Transportation Infrastructure Finance and Innovation Act (TIFIA)

Size: px
Start display at page:

Download "Transportation Infrastructure Finance and Innovation Act (TIFIA)"

Transcription

1 TIFIA Credit Program Overview Transportation Infrastructure Finance and Innovation Act (TIFIA) Updated September 27, 2006

2 Background on TIFIA Strategic goal to leverage limited Federal resources and stimulate private capital investment in transportation infrastructure by providing credit assistance in the form of direct loans, loan guarantees, and standby lines of credit (rather than grants) to projects of national or regional significance. Key objectives Facilitate projects with significant public benefits Encourage new revenue streams and private participation Fill capital market gaps for secondary/subordinate capital Be a flexible, patient investor willing to take on investor concerns about investment horizon, liquidity, predictability and risk Limit Federal exposure by relying on market discipline 1

3 Background on TIFIA (continued) Major requirements Large surface transportation projects ($50M generally, $15M for intelligent transportation systems ITS) TIFIA contribution limited to 33 percent Senior debt must be rated investment grade Dedicated revenues for repayment Applicable Federal requirements (Civil Rights, NEPA, Uniform Relocation, Titles 23/49) Public or private highway, transit, rail and port projects are eligible to apply for TIFIA assistance Application process project sponsors must submit proposals, including financial plans, to USDOT for consideration. 2

4 Eligible TIFIA Sponsors and Projects Highways and Bridges State Governments Intelligent Transportation Systems Intermodal Connectors Private Firms Special Authorities Transit Vehicles and Facilities Intercity Buses and Facilities Local Governments Freight Transfer Facilities Transportation Improvement Districts Passenger Rail Vehicles and Facilities 3

5 Statutory Selection Criteria Weighting (percentage amounts) Private Participation 20.0% Environmental Impact 20.0% National or Regional Significance 20.0% Project Acceleration 12.5% Credit Worthiness 12.5% Use of New Technologies 5.0% Reduced Federal Grant Assistance 5.0% Consumption of Budget Authority 5.0% 4

6 Program Implementation: Selection & Funding of a TIFIA Project 1 1 Sponsor Submits Sponsor Submits Letter of Interest to Letter of Interest to the DOT the DOT 2 2 Sponsor Prepares and Sponsor Prepares and Submits Application to Submits Application to the DOT the DOT 3 3 DOT Staff Prepare DOT Staff Prepare Preliminary Evaluation Preliminary Evaluation and Arrange Sponsor and Arrange Sponsor Presentation Presentation 5 5 DOT Credit Council Provides DOT Credit Council Provides Recommendations to the Recommendations to the Secretary, who Selects Secretary, who Selects Projects to Receive TIFIA Projects to Receive TIFIA Credit Assistance Credit Assistance 4 4 DOT Staff Prepare Final Evaluation DOT Staff Prepare Final Evaluation and Make Recommendation to and Make Recommendation to DOT Credit Council DOT Credit Council 6 6 The DOT Issues The DOT Issues Term Sheet and Term Sheet and Obligates Funds Obligates Funds 7 7 The DOT Executes The DOT Executes Credit Agreement and Credit Agreement and Disburses Funds Disburses Funds 5

7 TIFIA Documentation Requirements MAJOR REQUIREMENTS Preliminary rating opinion letter obtained Draft EIS circulated (or Categorical Exclusion or FONSI obtained) Project consistent with state transportation plan and, if applicable, included in metropolitan transportation plan ROD obtained Project included in STIP Investmentgrade rating on senior debt submitted prior to anticipated closing date APPLICATIONS, APPROVALS, AND FUNDING Project selection made Letter of interest provided Application submitted Term sheet issued Funding obligated Credit agreement executed Funds disbursed according to terms 6

8 TIFIA Program Fees The TIFIA JPO will require each applicant to pay a non-refundable application fee of $30,000. In addition each borrower will be required to pay a credit processing fee equal to a portion of the costs incurred by the TIFIA JPO in negotiating the credit agreement. This fee will typically range from $100,000- $300,000. Borrowers will also be required to pay a $11,000 loan servicing fee annually. 7

9 TIFIA Projects (TIFIA Instruments in Millions) Reno Rail Corridor Retired - paid in full $51 Staten Island Ferries Retired paid in full $159 Moynihan Station $160 Warwick Intermodal Station $42 SR 125 Toll Road $140 Total TIFIA Assistance: $3.2 Billion Total Project Investment: $13.2 Billion US 183-A Turnpike $66 Central Texas Turnpike $917 LA-1 $66 Miami Intermodal Center Rental Car Facility $170 Washington Metro CIP $600 Cooper River Bridge Retired - refinanced $215 Tren Urbano Retired - paid in full $300 PR FDOT Program Elements Retired paid in full $269 8

