1 TIFIA Credit Program Overview Transportation Infrastructure Finance and Innovation Act (TIFIA) Updated September 27, 2006
2 Background on TIFIA Strategic goal to leverage limited Federal resources and stimulate private capital investment in transportation infrastructure by providing credit assistance in the form of direct loans, loan guarantees, and standby lines of credit (rather than grants) to projects of national or regional significance. Key objectives Facilitate projects with significant public benefits Encourage new revenue streams and private participation Fill capital market gaps for secondary/subordinate capital Be a flexible, patient investor willing to take on investor concerns about investment horizon, liquidity, predictability and risk Limit Federal exposure by relying on market discipline 1
3 Background on TIFIA (continued) Major requirements Large surface transportation projects ($50M generally, $15M for intelligent transportation systems ITS) TIFIA contribution limited to 33 percent Senior debt must be rated investment grade Dedicated revenues for repayment Applicable Federal requirements (Civil Rights, NEPA, Uniform Relocation, Titles 23/49) Public or private highway, transit, rail and port projects are eligible to apply for TIFIA assistance Application process project sponsors must submit proposals, including financial plans, to USDOT for consideration. 2
4 Eligible TIFIA Sponsors and Projects Highways and Bridges State Governments Intelligent Transportation Systems Intermodal Connectors Private Firms Special Authorities Transit Vehicles and Facilities Intercity Buses and Facilities Local Governments Freight Transfer Facilities Transportation Improvement Districts Passenger Rail Vehicles and Facilities 3
5 Statutory Selection Criteria Weighting (percentage amounts) Private Participation 20.0% Environmental Impact 20.0% National or Regional Significance 20.0% Project Acceleration 12.5% Credit Worthiness 12.5% Use of New Technologies 5.0% Reduced Federal Grant Assistance 5.0% Consumption of Budget Authority 5.0% 4
6 Program Implementation: Selection & Funding of a TIFIA Project 1 1 Sponsor Submits Sponsor Submits Letter of Interest to Letter of Interest to the DOT the DOT 2 2 Sponsor Prepares and Sponsor Prepares and Submits Application to Submits Application to the DOT the DOT 3 3 DOT Staff Prepare DOT Staff Prepare Preliminary Evaluation Preliminary Evaluation and Arrange Sponsor and Arrange Sponsor Presentation Presentation 5 5 DOT Credit Council Provides DOT Credit Council Provides Recommendations to the Recommendations to the Secretary, who Selects Secretary, who Selects Projects to Receive TIFIA Projects to Receive TIFIA Credit Assistance Credit Assistance 4 4 DOT Staff Prepare Final Evaluation DOT Staff Prepare Final Evaluation and Make Recommendation to and Make Recommendation to DOT Credit Council DOT Credit Council 6 6 The DOT Issues The DOT Issues Term Sheet and Term Sheet and Obligates Funds Obligates Funds 7 7 The DOT Executes The DOT Executes Credit Agreement and Credit Agreement and Disburses Funds Disburses Funds 5
7 TIFIA Documentation Requirements MAJOR REQUIREMENTS Preliminary rating opinion letter obtained Draft EIS circulated (or Categorical Exclusion or FONSI obtained) Project consistent with state transportation plan and, if applicable, included in metropolitan transportation plan ROD obtained Project included in STIP Investmentgrade rating on senior debt submitted prior to anticipated closing date APPLICATIONS, APPROVALS, AND FUNDING Project selection made Letter of interest provided Application submitted Term sheet issued Funding obligated Credit agreement executed Funds disbursed according to terms 6
8 TIFIA Program Fees The TIFIA JPO will require each applicant to pay a non-refundable application fee of $30,000. In addition each borrower will be required to pay a credit processing fee equal to a portion of the costs incurred by the TIFIA JPO in negotiating the credit agreement. This fee will typically range from $100,000- $300,000. Borrowers will also be required to pay a $11,000 loan servicing fee annually. 7
9 TIFIA Projects (TIFIA Instruments in Millions) Reno Rail Corridor Retired - paid in full $51 Staten Island Ferries Retired paid in full $159 Moynihan Station $160 Warwick Intermodal Station $42 SR 125 Toll Road $140 Total TIFIA Assistance: $3.2 Billion Total Project Investment: $13.2 Billion US 183-A Turnpike $66 Central Texas Turnpike $917 LA-1 $66 Miami Intermodal Center Rental Car Facility $170 Washington Metro CIP $600 Cooper River Bridge Retired - refinanced $215 Tren Urbano Retired - paid in full $300 PR FDOT Program Elements Retired paid in full $269 8
