1 1. The CRA analysis showed greater trade benefits to the Entergy region from joining SPP rather than joining MISO. Did Entergy re-do the CRA analysis? No. The CRA analysis was a key component of the Entergy Operating Companies analysis and was used as the initial building block. CRA estimated trade benefits for the Entergy region, on a present value basis, of $891 million for the Entergy Region Joins SPP scenario and $737 million for the Entergy Region Joins MISO scenario. As part of the Operating Companies own analysis, three additional pieces of analysis were done for both the SPP and MISO scenarios, which resulted in total estimated production cost benefits of about $1.4 B for the SPP scenario and $1.6 B for the MISO scenario. First, CRA by design did not analyze the savings to the Entergy Operating Companies ( EOCs or OpCos ) of joining either RTO. Rather, CRA estimated the trade benefits that would accrue to the total Entergy region, including other load serving entities and merchant generators (but not including the Cleco region, which CRA analyzed separately.) FERC determined that Entergy would be responsible for identifying the trade benefits that would accrue to the EOCs. Entergy developed an analytical tool that took the CRA outputs in the status quo and change cases, and calculated the trade benefits for each Operating Company for each case; these were summed to arrive at the trade benefits for the Operating Companies as a whole for that scenario. This methodology, which was reviewed with the E-RSC Working Group before it was used, was a bottom up approach to calculating the savings to the EOCs, not a top down allocation of total benefits between the EOCs and the other entities in the Entergy region. The same methodology was applied to the results of both the MISO and SPP scenarios. Total trade benefits accruing to the EOCs in the two scenarios were similar, $619 million in the MISO scenario and $589 million for the SPP scenario. This similarity was not surprising, since the main benefit in both scenarios came from the application of the Day 2 market to the commitment and dispatch of generation in the Entergy footprint, not from importing cheaper power from elsewhere. Second, an adjustment was made to the base case or status quo case used by CRA for both the SPP and MISO scenarios. The status quo case underestimated the trade benefits of joining a Day 2 RTO, because it did not take into account the separation of EAI from the generation pool of the rest of the Operating Companies that would occur as of December 2013 in the absence of all Operating Companies joining a Day 2 RTO. However, in another scenario that CRA ran, the scenario where EAI alone goes to an RTO, CRA ran a status quo case that modeled the effect of the separation of EAI. When this more realistic status quo case is used in the all companies to an RTO scenarios, the trade benefits for both scenarios go up -- MISO trade benefits for all OpCos are $817 million and SPP trade benefits for all OpCos are $747 million. (There was no status quo case run by CRA that modeled the effect of the separation of EMI from the rest of the Operating Companies when EMI leaves the System Agreement in In that sense all of the estimates of production cost benefits from going to a Day 2 market are potentially understated, relative to a status quo world in which EAI and then EMI leave the generation pool that operates through the System Agreement.) Third, additional production cost benefits that were not captured in the CRA analysis were identified and quantified for both RTO scenarios. In 2007, MISO went through an exercise of identifying all the quantifiable benefits from its Day 2 market, in order to determine the value received by its members in return for the MISO administrative fees. This is called the MISO Value Proposition. When MISO reviewed the initial results of the CRA cost benefit studies (the methodology for which was developed

2 before MISO became a recognized alternative for the EOCs) it pointed out that a number of categories of benefits were not captured in the CRA modeling. While MISO developed an estimate of these benefits for the Entergy region, Entergy did not use the MISO estimates. Instead, Entergy reviewed the categories of additional production cost benefits identified by MISO, and used some, but not all, of them, and applied them to both the join MISO and join SPP scenarios. This added $770 million in production cost benefits for the EOCs in the MISO scenario, and added $646 million in production cost benefits for the SPP scenario. The additional benefits are primarily in ancillary services and reserve costs, in which scale economies play a major role; the higher level of benefits for MISO was largely due to scale differences between the two markets. (The MISO Day 2 market with the EOCs included would be at least 50% larger than an SPP Day 2 market with the EOCs included.) With these three additional pieces of analysis, the gross production cost benefits for the SPP scenario on a ten year NPV basis were approximately $1.4 billion; the gross MISO benefits were almost $1.6 billion. This is explained in detail in the Evaluation Report which the EOCs have filed with their retail regulators. 2. Were the additional categories of production cost benefits considered in the original CRA CBA methodology? No, and MISO and SPP both agree that total production cost benefits are not fully captured in the trade benefits analysis. The CRA trade benefits analysis used a production cost simulation model, GE MAPS, to project the fuel and dispatch cost related benefits that would arise as the result of the Operating Companies joining an RTO with a Day 2 market. An operating reserve requirement was modeled but was held constant between the base and change cases. As such, no quantification of the possible reduction in the quantity and cost for providing these services were captured in the CRA trade benefits analysis. CRA noted that installed reserve requirements could possibly decrease as a result of joining an RTO. However, the CRA analysis did not evaluate this benefit for the cases in which the entire Entergy region joined SPP or MISO. The Entergy analysis looked specifically at the impact on the combined EOCs installed reserve requirement as a result of joining a Day 2 market. 3. Were the additional categories of production cost benefits included in the qualitative benefits analysis that accompanied the original CRA FERC study? No. The purpose of that analysis was to identify non-quantifiable benefits such as transparency and independence. It was not designed to identify additional quantifiable production cost benefits. The additional production cost benefits can be and have been quantified for both the existing MISO Day 2 market and the proposed SPP Day 2 market, using a methodology that is described in the technical appendix to the Evaluation Report. 4. Are the anticipated MISO benefits that you cite dependent on the JOA dispute being resolved in MISO s favor? No. The analysis relies on CRA modeling runs that did not assume the existence of a JOA. CRA modeled the Join MISO case by removing wheeling charges and other impediments to trade (referred to as hurdle rates) between MISO and Entergy only on the 1000 MW contract path representing the existing Entergy/Ameren/AECI interconnection. CRA also performed preliminary

3 modeling of the JOA; Entergy did not use those results in its analysis. 5. If Entergy s analysis does not depend on any JOA interpretation, what is the significance of the JOA dispute and why should it be resolved by FERC now? h There are two main reasons. First, regardless of the modeling, there is a JOA in place between MISO and SPP and it is therefore important, even apart from benefits calculations, for the parties to understand the manner in which it will be applied upon the integration of Entergy. Second, as to benefit calculations specifically, the analysis has conservatively assumed that no JOA is in place, but if the MISO's position is accepted, we believe the benefits to joining MISO will be even greater, a point that would be relevant to Entergy's retail regulators in their review of the EOCs proposal to join MISO. 6. How did Entergy estimate the RTO administrative costs that would be allocated to the EOCs as a result of participating in a Day 2 RTO? First, it should be noted that CRA did not estimate administrative costs for the two RTOs; it was given estimates by SPP and MISO. Entergy adjusted both the SPP and the MISO estimates, based on an analysis of the ongoing operating cost of existing Day 2 markets. Based on this analysis, estimates were made for what the ongoing operating cost of the Day 2 market would be for both scenarios, and how much would be allocated to the EOCs, if the EOCs join the MISO, or if the EOCs join the SPP and SPP operates a Day 2 market. In addition, an estimate of the development cost for the SPP Day 2 market based on prior experience of other Day 2 RTOs, was included in the SPP administrative cost estimate. The development cost for the MISO Day 2 market was not an issue because that market is already in place and the costs are known, and in any event will have been largely amortized by the time the EOCs would join. 7. Is it a change of course for the Operating Companies to support joining a Day 2 Market? No. The Operating Companies interest is not new, and is not sudden. Discussion of the benefits of a Day 2 Market goes back as far as 2000, when the Operating Companies sought to establish a Day 2 market within SPP. The Operating Companies also proposed a Day 2 market as part of the SeTrans RTO initiative in Entergy has often explained that the market-driven congestion management of a Day 2 market makes sense for Entergy, given the level of merchant generation in its territory. 8. Why is it called a Day 2 market? The terms Day 1 and Day 2 refer to RTO requirements from FERC Order No There, the FERC required that an RTO must have effective protocols for managing congestion on the first day of operations ( Day One ) and must develop market mechanisms to manage transmission congestion no later than one year after it commences initial operation ( Day 2 ). Although the time frame was later relaxed, Day 2 became a shorthand reference for market-based congestion management including a centralized day ahead energy market.

