1 Public Private Partnerships A Presentation to the Association of Financial Professionals of Canada Edmonton Chapter March 20, 2013 Alternative Capital Financing Office Alberta Treasury Board and Finance
2 Presentation Topics P3 Basics Alberta s P3s Financing and Risk Best Practices Criticisms and Benefits Questions 2
3 P3 Basics - Traditional Project Delivery Most common method of delivery is design-bid-build (DBB) with operations and maintenance (O&M) procured and managed separately Manage Project Traditional Procurement Program Plan Design Build Maintain Finance Project Program Delivery Facility Management Services Own Building Own Land Public sector Private partner 3
4 P3 Basics - The Value Proposition What if design and build is combined, i.e. a DB? Synergy Risk transfer Innovation and efficiency What if O&M is added, i.e. a DBO or DBM? Life-cycle view Risk transfer Innovation and efficiency What if financing is added, i.e. a DBFO or DBFM? Provides alternative financing for project Brings added discipline from lender if funds at risk Enforces risk transfer 4
5 P3 Basics Alternative Project Delivery A P3 is a different, non-traditional way for government to create capital assets Manage Project P3 Procurement Program Plan Design Build Maintain Program Delivery Facility Management Services Finance Project Own Building Own Land Public sector Private partner 5
6 Alberta s P3 Definition Government of Alberta defines a P3 as an infrastructure project in which h a private contractor: Provides some or all of the financing; Designs and builds; Operates or maintains (an extended warranty ); and Receives payments from the government over an extended period of time, subject to deductions for failing to meet contractually defined performance standards A DBFO or DBFM 6
7 Alberta s P3 Projects Constructed and operational: Anthony Henday Southeast Northeast Stoney Trail Alberta Schools Alternative Procurement (ASAP) project, Phase 1 eighteen schools (K-4, K-6, K-9) Anthony Henday Northwest t ASAP, Phase 2 ten schools (K-6, 5-9, K-9) Under construction: Southeast Stoney Trail Anthony Henday Northeast ASAP, Phase 3 13 schools (K-5, K-6, K-9, K-12, 6-8, 9-12) Evan Thomas Water/Wastewater t t Treatment t Facilities 7
8 Typical P3 Arrangement Government Agency Direct Lender Agreement Lenders (Debt) Capital Contribution Availability Payments Concession Agreement Private Contractor (SPV) Investment Operating Private Finance Subcontractors Design Build Operate Maintain Sponsors (Equity) 8
9 Examples of Companies Involved in Canadian P3 Projects Equity Providers/Project Leads Contractors Acciona AMEC Inc. Bilfinger Berger BOT AXOR Carillion Canada Inc. Bilfinger Berger BOT* John Laing Bouygues Building Canada Plenary Group Brookfield LePage Johnson Controls Macquarie Carillion Canada Inc.* Hochtief Ellis Don* Fengate Ferrovial Innisfree Graham* SNC-Lavalin Grupo ACS Peter Kiewit Sons Inc. Lenders PCL Group Non-CDN Banks Serco North America CDN Insurance Companies CDN Pension Funds * Often participates as equity investor 9
10 P3 Basics - The Value Proposition Consider the strengths ascribed to each of the public and private partners Comparative Advantage of Government Standard-setting Make, change, and enforce law Prerogative to raise capital and spend it Comparative Advantage of Private Sector Efficient Specialized Nimble, responsive, sense of urgency Leadership over extensive group Eminent domain (can expropriate) Vast communication lines with public Timeline accountable Borderless Innovative 10
11 P3 Basics - The Value Proposition Government and private sector have different objectives Parties interests are aligned in P3s Merger of the comparative advantages provides P3 advantages The guiding principle that risk is to be allocated to the party best able to manage it on a cost effective basis is applied Forcing a partner to take on responsibilities in the other s domain can lead to: excessive project costs relational or contractual problems even project failure Understanding one s ability to manage risk lies at least in part with the comparative advantages of each party 11
12 P3 Benefits Fixed price Earlier opening Fixed opening date Better value for money Long term warranty Future cost certainty P3 benefits are the result of appropriate risk allocation 12
13 Earlier Completion Traditional Delivery P3 Delivery Project Time Project Time Deerfoot Trail Extension 5 yrs, 11 months SE ( ) Anthony Henday 4 yrs,1 month ( ) SW AHD 6 yrs, 5 months ( ) NE Stoney Trail 3 yrs, 8 months ( ) NW Stoney Trail 6 yrs, 7 months ( ) NW Anthony Henday 4 yrs, 3 months ( ) Average for 1 school 5 yrs ASAP I (18 schools) 2 yrs, 10 months ( ) (tracked by Alberta Infrastructure) ASAP II (10 schools) 3 yrs, 1 month ( ) 13
14 Value for Money (VfM) PROJECT PSC NPV BID NPV VFM SE AHD (2004 $) $ M $493 M $4 M NEST (2006 $) $ B $650 M $350 M NW AHD (2008 $) $1.6 B $1.4 B $200 M SEST (2010 $) $1.8 B $ 769 M $1 B NE AHD (2012$) $2.2 B $1.8 B $371 M ASAP I (2008 $) $752 M $634 M $97 M ASAP II (2010 $) $358 M $253 M $105 M ASAP III (2012 $) $332 M $289 M $43 M EVAN THOMAS (2012$) $62 M $60 M $2 M PSC Public Sector Comparator (traditional procurement approach) NPV Net present value 14
15 VfM and Effect on Risk Transfer Value for Money nt Value of Cost to Gov't Prese Retained Risk Transferred Risk Financing Rehabilitation O&M Construction Engineering or Procurement 0 Raw PSC Risk Adjusted PSC P3 15
16 Mechanisms Used to Manage Risk Contractual project agreement sets out responsibilities of contractor according to optimal project risk allocation Security liquid security (letters of credit, bonds) required at various stages of the procurement process (bid stage, construction stage) Performance monitoring and inspections Payment mechanism monthly payments to the contractor include deductions (penalties) for non-performance Private debt financing adds an additional layer of due diligence within the Contractor s team and layer of security for government Insurance 16
