding gap calculation if generating net revenues (based on cash flows from the CBA's financial analysis)

7 CBA: What does it mean in practice? A CBA is required for Works and Mixed proposals (not Study even if with pilot deployment) Specific CBA assessment by dedicated external CBA experts separately from the rest of the external evaluation Findings of CBA Assessment Report feed in the evaluation and scoring of the "Impact" criterion by technical experts

8 CBA in practice

9 Which methodology? The European Commission methodology developed for the Cohesion Policy (DG REGIO) The CBA shall include also a financial analysis RECOMMENDED

10 Key components of the CBA According to the methodology of DG REGIO Technical feasibility (demand and option analysis) Environmental and climate change considerations Financial analysis Economic analysis Risk assessment (including sensitivity analysis). The results of the technical feasibility and risk assessment should be at least summarised to substantiate the results of the Financial and Economic analysis.

11 Examples of further sectorial guidance Standard inputs for EUROCONTROL CBAs Pilot Common Project CBA (EC N 719/2014 Art 4(C) Economics of Satellite based ANS

12 Typical benefits (1/2) Operational efficiency Fuel savings: The improvement of air navigation systems and reduction of en-route delays lead to monetary savings in fuel consumption. Delay cost savings: The reduction of delayed flights and delay length is a benefit quantified using the average cost per minute of delay to the airline (e.g. crew cost and passenger opportunity cost (value of time))

13 Typical benefits (2/2) Environment & Productivity gains CO 2 savings: the reduced amount of fuel burned leads also to a reduction of greenhouse gas emissions which can be monetised. One could include other pollutants such as NOx, SO 2. ANS productivity: Air navigation service (staff) cost reduction achieved through productivity increase is another typical benefit.

14 Financial Analysis Confirms the need for the EU co-financing The financial profitability of the investment is assessed comparing investment costs to net revenues and measures the extent to which the project's net revenues are able to repay the investment, regardless of the sources of financing.

15 Funding Gap For net revenue-generating projects (with a CBA) The co-funding rate shall be applied to the part of a project's costs that are not covered by revenues ("funding gap") instead of the total eligible costs. NUMERICAL EXAMPLE a) Discounted revenues 100 m b) Discounted costs 80 m c) Discounted residual value 35 m d) Discounted net revenues (a-b+c) 55 m e) Discounted investment cost 550 m f) Funding gap (d-e) 495 m g) Funding gap rate (f/e) 90% h) Maximum EU co-funding rate 50% i) Modulated EU co-funding rate (g*h) 45%

16 Recommendations

17 Potential pitfalls Drawing upon lessons learned from previous calls CBA should be part of the project preparation process to improve projects (and not be treated solely as an obligation) The scope of the CBA should be the Action. However, if analysis on the action alone is not meaningful the scope can be expanded to a broader initiative PCP CBA can be submitted only for proposals under the "Common Projects" category Cost savings are to be considered as revenues: Unless transferred to users by a reduction of fares or compensated by an equal reduction in the operating subsidy, cost savings affect the funding gap!

18 Contact INEA Look for INEA!

Preparation of the cost-benefit analysis

Preparation of the cost-benefit analysis Preparation of the cost-benefit analysis Jornada informativa sobre fondos CEF-Transportes 16 March 2017 Gauthier CLAR INEA R1 Financial Engineering Senior Manager 1 Agenda The role of CBA in the CEF Transport

More information

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Massimo Marra JASPERS Networking and Competence Centre IPA Conference Impact Assessment What can we

More information

4. PERFORMANCE VIEW 3. PROJECT VIEW

4. PERFORMANCE VIEW 3. PROJECT VIEW 4.1 SDM in the SES performance framework...284 4.2 Performance Assessment and CBA Methodology...286 4.3 DP expected contribution to performance...287 4.4 DP Cost Benefit Analysis...292 4.5 Next Steps...303

More information

EU Funding Frequently Asked Questions. The rail freight industry is facing the

EU Funding Frequently Asked Questions. The rail freight industry is facing the EU Funding 2014-2020 The rail freight industry is facing the challenge to provide sustainable, efficient and competitive services. With the ongoing economic instability and changing geopolitical priorities

More information

OVERVIEW OF DETAILED APPRAISAL PROCESS

OVERVIEW OF DETAILED APPRAISAL PROCESS Section 3 OVERVIEW OF DETAILED APPRAISAL PROCESS 3.1 Introduction The detailed appraisal stage aims to provide a basis for a decision on whether to proceed with a project in principle or not. It includes

More information

Connecting Europe: Trans-European Networks [ :25]

Connecting Europe: Trans-European Networks [ :25] Connecting Europe: Trans-European Networks [18-11-2013-18:25] "Connecting Europe Facility" (CEF) is the EU's new funding mechanism for infrastructure projects of common interest for trans-european transport,

