The Subaward Process Part One A Research Administrator s Guide
|
|
- Colin Reynard Shields
- 5 years ago
- Views:
Transcription
1 The Subaward Process Part One A Research Administrator s Guide Anne Lesky, SPARCS Amy Herman, SPARCS With Assistance from Allison Nelson, C&G Brad Priser, C&G Learning Objectives After attending this session, you will: Know what proposal documentation to collect from each Subrecipient Understand the new process for Subrecipients in PINS View information from the Subrecipient Table in RADAR Submit a PMR subaward request under the new requirements Appreciate the steps involved in the subrecipient risk assessment process required prior to issuing a subaward 1
2 UG Summary of Subaward Changes Increased burden to support Subrecipient vs. Contractor decision ( ) F&A changes - Federally negotiated indirect cost rate (unless there is a program cap) or 10% MTDC de minimis ( & ) Increased burden on subrecipient monitoring ( ) and tracking of subrecipient s financial and programmatic reports ( ) Must document risk assessment for each subrecipient prior to issuance ( ) Requires process for screening and managing COI for PI and their subrecipients ( ) Federal Funding If source of funding is FEDERAL the subrecipient should have: A DUNS number (2 CFR 25) An active SAM registration Certain agencies implement through supplemental guidance NCSU uses SAM registration to confirm subrecipients representations, certifications, and assurances and to verify DUNS 2
3 The Subaward Process PROPOSAL PROCESSING 3
4 Subrecipient and Contractor Determinations UG clarifies that it is the PTE s responsibility to make subrecipient/contractor determinations on a case by case basis Characteristics and classification of subrecipients and contractors (previously called vendors ) remain the same as in A-133 Federal Agencies may require us to support our determinations If you have a Contractor Review Services/Contract Review Services.php 4
5 Subrecipient Proposal Package Signed Checklist determining Subrecipient or Contractor Letter of Intent signed by authorized signatory Statement of Work Itemized Budget Budget Justification Curriculum Vitae for each PI Copy of the federally negotiated F&A rate agreement, if applicable Proof of current compliance approvals Biosketches, pending support & other information required by Sponsor Indirect Cost Rate of Subrecipient Federally negotiated rate between the subrecipient and the federal government should be used; unless the program has a capped F&A rate If subrecipient does not have a federally negotiated rate, apply a de minimis rate of 10% of MTDC NC State University will not negotiate indirect cost rates with subrecipients 5
6 Fixed Amount Subawards & & Need prior written approval from awarding agency Include written request with justification for fixed amount subaward in proposal Limited to Simplified Acquisition Threshold ($150,000) Watch for exceptions in agency supplements! Can not be used in programs with mandatory cost share At close out, Subrecipient must certify in writing that the project is completed and/or the full effort occurred PINS 6
7 Adding Subrecipients in PINS A new question will be added to the second tab in PINS currently labeled Sponsors/Subs/Deadlines Upload Subrecipient s Proposal Documents 7
8 COI updates in PINS COI Question updated in Approvals/Routing: Do you have a significant financial interest in or other conflict of interest with the sponsor of this project OR any proposed subrecipient, subcontractor, vendor, or consultant? COI Representation and Certification language updated to include subrecipients, contractors, vendors, and consultants I have on file a current and up to date COI disclosure and have considered my relationship with this sponsor and all subrecipients, subcontractors, vendors, and consultants, if any, and find all such relationships either free of a conflict of interest or consistent with a previously disclosed, up to date, and active conflict of interest management plan. 8
9 Approval Certifications * portal/pins/help certifcation/ 9
10 PINS Approval Representations and Certifications Updated for Subrecipient certifications ** When you click APPROVE on the routing screen in PINS, you certify to the following regarding subrecipients: I certify that the subrecipient(s) was(were) selected based upon their technical expertise and ability to successfully perform the statement of work. (PI) I certify that the subrecipient s technical and cost proposals were reviewed and the activities proposed were found to be allowable and appropriate to meet the programmatic objectives of the project and that the costs proposed are allowable, reasonable, and necessary for the work to be done. (PI and CRO) RADAR 10
11 New Electronic Subrecipient Questionnaire Once the proposal is imported in RADAR, if needed, an electronic questionnaire will be automatically sent to the subrecipient RADAR: Subrecipient Table Search for subrecipients that NC State has previously worked with View risk assessment levels Request to add new subrecipients 11