17 Estimating Risk Costs Project risk register Risk identification/definition Allocation (government, partner, shared) for traditional and P3 In planning, design, procurement, construction, and O&M Risk cost estimation Expert workshops Likelihood of occurrence Impact, if it occurs: Best case, Worst case, Expected case Monte Carlo simulation Probability distribution of risk cost retained by government Probability distribution of risk cost transferred to partner 17
18 P3 Financing Financing is project finance, supported solely by project cash flows and therefore is ring-fenced or bankruptcy-remote Financing is paid back one of two ways via revenue generating asset (e.g. toll road) or payments from public agency based on availability Availability approach is almost exclusively used in Canada 18
19 PPP Spread Index (Source: Casgrain) The spread over long term GoCs matches term of P3 contracts 19
20 PPP Spread Index (Source: Casgrain) Bonds included in Index 20
21 P3 Project Selection Project size - sufficient capital cost and operations/rehabilitation Project scope can be clearly delineated Risks allocated to party best able to manage Private sector has capacity and sufficient interest for competitive process Term sufficient to generate value and fit with asset Output specifications can be developed Greenfield vs. brownfield Generate value for money (VfM) 21
22 Best Practices Evaluate potential project (business case) Project scope Business and operational impacts Market sounding Procurement alternatives Risk analysis and allocation Engineering, financial, legal analysis Value for money Qualitative factors Project team Schedule Obtain approvals Develop communications strategy Stick to schedule 22
23 Best Practices Develop standardized Agreement Competitive bidding process RFQ Shortlist to 3 bidders RFP Technical Submissions reviewed up front Open dialogue between the Department and Proponents Agreement Meetings Engineering Meetings Q&A Process Clarification Process Final submission low price wins; or with subjective evaluation? No negotiation after price submitted Debriefing bidders Fairness Auditor 23
24 Criticisms of P3s Cost of financing (GoA vs Private) Can be offset by innovation, economy of scale, earlier delivery Enforces risk transfer in agreement Off-book financing Accounting standards don t allow this It s not free money Private sector is making a profit They do on traditionally delivered projects as well Competitive procurement is conducted Small local contractors can t participate They get involved through subcontracts 24
25 Criticisms of P3s Lack of transparency More oversight and transparency on P3s than traditional Province posts P3 procurement documents, agreements, and VfM reports Public service levels suffer Service levels are defined and measured More accountability and an extended warranty with long term performance based contract t Government is privatizing public services Government owns infrastructure Government remains accountable for delivery of public services 25
26 26
Infrastructure Impact and Challenges P3s in the Water/Wastewater Sector. Stefan Dery, PPP Canada June 8, 2016 Ottawa, ON
Infrastructure Impact and Challenges P3s in the Water/Wastewater Sector Stefan Dery, PPP Canada June 8, 2016 Ottawa, ON Introduction PPP Canada Leading the Government s P3 Agenda Acts as a Source of Expertise
More informationP3 Fundamentals and Best Practices in Resource and Project Management
Achieving better value, timeliness and accountability through public-private partnerships P3 Fundamentals and Best Practices in Resource and Project Management Ottawa, Ontario November 26, 2015 Greg Smith
More informationIntro Public-Private Partnership (P3) Finance Course
Intro Public-Private Partnership (P3) Finance Course Identifying P3 Projects and Knowing the Atmosphere Kylee Anastasi Director, Capital Projects and Infrastructure Advisory PricewaterhouseCoopers LLP
More informationP3 Value for Money Assessment and Project Report. Southeast Stoney Trail (SEST) Ring Road Project Calgary, Alberta
P3 Value for Money Assessment and Project Report Southeast Stoney Trail (SEST) Ring Road Project Calgary, Alberta September 2010 Table of Contents 1. Summary: Using a P3 for Southeast Stoney Trail - did
More informationIntroduction to Alternative Procurement Delivery
Introduction to Alternative Procurement Delivery for Florida Transportation Commission January 24, 2013 TABLE OF CONTENTS Alternative Project Delivery (APD) US Market Overview APD Funding and Financing
More informationVALUE FOR MONEY ASSESSMENT HIGHWAY 407 EAST PHASE 1 PROJECT
VALUE FOR MONEY ASSESSMENT HIGHWAY 407 EAST PHASE 1 PROJECT 1 2 3 4 Highway 407 East Phase 1 Project Artist s rendering Highlights of Highway 407 East Phase 1 Highway 407 East will help to relieve congestion
More informationGovernment of Newfoundland and Labrador. Central Region Long Term Care Project Value for Money Assessment
Government of Newfoundland and Labrador Central Region Long Term Care Project Value for Money Assessment Government of Newfoundland and Labrador Central Region Long Term Care Project Limitations Ernst
More informationGovernment of Newfoundland and Labrador
Government of Newfoundland and Labrador Corner Brook Long Term Care Project Value for Money Report Table of contents 1. Limitations... 3 2. Executive Summary... 4 3. Background... 5 3.1 Project Description
More informationValue for Money Analysis: Choosing the Best Project Delivery Method. Ken L. Smith, PE, CVS -HDR Engineering, Inc.
