1 Overview of Highway Public-Private Partnerships (P3s) FHWA Office of Innovative Program Delivery Presentation to GBC Transportation & Mobility Committee March 11, 2015
2 Presentation Outline 2 Part 1 Part 2 Part 3 Part 4 What are P3s? Benefits & Challenges of P3s Federal Financing Tools Legislation Best Practices
3 Part I What are P3s?
4 What are P3s? 4 Acronym: Public-private partnerships (P3s or PPPs) Definition: Contractual agreements between a public agency and a private entity that include more than a single phase of a project Most common types: Design-Build Design-Build-Finance Design-Build-Finance-Operate-Maintain Purpose: To allow private participation in the delivery of projects when it could provide greater value and is in the public interest
5 P3s Involving Private Financing 5 P3 Greenfield Brownfield (primarily toll concessions) Design-Build- Finance Design-Build- Finance-Operate- Maintain* Toll Concession *Focus of FHWA Office of Innovative Program Delivery Availability Payment Concession
6 Example Toll Concession 6
7 Example Availability Payment 7
8 Conventional vs. P3 8 Conventional Projects (design-bid-build) P3 Projects (design-build-finance-operate-maintain) Public sector takes on most risks (except construction) Public Financing (mostly) Risks shared between public and private sector Private Financing (mostly) Lowest bidder Operations and maintenance (O&M) and ongoing rehabilitation (if any) carried out by public agency once constructed Best suited/best value O&M carried out by private sector; ongoing rehabilitation overseen by public sector stewardship of P3 agreement
9 The Role of Equity 9 Equity can leverage additional funding from a project s revenue stream and help fill the funding gap Total funding needed Gap that may be filled by equity Amount financeable by debt 0 Capital cost
10 Typical Cash Flow Waterfall 10 Project Revenues Revenue Fund O&M (Reserve) fund Rehabilitation & Reconstruction Reserve Fund Senior Debt Service (Reserve) Fund Subordinate Debt Service (Reserve) Fund Other Reserve Funds Equity Distributions
11 Part II P3 Benefits and Challenges
12 12 Potential Benefits and Drawbacks of P3s Potential Benefits Additional Financial Capacity Accelerates project delivery Conserves public sector debt capacity Lifecycle Cost Efficiencies Reduces costs through integration of phases, lifecycle costing, and management of risk Risk Transfer Budget and cost certainty Improved risk management reduces costs Potential Drawbacks Loss of flexibility of public agency Changing priorities Integration of facility into the wider network Complex procurement process Higher costs for procurement Need for P3 expertise to conduct negotiations Increased financial costs Higher cost for private capital
13 Challenges in Using P3s 13 Public acceptance Enabling legislation Organizational Capacity Knowledge gap Different oversight/contract management approach required
14 Challenges in Using P3s (Cont.) 14 Revenue constraints Federal and state toll restrictions Revenue shortfalls due to lower tax receipts Difficulty in predicting traffic and revenue Difficulty in identifying and pricing risk and proper risk allocation Long term nature of P3 Agreements Concern about loss of upside revenue potential to public Inability to anticipate future performance issues or public needs
15 Part III Federal Financing Tools
16 16 Federal Financing Tools Supporting P3s TIFIA: Flexible, low-cost lending that mitigates revenue ramp up risk PABs: Allows private sector to participate in tax-exempt market Other Innovative Financing Tools: Grant Anticipation Revenue Vehicles (GARVEEs) State Infrastructure Banks Section 129 Loans Other U.S. DOT credit support programs
17 P3 Projects in the US 17 Project Type Financial Close Upfront State Grant Debt Equity Tolls During Construction PABs TIFIA Bank Sr. Debt Private Equity East End Crossing Toll/AP 3/28/13 $677.0 $78.0 $755.0 I-95 HOT Lanes HOT 8/1/12 $71.0 $252.0 $300.0 $292.0 $915.6 Presidio Parkway No toll/ap 6/14/12 $150.0 $166.6 $43.0 $359.6 Midtown Tunnel Toll 4/16/12 $309.0 $675.0 $422.0 $221.0 $368.0 $1,995.0 LBJ-635 Corridor HOT 6/22/10 $496.0 $615.0 $850.0 $664.0 $2,625.0 North Tarrant HOT 12/17/09 $573.0 $398.0 $650.0 $0.0 $426.0 $2,047.0 Express Port of Miami Tunnel No 10/15/09 $309.8 $341.0 $341.0 $80.3 $1, toll/ap I-595 HOT/AP 3/3/09 $232.0 $603.0 $781.0 $207.7 $1,823.8 SH-130 Segment V-VI Toll 3/7/08 $430.0 $685.8 $209.8 $1,325.6 I-495 HOT Lanes HOT 12/20/07 $409.0 $589.0 $589.0 $0.0 $350.0 $1,937.0 Sources: Information on these projects was gathered from a variety of sources. For projects that were financed with Private Activity Bonds (PAB), the Official Statements (OS) provided much of the information. OS s are available for download online from the MSRB EMMA database: Total