4 9. SPP s web site says there are 41 physical ties (~14,100 MW capacity) between SPP members and Entergy and 9 physical ties (~4,400 MW capacity) between Entergy and SPP market participants. If MISO has only one direct transmission connection with the Operating Companies, shouldn t SPP be the preferred RTO for the Operating Companies? No. First, the SPP RTO does not have 41 interconnections with the Entergy Operating companies. The cited 41 interconnections with SPP members uses a broad definition of SPP members that includes utilities that are not SPP RTO members and do not take service under the SPP RTO tariff, such as Lafayette Utilities System (LUS) and Cleco. Entergy is an SPP member under that definition. There are 9 interconnections between the Operating Companies and actual RTO market members, and three of these account for 78% of the cited 4,400 MW capacity. Second, regardless of the number of interconnections 41 or 9 adding up their individual thermal capabilities is not meaningful. The sum of thermal ratings is not a measure of transfer capability (i.e., the maximum feasible power transfer from one region to another.) The actual transfer capability between SPP and Entergy is nowhere near 14,000 MW or even 4,400 MW for that matter. Third, even transfer capability by itself is not a particularly meaningful measure. The real question is whether that transfer capability would create savings for EOC customers in a Day 2 market and the measure of that is whether Entergy joining that market would result in increased use of the transfer capability. Based on the results of the CRA studies, average hourly transfers from SPP to the Operating Companies in the status quo case are about 450 MW; in the join SPP change case, that figure goes up to about 650 MW/hour. The fact that there would be little increased usage of the interconnections between SPP and Entergy if the Operating Companies were to join the SPP RTO and participate in a future Day 2 market indicates that transfer capability is not a key driver of benefits for the Operating Companies. 10. In MISO, how do the retail regulators participate in the decision making process, relative to the role of retail regulators in the SPP RSC? The formal structures for regulator participation are different between the two RTOs. The SPP Regional State Committee has specific authority under the SPP tariff on matters having to do with Section 205 filings regarding transmission cost allocation and other allocation-related issues. The retail regulators for the MISO members have an organization, the Organization of MISO States ( OMS ), that is advisory only. In MISO the retail regulators have a vote on the senior committee reporting to the board, the MISO Advisory Committee. Voting rights on that committee are allocated to 9 separate sectors, including IPPs, transmission owners, and transmission-dependent utilities. Retail regulators are one of the nine sectors, with two retail regulators sitting on the Advisory Committee. The OMS provides input to those regulator representatives on Advisory Committee.

5 11. What will happen to the E-RSC if the Operating Companies move to MISO? This scenario is specifically addressed in Attachment X of the Entergy OATT. The E-RSC will terminate if all the Operating Companies join an RTO. If the Operating Companies move to MISO, the Entergy retail regulators will become eligible for membership in the OMS and for election to the MISO Advisory Committee, which has two voting representatives from retail regulators. 12. Is MISO membership shrinking? No. Over the past 5 years, three members of MISO have left that RTO, while an additional 20 have joined. 13. Is Ameren considering leaving MISO? Ameren regularly prepares studies that evaluate the costs and benefits of remaining a MISO member, in part because the Missouri Public Service Commission requires them to do so on a periodic basis. The results of those past studies, the most recent dated November 1, 2010, show a benefit to remaining in MISO. There is no indication that Ameren is leaving MISO. 14. If Ameren decides to leave after the Operating Companies have joined MISO, could the OpCos remain in MISO? Yes. If Ameren withdraws from MISO after the Operating Companies join, the withdrawal would be subject to FERC review and approval. The OpCos would have several alternatives available, including acquiring a transmission contract path. 15. The Operating Companies are presenting this recommendation to all of their retail regulators for approval; does this mean that each regulator has a veto on whether every Operating Company goes to MISO? The Operating Companies believe that each of their regulators will recognize the benefits to customers of moving to MISO, and the advantages of moving together as a system. At this point there is no need to speculate on what would happen if their retail regulators do not all agree on the same course of action. 16. Is MISO heavily influenced by the views and requirements of members who have retail open access (ROA)? Although several MISO members operate in an ROA environment, most operate in traditional, vertically-integrated environments. Of note, both members who have recently left or announced they are leaving MISO for PJM (FirstEnergy and Duke Energy Ohio/Kentucky) operate in an ROA jurisdiction (Ohio.) In contrast, Duke Energy Indiana (Cinergy), which is not in an ROA state, is staying in MISO. Once the departing members leave, 4 MISO Transmission Owners will operate in ROA environments, representing less than 25% of the energy transactions within the MISO region.

6 17. How can the Operating Companies be sure their retail customers will see the benefits of a Day 2 Market? While it is impossible to predict with certainty the level of benefits to be obtained in a Day 2 market, the report discusses the extensive quantitative, qualitative, and conceptual bases for the Operating Companies conclusion that there will be material benefits to their customers from moving to a Day 2 market. All of the production costs benefits estimated in the Entergy calculations presented in the report for both RTOs, if realized, would accrue to the EOCs customers. The fact that MISO has an established, proven Day 2 market, whereas SPP s is still under development, is a key reason that the Operating Companies believe that there is far greater certainty in achieving those benefits by moving to MISO. 18. Do the benefits calculations assume that QF put rights would be eliminated if the EOCs join the MISO market? No. The CRA studies assumed that if the Operating Companies join a Day 2 RTO, the level of energy provided by QFs would not change, but that QFs would schedule the energy in the Day Ahead market. The Evaluation Report explains that this level of production cost benefits from QFs would likely be realized in a Day 2 market even absent formal abolition of the QF put right, as long as the compensation to QFs that choose to continue to put energy to the system reflects all the costs associated with those unscheduled or uninstructed injections of energy. Entergy believes the current MISO settlement rules reflect those costs. To the extent that local regulators modify the avoided cost rate to reflect the QFs effect on the MISO net charges to the EOCs, this should provide an incentive for QFs to schedule or bid in the RTO day-ahead energy market, or enter into bilateral contracts. 19. What will happen to wholesale customers under the current Entergy OATT, including interconnected generators and network customers if the Operating Companies move their transmission facilities to an RTO? Current OATT transmission customers and interconnected generators will still be interconnected to the Entergy Transmission System. The FERC tariff under which the Entergy System operates will shift from the Entergy OATT to the MISO Transmission Tariff. Conversion of service from one tariff to another is FERC jurisdictional; the provisions must be just and reasonable. 20. What will happen to transmission customers that have "Grandfathered Agreements if the Operating Companies join MISO? As with service under the Entergy OATT, conversion of grandfathered transmission agreements ( GFAs ) will be a FERC jurisdictional matter. MISO has extensive experience with Transmission Owners joining the Day 2 market with GFAs. Entergy Transmission and the Operating Companies intend to work with MISO and the GFA counterparties under those agreements to determine how best to honor the GFAs under the MISO transmission tariff.