More information

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes 2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes Reviewing and Approving TYNDP A Regulatory Perspective Evangelos Penglis Partner, VIS Economic & Energy Consultants 08/12/2017

More information

Connecting Europe Facility:

Connecting Europe Facility: Cyprus Oct 2013 S. Committee Development & Business Environment Connecting Europe Facility: Initial provisions Council and European Parliament agreement Brussels, 10 July 2013 Aris Chatzidakis 24-10-2013

More information

User Forum Continuous Descent Operations. Implementation in Europe. Brent Day & Veronica McMahon

User Forum Continuous Descent Operations. Implementation in Europe. Brent Day & Veronica McMahon User Forum 2013 Continuous Descent Operations Implementation in Europe Brent Day & Veronica McMahon CDO Implementation Team 24 Jan 2013 SCOPE Description and Concept of CDO Why CDO the benefits European

More information

European Fund for Strategic Investments (EFSI):

European Fund for Strategic Investments (EFSI): June 2015 European Fund for Strategic Investments (EFSI): SMART, SUSTAINABLE AND INCLUSIVE Recommendations for the Delegated Act establishing a scoreboard of indicators According to article 7.11 of the

More information

EVALUATION IN THE FIELD OF STATE AID WORKSHOP Brussels, 23 April 2013

EVALUATION IN THE FIELD OF STATE AID WORKSHOP Brussels, 23 April 2013 EVALUATION IN THE FIELD OF STATE AID WORKSHOP ANNE BUCHER European Commission DG Economic and Financial Affairs Director for Structual Reforms and Competitiveness Art.30 of the Financial Regulation In

More information

Module 7. Costing, assessing and selecting adaptation and mitigation. Training workshops on mainstreaming climate change

Module 7. Costing, assessing and selecting adaptation and mitigation. Training workshops on mainstreaming climate change Global Climate Change Alliance Support Facility Module 7 Costing, assessing and selecting adaptation and mitigation options and measures Training workshops on mainstreaming climate change Training materials

More information

Risk-Sharing Finance Facility and future EU Financial Instruments for RDI

Risk-Sharing Finance Facility and future EU Financial Instruments for RDI Not legally binding Risk-Sharing Finance Facility and future EU Financial Instruments for RDI Instrumentos financieros para apoyar la investigación, el desarrollo y la innovación en un contexto regional

More information

Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017

Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017 Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017 Together with the Joint Undertaking s reply 12, rue Alcide De Gasperi

More information

Commission Proposal on Connecting Europe Facility

Commission Proposal on Connecting Europe Facility Brussels, 7 September 2018 Commission Proposal on Connecting Europe Facility COM(2018) 438 final CER aisbl COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts 53 1000 Bruxelles T:

More information

Major projects in the programming period

Major projects in the programming period Regional Major projects in the 2014-2020 programming period Major Project Team Unit G.1 Competence Centre: Smart and Sustainable Growth DG Regional and Urban Legal framework 2014-2020 Regional New Cohesion

More information

INEA. Innovation and Networks Executive Agency. Making implementation happen

INEA. Innovation and Networks Executive Agency. Making implementation happen INEA Innovation and Networks Executive Agency Making implementation happen Michal KLIMA H2020 Transport Research, INEA Transport Research Arena 2016 Warsaw, 21 April 2016 Agenda Presentation of INEA H2020

More information

JASPERS Advisory and capacity building support for projects and investment

JASPERS Advisory and capacity building support for projects and investment JASPERS Advisory and capacity building support for projects and investment Massimo Marra, Senior Officer JASPERS Networking and Competence Centre JASPERS-EPEC Seminar on Blending ESI Funds and PPPs Brussels,

More information

D6.2 Stakeholder Consultation on Business and Regulatory Scenarios

D6.2 Stakeholder Consultation on Business and Regulatory Scenarios EXPLORATORY RESEARCH D6.2 Stakeholder Consultation on Business and Regulatory Scenarios Deliverable 6.2 Vista Grant: 699390 Call: H2020-SESAR-2015-1 Topic: Sesar-05-2015 Economics and Legal Change in ATM

More information

Stephen Barrett, Technical Advisor, Consultant, ICAO

Stephen Barrett, Technical Advisor, Consultant, ICAO ICAO CAPACITY BUILDING SEMINAR ON LOW EMISSIONS AVIATION MEASURES Regulatory and Organizational Framework to Address Aviation Emissions Stephen Barrett, Technical Advisor, Consultant, ICAO ICAO 2018 Presentation

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 9.12.2013 COM(2013) 864 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL Regulation (EU) No 691/2011 of the European Parliament and of the Council

More information

Funding and financing solutions for urban rail systems

Funding and financing solutions for urban rail systems Funding and financing solutions for urban rail systems Arturs Alksnis Public Affairs Manager 5 th European Conference on Sustainable Urban Mobility Plans 15 May 2018, Nicosia, Cyprus UNIFE is the European