18 Part IV P3 Legislation
19 P3 Legislation 19 A growing number of States have or are considering P3 enabling legislation Enabling legislation differs significantly from State to State It is up to each State to determine the appropriate approach to legislation, starting with an understanding of the goals it is trying to achieve Well-crafted and flexible legislation can help incentivize private sector participation in P3s
20 P3 Legislation 20 Enabling legislation can determine: Which agencies have the authority to enter into P3s The types of P3 agreements into which those agencies can enter The procurement methods used to arrive at P3 agreements The types of funding and financing arrangements that can be applied to those agreements
21 P3 Legislation 21 The complex nature of projects requires enabling legislation that is flexible enough to accommodate different circumstances P3 enabling legislation can allow for multiple P3 structures, project payment mechanisms (including tolls and availability payments), financing options, and risk allocation approaches
22 P3 Legislation 22 Legal issues may be addressed through statute, policy, or contract provisions There is no one correct way to address these issues There are tradeoffs associated with some decisions when crafting P3 legislation, particularly where public and private concerns can conflict, such as: The degree of transparency and competition to require in the procurement process The level of public and legislative input to allow in the decision-making process
23 Contact Information 23 Patrick DeCorla-Souza P3 Program Manager Office of Innovative Program Delivery Federal Highway Administration (202)
Charting a New Course? Infrastructure Investment Ahead. Bryan Grote
Charting a New Course? Infrastructure Investment Ahead Bryan Grote January 11, 2017 What is the Infrastructure Plan? Potential Federal Incentives Investment Tax Credits? Wilbur Ross (Commerce), Peter Navarro
More informationFredric W. Kessler, Esq.
Caltrans Legal Division Contract Law Workshop San Diego, California March 21, 2007 PUBLIC-PRIVATE PARTNERSHIPS Fredric W. Kessler, Esq. Nossaman Guthner Knox & Elliott LLP The information contained herein
More informationThe Federal Perspective: Project Finance, TIFIA and Public Private Partnerships
The Federal Perspective: Project Finance, TIFIA and Public Private Partnerships Mark Sullivan, Federal Highway Administration Innovative Transportation Finance Workshop Shoreview, Minnesota October 20,
More informationPublic Private Partnerships 101
Public Private Partnerships 101 Tony Elkins, Commercial Director October 6, 2016 Cintra s LBJ Managed Lanes P3, Dallas, Texas The Ferrovial Group Development Over The Entire Infrastructure Lifecycle INFRASTRUCTURE
More informationPublic-Private Partnerships Association of Government Accountants
Public-Private Partnerships Association of Government Accountants Fall Education Seminar Bob Childree November 2010 America's Infrastructure Report Card America s Infrastructure Report Card (American Society
More informationManaged Lanes: Transaction Strategies from the PPP Forefront
Managed Lanes: Transaction Strategies from the PPP Forefront December 2015 kpmg.com Managed Lanes: Transaction Strategies from the PPP Forefront 1 Introduction Managed lane projects have become an important
More informationTransportation Infrastructure Finance and Innovation Act (TIFIA)
Slide 1 Transportation Infrastructure Finance and Innovation Act (TIFIA) Reno Rail Corridor Port of Miami Tunnel SH 130 Jorianne Jernberg, Financial Analyst Office of Innovative Program Delivery Federal
More informationOctober 7, Introduction to the TIFIA Credit Program
October 7, 2015 Introduction to the TIFIA Credit Program Types of Credit Assistance 2 Secured (Direct) Loan Maximum term of 35 years from substantial completion Repayments must start 5 years after substantial
More informationIntroduction to Alternative Procurement Delivery
Introduction to Alternative Procurement Delivery for Florida Transportation Commission January 24, 2013 TABLE OF CONTENTS Alternative Project Delivery (APD) US Market Overview APD Funding and Financing
More informationAon Infrastructure Solutions
Aon Risk Solutions Aon Infrastructure Solutions Aon Infrastructure Solutions Alternative Project Delivery Risk Advisors Risk. Reinsurance. Human Resources. Empower Results Aon plc is the leading global
More informationPublic Private Partnerships. Virginia GFOA s 2015 Fall Conference. prepared for. by JoAnne Carter, Managing Director.