12 12
13 New Subrecipients not in PINS If a new subrecipient is not captured in PINS at the proposal stage: In Radar Subrecipient Table, request a new subrecipient A questionnaire will be sent and must be returned Risk assessment will need to be performed PMR 13
14 How to Avoid a PMR Return DO obtain prior approval from the Agency, if required DO ensure funds are in the prime Subcontract line DO upload required documents to PINS or PMR Subrecipient Proposal Package only upload docs in PMR if not in PINS Signed Checklist determining Subrecipient or Contractor Letter of Intent signed by authorized signatory Statement of Work Itemized Budget Budget Justification Curriculum Vitae for each PI Copy of the federally negotiated F&A rate agreement, if applicable Proof of current compliance approvals Biosketches, pending support & other information required by Sponsor 14
15 Rushes Rush Requests for Subawards Must include a Justification explaining the reasoning behind the rush Pursuant to the PMR manual, the RUSH field should only be used for the following criteria impending "agency imposed" deadline to submit request risk of loss of funding risk of loss of award risk of audit finding A subaward can not be issued until a Risk Assessment is performed on the subrecipient. RISK ASSESSMENT 15
16 The Risk Assessment Matrix NC State University has an obligation to perform a subrecipient risk assessment prior to issuing ALL subawards regardless of the type of funding Risk Assessment Check Points Subrecipient Questionnaire Indirect Cost Rate Audit Report NC Debarred Vendors List Compliance FDP FCOI Institutional Clearinghouse for NIH funding RCR for NSF, NIH, USDA NIFA Sam.gov Active registration FAPIIS Report Performance Integrity Visual Compliance Restricted party screening Key Personnel Entity 16
17 Determining Risk Risk will be assessed as either: Low (<=15): no anticipated measurable effect on achievement of project s goals and objectives High (<=24): Risk could compromise project goals and objectives or compliance with prime sponsor s terms and conditions (>=25): Requires management decision to go forward Subrecipient debarred or suspended, has a conflict of interest; Financial management and accounting systems are inadequate to account for award funds in accordance with federal requirements; NO DUNS registration; Subrecipient will not complete questionnaire High Risk Subrecipients High Risk Subrecipients Foreign entities For-profits with no annual audit Subrecipients with significant audit findings without a defined corrective action plan Monitoring requirements Increase frequency of financial and technical reporting On a case by case basis Request supporting detail with invoice Issue smaller increments of money Add stop work language for failure to comply Exercise right to perform audit, desk review, or perform site visit 17
18 SUBAWARD PROCESSING How to Find the Risk Level and Monitoring Responsibilities 18
19 Next Steps Obtain PI feedback regarding subrecipient performance quarterly, prior to issuing modifications, and/or at close out to use as additional risk assessment factor and as part of subrecipient monitoring to document that we are tracking reports Subaward Training Part Two, Subrecipient Monitoring Who do I contact for help? Anne Lesky, Compliance Accountant & QA Amy Herman, Assistant Director for Subawards 19
Project Modification Request (PMR) Justification Checklist Reference Guide
Project Modification Request (PMR) Justification Checklist No Cost Extension 1. Is agency approval needed? 2. Do we have a deadline to request extension? Is this a RUSH? 3. Is this a first NCE request?
More informationSubrecipient Monitoring Guide
Office of Research Subrecipient Monitoring Guide The purpose of this document is to communicate the University of Florida s guidelines pertaining to the programmatic and financial monitoring of its sponsored
More informationSubrecipient Assessment and Monitoring - It Takes a Village!
Subrecipient Assessment and Monitoring - It Takes a Village! Sharon Brooks Director of Award Management Services and Cash Management Robin Cyr Associate Vice Chancellor for Research, Director of OSR The
More informationUniversity of Missouri System Accounting Policies and Procedures
University of Missouri System Accounting Policies and Procedures Policy Number: APM-60.85 Policy Name: Subrecipient Monitoring Procedures General Policy and Procedure Overview: The University of Missouri
More informationUniform Guidance: Key Points of the UNC Implementation - Getting to the Real Impacts of 2 CFR Part 200
Uniform Guidance: Key Points of the UNC Implementation - Getting to the Real Impacts of 2 CFR Part 200 Sharon Brooks Director of Award Management Services and Cash Management Robin Cyr Associate Vice Chancellor
More informationOFFICE OF SPONSORED PROGRAMS SUBAWARD PROCESS MANUAL
OFFICE OF SPONSORED PROGRAMS SUBAWARD PROCESS MANUAL 1. INTRODUCTION The purpose of this document is to assist Virginia Tech faculty and staff in the preparation of subawards issued under sponsored programs.
