1 Caltrans Legal Division Contract Law Workshop San Diego, California March 21, 2007 PUBLIC-PRIVATE PARTNERSHIPS Fredric W. Kessler, Esq. Nossaman Guthner Knox & Elliott LLP The information contained herein does not constitute a legal opinion and should not be relied upon by the reader as legal advice or be regarded as a substitute for legal advice. Copyright, 2007 Nossaman Guthner Knox & Elliott, LLP. All Rights Reserved. 1 1
2 Overview Project Delivery Methods From DBB to PDA The Power of Concession Financing Types of Concessions Pre-Development Agreements Key Concession Contract Terms Protecting public sector while attracting private capital California Legislative Status 2 2
3 Project Delivery Methods: Public and Private Roles Method Design/ Construction O&M Financing Revenues Legal Authority GA Risk GA Control A. DBB GA/PS GA GA GA Y B. DB PS GA GA GA N C. DBOM PS PS GA GA N D. Availability Concession PS PS PS GA N E. Toll Concession PS PS PS PS N F. Prevelopment Agreement PS PS PS PS N GA Government Agency PS Private Sector 3 3
4 Project Delivery Methods: Design-Bid-Build as Base Case All projects are delivered through public-private partnerships just a question of degree! Most projects are delivered using the Design-Bid-Build model Public owner: Designs project to 100% PS&E Achieves environmental clearance Breaks project up into biddable scopes Pays all invoices out of allocated STIP funds, other tax revenues and/or bond proceeds Operates and maintains project itself or through separately procured contractors Provides design oversight and construction management Keeps integration, traditional construction contract risk, long term performance and revenue risks 4 4
5 Project Delivery Methods: Design-Bid-Build as Base Case Private Parties: Design project and perform construction under conventional contracts Have conventional rights to claims and change orders Alternatives frequently require special state legislation and, where federalized, sometimes exemptions from federal rules and statutes (e.g. SEP 14, SEP15) 5 5
6 Project Delivery Methods: Why Change? To justify deviating from the Base Case, P3 delivery method should offer advantages: Significantly accelerate project delivery Fix costs/completion date early in design phase; unlike Base Case Capture private sector innovation early in project development, especially in design, environmental and permitting processes Efficiently shift to private sector major risks and reduce claims which under Base Case would be government responsibility Encourage lifecycle cost efficiencies and quality facility performance over time Raise more capital to close funding gaps, deliver more mobility sooner 6 6
7 The Power of Concession Financing Equity Market appetite Factor Traffic and revenue projections Senior debt coverage ratios Subordinate debt coverage ratios Federal tax subsidies Tax exempt interest Depreciation / amortization Subordinate TIFIA debt Blended rate of interest on debt Maximum toll rates Yes Yes, if use PABs Yes Yes Concession Financing More aggressive Moderate to Conservative ( ) Moderate to liberal (1.1) Comparable (with PABs + TIFIA) Locked in by contract Strong market demand for debt and equity Tax Exempt Revenue Financing Conservative Conservative (1.25 +) Moderate to liberal (1.1) No Yes No Possible, but not likely Comparable Subject to political risk Deep, liquid bond market 7 7
8 The Power of Concession Financing Private Equity vs. Tax-Exempt Tax-exempt financing has more conservative debt coverage ratios (limits amount of debt Investor classes are different Private equity investors have sector expertise Private equity investors willing to take longer horizon view vs. typical year tax-exempt bond investors Surplus revenues not valued in tax-exempt structure, but highly valued by private equity Accelerated depreciation creates significant value for private equity that public sector cannot realize 8 8
9 The Power of Concession Financing What equity values (that tax-exempt financing doesn t) $ Surplus adds value Debt Service Operating Costs Y 40 Municipal bond investors rely on historical revenues to determine leverage levels, constraining total value for the owner Equity investors look for future returns based on growth Debt + Equity = Greater Proceeds for Owner of Asset 9 9
10 Types of Concessions Toll Concessions Availability Payment Concessions Asset Monetization Development Concession Mixed Concession Revenue Positive Revenue Negative 10
11 Types of Concessions Attributes of an Asset Monetization Long term lease and operation of existing facility ( Brownfield ) Operations, traffic and maintenance history Stable cash flows from tolls Stable expenses Lower risk profile for concessionaire in terms of traffic and revenue Buying a going concern Examples: Chicago Skyway, Indiana Toll Road 11
12 Types of Concessions Attributes of a Development Concession Project Characteristics Design, Construction, Operation of new facility ( Greenfield ) Long term lease No operations, traffic or maintenance history Unproven cash flows and expenses Reliance on cost estimates and traffic & revenue projections Higher risk profile for concessionaire Construction risk (delay and cost overruns) Traffic and revenue/start-up risk Higher risk profile requires higher return to investor Once past start-up, risks become similar to asset monetization 12
13 Types of Concessions Attributes of a Development Concession Nature of Competition Public partner defines project Clears it environmentally Achieves public consensus on project and PPP Validates financial feasibility Sets toll rate schedule Develops complete business and contract terms, technical specifications 13
14 Types of Concessions Attributes of a Development Concession Nature of Competition Qualifications submittal and short listing Industry workshops One-on-one proposal meetings Competing hard money bids Proposer assembles design, construction, O&M pricing and forces Proposer delivers firm equity/debt commitments Selection primarily a price competition Examples: Port of Miami Tunnel, Knik Arm Crossing 14
