RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Size: px
Start display at page:

Download "RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF Report No: RENOVATING AND STRENGTHENING PUBLIC MANAGEMENT (PRÓ-GESTÃO) TECHNICAL ASSISTANCE LOAN July 28, 2010 TO THE STATE OF RIO DE JANEIRO, BRAZIL WITH THE GUARANTEE OF THE FEDERATIVE REPUBLIC OF BRAZIL February 24, 2011 Poverty Reduction and Economic Management Unit Country Management Unit for Brazil Latin America and Caribbean Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

2 ABBREVIATIONS AND ACRONYMS DRM GORJ IDEB INEA MEC RioPrevidência SEPLAG SEEDUC SESDEC TAL TERV UGP UPA Disaster Risk Management Government of Rio de Janeiro Basic Education Development Index State Environment Institute Ministry of Education State of Rio de Janeiro Single Social Security Fund State Secretariat of Planning and Management State Secretariat of Education State Secretariat of Health and Public Safety Technical Assistance Loan Waiting time for patients with green risk level classification (Tempo de espera do paciente classificado como risco verde desde o acolhimento) Project Management Unit Urgent Care Facility (Unidade de Pronto Atendimento) Regional Vice President: Country Director: Sector Manager / Acting Sector Director: Sector Leader: Task Team Leader: Pamela Cox Makhtar Diop Veronica Zavala / Louise Cord Pablo Fajnzylber Tarsila Velloso 2

3 BRAZIL RIO DE JANEIRO RENOVATING AND STRENGTHENING PUBLIC MANAGEMENT TECHNICAL ASSISTANCE PROJECT P CONTENTS Page A. SUMMARY... 6 B. PROJECT STATUS... 9 C. PROPOSED CHANGES... 9 D. APPRAISAL SUMMARY ANNEX 1: RESULTS FRAMEWORK AND MONITORING

4 RIO DE JANEIRO RENOVATING AND STRENGTHENING PUBLIC MANAGEMENT TECHNICAL ASSISTANCE PROJECT RESTRUCTURING PAPER SUMMARY 1. The proposed restructuring seeks to introduce new activities under Component 1 of the project aimed at strengthening the government s for disaster risk prevention and reduction and to include an additional intermediate outcome indicator to measure the effects of the new activities. These modifications are proposed in response to a request by the Government of Rio de Janeiro (GORJ) to allocate funds under the existing project to its utmost priority of improving its capacity to prevent and respond to disasters. No additional changes are proposed and this restructuring would not entail changes to the legal agreement. 2. Background: The State of Rio de Janeiro is Brazil s third largest state in terms of population (16 million people; roughly 8% of Brazil s population), and is second only to São Paulo in terms of state Gross Domestic Product (GDP). After a period in which Rio s share of the country s population decreased from 7.9 percent in 1970 to 6.8 percent in 2001 and its share of the country s GDP declined from 14.8 to 8.1 percent, growth has recovered significantly in recent years due to rapid growth in the petroleum, steel and other industries. Such renewed growth and increased urbanization is of special concern in Rio since the state s territory is spatially constrained and environmentally fragile, implicating that future growth, if unplanned, could take place in an environment with high vulnerability to natural disasters such as flooding and landslides. The extensive urban occupation pattern in lowlands, floodplains, and river banks demands large investments in drainage and flood protection, and exposes residents to recurrent risks of floods in the rainy seasons. At the same time, the informal occupation of hills and mountains, and the subsequent deforestation of these areas, create an increase in rainwater run-off and the accumulation of water in the lowlands, aggravating floods and severe landslide risks. 3. These disaster risks can have negative impacts on the population as well as on the state economy. In the last four years alone, disasters displaced more than 100,000 families in the state of Rio de Janeiro, and had a direct impact on the livelihoods of the affected families and the deterioration of the housing deficit in the state. Disaster risks have yet to be clearly identified and mapped in many areas of the state of Rio de Janeiro. These inter-linked problems of environmental degradation, irregular urban occupation, and disaster risk affect poor residents most heavily. 4. Recent tragedies in the state of Rio de Janeiro have exposed the vulnerability of several regions of the state, especially the mountainous area Região Serrana. They have also exposed the weaknesses of prevention and reduction in the state and the lack 6

