ENVIRONMENT AND TRANSPORT

Size: px
Start display at page:

Download "ENVIRONMENT AND TRANSPORT"

Transcription

1 EUROPEAN COMMISSION REF Nº:... ANNEX D PROJECT TITLE:.. THE COHESION FUND APPLICATION FOR ASSISTANCE COUNCIL REGULATION (EC) N 64/94 of 6 May 994 COUNCIL REGULATION (EC) N º 64/99 of June 999 COUNCIL REGULATION (EC) N º 65/99 of June 999 ENVIRONMENT AND TRANSPORT (Version. Final)

2 CONTENTS. TITLE OF PROJECT, ORGANISATIONS AND REFERENCES 4. PROJECT TYPE AND LOCATION 5 3. PROJECT OBJECTIVES 6 4. PROJECT DESCRIPTION 8 5. TIMETABLE 9 6. COSTS OF PROJECT 0 7. FINANCIAL & ECONOMIC ANALYSIS 3 8. FINANCIAL ASSISTANCE 7 9. IMPACT ON EMPLOYMENT 8 0. COMPATIBILITY WITH OTHER COMMUNITY POLICIES 9. CONSISTENCY WITH OTHER MEASURES FINANCED BY THE EC. MONITORING 3. ARRANGEMENTS FOR MANAGEMENT, MONITORING, CONTROL AND EVALUATION 4. PUBLICITY MEASURES 4 5.A ENVIRONMENT PROJECTS 5 5.B TRANSPORT PROJECTS 7 Page 3 ANNEXES I. ENVIRONMENTAL IMPACT ASSESSMENT 3 I a) NATURA II. III III Part A MONITORING OF PUBLIC PROCUREMENT TENDER PROCEDURES SPECIFIC INFORMATION TO BE PROVIDED ACCORDING TO THE NATURE OF THE PROJECT Environmental projects in the field of water management (water supply and/or wastewater treatment) and solid waste III Part B Transport projects 38

3 THE COHESION FUND IMPORTANT NOTICE APPLICATION FOR ASSISTANCE Use this application form in the case of: a single project; a stage of a project which is technically and financially independent; a group of projects linked to a visible strategy and forming a coherent set. The application form and Annexes I, II and III (Part A or B) must be completed in all cases. Annex I a) should be completed when required. One original and nine copies of the form should be submitted to: European Commission Directorate General REGIO Directorate E Rue de la Loi, 00 - B 049 Brussels. All financial information must be given in Euro. The application must be accompanied by a full report describing the project and its anticipated effects, and any other information relevant to its assessment, including: feasibility or preparatory studies; maps showing the location of the project(s); cost-benefit and financial analysis; environmental impact documentation (see Annex I); public procurement documentation. In order to facilitate the assessment of projects, summaries of technical documentation may be provided. An electronic version of this application form is available in [ It is also possible to deliver one certified original and one diskette, CD-Rom or to transmit the document by in a compatible format (Rich Text Format or equivalent). Any non-digitalised material (maps, copies of documents, etc) should be transmitted with nine copies. 3

4 THE COHESION FUND: APPLICATION FOR ASSISTANCE Ref. N.... TITLE OF PROJECT, ORGANISATIONS & REFERENCES. Title of the project/group of projects/stage of a project Title Key Words. For groups of projects, list of individual projects Number of Title the project... Add rows if necessary.3. Authority responsible for the application. Name :. Address: 3. Contact: 4. Tel. 5. Fax Organisation responsible for implementation Complete for each individual project. Add as much rows as necessary. Number. Name. Address 3. Contact 4. Tel. 5. Fax Subject to VAT*?:. Name. Address 3. Contact 4. Tel. 5. Fax Subject to VAT*?:. Name. Address 3. Contact Add rows if necessary (*) Please answer Yes or No..5. Authority to which payments are to be made. Name :. Address: 3. Contact: 4. Tel. 5. Fax Bank Account: 4

5 . PROJECT TYPE AND LOCATION. Sector.. Environmental domain.. Transport domain 6 - Environment 65 - Transport Water treatment and supply Waste water treatment Waste management Other (please specify) Road Rail Port Airport Others (please specify). Type.3 Location of project(s) Single project Stage of a project Group of projects Other (specify) number 3 4 Member State (NUTS I) Add rows if necessary Region (NUTS II) County (NUTS III) Municipality 5

6 3. PROJECT OBJECTIVES 3. Explain the objectives of the project / stage of project / group of projects (see also Annexes III Part A or B) 3.. Describe the relevant overall strategy and explain how the project(s) will contribute to its implementation Explain the main problems detected and to which extent the project, the stage of project or the group of projects contributes to their resolution 3..3 Fully describe objectives and targets (e.g. in the case of transport projects specify bottlenecks to be tackled, planned increase in capacity, improvement in traffic speed or service levels, national and international traffic growth or other problems to be resolved; in the case of environmental projects specify the problems to be solved, population served, quality improvements, reductions of pollution, etc.) 3..4 Outline the coherence of the project with other s interventions 3. Explain briefly the possible alternatives considered for the solution of the main problems detected, which are intended to be solved by the project(s), and give the reasons for not pursuing these alternatives Principal quantified objectives Fill the table when possible number 3 Objective : Objective : Objective 3: Objective 4: Unit used: Unit used: Unit used: Unit used: Add rows and columns if necessary 6

7 3.3. Secondary quantified objectives Fill the table when possible number 3 Objective : Objective : Objective 3: Objective 4: Unit used: Unit used: Unit used: Unit used: Add rows and columns if necessary 7

8 4. PROJECT DESCRIPTION 4. Please give a description of the overall project / stage of project / group of projects (see also Annexes III Part A or B) In the case of a stage of project describe the main project to which it relates, describe the stage or section concerned, how it relates to the complete project and why it can be considered technically and financially independent in its own right. In the case of a group of projects describe the overall characteristics of the group and give a full description of each project included in the group. Use quantified indicators (e. g. capacity of water supply/treatment plants, population served, level of treatment proposed, kms road/rail to be constructed/upgraded, structures - bridges, interchanges, tunnels, viaducts to be constructed, equipment/supplies required, etc) by filling the box 4.3. and 4.3. Use annexes and plans if necessary If the project is likely to have an important cross-border impact by virtue of its size and/or location tick the yes box and explain the reasons. Yes No Quantitative description: principal indicators number Indicator : Indicator : Indicator 3: Indicator *: Unit used: Unit used: Unit used: Unit used: Add rows and columns if necessary *Use more indicators if necessary 4.3. Quantitative description: secondary indicators number Indicator : Indicator : Indicator 3: Indicator *: Unit used: Unit used: Unit used: Unit used: Add rows and columns if necessary *Use more indicators if necessary 8

9 5. TIMETABLE 5. Timetable foreseen number Previous stages and studies(*) Market procurement Land acquisition Construction Start date End date Start date End date Start date End date Start date End date // // // // // // // // Operational phase starts: // // // // // // // // // Operational phase starts: // // // // // // // // // group Operational phase starts: // Add rows if necessary // // // // // // // // Operational phase starts: // (*) This phase includes: feasibility studies, cost/benefit analysis, financial analysis and environmental impact analysis. 5. Briefly explain the earlier phases of the project / stage of project/ group of projects already undertaken. number Phase Phase Phase 3 Phase Phase Phase 3 Phase Phase Phase 3 Add rows if necessary Phases description Start date End date // // // // // // // // // // // // // // // // // // 5.3 In the case of a stage of a project, give the anticipated construction timetable and a description of other related stages. number Stage Stage Stage 3 Stage 4 Start date End date Start date End date Start date End date Start date End date // // // // // // // // Description Description Description Description Add rows and columns if necessary 9