10 TIFIA Portfolio (In Millions) TIFIA Number Project Project Project Instrument Credit Senior debt TIFIA Revenue Type Cost Type Amount obligations loan Pledge Active Credit Agreements b Miami Intermodal Center RCF Intermodal a Direct Loan * BBB User Charges Washington Metro CIP Transit 2,324 Guarantee A- BBB Interjurisdictional Funding Agreements Central Texas Turnpike Highway 3,700 Direct Loan BBB+ BB User Charges SR 125 Toll Road Highway 629 Direct Loan BBB- BB+ User Charges A Toll Road Highway 331 Direct Loan BBB- BB User Charges LA-1 Highway 247 Direct Loan A- BB User Charges Warwick Intermodal Station Intermodal 182 Direct Loan BBB+ BBB- User Charges Total $2, Commitments Awaiting Credit Agreements a Moynihan Station Passenger Rail 800 Direct Loan Lease Income b Moynihan Station Passenger Rail b Line of Credit Lease Income Total $ Retired Credit Agreements Tren Urbano (PR) Transit 2,250 Direct Loan BBB+ BBB- Tax Revenues Cooper River Bridge Highway 668 Direct Loan BBB- BBB- Infrastructure Bank Loan Repayments Staten Island Ferries Transit 482 Direct Loan A+ A+ Tobacco Settlement Revenues a Reno Rail Corridor Intermodal 280 Direct Loan BBB BB Room and Sales Tax a Miami Intermodal Center FDOT Intermodal $1,349 Direct Loan $ * A- Tax Revenues Total $ Total All Categories $13,242 $3, Note: Project costs and credit ratings as of TIFIA financial closing Footnotes a b Project Cost included in TIFIA Number a Project Cost included in TIFIA Number a * TIFIA is the only project debt 9

11 TIFIA JPO Organizational Framework Secretary of Transportation Asst. Secy. for Budget and Programs/CFO (Chair) Under Secy. of Transportation For Policy General Counsel DOT Credit Council Asst Secy. for Transportation Policy Director of OSDBU Federal Transit Administrator Federal Highway Administrator Federal Railroad Administrator Maritime Administrator Chief Financial Officer TIFIA Joint Program Office 10

12 TIFIA Oversight: Credit Instrument Life Cycle Construction Oversight and Performance Monitoring Design / Construction On-site inspections Periodic meetings Disbursement approvals Project acceptance Substantial Completion Operations/Post Construction Performance reporting Revenue realization Change reporting Compliance with credit agreement Financial Closing Construction Risk Performance Risk Exposure (Decreases over Time) Final Maturity 11

13 Contact: TIFIA Joint Program Office (HCF-50) U.S. Department of Transportation Room Seventh Street, SW Washington, DC fax: (202) Mark Sullivan, Chief (202) Robert C. Brown, Capital Markets Advisor (202) Duane Callender, Project Finance Coordinator (202) Lisa Floyd, Budget Analyst (202) Cheryl Jones, Project Finance Advisor (202) Suzanne Sale, Senior Financial Advisor (602)

Transportation Infrastructure Finance and Innovation Act (TIFIA) Program Overview

Transportation Infrastructure Finance and Innovation Act (TIFIA) Program Overview Transportation Infrastructure Finance and Innovation Act (TIFIA) Program Overview (general summary and overview only for full details, see 23 United States Code Section 601) TIFIA IS A CREDIT PROGRAM (not

More information

October 7, Introduction to the TIFIA Credit Program

October 7, Introduction to the TIFIA Credit Program October 7, 2015 Introduction to the TIFIA Credit Program Types of Credit Assistance 2 Secured (Direct) Loan Maximum term of 35 years from substantial completion Repayments must start 5 years after substantial

More information

Transportation Infrastructure Finance and Innovation Act (TIFIA)

Transportation Infrastructure Finance and Innovation Act (TIFIA) Slide 1 Transportation Infrastructure Finance and Innovation Act (TIFIA) Reno Rail Corridor Port of Miami Tunnel SH 130 Jorianne Jernberg, Financial Analyst Office of Innovative Program Delivery Federal

More information

Transportation Tuesdays Online Third in webinar series for transit CEOs & board members on economic sustainability January 17, 2012

Transportation Tuesdays Online Third in webinar series for transit CEOs & board members on economic sustainability January 17, 2012 Transportation Tuesdays Online Third in webinar series for transit CEOs & board members on economic sustainability January 17, 2012 CREATIVE FINANCING AND PUBLIC TRANSPORTATION Greg Evans Art Leahy Tom

More information

April 25, Martin Klepper Executive Director

April 25, Martin Klepper Executive Director April 25, 2017 Martin Klepper Executive Director A New Formula for Infrastructure Investment The BUILD AMERICA BUREAU 2 Bureau Credit Programs Transportation Infrastructure Finance and Innovation Act (TIFIA)

More information

Value Capture and U.S. DOT Financing Programs. October 21, 2018

Value Capture and U.S. DOT Financing Programs. October 21, 2018 Value Capture and U.S. DOT Financing Programs October 21, 2018 Build America Bureau Background Established by the Fixing America s Surface Transportation (FAST) Act. Consolidates TIFIA and RRIF loan programs

More information

The Federal Perspective: Project Finance, TIFIA and Public Private Partnerships

The Federal Perspective: Project Finance, TIFIA and Public Private Partnerships The Federal Perspective: Project Finance, TIFIA and Public Private Partnerships Mark Sullivan, Federal Highway Administration Innovative Transportation Finance Workshop Shoreview, Minnesota October 20,

More information

Florida Department of Transportation

Florida Department of Transportation JEB BUSH GOVERNOR Florida Department of Transportation 605 Suwannee Street, MS 07 Tallahassee, FL 32399 JOSE ABREU SECRETARY September 30, 2003 Dear MIC Partner: Attached is the third Annual Update of