More informationSubrecipient monitoring responsibilities are shared among the following:
SUBRECIPIENT MONITORING PURPOSE The OMB Uniform Guidance, 2 CFR Part 200 UNIFORM ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT REQUIREMENTS FOR FEDERAL AWARDS section 200.331 requires prime recipients
More informationUNIVERSITY OF ARIZONA SUBRECIPIENT MONITORING GUIDE
UNIVERSITY OF ARIZONA SUBRECIPIENT MONITORING GUIDE Contents Introduction... 2 Roles and Responsibilities Chart... 3 Subrecipient Monitoring at Proposal Stage... 4 Subrecipient Monitoring at Subaward Issuance
More informationMarch 23, /1/2018 WASHINGTON STATE UNIVERSITY. Subcontracting. Overview. Recording date of this workshop is
Subcontracting Presented by: Derek Brown, ORSO Anke Moore, SPS Lucas Sanchez, ORSO Ty Simanson, IPN March 2018 Recording date of this workshop is March 23, 2018 Some of the rules and procedures discussed
More informationOFFICE OF RESEARCH AND PROJECT ADMINISTRATION Updated December 2014 UNIVERSITY OF ROCHESTER
OFFICE OF RESEARCH AND PROJECT ADMINISTRATION Updated December 2014 POLICIES AND PROCEDURES FOR THE ADMINISTRATION OF SUBAGREEMENTS ISSUED TO A THIRD PARTY UNIVERSITY OF ROCHESTER December 2014 TABLE OF
More informationSubawards Policies and Procedures Johns Hopkins University School of Medicine
Subawards Policies and Procedures Johns Hopkins University School of Medicine I. Introduction Sponsored project awards made to The Johns Hopkins University ( JHU or University ) are generally conducted
More informationNOVA SOUTHEASTERN UNIVERSITY OFFICE OF SPONSORED PROGRAMS POLICIES AND PROCEDURES
PAGE 1 OF 5 PURPOSE: To establish the policy and procedures when the university will engage a third party in performing a substantive programmatic role under a sponsored award to the university. This policy
More informationOverview: Note: To add subrecipient information in all places needed in a proposal record, a user needs full edit access.
Overview: Subrecipients perform a portion of the project s scope of work, subject to review and oversight by CSU s lead PI. Note: To add subrecipient information in all places needed in a proposal record,
More informationTraining Document 1: Quick Proposal Creation using Kuali Coeus - Single PI Research Proposal
Training Document 1: Quick Proposal Creation using Kuali Coeus - Single PI Research Proposal This document illustrates how to create a single PI research proposal in response to a federal funding opportunity
More informationSINGLE AUDIT UPDATE. Presented By Joel Knopp, CPA
SINGLE AUDIT UPDATE Presented By Joel Knopp, CPA Session Covers Uniform Guidance Circular Components Single Audit Changes Auditee and Auditor Impact Scope of Audit under Uniform Guidance Florida Single
More informationUniform Guidance Super Circular 2 CFR Part 200
Uniform Guidance Super Circular 2 CFR Part 200 MSU First Looks and Future Plans May 27, 2014 Dan Evon, Contract & Grant Administration The Rules Contracts Federal Acquisition Regulations (FAR) Grants and
More informationProcedures for the Administration of Subcontracts
Procedures for the Administration of Subcontracts The purpose of this document is to assist Rensselaer faculty and staff in the preparation and administration of subawards and subcontracts issued under
More informationThe Uniform Guidance: Changes and Strategies for Implementation
The Uniform Guidance: Changes and Strategies for Implementation Mark Davis Attain LLC Cindy Hope University of Alabama Kim Moreland University of Wisconsin Madison Jeffrey Silber Cornell University Topics
More informationCoeus Premium. Proposal Development. Exercise Guide Day 2. IS&T Training
Coeus Premium Proposal Development Exercise Guide Day 2 IS&T Training Page 2 Coeus Premium : Proposal Development Exercises for Day 2 LESSON 5: EXERCISE 1... 5 OPEN A PROPOSAL FOR MODIFICATION...5 LESSON
More informationSPA and Outgoing Subawards. Molly Epstein, Karin Bourassa, Kathy McConnell, Erin Fitzgerald 12/8/2017
SPA and Outgoing Subawards Molly Epstein, Karin Bourassa, Kathy McConnell, Erin Fitzgerald 12/8/2017 This presentation will cover The difference between a subaward and a contract Roles and responsibilities
More informationOMB Uniform Guidance Hot Topics and Implementation. July 18, 2014: The University of Alabama in Huntsville
Special attention will be paid to those sections of the that carry the most uncertainty and that may require significant institutional planning and preparation. The purpose of this session is not to provide
More informationTIP SHEET GETTING STARTED: HOW TO REQUEST TO AMEND AN OUTGOING SUBAWARD
WHAT IS IT? This job aid steps through how to complete a change request in InfoEd for amending a subcontract 1. Login to InfoEd Go to infoed.northwestern.edu Login with your NetID and password 2. Create
More informationProcedures for the Administration of Sponsored Projects Subcontracts
Procedures for the Administration of Sponsored Projects Subcontracts Office of Research Administration University of Maryland, College Park (Updated August 6, 2015) 1 TABLE OF CONTENTS INTRODUCTION...