10 6. COSTS OF PROJECT 6. Eligible Costs number Planning Add rows if necessary Land acquisit. Site prepar. Building & Const. Technical Assist. Publicity 6. Expenditure before the application date* and/or identified as non eligible* number Planning Land acquisit. Site prepar. Building & Const. Technical Assist. Add rows if necessary * Refer to expenditure eligibility rules issued by the Commission (see Vademecum) 6.3 cost number Planning Add rows if necessary Land acquisit. 6.4 Value Added Tax Site prepar. Building & Const. Technical Assist. Publicity Publicity Equipment Contingency Equipment Contingency Equipment Contingency in thousand Euro VAT or equivalent in thousand Euro VAT or equivalent in thousand Euro VAT or equivalent If the organisation responsible for implementation is not subject to VAT (you filled in NO in.4.7) please give the legal basis for the exemption. If the organisation responsible for implementation is subject to VAT and it can not recover totally or partially the amount of the VAT paid, please explain the situation and give the legal basis applied to each particular case. Give the VAT percentage not recovered. 6.5 Eligible cost by year Numbe r in thousand Euro TOTAL 6.6 Financial Plan (see next page) (based on the foreseen expenditure to be incurred by the organisation responsible for implementation) 0

11 : No: TITLE Number FINANCING PLAN Public Expenditure or equivalent that meets the eligibility criteria for the Cohesion Fund Year TOTAL Cohesion Fund National Authorities Other % % Central Other Euro Community Loans (for information purposes only) []=[]+[4]+[8] [] [3]=[]/[] [4]=[6]+[7] [5]=[4]/[] [6] [7] [8] [3] : : : : : : : : : : : : : : : : : : : : : : : : [9] : : : [0] 0 Expenditures made before the application date [0] [] 0 Non eligible costs [] Investment [] = [9]+[0]+ [] 0 % Eligible Cost/ Investment [9] / []

12 6.7 Estimate the proportion of total cost attributable to measures taken to reduce and/or compensate negative environmental impacts and describe the measures taken number 3 4 % of project cost Add rows if necessary Measures taken 6.8 If the total eligible cost of the project or group of projects is less than 0 million Euro, tick the "yes" box and justify why the project should be considered for assistance Yes No

13 7. FINANCIAL & ECONOMIC ANALYSIS FINANCIAL ANALYSIS All applications must be accompanied by a financial analysis, attached in annex, indicating: - description of methodology (with particular mention to the assumptions made); - economic life of project; - capital costs; - the revenues generated (if any); - the operating and maintenance costs over its lifetime: - revenues generated over its lifetime; - discounted cash flow (DCF) analysis; - sensitivity analysis; 7. Anticipated operational costs and incomes in the year after the project has become substantially operational. number Year Estimated incomes () Add rows if necessary Estimated operational costs () % ()/() Net incomes (3) = () - () In thousand Euro Amortisation costs % (4) (3)/(4) 7. Summary of the financial analysis made and calculation of the maximum rate of cofinancing number life (years) Financial rate of return WITH the Cohesion Fund Assistance () Add rows if necessary Discounted cash flow Financial rate of return WITHOUT the Cohesion Fund Assistance () Net Present Value of Investment (3) Net Present Value of Net Revenues (4) In thousand Euro % % (4)/(3) - (4)/(3) Please comment: In no case should this percentage be higher than 85% of the eligible public expenditure. 3

14 7.3.a Describe the income foreseen in the financial analysis distinguishing between what is generated through tariffs or levies from what is generated by sale of products or other. Explain the method used in this calculation use more space if necessary 7.3.b If income is generated through tariffs or levies, explain if they differ between various users. 7.3.c If income is generated through tariffs or levies explain if they are proportional to the depreciation of the project / real consumption and / or to the pollution generated by users. 7.4 Describe the costs foreseen in the financial analysis and explain the method used in their calculation. 7.5 If the project is not generating income, explain what provisions have been made to cover operating and maintenance cost to ensure the viability of the project 4

15 7.6 ECONOMIC ANALYSIS All applications must be accompanied by a cost-benefit analysis, or other quantified economic analysis, such as cost effectiveness analysis or multi-criteria analysis. In the case of cost-benefit analysis, it should include the following: - description of methodology; - alternative options considered; - direct and indirect costs and benefits in construction stage; - direct and indirect costs and benefits in operational stage; - key assumptions made in valuing costs and benefits; - assessment of costs and benefits which cannot be fully quantified or valued; - main beneficiaries of the project(s) and anticipated rate of utilisation; - results of analysis expressed in terms of Internal Rate of Return, Net Present Value or benefit-cost ratios; - assessment of risk and uncertainties (estimated effect of changes in main parameters); - conclusions Main costs identified in the Cost-Benefits Analysis (CBA) number 3 Cost :. Cost :. Cost :. TOTAL Present Value % Present Value % Present Value % Present Value % Add rows and columns if necessary 7.6. Main benefits identified in the CBA number 3 Benefit :. Benefit :. Benefit. TOTAL Present Value % Present Value % Present Value % Present Value % Add rows and columns if necessary 7.7 Main results of the CBA number Economic Life Add rows if necessary Net Present Value of Costs Discount rate used Net Present Value of Benefits Net Present Value Internal Rate of Return In thousand Euro Benefit/Cost Ratio 5

16 Briefly comment the main conclusions of the CBA use more space if necessary 7.8 Give details of the main non-quantifiable / non valuable benefits and costs identified in the analysis use more space if necessary 7.9 If CBA has not been used, give reasons, describe the method of analysis used as well as the main conclusions of the analysis use more space if necessary RISK AND SENSITIVITY ANALYSIS 7.0 Describe the main assumptions of the analysis and indicate the main results to changes in Internal Rate of Return (IRR) and in Net Present Values (NPV) Parameter (*) Number 3 Type of modification Add rows if necessary I R R N P V (*) Add more relevant parameters if necessary Type of modification I R R N P V Type of modification I R R N P V Type of modification I R R N P V Please comment: use more space if necessary 6

17 8. FINANCIAL ASSISTANCE 8. Amount and rate of financial assistance requested number 3 4 Eligible Cost (in Euro) Add rows if necessary Amount of financial Assistance (in Euro) Rate of Assistance Requested (%) 8. If the project duration is less than years or the amount of the assistance does not exceed 50 millions Euro, is the grant requested as a single commitment? Yes No 7

18 9. IMPACT ON EMPLOYMENT 9. Number of jobs created* number 3 4 Construction Phase Direct jobs Indirect jobs Expected duration Add rows if necessary *In annual full-time equivalents Direct jobs Operational Phase Indirect jobs 8

19 0. COMPATIBILITY WITH COMMUNITY POLICIES 0. Public procurement Number Type of Contract Studies Works Supplies Services Studies Works Supplies Services 3 Studies Works Brief description Estimated Costs Supplies Services Add rows if necessary (*) Details for contracts already awarded, please fill the Annex II 0. Concessions Number of Contracts foreseen Cost of contracts already awarded* Number of Contracts awarded* Please attach a copy of the contract and give details of their essential elements (name of the contractor, legal status, duration of the contract, subject, etc.) 0.3 Competition Number Does the project involve a State Aid? Yes... Add rows if necessary No If YES, give details (e.g. if registered in a state aid scheme or in an ad hoc case, number of notification, reference of the letter of approval by the Commission, etc) 9

20 0.4. Environment 0.4. Explain how the project contributes to the objectives of sustainable development 0.4. Explain how the project respects the polluter pay principle If the project does not respect this principle, explain the reasons Consultation of the environmental authorities Number Have the environmental authorities concerned by the project been consulted? Yes No If YES, give name and address of the authority and the result of the consultation. If NO, give the reasons Add rows if necessary Environmental Impact Assessment Please complete for each project Annex I to this application form on Environmental Impact Assessment If the project(s) envisage(s), apart from an Environmental Impact Assessment, any additional environmental integration measures (e.g. environmental audit, environmental management, specific environmental monitoring), tick the Yes box and specify the measure. Number Yes No If YES specify the measure(s)..... Add rows if necessary 0.5 Others 0.5. Please refer to any other Community policy of relevance to the project (e.g. agriculture, energy, etc) and explain the connection: 0

21 . CONSISTENCY WITH OTHER MEASURES FINANCED BY THE COMMUNITY. Is this project complementary to any programme, project, or other form of intervention financed or to be financed by the Structural Funds? Yes No If yes, give details: (In the case of projects previously financed by the structural funds indicate the independence of this project. Has an application been made for financial assistance from any other Community source, including the EIB, for this project? Yes No If yes, please give details: Financial instruments concerned, reference N, dates, amounts requested, amounts granted, etc.