More information

ACCESSING PRIVATE CAPITAL FOR TRANSPORTATION INFRASTRUCTURE PROJECTS

ACCESSING PRIVATE CAPITAL FOR TRANSPORTATION INFRASTRUCTURE PROJECTS ACCESSING PRIVATE CAPITAL FOR TRANSPORTATION INFRASTRUCTURE PROJECTS Transportation Infrastructure Finance Workshop Chicago, Illinois OVERVIEW AND KEY PLANNING FACTORS April 29, 2008 David Seltzer, Principal

More information

23 USC 601. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

23 USC 601. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see TITLE 23 - HIGHWAYS CHAPTER 6 - INFRASTRUCTURE FINANCE 601. Generally applicable provisions (a) Definitions. In this chapter, the following definitions apply: (1) Eligible project costs. The term eligible

More information

Transportation Infrastructure Finance and Innovation Act

Transportation Infrastructure Finance and Innovation Act Transportation Infrastructure Finance and Innovation Act Program Expansion Must Not Erode Taxpayer Protections October 27, 2011 The Transportation Infrastructure Finance and Innovation Act 1 (TIFIA) was

More information

Approval to Submit TIFIA Loan Application

Approval to Submit TIFIA Loan Application Finance & Administration Committee Action Item III-G September 16, 2010 Approval to Submit TIFIA Loan Application Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

Solutions: Accelerating Infrastructure Projects Goldman, Sachs & Co. April 22, 2008

Solutions: Accelerating Infrastructure Projects Goldman, Sachs & Co. April 22, 2008 MUNIROOT\V_NY\MuniVol0\Shared\Zach\PPP\Greg Carey's Speech for Texas Transportation Forum v4.10.08.doc effroz 11 Apr 2008 16:46 1/13 Solutions: Accelerating Infrastructure Projects Goldman, Sachs & Co.

More information

Invest in Public Transportation for a Stronger America

Invest in Public Transportation for a Stronger America Invest in Public Transportation for a Stronger America Appendix: Finance Recommendations The American Public Transportation Association Urges the Trump Administration and Congress to Dramatically Increase

More information

MIAMI INTERMODAL CENTER

MIAMI INTERMODAL CENTER h FLORIDA DEPARTMENT OF TRANSPORTATION MIAMI INTERMODAL CENTER TENTH ANNUAL FINANCIAL PLAN UPDATE MAY 31, 2013 F L O R I D A D E P A R T M E N T O F T R A N S P O R T A T I O N M I A M I I N T E R M

More information

Regional Transportation District FasTracks Financial Plan. April 22,

Regional Transportation District FasTracks Financial Plan. April 22, Regional Transportation District FasTracks Financial Plan April 22, 2004 2-1 Executive Summary The Regional Transportation District (the District or RTD ), has developed a comprehensive $4.7 billion Plan,

More information

APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN Forecast of State and Federal Revenues for Statewide and Metropolitan Plans

APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN Forecast of State and Federal Revenues for Statewide and Metropolitan Plans APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN 2035 Forecast of State and Federal Revenues for Statewide and Metropolitan Plans Overview This appendix documents the current Florida Department

More information

Technical Appendix. FDOT 2040 Revenue Forecast

Technical Appendix. FDOT 2040 Revenue Forecast Technical Appendix FDOT 040 Revenue Forecast This page was left blank intentionally. APPENDIX FOR THE METROPOLITAN LONG RANGE PLAN 040 Forecast of State and Federal Revenues for Statewide and Metropolitan

More information

MIAMI INTERMODAL CENTER

MIAMI INTERMODAL CENTER FLORIDA DEPARTMENT OF TRANSPORTATION MIAMI INTERMODAL CENTER NINTH ANNUAL FINANCIAL PLAN UPDATE MAY 31, 2012 F L O R I D A D E P A R T M E N T O F T R A N S P O R T A T I O N M I A M I I N T E R M O

More information

GATEWAY PROGRAM UPDATE

GATEWAY PROGRAM UPDATE March 16, 2018 GATEWAY PROGRAM UPDATE John D. Porcari, Interim Executive Director Francis Sacr, Interim Finance Director Gateway Program Update»Gateway Program a Responsible, Rational, and Realistic Approach»Focusing

More information

Bonds and Financing Tools That May Be Used by Nevada s Department of Transportation (NDOT)

Bonds and Financing Tools That May Be Used by Nevada s Department of Transportation (NDOT) Bonds and Financing Tools That May Be Used by Nevada s Department of Transportation (NDOT) Susan G. Martinovich, P.E., Director, NDOT Robert D. Chisel, Assistant Director, Administration, NDOT Types of

More information

Florida Department of Transportation. Miami Intermodal Center

Florida Department of Transportation. Miami Intermodal Center Florida Department of Transportation Miami Intermodal Center May 31, 2017 EXECUTIVE SUMMARY FDOT is pleased to provide the 2017 Financial Plan Annual Update for the MIC program for the reporting period

More information

This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA).