Public Private Partnerships prepared for Virginia GFOA s 2015 Fall Conference by JoAnne Carter, Managing Director October 21, 2015 4350 North Fairfax Drive, Suite 580 Arlington, Virginia 22203 2015 Public
More informationValue for Money (VfM) Analysis Virginia s experiences and lessons learned
Value for Money (VfM) Analysis Virginia s experiences and lessons learned May 28, 2013 Morteza Farajian Program Manager Virginia s Enabling P3 Legislation Public-Private Transportation Act of 1995 Intent
More informationAVAILABILITY PAYMENTS What Can We Learn from Surface Transportation Projects? Pamela Bailey Campbell President, LeighFisher
AVAILABILITY PAYMENTS What Can We Learn from Surface Transportation Projects? Pamela Bailey Campbell President, LeighFisher What IS a Availability Payment P3? Direct payments From public sector to private
More informationTransportation Infrastructure Finance and Innovation Act (TIFIA) Program Overview
Transportation Infrastructure Finance and Innovation Act (TIFIA) Program Overview (general summary and overview only for full details, see 23 United States Code Section 601) TIFIA IS A CREDIT PROGRAM (not
More informationPublic-Private Partnerships for Transit
Public-Private Partnerships for Transit What is a P3? An agreement between public and private sector partners which allows more private sector participation than is traditional: Private sector may design,
More information70 th Annual Meeting CSG WEST August 18 th, 2017
70 th Annual Meeting CSG WEST August 18 th, 2017 Rick Sulzer, P.E. Chief Operating Officer Over 25 years in Transportation Infrastructure Design, Manufacturing, Distribution, Construction and Maintenance
More informationPublic-Private Partnerships and Innovative Finance
Public-Private Partnerships and Innovative Finance Agenda Brief Overview of P3 Lowell Clary, President Clary Consulting, LLC P3 and Innovative Finance 101 Lowell Clary Question/Answer Period Clary Background
More informationP3 Financing. Barney Allison. Peter Luchetti. Alfonso Mendez. Partner, Nossaman LLP. Managing Partner, Table Rock Capital
P3 Financing Barney Allison Partner, Nossaman LLP Peter Luchetti Managing Partner, Table Rock Capital Alfonso Mendez Senior Financial Advisor, Arup Typical P3 Financing Structure Project Company SPV P3
More informationSolutions: Accelerating Infrastructure Projects Goldman, Sachs & Co. April 22, 2008
MUNIROOT\V_NY\MuniVol0\Shared\Zach\PPP\Greg Carey's Speech for Texas Transportation Forum v4.10.08.doc effroz 11 Apr 2008 16:46 1/13 Solutions: Accelerating Infrastructure Projects Goldman, Sachs & Co.
More informationValue for Money Analysis: Choosing the Best Project Delivery Method. Ken L. Smith, PE, CVS -HDR Engineering, Inc.