22 . MONITORING. Specify the indicators to be used for monitoring and assessing the physical progress of the project: (a) (b) Identify key indicators (eg. earth works, material used, main structures, equipment, pipelines, etc.) Give estimated volume of work required to complete project. Indicator (*) Number Units used Number of units Units used Number of units Units used Number of units Units used Number of units Units used Number of units 3 4 Add rows if necessary (*) Add more relevant indicators if necessary

23 3. ARRANGEMENTS FOR MANAGEMENT, MONITORING, CONTROL AND EVALUATION 3. Briefly explain the arrangements in place for the monitoring, financial control and evaluation of the project 3. Specify if there are any special arrangements that apply to this project (eg. project management, specific monitoring committee) 3

24 4. PUBLICITY MEASURES 4. Give details of publicity foreseen for the project Refer to guidelines on information and publicity (to be issued by the Commission) Number Type of Publicity and brief description On site notice(s) Newspaper TV On site notice(s) Newspaper TV 3 On site notice(s) Newspaper TV... Add rows if necessary Expected duration (in months) Estimated Costs of the campaign Estimated date of start Comments if necessary 4

25 5.A ENVIRONMENT PROJECTS The following questions are intended to determine the general eligibility of environment projects for assistance from the Cohesion Fund. (See also Annex III Part A) 5.A. Explain to which of the environmental objectives of Art. 74 of the Treaty of the European Community and objectives or themes of the 5th Environmental Action Programme the project relates. Objectives / Themes Preserving, protecting and improving the quality of the environment Protecting human health Comments Prudent and rational utilisation of natural resources Promoting measures at international level to deal with regional or world-wide environmental problems Sustainable management of natural resources Integrated pollution control and prevention of waste Reduction in consumption of non-renewable energy Improved mobility management Improvement of environmental quality in urban areas Improvement of public health and safety Climate change Air quality Nature and biodiversity Urban environmental Waste management Coastal zones Water resources management 5

26 5.A. Explain if the project is of a preventive or of a curative nature? Preventive Curative Explain briefly: 5.A.3 Explain how the project is linked to the implementation of Community environmental legislation, referring to the specific Community Directive(s) or Regulation(s) involved 75/440/EEC (surface water quality) 75/44/EEC, amended by 9/56/EEC (waste) 9/676/EEC (nitrates) 9/689/EEC (dangerous waste) 9/7/EEC (urban waste water treatment) 94/6/EEC (packaging waste) Other (please specify) Add rows if necessary 5.A.4 Explain whether the project is consistent with a sectoral /integrated plan and programme associated with the implementation of Community policy or legislation mentioned in the previous point 6

27 5.B TRANSPORT PROJECTS The following questions are intended to determine the general eligibility of transport projects for assistance from the Cohesion Fund. (Annex III Part B should also be completed as appropriate according to the different modes of transport: roads or railways.) 5.B. Is the project included in the Trans-European transport network guidelines adopted by the Council and the European Parliament (Decision n 69/96/EC)? Yes No - If yes, specify which network guidelines: - If no, explain why the project should be considered for assistance: 5.B. Describe the specific contribution that the project is expected to make to the network guidelines in question (Explain in particular the contribution to a corridor or a system) 5.B.3 Which other projects of common interest are located on the same transport corridor? Title of the project Estimated starting date Estimated ending date Estimated cost A B Add more rows if necessary 7

28 5.B.4 What is the role of the project in the country's national transport policy? (Refer to National Planning document (if appropriate) and specify priority assigned to project) 5.B.5 Data on current and estimated future traffic flows by user category (Please fill in the following table for both the two scenarios (with/without project); adapt if appropriate Roads projects: % CATEGORY Year AADT* Intern. Light vehicles Heavy goods Buses Other Traffic Nation. Intern. Nation. Intern. Nation. Intern. Nation. Intern. Existing Completion Compl. + 5 Compl. + 0 Compl. + 5 Compl. + 0 * AADT - Annual average daily traffic YEAR Rail projects CATEGORY Passenger Man km Goods Tm km OTHER % Intern. % Intern. % Intern. Existing Completion Compl. + 5 Compl. + 0 Compl. + 5 Compl. + 0 Please comment on the main effects on present and potential future flows of international traffic, both within the Community and with third countries (e.g. Traffic volume variations, peak hour volumes, congestion periods, etc., existing and foreseen, with and without the project) 8

29 NAME and SIGNATURE:... AUTHORITY:... DATE // STAMP: 9

30 ANNEXES 30

31 ANNEX I ENVIRONMENTAL IMPACT ASSESSMENT (All parts to be completed for all projects). Development consent Has development consent 3 already been given to this project? Yes No If yes, on which date If no, when was the formal request for the development consent introduced and by which date is the final decision expected? Specify the competent authority or authorities, which has given or will give the development consent... Application of Directive on Environmental Impact Assessment (EIA) 4.. Is the project a class of development covered by: Annex I of Directive 85/337/EEC, as amended by Directive 9//EC Annex II of Directive 85/337/EEC, as amended by Directive 9//EC Not covered by Directive 85/337/EEC, as amended by Directive 9//EC (go to question.) (go to question.3) (go to question 3).. When covered by Annex I of the EIA Directive include the necessary documents 5. 3 i.e. decision of the competent authority or authorities which entitle the developer to proceed with the project 4 Directive 85/337/EEC on the assessment of the effects of certain public and private projects on the environment (OJ L 75 of ) as amended by Directive 97//EC (OJ L 73 of ). 5 Necessary documents are: a) the non-technical summary of the Environmental Impact Study carried out for the project; b) the results of consultations of the competent environmental authorities; c) the results of consultations with the public concerned. d) in the case of projects where the formal request for the development consent (point. above) was introduced after 4 March 999: the information referred to in article 9. of the Directive 85/337/EC as amended by article of Directive 97//EC. Note : In relation to b) and c) these may be represented in the form of a statement, conclusion or certification by the competent environmental authorities, indicating in what way the concerns of the designated consultees and concerned public have been taken into account 3

32 .3. When covered by Annex II of the EIA Directive has an Environmental Impact Assessment been carried out for this project? Yes No If yes include the necessary documents (see footnote 4). If no explain the reasons and give the thresholds, criteria or case by case examination carried out to reach the conclusion that the project has no significant environmental effects: 3. ASSESSMENT OF EFFECTS ON NATURA 000 SITES Will the project have significant negative effects on sites included or intended to be included in the Natura 000 network 6? Yes No - If yes, please attach a copy of the completed form including information on projects significantly affecting Natura 000 sites 7, as notified to the Commission (DG Environment) under Directive 9/43/EEC - If no, please complete declaration in Annex I(a) 6 These sites comprise: a) Special Protection Areas classified or requiring classification under the "Birds" Directive (79/409/EEC, OJ L03 of ) and b) Sites proposed or requiring proposal by Member states under Article 4() of the "Habitats" Directive (9/43/EEC, OJ L06 of.7.9). 7 Document no. 99/7-rev adopted by the Habitats Committee (Member States' representatives established under Directive 9/43/EEC) at its meeting of 4 October 999 3