More informationThe University Maryland Baltimore County
The University Maryland Baltimore County Office of Sponsored Programs Subaward Policies and Procedures Purpose The purpose of the University Maryland Baltimore County Subaward Policies and Procedures is
More informationCOLUMBIA UNIVERSITY POLICY ON SPONSORED PROJECT SUBAWARDS
COLUMBIA UNIVERSITY POLICY ON SPONSORED PROJECT SUBAWARDS I. Introduction Published: July 1, 2015 As the recipient of a primary award for a Sponsored Project, Columbia University (Columbia or the University)
More informationMichigan State University. ERA Hot Topics 11/6/14 Dan Evon, Director Contract and Grant Administration. UG, NSF Audit, Procurement
Michigan State University ERA Hot Topics 11/6/14 Dan Evon, Director Contract and Grant Administration UG, NSF Audit, Procurement Uniform Guidance 2 CFR Part 200 Effective 12/26/2014 Grants Reform A 122
More informationThe COGR Perspective on the OMB Uniform Guidance: A First Look
The COGR Perspective on the OMB Uniform Guidance: A First Look COGR Meeting Thursday, February 27, 2014 Washington Marriott Hotel Washington, D.C. Agenda for this Session The Big Picture and the Next 12
More informationBASIC BUDGETING ERA ELECTIVE
BASIC BUDGETING ERA ELECTIVE Presented by: Judy Brown, Director, Office of Research Support, College of Natural Science Denise Lator, Sponsored Programs Administrator, Office of Sponsored Programs 1 AGENDA
More informationSubrecipient Monitoring on Sponsored Projects Policy No. GSU: University Research Services and Administration
POLICY Issued: January 1, 2009 Revised: Contacts for questions about this policy, click here When Georgia State University (GSU) receives an award from a sponsoring agency, it may become necessary to establish
More informationPOLICY STATEMENT: Policy #: 1.1. Sub-recipient award management. Issue/Effective Date: December 26, Revision/Effective Date:
Policy #: 1.1 Policy Name: Sub-recipient award management. Issue/Effective Date: December 26, 2014 Revision/Effective Date: Technical Correction Effective Date: POLICY STATEMENT: West Virginia University
More informationPennERA Proposal Development v13 Upgrade
PennERA Proposal Development v13 Upgrade August 26, 2015 August 2015 PennERA Upgrade 1 Agenda Key changes Predictive text searches Complex projects capability Change upload file names New interface demonstration:
More informationMedical School NIH Research Proposal Review Checklist
Medical School This checklist serves as a reference guide for Medical School departments/units when reviewing NIH research grants prior to routing for approval. This document provides a quick reference
More information2 CFR Part 200 Uniform Guidance
2 CFR Part 200 Uniform Guidance Lisa Mosley Executive Director, Research Operations Michele Wrapp Associate Director, Research Operations December 15, 2014 200.110 Effective/applicability date Applies
More informationSDWP Operations Manual Chapter 2 Contract Administration
SDWP Operations Manual Chapter 2 Contract Administration Table of Contents I. Introduction... 2 II. Role and Responsibilities of the Contract Administrator... 2 III. Contract Management... 2 A. Contract
More informationInitial COGR observations on definitions are intertwined with the applicable sections below.