5 of capacity to properly manage disasters. Located 100 Km away from the state capital, the Região Serrana encompasses eight municipalities within an area of approximately 3,100 km 2 and a total population of close to 700,000 inhabitants. The region s economy relies mostly on vegetable crops, cloth manufacturing and tourism. On the second week of January 2011, summer storms dumped more than a month's worth of rain on the mountain slopes north of Rio in a matter of hours, which resulted in large landslides, rivers overflows and floods that caused significant destruction in the region and especially to the cities of Petrópolis, Teresópolis and Nova Friburgo 1. Roads of all sizes collapsed and left communities in complete isolation, while hundreds of thousands of households were without energy and drinkable water for days. A week after the disasters, several communities could still only be reached by helicopter or off-road automobiles. The total death count at the present time surpassed 900 people in six cities and another 405 are missing. Around 30,000 people had to leave their homes and half of them completely lost their houses. Table 1 below shows the number of deaths by affected city. Table 1 - Affected Cities and Key Data City Deaths Population Area (km2) GDP (thousand R$) GDP per capita (R$) Nova Friburgo , ,266,242 12,710 Teresópolis , ,596,477 13,029 Petropolis , ,126,961 17,370 Sumidouro 21 14, ,999 12,287 São José do Vale do Rio Preto 4 20, ,966 7,964 Bom Jardim 1 25, ,925 10, Total economic impacts have not yet been estimated, but they are expected to be significant. Agriculture production, which supports 17,000 families and generates R$850 million per year (US$ million), was devastated and at least 50% of the crops were destroyed. Manufacturing industries were also deeply harmed, and the state s industries federation estimates around R$150 million (US$85 million) in losses. Families have sheltered in stadiums and in some public schools that were less damaged. From 31 state schools inspected by the Department of Education, 70 percent were moderately or heavily damaged and will need repairs before school year starts. The municipality of Teresópolis alone has estimated total cost of reconstruction around R$500 million (US$285 million). Moreover, additional expenditures in support of families who have lost their homes in an estimate of R$1 million per month will also be made until families have been resettled. Food shortage, caused by decreased supply and collapse of the transport system, has made food prices sky-rocket, further affecting population s welfare. 6. In terms of comparing the costs of prevention and reconstruction, a recent World Bank publication entitled Natural Hazards, UnNatural Disasters: The Economics of Effective Prevention (2010) which examined four case studies in depth, has revealed that the estimated benefit-cost ratio varies from 1.5 to 5.7 (with rates above 1.0 indicating that prevention pays). Similarly, literature from the United Nations has demonstrated that 1 The State Environment Institute (INEA) calculated that such a heavy rain probably occurs each 350 years in the city. 7

6 each additional dollar invested in prevention and mitigation activities is equivalent to seven dollars of expenditures in post-disaster activities. 7. The Government of Rio de Janeiro has recognized the severity of the challenge imposed by these disasters and is undertaking actions to address them proactively. The first issue is the institutional framework of disaster risk management (DRM) 2, which tends to be better structured (and often more focused on) for disaster response than it is for risk prevention and mitigation. In Rio de Janeiro, the state s civil defense supports municipal entities when they become overwhelmed by the needs of responding to an emergency. There is no coordinating agency for risk reduction and prevention at the state level, and efforts in this regard are scattered among five state secretariats, which carry out independent DRM functions. 3 These piecemeal efforts need an institutional framework for improvement and continuity. The municipality of Rio de Janeiro has taken the largest steps forward with the establishment of two leading agencies: GeoRio and Rio Aguas. These institutions have provided technical assistance to other municipalities though an agreement with the state. GeoRio champions DRM at the municipal level in the city of Rio de Janeiro and has mapped the entire municipality. Other municipalities have not gotten this far and some have no experience in DRM. 8. A second aspect to be addresses is that although the government has institutions in place for disaster risk prevention and reduction, they have not been as effective as needed. Notwithstanding having an advanced disaster response system, the State Civil Defense System (Sistema Estadual de Defesa Civil, SIEDEC), the state has experience significant difficulty in dealing with the recent disaster. While coordination between state agencies and their counterparts at the municipal level is good, the ability of each municipality to respond to a disaster differs. Today, only the municipality of Rio de Janeiro has the capacity to respond to disasters, while nearly all other municipalities rely on the financial and operational support of the state when a disaster occurs. As a response, the state is moving toward a more proactive approach in the area of disaster risk management, 4 establishing an inter-institutional disaster risk management working group formed by state organizations. 2 On the federal level, the Ministry of National Integration (Ministério da Integração Nacional) is in charge of response through the National Policy of Civil Defense (Política Nacional de Defesa Civil), while the Ministry of Cities (Ministério das Cidades) is responsible for policies, regulations and incentive programs related to housing, land use and urban development, which contribute to risk mitigation and reduction. As for municipalities, they are responsible for the implementation and enforcement of land use planning and urban development regulations/control. 3 The Secretariat of Works (Secretaria de Obras) is in charge of implementing risk reduction and mitigation projects. The Department of Mineral Resources (Departamento de Recursos Minerais) is in charge of mapping for landslides. The State Secretariat for Social Action (Secretaria de Estado de Ação Social) provides resettlement and social services support after a disaster has taken place. The Secretariat of Housing (Secretaria de Habitação) and its affiliated State Housing Company (Companhia Estadual de Habitação do Estado) are in charge of housing policy including facilitating supply post-disaster. INEA, the Environmental Institute (Instituto Estadual do Ambiente) affiliated with the State Secretariat of Environment (Secretaria de Meio Ambiente), is in charge of mapping and monitoring flood zones. 4 The difference between disaster management and disaster risk management is that disaster management focuses on the response to an event, while disaster risk management focuses on activities to prevent or minimize the negative effects of an event, in addition to preparedness and post-disaster response. 8