More information

SESAR Solution Regulatory Overview

SESAR Solution Regulatory Overview SESAR Solution Regulatory Overview Digital Integrated Briefing Document information Document Name Digital Integrated Briefing Edition 01.00.00 Abstract This document contains an overview of the SESAR Solution

More information

HOLISTIC MOBILITY MANAGEMENT. SESSION 2 FINANCING THE TRANSITION The financing of TENs in Mediterranean Regions. Carmen Sandoval

HOLISTIC MOBILITY MANAGEMENT. SESSION 2 FINANCING THE TRANSITION The financing of TENs in Mediterranean Regions. Carmen Sandoval HOLISTIC MOBILITY MANAGEMENT BRUSSELS 11 DECEMBER 2012 SESSION 2 FINANCING THE TRANSITION The financing of TENs in Mediterranean Regions Carmen Sandoval CPMR/IMC Transports Working Group Improving accessibility

More information

CBA of transport infrastructure projects in Germany

CBA of transport infrastructure projects in Germany CBA of transport infrastructure projects in Germany Dr. Catharina Horn Federal Transport Infrastructure Planning, Investment Policy Paris, 27th of February 2014 www.bmvi.de 1. The Federal Transport Infrastructure

More information

Action number: EU-TM-0136-M Action Title DP Implementation - Call CEF 2014 Deliverable 1.7 FPA information package - Guidelines for execution phase

Action number: EU-TM-0136-M Action Title DP Implementation - Call CEF 2014 Deliverable 1.7 FPA information package - Guidelines for execution phase Action number: EU-TM-0136-M Action Title DP Implementation - Call CEF 2014 Deliverable 1.7 FPA information package - Guidelines for execution phase 3 rd December 2015 V1.0 DOCUMENT IDENTIFICATION SHEET

More information

ETS SUPPORT FACILITY COSTS BREAKDOWN

ETS SUPPORT FACILITY COSTS BREAKDOWN ETS SUPPORT FACILITY COSTS BREAKDOWN 1. INTRODUCTION 1.1. The EUROCONTROL Agency has recently submitted information papers to EUROCONTROL s Air Navigation Services Board and to the European Commission

More information

Financing Short Sea Shipping with EU innovative instruments

Financing Short Sea Shipping with EU innovative instruments Financing Short Sea Shipping with EU innovative instruments State of Play for Connecting Europe Facility and Juncker Plan Matthieu Bertrand, Policy Officer, Unit Connecting Europe Investment Strategy,

More information

Committee / Commission TRAN. Meeting of / Réunion du 08/09/2008 BUDGETARY AMENDMENTS / AMENDEMENTS BUDGÉTAIRES. Rapporteur: Eva LICHTENBERGER

Committee / Commission TRAN. Meeting of / Réunion du 08/09/2008 BUDGETARY AMENDMENTS / AMENDEMENTS BUDGÉTAIRES. Rapporteur: Eva LICHTENBERGER Committee / Commission TRAN Meeting of / Réunion du 08/09/2008 BUDGETARY AMENDMENTS / AMENDEMENTS BUDGÉTAIRES Rapporteur: Eva LICHTENBERGER EN EN Draft amendment 6419 Budget reference line : 02 02 08

More information

easyjet response to the Scottish government consultation on a Scottish replacement to Air Passenger Duty

easyjet response to the Scottish government consultation on a Scottish replacement to Air Passenger Duty easyjet response to the Scottish government consultation on a Scottish replacement to Air Passenger Duty Introduction easyjet is the UK s largest airline. We carry 5.5 million passengers to and from Scotland

More information

Project Economic and Financial Appraisal & Risk Analysis: A focus on GCF Funding Proposal

Project Economic and Financial Appraisal & Risk Analysis: A focus on GCF Funding Proposal Project Economic and Financial Appraisal & Risk Analysis: A focus on GCF Funding Proposal Obadiah K. Mungai Chief Environmental Economist & Chair NIE/AE Steering Committee NEMA Outline GCF s Investment

More information

EN 2019 Work Programme

EN 2019 Work Programme EN 2019 Work Programme EUROPEAN COURT OF AUDITORS 12, rue Alcide De Gasperi 1615 Luxembourg LUXEMBOURG Tel. +352 4398-1 Enquiries: eca.europa.eu/en/pages/contactform.aspx Website: eca.europa.eu Twitter:

More information

COMMISSION DELEGATED REGULATION (EU) /... of XXX

COMMISSION DELEGATED REGULATION (EU) /... of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2018) XXX draft COMMISSION DELEGATED REGULATION (EU) /... of XXX amending Regulation (EU) 2017/2359 as regards the integration of Environmental, Social and Governance

More information

Major projects CBA for transport sector Brussels, 30 September 2015

Major projects CBA for transport sector Brussels, 30 September 2015 Regional Major projects 2014-2020 - CBA for transport sector Brussels, 30 September 2015 Major projects 2007-2013 Witold Willak Head of Sector, Major Projects, Unit G1 for Smart and Sustainable growth,