Value for Money Analysis: Choosing the Best Project Delivery Method Ken L. Smith, PE, CVS -HDR Engineering, Inc. 1 Overview What is a VfM analysis Why is it used Key VfM components and principles Life
More informationFinance Tools for Project Advancement
Florida Department of TRANSPORTATION Finance Tools for Project Advancement Leon Corbett Project Finance Manager NCSL Southern States Fiscal Leaders September 23, 2016 Discussion Topics Public-Private Partnerships
More informationP3 CONTRACTS. Morteza Farajian, Ph.D. November 2016
P3 CONTRACTS Morteza Farajian, Ph.D. November 2016 What is a Public-Private Partnership (P3)? Overview of P3s Definition P3 Defined A P3 involves a partnership between the public and private sector to
More informationAvailability Payment or Revenue-Risk P3 Concessions? Pros and Cons for Highway Infrastructure
Reason Foundation Policy Study No. 458 November 2017 Availability Payment or Revenue-Risk P3 Concessions? Pros and Cons for Highway Infrastructure by Robert W. Poole, Jr. Reason Foundation Reason Foundation
More informationAGENDA ITEM #9 SUMMARY
AGENDA ITEM #9 SUMMARY Briefing on business considerations and state law requirements for the use of a comprehensive development agreement to develop a transportation project. Strategic Plan Relevance:
More informationPartnerships in Transportation Workshop Transportation PPPs beyond Toll Roads
TRANSACTION ADVISORY SERVICES PPP ADVISORY Partnerships in Transportation Workshop Transportation PPPs beyond Toll Roads Alistair SAWERS, Head of Transport, PPP Advisory, Ernst & Young 1 Introduction Brownfield
More informationACCESSING PRIVATE CAPITAL FOR TRANSPORTATION INFRASTRUCTURE PROJECTS
ACCESSING PRIVATE CAPITAL FOR TRANSPORTATION INFRASTRUCTURE PROJECTS Transportation Infrastructure Finance Workshop Chicago, Illinois OVERVIEW AND KEY PLANNING FACTORS April 29, 2008 David Seltzer, Principal
More informationI-77 Express Lanes Project Project Update. Rodger Rochelle October 2014
I-77 Express Lanes Project Project Update Rodger Rochelle October 2014 Project Description In 2009, NCDOT conducted a Fast Lanes Study that analyzed 12 corridors in a 10 county region. The Charlotte City
More informationPUBLIC-PRIVATE PARTNERSHIPS What? Why? Who? How? Where? and Here. I-77 HOT Lanes P3 Project. Lake Norman Transportation Summit March 13, 2013
PUBLIC-PRIVATE PARTNERSHIPS What? Why? Who? How? Where? and Here I-77 HOT Lanes P3 Project Lake Norman Transportation Summit March 13, 2013 Concession Getting past the jargon Turnkey BAFO RFQ BABs AFP
More informationApril 25, Martin Klepper Executive Director
April 25, 2017 Martin Klepper Executive Director A New Formula for Infrastructure Investment The BUILD AMERICA BUREAU 2 Bureau Credit Programs Transportation Infrastructure Finance and Innovation Act (TIFIA)
More informationPublic-Private. League of Women Voters. Nick Farber, Operations Manager, High Performance Transportation Enterprise. April 3, 2018
-Private Partnerships 101 League of Women Voters Nick Farber, Operations Manager, High Performance Transportation Enterprise April 3, 2018 What is Driving the Need? Continued Growth 1991 2015 2040 3.3
More informationIrvine Corona Expressway Project Financing Review
Irvine Corona Expressway Project Financing Review Sperry June 4, 2010 1 The Proposed Irvine Corona Expressway (ICE) Project Project screening is key aspect of pre-development discussions Environmental
More informationTHE USE OF FEDERAL INNOVATIVE FINANCE TECHNIQUES IN PUBLIC-PRIVATE PARTNERSHIPS THE CASE OF THE CAPITAL BELTWAY BY MARTIN J. LUBY
THE USE OF FEDERAL INNOVATIVE FINANCE TECHNIQUES IN PUBLIC-PRIVATE PARTNERSHIPS THE CASE OF THE CAPITAL BELTWAY BY MARTIN J. LUBY Compared with the rest of the world, the United States has been relatively
More information47th Annual Workshop on Transportation Law
47th Annual Workshop on Transportation Law Public Private Partnership Update: Legal Challenges and Obstacles - Protecting the Public Owner Implementation of the Texas Concessions Initiatives July 9, 2008
More informationPublic Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013
Public Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013 Agenda What is a Public-Private Partnership? P3 Lessons Learned Locality Concerns Pop Quiz: Is this a P3 Project????
More informationTexas' LBJ Freeway Managed Lanes P3
Texas' LBJ Freeway Managed Lanes P3 28/07/2010 The I-635/LBJ Managed Lanes project in Texas marks a major milestone in the development of private sector investment in infrastructure, standing as the largest
More informationP3: OPPORTUNITIES FOR AMERICA S INFRASTRUCTURE. Greg Hummel
P3: OPPORTUNITIES FOR AMERICA S INFRASTRUCTURE Greg Hummel Public Private Partnerships ( P3 ) Broadly refers to a variety of transactions in which a public or quasi-public entity shifts some degree of
More informationModel Concession Agreement for Highways: An Overview
Model Concession Agreement for Highways: An Overview - Gajendra Haldea The highways sector in India is witnessing significant interest from both domestic as well as foreign investors following the policy
More informationTHE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 )
THE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 ) VIRGINIA DEPARTMENT OF TRANSPORTATION ( VDOT ) VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION ( DRPT ) RESPONSE TO REQUEST FOR INFORMATION
More informationI-66 RFI Response Vinci Concessions USA 25 November 2013
General: 1. Please describe your firm, its experience in relation to public-private partnership projects, and its potential interest in relation to the Project (e.g., design/engineering firm, construction
More informationAAPA Finance Seminar Seaport Project Financing
AAPA Finance Seminar Seaport Project Financing April 9, 2014 Presented by: David C. Miller, Managing Director Public Financial Management, Inc. 300 South Orange Avenue, Suite 1170 Orlando, Florida 32801
More informationPublic Private Partnerships An overview from the legal perspective
Public Private Partnerships An overview from the legal perspective Ren Niemann Partner Allens is an independent partnership operating in alliance with Linklaters LLP. 1 What is a public private partnership?