7 21. If the Operating Companies move to MISO, are you creating a new seam? The move would actually eliminate a seam. Right now Entergy has a seam with SPP and a seam with MISO. If the Operating Companies join MISO, one of those seams -- the MISO/Entergy seam will be eliminated. Likewise, SPP currently has a seam with Entergy and seam with MISO; if the Operating Companies join MISO, that will become one seam between SPP and MISO. 22. MISO has more wind potential than the rest of the country. Does the MISO wind buildout, and in particular the resulting transmission costs, create risk for the Operating Companies customers? The transmission cost allocation methodology that MISO has proposed addresses this issue explicitly. MISO has identified a number of Multi Value Projects (MVPs) to address the windrelated needs of the states in its current footprint. MISO has recognized that these MVP projects were not planned in conjunction with the EOCs and cannot be assumed to provide benefits to the Entergy region. This is reflected in the transmission cost allocation proposal that MISO has prepared for Entergy. Under this proposal, no costs of the already-identified MVP projects would be allocated to the Entergy region for at least the first five years after Operating Companies join MISO; after that, the cost of the already-identified MVP projects can be allocated to the Entergy region Companies only if additional MVP projects are identified that provide enough benefits to the region to justify an allocated share of the costs of both the additional MVP projects and the already-identified MVP projects. 23. The materials accompanying the Entergy press release of April 25, 2011 said that MISO s transmission cost allocation proposal to Entergy was based on costcausative principles and was less risky for Entergy s customers than SPP s transmission cost allocation proposal. What does this mean? MISO and SPP have different methodologies with respect to the allocation of transmission costs. SPP s Highway/Byway methodology automatically socializes the cost of all transmission projects above a certain voltage threshold, while MISO uses 100% socialization only for its MVP projects, which have region-wide benefits. Further, the MISO transmission cost allocation proposal to Entergy recognizes that the already-identified MVP projects were not planned with Entergy in mind and would not provide benefits to the Entergy region sufficient to justify allocating Entergy a share of the costs. Under the MISO proposal, Entergy will not be allocated any share of costs of the already-identified MVP projects unless and until additional MVP projects are identified and placed in service that provide benefits that are large enough to justify the allocation of costs of the previously planned MVP projects as well. In contrast, the SPP transmission tariff has provisions (the Highway/Byway policy) that would allocate certain costs automatically to the Entergy zone, regardless of economic benefit or cost causation. Under this policy, the Entergy region would be allocated a load ratio share of new transmission projects of 300 kv voltage or higher. For lower voltage additions, 1/3 of the costs are socialized and 2/3 are charged to the situs utility zone (the utility building the transmission upgrades on its system.) The SPP proposal to Entergy did not alter this basic policy. Although SPP s proposal

8 focuses on the fact that Entergy would not be responsible for the costs of projects that have already been built or planned, such as the Balanced Portfolio projects, the fact remains that the Entergy region will automatically pick up a load ratio share of future >300 kv projects that come out of the SPP planning process. In addition, under the situs provisions of the Highway/Byway policy, the SPP methodology would potentially charge EOC customers with the bulk of the transmission costs required to make merchant generation on the Entergy system deliverable to network customers elsewhere in SPP. By contrast, under MISO s allocation methodology, the cost of such upgrades would generally be assigned solely to the requesting party. 24. If the EOCs join MISO, will they have to pay a termination fee under the SPP reserve sharing agreement to which they currently belong? No, the SPP Reserve Sharing Agreement does not include any provisions for exit or termination fees. 25. Does joining an RTO mean that the Entergy Region will sever its transmission ties with any surrounding transmission systems? No. The Operating Companies participation in one RTO does not entail the severing of ties with the other RTO or with any other transmission owner with whom the EOCs are interconnected. Joining an RTO with a Day 2 Market does not automatically result in any system topology change. Upon integration, the RTO s transmission planning process will determine if existing tie lines should be upgraded or if additional ties should be constructed. At this time, both SPP and MISO have indicated that no upgrades are necessary in order for the Operating Companies to join the respective RTOs, and thus no additional ties will be required as a result of RTO membership. 26. In your analysis did you assume that the Operating Companies are still part of the Entergy System Agreement? Yes. Entergy s analysis assumes that the System Agreement continues in existence as follows: For study year 2013, the analysis includes participation of all six Entergy OpCos in the System Agreement. In 2014 and 2015, the analysis assumes all OpCos except EAI are members of the System Agreement. From 2016 through 2022, the analysis assumes all OpCos except EAI and EMI are members. The analyses compare a status quo case to several Join an RTO cases. In the status quo case, when an OpCo leaves the System Agreement, it is assumed to operate as a stand alone balancing authority under the Entergy OATT/ICT, with its own unit commitment and dispatch and ancillary services. In the RTO cases, all OpCos are assumed to be part of the centralized Day 2 market. The System Agreement accounting would allocate costs from the RTO market among the remaining System Agreement members; some technical modifications to the System Agreement would likely be required in order to effectuate this. 27. If the Operating Companies join MISO, is a System Agreement still needed? The System Agreement is an agreement to share generation and transmission facilities and an agreement for how to allocate the resulting costs among the Operating Companies. If the