COGR Preliminary Assessment of Selected Items OMB Uniform Administrative Requirements, Cost Principles, and Administrative Requirements for Federal Awards January 14, 2014 Below is COGR s preliminary assessment
More informationFSM Research Administrators Workshop Series. Subcontracts and Subrecipient Monitoring November 1, 2012
FSM Research Administrators Workshop Series Subcontracts and Subrecipient Monitoring November 1, 2012 Melody Delfosse Information Manager, ASRSP Jamie Young Associate Director, OSR Today s Agenda Key Terms
More informationNew York University UNIVERSITY POLICIES
New York University UNIVERSITY POLICIES Title: Managing Subawards Issued by NYU Policy Effective Date: December 1, 2017 Supersedes: December 26, 2014 Issuing Authority: Responsible Officer: Sponsored Programs
More informationUniform Guidance for Federal Awards Key Changes and Lessons
Uniform Guidance for Federal Awards Key Changes and Lessons Learned Kinman Tong, Senior Manager Moss Adams LLP 1 PRESENTER Kinman Tong, Senior Manager Kinman has been in public accounting since 2003. He
More informationSubcontracts (Outgoing Funds) September Team Talks Grants and Contracts
Subcontracts (Outgoing Funds) September Team Talks Grants and Contracts Agenda Introduction Ryan Holland Proposal Stage David White Subcontract Request Eric Maize Postaward Management Stephanie Thompson
More informationWelcome Packet for New Johns Hopkins University Subrecipients Receiving Cost-Reimbursable Federal Subawards
Welcome Packet for New Johns Hopkins University Subrecipients Receiving Cost-Reimbursable Federal Subawards Dear Subrecipient, As the recipient of a federal cost reimbursable subaward from Johns Hopkins
More informationV.15 USER PREVIEW PLATFORM SIMPLIFIED PERESONNEL ENTRY ENABLED USER INTERFACE STREAMLINED NEW BUDGET MODEL ELECTRONIC RESEARCH ADMINISTRATION (ERA)
ELECTRONIC RESEARCH ADMINISTRATION (ERA) V.15 USER 2016 PREVIEW PLATFORM This documentation gives you a glance at the major changes in the Proposal Development (PD) module in the ENABLE version (V.15).
More informationAdvanced Budgeting September 8 th, 2015
Advanced Budgeting September 8 th, 2015 Maria Skinner Office of Sponsored Programs, Proposal Team 1 517-884-7431 skinne51@osp.msu.edu MaryJo Banasik College of Veterinary Medicine, Research Administration
More informationKC Update February 2016
KC Update February 2016 Agenda Welcome and Introductions Kuali Coeus Post Go-Live May 2015 KC Updates February 2016 KualiCo Partnership and Project Goals Release Notes and Resources Updated features Questions
More informationImplementation and Readiness Guide for the OMB Uniform Guidance Prepared by the Council on Governmental Relations (COGR) Introduction
Implementation and Readiness Guide for the OMB Uniform Guidance Prepared by the Council on Governmental Relations (COGR) DECEMBER 12, 2014 VERSION Introduction The Implementation and Readiness Guide for
More informationAgenda. Agency co chair discussion Clearinghouse update Subaward template changes: Subcontract template Unilateral Modifications (Partners) Open
Agenda Agency co chair discussion Clearinghouse update Subaward template changes: fixed price language audit clause IACUC Subcontract template Unilateral Modifications (Partners) Open Face Page: Fixed
More informationThe Uniform Guidance (2 CFR 200)*
The Uniform Guidance (2 CFR 200)* 1 * T H E B R V E N E W W O R L D O F F E D E R L S S I S T N C E ndrew Boulter, UCOP Joao Pires, UCOP The Uniform Guidance: History The Uniform Guidance resulted from
More informationAmy Roberts, Appalachian State University
Amy Roberts, Appalachian State University Originally referred to as A-81, the Super Circular, or the Omni Circular Consolidates 8 previous Circulars All Federal funding agencies are required to implement
More informationWHAT THE PI NEEDS TO KNOW
The UC Uniform Guidance Workgroup would like to acknowledge and thank the Council on Governmental Relations, the University of Minnesota, and Columbia University for their resources on which much of this
More informationCreating a high-level budget in Kuali Research Non-personnel Budget Entry Method non-modular Budgets
Creating a high-level budget in Kuali Research Non-personnel Budget Entry Method non-modular Budgets A high-level budget has annual direct and indirect (F&A) costs for a proposal with little to no budget
More informationProposal & Budget Development. Jordan Brown, Kiley Compton & Stacey Wade
Proposal & Budget Development Jordan Brown, Kiley Compton & Stacey Wade Training Credit Effective August 2017, employees must use k@te to submit training credit forms hr.tennessee.edu/training Choose:
More informationDownstate Medical Center. Office of Research Administration Sharon Levine-Sealy, Pre-Award Director Elliot Feder, Post-Award Director.