More informationFlorida Transportation Commission PUBLIC-PRIVATE PARTNERSHIPS (P3)
Florida Transportation Commission PUBLIC-PRIVATE PARTNERSHIPS (P3) AGENDA Current Status in Florida Federal Reauthorization/ SEP-15 P-3 Options Overview Key aspects of P-3 Georgia Status P-3 Initiatives
More informationPreliminary Findings and Recommendations
Review of the Comprehensive Agreement between the North Carolina Department of Transportation and I-77 Mobility Partners LLC Preliminary Findings and Recommendations July 2017 Overview NCDOT has initiated
More informationPUBLIC PRIVATE PARTNERSHIPS Rationale and Motivation. November 2015 Nicolas Rubio US President, Cintra
PUBLIC PRIVATE PARTNERSHIPS Rationale and Motivation November 2015 Nicolas Rubio US President, Cintra nrubio@cintra.us Agenda 1. The transportation infrastructure problem 2. Understanding the Private Sector
More informationNational Conference of State Legislatures
National Conference of State Legislatures Spring Forum April 22 23, 2009 Pamela Bailey-Campbell Parsons Brinckerhoff What is a PPP? An Agreement Between the Public and Private Sector Parties that Transfers
More informationNCDOT Public Private Partnerships P3 s Financing
NCDOT Public Private Partnerships P3 s Financing Mark Foster, Chief Financial Officer April 4, 2012 1 Public-Private Partnerships (P3 s) provide a new source of capital for state and local governments
More informationEmerging Trends in Port Infrastructure: Using P3s to Maximize Value
Emerging Trends in Port Infrastructure: Using P3s to Maximize Value Presented at AAPA Planning for Shifting Trade Program Tampa, FL 9:00 10:30 am, January 31, 2019 Brian G. Papernik, Partner Infrastructure
More informationMobilizing Islamic Finance for Long Term Financing: Lessons From Conventional Finance. Ana Carvajal
Mobilizing Islamic Finance for Long Term Financing: Lessons From Conventional Finance Ana Carvajal Istanbul, November 2015 The Context: Gaps in long term finance Infrastructure Financing gap estimated
More informationPrivate Financing for Port Infrastructure
Private Financing for Port Infrastructure Presented at AAPA Port Real Estate Issues Workshop Seattle, WA September 18, 2018 Andrée M. Blais, Partner Infrastructure Practice Group Shant S. Boyajian, Associate
More informationP3 Financing Stan Ladner, Butler Snow LLP Josh Evans, Bostonia Partners LLC
P3 Financing Stan Ladner, Butler Snow LLP Josh Evans, Bostonia Partners LLC P3 Financing Options Capital Markets Debt (Bank debt, subordinate debt) Private Activity Bonds (PABs) Governmental Tax-Exempt
More informationPublic Private Partnerships
Public Private Partnerships Dennis J. Enright Principal 201-656-0115 The PPP Decision 2 P3 Issues It s Greek to Me!! 3 Monetization Value for Money Project Finance Mezzanine Debt Weighted Average Cost
More informationOverview of the framework
Overview of the framework Need for a framework The highways sector in India is witnessing a significant interest from both domestic as well as foreign investors following the policy initiatives taken by
More informationSOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania
SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project
More informationDescription of the Submission / Conditions Precedent
Submittal Relating to the Development of the TxDOT North Tarrant Express Project, Segments 3A and 3B through a Facility Implementation Plan and Facility Agreement Description of the Submission / Conditions
More informationOverview of the framework
Overview of the framework Need for a framework Economic growth and trade expansion in recent years have enhanced the relevance of port sector as a critical element in globalisation of the Indian economy.