This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA). 8 FINANCIAL ANALYSIS This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA). The alternative formerly known as

More information

Joint Appropriations Subcommittee on Transportation

Joint Appropriations Subcommittee on Transportation Joint Appropriations Subcommittee on Transportation Funding Overview February 21, 2013 H. Tasaico, PE 1 NCDOT Funding Overview - Agenda State Transportation Comparative Data Transportation Funding Sources

More information

Highway & Transportation Authority (HTA)

Highway & Transportation Authority (HTA) Highway & Transportation Authority (HTA) Rubén A. Hernández Gregorat, PE, MEM Executive Director Jorge Junquera Chief Financial Officer R E S T O R I N G G R O W T H T H R O U G H F I S C A L R E S P O

More information

Transportation Primer

Transportation Primer Transportation Primer Joint Appropriations Committee on Transportation February 11, 2015 Amna Cameron Fiscal Research Division Agenda Background Transportation Revenues Items for Consideration Transportation

More information

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project

More information

P3 Financing. Barney Allison. Peter Luchetti. Alfonso Mendez. Partner, Nossaman LLP. Managing Partner, Table Rock Capital

P3 Financing. Barney Allison. Peter Luchetti. Alfonso Mendez. Partner, Nossaman LLP. Managing Partner, Table Rock Capital P3 Financing Barney Allison Partner, Nossaman LLP Peter Luchetti Managing Partner, Table Rock Capital Alfonso Mendez Senior Financial Advisor, Arup Typical P3 Financing Structure Project Company SPV P3

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Annual Report Dated February 1, 2018 Regarding Motor Fuel Tax Bonds

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Annual Report Dated February 1, 2018 Regarding Motor Fuel Tax Bonds STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS 2018 Annual Report Dated February 1, 2018 Regarding Motor Fuel Tax Bonds Pursuant to its contractual secondary market obligations for the fiscal year ending

More information

P3 Financing Stan Ladner, Butler Snow LLP Josh Evans, Bostonia Partners LLC

P3 Financing Stan Ladner, Butler Snow LLP Josh Evans, Bostonia Partners LLC P3 Financing Stan Ladner, Butler Snow LLP Josh Evans, Bostonia Partners LLC P3 Financing Options Capital Markets Debt (Bank debt, subordinate debt) Private Activity Bonds (PABs) Governmental Tax-Exempt

More information

State Department of Transportation Funding Alternatives May 18, 2016 Background and Current Considerations

State Department of Transportation Funding Alternatives May 18, 2016 Background and Current Considerations State Department of Transportation Funding Alternatives May 18, 2016 Background and Current Considerations Presented by Jill Jaworski, Managing Director Public Financial Management, Inc. 222 North LaSalle

More information

The Transportation Infrastructure Bond Act of 2000

The Transportation Infrastructure Bond Act of 2000 New York City Independent Budget Office The Transportation Infrastructure Bond Act of 2000 On November 7, 2000, New Yorkers will vote on the Transportation Infrastructure Bond Act of 2000. If passed, the

More information

Transportation Revenue Options and State Funding Initiatives

Transportation Revenue Options and State Funding Initiatives M I D A M E R I C A A S S O C I A T I O N O F S T A T E T R A N S P O R T A T I O N O F F I C I A L S 2 0 1 3 A N N U A L M E E T I N G M I L W A U K E E, W I W E D N E S D A Y 1 7 J U L Y 2 0 1 3 WHAT

More information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION HOUSE DRH70631-LBxz-401T (1/22) Short Title: Congestion Relief/Intermodal Transport Fund.

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION HOUSE DRH70631-LBxz-401T (1/22) Short Title: Congestion Relief/Intermodal Transport Fund. H GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 0 HOUSE DRH0-LBxz-0T (/) D Short Title: Congestion Relief/Intermodal Transport Fund. (Public) Sponsors: Referred to: Representative. A BILL TO BE ENTITLED AN

More information

Standard Policy No: (P) Effective: 4/17/1015 rev. 2/21/2018 Responsible Division: Finance STATE INFRASTRUCTURE BANK (SIB) LOANS AND BONDS

Standard Policy No: (P) Effective: 4/17/1015 rev. 2/21/2018 Responsible Division: Finance STATE INFRASTRUCTURE BANK (SIB) LOANS AND BONDS Approved: Jerry Wray Director Standard Policy No: 18-012(P) Effective: 4/17/1015 rev. 2/21/2018 Responsible Division: Finance BACKGROUND: STATE INFRASTRUCTURE BANK (SIB) LOANS AND BONDS SIB LOANS In 1995

More information

Mobility / Other Modes Roger Nober Executive Vice President Law and Secretary BNSF Railway

Mobility / Other Modes Roger Nober Executive Vice President Law and Secretary BNSF Railway Mobility / Other Modes Roger Nober Executive Vice President Law and Secretary BNSF Railway Today s Discussion Urban Mobility Rural Mobility and Safety Other Modes: Mass Transportation Freight and Intercity

More information

Florida Department of Transportation. Miami Intermodal Center

Florida Department of Transportation. Miami Intermodal Center Florida Department of Transportation Miami Intermodal Center May 31, 2015 EXECUTIVE SUMMARY FDOT is pleased to provide the 2015 Financial Plan Update for the MIC program for the reporting period through

More information

Recommend to Board. Final Action

Recommend to Board. Final Action RESOLUTION NO. R2016-20 Rebaseline the Tacoma Trestle Track & Signal Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 07/14/2016 07/28/2016 Recommend to Board