Downstate Medical Center Office of Research Administration Sharon Levine-Sealy, Pre-Award Director Elliot Feder, Post-Award Director September 2015 Identify the different funding opportunities Interpret
More informationTraining Exercise Guide Fall 2018
Coeus Lite Proposal Development Training Exercise Guide Fall 2018 Contents EXERCISE 1: CREATE A NEW PROPOSAL... 6 EXERCISE 2: REVIEW ORGANIZATION TAB... 8 EXERCISE 3: ADD KEY PERSONNEL... 9 Modify Person
More informationVCU Office of Sponsored Programs: Process When VCU Serving as Subrecipient (Our sponsor is Pass-through Entity)
VCU Office of Sponsored Programs: Process When VCU Serving as Subrecipient (Our sponsor is Pass-through Entity) Federal Demonstration Partnership Expanded Clearinghouse (FDP EC) VCU is an institutional
More informationBUDGET BUILDING. Christy Bischoff Justin Stidham Grants & Contracts Administrators Office of Sponsored Projects
BUDGET BUILDING Christy Bischoff Justin Stidham Grants & Contracts Administrators Office of Sponsored Projects Topics Budget components: Direct vs. Indirect costs Costing principles from the Uniform Guidance
More informationRESEARCH ADMINISTRATORS ROUND TABLE. June 7, 2016 Health Sciences Center June 8, 2016 Brooks Hall
RESEARCH ADMINISTRATORS ROUND TABLE June 7, 2016 Health Sciences Center June 8, 2016 Brooks Hall Round Table Menu Budgeting Overview Janet Boyles Recharge Centers Jaime Bunner Sub-award Management John
More informationBudget Preparation under Uniform Guidance 2 CFR 200
Budget Preparation under Uniform Guidance 2 CFR 200 Kim C. Carter Associate Director, Office of Sponsored Programs The Ohio State University carter.552@osu.edu Florida Research Administration Conference
More informationProcedures for the Administration of Sponsored Projects Subcontracts
Procedures for the Administration of Sponsored Projects Subcontracts Office of Research Administration University of Maryland, College Park (Updated April 2018) 1 TABLE OF CONTENTS INTRODUCTION... 3 I.
More informationCAYUSE (S2S) NIH SUBAWARD CHECKLIST Revised September 7, 2012
CAYUSE (S2S) NIH SUBAWARD CHECKLIST Revised September 7, 2012 Other Project Information Section 6.a. Does this project involve activities outside the U.S. or partnership with International Collaborators?
More informationKuali Coeus: Single Point Entry Budget Quick Reference Card
Kuali Coeus: Single Point Entry Budget Quick Reference Card Overview: The Kuali Coeus Single Point Entry (SPE) Budget is a quick budget feature that provides an alternative method for entering budget data
More informationBudgeting. Certificate Program 03/09/2016
Budgeting Certificate Program 03/09/2016 Presenters: Gaye Bugenhagen Director of Admin Services, Sociology X54840 gbugenha@umd.edu Muriel Averilla-Chin Senior Contract Administrator, ORA x55465 maverill@umd.edu
More informationCOGR Guide to the OMB Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards VERSION 2: SEPTEMBER 17, 2014
COGR Guide to the OMB Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards VERSION 2: SEPTEMBER 17, 2014 Introduction The OMB Uniform Administrative Requirements,
More informationT-203 F&A Cost Rates and the Uniform Guidance, A Non-Profit Perspective
T-203 F&A Cost Rates and the Uniform Guidance, A Non-Profit Perspective Alex Weekes Principal ML Weekes & Company, PC 203-458-0872 alex.weekes@mlweekes.com Agenda Regulations (Current and New) Rate Types
More informationFrequently Asked Questions
Frequently Asked Questions Updated: July 2017 For The Office of Management and Budget s Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards At 2 CFR 200 The
More informationSubrecipient Monitoring & Risk Assessment Guidelines
Overview and Key Concepts Responsible Offices: Sponsored Projects Accounting Office of Sponsored Research Services Effective Date: December 26, 2014 Revision Date: August 3, 2017 Subrecipient Monitoring
More informationStandard NIH Checklist for Coeus/SF424 Refer to the opportunity for specific requirements, which take precedence
Standard NIH Checklist for Coeus/SF424 Refer to the opportunity for specific requirements, which take precedence General NIH/K-Series/NRSA Kirschstein Fellowships and Coeus Requirements Due Date: Coeus
More informationOMB Super Circular Proposed Uniform Guidance. RAC Forum April 10, 2013
OMB Super Circular Proposed Uniform Guidance RAC Forum April 10, 2013 Change is Coming Good news A-21 is gone! Bad news It s back and bigger than ever Circular Consolidation Super Storm? Extreme Makeover:
More informationInfoEd Advanced Proposal Development: Completing System-System (S2S) Grants.gov Applications that Require Detailed Budgets
InfoEd Advanced Proposal Development: Completing System-System (S2S) Grants.gov Applications that Require Detailed Budgets Detailed below are instructions for building a Grants.gov proposal application
More informationFDP Fixed Price Clinical Trial Subaward Agreement:
FDP Fixed Price Clinical Trial Subaward Agreement: Pass-through Entity (PTE): PTE Principal Investigator (PI): Subrecipient: Subrecipient Principal Investigator (PI): PTE Federal Award No: FAIN: Federal
More informationPROPOSAL BUDGET BUDGETING OVERVIEW E.1.1. NAVIGATE TO BUDGET E.1.2. NAVIGATE FROM BUDGET TO PROPOSAL HOW TO START A BUDGET
E. PROPOSAL BUDGET E. E. E. BUDGETING OVERVIEW E. NAVIGATE TO BUDGET E. NAVIGATE FROM BUDGET TO PROPOSAL HOW TO START A BUDGET PERSONNEL E. E.2 E. E. F. E. E. E. E.7. E.8. E.9. E.10. E.1 E.1 E.1 E.1 E.1
More informationWelcome to Kuali COI Financial Disclosures
Welcome to Kuali COI Financial Disclosures As an investigator on a proposal submitted or award made in Kuali, you must disclose certain information with respect to conflicts of interest on real or potential
More informationDocument Downloaded: Wednesday June 11, FDP/COGR White Paper on the Uniform Guidance. Author: FDP. Published Date: 06/04/2014
Document Downloaded: Wednesday June 11, 2014 FDP/COGR White Paper on the Uniform Guidance Author: FDP Published Date: 06/04/2014 FDP/COGR Meeting on the Uniform Guidance NAS Keck Center, Room 101 April
More informationIndirect costs, on the other hand, are expenses that cannot be specifically identified with a particular project or activity.