More information1 EXECUTIVE SUMMARY. Figure 1-1: SR 156 Study Area & Monterey Expressway Alignment
1 EXECUTIVE SUMMARY The Transportation Agency for Monterey County (TAMC) Board commissioned a Level 2 Traffic and Revenue study on the feasibility of collecting tolls to fund the proposed new SR156 connector
More informationINFRASTRUCTURE AND BUILDINGS
INTERSTATE 66 CORRIDOR IMPROVEMENTS Response to Request for Information Office of Transportation Public Private Partnerships Morteza Farajian 600 E. Main Street, Suite 2120 Richmond, VA 23219 INFRASTRUCTURE
More informationHighway Public-Private Partnerships
Highway Public-Private Partnerships Securing Public Benefits and Protecting the Public Interest Presentation before the Enterprise Risk Management Symposium April 19, 2012 Steve Cohen Assistant Director
More informationIndia: Public Private Partnerships in Highways Sector
India: Public Private Partnerships in Highways Sector Prepared by World Bank as input for IDA paper, 2008 (provided by Tarun Sankar, PPIAF office, South Asia) India s transport program is one of the most
More informationNew Infrastructure Policies Surfacing? Ideas for Improvements to the RRIF Loan Program
Infrastructure Financing Tools New Infrastructure Policies Surfacing? Ideas for Improvements to the RRIF Loan Program By Richard Sherman The Seneca Group, LLC February 2018 T he ocean of U.S. public policy
More informationThe Future of US infrastructure under the Trump administration Engineering and Construction Conference
The Future of US infrastructure under the Trump administration 2017 Engineering and Construction Conference Agenda Topic US Infrastructure Market Overview Trump Infrastructure Initiative and Success Stories
More informationWorkshop on PPP in Roads and Highways
Workshop on PPP in Roads and Highways Vickram Cuttaree, PPP-Coordinator, Europe & Central Asia Member of the Global Expert Team on PPP June 7, 2011 Agenda Rationale for PPP and International Experience
More informationFREQUENTLY ASKED QUESTIONS: HIGHWAY P3S
FREQUENTLY ASKED QUESTIONS: HIGHWAY P3S by Austill Stuart and Baruch Feigenbaum May 2018 Reason Foundation s mission is to advance a free society by developing, applying and promoting libertarian principles,
More informationPublic Hearing Tarrant County. April 14, 2009
Public Hearing Tarrant County April 14, 2009 Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District 2 Public
More informationT o o l k i t f o r P u b l i c - P r i v a t e P a r t n e r s h i p s i n r o a d s & H i g h w a y s. Advantages of PPP
Advantages of PPP A key advantage of having the private sector provide public services is that it allows public administrators to concentrate on planning, policy and regulation. The private sector, in
More informationFinancial Submission
Financial Submission Prepared by NTE Mobility Partners Segments 2-4, LLC May 19, 2010 i Table of Contents 1 Feasibility of Financing Plan... 1 2 Introduction... 2 2.1 The Proposer... 2 2.2 Details of Equity
More informationFinancing road concessions in Europe. Guy Chetrit ASECAP Days, Athens, 28 May 2014
Financing road concessions in Europe Guy Chetrit ASECAP Days, Athens, 28 May 2014 Introduction: Presentation index About EPEC A warning on the data used Overview of the European market for the financing
More informationI-77 Managed Lanes Project Project Update. Ned Curran & Louis Mitchell September 2014
I-77 Managed Lanes Project Project Update Ned Curran & Louis Mitchell September 2014 Congestion and General Purpose lanes 2 Local Response CDOT NCDOT SCDOT MUMPO FHWA CATS Phase I: 2007 Phase II: 2008
More informationTransportation P3s Case Studies contrasting the Canadian and U.S. Approaches NUTC Spring Industry Workshop. May 2017
Transportation P3s Case Studies contrasting the Canadian and U.S. Approaches NUTC Spring Industry Workshop May 2017 Why Governments Use P3 for Infrastructure RISK TRANSFER Reallocate risks to the private
More informationDebunking Traffic & Revenue Risk in Highway PPP Projects Different Perspectives
Debunking Traffic & Revenue Risk in Highway PPP Projects Different Perspectives Optimism is the madness of insisting that all is well when we are miserable Voltaire Context Indiana Toll Road Seeks Bankruptcy
More informationMeeting the State s Transportation Needs Julie Brogan Deputy Director, ODOT Division of Innovative Delivery