15 Types of Concessions Attributes of a Mixed Concession Combination of existing facility plus new construction Reconstruction Capacity Expansions e.g., managed lanes Project extensions Long term lease Examples VDOT Pocahontas Parkway TxDOT SH segments, 24 miles One segment operational and almost complete; one almost complete; two have frontage roads only; one in NEPA process $2.1B up-front payment; $700M NPV of annual lease payments $550M construction Revenue sharing, including refinancing gain Bank debt plus TIFIA; PABs as Plan B 15
16 Types of Concessions Revenue Positive Concessions Project revenues exceed: Capital costs Debt costs (interest, principal, reserves) O&M costs Handback/end of term costs Return to private partner Can result in upfront payment from private partner to public owner, revenue sharing, or both Examples: TxDOT SH 130, Segments 5&6 16
17 Types of Concessions Revenue Negative Concessions Project revenues insufficient to cover: Capital costs Debt costs (interest, principal, reserves) O&M costs Handback/end of term costs Return to private partner Competition based primarily on least amount of public funds needed 17
18 Types of Concessions Contract provides for how gap filled How, when, on what conditions is Owner or other $ funded - Progress, milestone, periodic, etc. It may provide for recapture of $ back to Owner if Project performs above a certain measure Can affect contract provisions on Owner oversight, performance security Examples: TxDOT IH 635, North Tarrant Express 18
19 Types of Concessions Attributes of an Availability Payment Concession Same as Toll Concession, except Public Owner Retains project revenues, if any, and related risks Pays private party based upon project availability and performance over extended period Private Party Assumes concession type risks, sometimes even usage risk, but not collection of tolls, cost of collection or total revenue collected Competition primarily based on lowest availability payments needed to deliver and operate project 19
20 Examples Types of Concessions Florida DOT Port of Miami Tunnel British Columbia MOT Sea to Sky Highway 20
21 Pre-Development Agreements Attributes of PDA Project characteristics PPP formed at beginning or during environmental process Complex, large development project Project configuration fluid Finance plan rudimentary or non-existent Preliminary T&R analysis done and suggests financial feasibility Public partner may lack funds, resources to progress project 21
22 Pre-Development Agreements Attributes of PDA Nature of Competition: Selection is qualifications based Project understanding Conceptual development and finance plans Track record Pricing of pre-development work Successful work earns exclusive right to negotiate concession agreement 22
23 Pre-Development Agreements PDA Examples Wide domestic use, little international use California - SR 125, SR 91 Virginia Pocahontas, I-81 Truck Lanes, I-95/395 HOT Lanes, Dulles Rail Corridor Texas TTC-35, SH 130 Segments 5& 6, TTC-69 Oregon Sunrise, Newberg Dundee, I 205 South Corridor Washington Tacoma Narrows 23
24 Pre-Development Agreements Comparison of PDAs and Toll Concessions Private partner participation in predevelopment work Project definition Environmental review Preliminary T&R work Investment grade T&R study Value engineering Stakeholder relations PDA Strategic partner Strong Technical and economic analysis Yes Yes Yes, all stages Possibly Toll Concession Minimal Role Weak None No Yes Only via Alternative Technical Concepts at proposal stage, and postaward design More limited 24
25 Pre-Development Agreements (cont d) (cont d) Technical specification development Financial planning analysis Nature of Competition Predevelopment contract Concession contract Transparency Predevelopment PPP Direct participation Yes Qualifications Sole source negotiation (price reasonableness analysis) Less Hard $ PPP Only via industry draft review and comment No N/A Price competition More 25
26 Key Concession Contract Terms: Quality Design, Construction, Operation and Maintenance P3 Approach Private partner designs, constructs, operates, maintains Private investors and lenders will not accept traditional public sector control How can public partner assure quality? 26
27 Key Concession Contract Terms: Quality Design, Construction, Operation and Maintenance Tools Performance-based measures and standards specify outcomes, and inspections to measure outcome achievement Private partner project management plan procedures, processes, quality management systems for all aspects of work. Subject to public partner approval Private partner responsibility for acceptance testing and inspection 27
28 Key Concession Contract Terms: Quality Design, Construction, Operation and Maintenance Tools Use of Independent Engineer Field inspections, monitoring and auditing Document review and audits for compliance with management plan and performance standards Verification testing (at lesser frequency than private partner s testing) Reporting to both parties Measures to assure independence 28
29 Key Concession Contract Terms: Quality Design, Construction, Operation and Maintenance Regular performance measurement inspections and reports by private partner to determine and maintain asset condition Public partner audit and monitoring of IE and private partner, and spot testing and inspection Renewal and replacement scheduling and reserves Handback requirements 29
30 Key Concession Contract Terms: Quality Design, Construction, Operation and Maintenance Changes in Standards What is private sector obligation to conform to future changes in standards? PPP solutions vary Conform at public partner s election and expense (cost and revenue impacts) Conform at private partner s expense Sharing of cost risk 30
31 Key Concession Contract Terms: Reasonable Tolling Structure and Profits Public sector needs: Maximize its income? Minimize toll rates? Prevent excessive profit? Manage traffic demand and congestion? Depoliticize setting toll rates? Toll exemptions for critical public purposes? Tools: Indexed toll rate schedule caps future toll rates, depoliticizes Set initial rates Use stated rates of increase and/or inflation indices for capping future toll rate adjustments CPI, GDP, GSP, ECI 31