Value for Money Analysis: Choosing the Best Project Delivery Method Ken L. Smith, PE, CVS -HDR Engineering, Inc. 1 Overview What is a VfM analysis Why is it used Key VfM components and principles Life
More informationVALUE FOR MONEY ASSESSMENT WATERLOO REGION CONSOLIDATED COURTHOUSE MAKING PROJECTS HAPPEN: WATERLOO REGION CONSOLIDATED COURTHOUSE - PAGE 1 -
VALUE FOR MONEY ASSESSMENT WATERLOO REGION CONSOLIDATED COURTHOUSE - PAGE 1 - - PAGE 2 - - PAGE 3 - - PAGE 4 - - PAGE 5 - ARTIST S RENDERING OF THE WATERLOO REGION CONSOLIDATED COURTHOUSE Courtesy of ITS
More informationP3 CONTRACTS. Morteza Farajian, Ph.D. November 2016
P3 CONTRACTS Morteza Farajian, Ph.D. November 2016 What is a Public-Private Partnership (P3)? Overview of P3s Definition P3 Defined A P3 involves a partnership between the public and private sector to
More informationP3 Procurement Lessons Learned: Regina WWTP
P3 Procurement Lessons Learned: Regina WWTP 1 WWTP City of Regina 2 Jayne Krueger and Rob Court Project Awesomeness Group February 25, 2016 3 4 Reasons for Project Tighter effluent limits (December 31,
More informationThe Benefits of P3s. Why do P3s work?
The Benefits of P3s Why do P3s work? P3s are a long-term performance-based approach for procuring public infrastructure where the private sector assumes a major share of the responsibility in terms of
More informationNational Conference of State Legislatures
National Conference of State Legislatures Spring Forum April 22 23, 2009 Pamela Bailey-Campbell Parsons Brinckerhoff What is a PPP? An Agreement Between the Public and Private Sector Parties that Transfers
More informationCanada P3-12-Month Review
Canada greenfield P3-12-month review - deals reaching financial close Total Number of Deals 28 Total Deal Value 1 Federally procured project CAD 2.12bn BC 3 Deals CAD 662m NT 2 Deals CAD 344m AB 1 Deal
More informationVALUE FOR MONEY ASSESSMENT CENTRE FOR ADDICTION AND MENTAL HEALTH CENTRE FOR ADDICTION AND MENTAL HEALTH REDEVELOPMENT PROJECT - PAGE 1 -
VALUE FOR MONEY ASSESSMENT CENTRE FOR ADDICTION AND MENTAL HEALTH - PAGE 1 - - PAGE 1 - - PAGE 2 - Architectural rendering of CAMH Gateway Building Courtesy of Carillion Health Solutions Highlights of
More informationPublic Private Partnerships (PPPs) Projects
Development Process of Public Private Partnerships (PPPs) Projects By Dr Paul H K Ho 1 Disclaimer Funded by Commerce, Industry and Technology Bureau, The Government of the Hong Kong Special Administrative
More informationValue for Money and Project Report
Value for Money and Project Report Biosolids Project City of Greater Sudbury June 2013 Table of Contents Section 1: Executive Summary... 1 1.1 Overview... 1 Section 2: Project Overview... 3 2.1 Project
More informationGovernment of Newfoundland and Labrador. New Adult Mental Health Facility Project Value for Money Assessment
Government of Newfoundland and Labrador New Adult Mental Health Facility Project Value for Money Assessment Government of Newfoundland and Labrador Central Region Long Term Care Project April 2018 Limitations
More informationMethodology for Quantitative Procurement Options Analysis Discussion Paper. Partnerships British Columbia Updated April 2014
Methodology for Quantitative Procurement Options Analysis Discussion Paper Partnerships British Columbia Updated April 2014 Table of Contents Part 1: Overview... 1 1. Purpose... 1 1.1 Policy Context...