10 TIFIA Portfolio (In Millions) TIFIA Number Project Project Project Instrument Credit Senior debt TIFIA Revenue Type Cost Type Amount obligations loan Pledge Active Credit Agreements b Miami Intermodal Center RCF Intermodal a Direct Loan * BBB User Charges Washington Metro CIP Transit 2,324 Guarantee A- BBB Interjurisdictional Funding Agreements Central Texas Turnpike Highway 3,700 Direct Loan BBB+ BB User Charges SR 125 Toll Road Highway 629 Direct Loan BBB- BB+ User Charges A Toll Road Highway 331 Direct Loan BBB- BB User Charges LA-1 Highway 247 Direct Loan A- BB User Charges Warwick Intermodal Station Intermodal 182 Direct Loan BBB+ BBB- User Charges Total $2, Commitments Awaiting Credit Agreements a Moynihan Station Passenger Rail 800 Direct Loan Lease Income b Moynihan Station Passenger Rail b Line of Credit Lease Income Total $ Retired Credit Agreements Tren Urbano (PR) Transit 2,250 Direct Loan BBB+ BBB- Tax Revenues Cooper River Bridge Highway 668 Direct Loan BBB- BBB- Infrastructure Bank Loan Repayments Staten Island Ferries Transit 482 Direct Loan A+ A+ Tobacco Settlement Revenues a Reno Rail Corridor Intermodal 280 Direct Loan BBB BB Room and Sales Tax a Miami Intermodal Center FDOT Intermodal $1,349 Direct Loan $ * A- Tax Revenues Total $ Total All Categories $13,242 $3, Note: Project costs and credit ratings as of TIFIA financial closing Footnotes a b Project Cost included in TIFIA Number a Project Cost included in TIFIA Number a * TIFIA is the only project debt 9
11 TIFIA JPO Organizational Framework Secretary of Transportation Asst. Secy. for Budget and Programs/CFO (Chair) Under Secy. of Transportation For Policy General Counsel DOT Credit Council Asst Secy. for Transportation Policy Director of OSDBU Federal Transit Administrator Federal Highway Administrator Federal Railroad Administrator Maritime Administrator Chief Financial Officer TIFIA Joint Program Office 10
12 TIFIA Oversight: Credit Instrument Life Cycle Construction Oversight and Performance Monitoring Design / Construction On-site inspections Periodic meetings Disbursement approvals Project acceptance Substantial Completion Operations/Post Construction Performance reporting Revenue realization Change reporting Compliance with credit agreement Financial Closing Construction Risk Performance Risk Exposure (Decreases over Time) Final Maturity 11
13 Contact: TIFIA Joint Program Office (HCF-50) U.S. Department of Transportation Room Seventh Street, SW Washington, DC fax: (202) Mark Sullivan, Chief (202) Robert C. Brown, Capital Markets Advisor (202) Duane Callender, Project Finance Coordinator (202) Lisa Floyd, Budget Analyst (202) Cheryl Jones, Project Finance Advisor (202) Suzanne Sale, Senior Financial Advisor (602)
Transportation Infrastructure Finance and Innovation Act (TIFIA) Program Overview
Transportation Infrastructure Finance and Innovation Act (TIFIA) Program Overview (general summary and overview only for full details, see 23 United States Code Section 601) TIFIA IS A CREDIT PROGRAM (not
More informationOctober 7, Introduction to the TIFIA Credit Program
October 7, 2015 Introduction to the TIFIA Credit Program Types of Credit Assistance 2 Secured (Direct) Loan Maximum term of 35 years from substantial completion Repayments must start 5 years after substantial
More informationTransportation Infrastructure Finance and Innovation Act (TIFIA)
Slide 1 Transportation Infrastructure Finance and Innovation Act (TIFIA) Reno Rail Corridor Port of Miami Tunnel SH 130 Jorianne Jernberg, Financial Analyst Office of Innovative Program Delivery Federal
More informationTransportation Tuesdays Online Third in webinar series for transit CEOs & board members on economic sustainability January 17, 2012
Transportation Tuesdays Online Third in webinar series for transit CEOs & board members on economic sustainability January 17, 2012 CREATIVE FINANCING AND PUBLIC TRANSPORTATION Greg Evans Art Leahy Tom
More informationApril 25, Martin Klepper Executive Director
April 25, 2017 Martin Klepper Executive Director A New Formula for Infrastructure Investment The BUILD AMERICA BUREAU 2 Bureau Credit Programs Transportation Infrastructure Finance and Innovation Act (TIFIA)
More informationValue Capture and U.S. DOT Financing Programs. October 21, 2018
Value Capture and U.S. DOT Financing Programs October 21, 2018 Build America Bureau Background Established by the Fixing America s Surface Transportation (FAST) Act. Consolidates TIFIA and RRIF loan programs