9 Operating Companies are all in a Day 2 market under an RTO transmission tariff, the day to day sharing of generation and transmission facilities takes place automatically under the provisions of the RTO tariff; an Operating Company no longer needs to be in the System Agreement in order to be part of a larger pool of generation. However, those Operating Companies that have not given notice of termination would continue to participate in the System Agreement under a Day 2 market. This means they would, through the System Agreement accounting, continue to share the output of their owned generation units among themselves at cost. They would also continue reserve sharing and joint planning of generation resources within the MISO market. If they do elect to terminate membership pursuant to the applicable provisions of the agreement, such termination would be subject to FERC approval. 28. How does the recommendation to join MISO affect the effort to develop a successor arrangement to the current System Agreement? A proposed successor arrangement was developed as a way to keep EAI generation in a dispatch and cost sharing pool with the remainder of the Operating Companies after EAI terminates its participation in the System Agreement. The proposal was called the CODA Commitment, Operations, and Dispatch Agreement and it was discussed extensively with retail regulators. However, by joining MISO, all of the Operating Companies will be in a much larger generation dispatch pool, the MISO Day 2 market, regardless of whether they continue to participate in the System Agreement. The rationale for the CODA is no longer present, and therefore the CODA proposal has been withdrawn. 29. If the EOCs go to MISO, will the WPP be continued? No. The functions provided by the WPP in particular the simultaneous granting of transmission service and evaluation of generator offers are already performed within the MISO Day 2 market. The Operating Companies may elect to procure bilaterally on a weekly basis, as they did before the WPP was initiated, but the procurement would not involve the simultaneous granting of transmission service. 30. How will the new MISO proposal on capacity markets affect the potential benefits to the EOCs of joining MISO? MISO is considering instituting a forward capacity market. Under this proposal, any entity could continue to self supply its capacity requirements. This means that the EOCs would be able to continue to supply their capacity needs through building or bilateral procurement, and they would have an additional option of procuring through the MISO s forward capacity market (assuming it is approved by FERC), which may provide an opportunity to further reduce costs for customers. Retail regulator jurisdiction over generation resource planning would not be altered by this proposal. 31. Will the EOCs join MISO as one member? Holding companies in MISO typically sign a single Transmission Owner Agreement, and the EOCs would expect to do the same. However, the question of the EOCs membership should not be confused with the issue of zones, such as transmission zones and load settlement zones. The decisions on transmission and load zones will be made after further review and study of the

10 alternatives under the MISO tariff. It is anticipated that a preliminary determination will be completed prior to any Change in Control filings later this year. The question of membership is also different from the issue of load serving entities. The current expectation is that Entergy Arkansas will operate as a separate load serving entity within the MISO market and the other five Operating Companies will continue to operate as a single, combined load serving entity, at least initially. 32. Once the EOCs become members of an RTO, can they exit? Yes, although MISO generally requires at least five years of membership before withdrawal can take place. Both RTOs have exit provisions that obligate departing members to assume responsibility for non-avoidable costs that were incurred on their behalf. Both RTOs require that transmission service agreements between the departing member and other members of the RTO that were in effect at the time of exit must continue for the life of those agreements under the rates, terms, and conditions as if the withdrawal had not occurred. In both cases withdrawal may take place only with FERC review and approval of the terms and conditions of the withdrawal. SPP is in the process of revisiting its withdrawal provisions and any forthcoming changes are unknown at this time. 33. If Cleco elected not to join MISO, would the recommendation change? No. While trade benefits might diminish somewhat if Cleco were not in MISO, they would not be eliminated. For instance, the incentives for QFs to bid or schedule day ahead in a Day 2 market are independent of Cleco s participation in that market. The calculation of the other production cost benefits for the Operating Companies did not assume Cleco s participation. In sum, without Cleco there would still be meaningful benefits to joining MISO relative to the other alternatives.

Seams Cost Allocation: A Flexible Framework to Support Interregional Transmission Planning (Summary of Final Report)

Seams Cost Allocation: A Flexible Framework to Support Interregional Transmission Planning (Summary of Final Report) Seams Cost Allocation: A Flexible Framework to Support Interregional Transmission Planning (Summary of Final Report) Presented at: SPP RSC Quarterly Meeting Presented by: Johannes Pfeifenberger Delphine

More information

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP New Member Cost Allocation Review Process Prepared by: COST ALLOCATION WORKING GROUP TABLE OF CONTENTS 1. HISTORY AND BACKGROUND... 1 2. PURPOSE / GOAL STATEMENT... 3 3. OVERVIEW OF PROCESS... 3 4. NEW

More information

Cost Allocation Principles for Seams Transmission Expansion Projects

Cost Allocation Principles for Seams Transmission Expansion Projects Cost Allocation Principles for Seams Transmission Expansion Projects SPP s seams agreements currently contain requirements for SPP to develop coordinated system plans with its neighbors. The extent and

More information

SPP New Member Communication and Integration Process. Mountain West Transmission Group. Background Information October 2017

SPP New Member Communication and Integration Process. Mountain West Transmission Group. Background Information October 2017 1 SPP New Member Communication and Integration Process Mountain West Transmission Group Background Information October 2017 Contents Introduction... 2 1. Westside Tariff Design... 2 2. Operational Provisions...

More information

MISO Cost Allocation Response. RECBWG February 15, 2018

MISO Cost Allocation Response. RECBWG February 15, 2018 MISO Cost Allocation Response RECBWG February 15, 2018 MISO Cost Allocation Response: February 2018 Context The overall objective of the MISO transmission cost allocation methodology is to align who pays

More information

RR16 - Page 1 of

RR16 - Page 1 of DOCKET NO. APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES PUBLIC UTILITY COMMISSION OF TEXAS DIRECT TESTIMONY of ARTHUR P. FREITAS on behalf of SOUTHWESTERN PUBLIC SERVICE

More information

MISO Planning Process. May 31, 2013

MISO Planning Process. May 31, 2013 MISO Planning Process May 31, 2013 MISO Planning Objectives Fundamental Goal The development of a comprehensive expansion plan that meets reliability needs, policy needs, and economic needs MISO Board

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of.

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of. BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S INTERIM REPORT ON ITS PARTICIPATION IN THE SOUTHWEST POWER POOL REGIONAL TRANSMISSION ORGANIZATION,

More information

History of Cost Allocation within MISO RECB TF. January 29, 2015

History of Cost Allocation within MISO RECB TF. January 29, 2015 History of Cost Allocation within MISO RECB TF January 29, 2015 Cost Allocation FERC Orders, Filings, and Rulings Cost allocation for MISO began with Order 2003 which instituted a pro forma Generator Interconnection

More information

Kind of Service: Electric Class of Service: All Docket No.: U Order No.: 19 Part III. Rate Schedule No. 35 Effective: 3/31/16

Kind of Service: Electric Class of Service: All Docket No.: U Order No.: 19 Part III. Rate Schedule No. 35 Effective: 3/31/16 7 th Revised Sheet No. 35.1 Schedule Sheet 1 of 5 Replacing: 6 th Revised Sheet No. 35.1 35.0. LARGE COGENERATION RIDER 35.1. AVAILABILITY To any customer who takes service under the provisions of any

More information

Cost Allocation Reform Update

Cost Allocation Reform Update Cost Allocation Reform Update Regional Expansion Criteria and Benefits Working Group May 18, 2017 Conditions Precedent for Regional Transmission Investment 1. Increased consensus regarding the issue(s)

More information

Lower Voltage Interregional Economic Projects. RECBWG April 18, 2018

Lower Voltage Interregional Economic Projects. RECBWG April 18, 2018 Lower Voltage Interregional Economic Projects RECBWG April 18, 2018 Interregional Gaps & Inconsistencies 1. No tariff defined cost allocation for sub 345 kv economic projects with PJM 2. Economic projects

More information

Filed with the Iowa Utilities Board on May 31, 2017, E STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD

Filed with the Iowa Utilities Board on May 31, 2017, E STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD IN RE: MIDAMERICAN ENERGY IN RE: DOCKET NOS. E-22269, E-22270, AND E-22271 DOCKET NO. E-22279 (consolidated) ITC MIDWEST LLC BRIEF BY THE MIDCONTINENT