More information

Closing the Gap on Air Traffic Management Investment Needs

Closing the Gap on Air Traffic Management Investment Needs Increasing performance and investment requirements in Air Traffic Management to meet the goals and objectives of the Single European Sky programme Air Traffic Management (ATM) is going through a period

More information

Annual Activity Report

Annual Activity Report Ref. Ares(2016)1557661-01/04/2016 2015 Annual Activity Report Directorate-General for Mobility & Transport Foreword Introductory message by the Director General This Annual Activity Report covers the activities

More information

Methodology for CBA preparation SOP Environment

Methodology for CBA preparation SOP Environment Methodology for CBA preparation SOP Environment Programming Meeting for water and wastewater projects in the period 2008-2009 Mamaia, 10-13 th July 2008 Massimo Marra JASPERS Regional Office for Romania

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69 COUNCIL OF THE EUROPEAN UNION Brussels, 11 May 2010 9437/10 ECOFIN 249 ENV 265 POLGEN 69 NOTE from: to: Subject: The General Secretariat of the Council Delegations Financing climate change- fast start

More information

FICHE NO 19 DELEGATED ACT ON THE CALCULATION OF NET REVENUE FOR REVENUE VERSION NO 2 20/09/2013

FICHE NO 19 DELEGATED ACT ON THE CALCULATION OF NET REVENUE FOR REVENUE VERSION NO 2 20/09/2013 FICHE NO 19 DELEGATED ACT ON THE CALCULATION OF NET REVENUE FOR REVENUE GENERATING OPERATIONS VERSION NO 2 20/09/2013 Regulation Common Provisions Regulation Article Article 54 (3) (b) Operations generating

More information

THE RESEARCH INTO METHODOLOGY FOR EVALUATION OF TRANSPORT INFRASTRUCTURE INVESTMENTS

THE RESEARCH INTO METHODOLOGY FOR EVALUATION OF TRANSPORT INFRASTRUCTURE INVESTMENTS Proceedings of the 9th International Conference Reliability and Statistics in Transportation and Communication (RelStat 09), 21 24 October 2009, Riga, Latvia, p. 15-19. ISBN 978-9984-818-21-4 Transport

More information

ANNEX. to the. Proposal for a Regulation of the European Parliament and of the Council. establishing the InvestEU Programme

ANNEX. to the. Proposal for a Regulation of the European Parliament and of the Council. establishing the InvestEU Programme EUROPEAN COMMISSION Brussels, 6.6.2018 COM(2018) 439 final ANNEX 1 ANNEX to the Proposal for a Regulation of the European Parliament and of the Council establishing the InvestEU Programme {SEC(2018) 293

More information

Public hearing on The extension of the duration of the European Fund for Strategic Investment (EFSI 2.0) 10 November 2016

Public hearing on The extension of the duration of the European Fund for Strategic Investment (EFSI 2.0) 10 November 2016 Public hearing on The extension of the duration of the European Fund for Strategic Investment (EFSI 2.0) 10 November 2016 Agenda EUROPEAN FUND FOR STRATEGIC INVESTMENTS (EFSI) A SUCCESSFUL FIRST YEAR EUR

More information

4 TH MEETING OF THE EUROPEAN STATISTICAL SYSTEM COMMITTEE LUXEMBOURG 11 FEBRUARY 2010

4 TH MEETING OF THE EUROPEAN STATISTICAL SYSTEM COMMITTEE LUXEMBOURG 11 FEBRUARY 2010 ESSC 2010/04/13/EN Room document 4 TH MEETING OF THE EUROPEAN STATISTICAL SYSTEM COMMITTEE LUXEMBOURG 11 FEBRUARY 2010 Item 13 of the agenda Sponsorship Group to deal with the outcomes of the Stiglitz-Sen

More information

European Investment Bank Financing Instruments for TEN-T

European Investment Bank Financing Instruments for TEN-T Financing Instruments for TEN-T SESAR Implementation: Workshop on Financing and Funding Brussels, 17 February 2011 1. EIB Experience in TEN-T and the Air Transport Sector 2. EIB Financing Instruments Supporting

More information

EXECUTIVE SUMMARY. Written by CSIL Centre for Industrial Study In association with t33 Sound Policy April Regional and Urban Policy

EXECUTIVE SUMMARY. Written by CSIL Centre for Industrial Study In association with t33 Sound Policy April Regional and Urban Policy Study to determine flatrate revenue percentages for the sectors or subsectors within the fields of (i) ICT, (ii) research, development and innovation and (iii) energy efficiency to apply to net revenue

More information

Green Finance for Green Growth

Green Finance for Green Growth 2010/FMM/006 Agenda Item: Plenary 2 Green Finance for Green Growth Purpose: Information Submitted by: Korea 17 th Finance Ministers Meeting Kyoto, Japan 5-6 November 2010 EXECUTIVE SUMMARY Required Action/Decision