More informationPublic-Private Partnerships The Canadian Experience
T h e C a n a d i a n C o u n c i l f o r P u b l i c - P r i v a t e P a r t n e r s h i p s Public-Private Partnerships The Canadian Experience Mark Romoff President & Chief Executive Officer The Expanding
More informationVALUE FOR MONEY ASSESSMENT TORONTO SOUTH DETENTION CENTRE M AK I N G P R O J E C T S H AP P EN: TORONTO SOUTH DETENTION CENTRE - P AG E 1 -
VALUE FOR MONEY ASSESSMENT TORONTO SOUTH DETENTION CENTRE - P AG E 1 - - P AG E 2 - - P AG E 3 - - P AG E 4 - - P AG E 5 - ARTIST S RENDERING OF THE TORONTO SOUTH DETENTION CENTRE Image Courtesy of Integrated
More informationVALUE FOR MONEY ASSESSMENT BLUEWATER HEALTH REDEVELOPMENT PROJECT
VALUE FOR MONEY ASSESSMENT BLUEWATER HEALTH REDEVELOPMENT PROJECT - PAGE 1 - - PAGE 2 - - PAGE 3 - - PAGE 4 - Bluewater Health Artist s Rendering Farrow Partnership Architects Inc. Enhanced Services at
More informationThe 2009 Outsourcing World Summit. Outsourcing and Private Public Partnerships
The 2009 Outsourcing World Summit Outsourcing and Private Public Partnerships Jean-François Poisson, VP/GM SNC-Lavalin ProFac Jfpoisson@snclavalinprofac.com 1 About JF Joined SNC - Lavalin ProFac/Nexacor
More informationApplicability of Spanish PPP experience to Russian market
Applicability of Spanish PPP experience to Russian market Fernando Gutiérrez de Vera Chairman of SEOPAN Concessions Commission 21 October 2008 1 What is SEOPAN? The Association of Major Spanish Contractors
More informationPublic-Private Partnerships (P3)
Public-Private Partnerships () Agenda What is a? How are s structured? De-mystified 1 Defined UK, Canada, USA A Public-Private Partnership (PPP) is a contractual agreement between a public agency (federal,
More informationVALUE FOR MONEY ASSESSMENT TRILLIUM HEALTH PARTNERS CREDIT VALLEY HOSPITAL SITE PRIORITY AREAS REDEVELOPMENT PROJECT
VALUE FOR MONEY ASSESSMENT TRILLIUM HEALTH PARTNERS CREDIT VALLEY HOSPITAL SITE PRIORITY AREAS REDEVELOPMENT PROJECT - PAGE 1 - - PAGE 2 - - PAGE 3 - - PAGE 4 - - PAGE 5 - Credit Valley Hospital Priority
More informationWAYPOINT CENTRE FOR MENTAL HEALTH CARE REDEVELOPMENT PROJECT (FORMERLY MENTAL HEALTH CENTRE PENETANGUISHENE)
VALUE FOR MONEY ASSESSMENT WAYPOINT CENTRE FOR MENTAL HEALTH CARE REDEVELOPMENT PROJECT (FORMERLY MENTAL HEALTH CENTRE PENETANGUISHENE) - PAGE 1 - - PAGE 2 - - PAGE 3 - - PAGE 4 - - PAGE 5 - Waypoint Centre
More informationInfrastructure Ontario We build, manage, finance, and enhance the value of Ontario s public buildings, lands and assets
Infrastructure Ontario We build, manage, finance, and enhance the value of Ontario s public buildings, lands and assets Pension Investment in Infrastructure Ehren Cory Divisional President, Project Delivery
More informationP3 Value for Money Assessment and Project Report. Alberta Schools Alternative Procurement (ASAP) Project Phase II
P3 Value for Money Assessment and Project Report Alberta Schools Alternative Procurement (ASAP) Project Phase II September 2010 Table of Contents 1. Summary: Using a P3 for 10 new schools - did it work?...3
More informationProject Report: Abbotsford Law Courts Project
Project Report: Abbotsford Law Courts Project August 2018 Purpose of this Report The purpose of this report is to provide key information to the public about the Abbotsford Law Courts (ALC) Project (the
More informationNIAGARA HEALTH SYSTEM S NEW HEALTH-CARE COMPLEX
VALUE FOR MONEY ASSESSMENT NIAGARA HEALTH SYSTEM S NEW HEALTH-CARE COMPLEX - PAGE 1 - - PAGE 2 - - PAGE 3 - - PAGE 4 - NIAGARA HEALTH SYSTEM ARTIST S RENDERING Preliminary concept of the new Niagara Health
More informationONTARIO INFRASTRUCTURE AND LANDS CORPORATION. Value for Money Assessment. Sinai Health System Phase 3A Redevelopment Project at Mount Sinai Hospital
ONTARIO INFRASTRUCTURE AND LANDS CORPORATION Value for Money Assessment Sinai Health System Phase 3A Redevelopment Project at Mount Sinai Hospital June 2017 Table of Contents I. EXECUTIVE SUMMARY 2 Ð 2
More informationVALUE FOR MONEY ASSESSMENT WOMEN S COLLEGE HOSPITAL MAKING PROJECTS HAPPEN: WOMEN S COLLEGE HOSPITAL - PAGE 1 -
VALUE FOR MONEY ASSESSMENT WOMEN S COLLEGE HOSPITAL - PAGE 1 - - PAGE 2 - Artist s Rendering of Women s College Hospital Courtesy of Women s College Partnership Highlights of the new Women s College Hospital
More informationSouth Fraser Perimeter Road
Project Report South Fraser Perimeter Road JUNE 2011 www.partnershipsbc.ca Purpose of this Report The purpose of this report is to provide key information about the South Fraser Perimeter Road project.