More information

Transit Alternate Funding Options Study Technical Memo Task 1 November 23, 2010

Transit Alternate Funding Options Study Technical Memo Task 1 November 23, 2010 Transit Alternate Funding Options Study Technical Memo Task 1 November 23, 2010 Prepared for: Volusia Transportation Planning Organization Votran Prepared by: The PFM Group 300 South Orange Avenue Suite

More information

P.L.2016, CHAPTER 56, approved October 14, 2016 Assembly, No. 10 (Fourth Reprint)

P.L.2016, CHAPTER 56, approved October 14, 2016 Assembly, No. 10 (Fourth Reprint) - C.:B-. Title. Chapter B. (Rename) Infrastructure Trust.,-0 - C.:B-0. to :B-0. - C.:B-. - - C.:B-. & :B-. - Repealer - Note P.L., CHAPTER, approved October, Assembly, No. 0 (Fourth Reprint) 0 0 AN ACT

More information

Administration and Projects Committee STAFF REPORT March 1, 2018 Page 2 of 9 Below is a summary of the FY adopted budget and the proposed midy

Administration and Projects Committee STAFF REPORT March 1, 2018 Page 2 of 9 Below is a summary of the FY adopted budget and the proposed midy Administration and Projects Committee STAFF REPORT Meeting Date: March 1, 2018 Subject Summary of Issues Recommendations Financial Implications Options Approval of FY 2017 18 Midyear Budget for the Contra

More information

Joint Appropriations Subcommittee on Transportation. North Carolina Turnpike Authority Beau Memory March 14, 2017

Joint Appropriations Subcommittee on Transportation. North Carolina Turnpike Authority Beau Memory March 14, 2017 Joint Appropriations Subcommittee on Transportation North Carolina Turnpike Authority Beau Memory March 14, 2017 Benefits of Tolling: Funding source Supplements traditional transportation funding Can accelerate

More information

Public Private Partnerships 101

Public Private Partnerships 101 Public Private Partnerships 101 Tony Elkins, Commercial Director October 6, 2016 Cintra s LBJ Managed Lanes P3, Dallas, Texas The Ferrovial Group Development Over The Entire Infrastructure Lifecycle INFRASTRUCTURE

More information

Governor s FY 2019 Revised, FY 2020 and Capital Budget Recommendations House Finance Committee April 9, 2019

Governor s FY 2019 Revised, FY 2020 and Capital Budget Recommendations House Finance Committee April 9, 2019 Governor s FY 2019 Revised, FY 2020 and Capital Budget Recommendations House Finance Committee April 9, 2019 Quasi-public agency Established in 1964 Responsible: Fixed route bus service and Americans with

More information

Dominion Boulevard Improvements with Toll System VDOT Initial Financial Plan February 1, 2012

Dominion Boulevard Improvements with Toll System VDOT Initial Financial Plan February 1, 2012 VDOT February 1, 2012 Table of Contents Section 1 Summary.2 Project Description. 2 Project Background 2 Current Activities.3 Project Schedule.4 Section 2 Project Cost Estimate..4 Section 3 Project Financing..5

More information

CHAPTER 9 FINANCIAL CONSIDERATIONS

CHAPTER 9 FINANCIAL CONSIDERATIONS CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the Berryessa Extension Project (BEP) Alternative and the Silicon Valley Rapid Transit

More information

New Infrastructure Policies Surfacing? Ideas for Improvements to the RRIF Loan Program

New Infrastructure Policies Surfacing? Ideas for Improvements to the RRIF Loan Program Infrastructure Financing Tools New Infrastructure Policies Surfacing? Ideas for Improvements to the RRIF Loan Program By Richard Sherman The Seneca Group, LLC February 2018 T he ocean of U.S. public policy

More information

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting May 30, 2014 Discussion Outline Finance Plan for the Metrorail Project Allocation of Estimated Capital Costs and TIFIA

More information

III. Major Assumptions Projections

III. Major Assumptions Projections III. Major Assumptions 2004-2008 Projections Utilization (Revenue, Ridership, Vehicle Traffic) UTILIZATION Baseline Before Gap-Closing Actions 2004 Ridership and Revenue In 2004, ridership on the various

More information

Metropolitan Transportation Authority Proposed Capital Program

Metropolitan Transportation Authority Proposed Capital Program Metropolitan Transportation Authority Proposed 2008-2013 Capital Program Thomas P. DiNapoli New York State Comptroller Kenneth B. Bleiwas Deputy Comptroller Report 11-2008 March 2008 The proposed capital

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-PA Engineer Regulation 1165-2-122 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Water Resource Policies and Authorities STUDIES OF HARBOR OR INLAND HARBOR PROJECTS

More information

Nossaman Infra Insight

Nossaman Infra Insight Nossaman Infra Insight MAP-21: Surface Transportation Reauthorization Ushers in Significant Changes to TIFIA By: Fredric W. Kessler, Peter W. Denton, Nossaman LLP 07/06/12 On June 29, 2012 Congress passed

More information

Additional support documents to the resolution:

Additional support documents to the resolution: Resolution No. R2017-37 Additional support documents to the resolution: Memo from Sound Transit CEO Peter Rogoff Memorandum of Understanding between the Puget Sound Regional Council, Sound Transit, and