7 9. The GORJ recognizes the existing fragilities and the need for swift action to improve the state s capacity for disaster risk prevention and reduction. Therefore, the authorities have asked the Bank s support to develop core and a performance based management system in DRM and to acquire needed equipment. This restructuring is proposed as a first response to this request. In the next few months, an additional financing will be prepared to provide further technical and financial support to the Government in this area. A large Development Policy Loan to the state (Rio de Janeiro Metropolitan Urban and Housing DPL), which is at an advanced stage of preparation, will also provide support to disaster prevention, response and mitigation in the state. The ultimate goal is to have functioning core DRM and capacity built to prevent and reduce disasters. PROJECT STATUS 10. The Public Sector Modernization Project, also known as PRÓ-GESTÃO, is a Technical Assistance Loan (TAL) in the amount of US$ million, aimed at providing critical support to the Government s reform program, which is also supported through a Development Policy Loan of US$485 million (Fiscal Sustainability, Human Development and Competitiveness DPL). The project s objective is to support the GORJ to introduce performance-based management and information technologies to drive service delivery improvements in key public services, including secondary education and hospital care. 11. The ongoing loan, in the total amount of US$ million, became effective on December 27, Since then, the GORJ has already published the project s general procurement notice and two requests for expression of interest for activities in a total amount of US$4.1 million. Several of the terms of reference for the project s activities are being finalized and additional procurement process will start soon. Overall, the implementing team is very committed and prepared to conduct the project s activities and implementation progress can be rated as satisfactory. PROPOSED CHANGES 12. This restructuring aims to introduce new activities under Component 1 of the project, therefore reallocating funds amongst project components, as requested by the GORJ. Moreover, an additional intermediate outcome indicator will be added to measure the effect of the new activities. No changes are being proposed to the original Project Development Objectives, or to any other aspect of the project. Finally, no changes to the legal agreement are required. 13. Changes to Project Components. Currently, component 1 has a total allocation of US$7.65 million to support core government and management tools for improved performance and efficiency. With the proposed restructuring, activities to 9

8 improve the performance of the disaster risk prevention system would be included in this component, leading to a reallocation of US$4.22 million from components 2 and 3 to component 1. Table 2 below presents the proposed reallocation. Table 2: Proposed Reallocation of TAL financial resources to project components Components/Activities Current Proposed US$ millions US$ millions 1. Core Government Systems and Management Tools for Improved Performance and Efficiency Design and Application of Public Sector Performance Indicators 1.2 Real Estate Property Management Management Information System for Social Security Strengthening Education Management Capacity, Teacher Instructional Practice and Incentives for School Effectiveness Building SEEDUC Technical Capacity for Studies and Evidence-based Policy 2.2 School-level Performance Targets for State Schools 2.3 Developing Casa do Educador as an Effective In-Service Teacher Training Network Health Management and Information Systems 3.1 Accreditation System for UPAs Cost-Accounting Methodology for UPAs and Hospitals 3.3 Information System for Health Supply Chain Management 3.4 Evaluation of Financial Incentive Programs for Municipalities Operating Costs Price Contingencies Front-end Fee Total The current system for disaster risk prevention in place in the State of Rio de Janeiro is based on insufficient data and involves several agencies under different secretariats. The storm-tracking system uses two levels of data. Potential storms are identified through satellite imagery and ground data (network of pluviometers). The images do not have resolution to determine the intensity of the storm, precise location and the frequency of new images is not suitable to define speed and the direction of a 10

9 moving storm. The pluviometers provide accurate data but once the rain has already started. Meanwhile, the meteorological and hydrological data is managed by INEA under the Secretariat of Environment; while the Civil Defense is under the Secretariat of Health and the geological agency is under the Secretariat of Economic Development. 15. The activities to be support by this project aims at significantly improving the early warning system through the use of meteorological radar. This hardware will enable the tracking of storms (volume, speed and direction) before it reaches potentially risky areas. In addition, the project will support a study to model the hydrological disaster warning system including basic protocols to be used by state and municipalities. This modeling will be complemented by a study to identify the best institutional arrangement at the state level to ensure synergies among different agencies avoiding overlaps and improving response time. 16. While the ultimate goal of the newly proposed activities would be to prevent and reduce the negative effects from disasters, these activities also contribute to improving critical service delivery and strengthening public financial management by the state. 17. Results and indicators. In order to measure the effects of the new activities under component 1, a new indicator will be added to the project s results framework, as shown in Annex 1. The indicator will measure the time to release warning before the hydrological event occurs. It is expected that, as a result of the new activities, the time will increase from 1 to 5 hours by the end of project implementation. APPRAISAL SUMMARY 18. Economic and financial analysis. As mentioned above, recent literature on natural disasters and risk prevention suggests that effective prevention pays, since posdisaster spending on relief and reconstruction is higher and more volatile than prespending. Literature from the United Nations has demonstrated that expenditures in postdisaster activities may be up to seven times higher than prevention costs. By supporting the establishment of improved disaster risk prevention and management practices in the state, the newly proposed activities are expected to bring positive social and economic gains to the state population, especially to the most vulnerable groups. Moreover, a reduction in reconstruction expenditures is expected over time, as adequate measures are identified and taken to prevent the negative impacts currently observed. 19. Technical. The GORJ s capacity in the area of disaster risk prevention and management is heterogeneous as mentioned above; however, the new activities proposed will provide the support to fill the capacity gap in this area. The Bank team has provided support to the government in identifying the priority actions to be taken in the short and medium term and individual consultants with the required technical expertise have been hired by the government to assist in developing technical specifications of the equipment to be acquired. 11