More informationThe Federal Perspective: Project Finance, TIFIA and Public Private Partnerships
The Federal Perspective: Project Finance, TIFIA and Public Private Partnerships Mark Sullivan, Federal Highway Administration Innovative Transportation Finance Workshop Shoreview, Minnesota October 20,
More informationFlorida Department of Transportation
JEB BUSH GOVERNOR Florida Department of Transportation 605 Suwannee Street, MS 07 Tallahassee, FL 32399 JOSE ABREU SECRETARY September 30, 2003 Dear MIC Partner: Attached is the third Annual Update of
More informationACCESSING PRIVATE CAPITAL FOR TRANSPORTATION INFRASTRUCTURE PROJECTS
ACCESSING PRIVATE CAPITAL FOR TRANSPORTATION INFRASTRUCTURE PROJECTS Transportation Infrastructure Finance Workshop Chicago, Illinois OVERVIEW AND KEY PLANNING FACTORS April 29, 2008 David Seltzer, Principal
More information23 USC 601. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see
TITLE 23 - HIGHWAYS CHAPTER 6 - INFRASTRUCTURE FINANCE 601. Generally applicable provisions (a) Definitions. In this chapter, the following definitions apply: (1) Eligible project costs. The term eligible
More informationTransportation Infrastructure Finance and Innovation Act
Transportation Infrastructure Finance and Innovation Act Program Expansion Must Not Erode Taxpayer Protections October 27, 2011 The Transportation Infrastructure Finance and Innovation Act 1 (TIFIA) was
More informationApproval to Submit TIFIA Loan Application
Finance & Administration Committee Action Item III-G September 16, 2010 Approval to Submit TIFIA Loan Application Washington Metropolitan Area Transit Authority Board Action/Information Summary Action
More informationSolutions: Accelerating Infrastructure Projects Goldman, Sachs & Co. April 22, 2008
MUNIROOT\V_NY\MuniVol0\Shared\Zach\PPP\Greg Carey's Speech for Texas Transportation Forum v4.10.08.doc effroz 11 Apr 2008 16:46 1/13 Solutions: Accelerating Infrastructure Projects Goldman, Sachs & Co.
More informationInvest in Public Transportation for a Stronger America
Invest in Public Transportation for a Stronger America Appendix: Finance Recommendations The American Public Transportation Association Urges the Trump Administration and Congress to Dramatically Increase
More informationMIAMI INTERMODAL CENTER
h FLORIDA DEPARTMENT OF TRANSPORTATION MIAMI INTERMODAL CENTER TENTH ANNUAL FINANCIAL PLAN UPDATE MAY 31, 2013 F L O R I D A D E P A R T M E N T O F T R A N S P O R T A T I O N M I A M I I N T E R M
More informationRegional Transportation District FasTracks Financial Plan. April 22,
Regional Transportation District FasTracks Financial Plan April 22, 2004 2-1 Executive Summary The Regional Transportation District (the District or RTD ), has developed a comprehensive $4.7 billion Plan,
More informationAPPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN Forecast of State and Federal Revenues for Statewide and Metropolitan Plans
APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN 2035 Forecast of State and Federal Revenues for Statewide and Metropolitan Plans Overview This appendix documents the current Florida Department
More informationTechnical Appendix. FDOT 2040 Revenue Forecast
Technical Appendix FDOT 040 Revenue Forecast This page was left blank intentionally. APPENDIX FOR THE METROPOLITAN LONG RANGE PLAN 040 Forecast of State and Federal Revenues for Statewide and Metropolitan
More informationMIAMI INTERMODAL CENTER
FLORIDA DEPARTMENT OF TRANSPORTATION MIAMI INTERMODAL CENTER NINTH ANNUAL FINANCIAL PLAN UPDATE MAY 31, 2012 F L O R I D A D E P A R T M E N T O F T R A N S P O R T A T I O N M I A M I I N T E R M O
More informationGATEWAY PROGRAM UPDATE
March 16, 2018 GATEWAY PROGRAM UPDATE John D. Porcari, Interim Executive Director Francis Sacr, Interim Finance Director Gateway Program Update»Gateway Program a Responsible, Rational, and Realistic Approach»Focusing
More informationBonds and Financing Tools That May Be Used by Nevada s Department of Transportation (NDOT)
Bonds and Financing Tools That May Be Used by Nevada s Department of Transportation (NDOT) Susan G. Martinovich, P.E., Director, NDOT Robert D. Chisel, Assistant Director, Administration, NDOT Types of
More informationFlorida Department of Transportation. Miami Intermodal Center
Florida Department of Transportation Miami Intermodal Center May 31, 2017 EXECUTIVE SUMMARY FDOT is pleased to provide the 2017 Financial Plan Annual Update for the MIC program for the reporting period
More informationThis chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA).