More information

Mountain West Transmission Group (MWTG) Introduction and Process

Mountain West Transmission Group (MWTG) Introduction and Process Mountain West Transmission Group (MWTG) Introduction and Process October 13 Denver, CO October 16 Little Rock, AR 2 Agenda Overview of SPP Overview of the MWTG Members SPP Process New Member Integration

More information

Northern Tier Transmission Group Cost Allocation Principles Work Group. Straw Proposal. May 29, 2007

Northern Tier Transmission Group Cost Allocation Principles Work Group. Straw Proposal. May 29, 2007 Northern Tier Transmission Group Cost Allocation Principles Work Group Straw Proposal May 29, 2007 NTTG Cost Allocation Principles and Process page 1 INTRODUCTION This paper makes a strawman proposal responsive

More information

Two-Tier Allocation of Bid Cost Recovery

Two-Tier Allocation of Bid Cost Recovery Two-Tier Allocation of Bid Cost Recovery Jordan Curry Market Design & Regulatory Policy Developer December 21, 2015 Agenda Time Topic Presenter 1:00 1:05 Introduction Kim Perez 1:05 2:00 Purpose and Background

More information

Cost Allocation for Transmission Infrastructure

Cost Allocation for Transmission Infrastructure USAID/NARUC East Africa Regional Regulatory Partnership Exchange: Cost Allocation for Transmission Infrastructure Andrew Greene Massachusetts Dept. of Public Utilities Energy Facilities Siting Board Dar

More information

The cost allocation principles and methodologies in this Attachment Y cover only

The cost allocation principles and methodologies in this Attachment Y cover only 31.5 Cost Allocation and Cost Recovery 31.5.1 The Scope of Attachment Y Cost Allocation 31.5.1.1 Regulated Responses The cost allocation principles and methodologies in this Attachment Y cover only regulated

More information

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS TRANSMISSION OWNER ZONAL PLACEMENT PROCESS Published July 2017 CONTENTS Section 1: Introduction, Scope & Steps... 1 Subsection A: Introduction To Zonal Placement... 1 Subsection B: Scope... 1 Subsection

More information

SPP PLANNING AND COST ALLOCATION OVERVIEW

SPP PLANNING AND COST ALLOCATION OVERVIEW Benefit/Cost Ratio Primer 101 for the Regional Allocation Review Task Force August 4, 2011 1 SPP PLANNING AND COST ALLOCATION OVERVIEW 2 1 Transmission = 10% Retail Electricity Rates Transmission enables

More information

PJM/MISO Cost Allocation For Economic Upgrades

PJM/MISO Cost Allocation For Economic Upgrades PJM/MISO Cost Allocation For Economic Upgrades Stakeholder Meeting Hilton Baltimore BWI, Baltimore MD May 19, 2008 1 Topics for Discussion Background FERC Order / Schedule (RTO Staffs) Review Internal

More information

83C Questions and Answers

83C Questions and Answers 83C Questions and Answers (1) Section 1.10 Could the Evaluation Team elaborate on what types of changes constitute a new project, including listing additional examples? For example, we have assumed that

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY WILLIAM A. GRANT. on behalf of

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY WILLIAM A. GRANT. on behalf of BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION FOR REVISION OF ITS RETAIL RATES UNDER ADVICE NOTICE NO., SOUTHWESTERN PUBLIC SERVICE

More information

DUKE ENERGY OHIO REQUEST FOR PROPOSALS FOR PEAKING/INTERMEDIATE POWER SUPPLY IN RESPONSE TO OHIO SENATE BILL 221

DUKE ENERGY OHIO REQUEST FOR PROPOSALS FOR PEAKING/INTERMEDIATE POWER SUPPLY IN RESPONSE TO OHIO SENATE BILL 221 DUKE ENERGY OHIO REQUEST FOR PROPOSALS FOR PEAKING/INTERMEDIATE POWER SUPPLY IN RESPONSE TO OHIO SENATE BILL 221 DUKE ENERGY OHIO Table of Contents Section Description Page 1.0 Purpose of Request for Proposals

More information

CONTEMPORARY TRANSMISSION ISSUES:

CONTEMPORARY TRANSMISSION ISSUES: CONTEMPORARY TRANSMISSION ISSUES: COST ALLOCATION SESSION 1:00 PM Wisconsin Public Utility Institute May 26, 2010 Panelist: Greg Levesque, Manager - Regional Relations & Policy, ATC, Don Neumeyer, Engineer,

More information

Transmission System Expansion Cost Allocation Alternatives for Renewable Resources. Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8

Transmission System Expansion Cost Allocation Alternatives for Renewable Resources. Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8 Transmission System Expansion Cost Allocation Alternatives for Renewable Resources Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8 Page 1 Why Page 2 Page 1 of 11 Basic Principles Wind generation

More information

Southwest Power Pool s Balanced Portfolio Approach for Economic Upgrades

Southwest Power Pool s Balanced Portfolio Approach for Economic Upgrades Southwest Power Pool s Balanced Portfolio Approach for Economic Upgrades Presentation by Michael Proctor Chief Economist, Missouri PSC Harvard Electricity Policy Group Chicago, Illinois October 2, 2008

More information

Transmission Cost Allocation

Transmission Cost Allocation Transmission Cost Allocation IPSAC February 2, 2010 John P. Buechler NYISO Executive Regulatory Policy Advisor Background FERC Policy has evolved Order 888 No Planning Requirement for ISOs Order 2000 Planning

More information

MVP Postage Stamp Cost Allocation and Portfolio Requirement Regional Expansion Criteria and Benefits Working Group. September 28, 2017

MVP Postage Stamp Cost Allocation and Portfolio Requirement Regional Expansion Criteria and Benefits Working Group. September 28, 2017 MVP Postage Stamp Cost Allocation and Portfolio Requirement Regional Expansion Criteria and Benefits Working Group September 28, 2017 What is a Multi Value Project? A Multi Value Project is one or more

More information

Southwest Power Pool, Inc. Policy Recommendation for the SPP Board of Directors and Members Committee. March 6, 2018 Mountain West Transmission Group

Southwest Power Pool, Inc. Policy Recommendation for the SPP Board of Directors and Members Committee. March 6, 2018 Mountain West Transmission Group Southwest Power Pool, Inc. Policy for the SPP Board of Directors and Members Committee Policy Area #1 DC Ties March 6, 2018 Mountain West Transmission Group SPP and MWTG anticipate that incorporating the

More information

RATES FOR EXPORT TRANSMISSION SERVICE

RATES FOR EXPORT TRANSMISSION SERVICE Page of RATES FOR EXPORT TRANSMISSION.0 INTRODUCTION The OEB has directed Hydro One Transmission to monitor and report to the Board, at the next rate case, on the functioning of the Export Transmission

More information

Injection / Withdrawal CARP

Injection / Withdrawal CARP Injection / Withdrawal CARP Decisions Note: To inform the RECB Stakeholders at their upcoming September 30 th meeting, this version of the Decision Tree contains the decisions made by CARP (in bold/italics)

More information

SPP s Regional Review of SPP-MISO Coordinated System Plan Recommended Interregional Projects