10 20. Safeguards. The proposed new activities do not trigger any changes to the Project s original safeguards classification. Therefore, the project will continue to trigger only the safeguard policy OP 4.01 and its environmental classification will remains as Category C. 21. Risk. The overall risk rating for the project is Moderate. Additional risks have been identified related to the new proposed activities and are presented in Table 3 with the proposed mitigation measures. Table 3: Additional Project Risks and Mitigation Measures Description of Risk Mitigating Actions Risk rating with mitigation measures Insufficient coordination amongst government agencies involved in DRM in the State of Rio (Federal, State and Municipal) Technical and capacity difficulties delay or prevent the proper installation and operation of the radars Difficulties in managing expectations that the alert system will be fully operational and able to assist in disaster prevention in the short term. It will take over 18 months for the system to be become operational. In case of continued adverse natural disaster occurrence while the system is being installed, people may not be satisfied with the GORJ s response. While effective prevention and reduction of disaster risk requires coordination across government levels, the new activities supported by the project are under the responsibility of the state government. Nonetheless, in light of the recent disasters in the state, coordination efforts are expected to be supported by all levels of government. Finally, the Rio de Janeiro Metropolitan Urban and Housing DPL supports measures to incentive coordination between state and municipal governments. The installation and initial operation of the radars is complex and several pre-requisites have been identified. Responsibility over each activity is being clearly defined. The bidding documents are being carefully prepared as to anticipate critical steps that may be delegated to the provider of the radars, including support for initial operation. The GORJ has recognized the severity of the challenges regarding disaster risk management and is undertaking actions to address them proactively and systematically, including through this operation. A communication strategy that clearly explains the time needed for the alert system to be fully operational will be developed to leverage expectations. M L L 12

11 ANNEX 1: Results Framework and Monitoring BRAZIL: RIO DE JANEIRO RENOVATING AND STRENGTHENING PUBLIC MANAGEMENT Project Development Objective (PDO): Introduce performance-based management and information technologies to drive service delivery improvements in key public services, including secondary education and hospital care. D=Dropped Cumulative Target Values C=Continue PDO Level Results Indicators N= New Unit of Data Source/ Responsibility for Baseline Frequency R=Revised Measure YR 1 YR 2 YR 3 YR4 Methodology Data Collection Core Real Property Management: Average time (working days) to produce property appraisal RioPrevidência average elapsed time (days) to collect Social Security employment tax debts C working days 65 (2009) Semi-annual Subsec. for Real Property C days Semi-annual RioPrevidência RioPrevidência permanent C Semi-annual RioPrevidência personnel 5 Schools with critical IDEB C schools 372 scores (2.9 or lower) 6 (2009 IDEB results) Secondary school completion C Completi rate 7 on rate 33.4 (2008) n/a 300 (2011 IDEB results) n/a 37% (2010) n/a 200 (2013 IDEB results) 41% (2011) Bi-annual IDEB results Prova Brasil exam and student flow data 45% (2012) Annual Annual school census SEPLAG (Subsecretariat for Real Property) RioPrevidência RioPrevidência Ministry of Education (MEC) SEEDUC 5 These staff reductions will occur through attrition as efficiency gains negate the need to replace personnel who retire or otherwise willingly leave RioPrevidência. There is to be no Voluntary Retirement Scheme or dismissals. 6 The IDEB is a composite index developed by the Ministry of Education (MEC) that incorporates average student learning outcomes in math and Portuguese in the 6th, 9th and 12th grades of basic education (as measured on the bi-annual national Prova Brazil exam) and the promotion rate for students across all grades in the system. The IDEB is scaled to produce scores from 1-10, with 10 being highest. MEC produces an IDEB score for each state and municipal education system every 2 years. The national average score in 2009 for early years of fundamental education was 4.6, late years of fundamental education was 4.0, and secondary education scored 3.6. Scores for schools or school of 2.9 or lower are considered critical. 7 The completion rate is defined as the number of students graduating from secondary school in year t divided by the total number of enrolled students of year t-2.