8 FINANCIAL ANALYSIS This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA). The alternative formerly known as
More informationJoint Appropriations Subcommittee on Transportation
Joint Appropriations Subcommittee on Transportation Funding Overview February 21, 2013 H. Tasaico, PE 1 NCDOT Funding Overview - Agenda State Transportation Comparative Data Transportation Funding Sources
More informationHighway & Transportation Authority (HTA)
Highway & Transportation Authority (HTA) Rubén A. Hernández Gregorat, PE, MEM Executive Director Jorge Junquera Chief Financial Officer R E S T O R I N G G R O W T H T H R O U G H F I S C A L R E S P O
More informationTransportation Primer
Transportation Primer Joint Appropriations Committee on Transportation February 11, 2015 Amna Cameron Fiscal Research Division Agenda Background Transportation Revenues Items for Consideration Transportation
More informationSOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania
SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project
More informationP3 Financing. Barney Allison. Peter Luchetti. Alfonso Mendez. Partner, Nossaman LLP. Managing Partner, Table Rock Capital
P3 Financing Barney Allison Partner, Nossaman LLP Peter Luchetti Managing Partner, Table Rock Capital Alfonso Mendez Senior Financial Advisor, Arup Typical P3 Financing Structure Project Company SPV P3
More informationSTATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Annual Report Dated February 1, 2018 Regarding Motor Fuel Tax Bonds
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS 2018 Annual Report Dated February 1, 2018 Regarding Motor Fuel Tax Bonds Pursuant to its contractual secondary market obligations for the fiscal year ending
More informationP3 Financing Stan Ladner, Butler Snow LLP Josh Evans, Bostonia Partners LLC
P3 Financing Stan Ladner, Butler Snow LLP Josh Evans, Bostonia Partners LLC P3 Financing Options Capital Markets Debt (Bank debt, subordinate debt) Private Activity Bonds (PABs) Governmental Tax-Exempt
More informationState Department of Transportation Funding Alternatives May 18, 2016 Background and Current Considerations
State Department of Transportation Funding Alternatives May 18, 2016 Background and Current Considerations Presented by Jill Jaworski, Managing Director Public Financial Management, Inc. 222 North LaSalle
More informationThe Transportation Infrastructure Bond Act of 2000
New York City Independent Budget Office The Transportation Infrastructure Bond Act of 2000 On November 7, 2000, New Yorkers will vote on the Transportation Infrastructure Bond Act of 2000. If passed, the
More informationTransportation Revenue Options and State Funding Initiatives
M I D A M E R I C A A S S O C I A T I O N O F S T A T E T R A N S P O R T A T I O N O F F I C I A L S 2 0 1 3 A N N U A L M E E T I N G M I L W A U K E E, W I W E D N E S D A Y 1 7 J U L Y 2 0 1 3 WHAT
More informationGENERAL ASSEMBLY OF NORTH CAROLINA SESSION HOUSE DRH70631-LBxz-401T (1/22) Short Title: Congestion Relief/Intermodal Transport Fund.
H GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 0 HOUSE DRH0-LBxz-0T (/) D Short Title: Congestion Relief/Intermodal Transport Fund. (Public) Sponsors: Referred to: Representative. A BILL TO BE ENTITLED AN
More informationStandard Policy No: (P) Effective: 4/17/1015 rev. 2/21/2018 Responsible Division: Finance STATE INFRASTRUCTURE BANK (SIB) LOANS AND BONDS
Approved: Jerry Wray Director Standard Policy No: 18-012(P) Effective: 4/17/1015 rev. 2/21/2018 Responsible Division: Finance BACKGROUND: STATE INFRASTRUCTURE BANK (SIB) LOANS AND BONDS SIB LOANS In 1995
More informationMobility / Other Modes Roger Nober Executive Vice President Law and Secretary BNSF Railway
Mobility / Other Modes Roger Nober Executive Vice President Law and Secretary BNSF Railway Today s Discussion Urban Mobility Rural Mobility and Safety Other Modes: Mass Transportation Freight and Intercity
More informationFlorida Department of Transportation. Miami Intermodal Center
Florida Department of Transportation Miami Intermodal Center May 31, 2015 EXECUTIVE SUMMARY FDOT is pleased to provide the 2015 Financial Plan Update for the MIC program for the reporting period through
More informationRecommend to Board. Final Action
RESOLUTION NO. R2016-20 Rebaseline the Tacoma Trestle Track & Signal Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 07/14/2016 07/28/2016 Recommend to Board
More informationTransit Alternate Funding Options Study Technical Memo Task 1 November 23, 2010
Transit Alternate Funding Options Study Technical Memo Task 1 November 23, 2010 Prepared for: Volusia Transportation Planning Organization Votran Prepared by: The PFM Group 300 South Orange Avenue Suite
More informationP.L.2016, CHAPTER 56, approved October 14, 2016 Assembly, No. 10 (Fourth Reprint)
- C.:B-. Title. Chapter B. (Rename) Infrastructure Trust.,-0 - C.:B-0. to :B-0. - C.:B-. - - C.:B-. & :B-. - Repealer - Note P.L., CHAPTER, approved October, Assembly, No. 0 (Fourth Reprint) 0 0 AN ACT
More informationAdministration and Projects Committee STAFF REPORT March 1, 2018 Page 2 of 9 Below is a summary of the FY adopted budget and the proposed midy
Administration and Projects Committee STAFF REPORT Meeting Date: March 1, 2018 Subject Summary of Issues Recommendations Financial Implications Options Approval of FY 2017 18 Midyear Budget for the Contra
More informationJoint Appropriations Subcommittee on Transportation. North Carolina Turnpike Authority Beau Memory March 14, 2017
Joint Appropriations Subcommittee on Transportation North Carolina Turnpike Authority Beau Memory March 14, 2017 Benefits of Tolling: Funding source Supplements traditional transportation funding Can accelerate
More informationPublic Private Partnerships 101
Public Private Partnerships 101 Tony Elkins, Commercial Director October 6, 2016 Cintra s LBJ Managed Lanes P3, Dallas, Texas The Ferrovial Group Development Over The Entire Infrastructure Lifecycle INFRASTRUCTURE
More informationGovernor s FY 2019 Revised, FY 2020 and Capital Budget Recommendations House Finance Committee April 9, 2019
Governor s FY 2019 Revised, FY 2020 and Capital Budget Recommendations House Finance Committee April 9, 2019 Quasi-public agency Established in 1964 Responsible: Fixed route bus service and Americans with
More informationDominion Boulevard Improvements with Toll System VDOT Initial Financial Plan February 1, 2012
VDOT February 1, 2012 Table of Contents Section 1 Summary.2 Project Description. 2 Project Background 2 Current Activities.3 Project Schedule.4 Section 2 Project Cost Estimate..4 Section 3 Project Financing..5
More informationCHAPTER 9 FINANCIAL CONSIDERATIONS
CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the Berryessa Extension Project (BEP) Alternative and the Silicon Valley Rapid Transit
More informationNew Infrastructure Policies Surfacing? Ideas for Improvements to the RRIF Loan Program
Infrastructure Financing Tools New Infrastructure Policies Surfacing? Ideas for Improvements to the RRIF Loan Program By Richard Sherman The Seneca Group, LLC February 2018 T he ocean of U.S. public policy
More informationDulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting
Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting May 30, 2014 Discussion Outline Finance Plan for the Metrorail Project Allocation of Estimated Capital Costs and TIFIA
More informationIII. Major Assumptions Projections
III. Major Assumptions 2004-2008 Projections Utilization (Revenue, Ridership, Vehicle Traffic) UTILIZATION Baseline Before Gap-Closing Actions 2004 Ridership and Revenue In 2004, ridership on the various