More informationSUDBURY REGIONAL HOSPITAL REDEVELOPMENT PROJECT
VALUE FOR MONEY ASSESSMENT SUDBURY REGIONAL HOSPITAL REDEVELOPMENT PROJECT - PAGE 1 - - PAGE 2 - - PAGE 3 - - PAGE 4 - Sudbury Regional Hospital Artists Rendering Nicholls Yallowega Belanger Architects
More informationP3 Value for Money Assessment and Project Report. Alberta Schools Alternative Procurement (ASAP) Project Phase 1
P3 Value for Money Assessment and Project Report Alberta Schools Alternative Procurement (ASAP) Project Phase 1 June 2010 Table of Contents 1. Summary: Using a P3 for 18 new schools - did it work? 3 2.
More informationUnderstanding Public-Private Partnerships in Infrastructure September 4, 2013 Frontier Centre for Public Policy Luncheon Regina, Saskatchewan
Understanding Public-Private Partnerships in Infrastructure September 4, 2013 Frontier Centre for Public Policy Luncheon Regina, Saskatchewan Leonard Gilroy Director of Government Reform Reason Foundation
More informationTHE OTTAWA HOSPITAL REGIONAL CANCER PROGRAM REDEVELOPMENT PROJECT
VALUE FOR MONEY ASSESSMENT THE OTTAWA HOSPITAL REGIONAL CANCER PROGRAM REDEVELOPMENT PROJECT - PAGE 1 - - PAGE 2 - - PAGE 3 - - PAGE 4 - - PAGE 5 - - PAGE 6 - - PAGE 7 - The Ottawa Hospital Artist s rendering
More informationPublic Private Partnerships. Virginia GFOA s 2015 Fall Conference. prepared for. by JoAnne Carter, Managing Director.
Public Private Partnerships prepared for Virginia GFOA s 2015 Fall Conference by JoAnne Carter, Managing Director October 21, 2015 4350 North Fairfax Drive, Suite 580 Arlington, Virginia 22203 2015 Public
More informationGOVERNMENT OF NUNAVUT PUBLIC-PRIVATE PARTNERSHIP POLICY
POLICY STATEMENT GOVERNMENT OF NUNAVUT PUBLIC-PRIVATE PARTNERSHIP POLICY The GN believes that a cooperative approach to building infrastructure through public-private partnerships (P3) can be an appropriate,
More informationValue for Money Assessment St. Joseph s Healthcare Hamilton West 5th Campus
Value for Money Assessment St. Joseph s Healthcare Hamilton West 5th Campus - PAGE 1 - - PAGE 2 - - PAGE 3 - - PAGE 4 - - PAGE 5 - - PAGE 6 - Artist s Rendering of the new West 5th Campus Courtesy of Plenary
More informationP3 Value for Money Assessment and Project Report. Alberta Schools Alternative Procurement (ASAP) Project Phase III
P3 Value for Money Assessment and Project Report Alberta Schools Alternative Procurement (ASAP) Project Phase III March 2013 Table of Contents 1. Summary: Using a P3 for 12 new schools - did it work? 3
More informationPublic-private partnerships: opportunities in infrastructure. Wednesday, February 1, 2017
Public-private partnerships: opportunities in infrastructure Wednesday, February 1, 2017 Join the conversation Tweet using #NLawMotion and connect with @NLawGlobal Connect with us on LinkedIn linkedin.com/company/nortonrosefulbright
More informationPPP Project - D4 Motorway CZE. ARI PPP conference. November 27 th,
CZE ARI PPP conference www.pppd4.cz/en November 27 th, 2018 Introduction to Project 32 km greenfield part (DBFOM) 16 km brownfield part (O&M) Public Authority Ministry of Transport of the Czech Republic
More informationFollow-Up on VFM Section 3.05, 2014 Annual Report RECOMMENDATION STATUS OVERVIEW
Chapter 1 Section 1.05 Ministry of Infrastructure (formerly the Ministry of Economic Development, Employment and Infrastructure) Infrastructure Ontario Alternative Financing and Procurement Follow-Up on
More informationPublic Private Partnerships (PPP)- The Financial Perspective October 2014
Public Private Partnerships (PPP)- The Financial Perspective October 2014 The Logo is a trademark of Canadian Imperial Bank of Commerce, used by FirstCaribbean International Bank under license Table of
More informationProject financing: guidelines & best practices
Project Organizing in the construction industry Project financing: guidelines & best practices Padova, March 28th 2014 Palazzo del Bo Put simply: a PPP Project is considered bankable if lenders are willing
More informationINFRASTRUCTURE FINANCE AND PPP
INFRASTRUCTURE FINANCE AND PPP INFRASTRUCTURE FINANCE AND PPP (Course Director: Meg Osius) Program Overview and Objectives In this three-day program participants will become familiar with the wide array
More informationPublic Private Partnerships 101
Public Private Partnerships 101 Tony Elkins, Commercial Director October 6, 2016 Cintra s LBJ Managed Lanes P3, Dallas, Texas The Ferrovial Group Development Over The Entire Infrastructure Lifecycle INFRASTRUCTURE