12 UPAs with at least ten treatment protocols adopted by health care staff Waiting time for UPA patients with green risk classification (TERV) C Semi-annual SESDEC evaluation C 59.6 minutes 8 58 minutes 56 minutes 54 minutes INTERMEDIATE RESULTS 52 minutes Annual KLINIKOS IT System 9, used by the SESDEC in UPAs. SESDEC SESDEC Superintendent of Information Technology Intermediate Results (Component One): 1. Performance targets used as a management tool between government policy makers ( principals ) and line managers ( agents ) 2. Management information contribute to increased efficiency and responsiveness Revised Intermediate Results (Component One): na. Results Agreements between the Governor and line departments or other government bodies Real Property Management: Responses provided to requests from public bodies concerning the availability for use of a GORJ property 10 RioPrevidência: Average number of working days to prepare and deliver information demanded for judicial proceedings RioPrevidência: Average elapsed time (working days) to transfer financial data to SIAFEM-RJ (Sistema Integrado de Administração Financeira para Estados e Municípios) C Semi-annual Governor s office/ SEPLAG C 8.3% (2009; N=60 per month) 9% 9% 50% 90% Semi-annual Subsecretariat for Real Property C Semi-annual RioPrevidência SEPLAG SEPLAG (Subsecretariat for Real Property) RioPrevidência C Semi-annual SIAFEM-RJ RioPrevidência 8 Baseline is the 2009 annual average calculated from data collected daily by electronic records in 11 UPAs. 9 Data collection begins with UPA patient registration at the host system KLINIKOS. The outputs from one process (e.g., registration) are inputs of subsequent processes (e.g., risk classification). The information obtained serves as input to all subsequent processes to arrive at time elapsed during medical care. The KLINIKOS IT system records the time that each process starts and ends as well as the professional who recorded the information. 10 Note: A response may be based on imprecise information, but we don t have enough information to answer your question is not counted here as a response. 14

13 Time to release warning before the hydrological (floods) event occurs Intermediate Results (Component Two): 1. Increased information and accountability for learning results at the school level 2. Strengthened teacher capacity to drive learning improvements in the classroom Revised Intermediate Results (Component Two): NA. Schools that use SAERJ results in school-level Improvement Plans Schools with annual targets for learning improvement established with SEEDUC Casa do Educador: a) website downloads (e.g., sample lesson plans) b) teachers who have taken an online training course c) teachers who have taken a faceto-face course N hours Annual INEA Time of Flood Alert from hydrological and meteorological network and monitoring system C Annual SEEDUC C Annual SEEDUC C a: 0 b: 0 c: 0 a: 0 b: 0 c: 50 a: 100 b: 20 c: 100 Intermediate Results (Component Three): 1. Increased attention to the quality of health services delivery 2. Data available for evidence-based decision making to improve the cost efficiency of healthcare services Revised Intermediate Results (Component Three): NA. a: 200 b: 50 c: 400 a: 500 b: 300 c: 800 Semi-annual Casa do Educador Web server statistics and data INEA SEEDUC SEEDUC SEEDUC UPAs with completed quality accreditation by Joint Commission Methodology (Number of UPAs in 2009=22) UPAs reporting the full cost of medical services by Cost Center in their Annual Reports (also reported on SESDEC website) C Annual Quality Accrediation teams C Annual SESDEC SESDEC SESDEC 15

14 16

Project Name. Region Sector

Project Name. Region Sector Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Governance Global Practice IBRD/IDA Technical Assistance Loan FY 2011 Seq No: 12 ARCHIVED on 04-Mar-2016 ISR22690 Implementing Agencies:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SECOND STATE PENSION REFORM TECHNICAL ASSISTANCE LOAN PARSEP II. January 10, 2007 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SECOND STATE PENSION REFORM TECHNICAL ASSISTANCE LOAN PARSEP II. January 10, 2007 TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING

More information

The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT

The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: ICR00004283 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT ON A LOAN IN THE AMOUNT OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,719,682.50

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,719,682.50 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021067 Public Disclosure Authorized Public Disclosure Authorized Project ID P106768 Country Brazil Project

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities National Disaster Risk Management Fund (RRP PAK 50316) SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) A. Sector Road Map 1. Sector Performance, Problems, and Opportunities a. Performance

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6188 Operation Name

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 08-Nov-2016

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-7827-BR) ON A LOAN IN THE AMOUNT OF US$485 MILLION TO THE STATE OF RIO DE JANEIRO, BRAZIL

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-7827-BR) ON A LOAN IN THE AMOUNT OF US$485 MILLION TO THE STATE OF RIO DE JANEIRO, BRAZIL Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001836 IMPLEMENTATION COMPLETION AND RESULTS

More information

Disaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster

Disaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster Belize benefits from knowledge and experiences from the PPCR Disaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster Photo Credit: http://gov.vc

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER Report No: 72292-BR Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL) Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18226 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social Protection Unit South East/South AFTSE Africa Region Document of The World Bank

More information

PRODUCTIVE SECTOR MANUFACTURING PDNA GUIDELINES VOLUME B

PRODUCTIVE SECTOR MANUFACTURING PDNA GUIDELINES VOLUME B PRODUCTIVE SECTOR MANUFACTURING PDNA GUIDELINES VOLUME B 2 MANUFACTURE CONTENTS n INTRODUCTION 4 n ASSESSMENT PROCESS 5 n PRE-DISASTER SITUATION 6 n FIELD VISITS FOR POST-DISASTER DATA COLLECTION 6 n ESTIMATING

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Implementation Status & Results Brazil Fiscal Sustainability, Human Development and Competitiveness DPL (P117244)

Implementation Status & Results Brazil Fiscal Sustainability, Human Development and Competitiveness DPL (P117244) Public Disclosure Authorized Public Disclosure Authorized The World Bank Project Name: Implementation Status & Results Brazil Fiscal Sustainability, Human Development and Competitiveness DPL (P117244)

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 STATE OF RIO GRANDE DO SUL, BRAZIL