33 ANNEX I (a) DECLARATION BY THE AUTHORITY RESPONSIBLE FOR MONITORING NATURA 000 SITES Responsible Authority... Having examined 8 the project application... (title)... which is to be located at... we declare that (tick the appropriate box): The project is not likely to have significant effects on a Natura 000 site on the following grounds: Therefore an appropriate assessment required by Article 6 (3) was not deemed necessary. Following an appropriate assessment, according to Art. 6(3) of Directive 9/43/EEC, the project will not have significant negative effects on a Natura 000 site. A map at scale of : (or the nearest possible scale) is attached, indicating the location of the project as well as the Natura 000 sites concerned, if any. Signed:... (Authority responsible for monitoring Natura 000 sites) Official Seal: 8 taking into account the requirements of Art. 6(3) of Directive 9/43/EEC 33

34 ANNEX II MONITORING OF PUBLIC PROCUREMENT TENDER PROCEDURES This annex must be sent together with the application for assistance. During the execution phase of the project it should be periodically up-dated and transmitted to the Commission Available information date (DD/MM/YY) Number Type of Contract Brief description Works Contract Contract Contract... Supplies Contract Contract Contract... Amount of the contract Attribution procedure used () Date of publication of market notice () Date of the signature of the contract (3) Services (including studies) Contract Contract Contract Add as many rows as necessary () For procedures "by mutual agreement" or "restricted" tender attach a justification for the choice of this procedure. () Send a copy of the publication in the OJ and a copy of the pre-information notice if published. (3) Send a copy of the attribution report and a copy of the post-information notice, if any. 34

35 ANNEX III SPECIFIC INFORMATION TO BE PROVIDED ACCORDING TO THE NATURE OF THE PROJECT Some of the information listed below is automatically covered by the headings of the questionnaire. Where the relevant information is not provided in the main questionnaire, please give further details to allow the Commission to determine the eligibility of the project for assistance from the Cohesion Fund. Member States are free to add any complementary information in the most appropriate format. ANNEX III Part A: ENVIRONMENTAL PROJECTS IN THE FIELD OF WATER MANAGEMENT (WATER SUPPLY AND/OR WASTEWATER TREATMENT) AND SOLID WASTE I. General information 9 II. In order to determine the context in which the projects are proposed it is necessary to have the following information: Programme/plan to which the project or group of projects is linked (national, regional, local, catchment area) and where applicable the reference to the relevant environmental legislation) Details of the situation and localisation: project plan and schemes, map (:00.000), sensitive areas, points of discharge; Summary containing current data (infrastructure/inventory of the overall water quality aspects in the area/region concerned), problems and the solution(s)/effects aimed at by the project; Indication of needs for vocational training if necessary; Feasibility studies and other aspects taken into account (hydrological, health etc.). Specific technical information A. Water supply Assessment of the situation; Quantification of water through the system; Quality of water at source and at delivery; Technical description (technology applied); Description of the existing networks, including % of leakage; Connection rate to the system (population); Water quality monitoring system; Management (planning/availability of (technical) personnel; The opinion of the other member states concerned in the case of major projects related to an international river. B. Waste water treatment ) Collection Technical description of the collecting system (design capacity in population equivalents and hydraulic terms, separate or combined system, stormwater overflows); Description of existing installations and their integration into the future system; population and/or industrial waste water already connected to collecting systems; Prevention of leakage; 9 35

36 Monitoring system; ) Treatment Waste water characteristics (urban, industrial, etc.); Design capacity in terms of pollution load (BOD5 0 in accordance with Directive 9/7/EC) and in terms of hydraulic capacity Technical description of the treatment technology (primary, secondary or tertiary); Description of existing installations for waste water disposal and their integration into the future system; Monitoring system. 3) Receiving Water affected Description of receiving water, its characteristics and the quality objective to be achieved or maintained 4) Sludge Sludge handling treatment Sludge disposal 5) Management Planning/availability of (technical) personnel. C. Waste management ) General aspects Quantities and characteristics of the waste to be treated. Technical description of the technology applied. National or Regional Plan to which the facilities might be affected Description of existing installations and their integration into the future system; Management (planning/availability of (technical) personnel); Statement of the competent authorities on the conformity of the project in relation to the national and Community strategies as regards solid waste. Location of the project and maps to make possible a judgement on the location of the various facilities or components of the proposed waste management system. ) Landfills Size of the landfill: surface and volume available. Indicate the technical characteristics of the landfill including, amongst other features, a description of the types and quantities of waste to be disposed, the possibilities of extension, expected life-time, the treatment of the methane emission (and its possible use) and the treatment of the leachates. Provide a description of the site, including its hydrological and geological characteristics as well as of the information allowing a judgement on the potential environmental impact. Information on the methods envisaged for the operation, monitoring and control of the landfill. Information on the methods envisaged for the closure of the landfill and of its control and maintenance after closure. 0 - use parameters in existing Community Directives 36

37 3) Composting facilities Description of the measures to be taken upstream in the collection system, in order to ensure a compost of acceptable quality by the market. Description of the processes of separate collection and treatment. Description of the composting method used, including characteristics of the output, as well as the final destination of the different types of waste (garden waste, organic, domestic, sludge from water waste treatment plant, livestock waste, etc.) 4) Transfer stations Number and location of the transfer stations according to the studies of optimisation carried out taking into account the distances to be covered as well as the roads to be used, the number and types of trucks, etc., (with a view to minimise the environmental and economic impact). The measures envisaged to avoid environmental contamination and to preserve the health and security of the workers. 5) Sorting centres Description of the various components of the transfer units, according to the waste channels envisaged; the type of sorting system (by hand, mechanical, chemical, mixed, etc.); the output of the proposed system in order to achieve the quantitative objectives of the existing waste management plan. 6) Closure of uncontrolled landfills Plan of closure of the existing uncontrolled landfills, with particular mention of the measures to control and monitor methane emissions, leachates, infiltration towards aquifers, rivers, etc. Final use of the site once it has been closed. 7) Incinerators Types of waste to be incinerated. Measures to be taken upstream in the collection system to improve the incineration and to avoid the presence of undesirable wastes. Description of the method and technology used, location, energy production and the quality control measures. Characteristics and disposal methods for the slags and ashes. 37

38 ANNEX III Part B: TRANSPORT PROJECTS ROAD PROJECTS. description and location Type of project: New Upgrading Mixed Length:... Number of lanes per direction:... Number of junctions (per type):... Bridges (length/width):... Tunnels (length/width):... Number of other major technical works:.... Location General map (locating project on corridor) Detailed map (indicating the position of start and end (km), major technical works (km), adjacent villages/towns, etc.) RAIL PROJECTS. description and location Type of project: New Upgrading Mixed For upgrading specify: For new lines, specify: Electrification: Track doubling or improvement: Signalling modernisation: Track gauge/loading gauge adaptation: Elimination of level crossings:. Location Length: Max. Speed: Track/loading gauge: Type of signalling system: Electrification system: Number of bridges: Number of tracks: Bridges (length/width): Tunnels (length/width): Number of other major technical works: General map (locating project on corridor). Detailed map (indicating the position of start and end (km), major technical works (km), adjacent villages/towns, etc.). 38

This note has been prepared by the Directorate-General for Regional Policy.