More informationVALUE FOR MONEY ASSESSMENT THE NEW BRIDGEPOINT HOSPITAL MAKING PROJECTS HAPPEN: THE NEW BRIDGEPOINT HOSPITAL - PAGE 1 -
VALUE FOR MONEY ASSESSMENT THE NEW BRIDGEPOINT HOSPITAL - PAGE 1 - - PAGE 2 - - PAGE 3 - - PAGE 4 - ARTIST S RENDERING OF THE NEW BRIDGEPOINT HOSPITAL Courtesy of Plenary Health Highlights of the new Bridgepoint
More informationInspired by Hinterland Who s Who
Observing Public Private Partnerships David Little, Partner (with analysis by Fergus McDonnell, summer student) September 19, 2013 Inspired by Hinterland Who s Who WhoTube http://www.hww.ca/en/videos/beaver.html
More informationONTARIO INFRASTRUCTURE AND LANDS CORPORATION. Value for Money Assessment. Eglinton Crosstown Light Rail Transit
ONTARIO INFRASTRUCTURE AND LANDS CORPORATION Value for Money Assessment Eglinton Crosstown Light Rail Transit February 2016 Table of Contents I. EXECUTIVE SUMMARY 2 ÐÐ 2 ÐÐAlternative Financing and Procurement
More informationFlorida Transportation Commission PUBLIC-PRIVATE PARTNERSHIPS (P3)
Florida Transportation Commission PUBLIC-PRIVATE PARTNERSHIPS (P3) AGENDA Current Status in Florida Federal Reauthorization/ SEP-15 P-3 Options Overview Key aspects of P-3 Georgia Status P-3 Initiatives
More informationPlenary 2: Public-Private Partnerships. Monday, 12:00 to 13:00
Plenary 2: Public-Private Partnerships Monday, 12:00 to 13:00 Session agenda 1. What is PPP? 2. When are PPPs appropriate and where have they been used? 3. PPI in South Asia 4. Key terms 5. Summary and
More informationUnderstanding Public-Private Partnerships in Infrastructure
Understanding Public-Private Partnerships in Infrastructure 6 February 2014 Dr. Adrian Moore Vice President Reason Foundation What are public-private partnerships (PPPs)? An arrangement between governments
More informationValue for Money Assessment Forensic Services and Coroner s Complex
Value for Money Assessment Forensic Services and Coroner s Complex - PAGE 1 - - PAGE 2 - - PAGE 3 - - PAGE 4 - RENDERING OF THE FORENSIC SERVICES AND CORONER S COMPLEX Image Courtesy of Carillion Secure
More informationPublic-Private Partnerships for Public Buildings. Discussion Materials May 3, 2011
Public-Private Partnerships for Public Buildings Discussion Materials May 3, 2011 P3 Team FY 14 Kick Off Meeting December 11, 2013 What is a Performance Based PPP for Public Buildings? Objectives of the
More informationProject Report: Okanagan Correctional Centre
Project Report: Okanagan Correctional Centre July 2014 Purpose of this Report The purpose of this report is to provide key information to the public about the Okanagan Correctional Centre (OCC) project.
More informationPeople s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing
Consultant s Report Project Number: 49166-001 People s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing PPP Project Cycle Checklists and
More informationEquitable Financial Evaluation Method for Public-Private Partnership Projects *
TSINGHUA SCIENCE AND TECHNOLOGY ISSN 1007-0214 20/25 pp702-707 Volume 13, Number 5, October 2008 Equitable Financial Evaluation Method for Public-Private Partnership Projects * KE Yongjian ( ), LIU Xinping
More informationUndertaking Successful PPPs in Kazakhstan
Undertaking Successful PPPs in Kazakhstan Stephen Watson Head of Service PPP Astana, Kazakhstan 24 October 2013 image courtesy of stock.xchng Contents PPP Principles PPPs in Kazakhstan Renewables in Kazakhstan
More informationParticular Primary Principles of Public Private Partnerships. Doug Sanders, P.Eng., LL.B. November 2, 2011
Particular Primary Principles of Public Private Partnerships Doug Sanders, P.Eng., LL.B. November 2, 2011 Introduction Highways, water and wastewater treatment facilities, buildings, all targets for PPP
More informationPublic Private Partnerships 101
Public Private Partnerships 101 Keep Track of the Money ($$) Know How Your Project Will Be Delivered Dr. John B. Miller The Barchan Foundation, Inc. jbmiller@barchanfoundation.com jbmiller@pattonboggs.com
More informationTHE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 )
THE OFFICE OF TRANSPORTATION PUBLIC PRIVATE PARTNERSHIPS ( OTP3 ) VIRGINIA DEPARTMENT OF TRANSPORTATION ( VDOT ) VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION ( DRPT ) RESPONSE TO REQUEST FOR INFORMATION
More informationPrinciples of Public- Private Infrastructure Delivery
Principles of Public- Private Infrastructure Delivery Johns Hopkins, Carey Business School February 15, 2013 James McKellar Schulich School of Business York University, Toronto, Canada 1 What is infrastructure?