32 Key Concession Contract Terms: Reasonable Tolling Structure and Profits Toll Pricing congestion management Dynamic toll rates varying by time of day, level of congestion SR91, San Diego, SH 121, IH 635 (managed lanes) Banded revenue sharing generates public partner revenues, prevents excessive profit Public partner takes escalating share of toll revenue as rate of return increases Examples: Pocahontas: 40% of real net cash flow after IRR on total investment = 6.5%; 80% after IRR=8.0% Segments 5 & 6: 4.65% of gross revenue until IRR on equity = 11%; 9.3% of next band of gross until IRR = 15%, 50% of all further gross 32
33 Key Concession Contract Terms: Reasonable Tolling Structure and Profits Shadow tolls and availability payments reduce or eliminate tolls, prevent excessive profits, depoliticize Toll exemptions / suspensions Police, fire, emergency vehicles Transit vehicles School buses Contractor vehicles Suspend tolls for mass evacuations, emergency traffic diversions 33
34 Key Concession Contract Terms: Balanced Approach to Competing Facilities Public Sector Need - right to build other projects over time to address traffic safety and system capacity issues Private Sector Need - protection of the originally expected revenue stream 34
35 Key Concession Contract Terms: Balanced Approach to Competing Facilities The Mistakes of SR91 Contract prohibited operation of competing facilities Exceptions too narrow Result: Private partner had, and exercised, legal right to enjoin expansion of free lanes on SR91 The Lessons Learned The sole remedy is $ to cover net revenue impact No right to enjoin. Public sector free to build whatever it wants 35
36 Key Concession Contract Terms: Balanced Approach to Competing Facilities Exceptions for: All projects identified in transportation plans All projects outside a competing facilities zone Improvements for safety, maintenance or operational purposes Certain capacity improvements ITS systems, metering devices, intersection grade separations, restriping that adds lanes HOV/HOT lane additions on other roadways Transit and other non-highway projects All projects outside public partner s control 36
37 Key Concession Contract Terms: Effective Remedies Scale remedies to the type and severity of breach Liquidated damages for delayed completion, noncompliance with routine covenants Owner step-in rights, including receivership Work suspension during construction Anticipatory breach and assurances of future performance for persistent default Termination for major uncured default Lender rights to notice and cure Termination compensation to private partner 37
38 California Legislative Status History AB 680 adopted in late 1980 s; repealed in 2004: SR-91 and SR-125 Local Government Authority: Gov. Code et seq. (City/County Development Agreements) Local Government Privatization Act of 1985 Gov. Code 5956 et seq. (AB 2660) Individual agencies with broad enabling legislation 38
39 California Legislative Status AB 1467 Chaptered May project pilot program 2 in No. Cal and 2 in So. Cal and at least 2 must be sponsored by local transportation agencies Key Provisions/Concepts Designed for goods movement projects Can only toll commercial or non-commercial vehicles with 3 or more axles Legislature can reject contract within 60 days after submission P3 Agreement must establish specific toll rates Investor can earn reasonable return Reversion to government agency No more SR 91 non-competes 39
40 California Legislative Status Issues with AB 1467 Post-award legislature involvement How much flexibility in terms of setting toll rates? Indexing? Congestion Pricing? What is a reasonable rate of return? Conveyance at expiration at no charge Government reimbursed for provision of services Non-compete clauses Is DB permissible? Prescriptive specs 40
41 California Legislative Status Where do we go from here. Amend AB 1467 to address issues Expand AB 1467 for other projects Seek new/other P3 legislation Regional agencies are key!! Specific project-focused legislation Runner Bill 41
42 CONTACT Fredric W. Kessler Partner Nossaman Guthner Knox & Elliott LLP 445 S. Figueroa Street, 31st Floor Los Angeles, CA (213)
47th Annual Workshop on Transportation Law
47th Annual Workshop on Transportation Law Public Private Partnership Update: Legal Challenges and Obstacles - Protecting the Public Owner Implementation of the Texas Concessions Initiatives July 9, 2008
More informationOverview of Highway Public-Private Partnerships (P3s)
Overview of Highway Public-Private Partnerships (P3s) FHWA Office of Innovative Program Delivery Presentation to GBC Transportation & Mobility Committee March 11, 2015 Presentation Outline 2 Part 1 Part
More informationTRANSPORTATION RESEARCH BOARD. CONCESSIONS: A NEW FRONTIER? July 18, 2005 Portland, Oregon GEOFFREY S. YAREMA NOSSAMAN GUTHNER KNOX & ELLIOTT LLP
TRANSPORTATION RESEARCH BOARD 44th ANNUAL WORKSHOP ON TRANSPORTATION LAW CONCESSIONS: A NEW FRONTIER? July 18, 2005 Portland, Oregon GEOFFREY S. YAREMA NOSSAMAN GUTHNER KNOX & ELLIOTT LLP The information
More informationThe Federal Perspective: Project Finance, TIFIA and Public Private Partnerships
The Federal Perspective: Project Finance, TIFIA and Public Private Partnerships Mark Sullivan, Federal Highway Administration Innovative Transportation Finance Workshop Shoreview, Minnesota October 20,
More informationFlorida Transportation Commission PUBLIC-PRIVATE PARTNERSHIPS (P3)
Florida Transportation Commission PUBLIC-PRIVATE PARTNERSHIPS (P3) AGENDA Current Status in Florida Federal Reauthorization/ SEP-15 P-3 Options Overview Key aspects of P-3 Georgia Status P-3 Initiatives
More informationNational Conference of State Legislatures
National Conference of State Legislatures Spring Forum April 22 23, 2009 Pamela Bailey-Campbell Parsons Brinckerhoff What is a PPP? An Agreement Between the Public and Private Sector Parties that Transfers
More informationPublic Private Partnerships 101
Public Private Partnerships 101 Tony Elkins, Commercial Director October 6, 2016 Cintra s LBJ Managed Lanes P3, Dallas, Texas The Ferrovial Group Development Over The Entire Infrastructure Lifecycle INFRASTRUCTURE
More informationP3 CONTRACTS. Morteza Farajian, Ph.D. November 2016
P3 CONTRACTS Morteza Farajian, Ph.D. November 2016 What is a Public-Private Partnership (P3)? Overview of P3s Definition P3 Defined A P3 involves a partnership between the public and private sector to
More informationValue for Money Analysis: Choosing the Best Project Delivery Method. Ken L. Smith, PE, CVS -HDR Engineering, Inc.