This note has been prepared by the Directorate-General for Regional Policy. COCOF 08/0006/00-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DRAFT INFORMATION NOTE TO THE COCOF MAJOR PROJECTS IN THE PROGRAMMING PERIOD 2007-2013: THRESHOLDS AND CONTENTS OF COMMISSION

More information

DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD : THRESHOLD AND CONTENTS OF COMMISSION DECISIONS

DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD : THRESHOLD AND CONTENTS OF COMMISSION DECISIONS COCOF 08/0006/04-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD 2007-2013: THRESHOLD AND CONTENTS OF COMMISSION DECISIONS!WARNING!

More information

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Massimo Marra JASPERS Networking and Competence Centre IPA Conference Impact Assessment What can we

More information

FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT

FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT This list of frequently asked questions is based on comments received from Member States (MS) on Part II of the Guidance on ex ante conditionalities

More information

Ispa will have until 2006 an annual budget of about 1,040m (expressed in 1999 price).

Ispa will have until 2006 an annual budget of about 1,040m (expressed in 1999 price). 15 June 2000 The Instrument for Structural Policies for Pre-accession (Ispa) is the European Commission s instrument to help the ten Central European candidate countries to adapt to the environmental and

More information

GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER TWO PROGRAMMING PERIODS

GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER TWO PROGRAMMING PERIODS 29/03/2012 COCOF_12-0047-02-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DIRECTORATE-GENERAL EMPLOYMENT, SOCIAL AFFAIRS and EQUAL OPPORTUNITIES GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER

More information

INFRASTRUCTURE INVESTMENT

INFRASTRUCTURE INVESTMENT ANNEX MAJOR PROJECT 1 NOTIFICATION TO THE COMMISSION OF THE SELECTED MAJOR PROJECT UNDER ARTICLE 92.1. OF COMMON PROVISIONS REGULATION (CPR) (EC) NO ( ) 2 EUROPEAN REGIONAL DEVELOPMENT FUND / COHESION

More information

Official Journal of the European Union

Official Journal of the European Union L 157/8 9.6.2006 DIRECTIVE 2006/38/EC OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 17 May 2006 amending Directive 1999/62/EC on the charging of heavy goods vehicles for the use of certain infrastructures

More information

ISPA Manual Working Document TABLE OF CONTENTS PREFACE...4 I. INTRODUCTION...6 PROGRAMMING DECISIONS FOR ISPA PROJECTS...14

ISPA Manual Working Document TABLE OF CONTENTS PREFACE...4 I. INTRODUCTION...6 PROGRAMMING DECISIONS FOR ISPA PROJECTS...14 Revision April 2002 The "Instrument for Structural Policies for Pre-accession" (ISPA) is the European Community's financial instrument set up in order to assist the ten Central and East European candidate

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

Guide for the evaluation of LIFE Integrated Project proposals 2014 Environment sub-programme

Guide for the evaluation of LIFE Integrated Project proposals 2014 Environment sub-programme Guide for the evaluation of LIFE Integrated Project proposals 2014 Environment sub-programme This document aims at explaining to the public the criteria and procedures that will be used for the evaluation

More information

COMMISSION DECISION. C(2007)6376 on 18/12/2007

COMMISSION DECISION. C(2007)6376 on 18/12/2007 COMMISSION DECISION C(2007)6376 on 18/12/2007 adopting a horizontal programme on the Energy Efficiency Finance Facility for Albania, Bosnia and Herzegovina, Croatia, Montenegro, Serbia including Kosovo

More information

PE-CONS 3619/3/01 REV 3

PE-CONS 3619/3/01 REV 3 on the assessment of the effects of certain plans and programmes on the environment THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION, Having regard to the Treaty establishing the European

More information

CBA of transport infrastructure projects in Germany

CBA of transport infrastructure projects in Germany CBA of transport infrastructure projects in Germany Dr. Catharina Horn Federal Transport Infrastructure Planning, Investment Policy Paris, 27th of February 2014 www.bmvi.de 1. The Federal Transport Infrastructure

More information

An overview of the eligibility rules in the programming period

An overview of the eligibility rules in the programming period Rules and conditions applicable to actions co-financed from Structural Funds and Cohesion Fund An overview of the eligibility rules in the programming period 2007-2013 FEBRUARY 2009 1 Table of contents

More information

PART III. SUPPLEMENTARY INFORMATION SHEETS. Part III.4 a Provisional Supplementary Information Sheet on regional investment aid schemes

PART III. SUPPLEMENTARY INFORMATION SHEETS. Part III.4 a Provisional Supplementary Information Sheet on regional investment aid schemes PART III. SUPPLEMENTARY INFORMATION SHEETS Part III.4 a Provisional Supplementary Information Sheet on regional investment aid schemes Document version: May 2014 This supplementary information sheet is

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 30.3.2009 C(2009) 2178 final COMMISSION DECISION of 30.3.2009 establishing the multi-annual work programme 2009 for grants in the field of trans- European

More information

GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES

GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES April 2005 Introduction This document has been published by the Project Preparation Committee (PPC) within the framework of the DABLAS Task Force

More information

(Legislative acts) DIRECTIVES

(Legislative acts) DIRECTIVES 14.10.2011 Official Journal of the European Union L 269/1 I (Legislative acts) DIRECTIVES DIRECTIVE 2011/76/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 27 September 2011 amending Directive 1999/62/EC

More information

PART III. SUPPLEMENTARY INFORMATION SHEETS. Part III.4 b Provisional Supplementary Information Sheet on individual regional investment aid

PART III. SUPPLEMENTARY INFORMATION SHEETS. Part III.4 b Provisional Supplementary Information Sheet on individual regional investment aid PART III. SUPPLEMENTARY INFORMATION SHEETS Part III.4 b Provisional Supplementary Information Sheet on individual regional investment aid Document version: May 2014 This supplementary information sheet

More information

ANNEX. to the Comission Decision. amending Decision C(2013) 1573

ANNEX. to the Comission Decision. amending Decision C(2013) 1573 EUROPEAN COMMISSION Brussels, 30.4.2015 C(2015) 2771 final ANNEX 1 ANNEX to the Comission Decision amending Decision C(2013) 1573 on the approval of the guidelines on the closure of operational programmes

More information

Official Journal of the European Union L 78/41

Official Journal of the European Union L 78/41 20.3.2013 Official Journal of the European Union L 78/41 REGULATION (EU) No 229/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 13 March 2013 laying down specific measures for agriculture in favour

More information

ELIGIBILITY RULES. Rule No 1: Expenditure Actually Paid Out

ELIGIBILITY RULES. Rule No 1: Expenditure Actually Paid Out ESF/PA/2-2001 Eligibility Rules Department of Enterprise, Trade and Employment Circular No. ESF/PA/2-2001 The text of this Circular, with the exception of that in bold & italic, is taken directly from

More information

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Official Journal of the European Union. (Non-legislative acts) REGULATIONS 8.4.2016 L 94/1 II (Non-legislative acts) REGULATIONS COMMISSION IMPLEMTING REGULATION (EU) 2016/545 of 7 April 2016 on procedures and criteria concerning framework agreements for the allocation of rail

More information

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. amending Directive 1999/31/EC on the landfill of waste

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. amending Directive 1999/31/EC on the landfill of waste EUROPEAN COMMISSION Brussels, 2.12.2015 COM(2015) 594 final 2015/0274 (COD) Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL amending Directive 1999/31/EC on the landfill of waste

More information

Project Appraisal Guidelines for National Roads Unit Minor Projects ( 0.5m to 5m)

Project Appraisal Guidelines for National Roads Unit Minor Projects ( 0.5m to 5m) Project Appraisal Guidelines for National Roads Unit 14.0 - Minor Projects ( 0.5m to 5m) February 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII)

More information

REGULATION (EC) No 1083/2006 of 11 July 2006

REGULATION (EC) No 1083/2006 of 11 July 2006 REGULATION (EC) No 1083/2006 of 11 July 2006 Financial engineering Article 44 Financial engineering instruments As part of an operational programme, the Structural Funds may finance expenditure in respect