More information

V. FUNDING OPTIONS A. FUNDING THE NRPC -- THE GOVERNMENT OVERSIGHT AGENCY

V. FUNDING OPTIONS A. FUNDING THE NRPC -- THE GOVERNMENT OVERSIGHT AGENCY V. FUNDING OPTIONS The proposed rail passenger restructuring plan will only be effective if there are adequate, reliable sources of funding for the three types of entities being proposed: the NRPC (the

More information

Partnerships in Transportation Workshop Transportation PPPs beyond Toll Roads

Partnerships in Transportation Workshop Transportation PPPs beyond Toll Roads TRANSACTION ADVISORY SERVICES PPP ADVISORY Partnerships in Transportation Workshop Transportation PPPs beyond Toll Roads Alistair SAWERS, Head of Transport, PPP Advisory, Ernst & Young 1 Introduction Brownfield

More information

RESPONSIBLE MINISTER FOR MINISTRY OF TRANSPORT: Minister of Transport

RESPONSIBLE MINISTER FOR MINISTRY OF TRANSPORT: Minister of Transport Vote Transport APPROPRIATION MINISTER(S): Minister of Transport (M72) APPROPRIATION ADMINISTRATOR: Ministry of Transport RESPONSIBLE MINISTER FOR MINISTRY OF TRANSPORT: Minister of Transport THE ESTIMATES

More information

Fredric W. Kessler, Esq.

Fredric W. Kessler, Esq. Caltrans Legal Division Contract Law Workshop San Diego, California March 21, 2007 PUBLIC-PRIVATE PARTNERSHIPS Fredric W. Kessler, Esq. Nossaman Guthner Knox & Elliott LLP The information contained herein

More information

Finance Tools. Surface Transportation Funding, Finance, and Leadership. Joung Lee Wendy Franklin Deb Miller

Finance Tools. Surface Transportation Funding, Finance, and Leadership. Joung Lee Wendy Franklin Deb Miller Finance Tools Surface Transportation Funding, Finance, and Leadership Joung Lee Wendy Franklin Deb Miller AASHTO Center for Excellence in Project Finance (CEPF) One of four Centers of Excellence authorized

More information

The Railroad Rehabilitation and Improvement Financing (RRIF) Program

The Railroad Rehabilitation and Improvement Financing (RRIF) Program The Railroad Rehabilitation and Improvement Financing (RRIF) Program David Randall Peterman Analyst in Transportation Policy January 31, 2018 Congressional Research Service 7-5700 www.crs.gov R44028 Summary

More information

NCDOT Funding Overview

NCDOT Funding Overview NCDOT Funding Overview Joint Appropriations Subcommittee on Transportation Mark L. Foster, CFO H. Tasaico February 16, 2011 Transportation Outlook NCDOT Funding Sources Transportation Funding Equity Cash

More information

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016 Prioritization and Programming Process NCDOT Division of Planning and Programming November 16, 2016 Today s Roadmap 1. Planning and Programming Division Overview 2. Strategic Investments (STI) Law 3. Prioritization

More information

Florida Transportation Commission Florida Department of Transportation Management Compensation Study

Florida Transportation Commission Florida Department of Transportation Management Compensation Study APPENDIX H: BLS COMPARISONS Florida Transportation Commission Florida Department of Transportation Management Compensation Study CLASSICIATION COMPARISON TO BLS DATA SOURCE MATCHED POSITIONS - REGIONAL,

More information

77th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. House Bill 2800 CHAPTER... AN ACT

77th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. House Bill 2800 CHAPTER... AN ACT 77th OREGON LEGISLATIVE ASSEMBLY--2013 Regular Session Enrolled House Bill 2800 Sponsored by Representatives READ, BENTZ, Senators BEYER, STARR CHAPTER... AN ACT Relating to the Interstate 5 bridge replacement

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

PUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET

PUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET PUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET Before the Committee on Public Works and the Environment Council of the District of Columbia The Honorable Jim Graham,

More information

OCTOBER 2013 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS

OCTOBER 2013 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS OCTOBER 2013 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS The Airports Authority established the Dulles Corridor Enterprise (DCE) Fund to segregate the financial activity associated with

More information

Florida Transportation Commission PUBLIC-PRIVATE PARTNERSHIPS (P3)

Florida Transportation Commission PUBLIC-PRIVATE PARTNERSHIPS (P3) Florida Transportation Commission PUBLIC-PRIVATE PARTNERSHIPS (P3) AGENDA Current Status in Florida Federal Reauthorization/ SEP-15 P-3 Options Overview Key aspects of P-3 Georgia Status P-3 Initiatives

More information

Metroplan White Paper

Metroplan White Paper Background White Paper 30 Crossing Plan and TIP Amendments The 30 Crossing Project is a major design-build-finance reconstruction and expansion project on I-40 from the US 67/167 interchange to the north

More information

SOUND TRANSIT RESOLUTION NO. R99-14

SOUND TRANSIT RESOLUTION NO. R99-14 SOUND TRANSIT RESOLUTION NO. R99-14 A RESOLUTION of the Board of the Central Puget Sound Regional Transit Authority to reallocate $10 million (1995 dollars) from the East Everett Park and Ride Lot to the

More information

Federal Register / Vol. 81, No. 127 / Friday, July 1, 2016 / Rules and Regulations

Federal Register / Vol. 81, No. 127 / Friday, July 1, 2016 / Rules and Regulations Federal Register / Vol. 81, No. 127 / Friday, July 1, 2016 / Rules and Regulations 43105 49 CFR Section Description Guideline amount 2 IM portable tank, cite 173.24(f) and use the penalty amounts for tank