Value for Money Analysis: Choosing the Best Project Delivery Method Ken L. Smith, PE, CVS -HDR Engineering, Inc. 1 Overview What is a VfM analysis Why is it used Key VfM components and principles Life
More informationTransportation Infrastructure Finance and Innovation Act (TIFIA)
Slide 1 Transportation Infrastructure Finance and Innovation Act (TIFIA) Reno Rail Corridor Port of Miami Tunnel SH 130 Jorianne Jernberg, Financial Analyst Office of Innovative Program Delivery Federal
More informationOctober 7, Introduction to the TIFIA Credit Program
October 7, 2015 Introduction to the TIFIA Credit Program Types of Credit Assistance 2 Secured (Direct) Loan Maximum term of 35 years from substantial completion Repayments must start 5 years after substantial
More informationManaged Lanes: Transaction Strategies from the PPP Forefront
Managed Lanes: Transaction Strategies from the PPP Forefront December 2015 kpmg.com Managed Lanes: Transaction Strategies from the PPP Forefront 1 Introduction Managed lane projects have become an important
More informationPUBLIC-PRIVATE PARTNERSHIPS What? Why? Who? How? Where? and Here. I-77 HOT Lanes P3 Project. Lake Norman Transportation Summit March 13, 2013
PUBLIC-PRIVATE PARTNERSHIPS What? Why? Who? How? Where? and Here I-77 HOT Lanes P3 Project Lake Norman Transportation Summit March 13, 2013 Concession Getting past the jargon Turnkey BAFO RFQ BABs AFP
More informationTransportation Infrastructure Finance and Innovation Act (TIFIA) Program Overview
Transportation Infrastructure Finance and Innovation Act (TIFIA) Program Overview (general summary and overview only for full details, see 23 United States Code Section 601) TIFIA IS A CREDIT PROGRAM (not
More informationDescription of the Submission / Conditions Precedent
Submittal Relating to the Development of the TxDOT North Tarrant Express Project, Segments 3A and 3B through a Facility Implementation Plan and Facility Agreement Description of the Submission / Conditions
More informationI-66 RFI Response Vinci Concessions USA 25 November 2013
General: 1. Please describe your firm, its experience in relation to public-private partnership projects, and its potential interest in relation to the Project (e.g., design/engineering firm, construction
More informationTHE USE OF FEDERAL INNOVATIVE FINANCE TECHNIQUES IN PUBLIC-PRIVATE PARTNERSHIPS THE CASE OF THE CAPITAL BELTWAY BY MARTIN J. LUBY
THE USE OF FEDERAL INNOVATIVE FINANCE TECHNIQUES IN PUBLIC-PRIVATE PARTNERSHIPS THE CASE OF THE CAPITAL BELTWAY BY MARTIN J. LUBY Compared with the rest of the world, the United States has been relatively
More informationAVAILABILITY PAYMENTS What Can We Learn from Surface Transportation Projects? Pamela Bailey Campbell President, LeighFisher
AVAILABILITY PAYMENTS What Can We Learn from Surface Transportation Projects? Pamela Bailey Campbell President, LeighFisher What IS a Availability Payment P3? Direct payments From public sector to private
More informationIntroduction to Alternative Procurement Delivery
Introduction to Alternative Procurement Delivery for Florida Transportation Commission January 24, 2013 TABLE OF CONTENTS Alternative Project Delivery (APD) US Market Overview APD Funding and Financing
More informationAGENDA ITEM #9 SUMMARY
AGENDA ITEM #9 SUMMARY Briefing on business considerations and state law requirements for the use of a comprehensive development agreement to develop a transportation project. Strategic Plan Relevance:
More informationSolutions: Accelerating Infrastructure Projects Goldman, Sachs & Co. April 22, 2008
MUNIROOT\V_NY\MuniVol0\Shared\Zach\PPP\Greg Carey's Speech for Texas Transportation Forum v4.10.08.doc effroz 11 Apr 2008 16:46 1/13 Solutions: Accelerating Infrastructure Projects Goldman, Sachs & Co.
More informationF = MA : CSG SLC WEBINAR DECEMBER 16, J. Douglas Koelemay, Director
F = MA : CSG SLC WEBINAR DECEMBER 16, 2014 J. Douglas Koelemay, Director VIRGINIA LEADERSHIP IN PUBLIC-PRIVATE PARTNERSHIPS PPTA enabling legislation adopted 1995; PPEA followed PPTA implementation guidelines
More informationACCESSING PRIVATE CAPITAL FOR TRANSPORTATION INFRASTRUCTURE PROJECTS
ACCESSING PRIVATE CAPITAL FOR TRANSPORTATION INFRASTRUCTURE PROJECTS Transportation Infrastructure Finance Workshop Chicago, Illinois OVERVIEW AND KEY PLANNING FACTORS April 29, 2008 David Seltzer, Principal
More informationThe Bond Buyers 8 th Annual Transportation Finance/P3 Conference
The Bond Buyers 8 th Annual Transportation Finance/P3 Conference Highly-Leveraged Public Deals October 18, 2007 Brian Mayhew Chief Financial Officer MTC/Bay Area Toll Authority Is PPP The Answer Or Can
More informationPublic-Private Partnerships for Transit
Public-Private Partnerships for Transit What is a P3? An agreement between public and private sector partners which allows more private sector participation than is traditional: Private sector may design,
More informationI-77 Managed Lanes Project Project Update. Ned Curran & Louis Mitchell September 2014
I-77 Managed Lanes Project Project Update Ned Curran & Louis Mitchell September 2014 Congestion and General Purpose lanes 2 Local Response CDOT NCDOT SCDOT MUMPO FHWA CATS Phase I: 2007 Phase II: 2008