More informationCONFEDERATION LINE PROCUREMENT AS A PUBLIC PRIVATE PARTNERSHIP. Nancy Schepers Deputy City Manager, Planning and Infrastructure City of Ottawa
CONFEDERATION LINE PROCUREMENT AS A PUBLIC PRIVATE PARTNERSHIP Nancy Schepers Deputy City Manager, Planning and Infrastructure City of Ottawa OVERVIEW Project Overview Business Case & Benefits Procurement
More informationAon Infrastructure Solutions
Aon Risk Solutions Aon Infrastructure Solutions Aon Infrastructure Solutions Alternative Project Delivery Risk Advisors Risk. Reinsurance. Human Resources. Empower Results Aon plc is the leading global
More informationBENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS
BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS Regulatory and Institutional Framework for PPPs Does the regulatory framework in your country allow procuring PPPs?. If yes, please specify the relevant regulatory
More informationDelivering Public Private Partnerships in PNG
Port Moresby Chamber of Commerce-INA Public Private Partnership Seminar Pt Moresby, 22 nd February, 2012 1.4 Delivering Public Private Partnerships in PNG Michael Regan Professor of Infrastructure Institute
More informationAGENDA ITEM #9 SUMMARY
AGENDA ITEM #9 SUMMARY Briefing on business considerations and state law requirements for the use of a comprehensive development agreement to develop a transportation project. Strategic Plan Relevance:
More informationAVAILABILITY PAYMENTS What Can We Learn from Surface Transportation Projects? Pamela Bailey Campbell President, LeighFisher
AVAILABILITY PAYMENTS What Can We Learn from Surface Transportation Projects? Pamela Bailey Campbell President, LeighFisher What IS a Availability Payment P3? Direct payments From public sector to private
More informationPUBLIC-PRIVATE PARTNERSHIPS What? Why? Who? How? Where? and Here. I-77 HOT Lanes P3 Project. Lake Norman Transportation Summit March 13, 2013
PUBLIC-PRIVATE PARTNERSHIPS What? Why? Who? How? Where? and Here I-77 HOT Lanes P3 Project Lake Norman Transportation Summit March 13, 2013 Concession Getting past the jargon Turnkey BAFO RFQ BABs AFP
More informationDEVELOPING A FRAMEWORK FOR EX-POST VALUE FOR MONEY ANALYSIS IN PUBLIC PRIVATE PARTNERSHIP PROJECTS
DEVELOPING A FRAMEWORK FOR EX-POST VALUE FOR MONEY ANALYSIS IN PUBLIC PRIVATE PARTNERSHIP PROJECTS Final Report by Qingbin Cui Department of Civil Engineering University of Maryland College Park, MD 20742
More informationLife-Cycle Project Delivery
Life-Cycle Project Delivery A Note for Discussion IndII Round Table 11 th December 2012 Concerns with Conventional Project Delivery Government pays for inputs, not outputs Incentive for time/cost over-runs
More informationPort Development and Growth Trends. In the ASEAN region. 13 th ASEAN Ports and Shipping, Indonesia June 2015 maritime & transport business solutions
Port Development and Growth Trends In the ASEAN region 13 th ASEAN Ports and Shipping, Indonesia June 2015 maritime & transport business solutions Agenda Introduction to MTBS ASEAN Market & Port Developments
More informationPUBLIC-PRIVATE PARTNERSHIPS
BTYGROUP C O S T A N D R I S K A D V I S O R S MODELS AND PROCESSES FOR OVERVIEW INTRODUCTION ABOUT BTY GROUP THE PROCURMENT SPECTRUM SAMPLE DETERMINANTS PPP MODELS PPP PROCESS Q&A + DISCUSSION 2 ABOUT
More informationIPP TRANSACTION ADVISOR TERMS OF REFERENCE
IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction
More informationMs. Laurel Ross, Acting Commission Secretary and Director
Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com
More informationChapter 2 Department of Supply and Services Public-Private Partnership: Eleanor W. Graham Middle School and Moncton North School
Department of Supply and Services - Public-Private Partnership: Chapter 2 Department of Supply and Services Public-Private Partnership: Eleanor W. Graham Middle School and Moncton North School Contents
More informationPPP PUBLIC PRIVATE PARTNERSHIP
PPP PUBLIC PRIVATE PARTNERSHIP Definition by MOF 1. An arrangement between Government and Private party 2. To provide public assets and/or related services for public benefit 3. Private party makes investments
More informationScarborough Subway Extension Project Delivery Options. City Manager Deputy City Manager & Chief Financial Officer
STAFF REPORT ACTION REQUIRED Scarborough Subway Extension Project Delivery Options Date: April 8, 2015 EX5.6 To: From: Wards: Reference Number: Executive Committee City Manager Deputy City Manager & Chief
More informationMillennium Line Broadway Extension Project. Procurement Options Identification Report
Procurement Options Identification Report TABLE OF CONTENTS Millennium Line Broadway Extension Project Page i EXECUTIVE SUMMARY... 1 Purpose and Context... 1 Approach... 1 Recommendation... 2 1 INTRODUCTION...