More information

ALL Counties. ALL Districts

ALL Counties. ALL Districts TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation

More information

8.0 FINANCIAL ANALYSIS

8.0 FINANCIAL ANALYSIS Chapter 8 Financial Analysis 8.0 FINANCIAL ANALYSIS This chapter presents a summary of the financial analysis for the Central Corridor Light Rail Transit (LRT) Project, a description of the Project Sponsor

More information

Overview of Highway Public-Private Partnerships (P3s)

Overview of Highway Public-Private Partnerships (P3s) Overview of Highway Public-Private Partnerships (P3s) FHWA Office of Innovative Program Delivery Presentation to GBC Transportation & Mobility Committee March 11, 2015 Presentation Outline 2 Part 1 Part

More information

Measure I Strategic Plan, April 1, 2009 Glossary Administrative Committee Advance Expenditure Agreement (AEA) Advance Expenditure Process

Measure I Strategic Plan, April 1, 2009 Glossary Administrative Committee Advance Expenditure Agreement (AEA) Advance Expenditure Process Glossary Administrative Committee This committee makes recommendations to the Board of Directors and provides general policy oversight that spans the multiple program responsibilities of the organization

More information

DURHAM-ORANGE LIGHT RAIL TRANSIT PROJECT FINANCIAL RISKS AND MITIGATION STRATEGIES APRIL 2017

DURHAM-ORANGE LIGHT RAIL TRANSIT PROJECT FINANCIAL RISKS AND MITIGATION STRATEGIES APRIL 2017 DURHAM-ORANGE LIGHT RAIL TRANSIT PROJECT FINANCIAL RISKS AND MITIGATION STRATEGIES APRIL 2017 There are several financial risks to the 2017 County Transit Plans (Plans) that could arise at different times

More information

TRANSPORTATION INDUSTRY SALARY SURVEY RESULTS

TRANSPORTATION INDUSTRY SALARY SURVEY RESULTS APPENDIX F: TRANSPORTATION INDUSTRY SURVEY RESULTS Florida Transportation Commission Florida Department of Transportation Management Compensation Study BENCHMARK RESULTS FROM SURVEY OF CONSULTING FIRMS

More information

Description of the Submission / Conditions Precedent

Description of the Submission / Conditions Precedent Submittal Relating to the Development of the TxDOT North Tarrant Express Project, Segments 3A and 3B through a Facility Implementation Plan and Facility Agreement Description of the Submission / Conditions

More information

What Every Transportation Manager Should Know About GARVEEs

What Every Transportation Manager Should Know About GARVEEs May 2007 What Every Transportation Manager Should Know About GARVEEs Frederick J. Werner Federal Highway Administration Resource Center Frederick.werner@fhwa.dot.gov 0 Outline Background on Debt and Infrastructure

More information

I-66 RFI Response Vinci Concessions USA 25 November 2013

I-66 RFI Response Vinci Concessions USA 25 November 2013 General: 1. Please describe your firm, its experience in relation to public-private partnership projects, and its potential interest in relation to the Project (e.g., design/engineering firm, construction

More information

Tentative Work Program Fiscal Year 2004/ /09

Tentative Work Program Fiscal Year 2004/ /09 Tentative Work Program Fiscal Year 2004/05-2008/09 Florida Transportation Commission Statewide Public Hearing March 2, 2004 Work Program Section 339.135(3)(b) states, The tentative and adopted work programs

More information

Metropolitan Transportation Authority: East Side Access Cost Overruns

Metropolitan Transportation Authority: East Side Access Cost Overruns Metropolitan Transportation Authority: East Side Access Cost Overruns Thomas P. DiNapoli New York State Comptroller Kenneth B. Bleiwas Deputy Comptroller Report 12-2013 March 2013 Highlights East Side

More information

RESOLUTION NO. R Baseline Budget and Schedule, and Approve Gates 5 and 6 for the East Link Extension

RESOLUTION NO. R Baseline Budget and Schedule, and Approve Gates 5 and 6 for the East Link Extension RESOLUTION NO. R2015-04 Baseline and Schedule, and Approve Gates 5 and 6 for the East Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Board 04/23/15 Final Action Ahmad Fazel, DECM Executive

More information

Research: Research and Technology Transfer Office Sept. 1, 1996-Dec. 31, 1996 P.O. Box 5080

Research: Research and Technology Transfer Office Sept. 1, 1996-Dec. 31, 1996 P.O. Box 5080 1. Report No. 2. \.10vemment Accession No. 3. Recipient's Catalog No. FHWA/TX-99/1756-4 Technical Report Documentation Page 4. Title and Subtitle 5. ReportDate SUGGESTED GUIDELINES FOR REVIEWING PRIVATE

More information

Florida Senate SB 718 By Senator Sebesta

Florida Senate SB 718 By Senator Sebesta By Senator Sebesta 1 A bill to be entitled 2 An act relating to the Department of 3 Transportation; amending s. 337.251, F.S.; 4 authorizing the department to adopt rules 5 governing the leasing of property

More information

Transportation Funding

Transportation Funding Transportation Funding TABLE OF CONTENTS Introduction... 3 Background... 3 Current Transportation Funding... 4 Funding Sources... 4 Expenditures... 5 Case Studies... 6 Washington, D.C... 6 Chicago... 8