More informationP3: OPPORTUNITIES FOR AMERICA S INFRASTRUCTURE. Greg Hummel
P3: OPPORTUNITIES FOR AMERICA S INFRASTRUCTURE Greg Hummel Public Private Partnerships ( P3 ) Broadly refers to a variety of transactions in which a public or quasi-public entity shifts some degree of
More informationIrvine Corona Expressway Project Financing Review
Irvine Corona Expressway Project Financing Review Sperry June 4, 2010 1 The Proposed Irvine Corona Expressway (ICE) Project Project screening is key aspect of pre-development discussions Environmental
More informationPublic-Private Partnerships and Innovative Finance
Public-Private Partnerships and Innovative Finance Agenda Brief Overview of P3 Lowell Clary, President Clary Consulting, LLC P3 and Innovative Finance 101 Lowell Clary Question/Answer Period Clary Background
More information1 EXECUTIVE SUMMARY. Figure 1-1: SR 156 Study Area & Monterey Expressway Alignment
1 EXECUTIVE SUMMARY The Transportation Agency for Monterey County (TAMC) Board commissioned a Level 2 Traffic and Revenue study on the feasibility of collecting tolls to fund the proposed new SR156 connector
More informationHighway Public-Private Partnerships
Highway Public-Private Partnerships Securing Public Benefits and Protecting the Public Interest Presentation before the Enterprise Risk Management Symposium April 19, 2012 Steve Cohen Assistant Director
More informationPartnerships in Transportation Workshop Transportation PPPs beyond Toll Roads
TRANSACTION ADVISORY SERVICES PPP ADVISORY Partnerships in Transportation Workshop Transportation PPPs beyond Toll Roads Alistair SAWERS, Head of Transport, PPP Advisory, Ernst & Young 1 Introduction Brownfield
More informationPublic Hearing Tarrant County. April 14, 2009
Public Hearing Tarrant County April 14, 2009 Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District 2 Public
More informationPreliminary Findings and Recommendations
Review of the Comprehensive Agreement between the North Carolina Department of Transportation and I-77 Mobility Partners LLC Preliminary Findings and Recommendations July 2017 Overview NCDOT has initiated
More informationTHE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 )
THE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 ) VIRGINIA DEPARTMENT OF TRANSPORTATION ( VDOT ) VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION ( DRPT ) RESPONSE TO REQUEST FOR INFORMATION
More informationApril 25, Martin Klepper Executive Director
April 25, 2017 Martin Klepper Executive Director A New Formula for Infrastructure Investment The BUILD AMERICA BUREAU 2 Bureau Credit Programs Transportation Infrastructure Finance and Innovation Act (TIFIA)
More informationFinance Tools for Project Advancement
Florida Department of TRANSPORTATION Finance Tools for Project Advancement Leon Corbett Project Finance Manager NCSL Southern States Fiscal Leaders September 23, 2016 Discussion Topics Public-Private Partnerships
More informationNEWBERG-DUNDEE TRANSPORTATION IMPROVEMENT PROJECT. Milestone 1 Final Report Feasibility Assessment
NEWBERG-DUNDEE TRANSPORTATION IMPROVEMENT PROJECT Milestone 1 Final Report Feasibility Assessment C/O Macquarie North America Ltd. Suite 2664, 1055 Dunsmuir Street Vancouver, BC, V7X 1K8 Phone: (604) 605-3944
More informationPublic Private Partnerships. Virginia GFOA s 2015 Fall Conference. prepared for. by JoAnne Carter, Managing Director.
Public Private Partnerships prepared for Virginia GFOA s 2015 Fall Conference by JoAnne Carter, Managing Director October 21, 2015 4350 North Fairfax Drive, Suite 580 Arlington, Virginia 22203 2015 Public
More informationPPP s Misconceptions NICOLAS RUBIO US PRESIDENT, CINTRA
PPP s Misconceptions NICOLAS RUBIO US PRESIDENT, CINTRA 1. PPPs involve the "sale" of roads to private interests 10 Myths and Facts on The Reason Transportation Foundation, May 31, 2011 - By Leonard PPPs
More informationPublic Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013
Public Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013 Agenda What is a Public-Private Partnership? P3 Lessons Learned Locality Concerns Pop Quiz: Is this a P3 Project????
More informationRenegotiations & Bankruptcies in U.S. surface transportation P3s
Renegotiations & Bankruptcies in U.S. surface transportation P3s Lisardo Bolaños Center for Transportation Public-Private Partnership Policy George Mason University http://p3policy.gmu.edu/ IRF Public
More informationPublic Private Partnerships: Managing Risks, Unlocking Rewards
ABA Public Contract Law Section Public Private Partnerships: Managing Risks, Unlocking Rewards 3 rd Annual State & Local Procurement Symposium May 2, 2008, Austin, TX ABA Public Contract Law Section State
More informationAvailability Payment or Revenue-Risk P3 Concessions? Pros and Cons for Highway Infrastructure
Reason Foundation Policy Study No. 458 November 2017 Availability Payment or Revenue-Risk P3 Concessions? Pros and Cons for Highway Infrastructure by Robert W. Poole, Jr. Reason Foundation Reason Foundation