SPP s Regional Review of SPP-MISO Coordinated System Plan Recommended Interregional Projects SPP s Regional Review of SPP-MISO Coordinated System Plan Recommended Interregional Projects January 4, 2016 SPP Interregional Relations Table of Contents Executive Summary... 2 Introduction... 5 Stakeholder

More information

Rate Schedules and Seams Agreements Tariff

Rate Schedules and Seams Agreements Tariff Rate Schedules and Seams Agreements Tariff Southwest Power Pool Rate Schedules and Seams Agreements Tariff Document Generated On: 8/20/2015 Southwest Power Pool - Rate Schedules and Seams Agreements Tariff

More information

Standard Market Design: FERC Process and Issues

Standard Market Design: FERC Process and Issues Standard Market Design: FERC Process and Issues Richard O Neill and Udi Helman Division of the Chief Economic Advisor, Office of Markets, Tariffs and Rates Federal Energy Regulatory Commission IEEE PES

More information

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $60,516,589

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $60,516,589 Page 1 Formula-based Rate Template Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff Line No. Acct Description Notes Total Transmission A. Zonal Net ATRR 1 Gross ATRR

More information

Costs and Revenue Offsets Item # Description

Costs and Revenue Offsets Item # Description Item # CUS-13 Costs and Description Total Cost Allocation - Total cost (PV of 40-year ATRR's ) are listed as $7,382M on ESWG slide 3. Could we get a breakdown (listing) of how this total was determined.

More information

Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing

Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing I. Day Ahead and Real Time Energy and Ancillary Services Pricing Prices that Accurately Reflect the Marginal Cost of

More information

Public Utility Regulatory Policies Act (PURPA)

Public Utility Regulatory Policies Act (PURPA) Public Utility Regulatory Policies Act (PURPA) National Association of Regulatory Utility Commissioners Staff Subcommittee on Accounting and Finance September 21, 2016 Overview of PURPA What is PURPA?

More information

9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the First Revised Sheet No. 121 ORIGINAL VOLUME NO. I Replacing Original Sheet No. 121 9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. 9.1 Nature of Relationship. Each Participating TO shall enter into

More information

Illinois Power Agency Act and Related Legislation

Illinois Power Agency Act and Related Legislation Craig D. Nelson Vice President Regulatory Affairs & Financial Services November 1, 2007 Topics Implications of Illinois Power Agency Act and related changes to Public Utility Act Expected influence on

More information

Renewable Generation, Transmission and the Energy Marketplace

Renewable Generation, Transmission and the Energy Marketplace Renewable Generation, Transmission and the Energy Marketplace Portfolio Development and Business Case October 25, 2012 Overview Multi Value Projects reflect the transformation of the MISO planning process

More information

Appendix B-2. Term Sheet for Tolling Agreements. for For

Appendix B-2. Term Sheet for Tolling Agreements. for For Appendix B-2 Term Sheet for Tolling Agreements for For 2015 Request For Proposals For Long-Term Developmental Combined-Cycle Gas Turbineand Existing Capacity and Energy Resources in WOTAB DRAFT Entergy

More information

Financial Transmission and Auction Revenue Rights

Financial Transmission and Auction Revenue Rights Section 13 FTRs and ARRs Financial Transmission and Auction Revenue Rights In an LMP market, the lowest cost generation is dispatched to meet the load, subject to the ability of the transmission system

More information

MISO SCHEDULE 38 SCHEDULES SCHEDULE 38. MTEP Project Cost Recovery for DEO and DEK

MISO SCHEDULE 38 SCHEDULES SCHEDULE 38. MTEP Project Cost Recovery for DEO and DEK SCHEDULE 38 I. Definitions Any capitalized terms not defined in this Schedule 38 shall have the meaning as defined in Module A of the Tariff. Definitions for this Schedule 38 are as follows: A. ATSI American

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/15 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

10-YEAR COSTS AND BENEFITS TO SPP MEMBERS OF INTEGRATING MOUNTAIN WEST TRANSMISSION GROUP Quantitative Analysis of Costs and Benefits

10-YEAR COSTS AND BENEFITS TO SPP MEMBERS OF INTEGRATING MOUNTAIN WEST TRANSMISSION GROUP Quantitative Analysis of Costs and Benefits 10-YEAR COSTS AND BENEFITS TO SPP MEMBERS OF INTEGRATING MOUNTAIN WEST TRANSMISSION GROUP Quantitative Analysis of Costs and Benefits Published on March 19, 2018 By SPP Staff REVISION HISTORY DATE OR VERSION

More information

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618

Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff. Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618 Page 1 Formula-based Rate Template Calculate Net Annual Transmission Revenue Requirements (ATRR) and Rates for SPP Tariff Line Acct Description Notes Total Transmission A. Zonal Net ATRR 1 Gross ATRR $48,861,618

More information

ARRs and FTRs MISO Training

ARRs and FTRs MISO Training MISO Training Level 200 Auction Revenue Rights and Financial Transmission Rights Last material update: 07/09/2015 Course Content and Disclaimer 2 Course Description 1 2 3 4 This is a Level 200 overview

More information

NORTHEASTERN ISO/RTO PLANNING COORDINATION PROTOCOL DESIGNATION OF FILING PARTY

NORTHEASTERN ISO/RTO PLANNING COORDINATION PROTOCOL DESIGNATION OF FILING PARTY NORTHEASTERN ISO/RTO PLANNING COORDINATION PROTOCOL DESIGNATION OF FILING PARTY The Northeastern ISO/RTO Planning Coordination Protocol among PJM Interconnection, L.L.C. ( PJM ), the New York Independent

More information

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696

1 GROSS REVENUE REQUIREMENT (page 3, line 31, column 5) $ 121,165,696 Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/14 Utilizing FERC Form 1 Data Line Allocated No. Amount 1 GROSS REVENUE REQUIREMENT (page 3, line

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southwest Power Pool, Inc., ) Complainant, ) ) v. ) Docket No. EL14-21-000 ) Midcontinent Independent System ) Operator, Inc. )

More information

NYISO Posting for FERC Order 890 Describing the NYISO Planning Process

NYISO Posting for FERC Order 890 Describing the NYISO Planning Process NYISO Posting for FERC Order 890 Describing the NYISO Planning Process September 14, 2007 ` NYISO Posting for FERC Order 890 Filing DRAFT Table of Contents Section: Page No: I. Cover Memo - Draft OATT

More information

Participant Funding: The SeTrans Proposal. Bruce Edelston Director, Policy and Planning Southern Company

Participant Funding: The SeTrans Proposal. Bruce Edelston Director, Policy and Planning Southern Company Participant Funding: The SeTrans Proposal Bruce Edelston Director, Policy and Planning Southern Company Presentation to HEPG December 11, 2003 Point Clear, AL 1 SeTrans Participants CLECO Dalton Utilities

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/17 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

Summary of FERC White Paper on Bulk Power Market Design and Related Aspects of Senate Energy Bill No. S. 14

Summary of FERC White Paper on Bulk Power Market Design and Related Aspects of Senate Energy Bill No. S. 14 Summary of FERC White Paper on Bulk Power Market Design and Related Aspects of Senate Energy Bill No. S. 14 Introduction On April 28, 2003, the Federal Energy Regulatory Commission (FERC or Commission)