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 STATE OF RIO GRANDE DO SUL, BRAZIL Public Disclosure Authorized The World Bank REPORT NO.: RES29864 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 TO

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EMERGENCY BRIDGE RECONSTRUCTION & VULNERABILITY REDUCTION PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EMERGENCY BRIDGE RECONSTRUCTION & VULNERABILITY REDUCTION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

1. Basic Project Data

1. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATEDSAFEGUARDSDATASHEET APPRAISAL STAGE Date ISDS Prepared/Updated: December 20,

More information

Date Posted : 07/09/2014. Actual Project Name : Rio de Janeiro Metropolitan Urban And Housing Development L/C Number: US$M):

Date Posted : 07/09/2014. Actual Project Name : Rio de Janeiro Metropolitan Urban And Housing Development L/C Number: US$M): Public Disclosure Authorized IEG 1. Project Data : ICR Review Independent Evaluation Group Date Posted : 07/09/2014 Report Number : ICRR14377 Public Disclosure Authorized Public Disclosure Authorized Public

More information

6 Report No.: JSDSC1361 1

6 Report No.: JSDSC1361 1 Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE 6 Report No.: JSDSC1361 1,2 Date ISDS Prepared/Updated: 05-Nov-2015 Date ISDS Approved/Disclosed: 06-Nov-2015 Public Disclosure

More information

PROGRAM OF INDICATORS OF DISASTER RISK AND RISK MANAGEMENT IN THE AMERICAS. Review and Update. Omar D. Cardona

PROGRAM OF INDICATORS OF DISASTER RISK AND RISK MANAGEMENT IN THE AMERICAS. Review and Update. Omar D. Cardona PROGRAM OF INDICATORS OF DISASTER RISK AND RISK MANAGEMENT IN THE AMERICAS Review and Update Omar D. Cardona IRDR SC Member National University of Colombia ERN Evaluación de Riesgos Naturales - América

More information

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL

More information

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)

The World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED

More information

Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29

Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29 Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29 F. IMMEDIATE AND MEDIUM TERM RECOVERY STRATEGY Implementation Approach 75. One of the main challenges of developing a comprehensive, as

More information

Suggested elements for the post-2015 framework for disaster risk reduction

Suggested elements for the post-2015 framework for disaster risk reduction United Nations General Assembly Distr.: General 16 June 2014 A/CONF.224/PC(I)/6 Original: English Third United Nations World Conference on Disaster Risk Reduction Preparatory Committee First session Geneva,

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

CARIBBEAN DEVELOPMENT BANK SUPPORT FOR HAITI TO MEET COMMITMENT TO CARIBBEAN CATASTROPHE RISK INSURANCE FACILITY FOR THE HURRICANE SEASON

CARIBBEAN DEVELOPMENT BANK SUPPORT FOR HAITI TO MEET COMMITMENT TO CARIBBEAN CATASTROPHE RISK INSURANCE FACILITY FOR THE HURRICANE SEASON PUBLIC DISCLOSURE AUTHORISED CARIBBEAN DEVELOPMENT BANK SUPPORT FOR HAITI TO MEET COMMITMENT TO CARIBBEAN CATASTROPHE RISK INSURANCE FACILITY FOR THE 2017-2018 HURRICANE SEASON This Document is being made

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020620 Public Disclosure Authorized Public Disclosure Authorized Operation ID P147166 Country Haiti

More information

Binjai, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Binjai, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Binjai, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)

The World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MOZAMBIQUE - ARTISANAL FISHERIES AND CLIMATE CHANGE APPROVED ON MARCH

More information

Sustainable Recovery and Reconstruction Framework (SURRF)

Sustainable Recovery and Reconstruction Framework (SURRF) Sustainable Recovery and Reconstruction Framework (SURRF) Saroj Kumar Jha Program Manager Global Facility for Disaster Reduction and Recovery The World Bank Group, Washington DC 1 The definitional challenge

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Effective Disaster Risk Management for Sustainable Development

Effective Disaster Risk Management for Sustainable Development Effective Disaster Risk Management for Sustainable Development Catastrophe Risk Insurance: Key Challenges and Opportunities - Project Dissemination Workshop Sofia, Bulgaria, May 27, 2008 Margaret Arnold,

More information

STATE OF RIO DE JANEIRO

STATE OF RIO DE JANEIRO Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7773-BR Public Disclosure Authorized Loan Agreement (Rio de Janeiro Sustainable Rural Development Project Projeto de Desenvolvimento Rural Sustentável

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE <October 4, 2013> Report No.: 86550

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE <October 4, 2013> Report No.: 86550 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Operation Name PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report

More information

Service Delivery and Fiscal Management DPL Region

Service Delivery and Fiscal Management DPL Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE December 4, 2014 Report No.: 93412 (The

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417 PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No: PIDA1417 Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project ID Borrower(s)

More information

SISRI Knowledge Notes. The Small Island States Resilience Initiative (SISRI) OVERVIEW NOTE: #1 FOCUS: PROGRAM OVERVIEW OVERVIEW: NOTE: #1