More informationTexas' LBJ Freeway Managed Lanes P3
Texas' LBJ Freeway Managed Lanes P3 28/07/2010 The I-635/LBJ Managed Lanes project in Texas marks a major milestone in the development of private sector investment in infrastructure, standing as the largest
More informationPUBLIC PRIVATE PARTNERSHIPS Rationale and Motivation. November 2015 Nicolas Rubio US President, Cintra
PUBLIC PRIVATE PARTNERSHIPS Rationale and Motivation November 2015 Nicolas Rubio US President, Cintra nrubio@cintra.us Agenda 1. The transportation infrastructure problem 2. Understanding the Private Sector
More informationFinancial Submission
Financial Submission Prepared by NTE Mobility Partners Segments 2-4, LLC May 19, 2010 i Table of Contents 1 Feasibility of Financing Plan... 1 2 Introduction... 2 2.1 The Proposer... 2 2.2 Details of Equity
More informationPrivate Financing for Port Infrastructure
Private Financing for Port Infrastructure Presented at AAPA Port Real Estate Issues Workshop Seattle, WA September 18, 2018 Andrée M. Blais, Partner Infrastructure Practice Group Shant S. Boyajian, Associate
More informationTransportation Infrastructure Finance and Innovation Act (TIFIA)
TIFIA Credit Program Overview Transportation Infrastructure Finance and Innovation Act (TIFIA) Updated September 27, 2006 Background on TIFIA Strategic goal to leverage limited Federal resources and stimulate
More informationPublic-Private Partnerships Association of Government Accountants
Public-Private Partnerships Association of Government Accountants Fall Education Seminar Bob Childree November 2010 America's Infrastructure Report Card America s Infrastructure Report Card (American Society
More informationAMENDED AND RESTATED COMPREHENSIVE AGREEMENT RELATING TO THE I-95/395 HOV/HOT LANES PROJECT DATED AS OF JUNE 8, 2017 BY AND BETWEEN
Execution Version AMENDED AND RESTATED COMPREHENSIVE AGREEMENT RELATING TO THE I-95/395 HOV/HOT LANES PROJECT DATED AS OF JUNE 8, 2017 BY AND BETWEEN VIRGINIA DEPARTMENT OF TRANSPORTATION, an Agency of
More informationAMENDED AND RESTATED COMPREHENSIVE AGREEMENT RELATING TO THE ROUTE 495 HOT LANES IN VIRGINIA PROJECT DATED AS OF DECEMBER 19, 2007 BY AND AMONG
EXECUTION COPY AMENDED AND RESTATED COMPREHENSIVE AGREEMENT RELATING TO THE ROUTE 495 HOT LANES IN VIRGINIA PROJECT DATED AS OF DECEMBER 19, 2007 BY AND AMONG VIRGINIA DEPARTMENT OF TRANSPORTATION, an
More informationPublic Private Partnerships and Infrastructure Finance: Policy and Recent Evidence
Public Private Partnerships and Infrastructure Finance: Policy and Recent Evidence Presentation to: TRIWAY International Group October 8, 2016 Jonathan L. Gifford, Ph.D. George Mason University, Schar
More information70 th Annual Meeting CSG WEST August 18 th, 2017
70 th Annual Meeting CSG WEST August 18 th, 2017 Rick Sulzer, P.E. Chief Operating Officer Over 25 years in Transportation Infrastructure Design, Manufacturing, Distribution, Construction and Maintenance
More informationNorth Carolina Department of Transportation Report to Joint Legislative Transportation Oversight Committee
North Carolina Department of Transportation Report to Joint Legislative Transportation Oversight Committee Public Private Partnerships Policy and Document Standardization October 1, 2013 Executive Summary
More informationNossaman Infra Insight
Nossaman Infra Insight MAP-21: Surface Transportation Reauthorization Ushers in Significant Changes to TIFIA By: Fredric W. Kessler, Peter W. Denton, Nossaman LLP 07/06/12 On June 29, 2012 Congress passed
More informationP3 Financing. Barney Allison. Peter Luchetti. Alfonso Mendez. Partner, Nossaman LLP. Managing Partner, Table Rock Capital
P3 Financing Barney Allison Partner, Nossaman LLP Peter Luchetti Managing Partner, Table Rock Capital Alfonso Mendez Senior Financial Advisor, Arup Typical P3 Financing Structure Project Company SPV P3
More informationAAPA Finance Seminar Seaport Project Financing
AAPA Finance Seminar Seaport Project Financing April 9, 2014 Presented by: David C. Miller, Managing Director Public Financial Management, Inc. 300 South Orange Avenue, Suite 1170 Orlando, Florida 32801
More informationEmerging Trends in Port Infrastructure: Using P3s to Maximize Value
Emerging Trends in Port Infrastructure: Using P3s to Maximize Value Presented at AAPA Planning for Shifting Trade Program Tampa, FL 9:00 10:30 am, January 31, 2019 Brian G. Papernik, Partner Infrastructure
More informationI-77 Express Lanes Project Project Update. Rodger Rochelle October 2014
I-77 Express Lanes Project Project Update Rodger Rochelle October 2014 Project Description In 2009, NCDOT conducted a Fast Lanes Study that analyzed 12 corridors in a 10 county region. The Charlotte City
More informationSOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania
SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project
More informationTxDOT SH 288 TOLL LANES PROJECT IN HARRIS COUNTY TOLL CONCESSION PUBLIC-PRIVATE PARTNERSHIP AGREEMENT TERM SHEET
TxDOT SH 288 TOLL LANES PROJECT IN HARRIS COUNTY TOLL CONCESSION PUBLIC-PRIVATE PARTNERSHIP AGREEMENT TERM SHEET This document provides a summary of key terms and conditions for the toll concession Public