More information

Resource Adequacy. WPUI April 19, 2018

Resource Adequacy. WPUI April 19, 2018 WPUI April 19, 2018 Resource Adequacy What is the interplay between states resource adequacy power per the Federal Power Act and the RTO s Reliability Coordinator role? Is a state Integrated Resource Plan

More information

THE DEPARTMENT OF ENERGY S GRID RESILIENCE PRICING PROPOSAL: A COST ANALYSIS

THE DEPARTMENT OF ENERGY S GRID RESILIENCE PRICING PROPOSAL: A COST ANALYSIS THE DEPARTMENT OF ENERGY S GRID RESILIENCE PRICING PROPOSAL: A COST ANALYSIS BY ROBBIE ORVIS, ANDREW GOGGINS, BRENDAN PIERPONT, MAREN WENZEL, LAURA SANCHEZ, AND DAVID POSNER OCTOBER 2017 The Department

More information

153 FERC 61,249 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER REJECTING TARIFF REVISIONS. (Issued November 30, 2015)

153 FERC 61,249 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER REJECTING TARIFF REVISIONS. (Issued November 30, 2015) 153 FERC 61,249 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable. Southwest Power Pool,

More information

Transmission Congestion Contracts (TCCs) Provide Transmission Price Certainty

Transmission Congestion Contracts (TCCs) Provide Transmission Price Certainty Transmission Congestion Contracts (TCCs) Provide Transmission Price Certainty Arthur L. Desell Manager Resource Reliability New York Power Pool 1999 PICA Conference Santa Clara May 20, 1999 Locational

More information

ALBERTA MARKET RE-DESIGN CAPACITY MARKET DESIGN AND IMPLEMENTATION

ALBERTA MARKET RE-DESIGN CAPACITY MARKET DESIGN AND IMPLEMENTATION ALBERTA MARKET RE-DESIGN CAPACITY MARKET DESIGN AND IMPLEMENTATION November 30, 2016 www.poweradvisoryllc.com To: Power Advisory Clients and Colleagues From: Kris Aksomitis, Jason Chee-Aloy, Brenda Marshall,

More information

Chief Executive Officer and General Manager s Report and Recommendation. on Open Access Transmission Tariff. March 16, 2017 Volume 1

Chief Executive Officer and General Manager s Report and Recommendation. on Open Access Transmission Tariff. March 16, 2017 Volume 1 Chief Executive Officer and General Manager s Report and Recommendation on Open Access Transmission Tariff March 16, 2017 Volume 1 Powering forward. Together. GAF 1406-16C Chief Executive Officer and General

More information

Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts

Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts 1. Commission Directives to Submit a Market Redesign Plan The direct origin of the requirement that the CAISO

More information

Gray proposed revisions for CEE, Renewable Generator Exemption, Municipal Utilities Exemption

Gray proposed revisions for CEE, Renewable Generator Exemption, Municipal Utilities Exemption Yellow pending revisions filed 8/6/12 in ER12-2414-000 [Compliance revisions filed in response to Commission Order 139 FERC 61,244 (2012) in Docket EL11-42] Green pending revisions filed 10/11/12 in ER13-102-000

More information

EIPC Roll-Up Report & Scenarios

EIPC Roll-Up Report & Scenarios EIPC Roll-Up Report & Scenarios Zach Smith Director, Transmission Planning New York Independent System Operator IPTF/EGCWG/ESPWG Meeting January 6, 2014 2013 New York Independent System Operator, Inc.

More information

Regional Cost Allocation Review (RCAR II) July 11, 2016 SPP Regional Cost Allocation Review Report for RCAR II

Regional Cost Allocation Review (RCAR II) July 11, 2016 SPP Regional Cost Allocation Review Report for RCAR II Regional Cost Allocation Review (RCAR II) July 11, 2016 SPP Regional Cost Allocation Review Report for RCAR II 1 Table of Contents EXECUTIVE SUMMARY...5 BACKGROUND...7 SECTION 1: OVERVIEW OF THE RARTF

More information

Comments of PacifiCorp on the Consolidated EIM Initiatives

Comments of PacifiCorp on the Consolidated EIM Initiatives Comments of PacifiCorp on the Consolidated EIM Initiatives Submitted by Company Date Submitted Christine Kirsten christine.kirsten@pacificorp.com 916-207-4693 PacifiCorp June 30, 2017 Introduction PacifiCorp

More information

Financial Transmission and Auction Revenue Rights

Financial Transmission and Auction Revenue Rights Section 13 FTRs and ARRs Financial Transmission and Auction Revenue Rights In an LMP market, the lowest cost generation is dispatched to meet the load, subject to the ability of the transmission system

More information

FTR Credit Requirements Prevailing Flow Paths Affected by Transmission System Upgrades

FTR Credit Requirements Prevailing Flow Paths Affected by Transmission System Upgrades FTR Credit Requirements Prevailing Flow Paths Affected by Transmission System Upgrades Hal Loomis Manager, Credit Markets & Reliability Committee December 7, 2017 Credit Risk Exposure Issue Description

More information

Entergy Arkansas, Inc Integrated Resource Plan. Follow-Up Materials June 18, 2018 entergy-arkansas.com/irp

Entergy Arkansas, Inc Integrated Resource Plan. Follow-Up Materials June 18, 2018 entergy-arkansas.com/irp Entergy Arkansas, Inc. 2018 Integrated Resource Plan Follow-Up Materials June 18, 2018 entergy-arkansas.com/irp Follow-up Materials to the 2018 IRP Stakeholder Meeting The following information is provided

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION COMMENTS OF POTOMAC ECONOMICS, LTD.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION COMMENTS OF POTOMAC ECONOMICS, LTD. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Uplift Cost Allocation and Transparency ) in Markets Operated by Regional ) Docket No. RM17-2-000 Transmission Organizations and

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2016 Utilizing FERC Form 1 Data Northern Indiana Public Service Company Line Allocated No. Amount

More information

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data

Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Attachment O Page 1 of 5 Formula Rate - Non-Levelized Rate Formula Template For the 12 months ended 12/31/2019 Utilizing FERC Form 1 Data Northern Indiana Public Service Company LLC Line Allocated No.