SISRI Knowledge Notes. The Small Island States Resilience Initiative (SISRI) OVERVIEW NOTE: #1 FOCUS: PROGRAM OVERVIEW OVERVIEW: NOTE: #1 SISRI Knowledge Notes A series highlighting good practices in climate and disaster resilience in Small Island States The Small Island States Resilience Initiative (SISRI) Tom Perry/World Bank NOTE: #1

More information

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)

The World Bank Kabul Urban Transport Efficiency Improvement Project (P131864) Public Disclosure Authorized SOUTH ASIA Afghanistan Transport & Digital Development Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 09-Feb-2018

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Transport Global Practice IBRD/IDA Development Policy Lending FY 2014 Seq No: 3 ARCHIVED on 02-Jan-2015 ISR17516 Implementing Agencies: Public

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020321 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project ID P107840 Country Macedonia, former

More information

Rationalle for the Sendai Framework for DRR Evidence from the 2009, 2011 and 2013 Global Assessment Report on DRR

Rationalle for the Sendai Framework for DRR Evidence from the 2009, 2011 and 2013 Global Assessment Report on DRR Rationalle for the Sendai Framework for DRR Evidence from the 2009, 2011 and 2013 Global Assessment Report on DRR Good progress in Hyogo Framework for Action (HFA) implementation has been made, but more

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES19910 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723

More information

Sendai Cooperation Initiative for Disaster Risk Reduction

Sendai Cooperation Initiative for Disaster Risk Reduction Sendai Cooperation Initiative for Disaster Risk Reduction March 14, 2015 Disasters are a threat to which human being has long been exposed. A disaster deprives people of their lives instantly and afflicts

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sustainable Development Department Southeast Asia Country Management Unit East Asia and

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Project Information Document Report No. PID8416 Turkey-Marmara Earthquake

More information

REPUBLIC OF BULGARIA

REPUBLIC OF BULGARIA REPUBLIC OF BULGARIA DISASTER RISK REDUCTION STRATEGY INTRUDUCTION Republic of Bulgaria often has been affected by natural or man-made disasters, whose social and economic consequences cause significant

More information

PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B

PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B 2 COMMERCE CONTENTS n INTRODUCTION 2 n ASSESSMENT PROCESS 3 n PRE-DISASTER SITUATION 4 n FIELD VISITS FOR POST-DISASTER DATA COLLECTION 5 n ESTIMATION

More information

Introduction to the Disaster Risk Profile of Chittagong

Introduction to the Disaster Risk Profile of Chittagong Introduction to the Disaster Risk Profile of Chittagong subir Das Focal Person Youth Issue Young Power in Social Action (YPSA) Cell: +01716692292 Email: subir18bd@yahoo.com Chittagong at a Glance 2nd largest

More information

Pidie Jaya, Indonesia

Pidie Jaya, Indonesia Pidie Jaya, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GUINEA: EDUCATION FOR

More information

Palu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Palu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Palu, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA

A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA McLuckie D. For the National Flood Risk Advisory Group duncan.mcluckie@environment.nsw.gov.au Introduction Flooding is a natural phenomenon

More information

Barito Kuala, Indonesia

Barito Kuala, Indonesia Barito Kuala, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support

More information

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Background Context Draft Terms of Reference Mozambique Climate Change Technical Assistance

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESETTLEMENT POLICY FRAMEWORK HURRICANE TOMAS EMERGENCY RECOVERY PROJECT Saint Lucia

More information

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda Validation Report Reference Number: PVR-471 Project Number: 47337-001 Loan Number: 3080 December 2016 Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda Independent Evaluation

More information

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

The Bank s Emergency Policy

The Bank s Emergency Policy The Bank s Emergency Policy 04/10/2006 1 Emergency Recovery Assistance OP 8.50 Bank emergency assistance may take the form of (a) immediate support in assessing the emergency's impact and developing a

More information

Sint Maarten National Recovery and Resilience Plan A Roadmap to Building Back Better

Sint Maarten National Recovery and Resilience Plan A Roadmap to Building Back Better Sint Maarten National Recovery and Resilience Plan A Roadmap to Building Back Better EXECUTIVE BRIEF 2 Executive Brief Background Sint Maarten and Saint Martin 1 Saint Martin Sint Maarten Copyright 2018

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC695 Project Name DO

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.108 Issued August 18, 2017 Effective August 18, 2017 Retired November 9, 2017

More information

C o p e r n i c u s E m e r g e n c y M a n a g e m e n t S e r v i c e f o r R i s k p l a n n i n g a n d R e c o v e r y

C o p e r n i c u s E m e r g e n c y M a n a g e m e n t S e r v i c e f o r R i s k p l a n n i n g a n d R e c o v e r y C o p e r n i c u s E m e r g e n c y M a n a g e m e n t S e r v i c e f o r R i s k p l a n n i n g a n d R e c o v e r y Copernicus Service Copernicus EU Copernicus EU Copernicus EU www.copernicus.eu

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Second Disaster Risk Management Development Policy Loan with a CAT-DDO Region

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Second Disaster Risk Management Development Policy Loan with a CAT-DDO Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Operation Name Second Disaster

More information

Kyrgyz Republic. Measuring Seismic Risk {P149630} Public Disclosure Authorized. Report No: AUS Public Disclosure Authorized.