More informationModel Concession Agreement for Highways: An Overview
Model Concession Agreement for Highways: An Overview - Gajendra Haldea The highways sector in India is witnessing significant interest from both domestic as well as foreign investors following the policy
More informationGRAND PARKWAY TRANSPORTATION CORPORATION MONTHLY TRAFFIC AND OPERATING REPORT* For the Period Ending: September 30, 2017
TABLE OF CONTENTS SYSTEM REVENUE AND EXPENSES SYSTEM TRANSACTIONS PROCEEDS FROM SALE OF SYSTEM ASSETS FOOTNOTES TO PAGE 3 4 TOLL RATE SCHEDULE 6 OUTSTANDING OBLIGATIONS 7 TRUST ACCOUNT BALANCES & ACTIVITY
More informationU.S. Privatization Trends and the Ports Sector
AAPA Port Property Management and Pricing Seminar - October 24, 2006 U.S. Privatization Trends and the Ports Sector Joshua Schaff Infrastructure Finance AGENDA 1. Moody s Port Sector Ratings 2. Privatization
More informationCOMPREHENSIVE AGREEMENT RELATING TO THE TRANSFORM 66 P3 PROJECT DATED AS OF DECEMBER 8, 2016, BY AND BETWEEN
EXECUTION VERSION COMPREHENSIVE AGREEMENT RELATING TO THE TRANSFORM 66 P3 PROJECT DATED AS OF DECEMBER 8, 2016, BY AND BETWEEN VIRGINIA DEPARTMENT OF TRANSPORTATION, an Agency of the Commonwealth of Virginia
More informationFiscal Year th Quarter Report Quarterly Report of Actual Traffic and Revenue For period ending August 31, 2017
Fiscal Year 2017 4 th Quarter Report Quarterly Report of Actual Traffic and Revenue For period ending August 31, 2017 Footer Text Date Table of Contents Section Page Number Notes and Observations 3-4 Significant
More informationValue for Money (VfM) Analysis Virginia s experiences and lessons learned
Value for Money (VfM) Analysis Virginia s experiences and lessons learned May 28, 2013 Morteza Farajian Program Manager Virginia s Enabling P3 Legislation Public-Private Transportation Act of 1995 Intent
More informationDRAFT REQUEST FOR QUALIFICATIONS RELATING TO THE TRANSFORM 66 P3 PROJECT UNDER THE VIRGINIA PUBLIC-PRIVATE TRANSPORTATION ACT OF 1995 (AS AMENDED)
DRAFT REQUEST FOR QUALIFICATIONS RELATING TO THE TRANSFORM 66 P3 PROJECT UNDER THE VIRGINIA PUBLIC-PRIVATE TRANSPORTATION ACT OF 1995 (AS AMENDED) VIRGINIA DEPARTMENT OF TRANSPORTATION POSTED AUGUST 31,
More informationGRAND PARKWAY TRANSPORTATION CORPORATION MONTHLY TRAFFIC AND OPERATING REPORT* For the Period Ending: August 31, 2017
TABLE OF CONTENTS SYSTEM REVENUE AND EXPENSES SYSTEM TRANSACTIONS PROCEEDS FROM SALE OF SYSTEM ASSETS FOOTNOTES TO PAGE 3 4 TOLL RATE SCHEDULE 6 OUTSTANDING OBLIGATIONS 7 TRUST ACCOUNT BALANCES & ACTIVITY
More informationFlorida Department of Transportation
JEB BUSH GOVERNOR Florida Department of Transportation 605 Suwannee Street, MS 07 Tallahassee, FL 32399 JOSE ABREU SECRETARY September 30, 2003 Dear MIC Partner: Attached is the third Annual Update of
More informationSH 183 MANAGED LANES PROJECT TOLL CONCESSION PUBLIC-PRIVATE PARTNERSHIP AGREEMENT TERM SHEET
SH 183 MANAGED LANES PROJECT TOLL CONCESSION PUBLIC-PRIVATE PARTNERSHIP AGREEMENT TERM SHEET This document provides a summary of key terms and conditions for the toll concession Public Private Partnership
More informationComprehensive Development Agreement State Highway 288 Toll Lanes in Harris County. Between Texas Department of Transportation and [ ]
Comprehensive Development Agreement State Highway 288 Toll Lanes in Harris County Between Texas Department of Transportation and [ ] Dated [ ] PART A ARTICLE 1 TABLE OF CONTENTS THE TRANSACTION; FINANCING
More informationCAPITAL MAINTENANCE AGREEMENT I-2/I-69C INTERCHANGE PROJECT. between TEXAS DEPARTMENT OF TRANSPORTATION. and [DB CONTRACTOR] Dated as of:, 2019
CAPITAL MAINTENANCE AGREEMENT I-2/I-69C INTERCHANGE PROJECT between TEXAS DEPARTMENT OF TRANSPORTATION and [DB CONTRACTOR] Dated as of:, 2019 HIDALGO COUNTY Texas Department of Transportation I-2/I-69C
More informationCharting a New Course? Infrastructure Investment Ahead. Bryan Grote
Charting a New Course? Infrastructure Investment Ahead Bryan Grote January 11, 2017 What is the Infrastructure Plan? Potential Federal Incentives Investment Tax Credits? Wilbur Ross (Commerce), Peter Navarro
More informationOREGON DEPARTMENT OF TRANSPORTATION. Bear, Stearns & Co. Inc. Sperry Capital Inc. Oregon Innovative Partnership Program
OREGON DEPARTMENT OF TRANSPORTATION Oregon Innovative Partnership Program : Analysis of the Proposed Concession Arrangement for the Newberg-Dundee Bypass Project June 15, 2007 Bear, Stearns & Co. Inc.
More informationForm DOT F (8-72) 7. Author(s) Thomas L. Glenn. 10. Work Unit No. (TRAIS) 16. Abstract
I. Report No. 2. Government Accession No. FHWA/TX-99/1756-3 4. Title and Subtitle SUGGESTED GUIDELINES FOR THE PREP ARA 1;ION OF FEASIBILITY STUDIES FOR PRlV ATE TOLL ROAD PROJECTS IN TEXAS 7. Author(s)
More informationSt. Croix River Crossing Project: Innovative Financing Study. January 2011
St. Croix River Crossing Project: Innovative Financing Study January 2011 Cost of Completing this Study The consultant contract cost to complete this feasibility analysis and report was approximately $146,000.