More information

PLAN OF MEASURES TO DRIVE GROWTH, COMPETITIVENESS AND EFFICIENCY

PLAN OF MEASURES TO DRIVE GROWTH, COMPETITIVENESS AND EFFICIENCY PLAN OF MEASURES TO DRIVE GROWTH, COMPETITIVENESS AND EFFICIENCY 6 June, 2014 The National Reform Programme 2014 reflects the intense reforming activity of the last two years, which has led to the Spanish

More information

GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION

GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN 2014-2020 VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION Regulation Articles Article 18 Performance reserve Article 19 Performance

More information

The Programming Period Working Document No. 7. July 2009

The Programming Period Working Document No. 7. July 2009 EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Policy Development Evaluation The Programming Period 2007-2013 INDICATIVE GUIDELINES ON EVALUATION METHODS: REPORTING ON CORE INDICATORS FOR THE

More information

Ex-Post Evaluation of Projects and Activities Financed under the LIFE Programme

Ex-Post Evaluation of Projects and Activities Financed under the LIFE Programme Directorate General Environment, Unit E4 LIFE Ex-Post Evaluation of Projects Activities Financed under the LIFE Programme Country-by-country analysis Irel July 2009 COWI A/S Parallelvej 2 DK-2800 Kongens

More information

Ex Post evaluation of a sample of projects co-financed by the Cohesion Fund ( )

Ex Post evaluation of a sample of projects co-financed by the Cohesion Fund ( ) Ex Post evaluation of a sample of projects co-financed by the Cohesion Fund (1993-2002) Synthesis Report Final Report Client: European Commission, DG Regional Policy ECORYS Transport Rotterdam, 24 January

More information

CATEGORIES OF INTERVENTION. Fiche no 6. Brussels, 14 November Commission Proposals

CATEGORIES OF INTERVENTION. Fiche no 6. Brussels, 14 November Commission Proposals CATEGORIES OF INTERVENTION Fiche no 6 Brussels, 14 November 2011 Articles Commission Proposals Articles 87 (2) (b) (iv) and 102 (2) Common Provisions Regulation [COM(2011) 615] This draft working paper

More information

Committee on Petitions NOTICE TO MEMBERS

Committee on Petitions NOTICE TO MEMBERS EUROPEAN PARLIAMT 2009-2014 Committee on Petitions 29.11.2013 NOTICE TO MEMBERS Subject: Petition 0298/2012 by Arivem (French Association), on the construction of a gas production plant at Romainville

More information

JASPERS Advisory and capacity building support for projects and investment

JASPERS Advisory and capacity building support for projects and investment JASPERS Advisory and capacity building support for projects and investment Massimo Marra, Senior Officer JASPERS Networking and Competence Centre JASPERS-EPEC Seminar on Blending ESI Funds and PPPs Brussels,

More information

FISHERIES MEASURES FOR MARINE NATURA 2000 SITES A consistent approach to requests for fisheries management measures under the Common Fisheries Policy

FISHERIES MEASURES FOR MARINE NATURA 2000 SITES A consistent approach to requests for fisheries management measures under the Common Fisheries Policy FISHERIES MEASURES FOR MARINE NATURA 2000 SITES A consistent approach to requests for fisheries management measures under the Common Fisheries Policy It is the responsibility of Member States to designate

More information

Bucharest, 21 May 2016 FINANCING PRODUCTS FOR EU FUNDS PROJECTS

Bucharest, 21 May 2016 FINANCING PRODUCTS FOR EU FUNDS PROJECTS Bucharest, 21 May 2016 FINANCING PRODUCTS FOR EU FUNDS PROJECTS SUMMARY I) UNICREDIT BANK HISTORY IN FINANCING EU FUNDS PROJECTS II) 2014 2020 BUDGET ALLOCATIONS III) UNICREDIT BANK PRODUCTS IV) UNICREDIT

More information

Major projects CBA for transport sector Brussels, 30 September 2015

Major projects CBA for transport sector Brussels, 30 September 2015 Regional Major projects 2014-2020 - CBA for transport sector Brussels, 30 September 2015 Major projects 2007-2013 Witold Willak Head of Sector, Major Projects, Unit G1 for Smart and Sustainable growth,

More information

SEA&RDP. SEA and rural development programmes. Yvette IZABEL DG environment- Unit A3: Cohesion Policy and Environmental assessments

SEA&RDP. SEA and rural development programmes. Yvette IZABEL DG environment- Unit A3: Cohesion Policy and Environmental assessments SEA&RDP SEA and rural development programmes Yvette IZABEL DG environment- Unit A3: Cohesion Policy and Environmental assessments Environmental Assessment Water Framework Directive Policies Habitats and

More information

The new Trans-European Transport Network Policy

The new Trans-European Transport Network Policy The new Trans-European Network Policy A STRONG BASIS FOR THE EUROPEAN ECONOMY AND FOR TERRITORIAL DEVELOPMENT Gudrun Schulze, European Commission, DG MOVE, B1 Milano, 7 May 2015 TEN-T policy: Key to Europe's

More information

COMMISSION REGULATION (EU) / of XXX

COMMISSION REGULATION (EU) / of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2015) XXX draft COMMISSION REGULATION (EU) / of XXX amending Regulation (EU) No 651/2014 declaring certain categories of aid compatible with the internal market in

More information

Tracking climate expenditure

Tracking climate expenditure istockphoto Tracking climate expenditure The common methodology for tracking and monitoring climate expenditure under the European Structural and Investment Funds (2014-2020) Climate Action Introduction

More information

Connecting Europe: Trans-European Networks [ :25]

Connecting Europe: Trans-European Networks [ :25] Connecting Europe: Trans-European Networks [18-11-2013-18:25] "Connecting Europe Facility" (CEF) is the EU's new funding mechanism for infrastructure projects of common interest for trans-european transport,

More information

Trans-European Energy Networks

Trans-European Energy Networks Trans-European Energy Networks 1 st TEN-E Information Day Brussels, 30 th March 2007 Mr. Edgar Thielmann Dr. Wolfgang Kerner Mr. Mark Vangampelaere Mr. Patrick Bourrel Mr. Jean-Claude Merciol Acting Director

More information

EUROPEAN UNION. Brussels, 15 July 2011 (OR. en) 2008/0147 (COD) PE-CONS 24/11 TRANS 193 FISC 89 ENV 549 CODEC 1044

EUROPEAN UNION. Brussels, 15 July 2011 (OR. en) 2008/0147 (COD) PE-CONS 24/11 TRANS 193 FISC 89 ENV 549 CODEC 1044 EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Brussels, 15 July 2011 (OR. en) 2008/0147 (COD) PE-CONS 24/11 TRANS 193 FISC 89 V 549 CODEC 1044 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject: DIRECTIVE

More information

Strategic Review Financial Highlights. Business opportunities. Results by business

Strategic Review Financial Highlights. Business opportunities. Results by business March 2004 Strategic Review 2003 Financial Highlights Business opportunities Results by business Conclusions A Construction & Services Market Reference # 1 in Spanish Construction # 1 in Industrial Services

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ANNUAL REPORT OF THE COHESION FUND (2004) {SEC(2005)1396}

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ANNUAL REPORT OF THE COHESION FUND (2004) {SEC(2005)1396} COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 7.11.2005 COM(2005) 544 final REPORT FROM THE COMMISSION ANNUAL REPORT OF THE COHESION FUND (2004) {SEC(2005)1396} EN EN TABLE OF CONTENTS REPORT FROM THE

More information

Application of the SEA to the programmes

Application of the SEA to the programmes Application of the SEA to the programmes 2014-20 For programmes screened out (shorter procedure) The environmental assessment procedure Screening Scoping Environmental Report/Study Information and Consultation