More information

EU 4 EU Emission Trading Scheme (2003/87/EC)

EU 4 EU Emission Trading Scheme (2003/87/EC) Title of the measure: EU 4 EU Emission Trading Scheme (2003/87/EC) General description The Directive establishes a greenhouse gas (GHG) emission allowance trading within the Community to mitigate GHG emissions

More information

EU transport policy and TEN-T guidelines

EU transport policy and TEN-T guidelines EU transport policy and TEN-T guidelines VL-NL-Deltaconferentie Brugge Marc VANDERHAEGEN 07 November 2014 EU transport policy: relevant developments on Inland Waterways and Ports Ports policy: A mix of

More information

ANNEX. Innovation and Networks Executive Agency - Annual Work Programme to the COMMISSION DECISION

ANNEX. Innovation and Networks Executive Agency - Annual Work Programme to the COMMISSION DECISION Ref. Ares(2017)2754434-01/06/2017 EUROPEAN COMMISSION Brussels, 24.3.2017 C(2017) 1870 final ANNEX 1 ANNEX Innovation and Networks Executive Agency - Annual Work Programme 2017 to the COMMISSION DECISION

More information

Analysis Summary Consultation - SOU 2016:83 "A Swedish Aviation Tax"

Analysis Summary Consultation - SOU 2016:83 A Swedish Aviation Tax Analysis Summary Consultation - SOU 2016:83 "A Swedish Aviation Tax" The Inquiry s report shows that an aviation tax would only marginally contribute to the overall goal of a reduced climate impact. The

More information

The New Programming Period Working Document No. 4

The New Programming Period Working Document No. 4 EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Thematic development, impact, evaluation and innovative actions Evaluation and additionality The New Programming Period 2007-2013 GUIDANCE ON THE

More information

Energy Efficiency Directive: Public procurement & the promotion of energy services

Energy Efficiency Directive: Public procurement & the promotion of energy services Energy Efficiency Directive: Public procurement & the promotion of energy services CA ESD Dr Marc Ringel European Commission DG ENER Copenhagen, 27 March 2012 THE PUBLIC SECTOR IN THE EU KEY ISSUES 19%

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 6.7.2012 C(2012) 4531 final COMMISSION DECISION of 6.7.2012 with regard to the amendment of Decision C(2012) 1216 of 27 February 2012 adopting the 2012 work programme in the

More information

CEF conventional calls and call for blending 2016

CEF conventional calls and call for blending 2016 CEF conventional calls and call for blending 2016 Financial Opportunities for the Italian Port System and Logistics 9 November 2016 Antongiulio Marin European Commission DG Mobility and Transport Head

More information

Vueling Airlines, S.A. Annual Accounts for the year ending 31 December 2012 and Management Report, together with the Auditors Report

Vueling Airlines, S.A. Annual Accounts for the year ending 31 December 2012 and Management Report, together with the Auditors Report Vueling Airlines, S.A. Annual Accounts for the year ending 31 December 2012 and Management Report, together with the Auditors Report VUELING AIRLINES, S.A. BALANCE SHEET AS AT 31 DECEMBER 2012 () ASSETS

More information

Question 5: In your view, how does free allocation impact the incentives to innovate for reducing emissions? b) it largely keeps the incentive

Question 5: In your view, how does free allocation impact the incentives to innovate for reducing emissions? b) it largely keeps the incentive Question Answer Motivation Question 1: Do you think that EU industry is able to further reduce greenhouse gas emissions towards 2020 and beyond, without reducing industrial production in the EU? a) Yes

More information

Good Navigation Status Study

Good Navigation Status Study Good Navigation Status Study Overview Budapest, 13 th September 2016 Topics I. Desired GNS study outcome and status of work II. Ways of involvement and cooperation III. First findings draft GNS components

More information

Overview of the Final New Starts / Small Starts Regulation and Frequently Asked Questions

Overview of the Final New Starts / Small Starts Regulation and Frequently Asked Questions Overview of the Final New Starts / Small Starts Regulation and Frequently Asked Questions The Federal Transit Administration s (FTA) New Starts and Small Starts program represents the federal government

More information

JASPERS Networking Platform

JASPERS Networking Platform JASPERS Networking Platform Supporting investments in Smart Grids in 2014-2020 Background and Introduction Massimo Marra, Senior Officer JASPERS Networking and Competence Center Brussels, 25 March 2015

More information

The Malta Development Bank

The Malta Development Bank The Malta Development Bank Leveraging EU Funds Gozo Business Chamber, Malta Chamber of Commerce, Enterprise & Industry 31 May - 1 June 2018 1 O Outline Background Role and functions Governance structure