More informationTransportation Revenue Options and State Funding Initiatives
M I D A M E R I C A A S S O C I A T I O N O F S T A T E T R A N S P O R T A T I O N O F F I C I A L S 2 0 1 3 A N N U A L M E E T I N G M I L W A U K E E, W I W E D N E S D A Y 1 7 J U L Y 2 0 1 3 WHAT
More informationUNITED STATES DEPARTMENT OF TRANSPORTATION INDICATIVE TERM SHEET FOR TIFIA LOAN AGREEMENT
Draft 9/9/16 UNITED STATES DEPARTMENT OF TRANSPORTATION INDICATIVE TERM SHEET FOR TIFIA LOAN AGREEMENT TRANSFORM 66 P3 PROJECT (TIFIA APPLICATION FOR CREDIT ASSISTANCE NO. ) 1 The terms set forth herein
More informationCaution on New Jersey Turnpike and Parkway Deal
New Jersey Public Interest Research Group Caution on New Jersey Turnpike and Parkway Deal Six Public Interest Principles for Considering Toll Road Monetization A deal to monetize the New Jersey Turnpike
More informationPublic Private Partnerships (PPPs) in North America The Advent of a Market
Public Private Partnerships (PPPs) in North America The Advent of a Market RBS North American Infrastructure Advisory and Finance optional client logo 24 June 2008 Sell-Side Driver: The PPP market, while
More informationPublic-Private. League of Women Voters. Nick Farber, Operations Manager, High Performance Transportation Enterprise. April 3, 2018
-Private Partnerships 101 League of Women Voters Nick Farber, Operations Manager, High Performance Transportation Enterprise April 3, 2018 What is Driving the Need? Continued Growth 1991 2015 2040 3.3
More informationSH 249 EXTENSION PROJECT DRAFT COMPREHENSIVE MAINTENANCE AGREEMENT TERM SHEET DESCRIPTION OF SERVICES
SH 249 EXTENSION PROJECT DRAFT COMPREHENSIVE MAINTENANCE AGREEMENT TERM SHEET This document provides background information and summarizes the major terms of the Comprehensive Maintenance Agreement ( COMA
More informationACTION ELEMENT CONCLUSIONS
ACTION ELEMENT CONCLUSIONS The Action Element identifies all transportation projects within the horizon of the RTP/SCS and are financially constrained. This Action Element implements the Policy Element
More informationMAJOR BUSINESS TERMS FOR THE TRANSFORM 66 P3 PROJECT IN THE COMMONWEALTH OF VIRGINIA DBFOM DELIVERY METHOD
October 1, 2015 MAJOR BUSINESS TERMS FOR THE TRANSFORM 66 P3 PROJECT IN THE COMMONWEALTH OF VIRGINIA DBFOM DELIVERY METHOD This Term Sheet ( Term Sheet ) provides a summary of major business terms to be
More informationJune 2, 2017 I Ratings
Rating Methodology for ratings of road projects based on Hybrid Annuity Model (HAM) June 2, 2017 I Ratings Introduction: The Government of India has approved the hybrid annuity model (HAM) to increase
More informationEXECUTION VERSION JULY 31, 2012 COMPREHENSIVE AGREEMENT RELATING TO THE I-95 HOV/HOT LANES PROJECT DATED AS OF JULY 31, 2012 BY AND BETWEEN
COMPREHENSIVE AGREEMENT RELATING TO THE I-95 HOV/HOT LANES PROJECT DATED AS OF BY AND BETWEEN VIRGINIA DEPARTMENT OF TRANSPORTATION, an Agency of the Commonwealth of Virginia AND 95 EXPRESS LANES LLC,
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationOverview of the framework
Overview of the framework Need for a framework The highways sector in India is witnessing a significant interest from both domestic as well as foreign investors following the policy initiatives taken by
More informationManaging Change, Challenges & Other Things Malcolm T. Kerley, P.E. Chief Engineer, Virginia Department of Transportation Chair, AASHTO Subcommittee
Managing Change, Challenges & Other Things Malcolm T. Kerley, P.E. Chief Engineer, Virginia Department of Transportation Chair, AASHTO Subcommittee on Bridges & Structures April 19, 2010 1 Topics VDOT
More informationTO THE MEMBERS OF THE COMMITTEES ON GROUNDS AND BUILDINGS AND FINANCE: DISCUSSION ITEM EXECUTIVE SUMMARY
Office of the President J1 TO THE MEMBERS OF THE COMMITTEES ON AND FINANCE: DISCUSSION ITEM For the Meeting of UPDATE ON THE 2020 PROJECT, MERCED CAMPUS EXECUTIVE SUMMARY This item provides an overview
More informationThe challenge of paying for smart cities projects
The challenge of paying for smart cities projects 2 About John Skowron John has more than 25 years of experience in industry and management consulting. Within Deloitte Consulting LLP, he serves as the
More informationCASH MANAGEMENT & CONTRACT AWARDS
CASH MANAGEMENT & CONTRACT AWARDS Brian Ragland, Chief Financial Officer Bill Hale, Chief Engineer Randy Hopmann, Director of District Operations Footer Text Date I. Cash Management Practices 2 FY 2018-2019
More information77th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. House Bill 2800 CHAPTER... AN ACT
77th OREGON LEGISLATIVE ASSEMBLY--2013 Regular Session Enrolled House Bill 2800 Sponsored by Representatives READ, BENTZ, Senators BEYER, STARR CHAPTER... AN ACT Relating to the Interstate 5 bridge replacement
More informationPublic Private Partnerships
Public Private Partnerships Dennis J. Enright Principal 201-656-0115 The PPP Decision 2 P3 Issues It s Greek to Me!! 3 Monetization Value for Money Project Finance Mezzanine Debt Weighted Average Cost
More informationECONOMIC FEASIBILITY DEVELOPMENT PROCESS
Approved: Effective: January 29, 2013 Office: Work Program & Budget Topic No.: 350-090-001-j Department of Transportation ECONOMIC FEASIBILITY DEVELOPMENT PROCESS PURPOSE: To implement the requirements
More informationPublic-Private Partnerships. Lowell R. Clary
Public-Private Partnerships P3 Lowell R. Clary lclary@p3devco.com Types of P3s Design Build (DB) Asset Management Contract Design Build Operate Maintain (DBOM) Design Build Finance Operate (DBFO) Build
More informationIntro Public-Private Partnership (P3) Finance Course
Intro Public-Private Partnership (P3) Finance Course Identifying P3 Projects and Knowing the Atmosphere Kylee Anastasi Director, Capital Projects and Infrastructure Advisory PricewaterhouseCoopers LLP
More informationI-80 Corridor Unsolicited Proposal Transportation Board Meeting December 3, 2018
I-80 Corridor Unsolicited Proposal Transportation Board Meeting December 3, 2018 UNSOLICITED PROPOSAL NDOT is actively addressing issues on I-80 Reno-Sparks Traffic Study (Completed Spring 2018) o Identified