II. Other Direct Costs A. Overview A project budget is comprised of direct costs, i.e. salaries and other direct costs, and indirect costs. Other direct costs refer to expenditures that are allowed as
More informationPROPOSAL ROLES AND RESPONSIBILITIES MATRIX
PROPOSAL ROLES AND RESPONSIBILITIES MATRIX This document is meant to establish what each member of the pre award proposal team is responsible for as applications are prepared and submitted. It is geared
More informationSubcontract Request Form
960 Renaissance Park www.northeastern.edu/raf oraf@neu.edu Subcontract Request Form Please provide the information requested below and attach the following: 1. Subcontractors Statement of Work 2. Subcontractors
More informationKuali Coeus Research Management (KCRM) User Guide: Create a new Budget document for a Child Award
Kuali Coeus Research Management (KCRM) User Guide: Create a new Budget document for a Child Award Version 5.0: August 2014 Purpose: To create detailed or modular budget for a child (or grandchild) award.
More informationSPA & SPAC UPDATE MEETING SECOND QUARTER 2013
SPA & SPAC UPDATE MEETING SECOND QUARTER 2013 TODAY S AGENDA SPAC Personnel Changes Carryover Invoicing Terms on Cost-Reimbursable Awards Child Projects Sequestration and Other Federal Budget Updates Proposed
More informationMember Access Manual. Contents. Registration Process Logging In Making a Donation Donation History Account Information
Manual Contents Registration Process Logging In Making a Donation Donation History Account Information This is the first screen you will see as a new user, and for future logins. First time users must
More informationAICPA Governmental Audit Quality Center. Auditee Practice Aids: The Schedule of Expenditures of Federal Awards
AICPA Governmental Audit Quality Center Auditee Practice Aids: The Schedule of Expenditures of Federal Awards The Practice Aids, Accumulating Federal Program Information, and Disclosure Checklist: Schedule
More informationKuali Research User Guide: Create a new Budget document for a Child Award
Kuali Research User Guide: Create a new Budget document for a Child Award Version 6.0: November 206 Purpose: To create a detailed or modular budget for a child award. Trigger / Timing / Frequency: Once
More informationJanuary 16, DATES: Effective date: This interim final rule is effective on December 26, 2014
COGR Summary of Background and Technical Corrections to the OMB Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards January 16, 2015 The interim joint final
More informationGuidelines & Procedures for Monitoring Subrecipients
Guidelines & Procedures for Monitoring Subrecipients The University of Hawaii (UH) is responsible for the programmatic and financial monitoring of its sponsored research award subrecipients. A subrecipient
More information10/4/12. Accessing The Office. of Research. display. to Cayuse: Logging in. directly at. . The system. review.)
Accessing Cayuse 424 and training materials The Office of Research Electronic Research Administration (ERA) website can be used learn more about Cayuse 424 and to login to Cayuse 424. The URL is http://www.research.vt.edu/era/.
More informationUACES Subrecipient Monitoring Policy Statement
UACES Subrecipient Monitoring Policy Statement UACES monitors the financial and programmatic performance of Subrecipients, and evaluates their capacity to effectively manage a Subaward. The university
More informationPACS Portal Grants Module Create a Funding Proposal
PACS Portal Grants Module Create a Funding Proposal 1 Table of Contents What is the PACS Portal?... 4 Getting a PACS Account... 4 Logging into the PACS Portal... 5 Grants Tab... 6 Workflow... 7 Additional
More informationTwo main Goals. Budgeting for Sponsored Projects 2/21/2018 WASHINGTON STATE UNIVERSITY. Template-WSU Hrz 201.ppt 1.