More informationMetropolitan Transportation Authority Proposed Capital Program
Metropolitan Transportation Authority Proposed 2008-2013 Capital Program Thomas P. DiNapoli New York State Comptroller Kenneth B. Bleiwas Deputy Comptroller Report 11-2008 March 2008 The proposed capital
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CECW-PA Engineer Regulation 1165-2-122 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Water Resource Policies and Authorities STUDIES OF HARBOR OR INLAND HARBOR PROJECTS
More informationNossaman Infra Insight
Nossaman Infra Insight MAP-21: Surface Transportation Reauthorization Ushers in Significant Changes to TIFIA By: Fredric W. Kessler, Peter W. Denton, Nossaman LLP 07/06/12 On June 29, 2012 Congress passed
More informationAdditional support documents to the resolution:
Resolution No. R2017-37 Additional support documents to the resolution: Memo from Sound Transit CEO Peter Rogoff Memorandum of Understanding between the Puget Sound Regional Council, Sound Transit, and
More informationV. FUNDING OPTIONS A. FUNDING THE NRPC -- THE GOVERNMENT OVERSIGHT AGENCY
V. FUNDING OPTIONS The proposed rail passenger restructuring plan will only be effective if there are adequate, reliable sources of funding for the three types of entities being proposed: the NRPC (the
More informationPartnerships in Transportation Workshop Transportation PPPs beyond Toll Roads
TRANSACTION ADVISORY SERVICES PPP ADVISORY Partnerships in Transportation Workshop Transportation PPPs beyond Toll Roads Alistair SAWERS, Head of Transport, PPP Advisory, Ernst & Young 1 Introduction Brownfield
More informationRESPONSIBLE MINISTER FOR MINISTRY OF TRANSPORT: Minister of Transport
Vote Transport APPROPRIATION MINISTER(S): Minister of Transport (M72) APPROPRIATION ADMINISTRATOR: Ministry of Transport RESPONSIBLE MINISTER FOR MINISTRY OF TRANSPORT: Minister of Transport THE ESTIMATES
More informationFredric W. Kessler, Esq.
Caltrans Legal Division Contract Law Workshop San Diego, California March 21, 2007 PUBLIC-PRIVATE PARTNERSHIPS Fredric W. Kessler, Esq. Nossaman Guthner Knox & Elliott LLP The information contained herein
More informationFinance Tools. Surface Transportation Funding, Finance, and Leadership. Joung Lee Wendy Franklin Deb Miller
Finance Tools Surface Transportation Funding, Finance, and Leadership Joung Lee Wendy Franklin Deb Miller AASHTO Center for Excellence in Project Finance (CEPF) One of four Centers of Excellence authorized
More informationThe Railroad Rehabilitation and Improvement Financing (RRIF) Program
The Railroad Rehabilitation and Improvement Financing (RRIF) Program David Randall Peterman Analyst in Transportation Policy January 31, 2018 Congressional Research Service 7-5700 www.crs.gov R44028 Summary
More informationNCDOT Funding Overview
NCDOT Funding Overview Joint Appropriations Subcommittee on Transportation Mark L. Foster, CFO H. Tasaico February 16, 2011 Transportation Outlook NCDOT Funding Sources Transportation Funding Equity Cash
More informationPrioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016
Prioritization and Programming Process NCDOT Division of Planning and Programming November 16, 2016 Today s Roadmap 1. Planning and Programming Division Overview 2. Strategic Investments (STI) Law 3. Prioritization
More informationFlorida Transportation Commission Florida Department of Transportation Management Compensation Study
APPENDIX H: BLS COMPARISONS Florida Transportation Commission Florida Department of Transportation Management Compensation Study CLASSICIATION COMPARISON TO BLS DATA SOURCE MATCHED POSITIONS - REGIONAL,
More information77th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. House Bill 2800 CHAPTER... AN ACT
77th OREGON LEGISLATIVE ASSEMBLY--2013 Regular Session Enrolled House Bill 2800 Sponsored by Representatives READ, BENTZ, Senators BEYER, STARR CHAPTER... AN ACT Relating to the Interstate 5 bridge replacement
More informationIslamic Republic of Pakistan: Karachi Bus Rapid Transit Project
Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public
More informationPUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET
PUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET Before the Committee on Public Works and the Environment Council of the District of Columbia The Honorable Jim Graham,
More informationOCTOBER 2013 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS
OCTOBER 2013 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS The Airports Authority established the Dulles Corridor Enterprise (DCE) Fund to segregate the financial activity associated with
More informationFlorida Transportation Commission PUBLIC-PRIVATE PARTNERSHIPS (P3)