More informationOpportunity Paper Template
MARCH 2011 Department Address APPENDIX D.1 Opportunity Paper Template Project Name NOTE TO READER: This document is to be used to assess the potential of using P3 procurement for a capital project and
More informationPresentation of the Group
The world s leading infrastructure developer Presentation of the Group Key figures & Global Strategy July 2012 Grupo ACS The world s leading infrastructure & concessions developer Engineering contractor
More informationCreating a Uniquely Global and Integrated Infrastructure Group. October 2017
Creating a Uniquely Global and Integrated Infrastructure Group 1 October 2017 Agenda 1. Transaction Overview 2. Rationale for the Combination 3. Profile of the New HOCHTIEF 4. Key takeaways for ACS 2 Strategic
More informationHeadline Verdana Bold. Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited
Headline Verdana Bold Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited About us Kenneth Legesi Infrastructure and Capital Projects / PPP Advisory Deloitte
More informationInfrastructure Newsletter
11/1/2011 12/1/2011 1/1/2012 2/1/2012 3/1/2012 4/1/2012 5/1/2012 6/1/2012 7/1/2012 8/1/2012 9/1/2012 10/1/2012 11/1/2012 12/1/2012 1/1/2013 2/1/2013 3/1/2013 4/1/2013 5/1/2013 6/1/2013 7/1/2013 8/1/2013
More informationPublic Private Partnerships. Gautrain Rapid Rail Link. in St Petersburg. World Bank Institute. CEO: Gautrain Management Agency
Public Private Partnerships in St Petersburg Gautrain Rapid Rail Link World Bank Institute Jack van der Merwe (Pr.Eng) CEO: Gautrain Management Agency 07-08 December 2007 Why Gauteng... why Gautrain? The
More informationTHE WORLD BANK Procurement Regulations for IPF Borrowers
THE WORLD BANK Procurement Regulations for IPF Borrowers PROCUREMENT IN INVESTMENT PROJECT FINANCING Goods, Works, Non-Consulting and Consulting Services July 2016 Revised November 2017 Revised on November
More informationPublic Private Partnerships. Alberta Infrastructure Guidance Document
P3 Public Private Partnerships Alberta Infrastructure Guidance Document P3 Public Private Partnerships Alberta Infrastructure Guidance Document Excerpt from the February 18, 2003 Speech from the Throne
More informationConstruction Risk in P3 Projects. Timothy J. Murphy Partner McMillan LLP
Construction Risk in P3 Projects Timothy J. Murphy Partner McMillan LLP Risk Transfer in a P3 Key aspects of a P3: Private sector financing Public sector clarity through output specifications Integrated
More informationApplied Workshop on Preparing Infrastructure Projects 21 th - 25 th March Bangkok DAY 2
Applied Workshop on Preparing Infrastructure Projects 21 th - 25 th March Bangkok DAY 2 1 2 Recap of Day 1 Applying central concepts to structuring PPP projects S1: Project screening S2: Defining project
More informationMunicipality of the District of Chester
Municipality of the District of Chester Procurement Policy (P-04) Purpose and Objectives Low and High Value Procurement Directives Alternative Procurement Tender Types Submitting Bid Responses Bid Openings
More informationAn Introduction to Public-Private Partnerships
The Canadian Council for Public- Private Partnerships An Introduction to Public-Private Partnerships Presentation to the Greater Sudbury City Council Tuesday, February 23, 2016 P3 s: What Are They? 2 What
More informationPublic Private Partnerships A New Zealand Overview
Public Private Partnerships A New Zealand Overview PECC Workshop on PPPs 13 December 2004 Presented by Michael Weatherall Partner AK041960066 Public Private Partnerships Terminology Recent PPP projects
More informationDoheny Desalination Project Value-for-Money Analysis. March
Doheny Desalination Project Value-for-Money Analysis March 22 2017 Presentation Overview Team Introductions Goals of the VfM Analysis Financial Model Estimated Monthly Impacts to Typical Households In
More information2015S Utah Solar Request for Proposals Bidders Workshop North Temple Office, Room 130K Salt Lake City UT 84116
2015S Utah Solar Request for Proposals Bidders Workshop North Temple Office, Room 130K Salt Lake City UT 84116 June 3, 2015 3:00PM to 5:00PM Mountain Logistics June 3, 2015 3:00 PM - 5:00 PM (Mountain)
More informationPrivate Financing for Port Infrastructure
Private Financing for Port Infrastructure Presented at AAPA Port Real Estate Issues Workshop Seattle, WA September 18, 2018 Andrée M. Blais, Partner Infrastructure Practice Group Shant S. Boyajian, Associate
More informationPublic Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013
Public Private Partnerships What is That??? Raymond Partridge, Program Manager July 17, 2013 Agenda What is a Public-Private Partnership? P3 Lessons Learned Locality Concerns Pop Quiz: Is this a P3 Project????