More information

IV. Major Assumptions Projections

IV. Major Assumptions Projections IV. Major Assumptions 2004-2008 Projections This page has been intentionally left blank. Utilization (Revenue, Ridership, Vehicle Traffic) This page has been intentionally left blank. UTILIZATION Baseline

More information

Emilia Istrate, Senior Research Analyst. July 28, 2009 Washington DC

Emilia Istrate, Senior Research Analyst. July 28, 2009 Washington DC National Surface Transportation Legislation: Metropolitan Outlook Government Research Association Annual Conference Emilia Istrate, Senior Research Analyst July 28, 2009 Washington DC 1 2 3 The Background:

More information

May 31, 2016 Financial Report

May 31, 2016 Financial Report 2016 May 31, 2016 Financial Report Capital Metropolitan Transportation Authority 7/13/2016 Table of Contents SUMMARY REPORTS Budgetary Performance - Revenue 2 - Sales Tax Revenue 6 - Operating Expenses

More information

2017 Educational Series FUNDING

2017 Educational Series FUNDING 2017 Educational Series FUNDING TXDOT FUNDING INTRODUCTION Transportation projects take many years to develop and construct. In addition to the design, engineering, public involvement, right-of-way acquisition,

More information

January 31, Knowledge, Ethics, Drive & Transparency

January 31, Knowledge, Ethics, Drive & Transparency January 31, 2018 Knowledge, Ethics, Drive & Transparency GLOBAL INFRASTRUCTURE FUNDING GAP The gap is equivalent to $8.4 trillion (~$500 billion annually from 2013-2030) and leaves private investment as

More information

Urban Transport Institutional and Financial Issues. International best practices

Urban Transport Institutional and Financial Issues. International best practices Urban Transport Institutional and Financial Issues International best practices Contents 2 I N T R O D U C T I O N S E L E C T E D F O R E I G N E X A M P L E S C O N C L U S I O N Introduction : Key issues

More information

REPORT OF THE INTERMODAL COMMITTEE AND EXPLANATION OF CONGESTION RELIEF AND INTERMODAL TRANSPORTATION 21 ST CENTURY FUND

REPORT OF THE INTERMODAL COMMITTEE AND EXPLANATION OF CONGESTION RELIEF AND INTERMODAL TRANSPORTATION 21 ST CENTURY FUND REPORT OF THE INTERMODAL COMMITTEE AND EXPLANATION OF CONGESTION RELIEF AND INTERMODAL TRANSPORTATION 21 ST CENTURY FUND The Intermodal Committee recommends legislation to: 1. Create the Congestion Relief

More information

FEBRUARY 2013 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS

FEBRUARY 2013 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS FEBRUARY 2013 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS The Airports Authority established the Dulles Corridor Enterprise (DCE) Fund to segregate the financial activity associated with

More information

NORTH CAROLINA GENERAL ASSEMBLY

NORTH CAROLINA GENERAL ASSEMBLY NORTH CAROLINA GENERAL ASSEMBLY HOUSE TRANSPORTATION APPROPRIATIONS SUBCOMMITTEE MONEY REPORT AND SPECIAL PROVISIONS MAY 24, 2012 House Subcommittee on Transportation Highway Fund HIGHWAY FUND Total Budget

More information

Preliminary Findings and Recommendations

Preliminary Findings and Recommendations Review of the Comprehensive Agreement between the North Carolina Department of Transportation and I-77 Mobility Partners LLC Preliminary Findings and Recommendations July 2017 Overview NCDOT has initiated

More information

THE WHITE HOUSE Office of the Press Secretary EXECUTIVE ORDER

THE WHITE HOUSE Office of the Press Secretary EXECUTIVE ORDER FOR IMMEDIATE RELEASE August 15, 2017 THE WHITE HOUSE Office of the Press Secretary EXECUTIVE ORDER - - - - - - - ESTABLISHING DISCIPLINE AND ACCOUNTABILITY IN THE ENVIRONMENTAL REVIEW AND PERMITTING PROCESS

More information

Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012)

Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012) Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012) Summary Description Proposed Project: Light Rail Transit 2.9 Miles, 5 Stations Total Capital Cost ($YOE):

More information

5/3/2016. May 4, Item #1 CITIZENS PARTICIPATION

5/3/2016. May 4, Item #1 CITIZENS PARTICIPATION May 4, 2016 Item #1 CITIZENS PARTICIPATION 1 Item #2 ELECT AN ACTING CHAIR Item #3 APPROVAL OF MINUTES 2 Item #4 OVERVIEW OF TRAC AGENDA Committee Goals Learn about the RTC including its roadway and transit

More information

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012)

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) Summary Description Proposed Project: Commuter Rail 37.6 Miles, 14 Stations (12 new, two existing) Total Capital Cost ($YOE):

More information

Analysis of Transit 20 Year Capital Forecasts: FTA TERM Model vs. Transit Estimates

Analysis of Transit 20 Year Capital Forecasts: FTA TERM Model vs. Transit Estimates Analysis of Transit 20 Year Capital Forecasts: FTA TERM Model vs. Transit Estimates Dr. Allan M. Zarembski PE, FASME, Hon. Mbr. AREMA Research Professor and Director of the Railroad Engineering and Safety