Florida Transportation Commission PUBLIC-PRIVATE PARTNERSHIPS (P3) AGENDA Current Status in Florida Federal Reauthorization/ SEP-15 P-3 Options Overview Key aspects of P-3 Georgia Status P-3 Initiatives
More informationMetroplan White Paper
Background White Paper 30 Crossing Plan and TIP Amendments The 30 Crossing Project is a major design-build-finance reconstruction and expansion project on I-40 from the US 67/167 interchange to the north
More informationSOUND TRANSIT RESOLUTION NO. R99-14
SOUND TRANSIT RESOLUTION NO. R99-14 A RESOLUTION of the Board of the Central Puget Sound Regional Transit Authority to reallocate $10 million (1995 dollars) from the East Everett Park and Ride Lot to the
More informationFederal Register / Vol. 81, No. 127 / Friday, July 1, 2016 / Rules and Regulations
Federal Register / Vol. 81, No. 127 / Friday, July 1, 2016 / Rules and Regulations 43105 49 CFR Section Description Guideline amount 2 IM portable tank, cite 173.24(f) and use the penalty amounts for tank
More informationALL Counties. ALL Districts
TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation
More information8.0 FINANCIAL ANALYSIS
Chapter 8 Financial Analysis 8.0 FINANCIAL ANALYSIS This chapter presents a summary of the financial analysis for the Central Corridor Light Rail Transit (LRT) Project, a description of the Project Sponsor
More informationOverview of Highway Public-Private Partnerships (P3s)
Overview of Highway Public-Private Partnerships (P3s) FHWA Office of Innovative Program Delivery Presentation to GBC Transportation & Mobility Committee March 11, 2015 Presentation Outline 2 Part 1 Part
More informationMeasure I Strategic Plan, April 1, 2009 Glossary Administrative Committee Advance Expenditure Agreement (AEA) Advance Expenditure Process
Glossary Administrative Committee This committee makes recommendations to the Board of Directors and provides general policy oversight that spans the multiple program responsibilities of the organization
More informationDURHAM-ORANGE LIGHT RAIL TRANSIT PROJECT FINANCIAL RISKS AND MITIGATION STRATEGIES APRIL 2017
DURHAM-ORANGE LIGHT RAIL TRANSIT PROJECT FINANCIAL RISKS AND MITIGATION STRATEGIES APRIL 2017 There are several financial risks to the 2017 County Transit Plans (Plans) that could arise at different times
More informationTRANSPORTATION INDUSTRY SALARY SURVEY RESULTS
APPENDIX F: TRANSPORTATION INDUSTRY SURVEY RESULTS Florida Transportation Commission Florida Department of Transportation Management Compensation Study BENCHMARK RESULTS FROM SURVEY OF CONSULTING FIRMS
More informationDescription of the Submission / Conditions Precedent
Submittal Relating to the Development of the TxDOT North Tarrant Express Project, Segments 3A and 3B through a Facility Implementation Plan and Facility Agreement Description of the Submission / Conditions
More informationWhat Every Transportation Manager Should Know About GARVEEs
May 2007 What Every Transportation Manager Should Know About GARVEEs Frederick J. Werner Federal Highway Administration Resource Center Frederick.werner@fhwa.dot.gov 0 Outline Background on Debt and Infrastructure
More informationI-66 RFI Response Vinci Concessions USA 25 November 2013
General: 1. Please describe your firm, its experience in relation to public-private partnership projects, and its potential interest in relation to the Project (e.g., design/engineering firm, construction
More informationTentative Work Program Fiscal Year 2004/ /09
Tentative Work Program Fiscal Year 2004/05-2008/09 Florida Transportation Commission Statewide Public Hearing March 2, 2004 Work Program Section 339.135(3)(b) states, The tentative and adopted work programs
More informationMetropolitan Transportation Authority: East Side Access Cost Overruns
Metropolitan Transportation Authority: East Side Access Cost Overruns Thomas P. DiNapoli New York State Comptroller Kenneth B. Bleiwas Deputy Comptroller Report 12-2013 March 2013 Highlights East Side
More informationRESOLUTION NO. R Baseline Budget and Schedule, and Approve Gates 5 and 6 for the East Link Extension
RESOLUTION NO. R2015-04 Baseline and Schedule, and Approve Gates 5 and 6 for the East Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Board 04/23/15 Final Action Ahmad Fazel, DECM Executive
More informationResearch: Research and Technology Transfer Office Sept. 1, 1996-Dec. 31, 1996 P.O. Box 5080
1. Report No. 2. \.10vemment Accession No. 3. Recipient's Catalog No. FHWA/TX-99/1756-4 Technical Report Documentation Page 4. Title and Subtitle 5. ReportDate SUGGESTED GUIDELINES FOR REVIEWING PRIVATE