Kyrgyz Republic. Measuring Seismic Risk {P149630} Public Disclosure Authorized. Report No: AUS Public Disclosure Authorized. Public Disclosure Authorized Report No: AUS0000061 Kyrgyz Republic Public Disclosure Authorized Public Disclosure Authorized Measuring Seismic Risk {P149630} {December, 2017} URS Public Disclosure Authorized

More information

Sharm El Sheikh Declaration on Disaster Risk Reduction. 16 September Adopted at the Second Arab Conference on Disaster Risk Reduction

Sharm El Sheikh Declaration on Disaster Risk Reduction. 16 September Adopted at the Second Arab Conference on Disaster Risk Reduction Sharm El Sheikh Declaration on Disaster Risk Reduction 16 September 2014 Adopted at the Second Arab Conference on Disaster Risk Reduction City of Sharm El Sheikh, Arab Republic of Egypt, 14 16 September

More information

COMMISSION OF THE EUROPEAN COMMUNITIES

COMMISSION OF THE EUROPEAN COMMUNITIES EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 23.2.2009 COM(2009) 82 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE

More information

OECS Disaster Vulnerability and Climate Risk Reduction Program Region. Latin America and the Caribbean Country

OECS Disaster Vulnerability and Climate Risk Reduction Program Region. Latin America and the Caribbean Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6619 OECS

More information

Policy Implementation for Enhancing Community. Resilience in Malawi

Policy Implementation for Enhancing Community. Resilience in Malawi Volume 10 Issue 1 May 2014 Status of Policy Implementation for Enhancing Community Resilience in Malawi Policy Brief ECRP and DISCOVER Disclaimer This policy brief has been financed by United Kingdom (UK)

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PY Energy Sector Strengthening

More information

Public Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris

Public Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I - Basic Information Date ISDS Prepared/Updated:

More information

Disaster Risk Reduction and Financing in the Pacific A Catastrophe Risk Information Platform Improves Planning and Preparedness

Disaster Risk Reduction and Financing in the Pacific A Catastrophe Risk Information Platform Improves Planning and Preparedness Disaster Risk Reduction and Financing in the Pacific A Catastrophe Risk Information Platform Improves Planning and Preparedness Synopsis The Pacific Islands Countries (PICs) 1, with a combined population

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Jan-2013

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Operation Name Region Country Sector PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE

More information

Central government administration (80%); Sub-national government administration (20%) Operation ID

Central government administration (80%); Sub-national government administration (20%) Operation ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE 31 March 2016 Report No.: AB7818 (The

More information

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2224 BR. Public Disclosure Authorized. (Third Feeder Roads Project)

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2224 BR. Public Disclosure Authorized. (Third Feeder Roads Project) Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2224 BR Public Disclosure Authorized Project Agreement (Third Feeder Roads Project) Public Disclosure Authorized between INTERNATIONAL BANK FOR RECONSTRUCTION

More information

Submission by State of Palestine. Thursday, January 11, To: UNFCCC / WIMLD_CCI

Submission by State of Palestine. Thursday, January 11, To: UNFCCC / WIMLD_CCI Submission by State of Palestine Thursday, January 11, 2018 To: UNFCCC / WIMLD_CCI Type and Nature of Actions to address Loss & Damage for which finance is required Dead line for submission 15 February

More information

FINAL CONSULTATION DOCUMENT May CONCEPT NOTE Shaping the InsuResilience Global Partnership

FINAL CONSULTATION DOCUMENT May CONCEPT NOTE Shaping the InsuResilience Global Partnership FINAL CONSULTATION DOCUMENT May 2018 CONCEPT NOTE Shaping the InsuResilience Global Partnership 1 Contents Executive Summary... 3 1. The case for the InsuResilience Global Partnership... 5 2. Vision and

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF ENERGY

More information

Project development objective/outcomes

Project development objective/outcomes Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799

More information

US$M): US$M): (US$M. Cofinancing (US$M US$M):

US$M): US$M): (US$M. Cofinancing (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14162 1. Project Data: Date Posted : 05/20/2014 Public Disclosure Authorized Public Disclosure Authorized Public

More information

The World Bank NEITI Reporting Compliance (P162344)

The World Bank NEITI Reporting Compliance (P162344) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NEITI REPORTING COMPLIANCE APPROVED ON DECEMBER 7, 2016 TO FEDERAL MINISTRY

More information

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY DOCUMENT OF THE WORLD BANK REPORT NO.: RES29941 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 TO TRANSPORT & ICT

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR

More information

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PUBLIC DISTRIBUTION PROJECT INFORMATION DOCUMENT (PID) Project Name Iraq: Emergency School

More information

Responding to Shocks through the Social Protection System: Opportunities for Sri Lanka

Responding to Shocks through the Social Protection System: Opportunities for Sri Lanka Responding to Shocks through the Social Protection System: Opportunities for Sri Lanka Paula Bulancea Deputy Representative H i g h - L e v e l C o n f e r e n c e C o l o m b o, 2 5 S e p t e m b e r

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2560 Project Name. Bahia Integrated Water Management Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2560 Project Name. Bahia Integrated Water Management Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2560 Project Name Bahia

More information