Budgeting for Sponsored Projects Presented by: Matt Michener Grant and Contract Coordinator Lead Office of Research Support and Operations Erin-Kae Rice Director of Operations International Programs Kim
More information3 rd Annual Symposium for Research Administrators
3 rd Annual Symposium for Research Administrators Budgeting for Proposals John Sites, Interim Director for Pre-Award Services, Office of Sponsored Research Email: johj@email.unc.edu July 29, 2016 Who am
More informationThe Basics of F&A and How the Uniform Guidance Impacts Indirect Costs
The Basics of F&A and How the Uniform Guidance Impacts Indirect Costs Alex Weekes Principal ML Weekes & Company, PC 203-458-0872 alex.weekes@mlweekes.com Indirect Costs / Facilities and Admistrative Cost
More informationJOB AID Reviewing and Approving a Proposal
Institutional approval must be granted for proposals to be submitted to a sponsor. At MSU, institutional approval is obtained through a series of intermediate approvals, beginning with the investigators
More informationUNIVERSITY OF GHANA OFFICE OF RESEARCH, INNOVATION AND DEVELOPMENT (ORID) Grant Application Guide
UNIVERSITY OF GHANA OFFICE OF RESEARCH, INNOVATION AND DEVELOPMENT (ORID) Grant Application Guide Step 1: Login Process 1. Visit the UG-Research Management Application Portal (UG-ReMAP) to initiate your
More information2018 SRAI Annual Meeting October 27-31
2018 SRAI Annual Meeting October 27-31 Jennifer Camp, CRA, Director of Project Accounting Georgia Tech, Atlanta, GA, USA Trudy Riley, CRA, Executive Director Office of Sponsored Programs Georgia Tech,
More informationStandard NIH Checklist for Coeus/SF424 Refer to the opportunity for specific requirements, which take precedence
Standard NIH Checklist for Coeus/SF424 Refer to the opportunity for specific requirements, which take precedence General NIH/K-Series/NRSA Kirschstein Fellowships and Coeus Requirements Due Date: Coeus
More informationContract & Grant User s Group
Contract & Grant User s Group May 16, 2017 9:00 a.m. 10:30 a.m. UCR Alumni and Visitors Center Business & Financial Services A Division of Business & Administration Services (BAS) BAS Agenda Demo of New
More informationWelcome to Federal Small Business Rules & Regulations Update
Welcome to Federal Small Business Rules & Regulations Update Presented by: David Rose Principal Attorney Hosted by the Society of American Military Engineers 2 @SAME_HQ #SAMESBC SAFETY FIRST! Please take
More informationCoeus Premium Proposal Development. User Guide. Coeus For additional help, contact the UC Coeus Help Desk at
Coeus Premium Proposal Development User Guide Coeus 4.5.1 For additional help, contact the UC Coeus Help Desk at coeus@uc.edu Contents Contents Preface About the Proposal Development User Guide 7 Conventions
More informationUniform Guidance Overview
Compliance Auditing Update NC Local Government Auditing, Reporting and Review June 14, 2016 Uniform Guidance Overview Course Objectives-Uniform Administrative Requirements, Cost Principles, and Audit Requirements
More informationStandard NIH Checklist for Coeus/SF424 Refer to the opportunity for specific requirements, which take precedence
Standard NIH Checklist for Coeus/SF424 Refer to the opportunity for specific requirements, which take precedence General NIH/K-Series/NRSA Kirschstein Fellowships and Coeus Requirements Due Date: Coeus
More informationBill Pay User Guide FSCB Business
Bill Pay User Guide FSCB Business 1 Table of Contents Enrollment Process... 3 Home Page... 4 Attention Required... 5 Shortcut Method... 5 Scheduled... 5 History... 5 Since You Last Logged In... 5 Payees
More informationOmni Circular Key Area #5 Indirect Costs and the Omni Circular: What to Expect. Total Cost of Federal Awards. Costing Options:
Omni Circular Key Area #5 Indirect Costs and the Omni Circular: What to Expect Leigh Manasevit, Esq. lmanasevit@bruman.com Spring Forum 2014 Total Cost of Federal Awards Indirect 10% Direct Indirect Direct
More informationProposal Budget Basics
Proposal Budget Basics Include both direct and F&A costs Should be detailed Include only allowable costs If required, include matching or cost-sharing (cost sharing should only be included if required
More information