More informationFlorida Senate SB 718 By Senator Sebesta
By Senator Sebesta 1 A bill to be entitled 2 An act relating to the Department of 3 Transportation; amending s. 337.251, F.S.; 4 authorizing the department to adopt rules 5 governing the leasing of property
More informationTransportation Funding
Transportation Funding TABLE OF CONTENTS Introduction... 3 Background... 3 Current Transportation Funding... 4 Funding Sources... 4 Expenditures... 5 Case Studies... 6 Washington, D.C... 6 Chicago... 8
More informationIV. Major Assumptions Projections
IV. Major Assumptions 2004-2008 Projections This page has been intentionally left blank. Utilization (Revenue, Ridership, Vehicle Traffic) This page has been intentionally left blank. UTILIZATION Baseline
More informationEmilia Istrate, Senior Research Analyst. July 28, 2009 Washington DC
National Surface Transportation Legislation: Metropolitan Outlook Government Research Association Annual Conference Emilia Istrate, Senior Research Analyst July 28, 2009 Washington DC 1 2 3 The Background:
More informationMay 31, 2016 Financial Report
2016 May 31, 2016 Financial Report Capital Metropolitan Transportation Authority 7/13/2016 Table of Contents SUMMARY REPORTS Budgetary Performance - Revenue 2 - Sales Tax Revenue 6 - Operating Expenses
More information2017 Educational Series FUNDING
2017 Educational Series FUNDING TXDOT FUNDING INTRODUCTION Transportation projects take many years to develop and construct. In addition to the design, engineering, public involvement, right-of-way acquisition,
More informationJanuary 31, Knowledge, Ethics, Drive & Transparency
January 31, 2018 Knowledge, Ethics, Drive & Transparency GLOBAL INFRASTRUCTURE FUNDING GAP The gap is equivalent to $8.4 trillion (~$500 billion annually from 2013-2030) and leaves private investment as
More informationUrban Transport Institutional and Financial Issues. International best practices
Urban Transport Institutional and Financial Issues International best practices Contents 2 I N T R O D U C T I O N S E L E C T E D F O R E I G N E X A M P L E S C O N C L U S I O N Introduction : Key issues
More informationREPORT OF THE INTERMODAL COMMITTEE AND EXPLANATION OF CONGESTION RELIEF AND INTERMODAL TRANSPORTATION 21 ST CENTURY FUND
REPORT OF THE INTERMODAL COMMITTEE AND EXPLANATION OF CONGESTION RELIEF AND INTERMODAL TRANSPORTATION 21 ST CENTURY FUND The Intermodal Committee recommends legislation to: 1. Create the Congestion Relief
More informationFEBRUARY 2013 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS
FEBRUARY 2013 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS The Airports Authority established the Dulles Corridor Enterprise (DCE) Fund to segregate the financial activity associated with
More informationNORTH CAROLINA GENERAL ASSEMBLY
NORTH CAROLINA GENERAL ASSEMBLY HOUSE TRANSPORTATION APPROPRIATIONS SUBCOMMITTEE MONEY REPORT AND SPECIAL PROVISIONS MAY 24, 2012 House Subcommittee on Transportation Highway Fund HIGHWAY FUND Total Budget
More informationPreliminary Findings and Recommendations
Review of the Comprehensive Agreement between the North Carolina Department of Transportation and I-77 Mobility Partners LLC Preliminary Findings and Recommendations July 2017 Overview NCDOT has initiated
More informationTHE WHITE HOUSE Office of the Press Secretary EXECUTIVE ORDER
FOR IMMEDIATE RELEASE August 15, 2017 THE WHITE HOUSE Office of the Press Secretary EXECUTIVE ORDER - - - - - - - ESTABLISHING DISCIPLINE AND ACCOUNTABILITY IN THE ENVIRONMENTAL REVIEW AND PERMITTING PROCESS
More informationColumbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012)
Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012) Summary Description Proposed Project: Light Rail Transit 2.9 Miles, 5 Stations Total Capital Cost ($YOE):
More information5/3/2016. May 4, Item #1 CITIZENS PARTICIPATION
May 4, 2016 Item #1 CITIZENS PARTICIPATION 1 Item #2 ELECT AN ACTING CHAIR Item #3 APPROVAL OF MINUTES 2 Item #4 OVERVIEW OF TRAC AGENDA Committee Goals Learn about the RTC including its roadway and transit
More informationTEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012)
TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) Summary Description Proposed Project: Commuter Rail 37.6 Miles, 14 Stations (12 new, two existing) Total Capital Cost ($YOE):
More informationAnalysis of Transit 20 Year Capital Forecasts: FTA TERM Model vs. Transit Estimates
Analysis of Transit 20 Year Capital Forecasts: FTA TERM Model vs. Transit Estimates Dr. Allan M. Zarembski PE, FASME, Hon. Mbr. AREMA Research Professor and Director of the Railroad Engineering and Safety
More information