More information

Incentive Guidelines Investment Aid for Energy Efficiency Projects

Incentive Guidelines Investment Aid for Energy Efficiency Projects Incentive Guidelines Investment Aid for Energy Efficiency Projects Issue Date: 18 th May 2018 Version: 1 http://support.maltaenterprise.com Malta Enterprise provides support to interested applicants to

More information

Economic Analysis Concepts

Economic Analysis Concepts Economic Analysis Concepts Questions & Decisions (1) Is the project justified?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive alternatives? If funds

More information

Draft Environmental Impact Statement. Appendix G Economic Analysis Report

Draft Environmental Impact Statement. Appendix G Economic Analysis Report Draft Environmental Impact Statement Appendix G Economic Analysis Report Appendix G Economic Analysis Report Economic Analyses in Support of Environmental Impact Statement Carolina Crossroads I-20/26/126

More information

Financing ERTMS with the Connecting Europe Facility

Financing ERTMS with the Connecting Europe Facility Control Command and Railway Communication Conference Lille, 12 November 2013 Financing ERTMS with the Connecting Europe Facility Stéphane Ouaki European Commission, DG Mobility and (DG MOVE) 1 New funding

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 30.1.2019 COM(2019) 65 final 2019/0030 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL laying down provisions for the continuation of ongoing

More information

NGO voting recommendations Connecting Europe Facility Regulation

NGO voting recommendations Connecting Europe Facility Regulation NGO voting recommendations Connecting Europe Facility Regulation 2014-2020 ITRE-TRAN committee (Co-rapporteurs: D. Riquet, I. Ayala Sender,A. Valean) Vote on Tuesday 18 December 2012, from 09:00 Environmental

More information

DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT

DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT DRAFT 21.05.2013 DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT OF THE OPERATIONAL PROGRAMME Version 3 21.05.2013 This document is based on the Presidency compromise text (from 19 December 2012), which

More information

NOTE OF DG ENERGY & TRANSPORT ON DIRECTIVES 2003/54-55 AND REGULATION 1228\03 IN THE ELECTRICITY AND GAS INTERNAL MARKET

NOTE OF DG ENERGY & TRANSPORT ON DIRECTIVES 2003/54-55 AND REGULATION 1228\03 IN THE ELECTRICITY AND GAS INTERNAL MARKET NOTE OF DG ENERGY & TRANSPORT ON DIRECTIVES 2003/54-55 AND REGULATION 1228\03 IN THE ELECTRICITY AND GAS INTERNAL MARKET THIS DOCUMENT IS NOT BINDING ON THE COMMISSION EXEMPTIONS FROM CERTAIN PROVISIONS

More information

First analysis of the biannual report on policies and measures in the framework of Decision 280/2004/EC (Monitoring Mechanism) EU policy linkages

First analysis of the biannual report on policies and measures in the framework of Decision 280/2004/EC (Monitoring Mechanism) EU policy linkages First analysis of the biannual report on policies and measures in the framework of Decision 280/2004/EC (Monitoring Mechanism) EU policy linkages Study commissioned by the Federal Public Service of Public

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 6.7.2012 C(2012) 4531 final COMMISSION DECISION of 6.7.2012 with regard to the amendment of Decision C(2012) 1216 of 27 February 2012 adopting the 2012 work programme in the

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 7 November /05 Interinstitutional File: 2004/0154 (COD)

COUNCIL OF THE EUROPEAN UNION. Brussels, 7 November /05 Interinstitutional File: 2004/0154 (COD) COUNCIL OF THE EUROPEAN UNION Brussels, 7 November 2005 13688/05 Interinstitutional File: 2004/0154 (COD) CODEC 934 ECOFIN 325 TRANS 209 ECO 120 ER 159 NOTE from: to: Subject: General Secretariat Permanent

More information

DRAFT TEMPLATE AND GUIDELINES ON THE CONTENT PARTNERSHIP AGREEMENT OF THE

DRAFT TEMPLATE AND GUIDELINES ON THE CONTENT PARTNERSHIP AGREEMENT OF THE DRAFT TEMPLATE AND GUIDELINES ON THE CONTENT OF THE PARTNERSHIP AGREEMENT This is a draft document based on the new ESIF Regulations published in OJ 347 of 20 December 2013 and on the most recent version

More information

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT 17 April 2009 This document has been produced with the financial

More information

Guidance document on. management verifications to be carried out by Member States on operations co-financed by

Guidance document on. management verifications to be carried out by Member States on operations co-financed by Final version of 05/06/2008 COCOF 08/0020/04-EN Guidance document on management verifications to be carried out by Member States on operations co-financed by the Structural Funds and the Cohesion Fund

More information

Official Journal of the European Union. (Legislative acts) DIRECTIVES

Official Journal of the European Union. (Legislative acts) DIRECTIVES 25.4.2014 L 124/1 I (Legislative acts) DIRECTIVES DIRECTIVE 2014/52/EU OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 16 April 2014 amending Directive 2011/92/EU on the assessment of the effects of certain

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of 2008

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of 2008 EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION of 2008 adopting an Annual Programme II for Kosovo (under UNSCR 1244/99) 1 under the IPA Transition Assistance and Institution Building

More information

Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation (EC) No 1083/2006

Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation (EC) No 1083/2006 REVISED VERSION 08/02/2012 COCOF_10-0014-05-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation

More information

DECISIONS Official Journal of the European Union L 7/3

DECISIONS Official Journal of the European Union L 7/3 11.1.2012 Official Journal of the European Union L 7/3 DECISIONS COMMISSION DECISION of 20 December 2011 on the application of Article 106(2) of the Treaty on the Functioning of the European Union to State

More information

STRATEGIC ACTION PLAN GUIDELINES & MODEL

STRATEGIC ACTION PLAN GUIDELINES & MODEL Innovation and Networks Executive Agency STRATEGIC ACTION PLAN GUIDELINES & MODEL Background Article II.2.4 of the standard text of the Commission Decisions granting Community financial aid for projects

More information

EU Action Programme for reducing administrative burdens

EU Action Programme for reducing administrative burdens MEMO/07/25 Brussels, 24 th January 2007 EU Action Programme for reducing administrative burdens This Action Programme sets out how the Commission proposes that information obligations should be identified,

More information

Prioritisation Methodology

Prioritisation Methodology Prioritisation Methodology March 2014 PRIORITISATION METHODOLOGY Table of contents 1 Introduction... 5 2 The Projects Prioritisation Process... 7 3 The Methodological Assumptions... 8 3.1 Background...