Meeting the State s Transportation Needs Julie Brogan Deputy Director, ODOT Division of Innovative Delivery Give it some Gas tax is not enough $1.6B shortfall in shovel-ready projects $10B need in future
More informationPublic-Private Partnerships 101
Public-Private Partnerships 101 La Plata County Economic Summit Nick Farber, Operations Manager, High Performance Transportation Enterprise October 25, 2017 What is Driving the Need? Continued Growth 1991
More informationFuture of Funding and Innovative Finance Tools An Overview October 2013
Future of Funding and Innovative Finance Tools An Overview October 2013 Key Challenges Transportation funding sources are stressed at all levels of government Needs continue to grow new/expanded facilities
More informationPublic Private Partnerships and Infrastructure Finance: Policy and Recent Evidence
Public Private Partnerships and Infrastructure Finance: Policy and Recent Evidence Presentation to: TRIWAY International Group October 8, 2016 Jonathan L. Gifford, Ph.D. George Mason University, Schar
More informationThe Detroit River International Crossing (aka NITC) an update
The Detroit River International Crossing (aka NITC) an update Presentation by Dr. Roy Norton Consul General of Canada @ Detroit to the Urban Land Institute Michigan Wednesday, May 22, 2013 St. Clair College
More informationProject Development Under PPPs
Project Development Under PPPs Presented by: Afzal Dar Senior Infrastructure Specialist Infrastructure Project Development Facility (IPDF) afzal.dar@ipdf.gov.pk Outline Understanding PPPs- what they are;
More informationPublic-Private Partnership Projects. Current Policies Future Potential Best Practices Common Pitfalls
Public-Private Partnership Projects Current Policies Future Potential Best Practices Common Pitfalls Bob Chambers Les Snyder Geoffrey Stricker Skip Weiss Mary Alice McNamara Edward Fanter Ernie Brown P3
More informationVALUE FOR MONEY ASSESSMENT HIGHWAY 407 EAST PHASE 1 PROJECT
VALUE FOR MONEY ASSESSMENT HIGHWAY 407 EAST PHASE 1 PROJECT 1 2 3 4 Highway 407 East Phase 1 Project Artist s rendering Highlights of Highway 407 East Phase 1 Highway 407 East will help to relieve congestion
More informationThe Bond Buyers 8 th Annual Transportation Finance/P3 Conference
The Bond Buyers 8 th Annual Transportation Finance/P3 Conference Highly-Leveraged Public Deals October 18, 2007 Brian Mayhew Chief Financial Officer MTC/Bay Area Toll Authority Is PPP The Answer Or Can
More informationPublic-Private Partnerships in the United States: Evolving Market and New Opportunities
Public-Private Partnerships in the United States: Evolving Market and New Opportunities Brian Chase Working Paper #53 September 2009 Collaboratory for Research on Global Projects The Collaboratory for
More informationVirginia Department of Transportation. Midtown Tunnel Project. Updated Finance Plan Supplement. February 2013
Virginia Department of Transportation Midtown Tunnel Project Updated Finance Plan Supplement February 2013 1. Project Overview The Downtown Tunnel/Midtown Tunnel/MLK Extension Project located in the cities
More informationApplied Workshop on Preparing Infrastructure Projects 21 th - 25 th March Bangkok DAY 2
Applied Workshop on Preparing Infrastructure Projects 21 th - 25 th March Bangkok DAY 2 1 2 Recap of Day 1 Applying central concepts to structuring PPP projects S1: Project screening S2: Defining project
More informationState Department of Transportation Funding Alternatives May 18, 2016 Background and Current Considerations
State Department of Transportation Funding Alternatives May 18, 2016 Background and Current Considerations Presented by Jill Jaworski, Managing Director Public Financial Management, Inc. 222 North LaSalle
More informationFiscal Year VDOT Annual Budget June 2018
Fiscal Year 2019 VDOT Annual Budget June 2018 This Page Intentionally Left Blank Annual Budget FY 2019 2 Virginia Department of Transportation Table of Contents Overview. 5 Revenues. 7 Highway Maintenance
More informationAn Introduction to PPP s
An Introduction to PPP s AAPA Facilities Engineering Seminar San Diego November 8 th, 2007 Presented by Manju Chandrasekhar Vice President Halcrow, Inc. Outline A Definition of PPP s Principles of PPP
More informationInfrastructure Partnerships: Labor s Evolving Experience