More information

Summary. 1. Aviation taxation. February a briefing by

Summary. 1. Aviation taxation. February a briefing by How the undertaxed, polluting aviation sector can help fix the EU budget Taxing climate-intensive transport would encourage smarter transport behaviour February 2018 Summary Transport is Europe s biggest

More information

Renewable Energy Guidance

Renewable Energy Guidance NewClimate Institute, Verra Renewable Energy Guidance Guidance for assessing the greenhouse gas impacts of renewable energy policies May 2018 How to describe the policy or action being assessed 5. DESCRIBING

More information

Financing ERTMS with the Connecting Europe Facility

Financing ERTMS with the Connecting Europe Facility Control Command and Railway Communication Conference Lille, 12 November 2013 Financing ERTMS with the Connecting Europe Facility Stéphane Ouaki European Commission, DG Mobility and (DG MOVE) 1 New funding

More information

Czech Republic s Third National Communication under the United Nations Framework Convention on Climate Change, 2001.

Czech Republic s Third National Communication under the United Nations Framework Convention on Climate Change, 2001. Czech republic Sources of information Czech Republic s Third National Communication under the United Nations Framework Convention on Climate Change, 2001. Reporting Table 1: Information provided on policies

More information

G20 Peer Review on Fossil Fuel Subsidies in-person meeting. Measuring and monitoring Fossil Fuels Subsidies: The Italian case

G20 Peer Review on Fossil Fuel Subsidies in-person meeting. Measuring and monitoring Fossil Fuels Subsidies: The Italian case G20 Peer Review on Fossil Fuel Subsidies in-person meeting Measuring and monitoring Fossil Fuels Subsidies: The Italian case Gionata Castaldi Expert in Environmental Economics Italian Ministry of Environment,

More information

EUROCHAMBRES response to the consultation on the Emission Trading System (ETS) post-2020 carbon leakage provisions

EUROCHAMBRES response to the consultation on the Emission Trading System (ETS) post-2020 carbon leakage provisions EUROCHAMBRES response to the consultation on the Emission Trading System (ETS) post-2020 carbon leakage provisions I. General: competitiveness, carbon leakage and present free allocation rules 31 July

More information

Rural Cohesion Policy after 2013: A view from DG Regio

Rural Cohesion Policy after 2013: A view from DG Regio Rural Cohesion Policy after 2013: A view from DG Regio Sabrina Lucatelli, DG REGIO Directorate for Policy Conception and Coordination Brussels, 3 rd December 2010 1 From the past to the future 2000-2006

More information

8187/11 GL/mkl 1 DG C I

8187/11 GL/mkl 1 DG C I COUNCIL OF THE EUROPEAN UNION Brussels, 25 March 2011 8187/11 AVIATION 68 INFORMATION NOTE From: European Commission To: Council Subject: Recent developments in implementing the Single European Sky - Information

More information

Introduction to EIB activities in the OCTs

Introduction to EIB activities in the OCTs The (EIB) Introduction to EIB activities in the OCTs OCT-EU Forum Brussels, 5 th December 2013 EIB Caribbean and Pacific OCTs Divisions 1 The (EIB) European Union s long-term lending bank set up in 1958

More information

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Java Flying high some TALIS observations Total Information Sharing for Pilot Situational Awareness Enhanced by Intelligent Systems EC-DG-IS IST-2000/28744 By Ernst Kesseler kesseler@nlr.nl Overview Need

More information

Environmental economic accounts: EU statistical law and European Strategy

Environmental economic accounts: EU statistical law and European Strategy Environmental economic accounts: EU statistical law and European Strategy 2014-2018 Anton Steurer Eurostat E2 Environment statistics and accounts; sustainable development Presentation at the London Group

More information

GREENING TAXATION. Approaches to Agriculture. Andrew Kelly. 24 th April TFIAM/TFRN

GREENING TAXATION. Approaches to Agriculture. Andrew Kelly. 24 th April TFIAM/TFRN GREENING TAXATION Approaches to Agriculture Andrew Kelly 24 th April TFIAM/TFRN Certainties & I of V TAXES AND GREEN TAXES IN EUROPE Principal Function of Taxation To Raise Revenue Support wealth redistribution

More information

European Fund for Strategic Investments (EFSI): Rationale and Impact

European Fund for Strategic Investments (EFSI): Rationale and Impact European Fund for Strategic Investments (EFSI): Rationale and Impact Stéphane Ouaki, Head of Unit Connecting Europe Investment Strategy PRIME meeting 5 th February 2015 Context matters: Why EFSI and why

More information

Fact sheet: Financing climate change action Investment and financial flows for a strengthened response to climate change

Fact sheet: Financing climate change action Investment and financial flows for a strengthened response to climate change Fact sheet: Financing climate change action Investment and financial flows for a strengthened response to climate change In 2007, a review entitled Report on the analysis of existing and potential investment

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 17 November /1/05 REV 1 RECH 214 ENV 532 COSDP 814 TRANS 235