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Strasbourg, 25.10.2016 COM(2016) 710 final ANNEX 2 ANNEX to the COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE

More information

COMMISSION OPINION. of

COMMISSION OPINION. of EUROPEAN COMMISSION Brussels, 10.12.2014 C(2014) 9313 final COMMISSION OPINION of 10.12.2014 in accordance with Article 7h(2) of Directive 1999/62/EC concerning the introduction of a new tolling arrangement

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 2.0 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was updated further

More information

Proposal for a COUNCIL REGULATION

Proposal for a COUNCIL REGULATION EUROPEAN COMMISSION Brussels, 30.1.2019 COM(2019) 64 final 2019/0031 (APP) Proposal for a COUNCIL REGULATION on measures concerning the implementation and financing of the general budget of the Union in

More information

Croatian draft Waste Management Plan (WMP) including Waste prevention programme (WPP) and Action Plans COMMENTS. DG REGIO, DG ENV and JASPERS

Croatian draft Waste Management Plan (WMP) including Waste prevention programme (WPP) and Action Plans COMMENTS. DG REGIO, DG ENV and JASPERS Croatian draft Waste Management Plan (WMP) including Waste prevention programme (WPP) and Action Plans COMMENTS and JASPERS Background: These comments represent informal views of the Commission services

More information

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014)

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) FAQ Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) CORRIGENDUM: In the first version of the Application Guide,

More information

REPORT on the annual accounts of the European Railway Agency for the financial year 2008, together with the Agency s replies (2009/C 304/17)

REPORT on the annual accounts of the European Railway Agency for the financial year 2008, together with the Agency s replies (2009/C 304/17) 15.12.2009 Official Journal of the European Union C 304/89 REPORT on the annual accounts of the European Railway Agency for the financial year 2008, together with the Agency s replies (2009/C 304/17) CONTENTS

More information

Screening report Turkey

Screening report Turkey 20 June 2007 Screening report Turkey Chapter 21 Trans-European networks Date of the screening meetings: Explanatory meeting: 30 June 2006 Bilateral meeting: 29 September 2006 Turkey: chapter 21 Trans-European

More information

(Information) INFORMATION FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION

(Information) INFORMATION FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION C 188/4 EN Official Journal of the European Union 20.6.2014 II (Information) INFORMATION FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION COMMUNICATION FROM THE COMMISSION

More information

19 Major Accidents and Natural Disasters

19 Major Accidents and Natural Disasters 19 Major Accidents and Natural Disasters 19.1 Introduction This chapter describes likely significant negative effects on the environment arising from the vulnerability of the proposed development to risks

More information

State aid & Infrastructure. Lida BALTA DG for Competition European Commission

State aid & Infrastructure. Lida BALTA DG for Competition European Commission State aid & Infrastructure 1 Lida BALTA DG for Competition European Commission How to Assess Whether Support for an Infrastructure Project Involves State Aid Notion of aid in infrastructure projects Infrastructure

More information

GUIDANCE NOTE ON ANNUAL CONTROL REPORTS AND OPINIONS

GUIDANCE NOTE ON ANNUAL CONTROL REPORTS AND OPINIONS Final version of 18/02/2009 COCOF 09/0004/01-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY GUIDANCE NOTE ON ANNUAL CONTROL REPORTS AND OPINIONS [Article 62 (1) (d)(i) & (ii) of Council Regulation

More information

TRANS-EUROPEAN NETWORKS GUIDELINES

TRANS-EUROPEAN NETWORKS GUIDELINES TRANS-EUROPEAN NETWORKS GUIDELINES The Treaty on the Functioning of the European Union (TFEU) retains the trans-european networks (TENs) in the areas of transport, energy and telecommunications, first

More information

Table of contents. Introduction Regulatory requirements... 3

Table of contents. Introduction Regulatory requirements... 3 COCOF 08/0020/02-EN DRAFT Guidance document on management verifications to be carried out by Member States on projects co-financed by the Structural Funds and the Cohesion Fund for the 2007 2013 programming

More information

Methodology for CBA preparation SOP Environment

Methodology for CBA preparation SOP Environment Methodology for CBA preparation SOP Environment Programming Meeting for water and wastewater projects in the period 2008-2009 Mamaia, 10-13 th July 2008 Massimo Marra JASPERS Regional Office for Romania

More information

COMMISSION OF THE EUROPEAN COMMUNITIES

COMMISSION OF THE EUROPEAN COMMUNITIES EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 23.2.2009 COM(2009) 82 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE

More information

EVALUATION AND FITNESS CHECK (FC) ROADMAP

EVALUATION AND FITNESS CHECK (FC) ROADMAP TITLE OF THE EVALUATION/FC LEAD DG RESPONSIBLE UNIT TYPE OF EVALUATION EVALUATION AND FITNESS CHECK (FC) ROADMAP Evaluation of the impact of the CAP measures towards the general objective "viable food

More information

Working document. Consolidated version of amended annexes, 18/03/2009.

Working document. Consolidated version of amended annexes, 18/03/2009. EN EN EN COCOF 09/0014/00-EN Working document. Consolidated version of amended annexes, 18/03/2009. ANNEX I INSTRUCTIONS FOR CREATING THE EMBLEM AND A DEFINITION OF THE STANDARD COLOURS SYMBOLIC DESCRIPTION

More information

SEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1

SEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1 SEETO priority projects rating methodology July, 2012 13/07/2012 Page 1 Table of content 1 Introduction... 3 1.1 Purpose of the Rating methodology... 3 1.2 Rationale for the Rating methodology... 3 1.3

More information

Support study for an impact assessment on measures for the streamlining of TEN-T

Support study for an impact assessment on measures for the streamlining of TEN-T Support study for an impact assessment on measures for the streamlining of TEN-T Final Report Panteia [NL], M-Five [DE], PWC [IT], Rupprecht Consult [DE] SEPTEMBER 2018 Mobility and Transport EUROPEAN

More information

LIFE + : An overview. 4 December 2009 Dr. Christina Marouli, LIFE 07/ENV/GR/280. External Monitoring Team, SE Europe

LIFE + : An overview. 4 December 2009 Dr. Christina Marouli, LIFE 07/ENV/GR/280. External Monitoring Team, SE Europe LIFE + : An overview 4 December 2009, LIFE 07/ENV/GR/280 External Monitoring Team, SE Europe LIFE+: An overview Presentation of the LIFE+ instrument Presentation of the three LIFE+ strands LIFE+ application

More information

EUROPEAN COMMISSION. The Commission has based its decision on the following considerations:

EUROPEAN COMMISSION. The Commission has based its decision on the following considerations: EUROPEAN COMMISSION Brussels, 1.2.2017 C(2017) 693 final Subject: State aid Germany SA.43902 (2016/N-2) Saxony Natural heritage: nature protection related public relation and education activities Sir,

More information

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities Chhattisgarh State Road Sector Project (RRP IND 44427) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR 1. Sector Performance, Problems, and Opportunities 1. The state of Chhattisgarh

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 12.0 07/01/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was

More information

COMMISSION IMPLEMENTING DECISION. of adopting a

COMMISSION IMPLEMENTING DECISION. of adopting a EUROPEAN COMMISSION Brussels, 10.12.2014 C(2014) 9352 final COMMISSION IMPLEMENTING DECISION of 10.12.2014 adopting a Cross-border cooperation Programme Montenegro- Albania for the years 2014-2020 and

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 22.12.2011 C(2011) 9531 final COMMISSION IMPLEMENTING DECISION of 22.12.2011 amending Commission Decision C(2011) 1772 of 22 March 2011 on the adoption of a financing decision

More information

How to Develop High-Quality Full Application Writing a Winning Proposal

How to Develop High-Quality Full Application Writing a Winning Proposal How to Develop High-Quality Full Application Writing a Winning Proposal Information and Training Workshop Presentations held at the Country Workshops in Moldova, Ukraine and Georgia Day 1 Day!One!!!! Workshop

More information

Official Journal of the European Union L 347/185

Official Journal of the European Union L 347/185 20.12.2013 Official Journal of the European Union L 347/185 REGULATION (EU) No 1293/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 December 2013 on the establishment of a Programme for the Environment

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Chittagong-Cox s Bazar Railway Project, Phase 1 (RRP BAN 46452-002) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will construct 102

More information

Official Journal of the European Union

Official Journal of the European Union 15.2.2007 L 44/3 CORRIGDA Corrigendum to Commission Regulation (EC) No 1935/2006 of 20 December 2006 amending Regulation (EC) No 794/2004 implementing Council Regulation (EC) No 659/1999 laying down detailed

More information

Projects in the field of Motorways of the Sea (MoS)

Projects in the field of Motorways of the Sea (MoS) Trans-European Transport Network Executive Agency Calls for proposals for projects of common interest in the field of the trans-european transport network under the Multi-annual Work Programme 2013 as

More information