More information

Wholesale Energy Markets Overview. Jeff Klarer Market Strategist

Wholesale Energy Markets Overview. Jeff Klarer Market Strategist Wholesale Energy Markets Overview Jeff Klarer Market Strategist Wisconsin Electric Utility Fuel Rules (PSC-116) Fuel Cost Components Fuel for generation (coal, natural gas, uranium, etc.) Energy market

More information

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. First Revision of Sheet No. 38.1 P.S.C.U. No. 50 Canceling Original Sheet No. 38.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 38 STATE OF UTAH Qualifying Facility Procedures PREFACE: 1. The process

More information

Technical Conference. August 3, 2009

Technical Conference. August 3, 2009 Technical Conference August 3, 2009 1 2 Agenda Welcome Background and Overview Considerations for Participation by Third- Party Sellers Survey Results Next Steps 3 Background and Overview 4 Background

More information

5.2 Transmission Congestion Credit Calculation Eligibility.

5.2 Transmission Congestion Credit Calculation Eligibility. 5.2 Transmission Congestion culation. 5.2.1 Eligibility. (a) Except as provided in Section 5.2.1(b), each FTR Holder shall receive as a Transmission Congestion Credit a proportional share of the total

More information

Qualifying Facility Avoided Cost Procedures

Qualifying Facility Avoided Cost Procedures I.P.U.C. No. 1 Original Sheet No. 38.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 38 STATE OF IDAHO Qualifying Facility Avoided Cost Procedures PREFACE: 1. The process outlined in this Schedule

More information

Congestion Revenue Rights Settlement Rule

Congestion Revenue Rights Settlement Rule California Independent System Operator Corporation Congestion Revenue Rights Settlement Rule Department of Market Monitoring August 18, 2009 I. Background Under nodal convergence bidding, the California

More information

FERC Update RMEL ~ Keystone 2018

FERC Update RMEL ~ Keystone 2018 FERC Update RMEL ~ Keystone 2018 Bill Derasmo Troutman Sanders william.derasmo@troutman.com May 21, 2018 Introduction Bill Derasmo Partner, Troutman Sanders 20 + years experience with energy regulatory

More information

Appendix C-2 DRAFT. Entergy Services, Inc. May 6July 13, 2016

Appendix C-2 DRAFT. Entergy Services, Inc. May 6July 13, 2016 Appendix C-2 Preliminary Due Diligence List (Existing Resources) For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy New Orleans, Inc. DRAFT Entergy Services, Inc. May

More information

ATTACHMENT H: Large Generator Interconnection Agreement (LGIA) STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT

ATTACHMENT H: Large Generator Interconnection Agreement (LGIA) STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT ATTACHMENT H: Large Generator Interconnection Agreement (LGIA) STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT THIS STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT ( Agreement ) is made and entered

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404

More information

Easier Said Than Done: The Continuing Saga of Transmission Cost Allocation

Easier Said Than Done: The Continuing Saga of Transmission Cost Allocation Easier Said Than Done: The Continuing Saga of Transmission Cost Allocation Presented by: Johannes Pfeifenberger Presented to: Harvard Electricity Policy Group February 24, 2011 www.brattle.com Antitrust/Competition

More information

RSC Workshop on the Integration of WAPA, Basin, Heartland. April 4, 2014

RSC Workshop on the Integration of WAPA, Basin, Heartland. April 4, 2014 RSC Workshop on the Integration of WAPA, Basin, Heartland April 4, 2014 AGENDA I. Impact of IS Joining SPP II. Cost Allocation III. Potential Clarification to RSC Bylaws IV. SPP Bylaw and Membership Agreement

More information

Benefits Determination and Cost Allocation

Benefits Determination and Cost Allocation Benefits Determination and Cost Allocation Johannes Pfeifenberger Transmission Executive Forum West 2012 Meeting Public Policy Objectives through Transmission Investment San Diego, CA October 22, 2012

More information

Regulatory Status Report

Regulatory Status Report FERC or State Jurisdiction: FERC AD10-13 Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric Storage Technologies On July 18, 2013, FERC issued Order No. 784,

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: June 14, 2018 Re: Decision on congestion

More information

MARKET PARTICIPANT GUIDE: SPP 2016 CONGESTION HEDGING

MARKET PARTICIPANT GUIDE: SPP 2016 CONGESTION HEDGING MARKET PARTICIPANT GUIDE: SPP 2016 CONGESTION HEDGING Published: December 16, 2015 By: Congestion Hedging Team; TCR Markets REVISION HISTORY VERSION NUMBER AUTHOR CHANGE DESCRIPTION COMMENTS 1.0 Congestion

More information

Proposed Reserve Market Enhancements

Proposed Reserve Market Enhancements Proposed Reserve Market Enhancements Energy Price Formation Senior Task Force December 14, 2018 Comprehensive Reserve Pricing Reform The PJM Board has determined that a comprehensive package inclusive

More information

Financial Transmission and Auction Revenue Rights

Financial Transmission and Auction Revenue Rights Section 13 FTRs and ARRs Financial Transmission and Auction Revenue Rights In an LMP market, the lowest cost generation is dispatched to meet the load, subject to the ability of the transmission system

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION REQUESTING: ( ACKNOWLEDGEMENT OF ITS FILING OF THE 0 ANNUAL RENEWABLE ENERGY PORTFOLIO

More information

DRAFT DECEMBER 5, 2012 TRANSMISSION PLANNING AND COST ALLOCATON REQUIREMENTS OF ORDER NO. 1000

DRAFT DECEMBER 5, 2012 TRANSMISSION PLANNING AND COST ALLOCATON REQUIREMENTS OF ORDER NO. 1000 TRANSMISSION PLANNING AND COST ALLOCATON REQUIREMENTS OF ORDER NO. 1000 10. Consideration of Transmission Needs Driven by Public Policy Requirements 10.1 Procedures for the Consideration of Transmission

More information

ECONOMIC IMPACT OF THE WITHDRAWAL AGREEMENT

ECONOMIC IMPACT OF THE WITHDRAWAL AGREEMENT ECONOMIC IMPACT OF THE WITHDRAWAL AGREEMENT Written Evidence to Treasury Committee ahead of the Oral Evidence Session: The UK's economic relationship with the Prof. Jagjit S. Chadha, Director, National

More information

Financial Transmission and Auction Revenue Rights

Financial Transmission and Auction Revenue Rights Section 13 FTRs and ARRs Financial Transmission and Auction Revenue Rights In an LMP market, the lowest cost generation is dispatched to meet the load, subject to the ability of the transmission system

More information

Informational Filing of Midwest Independent Transmission System Operator, Inc. s Independent Market Monitor

Informational Filing of Midwest Independent Transmission System Operator, Inc. s Independent Market Monitor Potomac Economics, Ltd. 9990 Fairfax Boulevard, Suite 560 Telephone: 703-383-0720 Fairfax, Virginia 22030 Facsimile: 703-383-0796 Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

October 8, SPP Regional Cost Allocation Review Report

October 8, SPP Regional Cost Allocation Review Report Regional Cost Allocation Review October 8, 2013 SPP Regional Cost Allocation Review Report 1 Table of Contents EXECUTIVE SUMMARY...5 BACKGROUND...7 SECTION 1: OVERVIEW OF THE RARTF AND RCAR REVIEW...8

More information

Appendix C-2. Entergy Arkansas, Inc. May 26, 2016

Appendix C-2. Entergy Arkansas, Inc. May 26, 2016 Appendix C-2 Preliminary Due Diligence List (Existing Resources) For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Arkansas, Inc. Entergy Arkansas, Inc. May 26, 2016

More information

161 FERC 61,004 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

161 FERC 61,004 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 161 FERC 61,004 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Neil Chatterjee, Chairman; Cheryl A. LaFleur, and Robert F. Powelson. Midcontinent Independent System

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA COMMENTS OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA COMMENTS OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Develop an Electricity Integrated Resource Planning Framework and to Coordinate and Refine Long-Term Procurement

More information