COUNCIL OF THE EUROPEAN UNION. Brussels, 17 November /1/05 REV 1 RECH 214 ENV 532 COSDP 814 TRANS 235 COUNCIL OF THE EUROPEAN UNION Brussels, 17 November 2005 14499/1/05 REV 1 RECH 214 ENV 532 COSDP 814 TRANS 235 NOTE from : Council Secretariat to : Coreper/Council No. Cion prop. : 14443/05 RECH 212 ENV

More information

QUESTIONNAIRE FOR EU-PCD REPORT 2015: CONTRIBUTIONS FROM MEMBER STATES

QUESTIONNAIRE FOR EU-PCD REPORT 2015: CONTRIBUTIONS FROM MEMBER STATES QUESTIONNAIRE FOR EU-PCD REPORT 2015: Brief Introduction CONTRIBUTIONS FROM MEMBER STATES The European Union is a major global actor and its non-developmental policies have the potential for substantial

More information

UNCTAD World Investment Forum, Ministerial Round Table, 16/10/2014, 3 to 6 pm, Room XX, Palais des Nations

UNCTAD World Investment Forum, Ministerial Round Table, 16/10/2014, 3 to 6 pm, Room XX, Palais des Nations How can policies be deployed to engage private sector funding for the SDGs? With a view to maximizing the objectives of sustainable development by the private sector we may point out the following policies

More information

Indicator Protocols Set Economic (EC) Food Processing Sector Supplement

Indicator Protocols Set Economic (EC) Food Processing Sector Supplement Indicator Protocols Set Economic (EC) Food Processing Sector Supplement 2000-2010 GRI Version 3.0 SS Final Version Food Processing Sector Supplement Economic Performance Indicators Aspect: Economic Performance

More information

Innovation and Modernisation Fund. Christian Holzleitner DG CLIMA 12 September 2018

Innovation and Modernisation Fund. Christian Holzleitner DG CLIMA 12 September 2018 Innovation and Modernisation Fund Christian Holzleitner DG CLIMA 12 September 2018 Innovation Fund Basics Implemen tation Synergies Timeline Basics - EU ETS Directive 2018/410 NER300 Innovation Fund Impact

More information

EU funding for energy efficiency and sustainable energy in cities

EU funding for energy efficiency and sustainable energy in cities EU funding for energy efficiency and sustainable energy in cities Vincent Berrutto Head of Unit European Commission Executive Agency for Small and Medium-sized Enterprises EU Climate and Energy targets

More information

Urban Mobility within Sustainable Urban Development supported by the European Structural and Investment Funds

Urban Mobility within Sustainable Urban Development supported by the European Structural and Investment Funds Urban Mobility within Sustainable Urban Development supported by the European Structural and Investment Funds 2014-2020 1 st European Conference on Sustainable Urban Mobility Plans 12-13 June 2014, Sopot,

More information

Impact Assessment (IA)

Impact Assessment (IA) Title: : AMENDMENTS TO PART 3, CHAPTER 1 OF THE ENERGY ACT 2008 (as amended): NUCLEAR SITES: DECOMMISSIONING AND COST RECOVERY IA No: DECC0089 Lead department or agency: DECC Other departments or agencies:

More information

The Results Measurement (ReM) framework methodology

The Results Measurement (ReM) framework methodology The Results Measurement (ReM) framework methodology The ReM framework methodology European Investment Bank September 2017 1 Introduction EIB lending is results-driven. Outside the EU, we use the Results

More information

COMMISSION DELEGATED REGULATION (EU) /... of

COMMISSION DELEGATED REGULATION (EU) /... of EUROPEAN COMMISSION Brussels, 30.10.2018 C(2018) 7019 final COMMISSION DELEGATED REGULATION (EU) /... of 30.10.2018 amending Regulation (EU) No 1031/2010 as regards the auctioning of 50 million unallocated

More information

Transport & Environment Does the money match the targets? Aligning EU investments in transport infrastructure with EU climate targets

Transport & Environment Does the money match the targets? Aligning EU investments in transport infrastructure with EU climate targets Transport & Environment Does the money match the targets? Aligning EU investments in transport infrastructure with EU climate targets Pia Nieminen 7.12.2016 EIB: The EU Bank Independent institution founded

More information

COMMON APPRAISAL FRAMEWORK FOR TRANSPORT PROJECTS AND PROGRAMMES

COMMON APPRAISAL FRAMEWORK FOR TRANSPORT PROJECTS AND PROGRAMMES COMMON APPRAISAL FRAMEWORK FOR TRANSPORT PROJECTS AND PROGRAMMES March 2016 OVERVIEW OF 2016 COMMON APPRAISAL FRAMEWORK This guidance document replaces the 2009 Guidelines on a Common Appraisal Framework

More information

ESF contribution to EaSI under article 38.1(a) Guadalupe de la Mata, European Investment Fund