Infrastructure Partnerships: Labor s Evolving Experience Bill Barnhart March 2013 W W W.AMERICANPROGRESS.ORG Introduction and summary A 2,500-ton, German-made, highway-tunnel-boring machine nicknamed Harriet
More informationCASH MANAGEMENT & CONTRACT AWARDS
CASH MANAGEMENT & CONTRACT AWARDS Brian Ragland, Chief Financial Officer Bill Hale, Chief Engineer Randy Hopmann, Director of District Operations Footer Text Date I. Cash Management Practices 2 FY 2018-2019
More informationPublic-Private Partnerships To Use or Not to Use. Indiana Advisory Commission on Intergovernmental Relations Indianapolis December 1, 2015
Public-Private Partnerships To Use or Not to Use Indiana Advisory Commission on Intergovernmental Relations Indianapolis December 1, 2015 Traditional vs. Public-Private Partnership Traditional Options:
More informationPUBLIC-PRIVATE PARTNERSHIPS
BTYGROUP C O S T A N D R I S K A D V I S O R S MODELS AND PROCESSES FOR OVERVIEW INTRODUCTION ABOUT BTY GROUP THE PROCURMENT SPECTRUM SAMPLE DETERMINANTS PPP MODELS PPP PROCESS Q&A + DISCUSSION 2 ABOUT
More informationTRANSPORTATION FINANCE AND DEBT
2 0 1 3 N C S L S T A T E T R A N S P O R T A T I O N S U M M I T A T L A N T A, G A M O N D A Y 1 2 A U G U S T 2 0 1 3 Leveraging the Money TRANSPORTATION FINANCE AND DEBT Joung H. Lee Associate Director
More informationPresentation regarding Structured Bond Opportunities
Presentation regarding Structured Bond Opportunities Jane Lah Vice President, Municipal Derivatives Group Goldman Sachs, & Co. Overview of Case Studies Creative financing tools used by different issuers
More informationPublic-Private Partnerships. Lowell R. Clary
Public-Private Partnerships P3 Lowell R. Clary lclary@p3devco.com Types of P3s Design Build (DB) Asset Management Contract Design Build Operate Maintain (DBOM) Design Build Finance Operate (DBFO) Build
More informationTransportation Infrastructure Finance and Innovation Act (TIFIA)
TIFIA Credit Program Overview Transportation Infrastructure Finance and Innovation Act (TIFIA) Updated September 27, 2006 Background on TIFIA Strategic goal to leverage limited Federal resources and stimulate
More informationThe Evolution of Public-Private Partnerships & Best Practices for States
The Evolution of Public-Private Partnerships & Best Practices for States The CSG Transportation Policy Academy Washington, DC September 17, 2014 Jonathan L. Gifford, Ph.D. George Mason University School
More informationThe Future: What s in Store for the Next Generation?
The Future: What s in Store for the Next Generation? 3 rd Annual Texas Transportation Forum Adam Nicolopoulos ADN Capital Ventures, Inc. April 20 22, 2008 The Future - Financial Innovation? Where and How?
More informationBringing Virginia s Transportation Funding Up to Speed. August 25, 2014 John W. Lawson Chief Financial Officer
Bringing Virginia s Transportation Funding Up to Speed August 25, 2014 John W. Lawson Chief Financial Officer Virginia Enacts Legislation to Enhance Transportation Revenues After more than a decade of
More informationPlenary 2: Public-Private Partnerships. Monday, 12:00 to 13:00
Plenary 2: Public-Private Partnerships Monday, 12:00 to 13:00 Session agenda 1. What is PPP? 2. When are PPPs appropriate and where have they been used? 3. PPI in South Asia 4. Key terms 5. Summary and
More informationFinance Tools. Surface Transportation Funding, Finance, and Leadership. Joung Lee Wendy Franklin Deb Miller
Finance Tools Surface Transportation Funding, Finance, and Leadership Joung Lee Wendy Franklin Deb Miller AASHTO Center for Excellence in Project Finance (CEPF) One of four Centers of Excellence authorized
More informationInfrastructure Impact and Challenges P3s in the Water/Wastewater Sector. Stefan Dery, PPP Canada June 8, 2016 Ottawa, ON
Infrastructure Impact and Challenges P3s in the Water/Wastewater Sector Stefan Dery, PPP Canada June 8, 2016 Ottawa, ON Introduction PPP Canada Leading the Government s P3 Agenda Acts as a Source of Expertise
More informationSt. Croix River Crossing Project: Innovative Financing Study. January 2011
St. Croix River Crossing Project: Innovative Financing Study January 2011 Cost of Completing this Study The consultant contract cost to complete this feasibility analysis and report was approximately $146,000.
More information