ESF contribution to EaSI under article 38.1(a) Guadalupe de la Mata, European Investment Fund ESF contribution to EaSI under article 38.1(a) Guadalupe de la Mata, European Investment Fund Agenda Potential ESIF contributions to EU Level instruments: legal basis and scope ESF-EaSI contribution case

More information

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Governance and Institutional Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA

More information

10564/12 YG/LJP/sh 1 DG G II A

10564/12 YG/LJP/sh 1 DG G II A COUNCIL OF THE EUROPEAN UNION Brussels, 1 June 2012 10564/12 Inte rinstitutional File: 2011/0302 (COD) FIN 370 CADREFIN 271 POLGEN 97 REGIO 74 ENER 229 TRANS 183 TELECOM 113 COMPET 354 MI 385 ECO 73 CODEC

More information

Appendix H Page 1. Harmonising differences in definitions of solvent consumption between IPPC and SE Directives (scenario 2.4).

Appendix H Page 1. Harmonising differences in definitions of solvent consumption between IPPC and SE Directives (scenario 2.4). Appendix H Page 1 Introduction This appendix provides some of the detailed calculations supporting the quantitative analyses reported in the main report, particularly in relation to the detailed description

More information

Chapter 12 The recommendations of the Commission

Chapter 12 The recommendations of the Commission 1 Official Norwegian Report NOU 2015:15 2015 Chapter 12 Chapter 12 The recommendations of the Commission This chapter chronologically presents the recommendations of the Commission, as set out in Chapters

More information

Risk Assessment in the CBA process. Bruxelles, 30/9/2015 Antonio Carrarini JASPERS - Vienna Office

Risk Assessment in the CBA process. Bruxelles, 30/9/2015 Antonio Carrarini JASPERS - Vienna Office Risk Assessment in the CBA process Bruxelles, 30/9/2015 Antonio Carrarini JASPERS - Vienna Office Overview Reg. (EU) 1303/2013 ( Common provisions on the ERDF ) includes general requirements related to

More information

Prioritisation Methodology

Prioritisation Methodology Prioritisation Methodology March 2014 PRIORITISATION METHODOLOGY Table of contents 1 Introduction... 5 2 The Projects Prioritisation Process... 7 3 The Methodological Assumptions... 8 3.1 Background...

More information

PROCEDURES MANUAL. for. The technical and financial Due Diligence assessment under the NER 300 process

PROCEDURES MANUAL. for. The technical and financial Due Diligence assessment under the NER 300 process EUROPEAN COMMISSION PROCEDURES MANUAL for The technical and financial Due Diligence assessment under the NER 300 process Disclaimer This Manual has been developed by the Commission in consultation with

More information

TAXATION AND ENERGY EFFICIENCY

TAXATION AND ENERGY EFFICIENCY MINISTRY OF FINANCE TAXATION AND ENERGY EFFICIENCY LYUDMILA PETKOVA DIRECTOR, TAX POLICY DIRECTORATE MINISTRY OF FINANCE DECEMBER, 2011 FOCUS OF PRESENTATION The focus of this presentation is on the role

More information

Council of the European Union Brussels, 22 December 2015 (OR. en)

Council of the European Union Brussels, 22 December 2015 (OR. en) Conseil UE Council of the European Union Brussels, 22 December 2015 (OR. en) PUBLIC 15517/15 LIMITE FISC 198 ECOFIN 1002 NOTE From: To: Subject: Incoming Dutch Presidency Permanent Representatives Committee/Council

More information

Financial Instruments in Cohesion Policy

Financial Instruments in Cohesion Policy Financial Instruments in Cohesion State of play, lessons learned and outlook 2014-2020 Directorate General for and Urban Unit B3 : Financial Instruments and IFI Relations Workshop on Financial Instruments

More information

CYPRUS ENERGY REGULATORY AUTHORITY

CYPRUS ENERGY REGULATORY AUTHORITY CYPRUS ENERGY REGULATORY AUTHORITY METHODOLOGY AND CRITERIA FOR THE EVALUATION OF INVESTMENTS IN ELECTRICITY AND GAS INFRASTRUCTURE PROJECTS (ARTICLE 13(6) OF REGULATION (EU) No. 347/2013) 2015 WWW. C

More information

Summary of results from the ECA s 2017 annual audit of the European research Joint Undertakings

Summary of results from the ECA s 2017 annual audit of the European research Joint Undertakings Summary of results from the ECA s 2017 annual audit of the European research Joint Undertakings 12, rue Alcide De Gasperi - L - 1615 Luxembourg T (+352) 4398 1 E eca-info@eca.europa.eu eca.europa.eu 2

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL REGULATION

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL REGULATION COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 14.7.2004 COM(2004)490 final 2004/0161(CNS) Proposal for a COUNCIL REGULATION on support for rural development by the European Agricultural Fund for Rural

More information